Executive Summary with CRZ Details
Total Page:16
File Type:pdf, Size:1020Kb
DETAIL INFORMATION OF THE PROPOSAL AFFECTED BY COASTAL REGULATION ZONE Surya Integrated Water Supply Scheme for Bulk Water Supply to Western Sub-Region of MMR Sr. Description Remark Page No. No. 1 Name of Applicant/P.A.- Holder Mumbai Metropolitan Region Development Authority Water Supply Resource Management Cell 2 Communication Address, Phone#, Mr R.P. Varhade, S.E. Fax and mobile# email ID** ( Mumbai Metropolitan Region Development Compulsory) Authority, ‘B’ Wing , Old Building 5th Floor, Bandra Kurla Complex, Bandra (E) Mumbai 400 052 Tel. 022 26597428 Mob: 9422213033 e-mail: [email protected] 3 a) CS No / CTS No & village Inlet at S.No. 37,38,21 village Kaman & outlet b) Land is vacant/Occupied at S. No. 90, 95 Juchundra Village, VVCMC c) Copy of CTS plan & property register 4 a) Area as per land Record b) Area under proposal 50 sq m each for shaft of tunnel on both sides of Kaman Creek with pipeline of 2.6 M diameter going under the water bed of length 268 Metres c) Status of the Land Free Hold Free hold/ Lease Hold d) Zoning Remarks Public 5 Development Plan status & copy Part Plan attached herewith of DP Sheet showing site under reference 6 1) Costal Regulation Zone as per Shaft of 50.Sq. M proposed in CRZ III area of CZMP Approved by MOEF vide Kaman Village on north side of creek & 50 sq. letter DT. 27/09/96 & plan M. in CRZ III area of Juchundra village in prepared by MOEF Authorised VVCMC on south coast of Kaman creek. The agency CESS length of pipeline in CRZ III area of VVCMC is 268 Metres 2) a) Landward Side of existing Landward side of Road in VVCMC area Road Surya Integrated Water Supply Scheme for Bulk Water Supply to Western Sub-Region of MMR Sr. Description Remark Page No. No. b) Seaward Side of existing road c) Distance of the Plot from 48 metres on Kaman village side in North & 35 HTL if it is in CRZ III metres on Juchundra village side in south in VVCMC d) Affected by Mangroves No Buffer Zone Yes/No 3) Copy of CZMP sheet showing CRZ Sheet Part Plan attached herewith site U/R 7 Proposal: a) Proposed/ Redevelopment / New construction Reconstruction / New Construction b) If Proposal is of other than new Construction then NA i) Use of existing structure as on dt. 19/02/1991 ii) FSI Consumed iii) Existing Height c) Proposed Use Laying of water pipeline for transport of water from Kawadas Weir to Ghodbunder MBR for MBMC under Surya Regional Water Supply Scheme of MMRDA for Bulk water supplies to Western Sub-region of MMR d) Is there change in the existing use ( Work existing as defined by MOEF vide letter dt. 08/09/1998 No Change 8 1) As per DCR- ( As on dt. 19/02/1991 F.S.I. Height 2) Proposal specific comment, if Creek crossings: laying of water pipeline any under the tidal Kaman creek by underwater pipeline about 2.60 m in diameter and about 268 m long. Surya Integrated Water Supply Scheme for Bulk Water Supply to Western Sub-Region of MMR Sr. Description Remark Page No. No. 3) Rule clause under which permission is requested by the applicant/ Authority (Copy of DC Rule which was in effect on dt. 19/01/1991 to be enclosed) a) Proposed activity is permissible / Non-permissible as per DC Rule as on dt. 19/02/1991 9 Project investment ( As per ready reckoner/ conveyance deed report Rs 45 Crores cost for Kaman Creek crossing from registered valuer) Land / Land cost ( as per last sale deed / property card) Construction Cost 10 1) Remarks from CRZ point of Proposed Land site is in CRZ III view in case if the proposed Creek crossings: laying of water pipeline development on seaward side of under the tidal Kaman creek by underwater existing road pipeline about 2.60 m in diameter and about 268 m long. 2) As per detail explanation give by MOEF vide letter dt 08/09/1998 ( Imaginary Line) 3) Copy of Plan (showing Imaginary line) duely signed by Plan is attached herewith concerned engineer of Authority/ ADTP 4) Details of the authorized structures adjoining / abutting the plot. Along with occupation certificate/ approved building plan 11 1) Heritage NOC if necessary No 2) NOC of Director of Archaeology No 3) NOC of High Rise committee if No necessary 12 Proposal details & layout plan Plan attached herewith 1. Executive Summary of the Project CHAPTER-1 EXECUTIVE SUMMARY 1.1 Background MMRDA has decided to take up water resources development projects and water supply systems to meet the growing demand of drinking water supply in the Region. The Project includes water supply scheme to bring water from Surya source in order to augment the water supply of western sub-region of MMR. The Surya dam is owned by the Irrigation Department of Govt. of Maharashtra and is situated at about 54 km beyond the boundary line of MMR on north side. Tailrace water released from the hydro power project at the base of the dam is available as a source for proposed 403 MLD Water Supply Scheme to be developed to augment the water supply of western sub-region of MMR. An integrated water supply scheme has to be designed and implemented to Supply Bulk Water to two ULBs, VVCMC & MBMC and MMRDA’s proposed Rental Housing projects in the same area. Water from Surya Reservoir will be released through power house located at the base of the Dam at Dhamni. Tailrace water of the power house flows further into the Kawadas Weir and will be used for the proposed water supply scheme. It is further necessary to lift this water, convey it to the location where it can be treated and further transported by appropriate system to the various ULB’s and groups of villages. The MMRDA has accorded an administrative approval for revised estimated cost of Rs. 1977.29 Crores towards expenditure of proposed 403 Mld Surya Integrated Water Supply Scheme. Government of Maharashtra has allocated 67.18 Mm3 of water in Surya project as per GR (Water Resources Department) dated 07.12.2011. 1.2 PROPOSED WATER SUPPLY SCHEME The western sub-region of MMR comprising VVCMC, MBMC & adjoining villages are facing shortage of water to the extent of 45%.MMRDA therefore proposed Surya Integrated Water Supply Scheme to meet shortage of water in sub-region. MMRDA will take all precautions to protect environment and project affected people as a single agency in execution of this project. If both MBMC and VVCMC were to bring water from this source separately, duplication of pipeline, Operation & Maintenance work and multiple agencies would have disturbed the environment to greater extent. The Service Area of Project – The western subregion of MMR comprises of VVCMC, MBMC, and adjoining villages. This scheme is to supply bulk water to – A. Mira – Bhyandar Municipal Corporation Area and 5 adjoining villages B. Vasai -Virar Municipal Corporation Area and 27 villages not included in corporation area Fig b: Proposed location plan Table 1. Proposed Allocation of Bulk Water Supply Sr.No Name Qty. allocated Vasai-Virar Municipal Corporation area including 49 Villages 1 merged in VVMC 170 MLD MMRDA’s proposed Rental Housing Project in Vasai– Virar 2 Sub-region 27 villages in Vasai - Virar Sub-region not merged in 3 15 MLD VVMC Mira – Bhayandar Municipal Corporation including MMRDA’s 4 special planning areas at Uttan and other 5 Villages 218 MLD MMRDA’s Proposed Rental Housing Project in Mira 5 – Bhayander Sub-region Total 403 MLD Surya Project area falls in Palghar (earlier Thane) District which forms a part of North Konkan Region which lies between the Sahyadri hills in the east and the Arabian Sea in the West. It has coastal line of about 113 Kms. It lies Between 18°42' and 20°20' North latitudes and 72°45' to 73°48' East longitudes in eastern part of the state Its East-West spread is maximum at the South which is about 100 Kms. MIRA-BHAYANDAR SUB REGION Mira-Bhayandar city is located on Northern boundary of Mumbai and on Western side of Mumbai-Ahmedabad National Highway (NH-8). The city includes two important towns i.e. Mira and Bhayandar. Fig d: Map shows expanse Mira-Bhayandar Sub-region. Mira Bhayandar Municipal Corporation (MBMC) is the civic body that governs the city and was established in the year 2002. Total area of the corporation limit is 89 sq. km. As per 2001 census, population of Mira-Bhayandar is 5.20 Lakhs and the population as per 2011 Census is 8.15 Lakhs. Thus the growth rate per annum 4.6%.Mira developed only in the East part, while the West part, on the other side of the railway line is covered with salt pans and mangroves. Mira Road (East) is a predominantly residential area. It is calm, quiet surroundings and low pollution is a boon for residents. Bhayandar is divided into two parts by the Mumbai suburban rail line – East and West. The West was traditionally residential, and the East was predominantly commercial and an industrial area. Recent population growth and a flurry of construction has blurred the boundaries between Bhayandar and neighbouring Mira on the East side of the rail tracks, turning it into a populous suburb. EXISTING WATER TO MIRA-BHAYANDAR IS AS FOLLOWS: • STEM (Shahad Temghar) : 86 MLd • MIDC : 5 MLd Mira Bhayander Municipal Corporation Mumbai metropolitan region covers an area of about 4350 Sq. Km. comprising of Municipal Corporation of greater Mumbai, 13 municipal town and 1500 villages with a 1970 census population of 7.793 million people.