Written Scheme of Investigation for An

Total Page:16

File Type:pdf, Size:1020Kb

Written Scheme of Investigation for An WRITTEN SCHEME OF INVESTIGATION FOR AN ARCHAEOLOGICAL WATCHING BRIEF AT ASTBURY HALL, BRIDGNORTH, SHROPSHIRE WV16 6AT Prepared for: Astbury Hall Operations Ltd Bratherton Park Design Consultants Planning Application Number: 18/05078/FUL Project No: 2859 22.01.21 Archaeology Wales Limited The Reading Room, Town Hall, Great Oak Street Llanidloes, Powys SY18 6BN Tel: +44 (0) 1686 440371 Email: [email protected] P ag e | 2 CONTENTS 1 Introduction and planning background 3 2 Site description 4 3 Archaeological and historical background 4 4 Objectives 5 5 Timetable 6 6 Fieldwork 6 7 Monitoring 10 8 Post fieldwork programme 10 9 Staff 13 10 Additional considerations 13 11 Community engagement 15 12 Insurance 16 13 Quality control 16 14 References 17 P ag e | 3 Summary This Written Scheme of Investigation (WSI) details a programme of archaeological watching brief to be undertaken by Archaeology Wales at the request of Bratherton Park Design Consultants. The work will be undertaken prior the commencement of ground works associated with the re-development of Astbury Hall Estate to include the installation of 135 holiday let lodges with raised decked areas; office reception lodge; car parking areas; footpaths/cyclepaths and roadways; installation of foul water treatment plants and refuse points (Valley Lodge Phase). All work will be undertaken in accordance with the standards and guidelines of the Chartered Institute for Archaeologists (2014). 1. Introduction and planning background 1.1. This WSI details the methodology for a programme of mitigation to be undertaken in association with the re-development of Astbury Hall Estate to include the installation of 135 holiday let lodges with raised decked areas; office reception lodge; car parking areas; footpaths/cycle paths and roadways; installation of foul water treatment plants and refuse points (Valley Lodge Phase) at Astbury Hall, Astbury, Bridgnorth, Shropshire WV16 6AT – NGR SO 72502 89593. Planning Application 18/05078/FUL. 1.2. This WSI has been prepared by Irene Garcia Rovira MCIfA, Project Manager, Archaeology Wales Ltd (henceforth - AW) at the request of Bratherton Park Design Consultants. It results from the Condition 24 of application 18/05078/FUL which states: No development approved by this permission shall commence until the applicant, or their agents or successors in title, has secured the implementation of a programme of archaeological work in accordance with a written scheme of investigation (WSI). This written scheme shall be approved in writing by the Planning Authority prior to the commencement of works. Reason: The site is known to hold archaeological interest. P ag e | 4 1.3. The methodology set out in this WSI has been agreed with Shropshire County Council Historic Environment Team (henceforth SCC-HET) in its capacity as archaeological advisors to the local planning authority. 1.4. All work will be undertaken to the standards and guidance set by the Chartered Institute for Archaeologists (2014). AW is a Registered Organisation with the CIfA. 2. Site Description 2.1. The proposed development site is located off the B4555, northeast of Chelmarsh, Shropshire approximately 3.5km south of Bridgnorth town centre. It covers 2.9 hectares. 2.2. The site is surrounded by a rural landscape with the settlements of Eardington and Chelmarsh adjacent to the north and south of the settlement. The site is located on the western bank of Mor Brook and immediately east from Upper Forge and Astbury Hall. A gold course is located south from the site. 2.3. The underlying geology is defined by Permian Rocks - sandstone and conglomerate – formed during the Permian Period. The superficial soils are characterised by Alluvium, with clay, silt and sand formed during the Quaternary Period (BGS 2021). 3. Archaeological and historic background 3.1. A detailed research concerning the historic and archaeological background of the area proposed for development can be found in the Historic Impact Assessment carried out by the Centre of Archaeology at Staffordshire University (see Mitchell 2018). P ag e | 5 3.2. While the results indicate the presence of human activity running back to prehistoric chronologies, the evidence is residual and not directly concerning the proposed site. It is worth noting however, the presence of Iron Age/Romano British enclosures at Chelmarsh and Eardington. The latter settlements are known to have been founded in medieval chronologies. 3.3. It is well-established that Eardington became a successful local industrial estate during post-medieval times, extracting mineral resources and using Mor Brook as a source of energy. Extraction activities in the area are most represented with the existence of former quarries most probably used to extract sand and gravel, as well as with factory buildings associated with extraction activities. Furthermore, the site is located within the setting of Astbury Hall and Estate. Industrial remains, and the remains of elements associated with the hall may therefore be revealed during groundworks. 4. Objectives 4.1. This WSI sets out a program of works to ensure that the watching brief will meet the standard required by The Chartered Institute for Archaeologist’s Standard and Guidance for Archaeological Watching Briefs (update 2020). 4.2. The objective of the watching brief will be: 4.2.1. to allow the investigation, recording and reporting of any archaeological features that are uncovered during the proposed groundworks within the application area, 4.2.2. to provide the opportunity, if needed, for the watching archaeologist to signal to all interested parties, before the destruction of the material in question, that an archaeological find has been made for which the resources allocated to the watching brief are not sufficient to support the treatment to a satisfactory or proper standard. P ag e | 6 4.3. A written report will be compiled following the fieldwork. Sufficient desk- top research will be undertaken to ensure that the results of this work are properly understood, interpreted and reported. 4.4. The report will include a comprehensive assessment of the historic context within which the archaeological evidence rests and will aim to highlight any relevant research issues within regional, national and, if relevant, international research frameworks. 5. Timetable of works Fieldwork 5.1. The programme of mitigation will be undertaken prior ground works associated with the proposed development. Archaeology Wales will update SCC-HET with the exact date. Report delivery 5.2. The report will be submitted to Astbury Hall Operations Ltd, Bratherton Park Design Consultants and to SCC-HET within three months of the completion of the fieldwork. A copy of the report will also be sent to the regional HER. 6. Fieldwork 6.1. The work will be undertaken to meet the standard required by The Chartered Institute for Archaeologist’s Standard and Guidance for Watching Briefs (update 2020). 6.2. The Watching Brief will be carried out by a suitably qualified archaeologist on all groundworks associated with the development that could disturb sub-surface deposits containing potential archaeological material. The mechanical excavation will always be undertaken by a tracked 360-degree excavator using a toothless ditching bucket. P ag e | 7 6.3. The site archaeologist undertaking the watching brief will be afforded the required access by the main contractor in order to observe and where necessary to record any archaeological remains revealed. Groundwork will not be undertaken without the presence of the site archaeologist. The site archaeologist will record finds and less significant archaeological deposits and features without significant delay to the work program. 6.4. Any archaeological deposits or features encountered will be fenced off and highlighted to all contractors employed on the site. Once a meeting between the client, SCC-HET and AW has taken place, the features will be excavated at an appropriate sample rate. 6.5. To comply with professional guidelines, a contingency for a further limited period of uninterrupted access to each such areas and for a suitably sized team of further archaeologists to be employed should be provided. Contingency costs will be agreed in advance before any extension to the programme commences and will follow a site meeting between AW, the client and SCC-HET. Recording 6.6. Recording will be carried out using AW recording systems (pro-forma context sheets etc) using a continuous number sequence for all contexts. 6.7. Plans and sections will be drawn to a scale of 1:50, 1:20 and 1:10 as required and related to Ordnance Survey datum and published boundaries where appropriate. 6.8. All features identified will be tied into the OS survey grid and fixed to local topographical boundaries. 6.9. Photographs will be taken in digital format with an appropriate scale, using a 12MP camera with photographs stored in Tiff format. Finds P ag e | 8 6.10. The professional standards set in the Chartered Institute for Archaeologists’ Standard and guidance for the collection, documentation, conservation and research of archaeological (2014) will form the basis of finds collection, processing and recording. 6.11. All manner of finds regardless of category and date will be retained. 6.12. Finds recovered that are regarded as Treasure under The Treasure Act 1996 will be reported to HM Coroner for the local area. 6.13. Any finds which are considered to be in need of immediate conservation will be referred to a UKIC qualified conservator (normally Phil Parkes at Cardiff University). Environmental sampling strategy 6.14. Deposits with a significant potential for the preservation of palaeoenvironmental material will be sampled, by means of the most appropriate method (bulk, column etc). Where sampling will provide a significant contribution to the understanding of the site AW will draw up a site-specific sampling strategy alongside a specialist environmental archaeologist. All environmental sampling and recording and will follow English Heritage’s Guidelines for Environmental Archaeology (2nd Edition 2011).
Recommended publications
  • 125 Bus Time Schedule & Line Route
    125 bus time schedule & line map 125 Stourbridge - Kidderminster - Bewdley - Bridgnorth View In Website Mode The 125 bus line (Stourbridge - Kidderminster - Bewdley - Bridgnorth) has 5 routes. For regular weekdays, their operation hours are: (1) High Town: 7:27 AM - 5:20 PM (2) Kidderminster: 6:05 PM (3) Kidderminster: 6:25 PM (4) Stanmore: 6:30 AM (5) Stourbridge: 7:24 AM - 4:45 PM Use the Moovit App to ƒnd the closest 125 bus station near you and ƒnd out when is the next 125 bus arriving. Direction: High Town 125 bus Time Schedule 53 stops High Town Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 7:27 AM - 5:20 PM Stourbridge Interchange, Stourbridge Foster Street East, Birmingham/Wolverhampton/Walsall/Dudley Tuesday 7:27 AM - 5:20 PM Union St, Stourbridge Wednesday 7:27 AM - 5:20 PM The Plough & Harrow, Oldswinford Thursday 7:27 AM - 5:20 PM 104 Heath Lane, Birmingham/Wolverhampton/Walsall/Dudley Friday 7:27 AM - 5:20 PM Mary Stevens Park, Norton Saturday 7:37 AM - 5:20 PM A451, Birmingham/Wolverhampton/Walsall/Dudley Stanley Rd, Norton Beech Rd, Norton 125 bus Info Norton Road, Birmingham/Wolverhampton/Walsall/Dudley Direction: High Town Stops: 53 Osmaston Rd, Norton Trip Duration: 88 min Line Summary: Stourbridge Interchange, Heath Drive, Broadwaters Stourbridge, Union St, Stourbridge, The Plough & Harrow, Oldswinford, Mary Stevens Park, Norton, Broadwaters Drive, Broadwaters Stanley Rd, Norton, Beech Rd, Norton, Osmaston Rd, Broadwaters Bridge, Kidderminster Norton, Heath Drive, Broadwaters, Broadwaters Drive,
    [Show full text]
  • Chelmarsh Parish Council
    Chelmarsh Parish Council Parish Council meeting held on Tuesday 27th November 2018 at 7.30pm in Chelmarsh Parish Hall. Present: Cllrs R Woods (Chairman), M Williams, P Thomas, R Bebb, A Davies, A Cadwallader, P Garrett. Clerk: Mrs F Morris Parishioners: 1 0. Parishioner’s time: A parishioner asked if any consideration had been given to compensate any parishioners if their property suffered damage as a result of the developments at Astbury, in particular along Ingram Lane, where damage has already been caused due to the development in Highley. The Developers should be asked to include recompense to householders along the route to repair any damage caused. It was suggested that before work commenced that photographs are taken as evidence. Concern was expressed that as the units are being transported in on large lorries from all directions then damage is likely. Chairman thanked the parishioner for his comments. 1. Apologies for absence: Cllr Tindall (holiday). It was RESOLVED to accept this apology. 2. Declaration of interests: The Localism Act 2011, Relevant Authorities (Disclosable Pecuniary Interests) Regulations 2012. Members are reminded that they are required to leave the room during the discussion and voting on matters in which they have a disclosable pecuniary interest, whether or not the interest is entered in the register of member’s interests maintained by the Monitoring Officer. None. 3. Minutes of last meeting held on 23rd October 2018: These had been circulated with the agenda and Clerk confirmed that a request to remove figures quoted for the Broadband had been made and this had been removed.
    [Show full text]
  • Place Plan for Bridgnorth & Surrounding Area
    Place Plan for Bridgnorth & surrounding area 2015-2016 CONTENTS 1. INTRODUCTION ............................................................................... 2 1.1 What is this document? ................................................................................. 2 1.2 What are Place Plans? .................................................................................. 2 1.3 How are the Place Plans used? .................................................................... 3 1.4 How are the Place Plans structured? ............................................................ 3 1.5 Place Plan links to planning and locality commissioning ............................... 3 2. COMMUNITY LED PLANNING IN BRIDGNORTH AREA ................. 6 2.1 Bridgnorth Place Plan Area ........................................................................... 6 2.2 Summary of community priorities within Bridgnorth Town ............................. 6 2.3 Summary of community priorities within the surrounding area ...................... 8 3. DEVELOPMENT AND ASSOCIATED INFRASTRUCTURE REQUIREMENTS ................................................................................. 11 3.1 Vision to guide development in the Bridgnorth Place Plan Area ................. 11 3.2 Associated Infrastructure Requirements ..................................................... 12 Bridgnorth Town – Development related infrastructure requirements .................. 14 Community Hubs – Development related infrastructure requirements ................. 23 Community Clusters
    [Show full text]
  • 11 March 2020 COVID-19 (Coronavirus)
    Team Bootcamp Ltd ​ ​ Eardington Manor Eardington Bridgnorth Shropshire United Kingdom WV16 5JZ t: +44 (0) 1746 762 550 e: [email protected] w: team-bootcamp.com 11 March 2020 COVID-19 (Coronavirus) Latest TEAM Bootcamp Update Dear Boot Camper, If you are receiving this letter, you are due to arrive at TEAM Bootcamp within the next 14 days. We would, therefore, like to update you regarding Covid-19 and your stay. Rest assured, we continue to operate as normal at TEAM and you should continue with your travel plans with the exception of the conditions listed below. We ask that you observe the following: 1. If you have travelled from a controlled country in the last 14 days it is essential that you call to postpone your boot camp stay until later in 2020 to avoid potentially bringing the virus to boot camp. A list of controlled countries can be found on the WHO website. ​ ​ As a precautionary measure: During your stay, you will be asked to take extra efforts to keep hands & high contact ​ areas clean. Cleaning staff have doubled the cleaning of door handles and high contact ​ areas. Travel Insurance: As always we advise all boot campers to ensure their travel insurance is up to date and valid for your own peace of mind. We will continue to monitor the situation and contact you as necessary. If you have any questions please contact your booking representative via [email protected] or call +44 (0) 1746 762 550. A more detailed update can be found on our website.
    [Show full text]
  • Eardington Manor SCHOOL LANE, EARDINGTON, BRIDGNORTH, WV16 5JZ
    Eardington Manor SCHOOL LANE, EARDINGTON, BRIDGNORTH, WV16 5JZ BERRIMAN EATON A BEAUTIFUL PRESENTED GRADE II LISTED GEORGIAN VILLAGE HOUSE eardington manor, school lane, eardington, bridgnorth, wv16 5jz A exquisite Georgian country manor u 4 reception rooms u kitchen u 6 first floor bedrooms (2 en suite) u further bathroom u 6 further bedrooms on the second floor u bathroom u 2 bedroom coach house u stables u outbuildings and swimming pool u gardens u walled kitchen garden u paddock u all in about 4.5 acres Bridgnorth - 1.1 miles Much Wenlock 10.2 miles Telford - 14.3 miles Wolverhampton - 16.0 miles Stourbridge - 16.4 miles Shrewsbury 23.3 miles Birmingham - 30.8 miles (All distances are approximate). Situation Eardington Manor is situated in the heart of the village of Eardington, approximately 1.5 miles south of the market town of Bridgnorth. There are excellent shopping and leisure facilities available in Bridgnorth and more extensively in Wolverhampton and Telford. The well renowned Astbury Golf Course, restaurant and hotel together with Severn Valley Railway are both close by within 2 miles. Fishing, situated at Chelmarsh, horse riding, walking and cycling along Route 45 are all available in the vicinity. There are a number of primary and secondary schools available in Bridgnorth and Wolverhampton. Private schooling includes Moffats at Kinlet, Wrekin College Wellington and Shrewsbury School. There are bus collection for the private schools. St Dominics Brewood (private school) also offer a bus service from Bridgnorth. More local, Bridgnorth Endowed School (previously Bridgnorth Grammar) also offers a bus service. Description Eardington Manor combines classical Georgian architecture with its elegance and finesse: a wealth of original features including decorative ceilings and cornices, architraves, sash windows and shutters: together with all the attributes required for modern day living.
    [Show full text]
  • Eardington Manor and Coach House, School Lane, Eardington
    Eardington Manor And Coach House, School Lane, Eardington, Bridgnorth, WV16 5JZ Eardington Manor And Coach House, School Lane, Eardington, Bridgnorth, WV16 5JZ REDUCED from £1,400,000 to £1,000,000. A stunning Georgian country manor having 6-12 bedrooms, detached Coach House, stables and outbuildings (with potential for development STP), walled kitchen garden and swimming pool in a village location near Bridgnorth. 1.5 Acres of gardens and further paddocks available by negotiation. Bridgnorth - 1.9 miles, Telford - 14.3 miles, Shrewsbury 23.3 miles, Wolverhampton - 16.0 miles, Stourbridge - 16.4 miles, Birmingham - 30.8 miles. LOCATION On the first floor there are six generous bedrooms with up to date bathroom fittings: (having two Within 1.5 miles of the historic market town of Bridgnorth, this quiet Shropshire village is bordered staircases), a master bedroom suite which leads to a large en-suite with wardrobes, guest by the River Severn and the vintage Severn Valley Steam Railway. Located just over a mile away is bedroom with en-suite, four further bedrooms with bathroom and separate WC. Second floor; Astbury Golf Course, restaurant and hotel. Fishing, sailing at Chelmarsh, horse riding, walking and From the landing through double doors, a hallway gives access to six further bedrooms and cycling along Route 45 are all other nearby activities. Bridgnorth offers a wide variety of schools, storeroom. shopping, cafes and services, including a hospital. The Coach House stands to the rear. The detached accommodation comprises: Kitchen, Living This most attractive Grade II listed period house has generous proportions and well stocked Room, Dining Room, two Bedrooms and Bathroom.
    [Show full text]
  • PROGRAMME: March - June 2018
    PROGRAMME: March - June 2018 MEETING POINTS Sunday Abbey Foregate car park (opposite The Abbey). 9.30 am. unless otherwise stated in programme. Tuesday Car park behind Harvester Beaten Track PH, Old Potts Way. 9.30 am. unless otherwise stated in programme. Thursday Car park behind Harvester Beaten Track PH, Old Potts Way. 9.30 am. unless otherwise stated in programme. Saturday As per programme. Thu 1 Mar Ken Ashbee (07972012475) 5 miles Easy Coedway to the confluence of the rivers Severn and Vyrnwy followed by a pub meal at the Hand and Diamond pub, Coedway Depart 09:30 Harvester Car Park. Voluntary transport contribution £2 Sat 3 Mar Phil Barnes ( 01939 809037 / 07983 459531 ) 7 miles Moderate Leebotwood to Pulverbatch Bus Ramble. A walk via Picklescott taking in two motte and baileys and a hard to find church. Depart from Shrewsbury bus station at 09:30 on the Minsterley Motors 435 Ludlow bound bus. Return from Pulverbatch at 14:35 on an Arriva 546 bus. This is a walk that was listed in the previous programme, but did not take place because of iced-up road conditions Depart 09:30 Shrewsbury Bus Station. Sun 4 Mar Chris Raine ( 01743 249440 / 07974 453561 ) 7 miles Moderate Flounders Folly ramble. Craven Arms from the Shropshire Hills Discovery Centre across fields to Halford Wood and short road walk to Lower Dinchope then climb up Callow Hill to reach Flounders Folly. Returning via Strefford and along the Quinny Brook for tea and cakes (optional) at the Discovery Centre. Depart 09:30 Abbey Foregate. Voluntary transport contribution £3 Tue 6 Mar John Malam ( 01743 440555 ) 8.5 miles Moderate Oswald Trail Circular from Oswestry Racecourse Car Park.
    [Show full text]
  • Connecting Sandwell & Dudley Issue 8
    Connecting SANDWELL & DUDLEY ISSUE 8 OCTOBER 2020 Welcome New life for old track thanks to the Metro extension Welcome to ‘Connecting Sandwell & Dudley’, a Track from a disused railway line that was removed as part of bi-monthly publication designed to keep those the Wednesbury to Brierley Hill working and living in the area up-to-date on the Metro extension has been given progress of the Wednesbury to Brierley Hill a new home after being donated Metro extension which we’re building on behalf of to the Severn Valley Railway by Transport for West Midlands (TfWM). Transport for West Midlands and the Midland Metro Alliance. More than one mile of track has been removed from along the disused railway corridor and given to the heritage railway line to help with its annual track replacement Getting Around programme. The donation has come as a welcome boost to the much-loved heritage steam We appreciate that everyone will have a and diesel attraction, which recently reopened its doors after closing in March due to the coronavirus pandemic. different journey; the following is to assist you to plan ahead: Mayor of the West Midlands, Andy Street, said: “We are great supporters of our heritage railways and know that many thousands of people enjoy reliving the golden age of steam with Works are continuing to take place on Castle Hill in Dudley a ride on the Severn Valley Railway. So it is fantastic that the track from the former South to allow contractors working on behalf of Transport for Staffordshire Railway, which we don’t need as part of our Midland Metro expansion plans, West Midlands to progress utility upgrades and diversions will be recycled and once again used on an active railway line.
    [Show full text]
  • Issue 11 Ale Sabrina Autumn 2016
    Off To Find Some Yorkshire Beer Pubs By The North Yorkshire Moors Railway Two Pubs Re-Open Their Doors Royal Fountain and The Hare & Hounds Gluten Free Ales 12 Million Britons Can’t Be Wrong BridgBridgnorthnorth SkittlSkittleedd Again Wye Valley Win The Piston Broke Trophy Issue 11.Autumn20161 www.bridgnorthcamra.org.uk 2 Hi, Once again as I compilethese notes I am sitting in a beer garden enjoying a goodpint of real aleand basking in a mini heat wave. Since my last notes theweather has not been that good so beer gardens have been ‘off limits’. As youwill seeelsewhere in breweryand pub news therehave been lotsofchanges in andaround Bridgnorth with threenew landlordsand apub reopening that we thoughtwas lost in Bridgnorth itself! TheRoyal Fountainhas reopened in Cleobury Mortimer andalong theSevernValley line, TheHarbour in Arleyhas a newlandlord,althoughIdon’t think we have seen thelast of Mick. At Kidderminster TheKing andCastlehas hadamakeover with more handpumps andnew staff. TheWeaversonCombertonHill has been taken over by thePig IronBreweryand thereisanewmicro pub, TheBeer EmporiumonOxford Street. TheSeven Stars has been redecorated so I am told. So nowweare heading forthe timeofyearwhenthe maninthe redsuit arrivesand hopefully some nice winter ales to fend off thosecold winter tnigh s. So when I sit down to compile my next set of notes I will need to findapub with a comfortablechair andhopefully a roaring log fire. Wishing you all a Merry Christmas and a Happy New Year, see you next year. Cheers 3 at various levels from branch up to Afew wordsfrom theChairman national, through to talking to friends and By Adrian Zawierka strangers into trying real ale for the first time.
    [Show full text]
  • Eardington Manor and Coach House, School Lane
    Eardington Manor And Coach House, School Lane, Eardington, Bridgnorth, WV16 5JZ Eardington Manor And Coach House, School Lane, Eardington, Bridgnorth, WV16 5JZ A stunning Georgian country manor having 6-12 bedrooms, detached Coach House, stables, outbuildings and swimming pool in a village location near Bridgnorth. Around 4.5 acres including paddock and walled kitchen garden. Bridgnorth - 1.9 miles, Telford - 14.3 miles, Shrewsbury 23.3 miles, Wolverhampton - 16.0 miles, Stourbridge - 16.4 miles, Birmingham - 30.8 miles. (All distances are approximate). LOCATION On the first floor there are six generous bedrooms with up to date bathroom fittings: (having two Within 1.5 miles of the historic market town of Bridgnorth, this quiet Shropshire village is bordered staircases), a master bedroom suite which leads to a large en-suite with wardrobes, guest by the River Severn and the vintage Severn Valley Steam Railway. Located just over a mile away is bedroom with en-suite, four further bedrooms with bathroom and separate WC. Second floor; Astbury Golf Course, restaurant and hotel. Fishing, sailing at Chelmarsh, horse riding, walking and From the landing through double doors, a hallway gives access to six further bedrooms and cycling along Route 45 are all other nearby activities. Bridgnorth offers a wide variety of schools, storeroom. shopping, cafes and services, including a hospital. The Coach House stands to the rear. The detached accommodation comprises: Kitchen, Living This most attractive Grade II listed period house has generous proportions and well stocked Room, Dining Room, two Bedrooms and Bathroom. private gardens. A sweeping driveway through remote gates gives access to formal gardens with a 14ft high walled kitchen garden of half an acre including a fruit orchard, knot garden and extensive SERVICES: greenhouse with a well established grapevine.
    [Show full text]
  • Development Management Report
    Committee and date South Planning Committee 12 March 2019 Development Management Report Responsible Officer: Tim Rogers email: [email protected] Tel: 01743 258773 Fax: 01743 252619 Summary of Application Application Number: 18/03509/FUL Parish: Eardington Proposal: Change of use of land and the siting of 10 glamping tents plus one staff tent; formation of car park area; conversion of building to shower/amenity block; use of land for residential activity courses for health and fitness training and outdoor activities (part retrospective) Site Address: Proposed Camping Site And Amenity Block Adj The Old Vicarage Knowlesands Bridgnorth Shropshire Applicant: Kirbycraft Ltd Case Officer: Emma Bailey email: [email protected] Grid Ref: 371965 - 291719 © Crown Copyright. All rights reserved. Shropshire Council 100049049. 2018 For reference purposes only. No further copies may be made. Recommendation:- Grant Permission subject to the conditions set out in Appendix 1. Contact: Tim Rogers (01743) 258773 Proposed Camping Site And Amenity Block Planning Committee – 12 March 2019 Adj The Old Vicarage, Knowlesands, Bridgnorth, Shropshire REPORT 1.0 THE PROPOSAL 1.1 This application seeks full planning consent for the change of use of land for residential health and fitness training and outdoor activity courses, the siting of 10 glamping tents plus one staff tent, the formation of a car parking area and the conversion of building to an existing shower/WC block (part retrospective). 1.2 The north-west of the site provides accommodation for visitors in the form of ‘glamping tents’, the central area of the site is the dwellinghouse known as The Old Vicarage, and the south-eastern area of the site is used for activities in connection with the outdoor recreational ‘boot camp’.
    [Show full text]
  • William Hazledine, Shropshire Ironmaster and Millwright
    WILLIAM HAZLEDINE, SHROPSHIRE IRONMASTER AND MILLWRIGHT: A RECONSTRUCTION OF HIS LIFE, AND HIS CONTRIBUTION TO THE DEVELOPMENT OF ENGINEERING, 1780 - 1840 by ANDREW PATTISON A thesis submitted to the University of Birmingham for the degree of MASTER OF PHILOSOPHY Ironbridge Institute Institute of Archaeology and Antiquity, College of Arts and Law, University of Birmingham October 2011 University of Birmingham Research Archive e-theses repository This unpublished thesis/dissertation is copyright of the author and/or third parties. The intellectual property rights of the author or third parties in respect of this work are as defined by The Copyright Designs and Patents Act 1988 or as modified by any successor legislation. Any use made of information contained in this thesis/dissertation must be in accordance with that legislation and must be properly acknowledged. Further distribution or reproduction in any format is prohibited without the permission of the copyright holder. ABSTRACT The name of William Hazledine (1763 – 1840) is almost unknown, even to industrial historians. This is surprising, since he provided the ironwork for five world ‘firsts’, and he was described at the time of his death as ‘the first [foremost] practical man in Europe’. The five structures are Ditherington Flax Mill, Shrewsbury (the first iron- framed building in the world), Pontcysyllte Aqueduct (still one of the longest and highest in Britain), lock gates on the Caledonian Canal, a new genre of cast-iron arch bridges, and Menai Suspension Bridge. This thesis aims to rediscover Hazledine’s life and work, and place it in the context of social and industrial history. It particularly concentrates on the development of cast iron technology in Shropshire, which has been less studied than the work of earlier ironmasters, such as the Darbys and John Wilkinson.
    [Show full text]