Project Name Table of Contents: 00 0110 MASTER – July 31, 2015 Page 1

DOCUMENT 00 0110

TABLE OF CONTENTS

DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS

00 0110 Table of Contents 00 1100 Organization, Conventions, Abbreviations and Definitions 00 1200 Bidding Requirements and Procedures 00 1300 Award and Execution of Contact 00 1400 Scope of Work 00 1500 Control of Work 00 1600 Source of Materials 00 1650 Quality of Materials 00 1700 Legal Relations and Responsibilities 00 1800 Prosecution and Progress 00 1900 Measurement of Pay Quantities 00 1950 Payment 00 1960 Payment for Extra Work 00 1970 Payment for Force Account Work 00 1990 Disagreements, Protests, and Claims

DIVISION 01 GENERAL REQUIREMENTS

01 1100 Summary of Work 01 2100 Allowances 01 2200 Unit Prices 01 2300 Alternates 01 2500 Substitution Procedures 01 2600 Contract Modification Procedures 01 2900 Payment Procedures 01 3100 Project Management and Coordination 00 3200 Construction Progress Documentation 01 3300 Submittal Procedures 01 3333 Delegated Design Requirements 01 3563 Sustainability Certification Project Requirements 01 4000 Quality Requirements 01 4200 References 01 5000 Temporary Facilities and Controls 01 5639 Temporary and Plant Protection 01 6000 Product Requirements 01 7000 Execution and Closeout 01 7419 Construction Waste Management and Disposal

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Table of Contents: 00 0110 MASTER – July 31, 2015 Page 2

01 7800 Closeout Submittals

DIVISION 02 EXISTING CONDITIONS

02 4116 Structure Demolition (02050) 02 4119 Selective Demolition (02073) 02 8213 Asbestos Abatement (02080)

DIVISION 03 CONCRETE

03 3000 Cast‐In‐Place Concrete (03100, 03200, 03251, 03300, 03600)

DIVISION 04 MASONRY

04 0130 Unit Masonry Restoration and Cleaning (04500) 04 2113 Brick Masonry (04210) 04 2200 Concrete Unit Masonry (04220) 04 4300 Stone Masonry

DIVISION 05 METALS

05 1200 Structural Steel Framing (05120) 05 1300 Structural Aluminum (05130) 05 5000 Metal Fabrications (05500) 05 5200 Metal Railings (05520) 05 6010 Galvanizing (05910) 05 6020 Powder Coating (05920)

DIVISION 06 , PLASTICS, AND COMPOSITES

06 1000 Rough (06110) 06 1500 Wood Decking (06125) 06 1600 Sheathing (06115) 06 2013 Exterior Finish Carpentry (06200) 06 4000 Architectural Woodwork (06220, 06410)

DIVISION 07 THERMAL AND MOISTURE PROTECTION

07 1000 Waterproofing (07100) 07 1900 Water Repellents (07180) 07 2110 Building Insulation (07210) 07 3115 Fiberglass Shingles (07212) 07 3200 Roof Tiles (07320)

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Table of Contents: 00 0110 MASTER – July 31, 2015 Page 3

07 4110 Metal Roof and Wall Panels (07410) 07 4623 Wood (07460) 07 5100 Built‐Up Bituminous Roofing (07510) 07 5216 Modified Bituminous Membrane Roofing (SBS) (07525) 07 6000 Flashing and Sheet Metal (07620) 07 8400 Firestopping (07270) 07 9200 Joint Sealants (07900)

DIVISION 08 DOORS AND WINDOWS

08 1113 Standard Hollow Metal Doors and Frames (08112) 08 1213 Standard Hollow Metal Frames (08114) 08 1416 Flush Wood Doors (08211) 08 5210 Wood Window Rehabilitation (08620) 08 6213 Domed Unit Skylights (07820) 08 7100 Door Hardware (08710 08 8000 Glazing (08800) 08 9100 Louvers (10210)

DIVISION 09 FINISHES

09 2116 Gypsum Board Assemblies (09250) 09 3000 Tiling (09300) 09 5100 Acoustical Ceilings (09510) 09 6431 Wood Strip Flooring (09560) 09 6500 Resilient Flooring (09650) 09 6723 Resinous Flooring (09950) 09 6800 Carpeting (09680) 09 9100 Painting (09900)

DIVISION 10 SPECIALTIES

10 1430 Exterior Signs 10 1435 Disabled Parking Signs (10435) 10 1441 Interior Signs (10440) 10 1800 Informational Kiosks 10 2113 Metal Toilet Compartments (10160) 10 2115 Phenolic Toilet Compartments (10171) 10 2116 Shower and Dressing Compartments (10185) 10 2814 Toilet and Shower Accessories (10805) 10 4400 Fire Protection Specialties (10523)

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Table of Contents: 00 0110 MASTER – July 31, 2015 Page 4

DIVISION 11 EQUIPMENT

11 6623 Basketball Backstops (11484) 11 6624 Volleyball Equipment (11491) 11 6813 Play Equipment – Natural Features 11 6816 Play Structures (02865) 11 6824 Tennis Equipment (02832) 11 6834 Baseball Field Equipment 11 6835 Gold Course Equipment 11 6836 Frisbee Gold Course

DIVISION 12 FURNISHINGS

12 2113 Horizontal Louver Blinds (12511) 12 2524 Gymnasium Divider Curtains (11496) 12 9310 Site and Street Furnishings (02870)

DIVISION 13 SPECIAL CONSTRUCTION

13 1146 Swimming Pool Equipment (15492) 13 1180 Concrete Transient Float (03301) 13 1190 Wood Boarding Floats (06120) 13 1200 Fountains (02820) 13 1214 Water Feature System 13 3423 Fabricated Structures

DIVISION 14 CONVEYING SYSTEMS

14 1000 Dumbwaiters 14 2000 Elevators 14 4216 Vertical Wheelchair Lifts (14 42 00)

DIVISION 21 FIRE SUPPRESSION

21 0000 Fire Suppression

DIVISION 22 PLUMBING

22 0500 Common Work Results for Plumbing 22 1000 Plumbing Piping 22 3000 Plumbing Equipment 22 4000 Plumbing Fixtures

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Table of Contents: 00 0110 MASTER – July 31, 2015 Page 5

DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 0500 Common Work Results for HVAC

DIVISION 26 ELECTRICAL

26 0500 Common Work Results for Electrical 26 0519 Low Voltage Electrical Power conductors and Cables 26 0526 Grounding and Bonding for Electrical Systems 26 0533 Conduits, Raceways, Boxes, Fittings 26 0553 Identification for Electrical Systems 26 2000 Secondary Distribution System 26 2726 Wiring Devices and Plates 26 2816 Disconnect Switches 26 5600 Exterior Lighting 26 5610 Exterior LED Lighting

DIVISION 31 EARTHWORK

31 1000 Site Clearing (02110, 02130) 31 2000 Earth Moving (02210, 02220, 02233) 31 2500 Erosion and Sedimentation Controls (02270) 31 3233 Shotcrete Soil Slope Stabilization 31 6220 Steel Piling (02369)

DIVISION 32 EXTERIOR IMPROVEMENTS

32 1216 Asphalt Paving (02510, 02512) 32 1217 Chip Seal Paving (02530) 32 1243 Porous Asphalt Paving 32 1313 Concrete Paving (02521) 31 1343 Pervious Concrete Paving 32 1400 Unit Paving (02515) 32 1510 Soft Surface Trails (02540) 32 1540 Crushed Stone Surfacing ‐ Unstabilized 32 1541 Crushed Stone Surfacing ‐ Stabilized 32 1715 Precast Concrete Parking Bumpers (02845) 32 1723 Pavement Marking (02580) 32 1817 Playground Protective Surfacing 32 1824 Infilled Synthetic Turf 32 1825 Bitumen Rubber Track Surfacing (02555) 32 1827 Acrylic Tennis Court Surfacing (02560) 32 1828 Acrylic Basketball Court Surfacing (02562)

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Table of Contents: 00 0110 MASTER – July 31, 2015 Page 6

32 3114 Chain Link Fences (02831) 32 3129 Wood Fences and Gates (02834) 32 3400 Fabricated Bridges 32 8000 Irrigation (02810) 32 9010 , Plants, and Ground Covers (02950) 32 9013 Tree Pruning 32 9020 Lawns and Grasses (02930) 32 9021 Lawn Renovation (02922) 32 9113 Soil Preparation (02920) 32 9114 Soil Preparation for Athletic Fields (02925) 32 9115 Soil Treatment (02360) 32 9219 Seeding 32 9310 Landscape Maintenance

DIVISION 33 UTILITIES

33 0500 Common Work Results for Utilities 33 1100 Water Systems (02665) 33 1110 Water Lines (02660) 33 4100 Storm Drainage Systems (02715) 33 4350 Underground Utility Vaults (02667) 33 4600 Subdrainage Systems (02710) 33 4615 Athletic Field Drainage Systems (02716) 33 7719 Electrical Underground Ducts and Manholes

END OF TABLE OF CONTENTS

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Temporary Tree and Plant Protection: 01 5639 MASTER – July 31, 2015 Page 1

SECTION 01 5639

TEMPORARY TREE AND PLANT PROTECTION

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Temporary protection of existing trees and plants to remain. 2. Protection includes temporary fencing, barricades and guards.

B. Related Sections:

1. Section 31 1000: Site Clearing, for removal of other trees and plants not to remain. 2. Section 32 9013: Tree Pruning, for pruning included in Work of this Section. 3. Division 32: Exterior Improvements, for other Work that may affect Work of this Section. 4. Division 33: Utilities, for other Work that may affect Work of this Section.

1.2 DEFINITIONS

A. Certified Arborist: Certified by The International Society of Arboriculture (ISA).

B. Owner’s Arborist: A representative of the Urban Forester’s Office.

C. Consulting Arborist: A Consulting Arborist registered with the American Society of Consulting Arborists (ASCA), or is certified as a Board Certified Master Arborist (BCMA) with ISA.

D. Board Certified Master Arborist: ISA certified.

E. Certified Tree Worker: ISA certification.

F. Tree and Plant Protection Zone: Area of no disturbance as deemed necessary by a certified arborist and as shown or indicated.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Temporary Tree and Plant Protection: 01 5639 MASTER – July 31, 2015 Page 2

1.3 PERFORMANCE REQUIREMENTS

A. Intent of Work of this Section:

1. The preservation, protection, and trimming of existing trees and shrubs, and other vegetation indicated to remain. 2. To provide temporary fencing, barricades and guards to protect trees and plants from damage. 3. To protect trees and plants from stockpiling, material storage, vehicle parking and driving within the tree drip line or Tree and Plant Protection Zone area.

B. Tree and Plant Protection Plan: Consulting Arborist is to provide a Tree and Plant Protection Plan, to include the following:

1. Evaluation of plant materials, including root zones within the construction limits, for evidence of pre-existing rot, disease and damage that might otherwise contribute to or cause a decline in the health of materials designated to remain. 2. Location of fencing at the drip line of a single designated tree or the outermost perimeter of the combined drip line areas of a designated group of trees.

1) Location of fencing may be extended as deemed necessary by the Owner’s Arborist.

3. Owner's Arborist will review the Plan and will make the final determination as to the extent of conditions described in the Plan.

1.4 SUBMITTALS

A. Submit Consulting Arborist qualifications described in Article “Quality Assurance.”

1.5 QUALITY ASSURANCE

A. Consulting Arborist Qualifications: Engage an experienced arborist who will directly oversee Work of this Section, and has at least 5 years of consistent experience pruning large trees, and is accredited as defined in Article “Definitions.”

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Temporary Tree and Plant Protection: 01 5639 MASTER – July 31, 2015 Page 3

1. Consulting Arborist shall engage persons performing tree work and protection for trees and plants who have been trained in accordance with the tree and plant care standards accepted by the International Society of Arboriculture.

B. Regulatory Requirements: Meet with local jurisdiction requirements for protection of existing trees and vegetation.

C. Pre-Installation Meeting: Consulting Arborist to meet with Owner, including a representative of the Owner’s Arborist, to conduct on-site inspection of tree and plant materials to remain prior to start of Work, and to review the Tree Protection Plan.

1.6 SCHEDULING

A. Notify Owner’s Arborist 48 hours prior to starting pruning work.

B. Notify Owner’s Arborist 48 hours prior to start of construction work that is to occur in area of protected trees and plants.

PART 2 NOT USED

2.1 MATERIALS

A. Fencing: 6 foot portable chain link fencing on steel posts spaced a maximum of 6 feet on center, unless more stringent requirements are indicated in the Drawings.

B. Pruning Equipment:

1. Roots and Branches Larger than 1 inch in diameter: Sharp saw. 2. Roots and Branches 1 inch or less in diameter: Pruning shears.

PART 3 EXECUTION

3.1 EXAMINATION

A. Examine site for compliance with the Tree and Plant Protection Plan, and that required pruning has been completed prior to start of site clearing and construction activities.

1. Do proceed with site clearing and construction until unsatisfactory conditions have been corrected.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Temporary Tree and Plant Protection: 01 5639 MASTER – July 31, 2015 Page 4

3.2 PRE-CONSTRUCTION TREE CARE

A. Pruning and Structural Support:

1. Prune all trees designated to be retained within the project limits by a Certified Arborist according to ANSI A-300 Pruning Standards, and the requirements of Section 32 9013, “Tree Pruning.”

3.3 PROTECTION, GENERAL

A. Erect and maintain temporary fencing around Tree and Plant Protection Zones before starting site clearing. Remove fencing when construction is complete.

1. Once erected, maintain plant protection fencing throughout the duration of the work. Prohibit ingress without prior approval from the Owner’s Arborist

a. If activity is necessary within Tree and Plant Protection Zones, submit a work plan for approval by the Owner and Owner’s Arborist prior to the start of any such activity.

2. Unless otherwise indicated in the Drawings, the drip line of individual trees and shrubs or perimeter line of groups of trees or shrubs identifies the Tree and Plant Protection Zone. 3. Do not store construction material, debris, or excavated material within fenced area. 4. Do not permit vehicles, equipment or foot traffic within fenced area. 5. Maintain fenced area free of weeds and trash. 6. Where fencing an area would be too small to be adequate for protection, wrap mature trees in 8 foot long 2 by 4 or 2 by 6 and band.

B. Protect all plant growth including root systems of trees and plants from the following:

1. Dumping of construction related refuse. 2. Chemically injurious materials and liquids used in construction process. 3. Noxious materials in solution caused by run-off and spillage during mixing and placement of construction materials and drainage from stored materials. 4. Continual puddling of running water as a result of construction. 5. Construction activities including but not limited to, material storage, staging, all work activities and parking.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Temporary Tree and Plant Protection: 01 5639 MASTER – July 31, 2015 Page 5

C. Protect root zones from flooding, erosion, excessive wetting and drying resulting from de-watering and other operations.

D. Protect all existing plant material to remain against unnecessary cutting, breaking and skinning of roots and branches, skinning or bruising of .

E. Do not allow fires under and adjacent to trees or other plants.

F. Where required to provide clearance for new construction, engage the Owner and Owner’s Arborist to direct selective low limb removal of branches from trees and large shrubs that are to remain, and to direct tree root pruning and relocation work.

1. Where directed by the Owner and Owner’s Arborist, extend pruning operations to restore natural shape of trees and other plants impacted by construction activities. 2. Perform pruning and therapeutic care work according to ANSI A-300 Pruning Standards by tree care firms registered in the State of Oregon employing Certified Arborists. Perform work according to applicable ANSI standards, and requirements of Section 32 9013, “Tree Pruning.”

G. Water trees and other vegetation to remain, as necessary to maintain their health during the course of the work. Maintain a water schedule and log of watering operations.

H. Restrict vehicular and foot traffic of all construction crews to prevent compaction of soil over root systems and within tree protection zones.

3.4 EXCAVATION WITHIN TREE AND PLANT PROTECTION ZONES

A. Excavate within Tree and Plant Protection Zone and around tree roots only where indicated and acceptable to the Owner and Owner’s Arborist.

B. Where new construction is required within tree protection zones, hand clear and excavate to minimize damage to root systems. Use narrow-tine spading forks, comb soil to expose roots, and cleanly cut roots as close to excavation as possible.

1. Cover exposed roots with burlap and water regularly. 2. Temporarily support and protect roots from damage until they are permanently redirected and covered with soil.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Temporary Tree and Plant Protection: 01 5639 MASTER – July 31, 2015 Page 6

3. Coat cut faces of roots more than 1-1/2 inches in diameter with emulsified asphalt or other approved coating formulated for use on damaged plant tissues. 4. If roots larger than 2 inch diameter are damaged or need to be cut, a root inspection is required by the Owner’s Arborist. 5. Do not cut main lateral support roots. 6. Cut smaller roots using sharp pruning tools as specified. 7. Ripped and torn roots are prohibited. 8. Backfill roots with soil as soon as possible.

C. Do not allow exposed roots to dry out before permanent backfill is placed; provide temporary earth cover, pack with wet peat moss or 4 layers of wet untreated burlap, and temporarily support and protect from damage until roots are permanently relocated and covered with backfill. Water pit to settle backfill and to eliminate all voids and air pockets.

D. If roots are encountered within the limits of new construction, and the Owner determines that modification of the work is not practical, cut roots only as directed by Owner’s Arborist.

1. Cutting the roots without authorization from the Owner and the Owner’s Arborist is prohibited.

3.5 GRADING AND FILLING AROUND TREES AND PLANTS

A. Maintain existing grade within root zones of trees unless otherwise indicated or approved by the Owner and Owner’s Arborist.

B. Lowering Grades:

1. Where existing grade is above proposed finish grade shown around trees and plants, carefully hand excavate within tree protection zones to new grade, under direction of the Owner and Owner’s Arborist. 2. Cut roots exposed by excavation only as directed by the Owner and the Owner’s Arborist.

C. Raising Grades: Permitted only as acceptable to the Owner and Owner’s Arborist.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Temporary Tree and Plant Protection: 01 5639 MASTER – July 31, 2015 Page 7

3.6 REPAIR AND REMOVAL OF TREES

A. Engage a Certified Arborist to perform tree and shrub repair work.

1. Repair trees and shrubs damaged by construction operations in a manner acceptable to the Owner and the Owner’s Arborist. 2. Make repairs immediately after damage occurs to prevent progressive deterioration of damaged trees or shrubs.

B. Tree and shrub removal is prohibited unless indicated in the Drawings, or as directed by the Owner and the Owner’s Arborist.

3.7 COMPENSATON FOR DAMAGED TREES

A. In the event that any tree or trees are damaged, destroyed, or removed as a result of site construction, then damages shall be assessed against the Construction Contract in accordance with the trunk formula method set forth in The Council of Tree and Landscape Appraisers "Guide for Plant Appraisal,” latest edition.

1. If a tree must be removed due to damage, assessment will be determined at a specific rate for each deciduous tree, and a specific rate for each evergreen tree, per square inch of trunk area. 2. In the event that a tree is damaged, but not to the extent that it must be removed, damages will be calculated as a percentage of the total value of the damaged tree, as estimated by the Owner’s Arborist. 3. Damages will also be assessed for costs associated with the City’s appraisal of tree damage and lost tree value, as well as costs associated with repairs to the trees that are required, as determined solely by the Owner’s Arborist.

B. Any wound or damage by construction activities to an existing tree indicated to remain constitutes partial injury. These include, but are not limited to:

1. Any tissue damage. 2. Unauthorized cutting, breaking or removing tree branches or roots. 3. Unauthorized ingress, cutting or damaging protected root zones. 4. Soil compaction. 5. Toxic run-off into tree preservation areas. 6. Unauthorized discharge of materials into the tree protection zone.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Temporary Tree and Plant Protection: 01 5639 MASTER – July 31, 2015 Page 8

C. Partial injury will be calculated by percentage, estimated by the Owner and Owner’s Arborist, of the total value of the damaged tree.

1. Damages for partial injuries will include the cost to the Owner for loss appraisal by the Owner and Owner’s Arborist’s time plus the cost for necessary damage repair.

END OF SECTION

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Common Work Results for Electrical: 26 0500 MASTER – July 31, 2015 Page 1

SECTION 26 0500

COMMON WORK RESULTS FOR ELECTRICAL

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes: Common requirements for electrical systems.

1.2 REFERENCES

A. The latest adopted revisions of the following publications form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only:

1. International Building Code (IBC). 2. National Electrical Code (NEC). 3. National Fire Protection Association (NFPA). 4. National Electrical Manufacturers Association (NEMA). 5. National Electrical Contractors Association (NECA). 6. American National Standards Institute (ANSI). 7. Institute of Electrical and Electronic Engineers (IEEE). 8. Underwriters Laboratories (UL). 9. Intertek Electrical Testing Laboratories Listed (ETL). 10. Federal Specifications (Fed. Spec.). 11. Oregon Fire Code (OFC). 12. International Fire Code (IFC). 13. Oregon Administrative Rules (OAR). 14. Oregon Structural Specialty Code. 15. Oregon Energy Efficiency Specialty Code

1.3 PERFORMANCE REQUIREMENTS

A. Conduct work in a manner to cooperate with all other trades for proper installation of all items of equipment.

1. Consult Drawings of all other trades or crafts to avoid conflicts with cabinets, counters, equipment, structural members, etc. 2. In general, the Drawings govern; Resolve conflicts with the Owner prior to rough-in.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Common Work Results for Electrical: 26 0500 MASTER – July 31, 2015 Page 2

B. Verify the physical dimension of each item of electrical equipment to fit the available space.

1. Coordinate equipment to fit into available space, and the access routes through construction.

C. Coordinate rough-in and wiring requirements with equipment supplier and installer for all equipment provided under other Divisions of work that require electrical connections.

1. Make installation and connections in accordance with rough-in and wiring diagrams provided by equipment supplier and installers.

D. Arrange raceways, wiring, and equipment to permit ready access to switches, motors, and control components. Keep space in front of doors and access panels clear.

E. Coordinate all aspects of electrical, telephone, and other utility services with the appropriate serving utility.

1. No additional compensation will be allowed for connection fees or additional work or equipment not covered in the Drawings or Specifications but are required by the serving utility.

F. Coordinate underground work with other working on the site.

1. Coordinate electrical work with storm sewer, sanitary sewer, gas, water and irrigation lines to avoid conflicts. 2. Common trenches may be used with other trades, providing clearances required by codes and ordinances are maintained.

1.4 SUBMITTALS

A. Provide submittals according to Division 01 requirements for “Submittal Procedures” and the following:

1. Submit 5 copies of equipment data and shop drawings in expandable folders equal to Smead No. 1524E.

a. Provide a folder for each electrical Section to include data on all equipment requiring submittals for that Section.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Common Work Results for Electrical: 26 0500 MASTER – July 31, 2015 Page 3

b. Include in each folder a complete index for all Sections and materials requiring submittals.

2. Include in submittals all deviations from Drawings and Specifications; Failure to include a deviation will automatically void any implied use or the deviation in the Project.

B. Installation Shop Drawings: Show all outlets, devices, terminal cabinets, conduits, wiring, and connections required for a complete system.

C. Coordination Drawings:

1. Prepare detailed layout drawings for panel layouts in electric rooms or closets, utilizing dimensioned shop drawing data of equipment to be furnished. 2. Provide additional wiring details at switchboards, motor control centers, and other areas where work is of sufficient complexity to warrant additional detailing for coordination. 3. Submit layout drawings for approval prior to commencing field installation; Include with Shop Drawings.

D. Closeout Submittals:

1. Record Drawings. 2. Operating and Maintenance Manuals:

a. Draft Submittal: Submit 2 draft copies of the complete operating and maintenance manual for initial review. b. Final Submittal: Submit 3 copies of approved final operating and maintenance manuals bound in 3-ring binders with tabs and index. c. Base format of O & M manuals on a separate manual or chapter for each class of system as follows:

1) Secondary distribution system. 2) Low voltage distribution system. 3) Standby power system. 4) Egress lighting system, including battery backup ballasts. 5) Lighting systems, including lamps. 6) Lighting control system, interior and exterior. 7) Wiring devices, i.e., GFI receptacles and cable reels. 8) Code blue emergency phone tower system. 9) EV Charging system.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Common Work Results for Electrical: 26 0500 MASTER – July 31, 2015 Page 4

d. Content of each manual or chapter to include, but not limited to, the following:

1) Description of system. 2) Operating Sequence and Procedures:

aa. Step-by-step procedure for system start-up, including a pre-start checklist. Refer to controls and indicators by nomenclature consistent with that used on panels and in control diagrams. bb. Detailed instruction in proper sequence, for each mode of operation (i.e., day-night, staging of equipment). cc. Emergency Operation: If some functions of the equipment can be operated while other functions are disabled, give instructions for operations under those conditions. Include here only those alternate methods of operations (from normal) which the operator can follow when there is a partial failure or malfunctioning of components or other unusual condition. dd. Shutdown Procedure: Include instructions for stopping and securing the equipment after operation. If a particular sequence is required, give step-by-step instructions in that order.

e. Preventive Maintenance:

1) Provide a schedule for preventive maintenance. State the recommended frequency of performance of each preventive maintenance task such as cleaning, inspection, and scheduled overhauls. 2) Cleaning: Provide instructions and schedules for all routine cleaning and inspection with recommended lubricants. 3) Inspection: If periodic inspection of equipment is required for operation, cleaning, or other reasons, indicate the items to be inspected and give the inspection criteria. 4) Provide instructions for lubrication and adjustments required for preventive maintenance routines. Identify test points and given values for each.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Common Work Results for Electrical: 26 0500 MASTER – July 31, 2015 Page 5

f. Manufacturers’ Brochures: Include manufacturers’ descriptive literature covering devices and equipment used in the system, together with illustrations, exploded views, and renewal parts lists. Edit manufacturers’ standard brochures so that information applying to equipment actually installed is clearly defined.

1.5 QUALITY ASSURANCE

A. Materials: Provide new materials of the best quality, American made.

1. Provide manufactured in accordance with NEMA, ANSI, U.L., or other applicable standards.

B. Electrical Products: Provide products listed by a recognized testing laboratory, or approved in writing by the local inspection authority, as required by governing codes and ordinances.

1.6 WARRANTY

A. Provide a written warranty for Work of Division 26 according to requirements in the General Conditions.

1. Exclude incandescent lamps from warranty.

B. Warrant all electrical apparatus to be:

1. Free of defects of material and workmanship. 2. Built and installed to deliver the full rated capacity at the efficiency for which each individual apparatus was designed. 3. Operate at full capacity without objectionable noise or vibration.

C. Warranty a system against failure or damage caused by any system component.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION

3.1 INSTALLATION

A. Install a complete, properly operating system for each item of equipment specified.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Common Work Results for Electrical: 26 0500 MASTER – July 31, 2015 Page 6

1. Install equipment in accordance with manufacturer’s instructions, the best industry practices, and as indicated. 2. Where a conflict in instruction for installation occurs, request a clarification before work is roughed in.

a. Remove and correct conflicting Work installed without clarification at no cost to the Owner.

B. Install equipment in a neat, finished, and safe manner according to the latest published NECA Standard of Installation under competent supervision.

C. Where electrical equipment is installed in sleeves or block-outs penetrating rated fire barriers, install intumescent material around ducts, conduits, etc., to prevent spread of smoke or fire.

1. Use a penetration sealing system capable of passing a 3 hour test in according to ASTM E- 814 (UL 1479), consisting of material capable of expanding nominally 8 times when exposed to temperatures of 250-350° degrees F. An alternate method utilizing intumescent materials in caulk and/or putty form may be used.

3.2 EXCAVATION AND BACKFILL

A. Perform excavation and backfill for installation of electrical work in compliance with applicable requirements of Divisions 31, 32 and 33, and as described in this Article.

B. Direct Burial Cable or Non-Metallic Conduit: Place a minimum 3 inch cover of sand or clean earth fill around the cable or conduit on a leveled trench bottom.

1. Place steel conduit on a smooth, level trench bottom, so that contact is made for its entire length. 2. Remove water from trench while electrical conduit is being placed.

C. Place backfill in layers not exceeding 8 inches deep and compact to 95 percent of maximum density at optimum moisture.

1. Interior: Bank sand or pea gravel. 2. Exterior: Excavated material with final 8 inches of clean soil.

D. After backfilling, grade trenches level with surrounding soil. Dispose of excess soil off site.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Common Work Results for Electrical: 26 0500 MASTER – July 31, 2015 Page 7

E. Above high voltage cable or conduit runs, provide 6 inch wide vinyl tape marked “ELECTRICAL” in backfill, 12 inches below finished grade.

F. Patch asphalt or concrete surfaces disturbed by electrical work.

3.3 NOISE CONTROL

A. At opposite sides of partitions, do not place outlet boxes back to back or use straight through boxes to minimize transmission of noise between occupied spaces, except where specifically permitted in the Drawings.

B. Route conduit along corridors or other “noncritical” space to minimize penetrations through sound rated walls.

1. Grout penetrations through sound-rated partitions solid and airtight. 2. Do not rigidly connect (i.e., bridge) conduit and its associated attachment device to independent wall structures. Use flexible connections and attachments.

C. Do not place contactors, transformers, starters, and similar noise producing devices on walls which are common to occupied spaces, unless specifically shown in the Drawings.

1. Where such devices must be mounted on walls common to occupied spaces, they must be shock mounted or isolated in such a manner as to effectively prevent the transmission of their inherent noise to the occupied space.

D. Replace ballasts, contactors, starters, transformers, and like equipment that are noticeably noisier than other similar equipment in the project with that equipment that is less noisy.

3.4 EQUIPMENT CONNECTIONS

A. Provide complete electrical connections for all items of equipment requiring such connections, including incidental wiring, materials, devices, and labor necessary for a finished working installation.

B. Verify the location and method for connecting to each item of equipment prior to roughing-in. Check the voltage and phase of each item of equipment before connecting.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Common Work Results for Electrical: 26 0500 MASTER – July 31, 2015 Page 8

C. Make motor connections for the proper direction of rotation.

1. Use minimum 1/2 inch size flex for mechanical equipment, except at small control devices where 3/8 inch flex may be used. 2. For exposed wiring, provide jacketed metallic flex with a minimum 6 inch slack loop. 3. Do not test run pump motors until liquid is in the system.

D. Control devices and wiring for HVAC systems will be provided as work of Divisions 23, 24 and 35, except for provisions or items specifically noted in the electrical Drawings or specified to provide as Work of Division 26.

3.5 EQUIPMENT SUPPORT

A. Provide supports and fastening devices for electrical equipment, luminaires, panels, outlets, and cabinets capable of supporting not less than 4 times the ultimate weight of the object or objects fastened to or suspended from the building structure.

B. Properly install and adequately support luminaires from the building structure.

1. Provide supports that properly align and level luminaires. 2. Where flexible connections are permitted exposed luminaires, provide connections that are neat and straight, without excess slack, attached to the support device.

C. Support all junction boxes, pull boxes, or other conduit terminating housings located above the suspended ceiling from the floor above, roof, or penthouse floor structure to prevent sagging or swaying.

D. Conduits:

1. Support suspended conduits 1 inch and larger from the overhead structural system with metal ring or trapeze hangers and threaded steel rod having a safety factor of 4.

a. Conduits smaller than 1 inch, installed in ceiling cavities, may be supported on the mechanical system supports when available space and support capacity has been coordinated.

2. Anchor conduit installed in poured concrete to the steel reinforcing with No. 14 black iron wire.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Common Work Results for Electrical: 26 0500 MASTER – July 31, 2015 Page 9

E. Powder actuated or similar shot-in fastening devices will not be permitted for any electrical work except by special permission.

3.6 ALIGNMENT

A. Install panels, cabinets, and equipment level and plumb, parallel with structural building lines.

1. Fit switchgear panels and electrical enclosures neatly without gaps, openings, or distortion. 2. Properly and neatly close all unused openings with approved devices.

B. Fit surface panels, devices, and outlets with neat, appropriate trims, plates, or covers without overhanging edges, protruding corners, or raw edges to leave a finished appearance.

37 CUTTING AND PATCHING

A. Include cutting, patching and restoration of finishes where necessary.

1. Neatly patch and finish surfaces damaged by electrical work, and spaces around conduits passing through floors and walls, to match the adjacent construction, including painting. 2. Clean up and remove all dirt and debris. 3. Perform cutting and patching to satisfaction of the Owner.

B. Where equipment installations or connections require the installation of an access panel, arrange to provide a properly sized and installed access panel similar to those used for mechanical equipment access.

3.8 PROTECTION OF WORK

A. Protect electrical work and equipment installed under this Division against damage by other trades, weather conditions, or any other causes. Equipment found damaged or in other than new condition will be rejected as defective.

B. Keep switchgear, transformers, panels, luminaires, and electrical equipment covered or closed to exclude dust, dirt, and splashes of plaster, cement, and paint, and all other contamination.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Common Work Results for Electrical: 26 0500 MASTER – July 31, 2015 Page 10

1. Provide enclosures and trims in new condition, free of rust, scratches, and other finish defects. 2. If damaged, properly refinish in a manner acceptable to the Owner.

3.9 MAINTENANCE OF SERVICE

A. Where a portion of a building is occupied during construction, maintain service to all functioning portions of the building during normal working hours of the building, except as otherwise indicated.

B. Keep electrical power outages to occupied areas to a minimum. Pre-arrange necessary outages with the Owner.

1. Be liable for any damages resulting from unscheduled outages, or for those not confined to the pre-arranged times.

C. Keep signal, communication systems, and equipment in operation wherever they serve occupied or functional portions of the building.

1. Outages of these facilities will be treated the same as electrical power outages.

D. Where required during construction work, telephone services will be maintained by the Owner’s communications personnel.

1. Coordinate disruption with telephone services with the Owner in such a manner that service, as required by the building occupants, can be readily installed and maintained.

E. Provide temporary facilities and necessary provisions to maintain electrical services. Remove temporary wiring and facilities, if used, and the site left clean before final acceptance.

3.10 COMPLETION AND TESTING

A. Test systems upon completion to show that installed equipment operates as designed and specified, free of faults and unintentional grounds.

1. Test as many systems at one time as possible to work into construction phasing. 2. Perform tests in the presence of the Owner or his representative Provide 48 hours advance notice for scheduled tests.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Common Work Results for Electrical: 26 0500 MASTER – July 31, 2015 Page 11

B. Have a journeyman electrician with required tools available to conduct all tests, with or without the equipment factory representative present.

C. Testing to include, but not be limited to, the following systems:

1. Fire alarm 2. Lighting control systems 3. Emergency egress lighting 4. GFI receptacles testing

D. Compile a written record of tests performed, with dates performed and witnessed. Submit with operating and maintenance data to the Owner prior to final acceptance.

END OF SECTION

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Grounding and Bonding for Electrical Systems: 26 0526 MASTER – July 31, 2015 Page 1

SECTION 26 0526

GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Complete grounding for electrical systems, to include conduit system, transformer housings, switchboard frame and neutral bus, motors, and miscellaneous grounds as required. 2. A 600 volt insulated main bonding jumper for utility company connection between ground bus in switchgear lineup and ground termination point or service ground in transformer vault, as directed by the utility. 3. A continuation of existing system.

1.2 SUBMITTALS

A. Product Data for each type of electrical device specified. Include manufacturer's standard catalog pages and data sheets for grounding and bonding system components.

B. Shop Drawings indicating proposed arrangement for signal reference grids. Include locations of items to be bonded and methods of connection.

1.3 QUALITY ASSURANCE

A. Electrical Products: Provide products in conformance with requirements of NFPA 70.

PART 2 PRODUCTS

2.1 GROUND CONDUCTORS

A. Interior Bonding Systems: Bare or green insulated copper.

B. Underground or Exterior Systems: Bare copper.

C. Circuit Ground Conductors Installed in Raceways or MC Cable: are 600 Volt insulation to match phase and neutral conductor insulation rating.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Grounding and Bonding for Electrical Systems: 26 0526 MASTER – July 31, 2015 Page 2

2.2 CONNECTORS

A. Cast, set screw or bolted type.

B. Form poured, exothermic welds.

C. Grounding lugs, where provided, as standard manufacturer’s items on equipment.

2.3 GROUND PADS

A. Provide a ground pad, 1000A rated copper bus nominally 1/4 inch by 3 inches by 12 inches long, at each location shown in the Drawings.

B. Mount ground pads with stand-off devices to provide a minimum of 1-1/2 inches free space behind pad for access to lug nuts and washers.

2.4 GROUND RODS

A. Ground Rods: 5/8 inch by 10'-0" long Copperclad steel.

1. Where ground wells are indicated, provide a 12 inch deep, 8 inch diameter precast concrete well with flush lid for accessibility and inspection of welded connections; RCP Vaults No. 12R12A with 12R12-t cover.

PART 3 EXECUTION

3.1 INSTALLATION

A. Grounding Conductors: Sized in accord with Article 250, Tables 250-122 and 250-66 of the National Electrical Code.

B. Grounding Conductor Connectors: Make up tight to ensure low impedance; locate for future service.

C. Ground the electrical system, the cold water service, structural steel, and transformers, to the building ground grid.

D. Plug-in Receptacles: Bonded to the boxes, raceways, and grounding conductor.

E. Provide equipment grounding conductor in all PVC conduit runs.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Grounding and Bonding for Electrical Systems: 26 0526 MASTER – July 31, 2015 Page 3

F. Provide ground bonding to above ground portion of metal gas piping in accordance with NEC 250-104(b).

G. Solidly ground all separately derived systems to the nearest water piping.

H. Provide ground rod at all handhole locations. Provide ground conductor between ground rod and conduit stub-outs ground bushings via bare #2 CU.

3.2 UFER GROUND

A. Provide a concrete encased building grounding electrode where shown in the Drawings.

1. Grounding Electrode: Three No. 4/0 bare copper conductors a minimum of 20 feet each, cast into the bottom 6 inches of an exterior concrete foundation or footing.

B. Ufer Ground (Concrete-Encased Grounding Electrode):

1. Fabricate according to NFPA 70, Paragraph 250.50©, using a minimum of 20 feet of bare copper conductor not smaller than No. 4 AWG.

2. If concrete foundation is less than 20 feet long, coil excess conductor within the base of the foundation. 3. Bond grounding conductor to reinforcing steel in at least four locations and to anchor bolts. 4. Extend grounding conductor below grade and connect to grounding grid or to a grounding electrode external to concrete.

3.3 EQUIPMENT

A. Provide separate green insulated equipment ground conductor in all non-metallic and flexible electrical raceways.

1. Effectively ground all luminaires, panels, controls, motors, disconnect switches, exterior lighting standards, and noncurrent carrying metallic enclosures. 2. Use bonding jumpers, grounding bushings, lugs, buses, etc., for this purpose.

B. Provide grounding bushings on all feeder conduit entrances to panels and equipment enclosures and bond bushings to enclosures with minimum No. 10 AWG conductor.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Grounding and Bonding for Electrical Systems: 26 0526 MASTER – July 31, 2015 Page 4

1. Connect the equipment ground to the building system ground. 2. Use the same size equipment ground conductors as phase conductors, up through No. 10 AWG.

4.4 GROUND PADS

A. Drill ground pads as necessary for attachment of grounding conductors.

B. Utilize 2-hole lugs for terminating No. 4/0 AWG and larger ground conductors.

C. Bond ground pads to adjacent structural steel with #4/0 bare copper cable using form poured exothermic welds.

END OF SECTION

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Conduits, Raceways, Boxes, Fittings: 26 0533 MASTER - July 31, 2015 Page 1

SECTION 26 0533

CONDUITS, RACEWAYS, BOXES, FITTINGS

PART 1 GENERAL

1.1 SUMMARY

A. Section includes raceways and conduits of for electrical systems wiring, including fittings, boxes, hangers and appurtenances.

1.2 SUBMITTALS

A. Product Data for each type of electrical device specified. Include manufacturer's standard catalog pages and data sheets for conduits, fittings, and raceways and boxes.

B. Shop Drawings, including the following:

1. Proposed arrangement for conduits installed within structural concrete slabs. 2. Proposed locations of roof penetrations and methods for sealing.

1.3 QUALITY ASSURANCE

A. Electrical Products: Provide products in conformance with requirements of NFPA 70.

PART 2 PRODUCTS

2.1 METALLIC CONDUITS

A. Galvanized Rigid Conduit (GRC): Smooth surfaced heavy wall mild steel tube of uniform thickness and temper, reamed and threaded at each end and protected inside and out with galvanizing, sherardizing, or equivalent process. Comply with requirements of NEC Article 346.

B. Intermediate Metallic Conduit (IMC): Smooth surface, intermediate wall mild steel tube of uniform thickness and temper, reamed and threaded at each end, and protected inside and out with galvanizing, sherardizing, or equivalent process. Comply with requirements of NEC Article 345.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Conduits, Raceways, Boxes, Fittings: 26 0533 MASTER - July 31, 2015 Page 2

C. Electrical Metallic Tubing (EMT): Smooth surface, thin wall mild steel tube of uniform thickness and temper, galvanized or sherardized on the outside, and enameled on the interior. Comply with requirements of NEC Article 348.

D. Flexible Conduits (Flex):

1. Flexible Metallic Conduit: Interlocking single strip steel construction, galvanized inside and out after fabrication. Comply with requirements of NEC NEC Article 350. 2. Liquid Tight: Similar to flexible metallic conduit, except encased in a liquid tight polyvinylchloride or equivalent outer jacket over the flexible steel core. Comply with requirements of NEC Article 351.

2.2 NON-METALLIC CONDUITS

A. Underground Ducts:

1. PVC, Encased Burial: Type EB for concrete encasement, meeting or exceeding the current requirements of EB-20/ASTM F512, NEMA TC-6 and U.L. 65l. Rate for use with 90 degree C wire. 2. PVC, Direct Burial: Type DB suitable for direct burial, meeting or exceeding the current requirements of DB-20/ASTM F5l2 and NEMA TC-6. Rate for use with 90 degree C wire.

B. Rigid Non-Metallic Conduit: Type II PVC Schedule 40, suitable for use with 90 degree C rated wire. Conduit shall conform to UL Standard 65l and carry appropriate UL listing for above and below ground use.

2.3 METAL CLAD CABLE

A. Sheath: Steel of the interlocking metal type, continuous and close fitting.

1. Do not use sheath as a current carrying or grounding conductor. 2. Sheaths constructed using overlapping metal tape method are not acceptable. 3. Comply with requirements of NEC Article 330 for metal clad cable.

B. Conductors: XHHW stranded copper, of the same ampacity as the conduit/wire system indicated for the specific location. Include a bare copper grounding conductor in all applications.

C. Limit use of metal clad wire to interior or enclosed installation.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Conduits, Raceways, Boxes, Fittings: 26 0533 MASTER - July 31, 2015 Page 3

2.4 WIREWAYS

A. Troughs: Steel, painted, square in cross section, preformed knock-outs on standard spacing, screw cover.

B. Fittings: Provide tees, elbows, couplings as required for configurations shown in the Drawings.

2.5 FITTINGS

A. GRC and IMC:

1. Threaded Locknuts: Sealing type where used with NEMA 2, 3, 3R, 4 and 12 enclosures. 2. Threaded Bushings: 1-1/4 inch and larger, insulated, grounding type as specified in Section 26 0526, “Grounding and Bonding for Electrical Systems.” 3. Threaded Couplings: Standard threaded of the same material and as furnished with conduit supplied. Erickson type couplings may be used where required to complete conduit runs larger than 1 inch.

B. EMT:

1. Connectors: Steel compression ring or steel set screw type for conduit termination, with insulated throat, suitable for conditions used. Use lay-in grounding type bushings where terminating grounding conductors. 2. Couplings: Steel compression ring or steel set screw type, concrete tight.

C. MC Cable: Size and design box connectors for metal clad cable for the specific application as recommended by the cable manufacturer.

D. Threadless: GRC and IMC couplings and box connectors may be steel threadless, compression ring or set screw type for use with conduits 1 inch and smaller where installed in poured concrete locations, or where limited working space makes threaded fittings impractical.

E. Weatherproof Connectors: Threaded.

F. Expansion Couplings: Equal to O.Z. type EX with jumper.

G. Seal-Offs: With filler fiber, compound, and removable cover.

2.6 METALLIC BOXES

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Conduits, Raceways, Boxes, Fittings: 26 0533 MASTER - July 31, 2015 Page 4

A. Flush and Concealed Outlet Boxes: Galvanized stamped steel with screw ears for device ring mounting, knock-out plugs, mounting holes, fixture studs if required, Hubbell RACO, or approved.

B. Surface Outlet Boxes:

1. Ceilings: Galvanized stamped steel same as for flush and concealed outlet boxes. 2. Walls: Steel or aluminum with threaded hubs or bosses.

C. Large Boxes: Painted, welded steel construction with screw cover for boxes exceeding 4-11/16 inches square; Steel gauge as required for physical size; Hoffman, Circle AW, or approved.

D. Systems: Boxes for systems devices as recommended by the systems manufacturer, suitable for the equipment installed. Equip with grounding lugs, brackets, device rings, etc., as required.

2.7 FLOOR BOXES

A. Flush-in Floor Junction Boxes, and those serving pedestal fittings:

1. Concrete tight square stamped steel, fully adjustable, with round brass cover assembly, equivalent to Steel City 68 series with appropriate P-60 floor plate or Hubbell B2527 with appropriate service cover plate. 2. Comply with requirements of 514A. 3. Carpet Areas: Equip floor outlets with translucent polycarbonate carpet flanges equivalent to Steel City P-60-LCP, or Hubbell S3079. 4. In wood floor systems similar to above, non-adjustable; Hubbell B2588 with appropriate service cover plates. 5. Equip floor boxes with a aluminum pedestal housing as required, equivalent to Steel City (SFH-40) (SFH-50) series or Hubbell SC3099A

B. Combination Service Flush Floor Boxes:

1. Galvanized steel equipped with suitable sectionalizing plates with nominally 4 inch diameter opening and designated devices, equivalent to Steel City 663 series, or Hubbell SystemOne Series. 2. Comply with requirements of U.L. 514A. 3. Equip boxes in hard floors with Steel City P-60 series or Hubbell S1TFC covers, and in carpeted areas with P-62-CP or Hubbell S1CFC carpet plate and cover.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Conduits, Raceways, Boxes, Fittings: 26 0533 MASTER - July 31, 2015 Page 5

C. Combination Service Floor Boxes:

1. Galvanized steel equipped with suitable concrete-tight stamped steel sleeve, two device compartments for up to eight single going devices. 2. Provide die-cast aluminum trim ring with aluminum trim ring with aluminum-coated finish and blank access door. 3. Provide Wiremold RFB9 series floor box with RFB119BTCAL recessed activation kit or Hubbell CFB7G with CFB7TALU cover.

D. Concealed Service Floor Boxes:

1. Galvanized steel equipped with suitable sectionalizing plates, designated devices, hinged rectangular polymide access plate and carpet flange, equivalent to Steel City 664 series or Hubbell 3SFBSS series. 2. Comply with requirements of 514A. 3. Finish color and carpet as selected by Owner.

E. Flush Floor Boxes:

1. Cast iron, fully adjustable, brushed aluminum ring equipped with suitable metallic sectionalizing plates. 2. Comply with requirements of U.L. 514A. 3. Provide brushed aluminum duplex flaps for both power and Telecom. 4. Provide brushed aluminum carpet flange. 5. Single gang: Hubbell BA2436/SA3825/SA3083, Steel City, Wiremold, or approved. 6. Double gang: Hubbell BA4233/SA3825/SA3084, Steel City, Wiremold, or approved.

PART 3 EXECUTION

3.1 INSTALLATION

A. Conceal conduits in finished spaces.

1. Run concealed conduits in a direct line with long sweep bends and offsets. 2. Embed GRC and IMC in concrete below grade or in damp locations; make watertight by painting the entire male thread with Rustoleum metal primer or equal before assembly.

B. Route exposed conduit parallel or at right angles to structural building lines, neatly offset into boxes.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Conduits, Raceways, Boxes, Fittings: 26 0533 MASTER - July 31, 2015 Page 6

1. Closely follow surfaces for conduits attached directly to building. 2. Use conduit fittings to “saddle” under beams. 3. Coordinate with Owner drilling or notching of existing beams, on structural members.

C. Rigidly secure GRC and IMC terminations at boxes, cabinets, and general wiring enclosures with double locknuts and bushings or approved fittings.

1. Where conduit boxes with threaded hubs or bosses are used, screw in conduit, engaging at least 5 threads in hub. 2. Use insulating bushings d for conduits 1-1/4 inches or larger.

D. Keep conduit and raceways closed with suitable plugs or caps during construction to prevent entrance of dirt, moisture, concrete, or foreign objects.

1. Ensure that raceways are clean and dry before installation of wire at the time of acceptance.

E. Pack spaces around conduits with polyethylene backing rods and seal with polyurethane caulking to prevent entrance of moisture where conduits are installed in sleeves or block-outs penetrating moisture barriers.

3.2 CONDUIT

A. GRC may be used in all areas for wiring systems.

1. Install GRC for wiring underground in cast concrete construction, in damp locations, and in hazardous areas for serving fire pump controllers. 2. Install GRC made up tight where subject to mechanical injury with threaded fittings. 3. IMC may be used in locations not in contact with earth or fill.

B. EMT may be used in dry protected locations.

1. Provide green equipment bonding conductor where used for power circuit feeders 2-inch and larger. 2. Whether exposed or concealed, install EMT securely supported and fastened at intervals of nominally every 8 feet and within 24 inches of each outlet, ell, fitting, panel, etc.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Conduits, Raceways, Boxes, Fittings: 26 0533 MASTER - July 31, 2015 Page 7

C. Use flex for connections to vibration producing equipment, and where installation flexibility is required, with a minimum 12 inches slack connection.

1. Limit flex length to 36 inches for exposed equipment connections and 72 inches in concealed ceiling and wall cavities. 2. Use PVC jacketed flex in wet locations, areas subject to washdown, and exterior locations.

D. PVC Type II Schedule 40 may be used underground and in and under interior slabs, poured concrete walls, and where scheduled or noted in the Drawings.

1. Make connections with waterproof solvent cement. 2. Provide GRC at 60 degree and larger bends and where penetrating slabs.

3.3 RACEWAYS

A. Surface metal wireways may be installed at locations to serve motor starters or other control devices where required by a multitude of wiring interconnections or physical layout.

3.4 FITTINGS

A. Assemble metallic raceways and conduits continuous and secured to boxes, panels, etc., with appropriate fittings to maintain electrical continuity. Cut conduit joints square and reamed smooth with fittings drawn up tight.

B. Do not use crimp-on, tap-on, indenter type, malleable iron or cast set screw fittings.

3.5 BOXES

A. Mount boxes and outlets at nominal center line in accordance with Oregon State adopted ADA requirements.

1. Coordinate locations with Owner and heights shown in the Drawings. 2. Adjust heights in concrete masonry unit walls to prevent devices or finish plates from spanning masonry joints.

B. Provide outlet boxes of code required size to accommodate wires, fittings, and devices.

1. Provide multi-gang boxes as required to accept devices installed with no more than one device per gang.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Conduits, Raceways, Boxes, Fittings: 26 0533 MASTER - July 31, 2015 Page 8

2. Equip metallic boxes with grounding provisions.

C. Provide flush wall switch and receptacle outlets used with conduit systems 4 inches square, 1-1/2 inches or more deep, and with one or two-gang plaster ring mounted vertically.

1. Where three or more devices are at one location, use one piece multiple gang tile box or gang box with suitable device ring.

D. Provide wall bracket and ceiling surface mounted luminaire outlets with 4 inch octagon 1-1/2 inches deep boxes with 3/8 inch fixture stud.

1. Provide wall bracket outlets with single gang opening where required to accommodate fixture canopy. 2. Provide larger boxes or extension rings where quantity of wires installed requires more cubic capacity.

E. For junction boxes installed in accessible ceiling or wall cavities or exposed in utility areas, provide boxes a minimum of 4 inches square, 1-1/2 inches deep, with appropriately marked blank cover.

F. Provide boxes for the special systems suitable for the equipment installed. Coordinate size and type with the system supplier.

G. Provide pull boxes where shown for installation of cable supports, or where required to limit the number of bends in any conduit to not more than three 90 degree bends. Use galvanized boxes of code required size with removable covers installed so that covers will be accessible after work is completed.

H. Provide recessed boxes flush with finished surfaces, or not more than 1/8 inch back, level and plumb.

1. Do not use long screws with spacers or shims for mounting devices. 2. Do not expose wiring at outlets to combustible material.

I. Extend covers for flush mounted boxes in finished spaces a minimum of 1/4 inch beyond the box edge to provide a finished appearance. Finish edge of cover to match cover face.

J. Equip boxes attached to a stud in gypsum board walls with opposite side box supports equivalent to Caddy #760.

1. Install drywall screw prior to finish taping.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Conduits, Raceways, Boxes, Fittings: 26 0533 MASTER - July 31, 2015 Page 9

2. Use methods to attach boxes to studs that do not cause projections on the face of the stud, to prevent full length contact of gypsum board to the stud face.

3.6 PULL WIRES

A. Install nylon pull lines in all empty conduits larger than 1 inch where routing includes 25 feet or more in length or includes 180 degrees or more in bends.

B. Where conduits requiring pull lines are stubbed out and capped, coil a minimum of 36 inches of pull line and tape at termination of conduit for easy future access.

1. Label pull lines as to conduit starting or terminations point and intended future use.

END OF SECTION

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Identification for Electrical Systems: 26 0553 MASTER – July 31, 2015 Page 1

SECTION 26 0553

IDENTIFICATION FOR ELECTRICAL SYSTEMS

PART 1 GENERAL

1.1 SUMMARY

A. Section includes devices and requirements for identification of function and loads served of electrical equipment.

1.2 SUBMITTALS

A. Product Data: Provide manufacturer's standard catalog pages and data sheets for each product.

B. Shop Drawings: Provide schedule of items to be identified indicating proposed designations, materials, legends, and formats.

1.3 QUALITY ASSURANCE

A. Provide products in conformance with requirements of NFPA 70.

PART 2 PRODUCTS

2.1 LABELS

A. Pre-Printed Labels: Permanent material pre-printed with black on white, with adhesive backing; Brady, 3M, or approved.

B. Laminated Plastic: 3-ply laminated plastic, black with white letters, for 208/120V equipment and red with white letters for 480/277V equipment; Lamicoid, or approved.

C. Clear Plastic Tape: Black 12 point Helvetica medium characters machine imprinted on clear tape; Merlin, Kroy, or approved..

D. Plastic Tape: Black or red with white letters, adhesive backing, field printed with proper tool; Dymo-tape, or approved..

E. Wire Markers: White with black numbers, adhesive backed tape on dispenser roll; Brady, 3M, or approved.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Identification for Electrical Systems: 26 0553 MASTER – July 31, 2015 Page 2

F. Other label types prescribed by the Parks Supervising Electrician, specific for this Project, are as follows:

1. xxxxxxxxxxxxxxxxx 2. yyyyyyyyyyyyyyyyy

PART 3 EXECUTION

3.1 SWITCHGEAR

A. Label main and feeder protective devices in distribution panels and motor control centers with laminated plastic labels indicating the function or the load served.

B. Provide laminated plastic labels for bussed spaces indicating the maximum ampere rating or size of future breaker, switch or starter that may be installed in the reserved space.

3.2 BRANCH CIRCUIT PANELBOARDS

A. Indicate panel number with laminated plastic labels.

1. Use plastic tape labels on the side of the panel door to indicate voltage phase and feeder source, feeder wire size, and feeder breaker or fuse size. with plastic tape labels on the inside of the panel door.

B. Provide typewritten panel directories, with protective, clear transparent covers, accurately accounting for every breaker installed including spares.

1. Near completion of the Work, provide schedules in panel directories that use actual room designations assigned by name or number and not the space designation used in the Drawings.

3.3 EQUIPMENT

A. Label all disconnect switches, motor starters, relays, contactors, and time switches indicating equipment served with plastic tape labels.

B. Where the controlling device is remote mounted from the serving panel, include the serving panel designation and circuit number with additional plastic tape labels.

3.4 DEVICES

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Identification for Electrical Systems: 26 0553 MASTER – July 31, 2015 Page 3

A. Label each receptacle plate with preprinted clear plastic press on labels with 3/16" minimum black letters indicating serving panel and circuit number. Clean all oils, dirt and any foreign materials from plate prior to label application.

1. Provide the same labeling for receptacles connected to a GFCI protected circuit downstream from the protecting device.

3.5 RACEWAYS AND BOXES

A. Label pull boxes and junction boxes for systems with tape, paint, or marker pen on box cover identifying system.

1. If tape is used, place in an area readily visible, at least 3 inches in length across the box, installed in a neat and workman like manner. 2. Where box covers are exposed in finished areas, label inside of cover. 3. Label covers with the following colors:

a. 480Y/277V Wiring: Orange. b. 208Y/120V Wiring: Black. c. Fire Alarm: Red. d. Communications: Green. e. Security: Blue.

B. Label each end of pull wires left in empty conduits with tags or tape indicating location of other end of wire.

3.6 SYTSTEMS

A. Complex control circuits may utilize any combination of colors with each conductor identified throughout, using wraparound numbers or letters.

1. Use the number or letters shown where the Drawings or operation and maintenance data indicate wiring identification.

B. Label the fire alarm and communication equipment zones, controls, indicators, etc., with machine printed labels or indicators appropriate for the equipment installed as supplied or recommended by the equipment manufacturer.

3.7 EXISTING EQUIPMENT

A. Install nylon pull lines in all empty conduits larger than 1 inch where routing includes 25 feet or more in length or includes 180 degrees or more in bends.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Identification for Electrical Systems: 26 0553 MASTER – July 31, 2015 Page 4

END OF SECTION

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Secondary Distribution System: 26 2000 MASTER – July 31, 2015 Page 1

SECTION 26 2000

SECONDARY DISTRIBUTION SYSTEM

PART 1 GENERAL

1.1 SUMMARY

A. Section includes materials and equipment for a complete secondary service and distribution system.

B. Related Sections:

1. Section 26 0526: Grounding and Bonding for Electrical Systems. 2. Section 26 0553: Identification for Electrical Systems, for product identification requirements.

1.2 REFERENCES

A. NEMA 250 - Enclosures for Electrical Equipment (1000 Volts Maximum); 2008.

B. NEMA PB 1 - Panelboards; National Electrical Manufacturers Association; 2011.

C. UL 50 - Enclosures for Electrical Equipment, Non-Environmental Considerations; Current Edition, Including All Revisions.

D. UL 50E - Enclosures for Electrical Equipment, Environmental Considerations; Current Edition, Including All Revisions.

E. UL 67 - Panelboards; Current Edition, Including All Revisions.

1.3 SUBMITTALS

A. Product Data: Provide manufacturer's standard catalog pages and data sheets for panelboards, enclosures, overcurrent protective devices, and other installed components and accessories.

B. Shop Drawings: Indicate outline and support point dimensions, voltage, main bus ampacity, overcurrent protective device arrangement and sizes, short circuit current ratings, conduit entry locations, conductor terminal information, and installed features and accessories.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Secondary Distribution System: 26 2000 MASTER – July 31, 2015 Page 2

1. Include dimensioned plan and elevation views of panelboards and adjacent equipment with all required clearances indicated. 2. Include wiring diagrams showing all factory and field connections. 3. Clearly indicate whether proposed short circuit current ratings are fully rated or, where acceptable, series rated systems. 4. Include documentation of listed series ratings upon request.

C. Source Quality Control Test Reports: Include reports for tests designated in NEMA PB 1 as routine tests.

D. Field Quality Control Test Reports.

E. Manufacturer's Installation Instructions: Indicate application conditions and limitations of use stipulated by product testing agency. Include instructions for storage, handling, protection, examination, preparation, and installation of product.

F. Project Record Documents: Record actual installed locations of panelboards and actual installed circuiting arrangements.

G. Maintenance Data: Include information on replacement parts and recommended maintenance procedures and intervals.

H. Maintenance Materials: Furnish the following for Owner's use in maintenance of project:

1. Panelboard Keys: Two of each different key. 2. Maintenance requirements for products specified in this Section.

1.4 QUALITY ASSURANCE

A. Provide secondary distribution system that is fully rated.

B. Provide utility metering facilities that comply with the established serving utility requirements.

1. Provide quantity and style of meter sockets and accessories required by the utility.

C. Work of this Section to include all metering charges or connection costs charged by the serving utility.

PART 2 PRODUCTS

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Secondary Distribution System: 26 2000 MASTER – July 31, 2015 Page 3

2.1 ACCEPTABLE MANUFACTURERS

A. Enclosures; Hoffman Enclosure with __ inch: [Size TBD by Parks Supervising Electrician]

1. Riser Pedestal (PED-24DSS), by Portland Parks & Recreation. 2. Finish: Painted or Stainless Steel. Coordinate with Owner.

B. Electrical Branch Panel:

1. Siemens.

C. Lighting Time Clock; Non astronomic control time clock for shelter receptacle:

1. Itermatic ET 8215C, or approved.

D. Cabinet Fan Parts:

1. Hoffman Brand Fan Kit, as purchased from Fouch Electric, or approved.

E. Cabinet Fan:

1. #A4AXFN, as purchased from North Coast Electric, or approved.

2.2 COMMERCIAL METER PEDESTAL

A. Panel:

1. Pad mounted stainless steel metered pedestal or cabinet, free standing, lockable, NEMA 3R, front operated circuit breaker type, fully enclosed with bussing provisions for future extension. 2. Provide assemblies rated over 1000 amperes of free standing construction. 3. Provide overcurrent protection ratings as indicated in the Drawings. 4. Provide devices capable of interrupting the fault current available.

B. Bus Work:

1. Copper, sized as shown in the Drawings. 2. 100 percent neutral with a maximum hot-spot temperature rise of 65 degrees C above an ambient of 40 degrees C under continuous full load current. 3. Rated to withstand 65,000 A fault currents.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Secondary Distribution System: 26 2000 MASTER – July 31, 2015 Page 4

4. Include bussing provisions for mounting future devices in all spaces called for.

a. Where panel configuration provides additional spaces within a section, buss these spaces to receive future devices. b. Make provisions for future extension of bussing.

5. Provide a copper ground bus in bottom of enclosure.

C. Circuit Breakers:

1. Molded case, bolt-in thermal magnetic type. 2. Provide breakers with short circuit capacity rating to withstand the maximum short circuit duty that can be expected at the breaker location in the electrical system. 3. Minimum short circuit rating for any circuit breaker to be 10,000 A.I.C. for 120V and 208V breakers, and 14,000 A.I.C. for 277V and 480V breakers.

D. Provide power distribution section for branch circuits.

E. Branch Circuit Panels:

1. Bolt-in circuit breaker type with copper bussing. 2. Fit panels with flush lift latches and locks keyed alike. 3. Deliver panel keys to the Owner at completion of the Project.

F. Main Circuit Breakers:

1. Equip panels as indicated with main circuit breakers sized as scheduled and mounted behind door at top of panel. 2. Back feeding of branch circuit breakers is not acceptable.

G. Branch Circuit Breakers:

1. Molded case, thermal magnetic type. 2. Provide breakers with short circuit capacity rating to withstand the maximum short circuit duty which can be expected at the breaker location in the electrical system. 3. Provide breakers mounted in branch panelboards of the bolt-in type. 4. Provide circuit breakers used for switching duty to be UL listed for that purpose and marked “SWD.” 5. Minimum short circuit rating for any circuit breaker: 10,000 A.I.C. for 120V and 240V.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Secondary Distribution System: 26 2000 MASTER – July 31, 2015 Page 5

H. Cabinets:

1. Stainless steel, Type NEMA 4R or 4X stainless steel, pad lockable main disconnect and distribution compartment with space for controls and exterior lighting control contactors with fully functional lighting timeclock controls.

I. Ground Bus:

1. Provide a grounding bus with termination capacity for the grounding conductor sized for the branch circuit equipment grounding conductors in 240/120V panels. 2. Bond grounding bus to the panel cabinet.

J. Standards: Comply with Pacificorp Utility requirements, UL Listed, complies with ANSI C12.7.

K. Finish: Primed and finished with not less than two coats of light gray enamel.

L. Accessories for External Mounted Meter: Comply with Pacificorp Utility requirements, including work clearance requirements.

PART 3 EXECUTION

3.1 INSTALLATION

A. Install the secondary distribution system assemblies and equipment as shown on the Drawings, parallel and square with the building lines.

B. Neatly lace and secure the conductors of the feeder circuits individually at maximum 2 foot intervals. The cable lugs shall not support the weight of the cables.

C. Pole mount service transformer. Coordinate type of construction, conduit arrangement and grounding requirements with PacifiCorp prior to construction.

3.2 BRANCH PANELBOARDS

A. Install panelboards plumb and level, located as shown In the Drawings up 6'-0" to top, unless indicated otherwise.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Secondary Distribution System: 26 2000 MASTER – July 31, 2015 Page 6

B. Equip selected breakers with mechanical locking devices that may be locked in the “on” position.

1. Include selected breakers serving alarm systems, fire suppression systems, communications systems and other critical loads directed.

3.3 CONCRETE PADS

A. Provide nominally 3-1/2 inch deep concrete housekeeping pads under all free- standing service pedestals and cabinets. Extend pads nominally 2 inches beyond the edges of the equipment.

B. Anchor cabinet to foundation. Pass anchor bolts through housekeeping pad and anchor within foundation.

END OF SECTION

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Exterior Lighting: 26 5600 MASTER – July 31 2015 Page 1

SECTION 26 5600

EXTERIOR LIGHTING

PART 1 GENERAL

1.1 SUMMARY

A. Section includes exterior lighting systems.

1.2 PERFORMANCE REQUIREMENTS

A. Provide specified lighting units with a luminaire of the type designated and appropriate for the location.

1. Where outlet symbols in the Drawings do not designate a type of a luminaire, provide the same as those used in similar or like locations. 2. Where a luminaire type designation has been omitted and cannot be determined by inspection, request a clarification from the Owner and provide a suitable luminaire type as directed.

B. Coordinate installation of luminaires with other trades to provide a total system that is neat and orderly in apperarance.

C. Install remote ballast in enclosures as required by the type of luminaire specified. Located remote mounted ballasts within the distance limitations specified by the ballast manufacturer.

1.3 SUBMITTALS

A. Product Data: Provide manufacturer's standard catalog pages and data sheets including detailed information on luminaire construction, dimensions, ratings, finishes, mounting requirements, listings, service conditions, photometric performance, weight, effective projected area (EPA), and installed accessories; include model number nomenclature clearly marked with all proposed features

1. Provide electronic files of photometric data certified by a National Voluntary Laboratory Accreditation Program (NVLAP) lab or independent testing agency in IESNA LM-63 standard format upon request.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Exterior Lighting: 26 5600 MASTER – July 31 2015 Page 2

a. Photometry Reports consist of a minimum of: Candlepower Distribution Curves, LM-79 and LM-80 Reports for Solid State Lighting.

2. Certification of lamp ballast compatibility as well as lamp and lamp socket compatibility. 3. Lamps: Include rated life and initial and mean lumen output. 4. Poles: Include information on maximum supported effective projected area (EPA) and weight for the design wind speed.

B. Shop Drawings:

1. Indicate dimensions and components for each luminaire that is not a standard product of the manufacturer. 2. Provide photometric calculations where luminaires are proposed for substitution upon request. 3. Provide structural calculations for each pole proposed for substitution.

C. Field Quality Control Reports.

1. Include test report indicating measured illumination levels.

D. Certificates for Poles and Accessories:

1. Manufacturer's documentation that products are suitable for the luminaires to be installed and comply with designated structural design criteria.

E. Manufacturer's Installation Instructions:

1. Indicate application conditions and limitations of use stipulated by product testing agency. 2. Include instructions for storage, handling, protection, examination, preparation, installation, and starting of product.

F. Closeout Submittals:

1. Project Record Documents: Record actual connections and locations of pole foundations, luminaires, and any pull or junction boxes. 2. Operation and Maintenance Data: Instructions for each product including information on replacement parts. 3. Maintenance Materials: Furnish for Owner's use in maintenance of project. 4. Additional Requirements: Refer to Section 26 0500, “Common Work Results for Electrical.”

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Exterior Lighting: 26 5600 MASTER – July 31 2015 Page 3

1.4 QUALITY ASSURANCE

A. Provide products in conformance with requirements of NFPA 70.

1.5 PROJECT CONDITIONS

A. Coordination:

1. Coordinate placement of poles and associated foundations with utilities, curbs, sidewalks, trees, walls, fences, striping, etc. installed under Work of other Sections, or by others. 2. Coordinate elevation to obtain specified foundation height. 3. Notify Owner of conflicts or deviations; obtain direction prior to proceeding with Work.

1.6 MAINTENANCE

A. Extra Materials; Provide the following:

1. Extra Lamps: 10 percent of total quantity installed for each type, but not less than two of each type. 2. Extra Ballasts: 2 percent of total quantity installed for each type, but not less than one of each type. 3. Extra Fuses: 5 percent of total quantity installed for each type, but not less than two of each type. 4. Touch-Up Paint: 2 gallons, to match color of pole finish.

PART 2 PRODUCTS

2.1 MANUFACTURERS

A. Basis of Lighting Design, Luminaire types:

1. Light Poles: Ameron; embedded SEQ type with TG style Tenon. 2. Light Fixtures: Lithonia; Wall Packs and Path Fixtures.

a. Path Fixture Catalog # MRP-LED.

3. Handhole: Synertech #SYN1118 Covers marked “Lighting.”

B. Substitutions: Submit according to requirements of Division 01 Section “Substitutions.”

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Exterior Lighting: 26 5600 MASTER – July 31 2015 Page 4

C. Acceptance of substitutions will be determined by the following luminaire characteristics; Lack of data on any characteristic shall constitute justification for rejection of the submittal:

1. Performance:

a. Distribution. b. Utilization. c. Average brightness/maximum brightness. d. Spacing to mounting height ratio.

2. Construction:

a. Engineering. b. Workmanship. c. Rigidity. d. Permanence of materials and finishes.

3. Installation Ease:

a. Captive parts and captive hardware. b. Provision for leveling.

4. Maintenance:

a. Relamping ease. b. Replacement of ballast and lamp sockets.

5. Appearance:

a. Light tightness. b. Neat, trim styling. c. Conformance with design intent.

2.2 MATERIALS - GENERAL

A. Provide luminaires with trims which fit neatly and tightly to the surfaces in which they are installed without leaks or gaps.

1. Where necessary, install heat resistant non-rubber gaskets to prevent light leaks or moisture from entering between luminaires trim and the surface to which they are mounted.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Exterior Lighting: 26 5600 MASTER – July 31 2015 Page 5

B. Provide luminaires installed under canopies, roofs or open areas and similar damp or wet locations UL listed and labeled as suitable for damp or wet locations.

2.3 COMPACT FLUORESCENT LUMINAIRES

A. Ballasts: High power factor, suitable for lamp type(s) specified and switching controls indicated in Drawings.

B. Dimensions: As proper for various wattage indicated in the Drawings, as recommended by the luminaire manufacturer, or as specified.

C. Recessed Luminaires: Equip with through wire junction box. Provide box, ballast and replaceable components accessible from the ceiling opening.

D. Luminaire Finish:

1. Visible Surfaces: Color and texture as directed in Luminaire Schedule. 2. Concealed Surfaces: Matte black.

2.5 EXTERIOR SOLID STATE LUMINAIRES (LED)

A. Exterior LED Lighting is specified in Section 26 5610.

2.6 LAMPS

A. Lamp each luminaire with the suitable lamp cataloged for the specific luminaire type, and as indicated by manufacture.

1. Acceptable Lamp Manufacturers: General Electric, Phillips, Osram/Sylvania, Venture, or approved.

B. Compact Fluorescent Lamps: Of wattage and configuration indicated in Luminaire Schedule, Tri-Phosphor 3500 degree K.

1. Provide lamps with single ended dual pin plug-in base, except provide 4-pin configuration for lamps with dimming ballasts.

C. Exterior Solid State Luminaire (LED): Provide as specified in Section 26 5610, “Exterior LED Lighting.”

2.7 EXTERIOR LIGHTING SYSTEMS

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Exterior Lighting: 26 5600 MASTER – July 31 2015 Page 6

A. Unless otherwise indicated, provide cast-in-place embedded style concrete foundations with constructed forms for square foundations or round foundations with spirally wrapped treated forms. Provide concrete, anchor bolts, and reinforcing steel as indicated in the Drawings.

B. Provide poles of material and form as indicated in the luminaire schedule. Provide poles able to withstand winds of not less than 100 MPH and a gust factor of 1.30 with an ice load criteria up to 0.5 inch thick without damage to the pole and attached luminaire.

C. Provide poles with a handhole and removable handhole coverplate that matches the material and finish of the pole. Install covers with vandal resistant bolts. Locate handhole located approximately 18 inches above the pole base.

D. Provide poles with provisions for installation of Owner provided and installed security cameras. Provide handhole with removable handhole coverplate that matches the material and finish of the pole. Locate handhole based on Owner design of security cameras.

E. Provide poles with an internal ground lug easily accessible from the handhole.

F. Anchor Bolts: Provided by pole manufacturer of size and length and quantity as recommended by pole manufacturer.

1. Fabricate anchor bolts from hot rolled carbon steel bar with an “L” bend on one end. 2. Provide galvanized anchor bolts with a minimum of 12 inches on the threaded end. 3. Provide bolt circle and bolt projection dimensions with manufacturer’s Shop Drawings.

G. Provide poles with a base plate welded to the pole utilizing a back-up-ring and full- penetration welded connection.

H. Provide a one piece base cover to completely cover all foundation hardware. Provide base Cover of the same material and finish as the pole.

I. Provide external surfaces of the pole, base cover, support arms, and luminaires finished in the same material and color.

1. Provide poles chemically cleaned, rinsed, phosphatized, sealed and dried. 2. Apply an electrostatic application of polyester-power paint to all external surfaces.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Exterior Lighting: 26 5600 MASTER – July 31 2015 Page 7

3. Oven-bake complete unit to form a homogeneous, non-porous surface. Provide completed finish with no sags, drips, oxidation or runs.

J. Aluminum Poles: Seamless extruded aluminum shafts fully welded to a cast aluminum anchor base assembly.

1. Provide shaft square, straight, and meeting all requirements of AASHTO Standard Specifications. 2. Pole Height: As indicated in the Luminaire Schedule.

K. Provide luminaires listed and labeled for wet location installation.

L. Provide luminaires with a NEMA distribution pattern as indicated in the luminaire schedule.

M. Wrap poles in a protective material for shipment to the Project site.

PART 3 EXECUTION

3.1 INSTALLATION

A. Stake out the locations of exterior lighting poles for review and acceptance by the Owner prior to foundation or conduit rough-in.

B. Leave luminaires clean at the time of acceptance of the work with every lamp in operation. If luminaires are deemed dirty by the Owner at completion of the work, clean them at no additional cost to the Owner.

C. Level and align luminaires, and locate as shown in the Drawings. The final decision as to adequacy of support and alignment will be given by the Owner.

D. Aim luminaires to provide the lighting pattern for which the luminaire is designed and as directed by Owner.

E. Provide luminaires with manufacturer's labels or monograms that are not visible after the luminaire is installed.

F. Provide cast-in-place concrete foundations for pole mounted luminaires.

1. Concrete: As specified in Division 03 Section for “Cast-In-Place Concrete.” 2. Foundation Forms: As indicated. 3. Place anchor bolts in foundation as recommended by manufacturer in the required bolt circle size.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Exterior Lighting: 26 5600 MASTER – July 31 2015 Page 8

4. Tie reinforcing steel in foundation to the anchor bolts to form a solid cage. 5. Tamp wet concrete during pouring to assure complete coverage below, around and within the cage and form. 6. Hand finish top of foundation to produce a smooth, level surface.

G. Provide a minimum 10 foot copper-clad steel ground rod at each pole base. Connect from ground rod to the ground lug in the pole with minimum AWG No. 8 copper conductor.

H. Install pole mounted luminaires plumb with luminaires level, and with reflector distribution in the direction indicated in the Drawings.

1. Grout around the pole base at the foundation to close all openings. 2. Install pole base cover over all exposed installation hardware.

3.2 WIRING

A. Field install wiring within pole mounted units of the same size and type as the circuit supply conductors, unless a fuse is specified or shown in the Drawings.

END OF SECTION

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Asphalt Concrete Paving: 32 1216 MASTER – July 31, 2015 Page 1

SECTION 32 1216

ASPHALT CONCRETE PAVING

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Asphalt paving. 2. Asphalt tack coat. 3. Paving Geotextile.

B. Related Sections:

1. Section 01 4500: Quality Control, for independent inspection. 2. Section 01 5000, Construction Facilities and Temporary Controls, for vehicular and pedestrian traffic control. 3. Section 31 2000: Earth Moving, for aggregate subbase and base courses. 4. Section 32 1723: Pavement Marking 5. Section 32 1313: Concrete Paving, for concrete paving and curbs.

1.2 SYSTEM DESCRIPTION

A. Provide asphaltic concrete pavement according to the materials, workmanship, and other applicable requirements of the latest edition of standard specifications of the State of Oregon Standard Highway Department (OSHD) Specifications for Highway Construction.

1. Design paving for parking, light duty commercial vehicles, and movement of trucks up to 30,000 pounds.

1.3 SUBMITTALS

A. Product Data: For each type of product indicated. Include technical data and tested physical and performance properties.

B. Job Mix Design: For each job mix proposed for the Work.

C. Material Test Reports: For each paving material.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Asphalt Concrete Paving: 32 1216 MASTER – July 31, 2015 Page 2

D. Certification that job-mix design meets specified requirements.

1.4 QUALITY ASSURANCE

A. Mixing Plant Qualifications: Use a company with 5 years experience in production of hot-mix hot-laid asphaltic concrete pavement, and who is acceptable to the Owner.

B. Installer Qualifications: Use skilled workers trained and experienced in necessary crafts and familiar with requirements and methods needed for proper performance of work of this Section. Comply with the following:

1. Firm with 2 years experience in applying asphaltic concrete pavement. 2. Employ a construction supervisor who has evidence of 2 years experience with successful completion of paving projects of similar size, and who is acceptable to the Owner.

B. Regulatory Requirements: Conform to standards of governing authorities for paving work on public property.

1. City of Portland Standard Construction Specifications.

a. Section 205 Materials - Types and Use, Paragraph 205.2.14 Geotextile Fabrics. b. Section 309 Geotextile Fabrics, Paragraph 309.3.016 Geotextile Fabric for Asphalt Overlay.

1.5 ENVIRONMENTAL REQUIREMENTS

A. Do not apply asphaltic concrete materials if substrate is wet or excessively damp or when base surface temperature is less than 40 degrees F.

B. Apply prime and tack coats when ambient air temperature is above 50 degrees F. and has not been below 35 degrees F. for 12 hours prior to application.

C. Apply pavement sealer when air temperature is between 50 and 100 degrees F.

PART 2 PRODUCTS

2.1 MATERIALS

A. General: Provide materials and gradations conforming to requirements set forth in latest edition of State of Oregon Standard Specifications for Highway Construction (OSHD).

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Asphalt Concrete Paving: 32 1216 MASTER – July 31, 2015 Page 3

1. Various classes of asphaltic concrete are noted in Drawings.

B. Asphaltic Concrete [ Base ][ and Surface ] Course Materials:

1. Asphalt Cement: AR-4000 viscosity grade. 2. Aggregate Mix Design for Base Course: Class C mix.

3. Aggregate Mix Design for Surface Course: Class Metro C. 3. Aggregate Mix Design for Surface Course: Class Tight C.

C. Asphalt Materials:

1. Tack Coat Emulsified Asphalt: CSS-1 or CSS-1h. [ ,complying with ODOT Section 02710. ]

D. Aggregate Quality: In accordance with OSHD Specification 02680.10.

E. Aggregate for Wearing Surface Mix: In accordance with OSHD Specification Section 07545.12 and 02680 “Class C.”

F. Mineral Filler: Rock dust, hydraulic cement, or other inert material complying with ASTM D 242.

G. Asphalt Cement: PBA-5 per OSHD Specification 02710. [ASTM D 3381 for viscosity- graded material.]

H. Prime Coat: Asphalt emulsion prime conforming to OSHD Specifications.

I. Tack Coat: ASTM D 977, emulsified asphalt, slow setting, diluted in water, of suitable grade and consistency for application, Grade CSS-1h.

J. Fog Seal: ASTM D 977, emulsified asphalt, slow setting, diluted in water, of suitable grade and consistency for application.

K Water: Potable.

L. : Commercial chemical for weed control, registered by Environmental Protection Agency (EPA), in granular, liquid, or wettable powder form.

M. Paving Geotextile: AASHTO M 288, nonwoven polypropylene; resistant to chemical attach, rot, mildew; and specifically designed for paving applications. USE WHEN PAVING OVER EXISTING ASPHALT PAVING

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Asphalt Concrete Paving: 32 1216 MASTER – July 31, 2015 Page 4

1. Product: Amoco CEF Style 4596, or approved.

N. Joint Sealant: ASTM D 3405, hot-applied, single-component, polymer-modified bituminous sealant.

O. Herbicide: Granular pre-emergent.

1. Acceptable Herbicide: Ronstar 2G.

2.2 MIXES

A. Asphaltic Plant Mix: Dense, hot-laid, hot-mix asphalt plant mix, complying with the following when tested in accordance with ASTM D 1559 (Marshall Method).

1. Number of blows each end of specimen: 50. 2. Stability (Minimum): 1200. 3. Flow (Maximum) hundredths of an inch: 16. 4. Flow (Minimum) hundredths of an inch: 8.

A. Job Mix Formula Requirements for Bituminous Base Course:

1. Mix the base course in accordance with ODOT Section 00745 and Section 02680., [ except as modified in this Paragraph. ]

2. Maximum Recycled Asphalt Pavement: 20 percent. 3. Owner's Representative will establish the job mix formula for the plant mix bituminous base, based upon tests of the materials furnished. 4. Measure properties of the job mix using methods described in ASTM D 1559 as follows:

a. Number of blows, each end of specimen: 75 b. Marshall stability, minimum pounds: 1,800 c. Marshall flow: 8-16 d. Percent voids, total mix: 3-5 e. Percent void , filled with asphalt: 60-70

5. Maintain the established job mix formula until modified by the Owner's Representative. 6. The job mix formula shall establish the following:

a. Percentage of new aggregate, by weight. b. Percentage of new bituminous material, by weight.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Asphalt Concrete Paving: 32 1216 MASTER – July 31, 2015 Page 5

c. Percentage of recycled asphalt pavement, by weight. d. Temperature of mixture when delivered to point of discharge.

7. Be responsible for providing materials in proportions specified in job mix formula.

A. Job Mix Formula Requirements for Bituminous Base Course:

1. Aggregate Gradation Requirements: Comply with ODOT Section 00745 and Section 02680. 2. Furnish bituminous material to the site with a minimum temperature behind paver of 240 degrees and as indicates in ODOT Paragraph 00745.43. 3. Aggregate Gradation for Class C Oregon State Specifications:

a. 3/4" Sieve: 99 - 100 percent passing. b. 1/2 inch Sieve: 90 - 100 percent passing. c. 1/4 inch Sieve: 52 - 80 percent passing. d. Number 10 Sieve: 21 - 46 percent passing. e. Number 40 Sieve: 8 - 25 percent passing. f. Number 200 Sieve: 3 - 8 percent passing.

4. Asphalt Content: 5.5 +/- 0.6 percent bitumen in AR 4000 grade. 4. Asphalt Content: AR 4000 grade, ODOT Paragraph 02710.10.

A. Job Mix Formula Requirements for Bituminous Surface Course:

1. Mix surface course in accordance with ODOT Class C mix except in accordance with 00745 and Section 02680. [ as modified in this Paragraph. ] 2. Maximum Recycled Asphalt Pavement: 20 percent. 3. Owner's Representative will establish the job mix formula for plant mix bituminous surface course, based upon tests of materials furnished. 4. Measure properties of the job mix using methods described in ASTM D 1559 as follows:

a. Number of blows, each end of specimen: 75 b. Marshall stability, minimum pounds: 1,800 c. Marshall flow: 8-16 d. Percent voids, total mix: 3-5 e. Percent voids, filled with asphalt: 75-85

5. Maintain the established job mix formula until modified by Owner's Representative.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Asphalt Concrete Paving: 32 1216 MASTER – July 31, 2015 Page 6

6. The job mix formula shall establish the following:

a. Percentage of aggregate, by weight, passing each required sieve size. b. Percentage of new bituminous material, by weight. c. Percentage of recycled asphalt pavement, by weight. d. Temperature of mixture when delivered to point of discharge.

7. Be responsible for providing materials in proportions specified in job mix formula.

6. Aggregate Gradation Requirements: Comply with OSDOT, for Class C mix. 7. Furnish bituminous material to the site with at a minimum temperature behind the power of 240 degrees F and as indicated in ODOT Paragraph 00745.43.

8. Aggregate Gradation for Metro C Specifications:

a. 3/4 inch Sieve: 100 +/- 0 percent passing. b. 1/2 inch Sieve: 95 +/- 5 percent passing. c. 1/4 inch Sieve: 71 +/- 6 percent passing. d. Number 10 Sieve: 37 +/- 4 percent passing. e. Number 40 Sieve: 16 +/- 4 percent passing. f. Number 200 Sieve: 5 +/- 2 percent passing.

9. Asphalt Content: 5.5 +/- 0.5 percent bitumen in AR 4000 grade. 10. Aggregate Gradation for Tight C Specifications:

a. 3/4 inch Sieve: 100 +/- 0 percent passing. b. 1/2 inch Sieve: 97 + 3/- 2 percent passing. c. 1/4 inch Sieve: 80 +/- 6 percent passing. d. Number 10 Sieve: 50 +/- 6 percent passing. e. Number 40 Sieve: 17 +/- 9 percent passing. f. Number 200 Sieve: 5 +/- 2 percent passing.

11. Asphalt Content: 6.0 +/- 0.5 percent bitumen in AR 4000 grade.

B. Job Mix Formula for Seal Coat:

1. Aggregate: 3 pounds of aggregate. 2. Pavement Sealer: One gallon. 3. Water: 0.5 gallons of water per gallon of pavement sealer. 4. Admixture: 0.05 gallons of admixture per gallon of pavement sealer.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Asphalt Concrete Paving: 32 1216 MASTER – July 31, 2015 Page 7

2.3 EQUIPMENT

A. Paving and Compacting Equipment:

1. Self-Propelled Paving Equipment: Spreading machine capable of maintaining line, grade, and course thickness indicated. 2. Small Area Paving Equipment: Spreader box or manual raking for small areas less than 8 feet wide. 3. Heavy Compactors: Self propelled or tractor-towed aggregate and soil compactors including steel wheel, pneumatic tire, and vibrating roller compactors. 4. Light Compactors: Manually guided vibrating plate compactors. 5. Substrate Compaction Test Equipment: Rubber tired haul unit (dump truck), filled with soil, aggregate, or paving materials.

PART 3 EXECUTION

3.1 EXAMINATION

A. Verify that subgrade is dry and in suitable condition to support paving and imposed loads.

B. Verify that subgrade is compacted to a depth of 12 inches at 95 percent of maximum dry density at optimum moisture content as determined by ASTM D 698, Standard Proctor Test.

1. Proof-roll subbase using heavy, pneumatic-tired rollers to locate areas that are unstable or require further compaction.

C. Do not begin paving installation until unsatisfactory conditions have been corrected.

D. Verify that valve boxes, manholes, catch basins, and other appurtenances and structures that are exposed are adjusted to finish grade.

3.2 PATCHING

A. Saw cut perimeter of patch and excavate existing pavement section to sound base. Cut excavation faces vertically. Recompact existing unbound aggregate base course to form a new subgrade.

B. Tack Coat: Apply uniformly to vertical surfaces abutting or projecting into new asphaltic pavement at a rate of 0.05 to 0.15 gal./sq. yd.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Asphalt Concrete Paving: 32 1216 MASTER – July 31, 2015 Page 8

C. Patching: Fill excavated pavements with asphaltic base mix and compact flush with adjacent surface.

3.2 PREPARATION

A. Provide grade elevation stakes within the paving areas at not more than 25 feet on center each way.

1. Owner will provide grade elevation stakes within the paving areas at not more than 25 feet on center each way within 5 days after Notice to Proceed.

B. Notification: Notify Owner 24 hours prior to installation of aggregate base course and paving geotextile.

C. Remove loose and deleterious material from substrate surfaces.

D. Herbicide Treatment: Apply herbicide in accordance with manufacturer’s recommendations to dry, prepared existing paving, subgrade, or surface of compacted-aggregate base before applying paving materials.

E. Tack Coat: Apply uniformly to existing surfaces of asphaltic or cement concrete pavement, and to surfaces abutting or projecting into new asphaltic concrete pavement, such as vertical surfaces of existing pavement and curbs, and catch basins.

1. 1 part bituminous material plus 1 part water. 2. Apply at a rate of 0.06 to 0.10 gallons per square yard at a temperature range from 75 degrees F. to 130 degrees F. 0.05 to 0.2 gal./sq. yd. 3. At curbs, do not blacken surface above finished level of paving.

F. Prime Coat: Apply uniformly over surface of compacted-aggregate base to penetrate and seal surface.

1. Apply at a rate of 0.15 to 0.50 gal./sq. yd. 2. Allow prime coat to cure for 72 hours minimum. 3. Protect prime coat from damage until ready to receive paving.

G. Paving Geotextile Installation:

1. Apply tack coat uniformly to existing pavement surfaces at a rate of 0.20 to 0.30 gal./sq. yd.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Asphalt Concrete Paving: 32 1216 MASTER – July 31, 2015 Page 9

2. Place paving geotextile according to manufacturer’s instructions. Broom or roll geotextile smooth and free of wrinkles and folds. Overlap longitudinal joints 4 inches and transverse joints 6 inches.

3.3 ASPHALTIC CONCRETE PLACEMENT

A. Machine place asphaltic concrete mix on prepared surface, spread uniformly, and strike off. Where inaccessible to equipment, place mix by hand.

1. Haul, deposit, and apply asphaltic concrete in accordance with SSHC Paragraph 00745.48 by ODOT.

a. Do not start application of base course unit Owner has accepted base aggregate substrate.

2. Place base course in one life of 2 inch compacted thickness. 3. Place surface coarse in one lift of 3 inch compacted thickness in drive lanes and 2 inch compacted thickness in other parking areas and path lanes. 4. Spread mix at a temperature between 240 and 260 degrees F. 260 degrees F and 300 degrees F.

B. Begin application along centerline of crown for crowned sections and on high side of one-way slopes.

C. Regulate paver machine speed to obtain smooth, continuous surface free of pulls and tears in bituminous paving mat.

D. Place paving in consecutive strips of not less than 10 feet wide, except where infill edge strips of a lesser width are required.

1. After first strip has been placed and rolled, place succeeding strips and extend rolling to overlap previous strips. 2. Keep exposed vertical edges of paved strips free of accumulations of dirt or other foreign material before mix is spread in an adjacent strip.

a. Apply tack coat to dry or dusty contact surfaces.

E. Do not haul over material already placed until material has been compacted, and cooled to atmospheric temperature.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Asphalt Concrete Paving: 32 1216 MASTER – July 31, 2015 Page 10

3.4 JOINTS

A. Construct joints to ensure continuous bond between adjoining paving sections.

1. Construct joints free of depressions and with same surface uniformity of texture, density, smoothness, etc., as other sections of course. 2. Clean contact surfaces and apply tack coat. 3. Cut back on previous day’s application to expose full depth of course and apply tack coat to exposed edge. 4. Compact joints as soon as mixture will bear roller weight without excessive displacement.

B. Where new pavement joins to existing pavement, saw cut full depth of existing pavement in a straight and true line.

1. Protect saw cut edges from damage until finished surface has been completed. 2. Resaw damaged edges entire length of matching joint prior to placing finished surface.

3.5 COMPACTION

A. Begin compaction as soon as paving will bear roller weight without excessive displacement or hair check.

1. Compact asphaltic paving in accordance with SSHC Paragraph 00745.49, subparagraphs (a)(1), (a)(2), and (b)(1) by ODOT. 2. Compact paving with hot hand held tampers or vibratory-plate compactors in areas inaccessible to rollers. 2. Overlap rollers on successive trips. 3. Complete compaction before mix temperature cools to 185 degrees F.

B. Use one of the following compaction methods:

1. Steel-Wheel and Pneumatic: 1 pass of steel-wheel roller loaded to 10 tons, followed by 4 passes of pneumatic tired roller with tires inflated from 60 to 90 psi followed by 1 pass of steel-wheel roller loaded to 8 tons. 2. Steel-Wheel: 6 passes of steel wheel roller loaded to 10 tons. 3 Vibratory: 4 passes of vibratory roller.

C. Breakdown Rolling: Complete breakdown or initial rolling immediately after rolling joints and outside edge.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Asphalt Concrete Paving: 32 1216 MASTER – July 31, 2015 Page 11

1. Examine surfaces immediately after breakdown rolling for indicated crown, grade, and smoothness. 2. Correct laydown and rolling operations to comply with requirements.

D. Intermediate Rolling: Begin intermediate rolling immediately after breakdown rolling while asphalt is still hot enough to achieve specified density. Continue rolling until asphalt course has been uniformly compacted to the following density.

1. Average Density: 92 percent of reference maximum theoretical density according to ASTM D 2041, but not less than 90 percent no greater than 96 percent.

E. Finish Rolling: Finish roll paved surfaces to remove roller marks while asphalt is still warm.

F. Protection: After final rolling, do not permit vehicular traffic on pavement until it has cooled and hardened.

3.6 SEAL COAT

A. Apply seal coat mixture in one coat at admixture manufacturer's recommended rate to provide complete coverage of the existing pavement surface.

3.7 INSTALLATION TOLERANCES

A. Thickness: Compact each course to produce thickness indicated within the following tolerances:

1. Base Course: Plus or minus 1/2 inch. 2. Surface Course: Plus 1/4 inch, no minus.

B. Surface Smoothness: Compact each course to produce a surface smoothness within the following tolerances as determined by using a 10 foot straightedge applied transversely or longitudinally to paved areas:

1. Base Course: 1/4 inch. 2. Surface Course: 1/8 inch. 3. Crowned Surfaces: Test with crowned template; maximum allowable variance from template of 1/4 inch.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Asphalt Concrete Paving: 32 1216 MASTER – July 31, 2015 Page 12

3.8 FIELD QUALITY CONTROL

A. Owner will engage an independent testing agency to perform field inspections and tests and to prepare test reports.

1. Testing agency will conduct and interpret test and state in test reports whether Work complies with specified requirements.

B. Additional testing to determine compliance of corrected Work to meet specified requirements will be at Contractor’s expense.

C. Thickness: In-place compacted thickness will be determined according to ASTM D 3529.

D. Surface Smoothness: Finished surface will be tested for compliance with smoothness tolerances.

E. In-Place Density: Samples of uncompacted and compacted mixtures will be secured according to ASTM D 979.

1. Reference laboratory density will be determined by averaging results from 4 samples of mix delivered to site, prepared according to ASTM 1559, and compacted according to job-mix specifications. 2. In-Place Density of compacted material will be determined by core samples according to ASTM D 1188 or ASTM D 2726.

a. One core sample will be taken for every 1000 sq. yd. or less of installed pavement, but in no case less than 3 cores be taken.

F. Remove and replace or install additional mixture where test results or measurements indicate noncompliance with specified requirements.

1. Adjusting the Job Mix Formula:

a. If physical properties of asphaltic concrete paving described in this Section are not produced or if other unsatisfactory conditions result, Owner will require changes in the job mix formula or materials. b. Should the need for a new job mix formula result be required to meet specified requirements, Owner will develop a new formula. c. Owner will not be responsible for the cost for developing the new formula. d. Owner will not be responsible for construction delays caused by changing the job mix formula.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Asphalt Concrete Paving: 32 1216 MASTER – July 31, 2015 Page 13

3.9 CLEANING AND PROTECTION

A. Erect barricades to protect paving from traffic until mixture has cooled enough not to become marked.

B. Place barricades and traffic cones to keep traffic away from paving work.

C. Fill paving cracks with tack coat asphalt. D. Repair substrate soft areas and variations of more than 0.04 feet from surface grade indicated in Drawings.

1. Repair variations of more than 0.17 feet from perimeter paving lines indicated on Drawings.

E. Clean asphalt splatters, loose aggregate, from concrete curbs and walks.

F. Remove excess asphalt materials from the site.

END OF SECTION

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Concrete Paving: 32 1313 MASTER – July 31, 2015 Page 1

SECTION 32 1313

CONCRETE PAVING

PART 1 GENERAL

1.1 SUMMARY

A. Section includes cast-in-place exterior reinforced cement concrete paving including, but not limited to, the following:

1. Walkways. 2. Stairs. 3. Curbs.

B. Related Sections:

1. Section 01 4500: Quality Control, for testing procedures. 2. Section 03 3000: Cast-in-Place Concrete, for other concrete work not covered by Work of this Section. 3. Section 07 9200: Joint Sealants, for expansion and isolation joint sealant. 4. Section 31 2000: Earth Moving, for base course for concrete paving. 5. Section 32 1723: Pavement Markings

1.2 SUBMITTALS

A. Product Data: For concrete curing and hardening materials.

B. Design Mixes: For each concrete pavement mixture.

C. Reinforcement Shop Drawings:

1. Submit steel reinforcing placement drawings prior to fabrication of reinforcing. 2. Identify and dimension each type of reinforcing bar.

D. Test Reports: Submit copies of laboratory and field test reports for concrete work.

E. Ready-Mix Concrete Batch Ticket:

1. Provide a batch weight ticket with each truck for inspection agency.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Concrete Paving: 32 1313 MASTER – July 31, 2015 Page 2

2. Comply with requirements of ASTM C 94 in Article 16 Batch Ticket Information.

1.3 QUALITY ASSURANCE

A. Installer: Engage an experienced installer with at least 5 years experience and is familiar with requirements and methods needed for proper performance of Work of this Section.

B. Ready-Mix Concrete Manufacturer: Comply with ASTM C 94 requirements for production facilities and equipment.

C. Source Limitations: Provide each type or class of cementitious material of the same brand from the same manufacturer’s plant, and each aggregate from one source.

D. Comply with ACI 301, “Specifications for Structural Concrete,” unless modified by the requirements of the Contract Documents.

E. Comply with requirements in CRSI’s “Manual of Standard Practice” for fabricating reinforcement.

F. Regulatory Requirements: Conform to standards of governing authorities for paving work on public property.

PART 2 PRODUCTS

2.1 FORMS

A. Form Material: APA Grade “B” or better , metal, or other approved panel- type materials to provide full-depth, continuous, straight, smooth exposed surfaces.

1. Exposed Plywood Forms: Plyform, Class I or II. 2. Chamfer Strip: 1 inch radius.

B. Form Release Agent: Commercially formulated form-release agent that will not bond with, stain, or adversely affect concrete surfaces and will not impair subsequent treatments of concrete surfaces.

2.2 STEEL REINFORCEMENT

A. Reinforcing Bars: ASTM A 615, Grade 60, deformed, except where Grade 40 is indicated.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Concrete Paving: 32 1313 MASTER – July 31, 2015 Page 3

B. Plain-Steel Welded Wire Reinforcement: ASTM A 185, plain, fabricated from as- drawn steel wire into flat sheets.

C. Joint Dowel Bars: Plain steel bars, ASTM A 615, Grade 60.

D. Tie Bars: ASTM A 615, Grade 60, deformed.

E. Plain Steel Wire: ASTM A 82.

F. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcement bars, welded wire reinforcement, and dowels in place. Manufacture according to CRSI’s “Manual of Standard Practice” from steel wire, plastic, or precast concrete of greater compressive strength than concrete.

2.4 CONCRETE MATERIALS

A. Portland Cement: ASTM C 150, Type 1.

1. Fly Ash: ASTM C 618, Class C or F.

B. Normal Weight Aggregate: ASTM C 33, Class 4S coarse aggregate, uniformly graded. Provide aggregates from a single source.

C. Nonslip Aggregate:

1. Product Data: Not less than 95 percent pure aluminum oxide. 2. Acceptable Oxide Aggregates:

a. Gifford-Hill; Nonslip aggregate. b. Norton Company; Alundum. c. Sonneborn; Frictex N.S..

C. Exposed Aggregate: Selected, hard, and durable; washed; free of material with deleterious reactivity to cement or that cause staining; from a single source, with gap-graded coarse aggregate as follows:

1. Size: 3/8 inch to 5/8 inch diameter round aggregate in color selected.

D. Water: ASTM C 94.

E. Air-Entraining Admixtures: ASTM C 260.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Concrete Paving: 32 1313 MASTER – July 31, 2015 Page 4

F. Chemical Admixtures:

1. Water Reducing Admixture: ASTM C 494, Type A. 2. Retarding Admixture: ASTM C 494, Type B. 3. Water Reducing and Retarding Admixture: ASTM C 494, Type D.

2.5 CURING MATERIALS

A. Clear Waterborne Membrane Forming Curing Compound: ASTM C 309, Type 1, Class B.

1. Acceptable Compounds:

a. Burke; Spartan-Cote. b. Chem-Masters; Polyseal. c. Dayton Superior; J-20 Acrylic Cure, Seal & Dustproofer 14. d. A.C. Horn; Acrylic Sealer. e. Sonneborn; Kure-N-Seal. f. W.R. Meadows; Sealtight CS-309. g. Sika; Sikagard. h. Symons; Cure & Seal. i. Bostik; Polyclear.

B. Moisture Retaining Cover:

1. Polyethylene: ASTM D 2103, clear or white, minimum 6 mils thick. 2. Reinforced Laminated Paper for Pedestrian Traffic Areas: ASTM C 171, Orange Label Sisalkraft by Fortifiber Corp. 3. Reinforced Laminated Paper for Non-Traffic Areas: ASTM C 171, Sisalkraft SK-10 by Fortifiber Corp.

C. Water: Potable.

2.6 RELATED MATERIALS

A. Expansion and Isolation Joint Filler Material: 3/8 inch 1/2 inch nominal thickness.

1. ASTM D 1751, asphalt-saturated cellulosic fiber. 2. ASTM D 1752, cork or self-expanding cork.

B. Acrylic Bonding Agents: ASTM C 932.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Concrete Paving: 32 1313 MASTER – July 31, 2015 Page 5

C. Epoxy Bonding Adhesive: ASTM C881, two-component epoxy resin, of class suitable for application temperature and of grade to requirements; for bonding freshly mixed concrete to hardened concrete.

D. Patching Compounds: Two component cement base and acrylic polymer, with minimum compressive strength of 5,000 psi in 28 days.

E. Concrete Surface Cleaner: Heavy Duty Concrete Cleaner, by ProSo Co., or approved.

F. Form Joint Tape: Closed cell PVC foam with pressure sensitive adhesive on one side.

G. Chemical Surface Retarder: Water soluble, liquid set retarder with color dye for horizontal surface application for temporarily delaying hardening of concrete to a depth of 1/8 to 1/4 inch.

H. Colored, Mineral Dry-Shake Hardener: Factory-packaged dry combination of portland cement, graded quartz aggregate, coloring pigments, and plasticizing admixture.

1. Use coloring pigments that are finely ground, nonfading mineral oxides interground with cement. 2. Manufacturer: L. M. Scofield Co.; Lithochrome Color Hardener. 3. Color: As selected by Architect.

H. Color Pigment: ASTM C 979, synthetic mineral-oxide pigments or colored water- reducing admixtures; color stable, nonfading, and resistant to lime and other alkalis.

1. Color: As indicated by manufacturer's designation. 2. Color: Match Architect's sample. 3. Color: As selected by Architect from manufacturer's full range.

2.7 CONCRETE MIXES

A. Ready-Mixed Concrete: Certified by materials supplier to meet compressive strengths specified and conforming to ASTM C 94.

B. Prepare design mixes according to ACI 301 for each type and strength of normal- weight concrete determined by either laboratory trial mixes or field experience.

1. Minimum of 5-1/2 sacks of cement per cubic yard of concrete. 2. Minimum Compressive Strength: 3,500 psi at 28 days.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Concrete Paving: 32 1313 MASTER – July 31, 2015 Page 6

3. Minimum Compressive Strength for Colored Hardener Finish Concrete: 4,000 psi in 28 days. 4. Probability of Test Falling Below Specified Strength: One in five. 5. Minimum Cement Plus Pozzolan Content: 550 pounds per cubic yard. 6. Water Reducing Admixture: Type A or D. 7. Concrete Slump: Between 2 inches and 4 inches at time of placement. 8. Air Entrainment: Include 5 percent (Å 1 percent) of Admixture. 9. Water Cement Ratio: 0.45.

C. Coloring Agent: Add coloring agent to the mix according to manufacturer’s written instructions.

PART 3 EXECUTION

3.1 GENERAL

A. Comply with following minimum Specifications:

1. ACI 304 - Recommended Practice for Measuring, Mixing, Transporting and Placing Concrete. 2. ACI 305 - Hot Weather Concreting. 3. ACI 306 - Cold Weather Concreting. 4. ACI 308 - Recommended Practice for Curing Concrete. 5. ACI 309 - Recommended Practice for Consolidation Concrete.

3.2 PREPARATION

A. Verify sidewalks and driveways substrates have been brought to proper lines and grade and compacted to not less than 90 percent of maximum dry density, at optimum moisture, as determined by ASTM D 1557.

1. Correct non-conforming conditions. 2. Moisten base before concrete is placed.

B. Remove debris or extraneous matter from interior of forms or base prior to placing concrete.

1. Remove standing water and verify base is firm and stable.

C. Remove struts, stays and braces serving temporarily to hold forms in correct shape and alignment prior to placing of concrete when concrete placing has reached elevation rendering their service unnecessary.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Concrete Paving: 32 1313 MASTER – July 31, 2015 Page 7

D. Anchor Bolts:

1. Set anchor bolts for structural plates with anchor bolts double nutted to CDX plywood or templates. 2. Set anchor bolts for equipment with anchor bolts double nutted to templates furnished by equipment manufacturer.

3.3 EDGE FORMS

A. Set, brace, and secure edge forms, bulkheads, and intermediate screed guides for pavement to required lines, grades, and elevations.

1. Lines and forms for concrete sections shall not vary more than 1/4 inch in ten feet. 2. Do not exceed maximum variation from plumb of 1/4 inch.

B. Reuse of Forms: Clean concrete contact surfaces and reapply form release agents prior to reusing forms.

3.4 STEEL REINFORCEMENT

A. Comply with recommendations in CRSI’s “Placing of Reinforcing Bars” for fabricating, placing, and supporting reinforcement.

B. Install No. 3 bars spaced 18 inches on centers both ways.

1. Lap continuous grade 60 bars 30 or 36 diameters and not less than 24 inches, except where indicated otherwise. 2. Lap continuous grade 40 bars 24 diameters and not less than 24 inches. 3. Stagger reinforcing splices 36 inches minimum.

C. Installed welded wire reinforcement in lengths as long as practicable. Lap adjoining pieces at least one full mesh, and lace splices with wire. Offset laps of adjoining widths to prevent continuous laps in either direction.

3.5 JOINTS

A. General: Form construction, isolation, and contraction joints and tool edgings true to line with faces perpendicular to surface plane of concrete. Construct transverse joints at right angles to centerline, unless otherwise indicated.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Concrete Paving: 32 1313 MASTER – July 31, 2015 Page 8

B. Construction Joints: Set construction joints at side and end terminations of pavement, and at locations where pavement operations are stopped for more than 1/2 hours, unless pavement terminates at expansion or isolation joints.

1. Continue reinforcement across construction joints, unless otherwise indicated. 2. Butt Joints: Use epoxy bonding adhesive at locations where fresh concrete is placed against hardened of partially hardened concrete surfaces. 3. Doweled Joints: Install dowel bars and support assemblies at joints where indicated. Lubricate 1/2 of dowel length to prevent concrete bonding to one side of joint.

C. Expansion or Isolation Joints: Form expansion and isolation joints of preformed joint filler strips, as follows:

1. Width of Joint: 1/2 inch, unless otherwise indicated.

a. 3/4 inch where new concrete surfacing abuts other pavement.

2. Extend joint fillers to full depth of pavement if joint sealant is not indicated. 3. Terminate joint filler not less than 1/2 inch or more than 1 inch below finished surface if joint sealant is indicated.

a. Fill top of joint flush with pavement with pourable, self-leveling traffic sealant specified in Section 07 9200, “Joint Sealants.”

4. Locations:

a. Between driveways and other pavements. b. Transversely in walks at a distance of six to eight feet in from curbs that occur at walk-ends. c. Transversely in walks opposite expansion joints in adjoining curbs. d. Elsewhere at such locations that distance between transverse expansion joints does not exceed 25 feet. e. Where pavement abuts poles, posts, driveways, boxes, concrete curbs, catch basins, manholes, inlets, structures, walks, and other fixed objects which protrude through, into, or against pavement. f. Adjacent to other new or existing pavements.

D. Contraction Joints: Form contraction joints of weakened plane, sectioning concrete into areas indicated.

1. Space at a maximum of 5 feet, unless otherwise indicated.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Concrete Paving: 32 1313 MASTER – July 31, 2015 Page 9

2. Form joints to a depth of 1/3 of thickness of concrete and to a width of approximately 1/8 inch. 3. Tool joint edges smooth. 4. Provide sawed joints only with approval of Owner.

3.6 CONCRETE PLACEMENT

A. Remove snow, ice, or frost from subbase surface and reinforcement before placing concrete. Do not place concrete on frozen surfaces.

1. Do not place concrete when temperature or weather will affect performance or appearance of concrete. 2. Maximum Wind Velocity: 15 mph. 3. Minimum Ambient Temperature: 40 Degrees F. 4. Precipitation: None expected in 8 hours.

B. Coat aluminum conduit embedded in concrete with protective material or prime paint prior to concrete placement.

C. Moisten subbase to provide a uniform dampened condition at time concrete is placed.

D. Comply with ACI 301 requirements for measuring, mixing, transporting, and placing concrete.

E. Do not use concrete that does not reach its final position in forms within 1-1/2 hours after introduction of water to mix at batch plant.

F. Do not add water to concrete during delivery or at Project site.

G. Place concrete in a continuous operation between transverse joints.

H. Consolidate concrete, during and immediately after placing according to ACI 301 by mechanical vibrating equipment supplemented by hand spading, rodding, and tamping.

I. Screed pavement surfaces with a straightedge and strike off.

3.7 REMOVAL OF FORMS

A. Give consideration to location and character of concrete, weather and other conditions influencing setting of concrete and materials used in mix in determining time for removal of forms.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Concrete Paving: 32 1313 MASTER – July 31, 2015 Page 10

1. Comply with recommendations, precautions and requirements of ACI 347and ACI 318. 2. In any case, do not remove forms for a period of 4 days following placement of concrete.

3.8 CONCRETE FINISHING

A. Finish sidewalks, stair treads, loading dock, and pavements to a smooth and uniform texture by troweling and floating, and cross-broomed perpendicular to traffic.

1. Provide floated finish for slab surfaces to receive waterproofing membrane and brick pavers, and slab surfaces indicated to receive a seeded, dry shake, colored hardener, and washed aggregate finish. 2. Provide exposed aggregate seeded finish and smooth or textured colored hardener finish where indicated in the Drawings. 3. Surface score as indicated. 4. Tool exposed edges to 1/4 inch 1 inch radius.

B. Vertical Surfaces:

1. Concealed Vertical Surfaces:

a. Provide rough form finish, complying with ACI 301, paragraph 10.2.1. b. Remove fins and projections exceeding 1/4 inch in height and patch tie holes and surface defects.

2. Exposed Vertical Surfaces:

1. Provide smooth form finish complying with ACI 301, paragraph 10.2.2. 2. Remove fins and projections and patch tie holes and surface defects. 3. Provide smooth rubbed finish for exposed curb and walk edges, complying with ACI 301, paragraph 10.3.1. 4. Within 24 hours after form removal, wet and rub exposed curb and walk edges with carborundum brick or other abrasive until uniform color and texture are produced.

C. Scratched Slab Finish:

1. Provide scratched finish for slab surfaces to receive bonded paver applications, complying with ACI 301, paragraph 11.7.1.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Concrete Paving: 32 1313 MASTER – July 31, 2015 Page 11

2. Level to Class C Tolerance, 1/4 inch in 2 feet, and roughen with stiff brushes or rakes before final set.

D. Floated Finish: Comply with ACI 301, Paragraph 11.7.2.

1. Begin floating when bleed-water sheen has disappeared and surface has stiffened sufficiently to permit operations. 2. Check surface plane with a 10 foot straightedge at two or more angles during or after first floating. 3. Cut high spots and fill low spots during floating to level to class B tolerance, 1/4 inch in 10 feet. 4. Refloat surface immediately to a uniform granular texture.

E. Broom Finish: Comply with ACI 301, paragraph 11.7.4.

1. Medium-to-Fine Texture: Draw a soft bristle broom across float finished concrete perpendicular to line of traffic to provide a uniform, fine-line texture 2. Medium-to-Course Texture: Striate float finished concrete 1/16 to 1/8 inch deep with a stiff-bristled broom, perpendicular to line of traffic.

F. Burlap Finish: Drag a seamless strip of damp burlap across float finished concrete perpendicular to line of traffic to provide a uniform, gritty texture.

G. Monolithic Exposed Aggregate Finish: Expose coarse aggregate in pavement surface as follows:

1. Immediately after floating, spray apply chemical surface retarder in accordance with manufacturer’s instructions. 2. Cover with plastic sheeting, sealing laps with tape, and remove when ready to continue finishing operations. 3. Remove excess mortar without dislodging aggregate by lightly brushing surface with a stiff, nylon bristle broom. 4. Fine spray surface with water and brush. Repeat water flushing and brushing cycle until cement film is removed from aggregate surfaces to depth required.

H. Seeded Exposed Aggregate Finish:

1. Immediately after floating, broadcast a single layer of aggregate uniformly on pavement surface. 2. Tamp seeded aggregate into plastic concrete and float to entirely embed aggregate with mortar cover of 1/16 inch.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Concrete Paving: 32 1313 MASTER – July 31, 2015 Page 12

3. Spray apply chemical surface retarder in accordance with manufacturer’s instructions. 4. Cover with plastic sheeting, sealing laps with tape, and remove when ready to continue finishing operations. 5. Remove excess mortar without dislodging aggregate by lightly brushing surface with a stiff, nylon bristle broom. 6. Fine spray surface with water and brush. Repeat water flushing and brushing cycle until cement film is removed from aggregate surfaces to depth required.

I. Colored Dry-Shake Hardener Finish: After initial floating, apply dry-shake materials in accordance with manufacturer’s instructions and as follows:

1. Apply dry-shake hardener at minimum rate of 60 pounds per 100 sq. ft., unless otherwise recommended by manufacturer. 2. Apply in 2 or more shakes. 3. Float after each application. 4. Trowel to smooth and uniform texture after final floating. 5. Tool edges to 1/4 inch radius. 6. Cure concrete with curing compound recommended by dry-shake hardener manufacturer.

3.9 CURING

A. Protect freshly placed concrete from premature drying and excessive cold or hot temperatures.

1. Comply with ACI recommendations for cold weather and hot weather protection during curing.

B. Cure concrete by one of the following, or a combination of methods:

1. Moisture Curing: Keep concrete surfaces continually moist for not less than 7 days with water, continuous water-fog spray, or use of water saturated absorptive cover kept continuously wet. 2. Moisture Retaining Cover Curing: Cover concrete with moisture retaining cover with sides and ends lapped and sealed by waterproof tape. 3. Curing Compound: Apply uniformly in continuous operation according to manufacturer’s instructions.

C. Keep concrete protected and continuously moist for not less than 72 hours.

D. Keep pedestrian and vehicular traffic off surface for minimum of 7 days.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Concrete Paving: 32 1313 MASTER – July 31, 2015 Page 13

3.10 PAVEMENT TOLERANCES

A. Comply with tolerances of ACI 117 and as follows:

1. Elevation: 1/4 inch. 2. Thickness: Plus 3/8 inch, minus 1/4 inch. 3. Surface: Not to vary more than 1/4 inch when tested with a 10 foot straight edge. 4. Joint Spacing: 3 inches. 5. Contraction Joint Depth: Plus 1/4 inch, no minus. 6. Joint Width: Plus 1/8 inch, no minus.

3.11 FIELD QUALITY CONTROL

A. Owner will engage a testing and inspection agency to sample materials, perform tests, and submit test reports during concrete placement.

1. Notify testing and inspection agency 24 hours prior to delivery and placement of concrete. 2. Concrete strength tests for quantities less than 50 cubic yards will not be required when waived by Owner.

B. Do not place concrete or reinforcement in footing forms until compacted soil and aggregate materials within forms have been examined.

C. Do not place concrete in formwork until reinforcing steel has been examined.

D. Ready Mixed Concrete Inspection and Testing:

1. Sample each truck load of ready mixed concrete, complying with ASTM C172. 2. Perform one slump test for each truck load of ready mixed concrete, complying with ASTM C 143. 3. Perform one air content test for each set of compressive strength specimens, complying with ASTM C 231. 4. Make one set of 3 of compressive strength specimens for each day of structural concrete pouring or each 50 cubic yards or fraction thereof for each class of concrete, complying with ASTM C 31.

a. Test one specimen in accordance with ASTM C 39 after curing 7 days, one specimen after curing 28 days, and retain one specimen for testing after 35 days or as directed by Architect.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Concrete Paving: 32 1313 MASTER – July 31, 2015 Page 14

5. Batch Ticket:

a. Receive a batch weight ticket from each truck; batch ticket to comply with requirements of ASTM C 94 in Article 16 for Batch Ticket Information. b. Verify water/cement ratio.

1) No water may be added if load is at specified ratio. 2) Reject truck if ratio does not conform.

3.12 REPAIRS AND PROTECTION

A. Remove and replace concrete pavement that is broken, damaged, or defective or that does not comply with requirements in this Section.

1. Reconstruct damaged pavement for entire length between regularly scheduled joints. 2. If defects in color and texture of concrete surface cannot be repaired, remove and replace defective concrete. 3. Dispose removed concrete of in legal manner at no additional cost to Owner.

B. Protect concrete pavement from damage and discoloration.

1. Exclude traffic from pavement for at least 14 days after placement. 2. Cover fresh concrete with 1/2 inch thick, plywood or oriented strand board for 48 hours minimum where exposed to public, pedestrian, and animal traffic. 3. Protect concrete from shrinkage crack damage until protected by curing procedure. 4. Protect concrete from physical damage or reduced strength caused by air temperatures below 45 degrees F. during curing period, as recommended in ACI 306R. 5. Protect concrete from physical damage or reduced strength caused by air temperatures above 75 degrees F. during curing period, as recommended in ACI 305R.

C. Clean discolored concrete.

1. Apply concrete cleaner, in conformance with manufacturer’s recommendations, to remove oil residues, scum, excess mortar, and the like.

END OF SECTION

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Pavement Marking: 32 1723 MASTER – July 31, 2015 Page 1

SECTION 32 1723

PAVEMENT MARKING

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Traffic lane, curb, and parking stall painting and striping. 2. Symbols of accessibility. 3. Directional arrow painting. 4. Traffic Lane marking buttons. 5. Basketball court boundary striping and markings.

B. Related Sections:

1. Section 01 3563: Sustainability Certification Project Requirements, for additional submittal requirements. 1. Section 32 1216: Asphalt Paving, for substrate. 2. Section 32 1313: Concrete Paving, for substrate.

1.2 SUBMITTALS

A. Product Data: Product data sheet for paint to include general properties of paint, surface preparation, application instructions, and cleanup information.

B. Shop Drawings:

1. Indicate pavement markings, colors, lane separations, defined parking spaces, and dimensions to adjacent work. 2. Indicate, with international symbol of accessibility, spaces allocated for people with disabilities. 3. Indicate pavement markings, colors, defining basketball court boundary striping and markings.

C. Documentation required for LEED certification for Credits MR 5 and Credit ID 1, as described in Section 01 3563, “Sustainability Certification Project Requirements.”

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Pavement Marking: 32 1723 MASTER – July 31, 2015 Page 2

1.3 SITE CONDITIONS

A. Environmental Requirements:

1. Do not apply marking paint when wind velocity exceeds 15 mph. 2. Do not apply marking paint when pavement temperature is less than 40 degrees F, and ambient air temperature is less than 45 degrees F.

1.5 SCHEDULING

A. Perform pavement marking work after concrete curbs, and walks have been installed and cured.

B. Perform pavement marking work after asphaltic concrete paving has been installed, cured, and sealed.

PART 2 PRODUCTS

2.1 MANUFACTURERS

A. Provide products by manufacturers indicated in this Section, or approved.

1. Substitutions: Pre-approval by Owner according to requirements of Division 01 Section for “Substitutions.”

A. LEED Certification Goals: Provide surface marking paints that compliance with the following:

1. LEED Credit ID 1: For paints and coatings that comply with the following limits for VOC content by weight in grams/liter of product minus water:

a. Exterior Flat Paints: 100 b. Exterior Non-Flat Paints: 200

2. LEED Credit MR 5: For regionally manufactured products.

2.2 TRAFFIC MARKING PAINT

A. Latex Traffic Marking Paints: Provide products by one of the following:

1. Benjamin Moore: Super Spec HP, Safety & Zone Marking Latex P58. 2. Kelly-Moore: Mark Right Latex Traffic Paint 1450. 3. Miller Paint: Acrylic Zone Marking Finish; 8001 White, 8013 Yellow.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Pavement Marking: 32 1723 MASTER – July 31, 2015 Page 3

4. PPG: Traffic Marking Latex 11-23. 5. Rodda: Professional Maintenance, Driveline, 7341 White, 7342 Yellow. 6. Sherwin-Williams: Industrial & Marine, Setfast Acrylic Waterborne Traffic Paint TM227/TM226.

B. Alkyd Traffic Marking Paints: Provide products by one of the following:

1. PPG: Alkyd Traffic Paint 11-3, Series. 2. Rodda: Professional Maintenance Zone Marking Paint, 7171 Series.

1. Miller: Traffic Line Paint, 8000 White, 8002 Yellow, and 8008 Blue. 2. Parker: Traffic line paint, yellow, white, and blue. 3. P.P.G. Industries: Pittsburgh Traffic and Zone Marking Paint 22 Line, yellow, white, and blue. 4. Rodda: Traffic Paint, White 671, Yellow 670, and Blue 29712. 5. Sherwin-Williams: White B29 W1, Yellow B29 Y2, and Blue B29WI plus 6 ounces of Blue.

2.3 TRAFFIC LANE MAKING BUTTONS

A. Type: Reflective plastic cone with metal anchor pin in center.

B. Size: 3 inch diameter.

C. Epoxy Adhesive: ER-691T by Miracle Adhesives Corp., or approved.

2.4 ACCESSORIES

C. Asphalt Mark-out Materials:

1. Asphalt Emulsion: SS-sh.

D. Mark-Out Paint:

1. Color: Black. 2. Type: Acrylic latex or alkyd oil, flat enamel.

2.5 PAVEMENT MARKING EQUIPMENT

A. Apply paint with motor powered atomizing spray striping machine.

B. Adjust equipment to provide the specified wet film thickness.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Pavement Marking: 32 1723 MASTER – July 31, 2015 Page 4

PART 3 EXECUTION

3.1 PROTECTION AND PREPARATION

A. Protection: Place temporary barricade and rope or plastic cone barriers to protect striping from vehicular traffic until paint is dry.

B. Surface Preparation:

1. Pressure wash paving surface and blow dry wet areas prior to applying paint. 2. Cover existing striping with black paint where indicated.

3.2 PAVEMENT STRIPING

A. Spray apply paint with straight edges, true alignment, and uniform wet film thickness of 17 mils with thickness variation not to exceed 2 mils.

B. Form disabled accessibility symbols and arrows with templates.

C. Apply white paint to curbs and center lines of two direction drive lanes.

D. Apply yellow paint to curbs where parking is restricted, center lines of two direction drive lanes, no parking striped paving areas, and cross walks.

E. Apply blue paint for disabled accessibility symbols and markings.

F. Apply parking area striping in 3 inch wide yellow lines.

3.3 TRAFFIC LANE MAKING BUTTONS

A. Install marking buttons in epoxy adhesive and secure with driven anchor pin.

3.4 ADJUSTING

A. Remove misplaced marking paint from concrete surfaces and other surfaces.

B. Cover misplaced paint on asphaltic concrete with asphalt emulsion.

C. Remove and reinstall misplaced marking buttons.

END OF SECTION

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Infilled Synthetic Turf: 32 1824 MASTER – July 31, 2015 Page 1

SECTION 32 1824

INFILLED SYNTHETIC TURF

PART 1 GENERAL

1.1 SUMMARY

A. Section includes an installation of a vertically draining, infilled synthetic turf surfacing system with sand and rubber infill for an athletic playing field over a free- draining, permeable aggregate base, including field inlaid lines, markings, and logos.

B. Related Sections:

1. Section 01 2300: Alternates, for Alternate Nos. __, __, and __ affecting Work of this Section. 1. Section 01 4500: Quality Control, for independent testing requirements. 2. Section 01 5000: Construction Facilities and Temporary Controls, for pedestrian traffic control. 3. Section 31 2000: Earth Moving, for preparation of subsoils. 4. Section 32 3114: Chain Link Fences, for fenced enclosure. 5. Section 33 4615: Athletic Field Drainage Systems

1.2 REFERENCES

A. Federation Internationale de Football Association (FIFA) Rule of The Game, latest edition.

B. National Collegiate Athletic Association (NCAA) Soccer Rulebook, latest edition.

C. National Federation of State High School Association (NFHS) Soccer Rulebook, latest edition, as amended by Oregon School Activities Association (OSAA)).

D. Applicable American Society for Testing Materials (ASTM), latest editions.

1.3 SYSTEM DESCRIPTION

A. Infilled Synthetic Turf System: Vertical-draining permeable synthetic turf system, consisting of a synthetic grass like surface pile, tufted into a synthetic backing, with all layers firmly bonded together.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Infilled Synthetic Turf: 32 1824 MASTER – July 31, 2015 Page 2

B. The entire system constructed to maximize dimensional stability, to resist damage and normal wear and tear from its designated use, to minimize ultraviolet degradation, and be resistant to weather, insects, rot, mildew, and fungus growth, and be non-allergenic and non-toxic.

1.4 SUBMITTALS

A. Product Data, for each type of material and product specified and manufacturer’s written installation instructions.

1. Submit 5 copies of material specifications and installation instructions.

a. Include manufacturer’s provisions for achieving permeability, stating rate in infiltration and permeability in inches per hour of system material for the vertical draining system.

B. Shop Drawings: Detailed drawings scaled at 1 inch to 30 feet, indicating all components of the synthetic turf field system, including but not limited to, the following:

1. Edging details. 2. Insert details including backing materials. 3. Seam details. 4. Seam layout. 5. Gluing patterns. 6. Dimensions for field lines, markings, boundries.

C. Samples: Submit the following:

1. Two 6 inch by 12 inch samples of green turf showing backing with perforations. 2. Two 6 inch by 12 inch samples of other colors proposed for field lines and markings. 3. Two 6 inch by 12 inch samples of turf showing method of seam make-up with perforations.

a. Provide one sample with example of inlaid lines.

4. Two 1 pound samples of in-fill materials.

D. Evidence of certifications, licenses, and experience required for performing Work of this Section.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Infilled Synthetic Turf: 32 1824 MASTER – July 31, 2015 Page 3

E. Installer Certificate: Signed by synthetic turf provider certifying that Installer is approved, authorized, or licensed by manufacturer to install specified turf system and is eligible to receive the synthetic turf manufacturer's warranty.

F. Qualification Data: For firms and persons specified in the "Quality Assurance" Article.

G. Test Reports:

1. Evaluation of tests performed by an independent testing agency, that indicates compliance with requirements of specified turf system. 2. Synthetic turf system manufacturer's inspection report of completed installation, confirming that installation is in accordance with manufacturer’s requirements.

H. Maintenance Data: To include in the maintenance manuals specified in Division 01, a complete written guide for operation and maintenance of the turf system, including guidelines for training maintenance personnel and equipment required for field maintenance.

I. Submit as-built documents according to requirements of Division 01, and the the following:

1. A complete topographically surveyed map of all above and below grade utilities and systems, with actual locations of seams, drains, playing field lines and other pertinent information. 2. Provided in AutoCAD and PDF electronic format as well as hard copies according to Owner Standard Requirements.

J. Warranties: Submit 5 copies of installers and manufacturers warranties.

1.5 QUALITY ASSURANCE

A. Perform Work in accordance with turf manufacturer’s instructions.

1. For items in and around the playing field, ensure compliance with the most recent design standards of the National Federation of State High Schools Association.

B. Manufacturer Qualifications:

1. Manufacturer who has produced in-fill synthetic turf products for the following:

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Infilled Synthetic Turf: 32 1824 MASTER – July 31, 2015 Page 4

a. A minimum of 20 successful in-filled synthetic soccer fields of turf full size (minimum 75,000 SF) within the past 2 years. b. A minimum of 10 successful in-filled synthetic turf football or soccer fields of full size (minimum 75,000 SF) with the identical product including in-fill composition to that specified within the past year.

2. The manufacturer of the synthetic turf system shall have a designated employee representative available for service who is based in the Pacific Northwest (Oregon, Washington, or Idaho).

C. Installer Qualifications: An experienced installer who is familiar with requirements and methods needed for proper performance of Work of this Section, and meets the following requirements:

1. A firm authorized by the turf manufacturer. 2. A firm who has installed a minimum of 5 successful in-filled synthetic turf football or soccer fields of full size (minimum 75,000 SF) with the product manufacturer proposed for this Project, and has installed either:

a. A minimum of 10 successful in-filled synthetic turf football or soccer fields of full size (minimum 75,000 SF) within the past 2 years, or; b. A minimum of 20 successful in-filled synthetic turf football or soccer fields of full size (minimum 75,000 SF) within the past 5 years

3. Installer shall designate a single individual as project foreman who shall be on site at all times during installation and who has installed the specified product, or similar, at a minimum of 10 locations in the last 5 years.

a. Should a replacement of an appointed project foreman be required, the replacement must be approved by the Owner.

D. Certifications:

1. Written documentation by the synthetic turf manufacturer certifying the following:

a. The source of the fiber used in the field. b. Green and other colors used for lines and markings.

2. Certification from both the synthetic turf manufacturer and the fiber supplier that the fiber and SBR rubber has less than 50 ppm or less of lead.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Infilled Synthetic Turf: 32 1824 MASTER – July 31, 2015 Page 5

3. Certification from the installer of acceptability by the synthetic turf manufacturer of the existing permeable aggregate for installation and warranty validation. 4. Certification that synthetic turf manufacturer and installer have not infringed upon any current or pending patents held by other synthetic turf manufacturers or installer for the synthetic turf surfacing system, including installation methods and vertical draining characteristics.

F. Test Reports:

1. Engage an Independent Testing Laboratory with experience in testing synthetic turf or carpeting materials in accordance with requirements of Section 01 4500, “Quality Control,” for performing and evaluating tests specified required before installation and specified in “Field Quality Control” Article.

a. Transmit copies of test results to the Owner directly from the testing laboratory.

2. Prior to Installation:

a. Randomly sample and test synthetic material from every 6th roll for the following, of minimum 12 by 12 inch sample size:

1) Pile Composition; FTIR Spectrograph. 2) Pile Weight; ASTM D 5848. 3) Total Weight; ASTM D 5848. 4) Pile Height; ASTM D 5823. 5) Backing Perforation Diameter and Spacing; ASTM D 5793. 6) Tuft Bind (without in-fill); ASTM D 1335. 7) Grab/Tear Strength; ASTM D 5304.

3. Provide a written report that the representative of the Synthetic Turf Provider has inspected the installation and that the work conforms to the manufacturer’s requirements and any written directives of the manufacturer’s representative.

1.6 WARRANTIES

A. Warranty of Synthetic Turf:

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Infilled Synthetic Turf: 32 1824 MASTER – July 31, 2015 Page 6

1. Provide warranties that cover, in general, usability of the turf surface, accessories, use characteristics, and suitability of the installation, for a period of 8 years from the date of acceptance, for the following uses:

a. Soccer. b. Lacrosse. c. Football. d. Rugby. e. Ultimate Frisbee. f. Marching band. g. Physical excercises. h. Physical education activities. i. Pneumatic rubber-tired maintenance and service vehicles. j. Pedestrian traffic and other similar uses. k. Ceremonial and entertainment events with portable floor coverings.

3. All Warranties shall cover replacement or repair with new materials, including disposal of replaced items. 4. Warranty Insurance Policy: Furnish a pre-paid insurance policy in support of the field warranty for the entire warranty period from an A-rated domestic insurance carrier, secured to the Owner of not less than $300,000 per claim and an aggregate of $5,000,00.

a. A sample form of warranty, suggested for use for the Work of this Section, is included at the end of PART 3 of this Specification. b. Manufacturer’s standard form of warranty may be used provided all conditions specified are incorporated.

B. Warranty Testing:

1. The turf system shall be tested for dynamic cushioning (“GMAX” Test) by an experienced independent testing laboratory acceptable to the Owner.

a. Perform tests at the following times:

1) Shortly prior to acceptance inspection by the Owner; 2) At the anniversary date of the first year, second year, fourth year, sixth year, and 60 days prior to the anniversary date of the warranty expiration.

b. If conditions of the Specifications and/or Warranty are not met, the Contractor has the option of corrective work or replacement.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Infilled Synthetic Turf: 32 1824 MASTER – July 31, 2015 Page 7

c. In the event corrective work does not meet the requirements of the Specifications after a second attempt to bring the system within these limits, then the Contractor is to replace non-conforming areas or sections solely at the Owner’s discretion and direction.

2. Perform tests in accordance with ASTM F-1936-10 and F355 10A. 3. Test locations as designated in F-1936-10, Paragraph 8.

a. Include in the report the measured depth of the in-fill material at all test locations.

4. Include cost of all tests as Work of this Section. 5. Transmit copies of test results directly from the testing laboratory to the Owner, Contractor, and Field Consultant within 30 days of testing. 6. If the Contractor does not have the tests performed within 10 days of specified times listed, the Owner has the option of ordering the testing work at the expense of the Synthetic Turf Surfacing Contractor.

1.7 EXTRA MATERIALS

A. Provide the following extra materials neatly packaged and palletized, wrapped, and clearly labeled with Project Name and Date:

1. Infill Material: Four 33 gallon plastic trash containers with lids. 2. Turf for Future Repairs:

a. Material may be roll ends or cutoffs; each piece of at least 5 by 10 feet. Do not exceed 10 by 15 feet for any single piece. b. Provide the following minimum areas for extra synthetic turf materials:

Green Turf: 500 SF of each yarn type White Turf: 100 LF of 4 inch wide lines of each yarn type Blue and Red Turf: 20 LF of 4 inch wide lines each yarn type Alt: 100 LF of 4 inch wide lines of each type

1.8 MAINTENANCE

A. Provide to Owner a complete written guide for operation and maintenance of the turf system.

B. Provide training of maintenance personnel.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Infilled Synthetic Turf: 32 1824 MASTER – July 31, 2015 Page 8

1, Videotape training and provide to Owner at Project close-out. 2. Include written approval of the equipment the Owner or Owner’s agent uses to maintain the field, the activities required to maintain the field, and a schedule of maintenance activities.

C. Maintenance Machinery: Synthetic Turf Provider to verify if Owner’s existing machinery is approved for maintenance.

1. If Owner does not own required or sufficient equipment to maintain the field, provide the Owner with all equipment necessary to maintain the field as part of the Work of this Section.

D. Maintenance Service:

1. Provide complete maintenance of the synthetic turf field at both 6 months and 1 year after the date of Substantial Completion. Minimum maintenance activities shall include the following:

a Inspect and repair as required each seam. b. Inspect and repair each inlay and marking as required. c. Brush and remove surface debris, loose fibers and any other deleterious material. Use of a rotating, mechanical brush is recommended. d. Re-level infill materials. Import and place /top dress new infill material matching original infill materials as needed to establish original infill depth, with 3/4 inch of exposed fiber.

2. All maintenance activities shall be as approved and directed by the original manufacturer. 3. Coordinate all maintenance activities with scheduled use of the facility and completed at the convenience of the Owner and applicable user groups.

PART 2 PRODUCTS

2.1 MANUFACTURERS

A. Acceptable Fiber Manufacturers for In-Filled Synthetic Tturf Systems:

1. Bonar:

a. Monofilament: MN Ultra. b. Tape/File: Not applicable.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Infilled Synthetic Turf: 32 1824 MASTER – July 31, 2015 Page 9

2. Field Turf:

a. Monofilament: Revolution. b. Tape/File: Classic.

3. Polytex:

a. Monofilament: ME PE270RS. b. Tape/File: FB PE10000-9-11HP.

4. TenCate:

a. Monofilament: Monoslide HQ, Monoslide Pro. b. Tape/File: Tapeslide XT, XP Blade.

5. Wetekam:

a. Monofilament: Hellas C-8 Matrix Monofilament. b. Tape/File: Not applicable.

6. ITS Sprin Turf:

a. Monofilament: Not applicable. b. Tape/File: Ultrablade.

B. Substitutions: Submit according to Division 01 Section for “Substitutions.”

2.2 SYNTHETIC TURF SYSTEM – GENERAL CHARCTERISTICS

A. Resistant to weather, insects, rot, mildew, and fungus growth, non-allergenic and non-toxic.

B. Constructed to maximize dimensional stability, to resist damage and normal wear and tear from its designated use, and to minimize ultraviolet degradation.

C. Longitudinal Turf Seams: Sewn with high strength polyester fiber cord or nylon using an approved stitch method.

D. Backing Layers and Coatings: Firmly bonded together, with coating materials completely cured and bonded to other backing layers.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Infilled Synthetic Turf: 32 1824 MASTER – July 31, 2015 Page 10

E. Permeability Requirements: Capable of vertically draining a minimum of 20 inches of precipitation per hour without visible surface ponding, for entire system including the synthetic turf infill materials.

2.3 SYNTHETIC TURF SYSTEM – MATERIAL COMPONENTS

A. Pile fibers that resemble freshly-grown natural grass in appearance, texture and colors.

B. Fabric Backing: Loose laid and anchored at the perimeter of the fields as shown in details, or adhered to the base.

C. Bonding Adhesives: Resistant to moisture, bacterial and fungus attacks, and ultraviolet rays at any location.

2.4 DYNAMIC SYSTEM CUSHION REQUIREMENTS

A. Not to exceed a maximum value of 130 G's per ASTM, F1936-10 and ASTM, F355, procedure A at any location upon installation, nor exceed 165G’s throughout the warranted service life.

2.5 SYNTHETIC TURF PILE SURFACE

A. A pile surface that exhibits good traction in all types of weather with the use of conventional "sneaker-type shoes" and composition, molded-sole athletic shoes.

B. A pile surface nominally uniform in length for all portions of the field.

1. Synthetic turf panels or rolls with irregular pile heights or with “J hooked” fibers that extend more than 1/4 inch above the surrounding fibers are not allowed.

C. A pile surface that is suitable for both temporary and permanent line markings using rubber-base paint, where applicable.

D. Color of Synthetic Turf: Green.

1. Additional turf colors are specified for the lines and markings. 2. Provide fiber used for lines and markings of the same composition in all respects as the turf, except for color as that used for the green field areas.

2.6 SYNTHETIC TURF FABRIC SURFACE

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Infilled Synthetic Turf: 32 1824 MASTER – July 31, 2015 Page 11

A. A fabric surface constructed and installed in minimum 15 foot widths with no longitudinal or transverse seams, except for head or tee seams at field boundaries and inlaid lines within a finished roll assembly. Space seams at 15’-0” apart.

1. Not Allowed:

a. Rolls that that are not evenly laid, and with full dimension width. b. Fitted pieces or relief cuts to true alignment. c. Rolls with color that is not uniform and has visible deviations in shade.

2.7 SYNTHETIC TURF PERFORATIONS

A. Provide synthetic turf with tufted fibers and a coated backing that either has perforations in the backing for vertical drainage, or turf that includes a partially coated backing providing permeability without the use of perforations.

B. Perforated Backing:

1. Perforated with a minimum of 95 percent integrity over entire surface, with 3/16 inch clear opening holes spaced at a maximum of 4 inches on center. 2. Perforate completely through the underside of the turf backing with no material residue or fragmented fibers remaining. 3. Owner shall approve turf perforations either prior to shipment, upon delivery on-site, or during on-site perforating operations as applicable.

C. If non-permeable backing material exceeds 12 inches in width, provide perforations in accordance with requirements, drilling the surface after adhesive has set.

2.8 LINES AND MARKINGS

A. Provide with initial installation of surfacing system, a complete field lining, marking and field boundary system with team area limits, etc. Accurately survey layouts and mark prior to installation.

B. Turf in lines and field markings, or install as synthetic turf inlays.

1. Wherever possible, tuft lines into turf panels in lieu of inlays. 2. Provide markings uniform in color, providing a sharp contrast with turf color with sharp and distinct edges.

C. Provide a synthetic turf that is adaptable to painted lines in case painting is utilized in the future.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Infilled Synthetic Turf: 32 1824 MASTER – July 31, 2015 Page 12

D. Minimum Lining and Marking Requirements: Provide the following lines, numbers and field markings tufted in, or installed as synthetic turf inlays, without the use of paint:

1. Soccer:

a. Playing Field Boundaries: 4 inches wide; White. b. Mid-Field Line: 4 inches wide; White. c. Goal and Penalty Boxes: 4 inches wide; White. d. Center Circle and Penalty Arc: 4 inches wide; White. e. Corner Kick Arc: 4 inches wide; White. f. Corner Kick Hash Marks: 4 inches wide; White. g. Center Spot: 4 inches wide; White.

2. Women’s Lacrosse: Utilize soccer playing field boundaries.

a. Lines or Reference Marks: 4 inches wide; Dark Red.

3. Men’s Lacrosse: Provide a field 330 feet long and 180 feet wide.

a. Lines or Reference Marks: 4 inches wide; Navy Blue.

2.9 MINIMUM TURF MATERIAL SPECIFICATIONS

A. Pile fiber of parallel slit film fiber, 100 percent polyethylene athletic quality yarn designed specifically for outdoor use and stabilized to resist the effects of ultra- violet degradation, heat, wear, water and airborne pollution.

1. Fibrillation that is parallel with long slits meeting the following requirements:

ASTM Property Minimum Specifications

D 1577 Filament Thickness 100 U Micron D 2256 Yarn Breaking Strength 20 lbs. D 2256 Yarn Elongation to Break 50 percent D 789 Yarn Melting Point 240 degrees F.

B. Pile Fibers Lead Content: 50 ppm or less.

C. Fiber Wear Simulation: Exhibit no splitting or appreciable degradation after a minimum of 12,000 cycles of simulated Lisport wear testing, and serviceable

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Infilled Synthetic Turf: 32 1824 MASTER – July 31, 2015 Page 13

without appreciable face weight loss after a minimum of 40,000 cycles of simulated Lisport wear testing.

D. Fabric Composition: 100 percent polyethylene yarn tufted into polypropylene backings coated with high-grade polyurethane. Coating and backing materials with suitable tuft bind strength, dimensional stability, and long-term wearing properties.

E. Minimum specifications for turf systems produced with both monofilament and parallel fibrillated yarns, as follows:

1. SYSTEM OPTION 1 (Heavy Weight Turf, Light Infill)

ASTM Property Minimum Specifications

D 418 Pile Weight 44 oz/sq yard D 418 Primary Backing 6 oz/sq yard total D 418 Back Coating 20 oz/sq yard D 418 Total Weight 70 oz/sq yard. D 418 Pile Height 2.40 inches to 2.60 inches D 1335 Tuft Bind (unfilled) 8 lbs. D 1682 Grab/Tear Strength 200 lbs. D 2859 Pill burn Test Pass

Other Properties:

Stitch Gauge/Tuft Spacing < 3/4 inch Stand Infill >1.5 lb/sf Rubber Infill >3.5 lb/sf Total Infill >5 lb/sf

2. SYSTEM OPTION 2 (Light Weight Turf, Heavy Infill)

ASTM Property Minimum Specifications

D 418 Pile Weight 35 oz/sq yard D 418 Primary Backing 7 oz/sq yard total D 418 Back Coating >16 oz/sq yard D 418 Total Weight >58 oz/sq yard. D 418 Pile Height 2.40 inches to 2.60 inches D 1335 Tuft Bind (unfilled) 8 lbs. D 1682 Grab/Tear Strength 200 lbs. D 2859 Pill burn Test Pass

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Infilled Synthetic Turf: 32 1824 MASTER – July 31, 2015 Page 14

Other Properties:

Stitch Gauge/Tuft Spacing 3/4 inch Stand Infill >3 lb/sf Rubber Infill >3 lb/sf Total Infill >6 lb/sf

2.10 INFILL MATERIALS

A. A combination of sand and rubber infill materials, with cryogenically rendered crumb rubber.

B. Minimum Sand Content: 25 percent by volume with the maximum sand content not exceeding 35 percent by volume.

1. The exact in-fill material ratio may be altered to provide strength, shock attenuation, and to provide permeability, as approved.

C. Apply infill material in a dried condition when the turf is dry, in uniform layers effectively dragged to distribute material uniformly to the turf backing.

D. Sand infill Material: Graded silica sand, sub-round to round, compaction resistant, washed and dried, meeting the following criteria:

Percent Silica 80 to 90 percent Shape Round to sub-round Sphericity 0.65 to .085 Roundness 0.60 to .070 Hardness (Hoh) 7

E. Sand Gradation: Meeting the following wet sieve analysis:

#16 0 to 5 percent #20 10 to 20 percent #30 50 to 70 percent #40 15 to 25 percent #50 0 to 10 percent #100 0 to 5 percent Pan 0 to 2 percent

F. Rubber: SBR free of any tire cord, steel materials, and kevlar. Use only automotive or truck tires manufactured in North America within the last 10 years for SBR infill material.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Infilled Synthetic Turf: 32 1824 MASTER – July 31, 2015 Page 15

1. Infill Material Gradation: Meeting the following size requirements:

2.0 to 1.5 mm 0 to 10 percent 1.5 to 1.0 mm 10 to 30 percent 1.0 to 0.5 mm 40 to 80 percent 0.5 to 0.0 mm 0 to 10 percent

G. SBR Rubber Lead Content: 50 ppm or less.

H. Application Rate: A total minimum weight of 3.0 lbs of rubber infill material per square foot of turf area.

I. Maximum Exposed Fiber Height: 3/4 inch after infill placement, settling, and compaction.

2.11 MAINTENANCE EQUIPMENT

A. Pre-manufactured towable multi-purpose synthetic turf drag brush and tining apparatus.

1. Unit to include a 3-point hitch mechanism, PVC-clad steel frame and body, with polyester bristle drag brushes 5 foot minimum in width, adjustable depth. 2. Acceptable Product: SMG Decompaction Brush DC1600, or approved.

B. Leaf and Debris Sweeper:

1. 100 inch effective operating width, ganged, towable assembly. 2. Ground-contact, friction drive. 3. Powder coated tubular steel fFrame, reinforced vinyl basket, perforated stainless steel basket-floor. 4. Acceptable Product: Parker Estate Master Model 89580000, or approved.

C. Deliver to the Owner fully assembled with manufacturer’s printed operating and assembly instructions, properly demonstrated.

PART 3 EXECUTION

3.1 INSTALLERS

A. Acceptable Installers for Supply and Installation of Synthetic Turf Field Surfacin:

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Infilled Synthetic Turf: 32 1824 MASTER – July 31, 2015 Page 16

1. Astroturf; 206-979-9762. 2. A-Turf; 888-777-6910. 3. Hellas; 425-835-0315. 4. Field Turf USA; 360-668-8989. 5. Shaw Sports; 512-627-2220. 6. Sprinturf; 206-817-0905. 7. UBU Academy Sports; 800-828-8700.

B. Substitutions: Submit according to Division 01 requirements for substitutions.

3.2 SYNTHETIC TURF INSTALLATION CONDITIONS

A. Environmental Conditions: Do not apply adhesive materials or infill material during the following conditions:

1. Ambient air temperature is below 40 degrees F. 2. Material temperatures are below 40 degrees F. 3. Rain is falling or pending. 4. Conditions exist, or are pending, that will be unsuitable to the installation of the system.

B. Preparation:

1. Verify base substrates that the synthetic turf surfacing system and the anchoring system are to be applied, are acceptable. 2. Thoroughly clean base substrates, immediately prior to application of the synthetic turf, of all foreign material, soil, or any other substances that may be detrimental to permeability and the installation of the turf system.

C. Access: Do not allow passenger vehicles to park or be staged upon the completed aggregate surface either prior to or during installation of the synthetic turf.

D. Equipment:

1. Verify equipment used during construction is in complete working order, including compressors, generators, etc., with exhaust systems oriented vertically and away from the synthetic turf surface. 2. Adequately protect the finish turf surface at any location where equipment is parked and/or staged during installation, including, but not limited to, heat resistant panels, to ensure 100 percent viability of the finish turf surface and fibers.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Infilled Synthetic Turf: 32 1824 MASTER – July 31, 2015 Page 17

a. If a portion of the turf be damaged as a result of installation techniques, the entire turf panel may be subject to rejection and replacement at the direction of the Owner.

3.3 SYNTHETIC TURF INSTALLATION

A. Construct fabric surface and install in 15 foot minimum widths with no longitudinal or transverse seams, except for head or tee seams at field boundaries and inlaid lines within a finished roll assembly.

B. Do not place head seams inside of the active, marked field boundaries. A single head seam will be permitted in the quarter turned panels outside of the soccer sidelines, and lacrosse by approved.

C. Install fabric surface to lay evenly and with full dimension width, without fitted pieces, to true alignment.

D. Bonding of Material Surfaces: Bonding or fasten all system material components to provide a permanent, tight, secure and hazard-free, athletic playing surface. System material components include bonding seams, and inlaid line and markings.

E. Seams:

1. Sew turf panel seams within the field grid and the 1/4 turn sideline panels with high strength cord. 2. Cement all other seams with a supplemental backing material. 3. Ensure that seam gaps between fiber rows at seam locations do not exceed that of the tufting gauge of the turf materials. 4. Brush sewn seams to provide full coverage of fiber over the thread.

F. Turf Edge Anchoring: Anchor synthetic turf along the sides and ends to existing edge anchor as detailed.

3.4 LINING AND MARKING INSTALLATION

A. Complete field markings with the initial installation of the surfacing system.

B. Provide markings straight, true, clean and clear, and without variation of more than 7/32 inch from specified width and location.

C. If overlapping backing materials are utilized for the inlaid lines and markings resulting in a non-permeable surface in excess of 12 inches wide, perforate

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Infilled Synthetic Turf: 32 1824 MASTER – July 31, 2015 Page 18

the backing materials after gluing and prior to installation of the infill material.

D. To the greatest extent practical, install lines and markings without compromising the primary backing.

3.5 INFILL INSTALLATION

A. Apply infill material in a dry condition and when the synthetic turf is dry.

B. For sand and rubber infill systems, install infill materials with a minimum of 8 applications.

C. Do not trap fiber material trapped below the surface of the infill material.

1. If fiber is trapped below the surface, remove a portion or all of the infill material and reinstall.

D. Install infill material at a uniform depth across the entire field area.

1. Do not vary infill depths across the entire synthetic turf surfacing area by more than +/- 5 mm from the design infill level indicated.

E. Brush infill material to provide fiber fibrillation resulting in a natural surface appearance.

1. If in Owner’s opinion more fibrillation is desired, provide additional brushing of the surface to provide the desired level of fibrillation.

F. Water infill materials to settle and provide accelerated consolidation of the in-fill material prior to use.

1. Water is available from quick coupling valves located around the field. 2. Utilize portable sprinkler heads to evenly apply a minimum of 1 inch of water over the entire field area for water settlement. 3. Following completion of the initial water settlement, the surface will be inspected by the Owner for footing stability and in-fill consolidation. 4. Provide any additional water settling as required to achieve the desired level of infill stability and consolidation.

3.6 FIELD QUALITY CONTROL

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Infilled Synthetic Turf: 32 1824 MASTER – July 31, 2015 Page 19

A. Perform an inspection of the existing permeable aggregate base, and submit written certification of acceptance of the base for the installation of the synthetic turf system.

1. Summary of certification shall include, but not be limited to.

a. Acceptance of the base construction "finish surfaces" as totally suitable for the application of Work of this Section. b. Verification and certification of the infiltration and permeability rates as applying to the warranty.

B. Installer to document all discrepancies between the required materials, application and tolerance requirements found by the turf installer, and notify Owner of the discrepancies.

1. Failure to immediately inform the Owner of any prior work that does not meet requirements will result in the turf installer being required to perform any work needed to bring the base substrate to acceptable condition.

C. Inspection of Materials:

1. Prior to installation, and immediately upon delivery of synthetic turf system materials to the project site, the inspect material as follows:

a. For damaged or defective items; b. Measure turf pile height and thickness of each roll; c. Measure backing perforation diameter and spacing; d. Reject damaged materials and all materials out of tolerance with Specifications.

D. After Installation:

1. Inspect project area for acceptable seaming, adhesive bonding, uniformity of color of turf, bubble-free surface smoothness as laid, field lines and markings, insert installations, edge details. 2. Remove and/or repair deficient workmanship prior to requesting the Owner’s inspection pursuant to completion and acceptance of the work.

E. Owner’s Inspection:

1. Owner may have samples of the turf submitted and tested for verification of conformance to specifications.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Infilled Synthetic Turf: 32 1824 MASTER – July 31, 2015 Page 20

a. Turf system acceptance is subject to the results of Owner’s tests.

2. Replace any material tested and found not to conform to Specifications with material conforming to the Specifications without expense to the Owner.

a. Retesting of replace material will be required.

3.7 CLEANING

A. Remove excess materials of all types, equipment, debris, etc., from the site immediately after completion of the work, and dispose of in a legal manner.

1. Inspect the entire field area with a hand held metal detector to identify any construction materials or tools left on the field.

B. Remove stains and other blemishes from all finished surfaces. Leave work in clean, new appearing condition, ready for use by Owner.

3.8 PROTECTION

A. Adequately protect of materials and work from damage during installation and until acceptance of their Work.

1. Replace material damaged prior to acceptance at without cost to the Owner.

3.9 DISPOSAL OF SURPLUS AND WASTE MATERIALS

A. Disposal: Remove surplus waste material, including excess subsoil, unsuitable soil, trash, and debris, and legally dispose of it off Owner's property.

3.10 SAMPLE FORM OF WARRANTY OF SYNTHETIC TURF SYSTEM

A. Contractor hereby warrants to Owner, subject to the limitations and conditions set forth below, that its synthetic turf system consisting of synthetic turf described as ______, and the adhesives used in the installation, is free from defects in material and workmanship and shall, for a period of eight years as applicable from the date of Substantial Completion, remain serviceable for multiple sports activities.

B. Contractor warrants to the Owner that its synthetic turf materials shall not fade, fail, shrink, wrinkle, or reflect excessive wear. Contractor shall, at their sole expense and cost, replace such areas of the synthetic turf system not performing to these standards for the life of the warranty.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Infilled Synthetic Turf: 32 1824 MASTER – July 31, 2015 Page 21

C. Definitions:

1. The term "not fade" in the context of this warranty shall mean that the synthetic turf material shall remain a uniform shade of green, or other colors installed, with no significant loss of color. 2. The term "not fail" or "excessive wear" as used in the context of this warranty shall mean that the length and weight of the face yarn or pile material in the synthetic turf surface above the infill shall not have been decreased by more than 10% per year according to ASTM D418, nor exceed 50% during the warranty period. In the event that the synthetic turf system does not retain its fiber height or shock absorbency and is consequently no longer serviceable during the warranty period, the Contractor shall, at their sole expense, replace such portion of the system that is no longer serviceable. 3. The term "serviceable" in the context of this warranty shall mean that the synthetic turf system shall have a maximum "G" value according to ASTM F1936-10 and Procedure A, ASTM F355, not to exceed 130G's at any location upon installation and shall not exceed 165G's throughout life of the warranty period. This shall be determined by conducting dynamic cushioning tests at the locations designated in ASTM F1936-10 and at corners of the soccer penalty boxes at opposite sides of the field. Any increase from 130G's to allowable 165G's maximum shall be at a relative uniform rate not to exceed 15 G's in any single yearly period.

D. Where applicable, the fabric seams shall remain attached to the underlying surface over the warranty period and shall not separate or become unglued or unattached, as applicable.

E. Contractor warrants to the Owner that the permeable synthetic system shall drain vertically a minimum of 20 inches precipitation per hour without visible surface ponding.

F. Contractor shall replace with new materials, at their sole expense, any damage to the synthetic turf system that extends more than 3 feet beyond the location of foreign combustibles, which may ignite and fire-damage the synthetic turf system. The Contractor shall not be held liable for any incidental or consequential damages. These warranties and the Contractor's obligations here-under are expressly conditioned upon;

1. The Owner making all minor repairs to the synthetic turf system upon the discovery of the need for such repairs;

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Infilled Synthetic Turf: 32 1824 MASTER – July 31, 2015 Page 22

2. The Owner maintaining and properly caring for the synthetic turf system in accordance with the Contractor's maintenance manual and instructions; 3. The Owner complying with the dynamic and static load specifications established by the Contractor.

G. The warranty is not to cover any defect, failure, damage or undue wear in or to the synthetic turf system caused by or connected with abuse, neglect, deliberate acts, act of God, casualty, static or dynamic loads exceeding Contractor's recommendations, footwear having metal cleats, spikes, or similar projections other than conventional baseball, football, soccer, or rugby shoes having cleats of not more than 1/2" in length, and other conventional running track shoes having spikes of not more than 1/4" in length, or use of improper cleaning methods.

H. All claims by the Owner under this warranty must be made in writing to Contractor’s address at______within 30 days after the Owner learns of the defect giving rise to the claim.

I. Contractor shall be allowed to examine the synthetic turf system regarding any claim that the Owner makes to be present at any time, to analyze the results of all tests conducted by the Owner or others, and to conduct such tests of their own. Contractor shall not be responsible for any costs or expenses incurred by the Owner or others with respect to such tests, except the Contractor shall pay for costs of all tests and analysis conducted or directed by their representative.

J. In the event the Contractor does not respond to the Owner’s written notice within 10 days of receipt of notice or does not submit, schedule and execute corrective work within 30 days, the Owner has the option of having the work performed at the expense of the Contractor.

K. This warranty shall constitute a contract made in the State of Oregon and shall be governed by the laws thereof.

END OF SECTION

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Irrigation: 32 8000 MASTER – July 31, 2015 Page 1

SECTION 32 8000

IRRIGATION

PART 1 GENERAL

1.1 SUMMARY

A. Work of this section includes labor and materials necessary to construct or modify the irrigation system as shown on the drawings and specified in this Section, including, but not limited to, the following:

1. Trenches 2. Sleeves 3. Pipe and Fittings 4. Valves. 5. Controller(s) and other control elements. 6. Electrical control wiring and connectors. 7. Sprinkler heads.

B. Related Sections:

1. Section 01 5639: Temporary Tree and Plant Protection 2. Section 31 1000: Site Clearing 3. Section 31 2000: Earth Moving, for subgrade preparation, backfilling, and compacting. 4. Section 32 9010: Trees, Plants, and Ground Covers 5. Section 32 9020: Lawns and Grasses 6. Section 32 9310: Landscape Maintenance 7. Division 22: Plumbing, for water source. 8. Division 26: Electrical, for power. 9. Division 27: Communications, for communication system.

1.2 DEFINITIONS

A. Pipe sizes used in this Section are nominal pipe size (NPS) in inches. Tube sizes are Standard size in inches.

B. Mainline Piping: Piping downstream from water meter to and including control valves.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Irrigation: 32 8000 MASTER – July 31, 2015 Page 2

C. Lateral Piping: Piping downstream from control valves to irrigation system sprinklers, emitters, devices, and drain valves.

D. American Public Works Association (APWA).

E. American Standards for Testing and Materials (ASTM).

1. D 1785-99 - Standard Specification for Poly (Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120. 2. D 2241-00 - Standard Specifications for Poly (Vinyl Chloride) (PVC) Plastic Pipe (SDR-PR). 3. D 2466-91 (1996) - Standard Specifications for Poly (Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 40. 4. D 2564-96a - Standard Specifications for Solvent Cements for Poly (Vinyl Chloride) (PVC) Plastic Pipe and Fittings. 5. B3-01 - Specification for Soft or Annealed Copper Wire. 6. Galvanized, Copper, Brass, HDPE, PVC Class 200, PVC Class 315, and PE 7. ASTM B32 – Standard Specification for Solder Metal. 8. ASTM B42 – Standard Specification for Seamless Copper Pipe, Standard Sizes. 9. ASTM D2855 Solvent Welding Technique Best Practices. 10. ASME B31.3 Bonder qualification, inclusive of sample testing and card issuance.

F. American Water Works Association (AWWA).

1. C500 - Gate Valves for Water Systems.

1.3 SYSTEM PERFORMANCE REQUIREMENTS

A. Minimum Water Coverage: 100 percent head-to-head coverage is required in all areas.

B. Location of Sprinklers and Devices:

1. Design location is approximate. Make minor adjustments necessary to avoid plantings and obstructions such as signs and light standards. 2. Except where crossing paved areas, irrigation materials are shown outside of turf and plant bed areas for graphic clarity only. Install in adjacent turf and plant bed area.

1.4 SUBMITTALS

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Irrigation: 32 8000 MASTER – July 31, 2015 Page 3

A. System Capacity Acknowledgement signed by contractor and submitted a minimum of 30 days prior to installation.

1. System capacity calculations worksheet provided by Owner annotated with confirmations and or noting potential performance issues.

B. Product data including pressure rating, rated capacity, settings, and electrical data of selected models for the following:

1. Backflow assembly devices, including pipe, fittings and vault information. 2. Valves, including general duty, underground, manual and automatic control, and quick coupler types, and valve boxes. 3. Bodies, nozzles, and swing joint assemblies. 4. Controls, including all components required for the control system, including communication devices, flow sensing components and climatic sensors. 5. Wiring, including communication and data cables, splices, trace wire, and grounding.

B. Installer Qualification Statements

C. Backflow Assembly Test Reports: certified.

D. Closeout Submittals:

1. As-Built Drawings.

2. Maintenance Manuals: Submit 3 copies, including:

a. Catalog cuts of all irrigation materials installed. b. Contractor's name, address and telephone number. c. The duration of the guarantee period. d. The name and address of the local manufacturer's representative. e. List and description of routine maintenance procedures, including winterization, start-up, and recommended watering times for each zone. f. Troubleshooting guide.

3. Controller Reference Chart:

a. Submit 3 copies of a chart for each controller installed showing area covered by each sprinkler zone.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Irrigation: 32 8000 MASTER – July 31, 2015 Page 4

b. The chart to be a reduced copy of the as-built drawings, color coded to differentiate zone areas, sized to fit the controller door, and hermetically sealed between 20 mil. plastic sheets.

4. Supplemental Equipment:

a. Submit 2 each of keys to the following: quick coupling valves, quick coupling valve lids, valve boxes, and controller cabinets. b. Submit 2 valve box unlock tools.

1.5 QUALITY ASSURANCE

A. The same subcontractor shall install both irrigation and landscape planting work of Section 32 9010, “Trees, Plants, and Ground Covers,” and Section 32 9020, “Lawns and Grasses.”

B. Installer Qualifications:

1. Irrigation system to be installed by a licensed and bonded irrigation or landscape contracting firm.

a. Installer will have successfully and satisfactorily completed at least six irrigation systems similar in material, design, and extent to that indicated for Project that have resulted in a record of successful in-service performance.

b. Installer has been and is currently a member of the Oregon Landscape Contractor Association (OLCA)

c. Installers working directly on Project will possess the Landscape Industry Certified Technician - Exterior (CLT-E) certification in irrigation installation and a minimum of five years documentable experience in irrigation system installations that are comparable to this projects scale and scope.

d. Installers working directly on solvent welding will possess certification in solvent welding training. Documented training will include a constructed sample.

C. Regulatory Requirements:

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Irrigation: 32 8000 MASTER – July 31, 2015 Page 5

1. Comply with all local, municipal and state laws and rules and regulations governing or relating to any portion of the Work of this Section, including the following:

a. Requirements of utility supplying water for prevention of backflow and back siphonage.

b. Requirements of authority with jurisdiction for irrigation systems.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Handle all components as directed by the manufacturer’s handling and installation instructions.

B. Store and protect all specified components from adverse weather conditions and protect from physical damage until installation is complete.

1. Store PVC pipe and fittings out of direct sunlight and support the pipe its entire length.

1.7 PROJECT CONDITIONS

A. Inspect the site prior to construction and verify the extent of the work required.

1. Contractor shall confirm the static water pressure as per design. If the static water pressure is not within 5 pounds per square inch of the design specified pressure, the Irrigation Contractor will communicate this reading to the General Contractor within one working day.

2. Commencement of work indicates acceptance of site conditions.

B. Site Information:

1. Reports on subsurface condition investigations made during design of the Project are available for informational purposes only; data in reports are not intended as representations or warranties of accuracy or continuity of conditions (between soil borings). Owner assumes no responsibility for interpretations or conclusions drawn from this information.

C. Existing Utilities:

1. Verify locations of existing utilities, structures, and services before commencing work.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Irrigation: 32 8000 MASTER – July 31, 2015 Page 6

a. Contractor shall contact Portland Parks and Recreation's Utility Locate service at (503) 823-1660 and the Utility Notification Center at least 48 hours in advance fof any utility locate request. The Contractor shall verify, locate, and identify, with visible marking, all existing underground utilities in the areas of work and maintain such markings until all work in those areas is complete. If utility locate markings are not maintained by the Contractor requiring relocation by Portland Parks and Recreation's Utility Locate service the Contractor will be billed at the rate of $60.00 per hour for relocating services. If utilities are to remain in place, the Contractor shall provide adequate means of protection during excavation operations. Oregon Utility Notification Center (OUNC) Call: 1-800-332-2344 (or 811) - See more at: http://callbeforeyoudig.org/oregon/index.asp#sthash.suERpSOB.dpuf

2. Should uncharted piping or other existing utilities be encountered during the execution of the work, notify the Owner's Representative immediately and consult with the utility owner for instructions before proceeding with the work.

a. Keep the services and facilities of public or private utility companies in operation unless directed otherwise in writing by Owner.

b. If it becomes necessary to temporarily interrupt existing services or facilities, the Contractor must provide temporary utility services to the satisfaction of the Owner.

3. The location of utilities, structures and services shown in the Drawings are approximate only. Report any discrepancies between these plans and the actual field conditions to the Owner immediately.

D. Weather Requirements:

1. Do not solvent weld polyvinyl chloride pipe when ambient temperature is below 40 degrees F and falling.

2. Do not solvent weld polyvinyl chloride pipe in wet conditions, without adequate cover.

3. Perform soil work only when weather conditions do not detrimentally affect the quality of Work.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Irrigation: 32 8000 MASTER – July 31, 2015 Page 7

E. Existing Tree Canopy areas:

1. Do not trench within the canopy of existing trees except in accordance with the approved Tree Plan.

F. Protection:

1. Protect all areas of work defined in the Drawings and existing on-site vegetation, structures, utilities. 2. Make provision for traffic control, barricades, and safety guards to protect structures or improvements, and for the complete protection of the public. 3. Take adequate precautions to keep rock, dirt, gravel, debris, and all other foreign materials from entering piping, valves and other irrigation equipment. (PM: if source is not potable city water, retain 1.7.F.4. Otherwise, delete.) 4. Verify non-potable water sources and install labeled components as required by State and Federal laws.

1.8 SEQUENCING AND SCHEDULING

A. Do not interrupt water service to buildings and other site features unless approved by the Owner. Arrange for temporary water shutoff with Owner.

1. Provide temporary utility services to the satisfaction of the Owner if it becomes necessary to temporarily interrupt existing services or facilities

D. Piping and fittings must be visible for inspection before and during pressure test. Do not complete trench backfill until after system pressure test has been approved by the Owner.

1. Center loading shall be allowed but only after completion of a visual inspection and prior to actual system pressurization.

C. Scheduling Installation of Pipe Sleeves and Sprinkler Heads:

1. Schedule installation of pipe sleeves below paving and walks prior to installation of paving and walks. 2. Schedule installation of sprinkler heads after final grading.

1.9 WARRANTIES

A. Manufacturer's Warranty:

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Irrigation: 32 8000 MASTER – July 31, 2015 Page 8

1. Provide equipment manufacturer's standard Warranty for automatic controllers, control valves, quick couplers, and heads.

B. Installer's Guarantee:

1. Provide installer's 2 year guarantee for watertight pipe system indicating date of completion, and start of the guarantee period per the General Conditions of the Contract. 2. Guarantee to repair trench back-fill that settles more than 1/2 inch, or repair of plantings, lawns, paving, and walk materials damaged by settlement of trench backfill soils, during the guarantee period.

1.10 MAINTENANCE

A. Provide a minimum 1 year maintenance period, unless specified elsewhere.

1. Start the maintenance period upon completion of system and end at completion of establishment maintenance period.

B. After 2 weeks of operation, flush lines and remove particulates from system. Adjust and clean all filters and/or screens bi-monthly during the irrigation season.

C. Complete and submit irrigation system inspection report form provided by Owner within 1 business day of inspection.

1. Review site conditions and plant vitality on a monthly basis and adjust watering schedule and components as necessary to maintain plant health. Submit completed inspection form along with photos to Owner within 2 business days of site.

2. Notify Owner 48 hours before date and time of system inspections.

D. Run through controller and verify time settings at each inspection.

E. Perform seasonal winterization and system start-up. Demonstrate start-up and winterizing procedures to Owner’s operating personnel.

F. Repair and adjust system when necessary, in consultation with Owner.

PART 2 PRODUCTS

2.1 MANUFACTURERS

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Irrigation: 32 8000 MASTER – July 31, 2015 Page 9

A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, those listed in this Specification.

1. Proprietary items indicated in the Drawings and specified in this Section establish standards of quality, utility, design and function.

B. Substitutions: Submit in accordance with requirements of Division 01 Section “Substitutions.”

2.2 MATERIALS - GENERAL

A. Provide materials that are new, defect free, and of the type indicated in the Drawings or specified in this Section. Incidental materials shall be as approved by the Owner. Provide PVC and PE pipe and fittings with the following markings:

1. Manufacturer’s Name. 2. Schedule or class. 3. Nominal pipe size. 4. Pressure rating in psi. 5. NSF International seal of approval. 6. Date of extrusion.

2.3 PLASTIC PIPE

A. Provide all plastic pipe as polyvinyl chloride (PVC) continuously bearing the seal of the National Sanitation Foundation, with the exception of specified polyethylene pipe. With the exception of 1-1/2” and 2-1/2” diameter piping, provide piping in 1” diameter increments only, starting with a minimum diameter of 1”.

B. Polyvinyl Chloride (PVC) pipe:

1. Main lines: a. Main lines 1-1/2” or less will be PVC (polyvinyl chloride) Schedule 40, bell end, continuously bearing the seal of the National Sanitation Foundation and complying with the requirements of ASTM D-1785. b. Main lines 2” and larger will be PVC (polyvinyl chloride) Class 315, bell end, continuously bearing the seal of the National Sanitation Foundation and complying with the requirements of ASTM D-1784, D-2241.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Irrigation: 32 8000 MASTER – July 31, 2015 Page 10

2. Lateral lines: Plastic pipe for lateral lines will be PVC (polyvinyl chloride) Schedule 40, bell end, continuously bearing the seal of the National Sanitation Foundation and complying with the requirements of ASTM 1785.

3. Sleeves: Plastic Pipe for sleeves under paved areas will be PVC (polyvinyl chloride) Schedule 40, bell end, continuously bearing the seal of the National Sanitation Foundation and complying with the requirements of ASTM D- 1785. Sleeves will be a minimum of 4” in diameter or twice the diameter of the main line or lateral line, whichever is larger.

C. Risers and Nipples: PVC, Type 1, Schedule 80 one piece gray, standard weight with molded threads, both ends, ASTM D1785.

D. Electrical Conduit: PVC Schedule 40 electrical conduit, standard weight; minimum 1-1/2 inch nominal diameter, unless otherwise required. Refer to sizing chart for minimum conduit sizes per gauge and number of wires. At all changes in direction utilize extended sweeps or junction boxes. In no case shall total degrees of sweeps exceed 270 degrees.

E. Polyethylene Pipe and fittings:

1. Flexible, thick walled designed to withstand 400 psi burst pressure test. 2. Quality and wall thickness to meet ASTM D-2104, D-2239, D-2737 with inside diameter of .49”, minimum of 100 psi operation pressure rating, and kink resistant linear low-density polyethylene material. 3. Size according to manufacturer's specified velocity tolerances.

2.4 GALVANIZED PIPE

A. Threaded, hot-dipped galvanized standard steel pipe, Schedule 40, standard weight.

2.5 PLASTIC FITTINGS

A. Plastic fittings will be solvent weld PVC (polyvinyl chloride) Class 315 Pressure Rated EverTUFF as manufacturer by Spears Manufacturing, or approved equal.

B. Swing Joints for ¾” inlet and larger rotor type sprinklers will be Class 315 Pressure Rated EverTUFF as manufactured by Spears Manufacturing, or approved equal.

2.6 GALVANIZED FITTINGS

A. Threaded, hot dip galvanized standard steel, Schedule 40, standard weight.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Irrigation: 32 8000 MASTER – July 31, 2015 Page 11

2.7 PIPE JOINING COMPOUNDS

A. Cement and Primer for Solvent Weld Joints: Weld-On or Spears Manufacturing. Adhere to manufacturers specifications in regards to material being joined and weather conditions at all times.

B. Threaded connections: 1. Constant pressure connections: Christy’s Ultra Seal. 2. Sprinkler head connects only: Teflon tape meeting MIL-T-27730A is permitted.

2.8 ELECTRIC CONTROL WIRE AND CONNECTORS

A. Control valve wire: single strand copper, UL-approved for direct burial, AWG (UL) Type UF, 600 V, sized per manufacturer’s specifications, minimum 14-gauge.

1. All remote control valve wires will be red, with white being the common. 2. Master valve wires will be yellow for control and green for common.

B. If a wall mount enclosure is specified, direct burial rated 18 AWG UL Multi-Stand irrigation wire may be used from the terminal strip installed in the enclosure to a splice box at the base of the wall.

C. Wire Connectors: UL approved for direct burial 3M-DBY6 & DBR6 Splice Kits. 3M- BDY & DBR Splice Kits.

D. Wire Ties: TYTON No. T-50-R Nylon, one-piece molded, self-locking tie, 1/4 inch nominal width.

2.9 AUTOMATIC CONTROLLER

A. Automatic controllers: ESP-Site Satellite by Rainbird. Controller shall have ability for all zones to fully operate and meet system size, zone quantities and requirements as indicted in Drawings, and as required by site conditions.

1. Controller: Solid State, commercial grade, with a single station for each control valve plus a minimum of 6 unused stations for future expansion, installed according to manufacturer’s recommended installation procedures. 2. Provide controller MAXICOM capable, equipped with master valve/pump start capability. 3. Provide controller suitable for either indoor or outdoor mounting.

a. Coordinate with Owner to identify location for Controller mount.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Irrigation: 32 8000 MASTER – July 31, 2015 Page 12

b. Provide appropriate, lockable cabinet for location.

4. Control Cabinet: Strongbox SB24SS. 5. Include with controller a rainfall sensor. Coordinate mounting location with Owner.

B. Flow Sensor: Data Industrial series 200, sized appropriately for flow and size of pipe, or approved.

C. Conduit Putty: Permanently soft, non-corrosive, non-reactive, indoor or outdoor rated. RectorSeal Duct Seal Compound or approved.

2.10 VALVES, FILTERS, PRESSURE REGULATORS

A. Ball Valves: BA260 Series w/ Stainless Steel Level:

1. Hammond Valve, or approved equal.

B. Manual Isolation Valves:

1. Available Manufacturers:

a. Kennedy Valve Div. b. Stockham.

C. Remote Control Valve(s): ICV Valves by Hunter Industries, or approved.

D. Master Valve: Bernard 700, Series, or approved.

E. Flow Monitor: Badger Data Industrial, Model 3000 series, or approved.

F. Flow Sensor: Badger Data Industrial 200P-IR series for PVC line, factory set in Tee, size as indicated.

G. Quick Coupling Valve and Accessories: 1-inch RainBird 44LRC with key and Swivel hose ell of same manufacture, or approved. All Quick Couplers shall have stabilizer wings attached.

H. Pressure Reducing Valve: Water pressure reducer by Wilkins, Watts, or approved.

2.11 VALVE BOXES

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Irrigation: 32 8000 MASTER – July 31, 2015 Page 13

A. Plastic valve box with locking lid, sized to provide clearances from valve as indicated, NDS or approved.

2.12 BACKFLOW PREVENTION DEVICE

A. Backflow prevention device: Conbraco DC40LF series, or approved.

2.13 VAULT/BOX FOR BACKFLOW PREVENTION DEVICE

A. Size and type to conform to state and local codes and providing a minimum of 6 inches clear on all sides of the device.

2.14 SPRINKLERS

A. Sprinkler Heads: As indicated in Drawings, or approved.

B. Where necessary to control zone drainage, at the bottom of slope areas, install low head drainage bodies on lowest heads in zone.

C. Pop-up riser heights are indicated in the Drawings.

2.15 MISCELLANEOUS MATERIALS

A. Gravel: 3/4 inch minus, washed, crushed rock.

B. Tracer Wire: 14, 12 or 10 AWG SOLID HDPE 45 MIL copper conductor with a 45 mil thick, high-density, high molecular weight polyethylene (HDPE) insulation, rated for 600 volts as manufactured b Trace-Safe. Utilize connectors as specified by manufacturer.

1. Provide insulation and jacket RoHS compliant, and utilizing virgin grade material. 2. Insulation Color: Meet the APWA Blue color code standard for identification of buried utilities. 3. Size: According to manufacturer’s recommendations.

C. Pipe backfill: Provide backfill material for turf areas, shrub beds and other planting areas, including material depths, as specified in Section 32 9113, “Soil Preparation.” Clean, dry, friable topsoil void of stones larger than 1 inch diameter, and other material deleterious to specified pipe. Use soil suitable for compaction to prevent settlement conditions of specified finish grades.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Irrigation: 32 8000 MASTER – July 31, 2015 Page 14

D. Provide all other materials not specifically described but required for a complete and proper irrigation system installation, new and of first quality, and approved by the Owner prior to installation.

PART 3 EXECUTION

3.1 PREPARATION

A. Prior to commencing with Work of this Section, carefully inspect previously installed work and verify that all such work is complete to the point where specified installation may properly commence.

B. Verify that irrigation system may be installed in strict accordance with codes and regulations, the accepted design, the referenced standards, and the manufacturer's specifications.

C. Prior to commencing with Work of this Section, carefully inspect previously installed work and verify that all such work is complete to the point where specified installation may properly commence.

D. The irrigation system is to be connected to existing water, electrical and communications systems.

1. If new systems are required, verify that that work is complete.

3.2 PIPE INSTALLATION

A. Install sleeving prior to paving preparation but after grades have been established.

B. Prior to trenching or installation, field stake proposed irrigation lines wherever they pass under existing tree canopies. Stake proposed new tree planting and sign locations as well prior to any trenching or installation. Call for inspection a minimum of 48 hours prior to anticipated trenching.

C. Trench Depths:

1. Provide minimum cover as indicated in the Drawings or as directed by Owner. 2. Provide depth of trenching as indicated, sufficient to avoid interference with waterlines and other utilities, and to allow for clearance between pipes within the trench.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Irrigation: 32 8000 MASTER – July 31, 2015 Page 15

D. Trench Widths: Provide minimum clearances as indicated in the Drawings.

E. Trench Bottoms:

1. Provide trench bottoms free of rocks or sharp-edged objects. 2. Stones larger than 1 inch in diameter are not allowed in backfill material. 3. Compact to adjacent soil density. 4. Keep trenches free of debris during construction.

3.3 PIPE CONNECTIONS

A. Solvent weld PVC pipes only during non-freezing weather, and under cover in rainy weather.

1. Do not allow flooding of welded piping until cure time has elapsed. Follow solvent cement manufacturer’s cure time charts.

B. Join surfaces of PVC plastic pipe when air temperature is between 40 degrees F and 100 degrees F.

C. Comply with manufacturer’s instructions for solvent welding of PVC pipe and fittings to achieve tight and inseparable joints.

E. Cementing Plastic Pipe:

1. Cut all ends squarely with approved pipe cutting tool, either a mechanical pipe cutter or a pipe cutting wheel. Saws will not be acceptable. 2. Bevel ends with a deburring tool and clean all pipe ends prior to assembly. 4. Clear all pipe lengths of dirt and debris. Protect from contamination. 5. Do not use excess primer and solvent when joining pipe ends. 6. Insert pipe ends to full depth of fitting, hold tightly as necessary to insure full depth bonding. 7. Allow 15 minutes’ curing time following joint assembly prior to moving or handling jointed pipe.

F. Threaded Pipe Joints:

1. Do not use solvent cement on threaded joints. Use approved pipe thread compound in accordance with manufacturer's specifications. 2. Tighten fittings to manufacturer’s specifications; do not overtighten.

3.4 BACKFILLING

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Irrigation: 32 8000 MASTER – July 31, 2015 Page 16

A. Backfill trenches only after main and lateral line inspection and testing, and after receiving written approval from Owner. Notify Owner a minimum of 48 hours in advance when requesting inspection.

B. Completely fill trench with backfill material.

C. Fill all voids and tamp thoroughly in compacted layers of 6 inches at a time. Place and compact soil to prevent settling of final trench grades.

3.5 VALVE INSTALLATION

A. Install as indicated in the Drawings.

B. Install quick coupling valve at point of connection and as indicated in the Drawings.

E. Consult the Drawings when determining final valve box locations.

1. Locate valve and valve box locations so as not to interrupt plant massing or groups, hedge lines, or otherwise alter the character of the proposed plantings. 2. In public areas where valves or valve boxes may be readily visible to the public, verify their location with Owner prior to installation. 3. In turf areas, place valves and valve boxes offset from adjacent paving as indicated in the Drawings.

3.6 BACKFLOW PREVENTION DEVICE INSTALLATION

A. Install at location indicated in the Drawings. Notify Owner of conflicts or complications with specified backflow locations prior to installation.

3.7 CONTROLLER INSTALLATION

A. Install controller in accordance with manufacturer's specifications, and respective State and Local codes.

1. Install at location indicated in the Drawings. Notify Owner of conflicts or complications with specified controller locations prior to installation. Seal all open conduits and other openings as directed with conduit putty or other approved means.

3.8 ELECTRICAL WIRE INSTALLATION

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Irrigation: 32 8000 MASTER – July 31, 2015 Page 17

A. All automatic remote control valves, including master valves, will be wired with single strand copper, UL approved for direct burial, AWG (UL) Type UF, 600 V, sized per manufacturer’s specifications minimum 14-gauge accepted.

B. Install a separate common wire for each controller.

C. Install a spare black wire in every wire run up into each valve box along that run. Provide 3-foot loop.

D. At each valve, a three (3) foot length of wire will be provided neatly coiled.

E. An expansion coil of twelve (12) inches will be installed at each 90 degree bend of the wire run, at each remote control valve and before the sweep into conduit.

F. If a wall mount enclosure is specified, 18 AWG UL Multi- Stand irrigation (direct burial rated) may be used from the terminal strip installed in the enclosure to a splice box at the base of the wall. In no case will any splice be approved between the terminal strip and splice box.

G. All valve field wire splices made will be installed in valve boxes, with no splices between valve boxes and valve boxes and controllers. Approval from owner will be required prior to installation of wiring for all splices occurring other than in remote control valve locations or at entry to conduit from wall mount enclosures.

H. Run all 24-volt direct burial service wires for remote valves in electrical conduit from the bottom of the controller to the outside of the structure, in accordance with State and Local codes.

I. Install all wire under paving using sleeves.

J. Bundle together 24 VAC wiring using standard electrical PVC tape.

K. Lay bundled and taped wiring close to and alongside the PVC main line with 3” separation.

L. Run a spare red wire from the controller past farthest remote control valve(s) in the field, but not connected inside of valve box. At controller and at each remote control valve, provide as a minimum an 18-inche loop in the spare wire, and label "Spare Wire”.

M. Install tracer wire along the top of all main lines and specified pipes of nonmetallic composition. Tape to piping at 20-foot intervals with standard black 3/4 inch electrical tape.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Irrigation: 32 8000 MASTER – July 31, 2015 Page 18

N. Install all wire in accordance with manufacturer's specifications with a minimum of 18 inches of wire looped inside the valve box at each remote control valve and at the controller.

O. Splice wire only within valve or junction boxes. Make splices waterproof according to manufacturer's instructions for wire connectors and sealant.

3.9 SPRINKLER INSTALLATION

A. Install in accordance with manufacturer's specifications.

B. Install sprinklers on PVC swing joints.

C. Install sprinklers perpendicular to grade.

3.10 SYSTEM FLUSHING

A. Flush mainline thoroughly prior to installing remote control valves.

B. Flush lateral piping thoroughly prior to installing sprinkler heads and bubblers.

C. Cap or install heads immediately after flushing.

3.11 SYSTEM PROGRAMMING

A. Calculate three irrigation programs: Spring / Early Summer, Summer, and Late Summer/ Fall. Base system operation requirements on sprinkler precipitation rates, plant material maturation requirements, solar aspect, topography and soil conditions.

B. Submit seasonal controller operation programs with as-built drawings, including a laminated copy of each program in controller cabinet at each controller location. Include total application quantities in inches per week for all zones, for establishment period and normal system operation.

3.12 FIELD QUALITY CONTROL

A. Pressure Testing:

1. Perform a first test prior to notifying Owner to witness testing, and repair any leaks or defects.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Irrigation: 32 8000 MASTER – July 31, 2015 Page 19

2. Conduct test for approval in presence of Owner. Notify Owner at least 48 hours in advance of scheduled testing. 3. Conduct pressure testing with backflow prevention, quick couplers, control valves and manual drains in place prior to backfilling.

B. Testing Procedure:

1. Perform all testing with a certified pressure gauge. Submit written certification of the gauges’ accuracy prior to testing. 2. Test lateral piping at full pressure. 3. Test mainline, valves, joints and fittings at minimum pressure test of 100 pounds per square inch without losing more than 3 pounds per square inch for a period of 1 hour. 4. Correct defects and retest until Owner approves.

C. Provide certified backflow assembly test report for each assembly installed by contractor indicating a passing condition.

3.13 FINAL INSPECTION AND DEMONSTRATION

A. Thoroughly clean, adjust and balance the installed irrigation system.

1. Adjust spray pattern of nozzles to reduce throw of water onto buildings, structures, vehicles, and paved surfaces. 2. Monitor and re-adjust system operation until components operate continually as specified.

B. Operate the system in the presence of the Owner to demonstrate satisfactory performance and coverage.

1. Notify the Owner a minimum of 48 hours in advance when requesting final inspection.

C. Demonstrate complete operation of the system, including controller-operating program, start-up and winterizing procedures.

1. Deliver all supplemental equipment to the Owner's designated operating personnel.

END OF SECTION

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Trees, Plants, and Ground Covers: 32 9010 MASTER – July 31, 2015 Page 1

SECTION 32 9010

TREES, PLANTS, AND GROUND COVERS

PART 1 GENERAL

1.1 SUMMARY

A. Section includes requirements for furnishing, installing and maintaining live plant material.

1. Trees. 2. Plants. 3. Ground covers. 4. . 5. Plant Maintenance and Warranty.

B. Related Sections:

1. Section 01 5639: Temporary Tree and Plant Protection 2. Section 31 1000: Site Clearing 3. Section 31 2000: Earth Moving, for preparation of subsoils. 4. Section 32 8000: Irrigation, for underground sprinkler system. 5. Section 32 9020: Lawns and Grasses, for other landscape work not included in this Section. 6. Section 32 9113: Soil Preparation, for topsoil, soil fertilizer and amendments.

1.2 DEFINITIONS

A. The following publications, referred to thereafter by basic designation only, form a part of this specification to the extent indicated by references:

1. STANDARDIZED PLANT NAMES, 1942 Edition, published by J. Horace McFarland Company. 2. FLORA OF THE PACIFIC NORTHWEST, latest edition, by Hitchcock and Cronquist. 3. Federal Standard for Fertilizers - Mixed, Commercial: FS0-F-241D.

B. ANSI: American National Standards Institute. Z60.1 is the national standard for nursery stock.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Trees, Plants, and Ground Covers: 32 9010 MASTER – July 31, 2015 Page 2

B. Balled and Burlapped Stock: Exterior plants dug with firm, natural balls of earth in which they were grown wrapped with burlap, tied, rigidly supported, and drum laced with twine with the root flare visible at the surface of the ball as recommended by ANSI Z60.1

C. Bare-Root Stock: Exterior plants with a well-branched, fibrous-root system developed by transplanting or root pruning, with soil or growing medium removed, and with not less than the minimum root spread according to ANSI Z60.1 for type and size of exterior plant required.

D. Caliper: Trunk diameter is measured six-inches (6”) from the ground; if the caliper is greater than four-inches (4”), the measurement is taken at twelve-inches (12”) from the ground.

E. Cane: A cane shall be considered a primary stem which starts from the ground or at a point close to the ground at a point not higher than one-fourth (1/4) the height of the plant, and which reaches the minimum height stated in the plant size specification.

F. Central leader: Also referred to as leader or the dominant leader. A continuation of the main trunk located more or less in the center of the crown, beginning at the lowest main scaffold branch and extending to the top of the tree.

G. Circling root(s): One or more roots whose diameter is greater than ten percent (10%) of the trunk caliper circling more than one-third of the trunk. Circling roots are unacceptable.

H. Clear Trunk: The portion of the trunk below the main crown which may include shortened temporary branches.

I. Co-dominant: Two or more vigorous, upright branches or stems of relatively equal diameter that originate from a common point, usually where the leader was lost or removed. Co-dominant stems are unacceptable.

J. Compost: ______.

K. Container-Grown: Healthy, vigorous, well-rooted exterior plants grown in a container with a well-established root system reaching sides of container and maintaining a firm ball when removed from container. Container shall be rigid enough to hold ball shape and protect root mass during shipping and be sized according to ANSI Z60.1 for type and size of plant required.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Trees, Plants, and Ground Covers: 32 9010 MASTER – July 31, 2015 Page 3

L. Crown: The portion of a tree beginning at the lowest main scaffold branch extending to the top of the tree. On younger trees, the crown may be comprised of temporary branches.

M. Cultivar: A named plant selection from which identical or nearly identical plants can be produced, usually by vegetative propagation or cloning.

N. Finish Grade: Elevation of finished surface of planting soil.

O. Included Bark: Bark embedded in the union between a branch and the trunk or between two or more stems that prevents the formation of a normal branch bark ridge. Included bark is unacceptable.

P. Kinked Root: A main root that is sharply bent. Kinked roots are unacceptable.

Q. Noxious weeds include the following:

1. Blackberry, Canada Thistle, Dandelion, Horsetail, Morning Glory, Nut Sedge, Poison Oak, Rush Grass, Annual Bluegrass, Bermuda Grass, Brome, Crabgrass, Johnson Grass, Nut Grass, Quack Grass, Shiny Geranium, Garlic Mustard, Nutsedge and Lesser Celandine. 2. Other plants designated as a noxious weed by authorized State, County and City officials.

R. Pesticide: A substance or mixture intended for preventing, destroying, repelling, or mitigating a pest. Pesticides include insecticides, miticides, , fungicides, rodenticides, and molluscicides. They also include substances or mixtures intended for use as a plant regulator, defoliant, or desiccant.

S. Pests: Living organisms that occur where they are not desired or that cause damage to plants, animals, or people and as defined in PP&R’s Integrated Pest Management Program at http://www.portlandoregon.gov/parks/article/116237

T. Planting Soil: Native or imported topsoil, manufactured topsoil, or surface soil modified to become topsoil; mixed with soil amendments.

U. Root Collar: Also referred to as the root flare. The base of a tree where the main roots and trunk meet.

V. Scaffold Branches: Large main branches that form the main structure of the crown.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Trees, Plants, and Ground Covers: 32 9010 MASTER – July 31, 2015 Page 4

W. Stem-girdling Root: A circling, bent, or straight root that touches or rests on the trunk or root flare that can become a permanent root. Stem-girdling roots are unacceptable.

X. Subgrade: Surface or elevation of subsoil remaining after completing excavation, or top surface of a fill or backfill, before placing planting soil.

Y. Temporary Branch: A small branch that is temporarily retained along the lower trunk of young trees.

Z. Taper: The thickening of a trunk or branch toward its base.

1.3 SUBMITTALS

A. Within 2 weeks after Notice to Proceed, submit copies of confirmed plant orders including information on quantity ordered, sizes and location, phone number, and address of grower who has committed to provide plant material.

B. Within 60 days before beginning planting work, submit copies of all nursery invoices for plant materials proposed for use.

1. Invoices must indicate source of supply by name, address and phone number, order invoice number, and size and quantity for each species or variety of plant material ordered.

C. Submit inspection certificates required by law, to accompany each shipment of plant materials.

D. Submit an approved Application for Pesticide Use on PP&R Property.

E. Submit samples of the following:

1. Soil Test Results 2. Organic Amendment – ½ gallon [1/4 cubic foot] 3. Bark and other local area available mulches – ½ gallon 4. Tree Stakes 5. Guy Material 6. Tree Wrap 7. Tree Grate

F. Submit maintenance recommendations to Owner for maintenance of landscape planting and operation of the irrigation system addressing a full calendar year.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Trees, Plants, and Ground Covers: 32 9010 MASTER – July 31, 2015 Page 5

1.4 QUALITY ASSURANCE

A. The same subcontractor shall install both irrigation and landscape planting work of and Section 32 8000, “Irrigation” and Section 32 9020, “Lawns and Grasses”.

B. Installer Qualifications: An installer with a minimum of 2 years experience in landscape construction, currently licensed under respective jurisdictions, who can perform and supervise Work of this Section in accordance with proper horticultural practices.

1. Installer's Personnel Certifications: Certified Landscape Technician, CLT- Exterior.

C. Comply with applicable requirements of the United States Department of (USDA) for work and material supplied.

D. Provide quantity, size, genus, species, and variety of exterior plants indicated, complying with applicable requirements in ANSI Z60.1, "American Standard for Nursery Stock”.

1. Names and sizes of plants shall comply with the Standards of Practice of the American Association of Nurserymen, Inc. 2. Botanical names take precedence over common names. 3. Owner may make selection of exterior plants purchased under allowances, and will tag plants at their place of growth before they are prepared for transplanting.

E. Tree and Shrub Measurements:

1. Measure according to ANSI Z60.1 with branches and trunks or canes in their normal position. Do not prune to obtain required sizes. 2. Take caliper measurements above ground for trees up to caliper size, and above ground for larger sizes. 3. Measure main body of tree or shrub for height and spread; do not measure branches or roots tip-to-tip.

F. Initial Inspection of Plant Material:

1. Owner may observe trees and shrubs at place of growth or on-site or both before planting for compliance with requirements for genus, species, variety, size, and quality. Although inspection of materials is primarily for quality, size, and variety, other requirements are not waived even though initial inspection results in approval.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Trees, Plants, and Ground Covers: 32 9010 MASTER – July 31, 2015 Page 6

2. Assemble all plants for each inspection at one location for inspection to be completed in one visit. Any further inspection required due to plants being unavailable, rejected, and or not meeting specifications shall be charged to the Contractor at the current hourly rate for the City personnel performing the inspection. 3. Owner retains right to observe trees and shrubs further for size and condition of balls and root systems, insects, injuries, and latent defects and to reject unsatisfactory or defective material at any time during progress of work. 4. Remove rejected trees or shrubs from Project site within 24 hours. 5. Replace plant materials rejected by Owner at no additional expense to Owner.

F. Regulatory Requirements:

1. Inspection certificates are required by law to accompany each shipment of plant material. 2. All plant material shall meet requirements of State and Federal laws with respect to inspection for plant diseases and infestation. 3. By City of Portland Ordinance, use of neonicotinoid pesticides and plants treated with neonicotinoid pesticides are banned from use on City of Portland owned property. 4. Herbicide and pesticide application must follow the procedures and policies of the Owner’s Integrated Pest Management Program (IPM):

a. Application of herbicides for weed control may only be made only by an applicator holding a current commercial license under State and Federal law for herbicide application. b. Apply only herbicide or pesticide products approved by Owner through the Owner’s Integrated Pest Management (IPM) process. c. Apply herbicide or pesticide products only according an Application for Pesticide Use plan approved by Owner’s IPM Administrator.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Packaged Materials: Deliver packaged materials in containers showing weight, analysis, and name of manufacturer. Protect materials from deterioration during delivery and while stored at site.

B. Bulk Materials:

1. Do not dump or store bulk materials near structures, utilities, walkways and pavements, or on existing turf areas or plants or critical root zone.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Trees, Plants, and Ground Covers: 32 9010 MASTER – July 31, 2015 Page 7

2. Accompany each delivery of bulk materials with appropriate certificates.

C. Deliver exterior plants freshly dug:

1. Immediately after digging up bare-root stock, pack root system in wet straw, hay, or other suitable material to keep root system moist until planting.

D. Do not prune trees and shrubs before delivery, except as approved by Owner.

1. Protect bark, branches, and root systems from sun scald, drying, sweating, whipping, and other handling and tying damage. 2. Do not bend or bind-tie trees or shrubs in such a manner as to destroy their natural shape. 3. Provide protective covering of exterior plants during delivery. 4. Do not drop exterior plants during delivery.

C. Handle planting stock by root ball. Handle containerized stock by the container.

D. Deliver exterior plants after preparations for planting have been completed and install immediately. Do not deliver more plant material than can be planted in one day. If planting is delayed more than six hours after delivery, set exterior plants trees in shade, protect from weather and mechanical damage, and keep roots moist.

1. Heel-in bare-root stock: Soak roots in water for two hours if dried out. 2. Set balled stock on ground and cover ball with soil, peat moss, , or other acceptable material. 3. Do not remove container-grown stock from containers before time of planting. 4. Water root systems of exterior plants stored on-site with a fine-mist spray. Water as often as necessary to maintain root systems in a moist condition. 5. Store bulbs, corms, and tubers in a dry place at sixty degrees to sixty-five degrees until planting.

E. Transport and handle all materials in strict accordance with proper horticultural standards.

F. Protect all materials, at all times during handling, shipping and storage, from extreme weather conditions, wind, drying of roots or root ball injury.

H. Store fertilizers in a dry place and protect from intrusion of moisture.

1.6 PROJECT CONDITIONS

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Trees, Plants, and Ground Covers: 32 9010 MASTER – July 31, 2015 Page 8

A. Weather Limitations: Proceed with planting only when existing and forecasted weather conditions permit:

1. Do not plant when air temperature is less than 35 degrees F or above 90 degrees F. 2. Do not plant when ground is frozen, excessively wet or dry. 3. Do not plant when wind velocity exceeds 25 mph. 4. Apply products during favorable conditions according to manufacturer’s written instruction sand warranty requirements.

B. Adverse Soil Conditions: When conditions detrimental to plant growth are encountered, such as rubble fill, adverse drainage conditions, or obstructions, notify Owner before planting.

C. Vehicular Accessibility: Repair damage to prepared topsoil and existing surfaces, caused by vehicular access and movement during work under this section, to original condition at no additional cost to the Owner.

1.7 COORDINATION AND SCHEDULING

A. Coordinate installation of planting materials during normal planting seasons for each type of plant material required.

1. Coordinate Work with park activities. 2. Plant trees and shrubs after finish grades are established and before planting lawns, unless otherwise acceptable to Owner.

B. Coordinate installation planting materials with irrigation. Plant only in areas where the irrigation system is complete and fully operational.

1.8 WARRANTY

A. Provide the following warranties:

1. Trees and plants: 2 years after Final Acceptance. 2. Annuals: 3 months.

B. At the end of the warranty period, all plants not in a healthy growing condition will be noted.

1. Remove and replace unacceptable plants from site within 15 [15] work days unless otherwise approved by the Owner.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Trees, Plants, and Ground Covers: 32 9010 MASTER – July 31, 2015 Page 9

2. Make replacement with plants of the same species, size and condition as those specified for the original plantings, and at no additional cost to the Owner. 3. A new warranty period of 2 years starts upon replacement under warranty.

1.9 MAINTENANCE

A. Maintain landscape plantings from installation until Final Acceptance.

1. Adhere to Owner’s Integrated Pest Management (IPM) program during maintenance period.

B. Trees, Shrubs, and Ground Cover:

1. Maintain trees, shrubs, and ground cover by trimming, pruning, cultivating, watering, weeding, fertilizing, restoring planting saucers, tightening and repairing stakes and guy supports, and resetting to proper grades or vertical position, as required to establish healthy, viable plantings. 2. Water trees by deep root watering method. 3. Restore or replace damaged tree wrappings. 4. Keep mulch smooth, loose and at specified depth. Provide additional mulch as needed.

C. Weeding and Cleanup:

1. Keep all landscape areas clean and weed free. Keep all buildings, pavements, and other exterior improvements clean and free of soil and debris. 2. Weed all beds weekly. 3. Police and cleanup entire site at least once a week and additionally as needed to collect seasonal debris (leaves). 4. As directed by Owner, compost non-woody debris in place or remove collected materials from site after each visit. Remove all invasive weeds from landscape and dispose of legally off-site.

D. Plant Health and Replacement:

1. Check all plantings at least weekly to determine their condition. 2. Treat plantings as needed to keep disease and pest free. 3. Immediately notify and consult with Owner regarding any questionable plants. Remove plants that are in poor condition, dead, damaged, diseased, and otherwise unacceptable. Remove unacceptable plants immediately and replace within 15 work days unless otherwise approved by Owner. Provide the Owner with a written notice indicating plants which are to be replaced,

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Trees, Plants, and Ground Covers: 32 9010 MASTER – July 31, 2015 Page 10

plants which have been removed, and when replacements will be installed. Note location on copy of planting plan.

E. If work is not promptly or properly performed by the Contractor, the Owner will, at their discretion, have the work performed by others. The cost of the work by others will be deducted from the Contract amount.

PART 2 PRODUCTS

2.1 PLANT MATERIALS

A. Provide plants named in the Drawings.

1. Substitutions will not be accepted unless specifically accepted in writing by the Owner.

B. Substitutes proposed for approval, in each case, shall possess the same essential characteristics as the kind of plant actually specified in regard to appearance, ultimate height, shape, hardiness, habit of growth, general soil, and other requirements.

1. Substitutions of larger material may be acceptable to owner with a proportionate increase in the size of the roots or rootball.

C. The Drawings note the species (botanical and common names), size, manner in which plants are to be furnished, and spacing of the required plant materials.

D. Determine the quantities of plant materials required in accordance with the specified spacing, or location indicated in the Drawings. Be responsible for surplus or shortages of plant quantities.

2.2 TREES, SHRUBS AND GROUNDCOVER

A. Provide general species, variety, quantity, size and condition of plant as indicated in the Drawings.

1. Supply plant material, but not limited to form and conditions, defined as follows:

Rhizome: Section of root or stolon Bulb: Single bulb mass Plug: Rooted Cutting Seedling: Rooted tree or shrub

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Trees, Plants, and Ground Covers: 32 9010 MASTER – July 31, 2015 Page 11

Tubeling: Rooted tree or shrub in single tube Bare Root: Shrub or tree with soil removed from root mass Cutting: Stem cut from parent stock Ball and Burlap: Tree or shrub with excavated root ball wrapped and tied Container: Standard pot or bag, per ANSI standard sizing

B. Use nomenclature that conforms to "Standardized Plant Names.”

C. Quality definitions, grading tolerances, and caliper to height ratios are to be no less than minimum specified in ANSI Z60.1.

D. Provide plant material that is healthy nursery stock, well branched, and full foliated when in leaf; and free from disease, injury, insects, weeds and weed roots.

E. Cold storage plants will not be permitted.

F. Provide plant nursery-grown materials, unless otherwise specified. Provide nursery- grown plants that have been growing continuously in licensed nurseries for the following minimum number of growing seasons:

Plant Materials Time in Nursery Evergreens and conifers Two growing seasons Deciduous One growing season Groundcover and Vines One growing season

G. Furnish balled and burlapped (B&B) stock with natural ball.

H. Provide potted and container stock well rooted, vigorous enough to ensure survival and exhibit healthy growth.

I. Provide container stock that has been growing in its container for a minimum of 6 months and a maximum of 2 years, with roots filling the containers but not showing evidence of being, or having been, root bound.

J. Trees: Provide untapped, straight, single-leader trees.

1. Crown: The form and density of the crown shall be typical for a young specimen of the species or cultivar. Changes in form caused by wind, pruning practices, pests, or other factors shall not substantially alter the form for the species or cultivar. These crown specifications do not apply to plants that have been specifically trained in the nursery to be: topiary, espalier, multi- stem, or clump; or unique selections such as contorted or weeping cultivars.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Trees, Plants, and Ground Covers: 32 9010 MASTER – July 31, 2015 Page 12

a. Trees shall have a single, relatively straight trunk, and central leader, unless noted on plans to be “Multi-trunk” or “Clump”. They shall be free of co-dominant stems and vigorous, upright branches that compete with the central leader. If the original leader has been headed, a new leader at least one-half of the diameter of the original leader shall be present. b. Main branches shall be evenly distributed along the central leader, not clustered together. They shall form a balanced crown appropriate for the age of the species/cultivar. c. Branch diameter shall be no larger than one-half the diameter of the central leader measured 1 inch above where the branch is attached. d. The attachment of the largest scaffold branches shall be free of included bark. e. Temporary branches, unless otherwise specified, should be present along the lower trunk below the lowest scaffold branch, particularly for trees less than 1 inch in caliper. These branches should be no greater than 3/8 inch in diameter. Clear trunk shall be no more than 30% of the total height of the tree, unless otherwise noted.

2. Trunk: The tree trunk shall be relatively straight; vertical; free of wounds, except properly made pruning cuts, which shall be closed over or less than ¾ inch-diameter open; sunburned areas; conks (fungal fruiting bodies); wood cracks; bleeding areas; signs of boring insects; galls; cankers; stem-girdling ties; or mechanical injury or lesions.

a. Trunk caliper and taper shall be sufficient so that the tree will remain vertical without a stake. Trunk caliper at 6 inches above the soil media (substrate) surface shall be within the diameter range shown for each container size below and as specified in current edition of ANSI Z60.1. b. The cut made when re-growing the top should be just above the major structural roots. The “shank” that results from this procedure should be at a consistent height above the structural roots and no longer than 5 inches, to ensure that the trees are consistently planted at the correct depth. The base of the trunk should not have a large pruning cut from re-growing the top.

3. Roots: The root system shall be substantially free of injury from biotic agents, for example insects and pathogens; and abiotic agents, for example pesticide toxicity and salt injury.

a. The uppermost roots or root collar shall be within the upper 2 inches of the soil media (substrate). Depth of the root-ball shall be

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Trees, Plants, and Ground Covers: 32 9010 MASTER – July 31, 2015 Page 13

measured from the top of the ball, which in all cases shall begin at the root flare. Soil above the root flare shall not be included in the root- ball depth measurement, and shall be removed. b. The root collar and the inside portion of the root-ball shall be free of defects, including circling, kinked, and stem-girdling roots. Soil removal or root washing near the root collar may be necessary to inspect for the aforementioned root defects. c. Roots on the periphery and bottom of the root-ball shall be less than 1/8 inch diameter. d. The tree shall be well rooted in the soil media (substrate). Root distribution shall be uniform throughout the soil or media. Structure and growth shall be appropriate for the species/cultivar. When the burlap or container is removed, the root-ball shall remain intact. Trees should have several lateral roots or many fibrous roots spaced evenly around the trunk to provide support so the trees are stable when planted. Trees should have as many small roots as possible. These roots are key to the uptake of sufficient water and nutrients. Fibrous roots can be achieved by root-pruning, using air-pruning containers, or under-cutting or root pruning and transplanting at any stage of production. e. As a general rule for young nursery-grown trees, there should be two or more structural roots within 1-3 inches of the soil surface. “First order lateral roots” is another term that has been used for these roots. If the roots are deeper than 3 inches, the stock shall be rejected. f. Root balls that are undersized as specified in current edition of ANSI Z60.1. will be rejected. Field grown trees for balled and burlap delivery shall have the roots pruned at least 6 inches inside the final root-ball size performed within adequate time for the tree to develop fibrous roots at the outer edge of the root-ball prior to harvest and delivery.

4. Leaves: The size, color, and appearance of leaves shall be typical for the time of year and stage of growth of the species or cultivar. Trees shall not show signs of prolonged moisture stress or extended drought as indicated by wilted, shriveled, or dead leaves.

5. Branches: Length and diameter of shoot growth throughout the crown shall be appropriate for the age and size of the species or cultivar. Trees shall not have dead, diseased, broken, distorted, or otherwise injured branches.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Trees, Plants, and Ground Covers: 32 9010 MASTER – July 31, 2015 Page 14

K. Provide plant materials free from disease, insects, disfiguring knots, sun scale, injuries, bark abrasion, evidence of improper pruning, and other objectionable disfigurements.

L. Provide shrubs with developed branching system and full foliage. Shrubs shall not be leggy.

M. Thin, weak, leggy, or misshapen plants will be rejected by the Owner.

N. Labels:

1. Securely attach to all individually shipped plants, and to each box, bundle, bale and container of plant materials, labels with the correct horticultural name, size and caliper and/or other data, as specified in the Drawings. 2. Provide durable labels written in weather-resistant ink. 3. Maintain labels on representative plant materials until final acceptance of planting. 4. Affix labels in such a manner that will not girdle the plant materials.

2.3 TREES, STABILIZATION MATERIALS

A. Stakes and Guys:

1. Upright and Guy Stakes: Rough-sawn, sound, new untreated softwood, free of knots, holes, cross grain, and other defects, 2 by 2 inch minimum by length indicated, pointed at one end. 2. Flexible Ties: Chainlock, or approved, straps of length required to reach stakes or turnbuckles. 3. Tree-Tie Webbing: UV-resistant polypropylene or nylon webbing with brass grommets. 4. Flags: Standard surveyor's plastic flagging tape, white, 6 inches long. 5. Proprietary Staking-and-Guying Devices: Proprietary stake and adjustable tie systems to secure each new planting by plant stem; sized as indicated and per manufacturer's written recommendations. Tree stage and guys must not contain any metal.

B. Root-Ball Stabilization Materials:

1. Upright Stakes and Horizontal Hold-Down: Rough-sawn, sound, new hardwood or softwood, free of knots, holes, cross grain, and other defects, 2- by-2-inch nominal by length indicated; stakes pointed at one end. 2. Wood Screws: ASME B18.6.13.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Trees, Plants, and Ground Covers: 32 9010 MASTER – July 31, 2015 Page 15

3. Proprietary Root-Ball Stabilization Devices: Proprietary at-or below-grade stabilization systems to secure each new planting by root ball; size per manufacturer's written recommendations, unless otherwise indicated.

a. Products: Subject to compliance with requirements, provide the following:

1) Border Concepts, Inc.; Tomahawk Tree Stabilizers. 2) Foresight Products, LLC; Duckbill Rootball Fixing System. 3) Tree Staple, Inc.; Tree Staples.

2.4 WATER

A. Water: Suitable for irrigation, free from oil, acid, alkali, salt or other substances harmful to plant life.

2.5 LARGE WOODY DEBRIS

A. Obtain whole trees, including trunk and root mass from demolition and site clearing activities wherever possible. Trees must be free of disease or insect infestations that may be harmful to existing vegetation and new plantings.

1. Contractor may remove root mass for ease of installation. 2. Large Woody Debris shall be a minimum of 16 inches in diameter when measured 4’ above the root crown and cut in varying lengths to be a minimum of 15 feet and maximum of 20 feet long.

B. Flagging: Prior to felling trees, flag trees to remain on-site for approval and reuse in the landscape design.

C. Stockpile Large Woody Debris for approval by Owner prior to installation.

2.6 MULCHES

A. Imported Mulch: Fir and/or hemlock bark, 1 inch minus size with less than 30 percent bark finer than 1/4 inch size. Sawdust and wood shavings will not be acceptable.

2.7 HERBICIDE

A. As listed on the approved Application for Pesticide Use on PP&R Property.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Trees, Plants, and Ground Covers: 32 9010 MASTER – July 31, 2015 Page 16

2.8 MISCELLANEOUS PRODUCTS

A. Wood Pressure-Preservative Treatment: AWPA C2, with waterborne preservative for soil and freshwater use, acceptable to authorities having jurisdiction, and containing no arsenic; including ammoniacal copper arsenate, ammoniacal copper zinc arsenate, and chromated copper arsenate.

B. Root Barrier: Black, molded, modular panels manufactured with 50 percent recycled polyethylene plastic with ultraviolet inhibitors, thick, with vertical root deflecting ribs protruding out from panel, and each panel wide.

C. Filter Fabric: Nonwoven geotextile manufactured for separation applications and made of polypropylene, polyolefin, or polyester fibers, or a combination of them.

D. Mycorrhizal Fungi: Dry, granular inoculant containing at least 5300 spores per of vesicular-arbuscular mycorrhizal fungi and 95 million spores per of ectomycorrhizal fungi, 33 percent hydrogel, and a maximum of 5.5 percent inert material.

2.8 SOURCE QUALITY CONTROL

A. Plant materials not meeting specification requirements will be rejected.

B. All native plants shall be nursery stock except hardwood cuttings.

C. Hardwood cuttings, as identified on the plant list, shall be taken from healthy, vigorous, one to three-year old, plants grown in full sunlight and obtained from the respective watershed identified by the Owner.

1. Cuttings shall be from 1 to 2 feet in length and between 1/4 and 3/4 inch in diameter, as shown on plans. 2. Each piece shall contain a minimum of 2 dormant buds per foot of length. 3. Period of collection shall be at dormancy and at the optimum time per proper horticultural standards for cutting establishment.

PART 3 EXECUTION

3.1 EXAMINATION

A. Examine areas to receive landscaping for compliance with requirements and for conditions affecting performance of Work of this Section. Do not proceed with installation until unsatisfactory conditions have been corrected.

3.2 PLANT BED PREPARATION

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Trees, Plants, and Ground Covers: 32 9010 MASTER – July 31, 2015 Page 17

A. Prepare plant beds as specified in Section 32 9113, “Soil Preparation.”

3.3 PLANT LAYOUT AND INSPECTION

A. Layout of major planting areas as indicated in the Drawings are approximate only; Outline in the field locations and identity of all trees, shrubs and ground covers, subject to review and approval.

B. Inspection: Notify the Owner 48 hours prior to beginning planting. The Owner may adjust plant material location to meet field conditions.

C. Do not commence with planting until Owner has approved the location and layout of all plant beds.

3.4 NURSE LOGS

A. Flag locations and orientation of Nurse Logs for approval of Owner prior to placing.

3.5 TREES, SHRUBS AND GROUNDCOVER PLANTING

A. Plant trees and shrubs upright and adjust to set best appearance or relationship to adjacent plants and structures.

1. Plant shrubs and groundcovers 1/2 the distance from curbs, sidewalks, buildings and other objects, as specified in the spacing requirements.

2. Install plant material with regard to condition specified in the Drawings, according to, but not limited to, the following:

Propagule: Cut into soil surface within 2 inches of surface Bulb: Set into soil 4 to 6 inches deep; point up Plug: Placed into soil at size of root mass Aquatic container: Dispersed into open water surface Seedling: Cut into soil as deep as root mass, compacted Tubeling: Cut into soil as deep as root mass, compacted Bare Root: Placed into plant pit sufficient for root mass, compacted Cutting: Dibble into soil per cutting installation detail on plan Ball and Burlap: Placed into plant pit twice the size of root ball, compacted Container: Placed into plant pit twice the size of container. Scarify sidewalls of planting hole to help with root

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Trees, Plants, and Ground Covers: 32 9010 MASTER – July 31, 2015 Page 18

penetration. Cut any circling roots. If shrub is pot- bound, use pruning shears or serrated knife to make slices 1 to 2 inches deep going from top of root ball to bottom. Make slices in 3 or 4 places around the root ball. Pull the roots growing along the outside of the root ball away from the root ball.

B. Excavation for planting:

1. Stockpile excavated topsoil for planting operations. 2. In digging pits for trees, separate sod, topsoil suitable for backfill, and subsoil, and dispose of the sod, rocks and unsuitable material off-site. 3. Refer to Drawings for diameter or minimum width of planting pit or trenches. 4. If standing water is encountered during excavation of the planting pits, notify the Owner who will determine the corrective drainage measures required. 5. If underground obstructions or rocks are encountered in excavation of planting areas making it impossible to plant materials as indicated, an alternate location for the planting will be selected by the Owner. 6. Use excess excavated topsoil to form saucers around plants as indicated. Dispose soil not required or suitable for the usage properly off of Project site.

C. Cutting: Cut off cleanly all broken or frayed roots, smaller than 1/2 inch caliper.

D. Prior to completing backfilling, flood the upper two-thirds of the plant pit with the plant starter solution. Allow solution to soak away. Finish filling holes to finish grade and lightly compact soil around root ball.

E. Placement and compaction: Place and compact backfill soil mixture carefully to avoid injury to roots; fill all voids.

3.6 SHRUBS AND GROUNDCOVER PLANTING BED GRADES

A. Establish finish grades and slopes in accordance with finish grades as specified.

3.7 MULCHING

A. Mulch all shrubs and ground cover planting beds with a 2 inch layer of imported mulch material within 2 days after planting.

1. Cover entire bed areas; apply evenly. 2. Apply a 2 inch layer of mulch material to saucer areas of trees and shrubs located outside of planting beds.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Trees, Plants, and Ground Covers: 32 9010 MASTER – July 31, 2015 Page 19

3. Place mulch no closer than 4 inches from trunks of woody plant material and away from the crowns of herbaceous plants. 4. Maintain depth and smooth cover flush with finish level of adjacent grades.

3.8 TREE STAKING

A. Install tree staking as follows, unless otherwise indicated:

1. Upright Staking and Tying: Stake trees of 2 through 5 inch caliper.

a. Stake trees of less than 2 inch caliper only as required to prevent wind tip out. b. Use a minimum of 2 stakes of length required to penetrate at least 18 inches below bottom of backfilled excavation and to extend above grade to the dimension indicated in the Drawings. c. Set vertical stakes and space to avoid penetrating root balls or root masses.

2. Use 2 stakes for trees up to 12 feet high and 2-1/2 inches or less in caliper. Space stakes equally around trees.

3. Support trees with bands of flexible ties at contact points with tree trunk. Allow enough slack to avoid rigid restraint of tree.

3.9 ROOT-BARRIER INSTALLATION

A. Install root barrier where trees are planted within 60 inches of paving or other hardscape elements, such as walls, curbs, and walkways unless otherwise indicated in the Drawings.

3.10 EDGING INSTALLATION

A. Shovel-Cut Edging: Separate mulched areas from turf areas, curbs, and paving with a 45 degree, 4 to 6 inch deep, shovel-cut edge.

3.11 PRUNING

A. Prune at or after the time of planting in accordance with proper horticultural practice.

B. Limit pruning to injured twigs and branches only.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Trees, Plants, and Ground Covers: 32 9010 MASTER – July 31, 2015 Page 20

1. Prune in accordance with proper arboricultual practices and ANSI A 300 Pruning Standard.

C. With the permission of the Owner, pruning may be done before delivery of plants, but not before plants have been inspected and accepted.

3.12 CLEANUP

A. Keep premises free from accumulation of debris.

B. At completion of each area of work, remove all debris, equipment and surplus materials.

END OF SECTION

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Tree Pruning: 32 9013 MASTER – July 31, 2015 Page 1

SECTION 32 9013

TREE PRUNING

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Pruning of park trees to best preserve and enhance the beauty, structural integrity, and functional values of the trees. 2. Working guidelines for pruning trees that are individually unique in form and structure without adhering to strict rules.

B. Related Sections:

1. Section 31 1000: Site Clearing, for removal of other trees and protection for trees to remain. 2. Section 32 9010: Trees, Plants, and Ground Covers, for other landscape work not included in this Section.

1.2 SUBMITTALS

A. Submit arborist qualifications described in Article “Quality Assurance.”

1.3 QUALITY ASSURANCE

A. Arborist Qualifications: Engage an experienced arborist who will directly oversee the Work of this Section, and has at least 5 years of consistent experience pruning large trees, and is certified by the International Society of Arboriculture.

1. Arborist shall engage persons performing tree work who have been trained in accordance with the tree care standards accepted by the International Society of Arboriculture.

a. Persons performing tree work on trees in or around primary electrical lines must be trained to do so according standards and practices as directed by the associated utility company. B. Perform tree pruning according to tree related safety requirements in ANSI Z133.1- 2012 and all applicable provisions of the most current ANSI A300 Standards and Best Management Practices.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Tree Pruning: 32 9013 MASTER – July 31, 2015 Page 2

C. Do not use climbers, hooks and spurs or other climbing tools that may damage trees.

D. Utilize adequate safety measures at all times to protect employees, public, and associated trades doing work around trees.

1.6 COORDINATION

A. Pruning may be accomplished at any time of year with seasonally adjusted methods and caution as necessary.

1. Coordinate Work with park activities.

B. Coordinate Work with park activities and other work occuring within and around the drip line of trees being pruned.

PART 2 NOT USED

PART 3 EXECUTION

3.1 EXAMINATION

A. Examine areas to receive tree pruning for compliance with requirements and for conditions affecting performance of Work of this Section. Do not proceed with installation until unsatisfactory conditions have been corrected.

3.2 PREPARATION AND SAFETY

A. Protect structures, utilities, sidewalks, pavements, lawns, plantings, and other facilities from damage caused by pruning operations.

B. Coordinate barricades around trees to ensure safe removal of tree branches. At least one person shall serve to coordinate safe operations on the ground at all times when work operations are in progress.

C. Whenever large tree sections are being cut in a treetop, which may endanger persons or property, secure such sections by ropes and lower safely to the ground in a controlled manner.

3.3 TREE PRUNING

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Tree Pruning: 32 9013 MASTER – July 31, 2015 Page 3

A. Generally, where trees are closely spaced or provide dense shade, prune to remove between 20 to 25 percent of the foliage from the outer crown to allow more light penetration.

B. Tree pruning consists of the total removal of dead or living branches as may threaten the future health, strength and attractiveness of trees. Specifically, prune trees in such a manner as to:

1. Prevent branch and foliage interference with requirements of safe public passage. Keep over street clearance to a minimum of 16 feet above the paved surface of the street, 15 above the curb, and 8 feet above the surface of a public sidewalk or pedestrian way. Exceptions are allowed for young trees, which would be irreparable damaged by such pruning action. 2. Remove dead and dying branches and branch stubs that are 1/2 inch diameter or larger. 3. Remove broken or loose branches.

4. Remove live branches which interfere with the tree’s structural strength, and healthful development, which include the following:

a. Branches that rub and abrade a more important branch. b. Branches of weak structure that are not important to the framework of the tree. c. Branches, that if allowed to grow, would wedge apart the junction of more important branches. d. Branches forming multiple leaders in a single leader type tree. e. Branches near the end of a limb, that will produce more weight or offer more resistance to wind than the limbs are likely to support. f. Selective removal of undesirable sucker and sprout growth paying specific attention not to nick or damage the sprout “burl.” g. Selective removal of one or more developing leaders where multiple branch growth exists near the end of broken or stubbed limbs. h. Selective removal of limbs obstructing buildings or other structures or traffic signs. Generally, limbs closer than five (5) feet to a building or other structure should be removed unless doing so would severely damage a tree. i. Removal of branches, which project too far outward beyond an otherwise symmetrical form.

C. Cut back branches completely to reduce weight where excessive overburden appears likely to result in breakage of supporting limbs.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Tree Pruning: 32 9013 MASTER – July 31, 2015 Page 4

D. Clear trees of sprout or sucker growth to a minimum height of 8 feet above ground level. Exceptions are allowed for young trees, that would be irreparably damaged by such pruning action.

E. Obtain a balanced appearance when viewed from the opposite side of the street immediately opposite the tree, unless authorized by the Owner to do otherwise.

F. Clear all branches and foliage within 10 feet of primary electrical lines and 3 to 5 feet of secondary electrical lines.

G. Clear all branches that interfere with telephone cable and other utility lines within 1 foot of lines, wherever feasible.

3.4 UNACCEPTABLE PRUNING

A. The following procedures, including but not limited to those listed, will result in tree decline and are not allowed:

1. Severe cutting back of all growing tips usually referred to as topping, pollarding, or hat racking. 2. Flush cutting where a cut is made even with the surface of the trunk or limb, removing the branch collar and branch bark ridge. 3. Stub cutting where branch removals results in the base of branch removed protruding more than approximately 1/4 inch beyond the zone of branch collar and branch bark ridge. 4. Removal of a healthy main leader, for reasons other than power line clearance. 5. Excessive cutting or lifting that exceeds the International Society of Arboriculture or these specifications.

B. Replace at no expense to the Owner, trees that have declined in health due to improper pruning procedures.

3.5 CLEANUP AND PROTECTION

A. Promptly cleanup debris resulting from tree pruning operations. Keep work area safe at all times until tree pruning is completed. Under no circumstances will the accumulation of debris be allowed in such a manner to result in a hazard to the public.

1. Clean debris from tree pruning each day before leaving the project site.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Tree Pruning: 32 9013 MASTER – July 31, 2015 Page 5

B. At completion of tree pruning, rake and/or blow clean, all brush, branches, leaves, or other debris from lawn areas, parkways, streets and sidewalks and remove from Project site. Leave areas in a condition equal to, or better than, that which existed prior to the commencement of tree pruning operations.

3.6 DISPOSAL

A. Remove all cuttings, branches, wood chips, leaves and other debris and legally dispose of it off Owner's property.

END OF SECTION

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation: 32 9113 MASTER – July 31, 2015 Page 1

SECTION 32 9113

SOIL PREPARATION

PART 1 GENERAL

1.1 SUMMARY

A. Section includes topsoil and soil preparation of completed rough grading, including the following:

1. Soil materials. 2. Testing of soil materials. 3. Preparation for planting areas. 4. Preparation for lawn areas. 5. Soil amendments, fertilizers and mulches.

B. Related Sections:

1. Section 01 5639: Temporary Tree and Plant Protection 2. Section 31 1000: Site Clearing 3. Section 31 2000: Earth Moving 4. Section 32 8000: Irrigation, for underground sprinkler system. 5. Section 32 9010: Trees, Plants, and Groundcover, for landscape work not included in this Section. 6. Section 32 9020: Lawns and Grasses, for landscape work not included in this Section.

1.2 DEFINTIONS

A. Backfill: The earth used to replace or the act of replacing earth in an excavation.

B. Duff Layer: The surface layer of native topsoil that is composed of mostly decayed leaves, twigs, and detritus.

C. Finish Grade: Elevation of finished surface of planting soil.

D. Manufactured Topsoil: Soil produced off-site by homogeneously blending mineral soils or sand with stabilized organic soil amendments to produce topsoil or planting soil.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation: 32 9113 MASTER – July 31, 2015 Page 2

E. Pesticide: A substance or mixture intended for preventing, destroying, repelling, or mitigating a pest. This includes insecticides, miticides, herbicides, fungicides, rodenticides, and molluscicides. It also includes substances or mixtures intended for use as a plant regulator, defoliant, or desiccant.

F. Pests: Living organisms that occur where they are not desired, or that cause damage to plants, animals, or people. These include insects, mites, grubs, mollusks (snails and slugs), rodents (gophers, moles, and mice), unwanted plants (weeds), fungi, bacteria, and viruses.

G. Planting Area: Areas to be planted.

H. Planting Soil: Standardized topsoil; existing, native surface topsoil; existing, in-place surface soil; imported topsoil; or manufactured topsoil that is modified with soil amendments and perhaps fertilizers to produce a soil mixture best for plant growth.

I. Plant; Plants; Plant Material: These terms refer to vegetation in general, including trees, shrubs, vines, ground covers, ornamental grasses, bulbs, corms, tubers, or herbaceous vegetation.

J. Subgrade: Surface or elevation of subsoil remaining after excavation is complete, or the top surface of a fill or backfill before planting soil is placed.

K. Subsoil: All soil beneath the topsoil layer of the soil profile, and typified by the lack of organic matter and soil organisms.

L. Surface Soil: Soil that is present at the top layer of the existing soil profile at the Project site. In undisturbed areas, the surface soil is typically topsoil; but in disturbed areas such as urban environments, the surface soil can be subsoil.

M. Topsoil: Top layer of the soil profile consisting of existing native surface topsoil or existing in-place surface soil and is the zone where plant roots grow.

1.3 SUBMITTALS

A. Submit certified analysis of imported topsoil from a qualified soil testing laboratory 20 working days prior to use on site. The report to contain the following:

1. Percentages of organic matter; gradation of sand, silt, and clay content; action exchange capacity; sodium absorption ratio; deleterious material; pH; and mineral and plant-nutrient content of topsoil. 2. Suitability of tested soil for plant growth.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation: 32 9113 MASTER – July 31, 2015 Page 3

3. Based upon the test results, the laboratory soil analysis is to include recommendations for soil treatments and soil amendments to be incorporated. State recommendations in weight per 1000 sq. ft. (92.9 sq. m) or volume per cu. yd. (0.76 cu. m) for nitrogen, phosphorus, and nutrients and soil amendments to be added to produce satisfactory planting soil suitable for healthy, viable plants. 4. Report presence of problem salts, minerals, or heavy metals, including aluminum, arsenic, barium, cadmium, chromium, cobalt, lead, lithium, and vanadium. If such problem materials are present, provide additional recommendations for corrective action.

B. Available Testing Laboratories; An independent laboratory, recognized by the State Department of Agriculture, with the experience and capability to conduct the testing indicated and that specializes in types of tests to be performed:

1. Soil and Plant Laboratory, Inc. – www.soilandplantlaboratory.com 2. Western Agricultural Laboratories – www.al-labs-west.com

C. Where tests of imported topsoil show results that fail to conform to required standards, include with the report a recommended treatment plan to bring the material into conformance.

D. Ecoroof Submittals:

1. Provide data on Ecoroof soil mix indicating compliance with specified parameters and third party certification of saturated weights. 2. Provide product data and samples of all components of ecoroof assembly.

1.4 QUALITY ASSURANCE

A. Soil Preparation: Perform under supervision of a firm having experience in landscape construction, and in accordance with proper horticultural practices.

B. Regulatory Requirements for Herbicide Application:

1. Apply herbicides by an applicator with a current commercial license under State and Federal law for herbicide application. Apply only products approved by Owner and in accordance with Owner’s Integrated Pest Management (IPM) process. 2. By City of Portland Ordinance, use of neonicotinoid pesticides are banned from use on City of Portland owned property.

1.5 DELIVERY, STORAGE, AND HANDLING

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation: 32 9113 MASTER – July 31, 2015 Page 4

A. Packing and Shipping:

1. Deliver commercial fertilizer in original containers with labels indicating weight, chemical analysis and name of manufacturer.

B. Storage and Protection:

1. Store fertilizers and lime in dry place, free from intrusion of moisture, and protected from contamination by herbicides. 2. Protect soil and compost materials from deterioration by surface moisture erosion, freezing temperatures, and chemical contamination during storage and handling.

1.6 PROJECT CONDITIONS

A. Set limits of work areas for vehicles and equipment to minimize soil compaction in planting areas.

B. Stockpile topsoil on-site no higher than 4 feet.

C. Provide protective covers and barriers to prevent damage and staining to existing site improvements.

D. Prepare topsoil only when weather and soil conditions allow. Do not attempt soil preparation work when weather or soil conditions would contribute to poor or improper mixing, voids, or other adverse conditions.

E. Ecoroof System:

1. Coordinate Ecoroof System with work of other building trades.

2. Do not allow waste products, such as petroleum, grease, oil, solvents, vegetable or mineral oil, animal fat, etc., to come in contact with the roof membrane.

a. Any exposure to foreign materials or chemical discharges must be presented to membrane manufacturer for evaluation to determine any impact on the roof membrane assembly performance.

3. Ensure that protection is provided during and after Ecoroof installation so other trades do not damage membrane.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation: 32 9113 MASTER – July 31, 2015 Page 5

4. Work of this Section must comply with the roof membrane manufacturer’s requirements for maintaining the membrane warranty.

1.7 SEQUENCING AND SCHEDULING

A. Coordinate soil preparation work with installation of other site improvements and planting of trees, shrubs, ground covers and lawns.

1. Schedule preparation of seeding and sodding areas within 48 hours prior to application of seeding and sodding.

B. Stockpile amended topsoil for lawn areas and for planting areas in separate locations for review and approval by Owner.

C. Coordinate Work with park activities.

PART 2 PRODUCTS

2.1 ECOROOF SOIL SYSTEM MATERIALS

A. Drainage Mat:

1. Miradrain GR 9200 Drain Mat with geotextile layer, or approved.

B. Filter Fabric: Polyester/Polypropylene filter fabric, made of non-woven needle punched fibers.

C. Growing Media for Intensive Ecoroof: Provide the following, or approved:

1. Pro-Gro Intensive, with Field Moisture Capacity of 62.0 pounds per cubic foot saturated; Pro-Gro Soils, Tualatin, Oregon; 503-682-3500.

2.1 TOPSOIL

A. Existing Topsoil:

1. Topsoil stockpiled on site under provisions of Section 31 1000, “Site Clearing,” for use in landscaping 2. Verify suitability of existing topsoil meeting requirements equal to imported soil and amend when necessary. Supplement with imported topsoil when quantities are insufficient. 3. Clean topsoil of roots, plants, sods, stones, clay lumps, and other extraneous materials harmful to plant growth.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation: 32 9113 MASTER – July 31, 2015 Page 6

B. Imported Topsoil:

1. ASTM D 5268, pH range of 5.5 to 7, 4 percent organic material minimum, free of stones and gravel, and other extraneous materials that will interfere with planting and are harmful to plant growth. 2. Free of noxious weeds as designated in this Section and as listed by State of Oregon Dept. of Agriculture. 3. Obtain from well drained site.

2.2 PLANTING SOILS – GENERAL

A. Planting Soil for Seeded Lawns: Amended native topsoil complying with the following:

1. Organic material content; free of stones 1 inch or larges in any dimension and other extraneous materials harmful to lawn growth, with a pH Range between 5.5 and 7. 2. Amendments:

a. Ratio of Loose Compost to Topsoil by Volume: 1:4. b. Ratio of Sand to Topsoil by Volume: 1:20. 3. Weight of Sulfur per 1000 Sq. Ft.: 6 lbs. 4. Weight of Agricultural Gypsum per 1000 Sq. Ft.: 10 lbs. 5. Weight of Bonemeal per 1000 Sq. Ft.: 3 lbs. 6. Weight of Superphosphate per 1000 Sq. Ft.: 3 lbs. 7. Weight of Commercial Fertilizer per 1000 Sq. Ft.: 15 lbs. 8. Weight of Slow-Release Fertilizer per 1000 Sq. Ft.: 5 lbs.

B. Planting Soil for Planting Areas; Import planting soil complying with the following:

1. Organic material content at levels between 2-6 percent; free of stone 1-1/2 inches or larger in any dimension and other extraneous materials harmful to plant growth, with a pH Range between 5.5 and 7.

C. Topsoil Textural Class Requirements: Textural analysis within the following gradations:

Textural Class % of Total Weight Average %

Sand (0.05-2.0mm dia.) 45-75 60 Silt (0.002-0.05mm dia.) 15-35 25 Clay (less than 0.002mm dia.) 05-20 15

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation: 32 9113 MASTER – July 31, 2015 Page 7

D. On-Site Amended Planting Soil: Native soil is not acceptable for planting soil.

1. If determined that native topsoil is suitable to produce viable planting soil, clean soil of roots, plants, sod, stones, clay lumps, and other extraneous materials harmful to plant growth.

E. Additional Properties of Imported Topsoil or Manufactured Topsoil:

1. Screened and free of stones 1 inch or larger in any dimension. 2. Free of roots, plants, sod, clods, clay lumps, pockets of coarse sand, paint, paint washout, concrete slurry, concrete layers or chunks, cement, plaster, building debris, oils, gasoline, diesel fuel, paint thinner, turpentine, tar, roofing compound, acid, and other extraneous materials harmful to plant growth. 3. Free of weeds and invasive plants including but not limited to:

a. Cirsium arvense (Canadian Thistle) b. Convolvulus spp. (Morning Glory) c. Cyperus esculenturs (Yellow Nutsedge) d. Cytisus scoparus (Scotch Broom) e. Dipsacus sylvestris (Common Teasel) f. Equisetum (Horsetail) g. Festuca arundinaceae (Tall Fescue) h. Hedera helix (English Ivy) i. Holcus canatus (Velvet Grass) j. Lolium spp. (Rye Grasses) k. Lotus corniculatus (Bird's Foot Trefoil) l. Lythrium salicaria (Purple Loose Strife) m. Melilotus spp. (Sweet Clover) n. Myriophyllum spicatum (Eurasian Milfoil) o. Phalaris arundinaceae (Reed Canary Grass) p. Rubus discolor (Himalayan Blackberry) q. Solanum spp. (Nightshade) r. Trifolium spp. (Clovers)

4. Not infested with parasitic nematodes, grubs, other pests, pest eggs, or other undesirable organisms and disease-causing plant pathogens; friable and with sufficient structure to give good tilth and aeration. 5. Continuous, air-filled, pore-space content on a volume/volume basis shall be at least 15 percent when moisture is present at field capacity. 6. Soil shall have a field capacity of at least 15 percent on a dry weight basis.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation: 32 9113 MASTER – July 31, 2015 Page 8

2.3 INORGANIC SOIL AMENDMENTS

A. Lime: ASTM C 602, agricultural limestone containing a minimum 80 percent calcium carbonate equivalent and as follows:

1. Class: Class T, with a minimum 99 percent passing through No. 8 sieve and a minimum 75 percent passing through No. 60 sieve. 2. Class: Class O, with a minimum 95 percent passing through No. 8 sieve and a minimum 55 percent passing through No. 60 sieve. 3. Provide lime in form of dolomitic limestone.

B. Sulfur: Granular, biodegradable, containing a minimum of 90 percent sulfur, with a minimum 99 percent passing through No. 6 sieve and a maximum 10 percent passing through No. 40 sieve.

C. Iron Sulfate: Granulated ferrous sulfate containing a minimum of 20 percent iron and 10 percent sulfur.

D. Aluminum Sulfate: Commercial grade, unadulterated.

E. Perlite: Horticultural perlite, soil amendment grade.

F. Agricultural Gypsum: Finely ground, containing a minimum of 90 percent calcium sulfate.

G. Sand: Clean, washed, natural or manufactured, free of toxic materials.

H. Diatomaceous Earth: Calcined, diatomaceous earth, 90 percent silica, with approximately 140 percent water absorption capacity by weight.

I. Zeolites: Mineral clinoptilolite with at least 60 percent water absorption by weight.

2.4 COMPOST

A. Compost: Well-composted, stable, and weed-free organic matter, pH range of 5.5 to 8; moisture content 35 to 55 percent by weight; 100 percent passing through 3/4 inch sieve; soluble salt content of 5 to 10 decisiemens/m; not exceeding 0.5 percent inert contaminants and free of substances toxic to plantings; and as follows:

1. Organic Matter Content: 50 to 60 percent of dry weight. 2. Feedstock: Agricultural, food, or industrial residuals; biosolids; yard trimmings; or source-separated or compostable mixed solid waste.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation: 32 9113 MASTER – July 31, 2015 Page 9

B. Wood Derivatives: Decomposed, nitrogen-treated sawdust, ground bark, or wood waste; of uniform texture, free of chips, stones, sticks, soil, or toxic materials.

C. Manure: Well-rotted, unleached, stable or cattle manure containing not more than 25 percent by volume of straw, sawdust, or other bedding materials; free of toxic substances, stones, sticks, soil, weed seed, and material harmful to plant growth.

2.5 FERTILIZERS

A. Bonemeal: Commercial, raw or steamed, finely ground; a minimum of 4 percent nitrogen and 10 percent phosphoric acid.

B. Superphosphate: Commercial, phosphate mixture, soluble; a minimum of 20 percent available phosphoric acid.

C. Commercial Fertilizer: Commercial-grade complete fertilizer of neutral character, consisting of fast- and slow-release nitrogen, 50 percent derived from natural organic sources of urea formaldehyde, phosphorous, and potassium in the following composition:

1. Composition: 1 lb/1000 Sq. Ft. of actual nitrogen, 4 percent phosphorous, and 2 percent potassium, by weight. 2. Composition: Nitrogen, phosphorous, and potassium in amounts recommended in soil reports from a qualified soil-testing agency.

D. Slow-Release Fertilizer: Granular or pelleted fertilizer consisting of 50 percent water-insoluble nitrogen, phosphorus, and potassium in the following composition:

1. Composition: 20 percent nitrogen, 10 percent phosphorous, and 10 percent potassium, by weight. 2. Composition: Nitrogen, phosphorous, and potassium in amounts recommended in soil reports from a qualified soil-testing agency.

E. Planting Tablets: Tightly compressed chip type, long-lasting, slow-release, commercial-grade planting fertilizer in tablet form. Tablets shall break down with soil bacteria, converting nutrients into a form that can be absorbed by plant roots.

1. Size: 10-gram tablets. 2. Nutrient Composition: 20 percent nitrogen, 10 percent phosphorous, and 5 percent potassium, by weight plus micronutrients.

2.6 PRE-EMERGENT HERBICIDE

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation: 32 9113 MASTER – July 31, 2015 Page 10

A. Pre-emergent Herbicide: As directed for condition by currently licensed herbicide applicator.

2.7 -EMERGENT HERBICIDE

A. Post-emergent Herbicide: As directed for condition by currently licensed herbicide applicator.

2.8 WATER

A. Water: Suitable for irrigation, free from oil, acid, alkali, salt or other substances harmful to plant life.

2.9 EQUIPMENT

A. Fertilizer Spreading Equipment:

1. Power Operated Spreaders: Rotary or drop distribution equipment. 2. Manual Operated Spreaders: Hand operated distribution equipment.

PART EXECUTION

3.1 EXAMINATION

A. Examine the site for conditions that will adversely affect execution, permanence and quality of work, and survival of plant materials. Verify rough graded surfaces are free of:

1. Concrete, asphalt, and other construction debris. 2. Limbs, twigs, cones, seed-pods and other woody material. 3. Rock, gravel or other material not suitable for plant growth.

B. Verify that rough grades and slopes of areas to be planted areas are set at sufficient depth to allow for placement of specified materials. If the site is not suitable for landscaping operations, perform necessary corrective work.

C. Rough Grading Inspection: Notify Owner a minimum of 72 hours in advance for inspection of rough grades.

D. Ecoroof:

1. Examine all roofing surfaces to verify that it is acceptable for installation of Ecoroof materials.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation: 32 9113 MASTER – July 31, 2015 Page 11

2. Do not proceed with installation of Ecoroof components until waterproofing test has been conducted on roof membrane and necessary repairs are made to achieve a water-tight membrane. 3. Protect roof membrane from damage during Ecoroof installation. 4. Prevent debris from entering and clogging roof drainage system.

E. Do not proceed with Work of this Section until unsatisfactory conditions have been corrected.

3.2 ECOROOF

A. Install components as indicated in the Drawings and as specified.

B. Drainage Layer Materials: Provide complete coverage along with overlap to entire roof area to receive Ecoroof system components.

1. Protect separation fabric from damage and ensure entire drainage layer is thoroughly covered prior to installation of soils.

C. Water Retention Mat: Where specified, install a layer of moisture retention material over the root barrier overlapping adjacent rolls a minimum of 4 inches.

1. Turn material up all vertical, roofed/flashed surfaces a minimum of 6 inches beyond the anticipated soil level. 2. Trim excess down to the level of the soil.

D. Install filter fabric where indicated and at material interfaces to prevent erosion and assist in soil retention along perimeters.

E. Growing Media: Install growing media in specified areas and at depths indicated in Drawings.

1. Consistently monitor to ensure that maximum soil depth is not being exceeded in any area. 2. If necessary, cover soil with inert straw mulch to limit wind and water erosion during planting/irrigation installation. 3. Place soil carefully to avoid damage or displacement of other materials. 4. Place soil no more than 1 inch above specified final grade and compact to final grade level prior to planting using a 200-300 lb. hand landscape roller. Do not over compact or crush soil components.

3.3 GENERAL PREPARATION OF GROUND SURFACES – ALL PLANTING AND SEEDING AREAS

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation: 32 9113 MASTER – July 31, 2015 Page 12

A. Eliminate uneven areas and low spots, and remove lumber, stones, sticks, mortar, concrete, rubbish, debris, contaminated soil and any other material harmful to plant life, in shrub and ground cover beds.

B. Verify that invasive species and weeds have been eliminated prior to the placement of topsoil. Do not place topsoil until all living weed matter has been eliminated.

1. Weed eradication includes herbicide and non-herbicide methods. 2. Eradication includes, but is not limited to, elimination of the following invasive species and weeds:

a. Cirsium arvense (Canadian Thistle) b. Convolvulus spp. (Morning Glory) c. Cyperus esculenturs (Yellow Nutsedge) d. Cytisus scoparus (Scotch Broom) e. Dipsacus sylvestris (Common Teasel) f. Equisetum (Horsetail) g. Festuca arundinaceae (Tall Fescue) h. Hedera helix (English Ivy) i. Holcus canatus (Velvet Grass) j. Lolium spp. (Rye Grasses) k. Lotus corniculatus (Bird's Foot Trefoil) l. Lythrium salicaria (Purple Loose Strife) m. Melilotus spp. (Sweet Clover) n. Myriophyllum spicatum (Eurasian Milfoil) o. Phalaris arundinaceae (Reed Canary Grass) p. Rubus discolor (Himalayan Blackberry) q. Solanum spp. (Nightshade) r. Trifolium spp. (Clovers)

3. Apply herbicide by manual 'spot spraying', wicking, or backpack methods according to manufacturer's specifications. 4. Apply herbicide as directed by a currently licensed applicator, strictly applied by manufacturer's specifications and applicable codes and regulations, and in accordance with Owner’s Integrated Pest Management (IPM) process. 5. Remove invasive plant material after herbicide application has effectively stopped plant growth. Dispose legally off-site. 6. After initial spraying and removal of weeds, and prior to placing topsoil, water the subgrade sufficiently to germinate dormant weed seeds.

a. Prior the weed crop producing seeds, spray weeds with herbicide and remove them from site.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation: 32 9113 MASTER – July 31, 2015 Page 13

b. Before continuing with topsoil placement, verify with the Owner whether or not to repeat this treatment.

7. Use selective hand removal by non-herbicide methods if herbicide application threatens existing plantings. 8. Replace immediately existing or new plantings damaged or killed by herbicide application at no additional cost to the Owner.

3.4 PLACING PLANTING SOILS

A. Place planting soils in minimum depths of 6 inches in planting, and inches in seeded lawn areas.

B. Verify that planting soil is stockpiled in sufficient quantities to be placed at depths specified.

1. Notify the Owner immediately if supplies are inadequate or do not meet specifications for topsoil. 2. Provide imported topsoil meeting the requirements of this Section if the supply of existing on-site topsoil is insufficient.

C. Place planting soil at specified grades between existing or constructed points on the site, such as curbs, walls, walks and paving.

3.5 SOIL PREPARATION IN PLANTING BEDS

A. Loosen subgrade of planting beds to a minimum depth of 8 inches. Remove stones larger than 1-1/2 inches in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off Owner's property.

1. Select from or retain both options in first subparagraph below for off-site or in-place mixing of planting soil. 2. Spread topsoil, apply soil amendments and fertilizer on surface, and thoroughly blend with loosened subgrade.

a. Delay mixing fertilizer with planting soil if planting will not proceed within a few days. b. Mix lime with dry soil before mixing fertilizer. c. Spread planting soil mix to a depth of 6 inches but not less than required to meet finish grades after natural settlement. Do not spread if planting soil or subgrade is frozen, muddy, or excessively wet.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation: 32 9113 MASTER – July 31, 2015 Page 14

d. Retain subparagraph below to knit planting soil to subsoil and to improve soil drainage. Retain for hardpan subgrades, poorly drained subgrades, or subgrades that heavily compact during construction. Usually delete if planting soil exceeds a depth of 8 inches. e. Spread approximately 1/2 the thickness of planting soil mix over loosened subgrade. Mix thoroughly into top 4 inches of subgrade. Spread remainder of planting soil mix

B. Finish Grading: Grade planting beds to a smooth, uniform surface plane with loose, uniformly fine texture. Roll and rake, remove ridges, and fill depressions to meet finish grades.

C. Restore planting beds if eroded or otherwise disturbed after finish grading and before planting.

3.6 SOIL PREPARATION IN SEEDED LAWN AREAS

A. Limit lawn subgrade preparation to areas to be seeded.

B. Newly Graded Subgrades: Loosen subgrade to a minimum depth of inches. Remove stones larger than 1 inch in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off Owner's property.

1. Apply fertilizer directly to subgrade before loosening. 2. Thoroughly blend planting soil mix off-site before spreading or spread topsoil, apply soil amendments and fertilizer on surface, and thoroughly blend planting soil mix.

a. Delay mixing fertilizer with planting soil if seeding will not proceed within a few days. b. Mix lime with dry soil before mixing fertilizer.

3. Spread planting soil mix to a depth of 4 inches but not less than required to meet finish grades after light rolling and natural settlement. Do not spread if planting soil or subgrade is frozen, muddy, or excessively wet.

a. Spread approximately one-half the thickness of planting soil mix over loosened subgrade. Mix thoroughly into top 4 inches of subgrade. Spread remainder of planting soil mix.

C. Finish Grading: Grade areas to a smooth, uniform surface plane with loose, uniformly fine texture. Grade to within plus or minus 1/2 inch of finish elevation. Roll and rake, remove ridges, and fill depressions to meet finish grades.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation: 32 9113 MASTER – July 31, 2015 Page 15

D. Moisten prepared lawn areas before if soil is dry. Water thoroughly and allow surface to dry before. Do not create muddy soil.

E. Restore areas if eroded or otherwise disturbed after finish grading and before seeding.

3.7 SOIL PREPARATION IN NATURAL AREAS

A. Prepare soils for planting and seeding in natural areas same as specified for general requirements for soil preparation, including eradication of weeds, except that fertilizers are not required.

3.8 ADJUSTING, CLEANING, AND PROTECTION

A. Restore prepared areas to specified condition where eroded, settled, or compacted after mixing of soil amendments and fine grading.

B. Keep adjacent pavement, curb, and walking surfaces clean and work area in an orderly condition.

1. Provide protective cover and barriers as necessary to prevent damage and staining.

C. Keep project site free from accumulation of debris, topsoil, and other material.

D. At completion of each area of work, completely remove debris, equipment and surplus materials.

E. Clean paved area or surfaces stained or soiled from landscaping materials with a power sweeper using water under pressure. Wash building surfaces with proper equipment and materials as approved by the Owner.

3.9 DISPOSAL OF SURPLUS AND WASTE MATERIALS

A. Disposal: Remove surplus soil and waste material, including excess subsoil, unsuitable soil, trash, and debris, and legally dispose of it off Owner's property.

END OF SECTION

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation for Athletic Fields: 32 9114 MASTER – July 31, 2015 Page 1

SECTION 32 9114

SOIL PREPARATION FOR ATHLETIC FIELDS

PART GENERAL

1.1 SUMMARY

A. Section Includes:

1. Soil materials. 2. Preparation for athletic fields. 3. Soil amendments and fertilizers.

B. Related Sections:

1. Section 31 1000: Site Clearing, for removal and stockpiling of existing topsoil. 2. Section 31 2000: Earth Moving, for grading of subsoil and imported topsoil. 3. Section 32 9113: Soil Preparation, for removal and stockpiling of existing topsoil. 4. Section 32 9020: Lawns and Grasses, for lawns for athletic fields.

C. Definitions:

1. Noxious weeds include the following:

a. Blackberry, Canada Thistle, Dandelion, Horsetail, Morning Glory, Nut Sedge, Poison Oak, Rush Grass, Annual Bluegrass, Bermuda Grass, Brome, Crabgrass, Johnson Grass, Nut Grass, Quack Grass, Shiny Geranium, Garlic Mustard, Nutsedge and Lesser Celandin. b. Other plants designated as a noxious weed by authorized State, County and City officials.

1.2 SUBMITTALS

A. Submit certification of quantities of topsoil, and soil amendments delivered to the site.

1. Soil Test Results:

a. Test both existing site soils and imported topsoils.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation for Athletic Fields: 32 9114 MASTER – July 31, 2015 Page 2

b. Test soils in at least four locations scattered throughout the site. c. Laboratory Analysis: Perform soils test by an agricultural soil science laboratory approved by the Association of Official Agriculture Chemists. Accompany test results with recommendations for treatment and amendment of lawn and shrub/ground cover areas.

B. Submit one copy of certificates of inspection for soil amendments as required by governmental authorities.

C. Submit one copy of manufacturer's or vendor's certified analysis of soil amendments dated within 6 months of scheduled purchase of amendments.

D. Submit qualifications data for firm and supervisor proposed to perform Work of this Section.

E. Submit an approved Application for Pesticide Use on PP&R Property.

1.3 QUALITY ASSURANCE

A. Qualifications of Imported Topsoil:

1. Prior to delivery of topsoil, submit written statement giving location of property from which topsoil will be obtained, Owner's Representative will inspect site. 2. Include in written statement, names and addresses of property owners, depth of soil to be stripped and two year history of crops grown from similar soil.

B. Regulatory Requirements:

1. Herbicide and pesticide application must follow the procedures and policies of the Owner’s Integrated Pest Management Program (IPM): a. Application of herbicides for weed control may only be made only by an applicator holding a current commercial license under State and Federal law for herbicide application. b. Apply only herbicide or pesticide products approved by Owner through the Owner’s Integrated Pest Management (IPM) process. c. Apply herbicide or pesticide products only according an Application for Pesticide Use plan approved by Owner’s IPM Administrator.

C. Firm and Personnel Qualifications: An installer with a minimum of 2 years’ experience in landscape construction, currently licensed under respective

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation for Athletic Fields: 32 9114 MASTER – July 31, 2015 Page 3

jurisdictions, who can perform and supervise Work of this Section in accordance with proper horticultural practices.

1. Installer's Personnel Certifications: Certified Landscape Technician, CLT- Exterior.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Packing and Shipping:

1. Deliver commercial fertilizer in original containers with labels indicating weight, chemical analysis and name of manufacturer.

B. Storage and Protection:

1. Store fertilizers and lime in dry place and protect from contamination by herbicides. 2. Protect soil materials from deterioration by surface moisture erosion, freezing temperatures, and chemical contamination during storage and handling.

1.6 PROJECT CONDITIONS

A. Environmental Requirements:

1. Prepare soil only when topsoil is not in a wet, muddy, or frozen condition.

1.7 COORDINATION AND SCHEDULING

A. Schedule preparation of seeding and sodding areas within 48 hours prior to application of seeding and sodding.

B. Coordinate Work with park activities.

PART 2 PRODUCTS

2.1 TOPSOIL

A. Existing Topsoil:

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation for Athletic Fields: 32 9114 MASTER – July 31, 2015 Page 4

1. Topsoil stockpiled on site under provisions of Section 31 1000, “Site Clearing,” for use in landscaping 2. Verify suitability of existing topsoil meeting requirements equal to imported soil and amend when necessary. Supplement with imported topsoil when quantities are insufficient. 3. Clean topsoil of roots, plants, sods, stones, clay lumps, and other extraneous materials harmful to plant growth.

B. Imported Topsoil:

1. ASTM D 5268, pH range of 5.5 to 7, minimum 4 percent organic material, free of stones and gravel and other extraneous materials that will interfere with planting and are harmful to plant growth. 2. Free of noxious weeds as designated in this Section and as listed by State of Oregon Dept. of Agriculture. 3. Obtain from well drained site.

2.2 SOIL AMENDMENTS AND FERTILIZER

A Dolomite limestone, calcium magnesium carbonate, containing a minimum 85 percent of total carbonates, ground so that not less than 90 percent passes a 10 mesh sieve and not less than 50 percent passes a 100 mesh sieve. [80 percent calcium carbonate equivalent, with a minimum 99 percent passing a No. 8 sieve and a minimum 75 percent passing a No. 60 sieve.] an alternate

A. Dolomite limestone, calcium magnesium carbonate, 50 percent passing through a 100 mesh sieve, 95 to 100 percent passing through a 20 mesh sieve, agricultural ground grade, minimum neutralizing value of 90 percent.

B. Fine Aggregate, A9: As specified in Section 31 2100, “Earthwork.”

C. Manure:

1. Two year old well-rotted cow or steer manure, free of weed seeds, rocks, sticks, and containing not more than 50 percent sawdust, straw, or shavings.

D. Commercial Peat Moss:

1. Dried horticultural peat moss, coarse, shredded, acid reaction pH 4.0-5.0, water absorbing capacity 1100 to 1200 percent moisture content approximately 30 percent, containing no more than 2 percent ash or foreign matter.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation for Athletic Fields: 32 9114 MASTER – July 31, 2015 Page 5

E. Local Peat Moss:

1. Acceptable Local Supplier: Bill Fackrel, McCormick Garden Road, Gearhart, OR, 503-738-8601, or approved.

F. Bark Dust:

1. Ground tree bark dust, not less than 88 percent from trees, 100 percent passing a 1 inch mesh and blended with not more than 12 pounds ammonium nitrate or 18 pounds ammonium sulfate per 83 cubic feet of bark dust covering 1,000 square feet, 1 inch deep

G. Commercial Planting Fertilizers:

1. Comply with State of Oregon fertilizer laws, uniform in composition, granular or pellet form, dry, free flowing, and bearing guaranteed analysis of manufacturer. 2. PF1: Organic base fertilizer with minimum 6 percent nitrogen, 10 percent phosphoric acid and 4 percent potash.

H. Commercial Lawn Seed Start Fertilizer:

1. Comply with State of Oregon fertilizer laws, uniform in composition, dry, free flowing. 2. Granular, non-burning product, composed of not less than 50 percent organic, slow acting, guaranteed analysis. 3. SF1: Containing 20 percent nitrogen, 26 percent phosphoric acid, and 6 percent potash by weight, or similar composition.

I. Commercial Lawn Top Dress Fertilizer:

1. Comply with State of Oregon fertilizer laws, uniform in composition, dry, free flowing. 2. Granular, non-burning product, composed of not less than 50 percent organic, slow acting, guaranteed analysis. 3. DF1: Containing 31 percent nitrogen, 3 percent phosphoric acid, and 10 percent potash by weight, or similar composition.

J. Fertilizers:

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation for Athletic Fields: 32 9114 MASTER – July 31, 2015 Page 6

1. Nitrogen (N): In ammonic, organic or uramite form with granular vehicle. Commercial brand for agricultural application on soil. 2. Phosphorus (P): Commercial brand for agricultural application on soil, in form of super-phosphate or treble super-phosphate, or other Owner approved form. 3. Potassium (K): Sulfate of potash or muriate of potash, or other form acceptable to Owner's Representative.

2.3 EQUIPMENT

A. Fertilizer Spreading Equipment:

1. Power Operated Spreaders: Rotary or drop distribution equipment. 2. Manual Operated Spreaders: Hand operated distribution equipment.

2.4 MIXES

A. Planting Soil Mixes:

1. Where Work requires more than one material in same area, blend required topsoil, lime, barkdust and fertilizer materials in that area in specified proportions. 2. Produce blend by uniformly distributing required quantities of materials over area and thoroughly cultivate. 3. Option: Ammonium nitrate or ammonium sulfate may be blended in plant by barkdust supplier or at Project site. Fertilizers may be purchased in plant blended proportions.

B. Material Proportions for Planting Soil:

1. Topsoil: 9 cubic yards. 2. Manure: 2 cubic yards. 3. Peat Moss: 4 cubic yards. 4. Commercial Fertilizer: 10 pounds.

C. Mixing Location for Planting Soil:

1. Mix soil materials at off site location.

PART 3 EXECUTION

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation for Athletic Fields: 32 9114 MASTER – July 31, 2015 Page 7

3.1 EXAMINATION

A. Examine areas of soil preparation for compliance with requirements, and that existing conditions will not adversely affect execution, permanence, quality of work, and survival of lawns.

1. Report existing conditions detrimental to completion of soil preparation work.

B. Verify that grade and slopes of lawn areas are acceptable to Owner prior to beginning soil preparation.

C. Do not proceed with installation until unsatisfactory conditions have been corrected.

3.2 PREPARATION - GENERAL

A. Protection:

1. Protect utility lines, storm drainage lines, site improvements, and underground utilities.

a. Stake location of underground utilities and avoid excavation in these areas beyond safe limits. b. Hand excavate where required to avoid utility line damage.

2. Protect existing utility systems, paving, walks, curbs, and other site improvements from damage.

B. Stockpiling: Stockpile and protect the following in designated locations on site:

1. Imported planting soil mix. 2. Existing topsoil.

3.3 SUBGRADE PREPARATION - IMPORTED TOPSOIL FOR PLANTING AREAS

A. Remove existing soil to 8 inches below finished grade indicated in Drawings.

B. Kill, eradicate, and remove all weed plant growth, roots, and other plants designated as a noxious weed according to the approved Application to Apply Pesticide on PP&R Property.

C. Place prepared imported topsoil mix 6 inches thick in designated lawn areas.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation for Athletic Fields: 32 9114 MASTER – July 31, 2015 Page 8

3.4 SUBGRADE PREPARATION - EXISTING TOPSOIL FOR PLANTING AREAS

A. Loosen existing topsoil by ripping or tilling to form a loose topsoil 6 inches deep.

B. Clean topsoil to a depth of 6 inches by removing rock, gravel, soils contaminated with materials harmful to planting, debris, and excess soils. Dispose of undesirable materials off site. Where removal of undesirable materials lowers the grade below lawn elevations indicated in the Drawings, provide topsoil fill as needed to bring up level to desired elevation.

1. Kill, eradicate, and remove all weed plant growth, roots, and other plants designated as a noxious weed according to the approved Application to Apply Pesticides on PP&R Property.

C. Spread six cubic yards of manure, six cubic yards of peat moss and forty pounds of commercial fertilizer for each 1,000 square feet of planting bed area.

D. Till soil amendments into existing topsoil to a minimum depth of 6 inches.

E. Float existing amended topsoil to 2 inches below finish elevations indicated on Drawings.

F. Slope planting beds with 6 inch crown or slope 2 percent minimum.

3.5 SUBGRADE PREPARATION - IMPORTED TOPSOIL FOR ATHLETIC FIELDS

A. Remove existing soil to 6 inches below finished grade indicated in Drawings.

B. Kill, eradicate, and remove all weed plant growth, roots, and other plants designated as a noxious weed according to the approved Application to Apply Pesticides on PP&R Property.

C. Place prepared imported topsoil mix 6 inches thick in designated lawn areas.

D. Float lawn areas to achieve elevations indicated In Drawings, with 1 percent minimum slope.

1. Smooth to finish grades and roll to obtain firmness with minimum 200 pound roller. 2. Remove or break up soil clods larger than 1/4 inch.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation for Athletic Fields: 32 9114 MASTER – July 31, 2015 Page 9

E. Loosen surface soils to a minimum depth of 1/2 inch and a maximum depth of 1-1/2 inches to be favorable for germination and growth of grass seed.

3.6 PREPARATION - EXISTING TOPSOIL FOR ATHLETIC FIELDS

A. Prior to placing amendments thoroughly prepare the existing topsoil.

B. Loosen existing topsoil by ripping or tilling to form a loose topsoil 6 inches deep.

C. Clean topsoil to a depth of 6 inches by removing rock, gravel, soils contaminated with materials harmful to planting, debris, and excess soils. Dispose of undesirable materials off site. Where removal of undesirable materials lowers the grade below lawn elevations indicated in the Drawings, provide topsoil fill as needed to bring up level to desired elevation.

1. Kill, eradicate, and remove all weed plant growth, roots, and other plants designated as a noxious weed according to the approved Application to Apply Pesticides to PP&R Property.

D. Apply lime 2 weeks prior to seeding at 100 pounds per 1,000 square feet of lawn area.

E. Till soil amendments into existing topsoil to a minimum depth of 4 inches.

F. Float lawn areas to achieve elevations indicated in Drawings, with 1 percent minimum slope.

1. Smooth to finish grades and roll to obtain firmness with minimum 200 pound roller. 2. Remove or break up soil clods larger than 1/4 inch.

G. Loosen surface soils to a minimum depth of 1/2 inch and a maximum depth of 1-1/2 inches to be favorable for germination and growth of grass seed.

3.7 PREPARATION - EXISTING AND IMPORTED TOPSOIL FOR ATHLETIC FIELDS

A. Prior to placing amendments thoroughly prepare the existing topsoil.

B. Loosen existing topsoil by ripping or tilling to form a topsoil 8 inches deep.

C. Clean topsoil by removing rock, gravel, soils contaminated with materials harmful to planting, debris, and excess soils. Dispose of undesirable materials off site. Where

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation for Athletic Fields: 32 9114 MASTER – July 31, 2015 Page 10

removal of undesirable materials lowers the grade below lawn elevations indicated in the Drawings, provide topsoil fill as needed to bring up level to desired elevation.

1. Kill, eradicate, and remove all weed plant growth, roots, and other plants designated as a noxious weed.

D. Place prepared imported topsoil mix 4 inches thick in designated lawn areas.

E. Float lawn areas to a smooth, free draining, and level surface with loose, moderately coarse texture to achieve elevations indicated in Drawings, with 1 percent minimum slope.

1. Smooth to finish grades and roll to obtain firmness with minimum 200 pound roller. 2. Remove or break up soil clods larger than 1/4 inch.

F. Loosen surface soils to a minimum depth of 1/2 inch and a maximum depth of 1-1/2 inches to be favorable for germination and growth of grass seed.

G. Apply seed start fertilizer to lawn areas at a rate of 1.0 pounds of nitrogen for each 1,000 square feet of lawn area.

1. Apply fertilizer by power operated spreaders, except in small areas use manual operated spreaders.

H. Till fertilizer into topsoil to a minimum depth of 3 inches by discing, or as otherwise approved by Owner.

3.8 PREPARATION - AREA WITHIN ATHLETIC FIELD RUNNING TRACK

A. Remove soils to 7 inches below indicated field elevations.

B. Apply 4 inch thick layer of fine aggregate, A9.

C. Apply 1-1/2 inches thick layer of topsoil on sand.

D. Apply 1-1/2 inches thick layer of barkdust on topsoil.

E. Apply soil amendments with metering equipment before cultivating soil mix in the following quantities per 1,000 square feet.

a. Lime: 50 pounds.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation for Athletic Fields: 32 9114 MASTER – July 31, 2015 Page 11

b. Nitrogen: As required to raise nitrogen content for full 7 inch depth of soil mixture between 10 and 12 percent. c. Phosphorus: 5 pounds. d. Potassium: 4 pounds.

3.9 CULTIVATION

A. Thoroughly cultivate soils, soil amendments and the top 1 inch of drainage sands to produce a uniform blend of soil materials to 4 inch depth at lawns and 12 inch depth at planting areas.

B. During cultivation, remove extraneous materials detrimental to good planting beds.

C. Leave the athletic field within the running track area with 1-1/2 inches of topsoil, 1- 1/2 inches of barkdust, lime and fertilizer additives, and top 1 inch of drainage sand to provide a 4 inch thick growing medium over 3 inches of fine aggregate, A9.

3.10 FINISH GRADING

A. Rake soils to smooth slopes without sharp breaks.

B. Rake planting soils to required grades with top of soil 1 inch below adjacent walks, curbs, and catch basin grates and lids.

3.11 FINISH GRADING - SOFTBALL INFIELDS

A. Mow existing grass at infield area to 1-1/2 inch height.

B. Remove existing sod at infield area to 4 inches below final grade.

C. Add herbicide to substrate soils prior to application of sand and topsoil. Comply with the approved Application for Pesticide Use on PP&R Property.

D. Apply 2 inches of fine aggregate, A9 and 2 inches of imported topsoil to subgrade at infield area.

E. Cultivate sand and topsoil 4 inches deep to produce a uniform mix.

F. Mound the fine aggregate, A9, and topsoil mixture to height required for the pitcher’s mound at indicated location within softball infield.

3.12 PLANTING AREAS

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Soil Preparation for Athletic Fields: 32 9114 MASTER – July 31, 2015 Page 12

1. Apply 2 inch thick layer of bark dust over planting soil surface after cultivating and grading planting soil areas.

3.13 ADJUSTING, CLEANING, AND PROTECTION

A. Restore prepared areas to specified condition where eroded, settled, or compacted after mixing of soil amendments and fine grading.

B. Keep adjacent pavement, curb, and walking surfaces clean and work area in an orderly condition.

1. Provide protective cover and barriers as necessary to prevent damage and staining.

3.10 DISPOSAL OF SURPLUS AND WASTE MATERIALS

A. Disposal: Remove surplus soil and waste material, including excess subsoil, unsuitable soil, trash, and debris, and legally dispose of it off Owner's property.

END OF SECTION

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Seeding: 32 9219 MASTER – July 31, 2015 Page 1

SECTION 32 9219

SEEDING

PART 1 GENERAL

1.1 SUMMARY

A. Section includes requirements for seeding of lawns, including required labor, material and equipment.

B. Related Sections:

1. Section 31 1000: Site Clearing 2. Section 31 2000: Earth Moving 3. Section 31 2500: Erosion and Sedimentation Controls 4. Section 32 9310: Landscape Maintenance 5. Section 32 9113: Soil Preparation

1.2 DEFINITIONS

A. Finish Grade: Elevation of finished surface of planting soil.

B. Manufactured Soil: Soil produced off-site by homogeneously blending mineral soils or sand with stabilized organic soil amendments to produce topsoil or planting soil.

C. Planting Soil: Native or imported topsoil, manufactured topsoil, or surface soil modified to become topsoil; mixed with soil amendments.

D. Subgrade: Surface or elevation of subsoil remaining after completing excavation, or top surface of a fill or backfill immediately beneath planting soil.

1.3 SUBMITTALS

A. Product Data: For each type of product indicated.

B. Grass Seed Certification: From seed supplier for each grass seed monostand or mixture stating the botanical and common name, and the following:

1. Weight of each species and variety. 2. Percentage of purity, germination, and weed seed. 3. Identification of source, including name and telephone number of supplier.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Seeding: 32 9219 MASTER – July 31, 2015 Page 2

C. Product Certificates:

1. Suppliers certificate guaranteeing seed conforms to specified requirements and USDA certification. 2. For soil amendments and fertilizers, signed by product manufacturer.

1.4 QUALITY ASSURANCE

A. Perform Work of this Section under the supervision of a firm having experience in landscape construction

B. Comply with applicable requirements of the United States Department of Agriculture (USDA) for work and material supplied to meet the requirements of this Section.

C. Certifications: Furnish suppliers certificate guaranteeing seed conforms to the specified requirements and USDA certification.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Deliver grass seed in unopened, original containers bearing USDA and suppliers certificates, and showing analysis of seed mixture, percentage of pure seed, year of production, net weight, date of packaging and location of packaging.

1. Damaged packages are not acceptable.

B. Deliver fertilizer in waterproof bags showing weight, chemical analysis, and name of manufacturer.

1.6 PROJECT CONDITIONS

A. Seed Season: March 15th to October 15th.

B. Environmental Conditions: Seeding is not permitted during the following weather conditions:

1. Cold weather: When air or surface temperature is less than 32 degrees F. 2. Hot weather: When air temperature is greater than 80 degrees F. 3. Soil Temperature: When soil temperature is less than 55 degrees F. 4. Wet weather: When ground becomes saturated. 5. Windy weather: When wind velocity is greater than 10 mph.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Seeding: 32 9219 MASTER – July 31, 2015 Page 3

1.7 WARRANTY

A. Warranty for Plant Materials Furnished and Planted: One year from the date of Substantial Completion.

1. At the end of the warranty period, Reseed areas not complying with specified requirements with the same species and size or seed originally specified. 2. Reseed as specified for the original plantings, and at no extra cost to the Owner. 3. Extend the warranty on reseeded areas for one full season’s cycle after completion of reseeding.

PART 2 PRODUCTS

2.1 SEED MIXTURES

A. General:

1. Provide seed that meets or exceed Blue Tag quality according to current Oregon Certified Seed Standards published by Oregon State University. 2. Label seeds in accordance with USDA Rules and Regulations under the Federal Seed Act. 3. Furnish seeds in sealed, standard containers, unless written exception is granted. 4. Noxious weed seed not to exceed 1 percent by weight. 5. Seed that is wet or moldy or has been damaged in transit is not acceptable.

B. Seeded Lawn Mixture: Celebration (3-Way Perennial Ryegrass Mixture) by Sunmark Seeds, or approved.

2.2 WATER

A. Free from oil, acid, alkali, salt and other substances harmful to growth of grass, and from a source approved prior to use.

2.3 MULCHES

A. Straw Mulch: Air-dried, clean, mildew and seed free, salt hay or threshed straw of wheat, rye, oats, or barley. B. Fiber Mulch: Biodegradable, dyed-wood, -fiber mulch; nontoxic and free of plant-growth or germination inhibitors; with a maximum moisture content of 15 percent and a pH range of 4.5 to 6.5.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Seeding: 32 9219 MASTER – July 31, 2015 Page 4

C. Nonasphaltic Tackifier: Colloidal tackifier recommended by fiber-mulch manufacturer for slurry application; nontoxic and free of plant-growth or germination inhibitors.

2.4 SPECIAL SEEDING AND MULCHING EQUIPMENT

A. Hydraulic equipment: Use equipment for the application of fertilizer, seed and slurry of prepared wood-cellulose fiber that complies with the following:

1. Has a built-in agitation system with an operating capacity sufficient to agitate, suspend and homogeneously mix the slurry specified; 2. Has slurry distribution lines large enough to prevent stoppage; 3. Is equipped with a set of spray nozzles that will provide even distribution of the slurry on the various slopes.

PART 3 EXECUTION

3.1 GENERAL PREPARATION

A. Verify that grading and soil preparation is complete and correct.

1. Notify Owner of discrepancies; do not proceed with work until discrepancies have been resolved.

B. Notify Owner at least 24 hours prior to seeding operations for Owner’s inspection of soil preparation.

3.2 LAWN PREPARATION

A. Prepare subgrade and lawn areas to be seeded as specified in Section 32 9113, “Soil Preparation.”

3.3 SEEDING – ALL AREAS

A. Sow seed with spreader or seeding machine.

1. Do not broadcast or drop seed when wind velocity exceeds 5 mph. 2. Evenly distribute seed by sowing equal quantities in 2 directions at right angles to each other. 3. Do not use wet seed or seed that is moldy or otherwise damaged.

B. Application rate: 8 lbs/1,000 square feet.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Seeding: 32 9219 MASTER – July 31, 2015 Page 5

C. Rake seed lightly into top 1/8 inch of topsoil, roll lightly, and water with fine spray.

D. Protect seeded areas with slopes not exceeding 1:6 by spreading straw mulch.

1. Spread uniformly at a minimum rate of 2 tons/acre to form a continuous blanket 1-1/2 inches in loose depth over seeded areas. 2. Spread by hand, blower, or other suitable equipment. 3. Anchor straw mulch by crimping into topsoil with suitable mechanical equipment. 4. Bond straw mulch by spraying with asphalt emulsion at the rate of 10 to 13 gal/1000 sq. ft. 5. Take precautions to prevent damage or staining of structures or other plantings adjacent to mulched areas.

a. Immediately clean damaged or stained areas.

E. Protect seeded areas from hot, dry weather or dying winds by applying planting soil within 24 hours after completion of seeding operations.

1, Soak and scatter planting soil uniformly to a depth of 3/16 inch and roll to a smooth surface.

F. Erosion Control Seeding: Apply erosion control mulch at slope areas 1:1 or less plus/minus.

1. Mix mulch at a rate of one ton per acre, with a polymer solution in the mix at a rate of 4 lbs. per acre. 2. Straw may be applied simultaneously to hydro-mulch batch as indicated above, at areas vulnerable to surface erosion. 3. Apply specified erosion control seed mix at a rate of 4 lbs. per acre, simultaneously with hydro mulch erosion control.

3.4 HYDROSEEDING

A. Hydroseeding: Mix specified seed, fertilizer, and fiber mulch in water, using equipment specifically designed for hydroseed application. Continue mixing until uniformly blended into homogeneous slurry suitable for hydraulic application.

1. Mix slurry with non-asphalatic tackifier. 2. Apply slurry uniformly to areas to be seeded in a one-step process. 3. Apply mulch at a minimum rate of 1500 lb/acre dry weight, but not less than the rate required to obtain specified seed application rate.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Seeding: 32 9219 MASTER – July 31, 2015 Page 6

3.5 TURF RENOVATION

A. Renovate existing turf.

B. Renovate existing turf damaged by seeding operations, such as storage of materials or equipment and movement of vehicles.

1. Reestablish turf where settlement or washouts occur or where minor regrading is required

C. Remove sod and vegetation from diseased or unsatisfactory turf areas; do not bury in soil.

D. Remove topsoil containing foreign materials resulting from seeding operations, including oil drippings, fuel spills, stone, gravel, and other construction materials, and replace with new planting soil.

E. Mow, dethatch, core aerate, and rake existing lawn.

F. Remove weeds before seeding. Where weeds are extensive, apply selective herbicides as required. Do not use pre-emergence herbicides.

G. Remove waste and foreign materials, including weeds, soil cores, grass, vegetation, and turf, and legally dispose of off Owner's property.

H. Till stripped, bare, and compacted areas thoroughly to a soil depth of 6 inches.

I. Apply soil amendments and initial fertilizers required for establishing new lawns and mix thoroughly into top 4 inches of existing soil. Provide new planting soil to fill low spots and meet finish grades.

J. Apply seed and protect with straw mulch as required for new turf.

K. Water newly planted areas and keep moist until new turf is established.

3.6 FIRST MOWING

A. Mow lawn areas when seed has germinated to a thick stand 4 inches in height, to 1- 1/2 inch above ground level with a sharp, sterile, power mower.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Seeding: 32 9219 MASTER – July 31, 2015 Page 7

1. Remove clippings and dispose legally off-site, or cut lawn with ‘mulching’ mower of sufficient power to thoroughly cut and distribute clippings at soil level of lawn.

3.7 ACCEPTANCE OF SEEDED AREAS

A. Satisfactory Seeded Areas: Unless otherwise specified, seeded areas should exhibit the following at time of Substantial Completion:

1. A healthy, uniform, close stand of the specified seed mix, free of weeds and surface irregularities, with coverage of mix in specified proportions, exceeding 90 percent over any 10 sq. ft. and bare spots not exceeding 5 by 5 inches.

B. Satisfactory Seeded Lawn: Seeded areas should exhibit the following at time of Substantial Completion:

1. A healthy, uniform, close stand of grass established, free of weeds and surface irregularities, with coverage of mix in specified proportions, exceeding 90 percent over any 10 sq. ft. and bare spots not exceeding 5 by 5 inches.

C. Reestablish lawn areas that do not comply with requirements and continue maintenance until lawns are satisfactory.

3.8 CLEANUP, PROTECTION, AND ACCEPTANCE

A. Promptly remove soil and debris created by turf work from paved areas. Clean wheels of vehicles before leaving site to avoid tracking soil onto roads, walks, or other paved areas

B. Erect temporary fencing or barricades and warning signs as required to protect newly planted areas from traffic. Maintain fencing and barricades throughout initial maintenance period and remove after plantings are established

C. Remove nondegradable erosion-control measures after grass establishment period.

D. Obtain written Conditional Acceptance from the Owner after all turf areas have been mowed at least twice.

E. Disposal: Remove surplus and waste material, including excess subsoil, unsuitable soil, trash, and debris, and legally dispose of it off Owner's property.

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Seeding: 32 9219 MASTER – July 31, 2015 Page 8

END OF SECTION

Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 AUTOCAD LAYER STANDARDS FOR PORTLAND PARKS & RECREATION (LANDSCAPE ARCH.)

Layer Name Line Type Color Description

CONSTRUCTION DOCUMENT SECTION:

001-TITLE CONT. 7 (White) Title Text Cell

002-DIMENSIONS CONT. 2 (Yellow) Dimensions (include text, terminator,geom.)

003-S-TEXT CONT. 2 (Yellow) Small Text plotted at 1/8"(include ldr.& term.)

004-L-TEXT CONT. 4 (Cyan) Large Text plotted at 1/4"(include bub.& undl)

005-MARKER CONT. 3 (Green) Section and Detail markers (include annot.)

006-TABLELEG CONT. 3 (Green) Table and Legend information

007-PATTERNING CONT. 1 (Red) All pattern elements

008-CENTERLINES CONT. 1 (Red) Misc. centerline elements

009-CELLS-BLOCKS CONT. 3 (Green) Misc. cells (North arrow, flow symbols, etc.)

010-DGNINFO CONT. 3 (Green) Design file info (Active scale, Tx=, etc.)

011-D-13-100 CONT. 1 (Red) Detail level for .13mm-100% Black Line work

012-D-25-100 CONT. 2 (Yellow) Detail level for .25mm-100% Black Line work

013-D-35-100 CONT. 3 (Green) Detail level for .35mm-100% Black Line work

014-D-50-100 CONT. 4 (Cyan) Detail level for .50mm-100% Black Line work

015-D-70-100 CONT. 5 (Blue) Detail level for .70mm-100% Black Line work

016-D-100-100 CONT. 6 (Magenta) Detail level for 1.0mm-100% Black Line work

017-D-140-100 CONT. 7 (White) Detail level for 1.4mm-100% Black Line work

018-D-200-100 CONT. 8 (Gray) Detail level for 2.0mm-100% Black Line work

019-D-25-40 CONT. 9 (Dark Gray) Detail level for .25mm-40% Screen Line work

020-D-35-40 CONT. 10 (Red) Detail level for .35mm-40% Screen Line work

021-D-50-40 CONT. 11 (Lt. Red) Detail level for .50mm-40% Screen Line work

022-D-70-40 CONT. 12 (Med. Red) Detail level for .70mm-40% Screen Line work

023-D-25-20 CONT. 13 (Med. Red) Detail level for .25mm-20% Screen Line work

024-D-50-20 CONT. 14 (Dark Red) Detail level for .50mm-20% Screen Line work

025-D-70-20 CONT. 15 (Dark Red) Detail level for .70mm-20% Screen Line work

TITLE_BLOCK CONT. 7 (White) Various Components of Title Block

TITLEBLK CONT. 1 (Red) Title Block Outline

TITLEBLK-TEXT-LARGE CONT. 2 (Yellow) Large Title Block Text

TITLEBLK-TEXT-SMALL CONT. 1 (Red) Small Title Block Text

FACILITY SECTION:

101-BLDG-COMM-CEN CONT. 4 (Cyan) Community Center Buildings

102-BLDG-SERVICE CONT. 3 (Green) Service Buildings

Last updated on:August 31, 2015

Layer Name Line Type Color Description 103-BLDG-MISC CONT. 4 (Cyan)) Miscellaneous Buildings

104-BLDG-EXT CONT. 4 (Cyan) External Buildings (Residential, Commercial)

105-RESTROOM CONT. 3 (Green) Restroom Structures

106-PICNIC CONT. 2 (Yellow) Picnic Area (Covered/Non covered)

107-STADIUM CONT. 4 (Cyan) Stadium Facilities

108-CONCRETE PAD CONT. 3 (Green) Concrete Pads

110-SPORTS-FIELD CONT. 2 (Yellow) Sports Fields (Baseball, Football, Soccer,etc.)

111-COURTS CONT. 2 (Yellow) Hard Courts (Basketball, Tennis,etc.)

112-PLAYGROUND CONT. 2 (Yellow) Play Ground area

120-TABLES CONT. 2 (Yellow) All Tables (Picnic, Game, etc.)

121-BENCHES CONT. 2 (Yellow) Benches

122-BLEACHERS CONT. 2 (Yellow) Bleacher Stands

123-BIKE-RACK CONT. 3 (Green) Bicycle Racks

124-PLAY-EQUIP CONT. 3 (Green) Playground Equipment

125-PL-EQ-FALL-ZONE DASHED2 1 (Red) Playground Equipment Safety Zone

126-BARBEQUE CONT. 2 (Yellow) Barbeque Pit

127-DRINK CONT. 2 (Yellow) Drinking Fountains

128-TRASH CONT. 2 (Yellow) Trash Receptacles

129-ART CONT. 2 (Yellow) Miscellaneous Art Work

130-SIGNAGE CONT. 2 (Yellow) All Signage

131-MEMORIAL CONT. 2 (Yellow) Miscellaneous Memorial Monuments/Plaques

132-MISC CONT. 2 (Yellow) Parking meters,Street Signs,Misc. Features

133-BOLLARDS CONT. 2 (Yellow) Bollard Symbol

134-RUBBER SURFACE CONT. 2 (Yellow) Rubber Safety Surface

140-POND-LAKE CONT. 3 (Green) Ponds (Natural/Man-made)

141-POOLS CONT. 3 (Green) Pools (Swimming, Wading,etc.)

142-STREAM CONT. 3 (Green) Streams/Creeks (Natural/Man-made)

143-FOUNTAIN CONT. 2 (Yellow) Fountains

162-EASEMENTS CONT. 2 (Yellow) All Facility Easements

163-DEMOLITION CONT. 2 (Yellow) All demolition data (misc. elements)

SITE SECTION:

201-PROPERTY PHANT. 2 (Yellow) Property Boundary Line

202-ROW CONT. 2 (Yellow) Right of Way

203-LOT LINES CONT. 2 (Yellow) Lot Lines

204-CONTOUR-MAJOR CONT. 3 (Green) Index Contour Lines

205-CONTOUR-MINOR CONT. 2 (Yellow) Intermediate Contour Lines

Last updated on:August 31, 2015

Layer Name Line Type Color Description 206-SWALE DASHED 2 (Yellow) Swale Lines

207-SPOT-EL CONT. 2 (Yellow) Spot Elevation Markers

208-SIDEWALK CONT. 2 (Yellow) Sidewalks Exterior to Property Line

209-CURB CONT. 2 (Yellow) Curb Lines

210-DRIVEWAY CONT. 2 (Yellow) Driveway Entrances

211-FENCES CONT. 2 (Yellow) All Fences(Chainlink, wood, etc.)

212-WALL CONT. 2 (Yellow) All Walls (Concrete,brick,wood, retaining,etc.)

213-STAIRS CONT. 2 (Yellow) All Stairs

214-GUARD-RAIL CONT. 2 (Yellow) Guard Railing

215-RAILROAD CONT. 3 (Green) Railroad

216-CONTOUR-TEXT CONT. 2 (Yellow) Contour Elevation Text

217-POINTS CONT. 1 (Red) Point Numbers & Markers

218-ELEVATIONS CONT. 1 (Red) Elevation Notations

219-DESCRIPTIONS CONT. 1 (Red) Point Descriptions

220-PATH-CONCRETE CONT. 2 (Yellow) Pathway Concrete

221-PATH-ASPHALT CONT. 2 (Yellow) Pathway Asphalt

222-PATH-CHIP CONT. 2 (Yellow) Pathway Barkchip

223-PATH-OTHER CONT. 2 (Yellow) Pathway Other(Gravel, dirt, sand, etc.)

224-PATH-CENTERLINE CENTER 1 (Red) Pathway Centerline (Alignment)

225-ROAD-CONC CONT. 2 (Yellow) Roadway Concrete

226-ROAD-ASPHALT CONT. 2 (Yellow) Roadway Asphalt

227-ROAD-GRAVEL CONT. 2 (Yellow) Roadway Gravel

228-ROAD-OTHER CONT. 2 (Yellow) Roadway Other(Dirt, sand, etc.)

229-ROAD-CENTERLINE CENTER 1 (Red) Roadway Centerline (Alignment)

230-PARKING CONT. 2 (Yellow) Parking Asphalt

231-BRIDGES CONT. 3 (Green) All Bridge Structures

232-BOAT-RAMPS CONT. 3 (Green) All Boat Ramps/Docks

233-ASPHALT CONT. 2 (Yellow) Miscellaneous Asphalt Features

234-CONCRETE CONT. 2 (Yellow) Miscellaneous Concrete Features

235-MISC-TEXT CONT. 2 (Yellow) Miscellaneous Text

236-PARKING-STRIPING CONT. 1 (Red) Parking striping

237-CONCRETE-JOINTS CONT. 1 (Red) Concrete expansion joints

240-TREELINE-TRUNK CONT. 2 (Yellow) Tree Line Boundary

241-TREE-DECID CONT. 3 (Green) Tree - Deciduous

242-TREE-EVER CONT. 3 (Green) Tree - Evergreen

243-TREE-SHRUB CONT. 3 (Green) Tree - Shrub

Last updated on:August 31, 2015

Layer Name Line Type Color Description 244-HEDGE CONT. 3 (Green) Hedge Row Line

245-TURF CONT. 2 (Yellow) Low Maintenance Turf

246-LAWN CONT. 2 (Yellow) Lawn

247-BED-PLANT CONT. 2 (Yellow) Bark Chip Areas

248-COMM-GARDEN CONT. 2 (Yellow) Community Garden

249-SHADOW CONT. 9 (Dark Gray) Plant Shadows (Master Plan)

250-WETBOUND DASHEDX2 2 (Yellow) Wetland Boundary

256-WILDLIFE DASHED2 2 (Yellow) Wildlife Preseve

257-PLANT TEXT CONT. 2 (Yellow) All plant I.D. Information

262-EASEMENTS CONT. 2 (Yellow) All site easement information

263-DEMOLITION DASHED 2 (Yellow) All demolition data

UTILITY SECTION:

301-W-MAIN CONT. 3 (Green) Water Main Line (potable)

302-W-VALVE CONT. 2 (Yellow) Water System valves

303-W-EQUIP CONT. 2 (Yellow) Water Equipment (pumps, motors, meters, etc.)

304-W-SERVICE CONT. 2 (Yellow) Water Service (Tanks, Hydrants, etc.)

305-W-VAULT CONT. 2 (Yellow) Water Vaults

306-W-TEXT CONT. 2 (Yellow) Water SystemText

310-G-MAIN CONT. 3 (Green) Gas Lines

311-G-VALVE CONT. 2 (Yellow) Gas Valves

312-G-TEXT CONT. 2 (Yellow) Gas System Text

320-E-AMAIN CONT. 3 (Green) Electrical Lines Above ground

321-E-BMAIN CONT. 3 (Green) Electrical Lines Below ground

322-E-EQUIP CONT. 2 (Yellow) Electrical Equipment (transformers, meters,etc)

323-E-LIGHT CONT. 2 (Yellow) Electrical Lighting

324-E-VAULT CONT. 2 (Yellow) Electrical Vaults

325-E-TEXT CONT. 2 (Yellow) Electrical Text

326-T-A-TELECOM CONT. 3 (Green) Telecommunication Lines Above ground

327-T-BTELECOM CONT. 3 (Green) Telecommunication Lines Below ground

328-T-EQUIP CONT. 2 (Yellow) Telecommunication Equipment

329-T-TEXT CONT. 2 (Yellow) Telecommunication Text

330-SS-MAIN CONT. 3 (Green) Sanitary Sewer Main Lines

331-SS-LATERAL CONT. 2 (Yellow) Sanitary Sewer Lateral Lines

332-SS-MAN CONT. 2 (Yellow)) Sanitary Sewer Manholes

333-SS-VAULT CONT. 2 (Yellow) Sanitary Sewer Vaults (sumps, basins, etc.)

334-SS-TEXT CONT. 2 (Yellow) Sanitary Sewer Text

335-ST-MAIN CONT. 3 (Green) Storm Sewer Lines

Last updated on:August 31, 2015

Layer Name Line Type Color Description

336-ST-LATERAL CONT. 2 (Yellow) Storm Sewer Lateral Lines

337-ST-MAN 0 2 (Yellow) Storm Sewer Manholes

338-ST-VAULT 0 2 (Yellow) Storm Sewer Vaults (sumps, basins,etc.)

339-ST-TEXT 0 2 (Yellow) Storm Sewer Text

340-I-MAIN 3 5 (Blue) Irrigation Main Line

341-I-LATERAL 0 3 (Green) Irrigation Lateral Lines

342-I-SLEEVES 2 7 (White) Irrigation Sleeves

343-I-HEADS 0 2 (Yellow) Irrigation Heads

344-I-RADIUS 2 1 (Red) Irrigation head spray pattern

345-I-VALVE 0 2 (Yellow) Irrigation Valves

346-I-METERS 0 2 (Yellow) Irrigation Meters

347-I-CONTROLLER 0 2 (Yellow) Irrigation Controllers

348-I-VAULT 0 3 (Green) Irrigation Vaults

349-I-TEXT 0 2 (Yellow) Irrigation Text

362-U-EASEMENT 0 2 (Yellow) Utility Easement

363-DEMOLITION 5 2 (Yellow) Demolition data

Last updated on:August 31, 2015

AUTOCAD LAYER STANDARDS FOR PORTLAND PARKS & RECREATION (ARCHITECTURAL)

Layer Name Line Type Color Description

CONSTRUCTION DOCUMENT SECTION:

001-TITLE CONT. 7 (White) Title Text Cell

002-DIMENSIONS CONT. 2 (Yellow) Dimensions (include text, terminator,geom.)

003-S-TEXT CONT. 2 (Yellow) Small Text plotted at 1/8"(include ldr.& term.)

004-L-TEXT CONT. 4 (Cyan) Large Text plotted at 1/4"(include bub.& undl)

005-MARKER CONT. 3 (Green) Section and Detail markers (include annot.)

006-TABLELEG CONT. 3 (Green) Table and Legend information

007-PATTERNING CONT. 1 (Red) All pattern elements

008-CENTERLINES CONT. 1 (Red) Misc. centerline elements

009-CELLS-BLOCKS CONT. 3 (Green) Misc. cells (North arrow, flow symbols, etc.)

010-DGNINFO CONT. 3 (Green) Design file info (Active scale, Tx=, etc.)

011-D-13-100 CONT. 1 (Red) Detail level for .13mm-100% Black Line work

012-D-25-100 CONT. 2 (Yellow) Detail level for .25mm-100% Black Line work

013-D-35-100 CONT. 3 (Green) Detail level for .35mm-100% Black Line work

014-D-50-100 CONT. 4 (Cyan) Detail level for .50mm-100% Black Line work

015-D-70-100 CONT. 5 (Blue) Detail level for .70mm-100% Black Line work

016-D-100-100 CONT. 6 (Magenta) Detail level for 1.0mm-100% Black Line work

017-D-140-100 CONT. 7 (White) Detail level for 1.4mm-100% Black Line work

018-D-200-100 CONT. 8 (Gray) Detail level for 2.0mm-100% Black Line work

019-D-25-40 CONT. 9 (Dark Gray) Detail level for .25mm-40% Screen Line work

020-D-35-40 CONT. 10 (Red) Detail level for .35mm-40% Screen Line work

021-D-50-40 CONT. 11 (Lt. Red) Detail level for .50mm-40% Screen Line work

022-D-70-40 CONT. 12 (Med. Red) Detail level for .70mm-40% Screen Line work

023-D-25-20 CONT. 13 (Med. Red) Detail level for .25mm-20% Screen Line work

024-D-50-20 CONT. 14 (Dark Red) Detail level for .50mm-20% Screen Line work

025-D-70-20 CONT. 15 (Dark Red) Detail level for .70mm-20% Screen Line work

TITLE_BLOCK CONT. 7 (White) Various Components of Title Block

TITLEBLK CONT. 1 (Red) Title Block Outline

TITLEBLK-TEXT-LARGE CONT. 2 (Yellow) Large Title Block Text

TITLEBLK-TEXT-SMALL CONT. 1 (Red) Small Title Block Text

EXISTING FEATURES FLOOR PLAN & ELEVATIONS

101-E-FLOOR-ID CONT. 2 (Yellow) Existing Room/Space Identification

Last updated on:August 31, 2015 102-E-FLOOR-GRID CONT. 1 (Red) Existing Floor Grid and ID Bubbles

103-E-FLOOR-OTLN CONT. 3 (Green) Existing Floor Outline/Building Outline Foot Print

104-E-FLOOR-MISC CONT. 1 (Red) Existing Floor Features (ie.Patterns,Materials,etc)

105-E-WALL-EXT CONT. 2 (Yellow) Existing Exterior Walls

106-E-WALL-INT CONT. 2 (Yellow) Existing Interior (Full Height) Walls

107-E-WALL-PART CONT. 2 (Yellow) Existing Interior (Partial Height/Partition) Walls

108-E-WALL-MISC CONT. 1 (Red) Miscellaneous Wall Features (patterns, fire rating etc)

109-E-DOOR CONT. 2 (Yellow) Existing Doors (Exterior/Interior)

110-E-DOOR-SWING CONT. 1 (Red) Existing Door Swing

111-E-DOOR-ID CONT. 2 (Yellow) Existing Door ID Callouts

112-E-WINDOW CONT. 2 (Yellow) Existing Windows (Exterior/Interior)

113-E-WINDOW-GLASS CONT. 2 (Yellow) Existing Window Glass

114-E-WINDOW-SIL CONT. 1 (Red) Existing Window Sill

115-E-WINDOW-MUL CONT. 3 (Green) Existing Window Mullion

116-E-WINDOW-ID CONT. 2 (Yellow) Existing Window ID Callouts

117-E-CEILING-ACCS CONT. 4 (Cyan) Existing Ceiling Access (Panels,Openings)

118-E-CEILING-FIX CONT. 2 (Yellow) Existing Ceiling Fixtures

119-E-CEILING-GRID CONT. 1 (Red) Existing Ceiling Grid

120-E-CEILING-HEADER CONT. 4 (Cyan) Existing Door/Window Headers

121-E-CEILING-HIDDEN HIDDEN 1 (Red) Existing Ceiling Hidden Lines

122-E-CEILING-SOFFIT CONT. 2 (Yellow) Existing Ceiling Soffit

123-E-CEILING-MISC CONT. 2 (Yellow) Miscellaneous Reflected Ceiling Features

124-E-ROOF-OTLN CONT. 3 (Green) Existing Roof Outline

125-E-ROOF-VALLEY CONT. 1 (Red) Existing Roof Valleys

126-E-ROOF-GUTTER CONT. 2 (Yellow) Existing Roof Gutters and Flashing

127-E-ROOF-HIDDEN HIDDEN 1 (Red) Existing Roof Hidden Lines

128-E-ROOF-VENT CONT. 3 (Green) Existing Roof Vents/Chimneys

129-E-ROOF-SKYLIGHT CONT. 3 (Green) Existing Roof Skylights

130-E-ROOF-LOWER CONT. 1 (Red) Existing Roof Features Below Outline

131-E-ROOF-MISC CONT. 2 (Yellow) Miscellaneous Roof Features

132-E-STAIR-RAMP CONT. 2 (Yellow) Existing Stairs (Treads) or Ramps

133-E-RAILING CONT. 2 (Yellow) Existing Railings (Balcony, Stairs, etc.)

134-E-EQUIPMENT CONT. 2 (Yellow) Existing Equipment (Elevators)

135-E-FIXTURES CONT. 2 (Yellow) Existing Fixtures

136-E-SHAFTS CONT. 3 (Green) Existing Shafts (Elevator, Access)

137-E-CABINET-MIL CONT. 1 (Red) Existing Cabinet and Mill/Case Work

138-E-BALCONIES CONT. 1 (Red) Existing Balconies, Decks, Porches

139-E-FURNITURE CONT. 2 (Yellow) Existing Miscellaneous Furniture

140-E-SOFFIT CONT. 1 (Red) Existing Soffits

Last updated on:August 31, 2015 141-E-COLUMNS CONT. 2 (Yellow) Existing Structural Columns

142-E-STRUCT-GRID CONT. 1 (Red) Existing Structural Grid & Bubbles

143-E-STRUCT-BEAM CONT. 2 (Yellow) Existing Structural Beams

144-E-STRUCT-WALL CONT. 2 (Yellow) Existing Structural Walls

145-E-STRUCT-JOIST CONT. 2 (Yellow) Existing Structural Joist

160-D-DEMOLITION DASHED 3 (Green) Demolition Layer for all Structural/Arch. Comp.

NEW FEATURES FLOOR PLAN & ELEV.

201-N-FLOOR-ID CONT. 2 (Yellow) New Room/Space Identification

202-N-FLOOR-GRID CONT. 1 (Red) New Floor Grid and ID Bubbles

203-N-FLOOR-OTLN CONT. 4 (Cyan) New Floor Outline/Building Outline Foot Print

204-N-FLOOR-MISC CONT. 1 (Red) New Floor Features (ie.Patterns,Materials,etc)

205-N-WALL-EXT CONT. 3 (Green) New Exterior Walls

206-N-WALL-INT CONT. 3 (Green) New Interior (Full Height) Walls

207-N-WALL-PART CONT. 3 (Green) New Interior (Partial Height/Partition) Walls

208-N-WALL-MISC CONT. 2 (Yellow) Miscellaneous Wall Features (patterns, fire rating etc)

209-N-DOOR CONT. 3 (Green) New Doors (Exterior/Interior)

210-N-DOOR-SWING CONT. 1 (Red) New Door Swing

211-N-DOOR-ID CONT. 2 (Yellow) New Door ID Callouts

212-N-WINDOW CONT. 3 (Green) New Windows (Exterior/Interior)

213-N-WINDOW-GLASS CONT. 1 (Red) New Window Glass

214-N-WINDOW-SIL CONT. 3 (Green) New Window Sill

215-N-WINDOW-MUL CONT. 4 (Cyan) New Window Mullion

216-N-WINDOW-ID CONT. 2 (Yellow) New Window ID Callouts

217-N-CEILING-ACCS CONT. 5 (Blue) New Ceiling Access (Panels,Openings)

218-N-CEILING-FIX CONT. 3 (Green) New Ceiling Fixtures

219-N-CEILING-GRID CONT. 1 (Red) New Ceiling Grid

220-N-CEILING-HEADER CONT. 5 (Blue) New Door/Window Headers

221-N-CEILING-HIDDEN HIDDEN 1 (Red) New Ceiling Hidden Lines

222-N-CEILING-SOFFIT CONT. 3 (Green) New Ceiling Soffit

223-N-CEILING-MISC CONT. 3 (Green) Miscellaneous Reflected Ceiling Features

224-N-ROOF-OTLN CONT. 4 (Cyan) New Roof Outline

225-N-ROOF-VALLEY CONT. 2 (Yellow) New Roof Valleys

226-N-ROOF-GUTTER CONT. 3 (Green) New Roof Gutters and Flashing

227-N-ROOF-HIDDEN HIDDEN 1 (Red) New Roof Hidden Lines

228-N-ROOF-VENT CONT. 4 (Cyan) New Roof Vents/Chimneys

229-N-ROOF-SKYLIGHT CONT. 4 (Cyan) New Roof Skylights

230-N-ROOF-LOWER CONT. 1 (Red) New Roof Features Below Outline

231-N-ROOF-MISC CONT. 3 (Green) Miscellaneous Roof Features

Last updated on:August 31, 2015 232-N-STAIR-RAMP CONT. 3 (Green) New Stairs (Treads) or Ramps

233-N-RAILING CONT. 3 (Green) New Railings (Balcony, Stairs, etc.)

234-N-EQUIPMENT CONT. 3 (Green) New Equipment (Elevators)

235-N-FIXTURES CONT. 3 (Green) New Fixtures

236-N-SHAFTS CONT. 4 (Cyan) New Shafts (Elevator, Access)

237-N-CABINET-MIL CONT. 2 (Yellow) New Cabinet and Mill/Case Work

238-N-BALCONIES CONT. 2 (Yellow) New Balconies, Decks, Porches

239-N-FURNITURE CONT. 3 (Green) New Miscellaneous Furniture

240-N-SOFFIT CONT. 2 (Yellow) New Soffits

241-N-COLUMNS CONT. 3 (Green) New Structural Columns

242-N-STRUCT-GRID CONT. 2 (Yellow) New Structural Grid & Bubbles

243-N-STRUCT-BEAM CONT. 3 (Green) New Structural Beams

244-N-STRUCT-WALL CONT. 3 (Green) New Structural Walls

245-N-STRUCT-JOIST CONT. 3 (Green) New Structural Joist

EXISTING UTILITY FEATURES: ELECTRICAL

301-E-LIGHT CONT. 2 (Yellow) Existing Electrical Lighting Fixtures

302-E-LIGHT-ID CONT. 2 (Yellow) Existing Lighting Circuit ID

303-E-LIGHT-SWITCH CONT. 2 (Yellow) Existing Lighting Wall Switch

304-E-LIGHT-CIRCUIT CONT. 1 (Red) Existing Lighting Wire Circuits

305-E-POWR-OUTLET CONT. 2 (Yellow) Existing Power Outlets (Receptacles)

306-E-POWR-CIRCUIT CONT. 1 (Red) Existing Power Wire Circuits

307-E-POWR-TEXT CONT. 2 (Yellow) Existing Electrical System Text

EXISTING UTILITY FEATURES:MECHANICA L

311-E-MECH-EQMT CONT. 2 (Yellow) Existing HVAC Equipment (Compressors, etc.)

312-E-MECH-DUCT CONT. 1 (Red) Existing HVAC Duct (Supply/Return) Systems

313-E-MECH-DIFF CONT. 2 (Yellow) Existing HVAC Diffusers/Vents

EXISTING UTILITY FEATURES: PLUMBING

315-E-H2O-FIXTURES CONT. 2 (Yellow) Existing Water Fixtures

316-E-H2O-HSUPPLY CONT. 1 (Red) Existing Hot Water Supply

317-E-H2O-CSUPPLY CONT. 1 (Red) Existing Cold Water Supply

318-E-H2O-EQMT CONT. 2 (Yellow) Existing Water Equipment (Pumps, Tanks, etc.)

319-E-SAN-DRAIN CONT. 2 (Yellow) Existing Sanitary Inlet Drains

320-E-SAN-EQMT CONT. 2 (Yellow) Existing Sanitary Equipment

321-E-SAN-PIPE CONT. 1 (Red) Existing Sanitary Piping

322-E-STRM-DRAIN CONT. 2 (Yellow) Existing Storm Inlet Drains

323-E-STRM-PIPE CONT. 1 (Red) Existing Storm Piping

Last updated on:August 31, 2015

EXISTING UTILITY FEATURES: DATA

325-E-TELE-OUTLET CONT. 2 (Yellow) Existing Telephone Outlets

326-E-TELE-CIRCUIT CONT. 1 (Red) Existing Telephone Wire Circuit

327-E-TELE-EQMT CONT. 2 (Yellow) Existing Telephone Equipment

328-E-DATA-OUTLET CONT. 2 (Yellow) Existing Computer Network Outlets

329-E-DATA-CIRCUIT CONT. 1 (Red) Exisitng Computer Network Wire Circuit

330-E-DATA-EQMT CONT. 2 (Yellow) Exisitng Computer Equipment

DEMOLITION UTILITY FEATURES

332-D-DEMO-ELEC DASHED 3 (Green) Demolition Layer for Electrical Systems

333-D-DEMO-MECH DASHED 3 (Green) Demolition Layer for Mechanical Systems

334-D-DEMO-PLUMB DASHED 3 (Green) Demolition Layer for Plumbing Systems

335-D-DEMO-DATA DASHED 3 (Green) Demolition Layer for Telephone/Computer Systems

NEW UTILITY FEATURES: ELECTRICAL

337-N-LIGHT CONT. 3 (Green) New Electrical Lighting Fixtures

338-N-LIGHT-ID CONT. 3 (Green) New Lighting Circuit ID

339-N-LIGHT-SWITCH CONT. 3 (Green) New Lighting Wall Switch

340-N-LIGHT-CIRCUIT CONT. 2 (Yellow) New Lighting Wire Circuits

341-N-POWR-OUTLET CONT. 3 (Green) New Power Outlets (Receptacles)

342-N-POWR-CIRCUIT CONT. 2 (Yellow) New Power Wire Circuits

343-N-POWR-TEXT CONT. 2 (Yellow) New Electrical System Text

NEW UTILITY FEATURES:MECHANICA L

344-N-MECH-EQMT CONT. 3 (Green) New HVAC Equipment (Compressors, etc.)

345-N-MECH-DUCT CONT. 2 (Yellow) New HVAC Duct (Supply/Return) Systems

346-N-MECH-DIFF CONT. 3 (Green) New HVAC Diffusers/Vents

NEW UTILITY FEATURES: PLUMBING

348-N-H2O-FIXTURES CONT. 3 (Green) New Water Fixtures

349-N-H2O-HSUPPLY CONT. 2 (Yellow) New Hot Water Supply

350-N-H2O-CSUPPLY CONT. 2 (Yellow) New Cold Water Supply

351-N-H2O-EQMT CONT. 3 (Green) New Water Equipment (Pumps, Tanks, etc.)

352-N-SAN-DRAIN CONT. 3 (Green) New Sanitary Inlet Drains

353-N-SAN-EQMT CONT. 3 (Green) New Sanitary Equipment

354-N-SAN-PIPE CONT. 2 (Yellow) New Sanitary Piping

355-N-STRM-DRAIN CONT. 3 (Green) New Storm Inlet Drains

356-N-STRM-PIPE CONT. 2 (Yellow) New Storm Piping

Last updated on:August 31, 2015

NEW UTILITY FEATURES: DATA

358-N-TELE-OUTLET CONT. 3 (Green) New Telephone Outlets

359-N-TELE-CIRCUIT CONT. 2 (Yellow) New Telephone Wire Circuit

360-N-TELE-EQMT CONT. 3 (Green) New Telephone Equipment

361-N-DATA-OUTLET CONT. 3 (Green) New Computer Network Outlets

362-N-DATA-CIRCUIT CONT. 2 (Yellow) New Computer Network Wire Circuit

363-N-DATA-EQMT CONT. 3 (Green) New Computer Equipment

Last updated on:August 31, 2015

August 31, 2015

Requirements of the Work As-Built and Record Drawings

1. The Construction Contractor shall mark up all changes from the Bid Set or Construction Set, whichever set was issued by the PPR (Portland Parks & Recreation) Project Manager as the drawing set to construct from. The Contractor shall use red to indicate any element that was removed from the drawing, green to indicate any elements that were added to the drawing, and any element requiring changes or editing in blue. No White-Out or black ink shall be used. Contractor shall include all ASIs (Architect’s Supplemental Instructions), FCDs (Field Change Directives), approved substitutions, and all other changes to the drawings during the course of the project, by attaching the most current version of changes issued to the drawing. Contractor who is documenting as-built information shall mark in the lower right corner of each drawing with the words “As Built”, the date, signature, and company name who provided the as-built information. (Further instructions to contractor provided in PPR Division One specifications.)

2. Once the construction contractor has submitted their complete set of as-builts for review, the PPR Project Manager (PM) and/or Construction Manager (CM) will distribute them to the design consultants and PPR staff as necessary for review for completeness and accuracy. Design consultants and PPR staff shall submit to the PPR PM or CM their comments regarding anything not indicated correctly or that they are aware is missing from the contractor’s mark ups.

3. The PPR PM or CM will return the review comments and as-builts to the construction contractor for correction, as necessary. Once an acceptable set of As-Builts has been received by PPR from the contractor, the design consultant shall color scan each sheet that has color mark ups and black & white scan each sheet with no color mark ups, resulting in one .pdf per sheet for the entire set. This scan will serve as the As-Builts for the project records showing what changed during the course of the construction project.

4. The design consultants shall draft the as-built changes into CAD from the contractor mark ups and any other changes the design team is aware of that may not have been reflected by the contractor, including all ASIs, FDCs, approved substitutions, etc. All bubbles and deltas should come off the Record Drawings and in the titleblocks, and the drawings should only show the final condition, not what changed. Nothing should be crossed out to show the difference between the bid or construction set and what was built. Only show the final condition. Also

Administration 1120 S.W. 5th Ave., Suite 1302 www.PortlandParks.org Portland, OR 97204 Nick Fish, Commissioner Tel: (503) 823-7529 Fax: (503) 823-6007 Zari Santner, Director Sustaining a healthy park and recreation system to make Portland a great place to live, work and play.

include all measurements the contractor has provided to indicate the actual location of underground improvements from a known point of reference. If the underground improvements were built within reasonable proximity, dimensions will suffice to show the actual location is over a few feet. If underground improvements were installed in significantly different locations, redraw the elements to the correct location on the drawings, and also include the dimensions.

5. Label in an appropriate location in the title block “Record Drawings” and the date. Also label “Record Drawings” in larger letters outside the title block in the lower right corner of each sheet.

6. Design consultant shall submit draft Record Drawings set(s) (hard copy or electronic in .pdf format, as directed by PPR PM) to PPR PM for review, along with the contractor As-Built mark-up set(s). Make corrections if necessary and resubmit for PPR PM approval.

7. Each drawing sheet shall be individual document files in both .pdf and CAD formats. See CAD Delivery document for specifications.

8. Final products are to be delivered via e-mail/FTP/CD-Rom or DVD.