![Attachment K](https://data.docslib.org/img/3a60ab92a6e30910dab9bd827208bcff-1.webp)
Project Name Table of Contents: 00 0110 MASTER – July 31, 2015 Page 1 DOCUMENT 00 0110 TABLE OF CONTENTS DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 0110 Table of Contents 00 1100 Organization, Conventions, Abbreviations and Definitions 00 1200 Bidding Requirements and Procedures 00 1300 Award and Execution of Contact 00 1400 Scope of Work 00 1500 Control of Work 00 1600 Source of Materials 00 1650 Quality of Materials 00 1700 Legal Relations and Responsibilities 00 1800 Prosecution and Progress 00 1900 Measurement of Pay Quantities 00 1950 Payment 00 1960 Payment for Extra Work 00 1970 Payment for Force Account Work 00 1990 Disagreements, Protests, and Claims DIVISION 01 GENERAL REQUIREMENTS 01 1100 Summary of Work 01 2100 Allowances 01 2200 Unit Prices 01 2300 Alternates 01 2500 Substitution Procedures 01 2600 Contract Modification Procedures 01 2900 Payment Procedures 01 3100 Project Management and Coordination 00 3200 Construction Progress Documentation 01 3300 Submittal Procedures 01 3333 Delegated Design Requirements 01 3563 Sustainability Certification Project Requirements 01 4000 Quality Requirements 01 4200 References 01 5000 Temporary Facilities and Controls 01 5639 Temporary Tree and Plant Protection 01 6000 Product Requirements 01 7000 Execution and Closeout 01 7419 Construction Waste Management and Disposal Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Table of Contents: 00 0110 MASTER – July 31, 2015 Page 2 01 7800 Closeout Submittals DIVISION 02 EXISTING CONDITIONS 02 4116 Structure Demolition (02050) 02 4119 Selective Demolition (02073) 02 8213 Asbestos Abatement (02080) DIVISION 03 CONCRETE 03 3000 Cast‐In‐Place Concrete (03100, 03200, 03251, 03300, 03600) DIVISION 04 MASONRY 04 0130 Unit Masonry Restoration and Cleaning (04500) 04 2113 Brick Masonry (04210) 04 2200 Concrete Unit Masonry (04220) 04 4300 Stone Masonry DIVISION 05 METALS 05 1200 Structural Steel Framing (05120) 05 1300 Structural Aluminum (05130) 05 5000 Metal Fabrications (05500) 05 5200 Metal Railings (05520) 05 6010 Galvanizing (05910) 05 6020 Powder Coating (05920) DIVISION 06 WOOD, PLASTICS, AND COMPOSITES 06 1000 Rough Carpentry (06110) 06 1500 Wood Decking (06125) 06 1600 Sheathing (06115) 06 2013 Exterior Finish Carpentry (06200) 06 4000 Architectural Woodwork (06220, 06410) DIVISION 07 THERMAL AND MOISTURE PROTECTION 07 1000 Waterproofing (07100) 07 1900 Water Repellents (07180) 07 2110 Building Insulation (07210) 07 3115 Fiberglass Shingles (07212) 07 3200 Roof Tiles (07320) Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Table of Contents: 00 0110 MASTER – July 31, 2015 Page 3 07 4110 Metal Roof and Wall Panels (07410) 07 4623 Wood Siding (07460) 07 5100 Built‐Up Bituminous Roofing (07510) 07 5216 Modified Bituminous Membrane Roofing (SBS) (07525) 07 6000 Flashing and Sheet Metal (07620) 07 8400 Firestopping (07270) 07 9200 Joint Sealants (07900) DIVISION 08 DOORS AND WINDOWS 08 1113 Standard Hollow Metal Doors and Frames (08112) 08 1213 Standard Hollow Metal Frames (08114) 08 1416 Flush Wood Doors (08211) 08 5210 Wood Window Rehabilitation (08620) 08 6213 Domed Unit Skylights (07820) 08 7100 Door Hardware (08710 08 8000 Glazing (08800) 08 9100 Louvers (10210) DIVISION 09 FINISHES 09 2116 Gypsum Board Assemblies (09250) 09 3000 Tiling (09300) 09 5100 Acoustical Ceilings (09510) 09 6431 Wood Strip Flooring (09560) 09 6500 Resilient Flooring (09650) 09 6723 Resinous Flooring (09950) 09 6800 Carpeting (09680) 09 9100 Painting (09900) DIVISION 10 SPECIALTIES 10 1430 Exterior Signs 10 1435 Disabled Parking Signs (10435) 10 1441 Interior Signs (10440) 10 1800 Informational Kiosks 10 2113 Metal Toilet Compartments (10160) 10 2115 Phenolic Toilet Compartments (10171) 10 2116 Shower and Dressing Compartments (10185) 10 2814 Toilet and Shower Accessories (10805) 10 4400 Fire Protection Specialties (10523) Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Table of Contents: 00 0110 MASTER – July 31, 2015 Page 4 DIVISION 11 EQUIPMENT 11 6623 Basketball Backstops (11484) 11 6624 Volleyball Equipment (11491) 11 6813 Play Equipment – Natural Features 11 6816 Play Structures (02865) 11 6824 Tennis Equipment (02832) 11 6834 Baseball Field Equipment 11 6835 Gold Course Equipment 11 6836 Frisbee Gold Course DIVISION 12 FURNISHINGS 12 2113 Horizontal Louver Blinds (12511) 12 2524 Gymnasium Divider Curtains (11496) 12 9310 Site and Street Furnishings (02870) DIVISION 13 SPECIAL CONSTRUCTION 13 1146 Swimming Pool Equipment (15492) 13 1180 Concrete Transient Float (03301) 13 1190 Wood Boarding Floats (06120) 13 1200 Fountains (02820) 13 1214 Water Feature System 13 3423 Fabricated Structures DIVISION 14 CONVEYING SYSTEMS 14 1000 Dumbwaiters 14 2000 Elevators 14 4216 Vertical Wheelchair Lifts (14 42 00) DIVISION 21 FIRE SUPPRESSION 21 0000 Fire Suppression DIVISION 22 PLUMBING 22 0500 Common Work Results for Plumbing 22 1000 Plumbing Piping 22 3000 Plumbing Equipment 22 4000 Plumbing Fixtures Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Table of Contents: 00 0110 MASTER – July 31, 2015 Page 5 DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) 23 0500 Common Work Results for HVAC DIVISION 26 ELECTRICAL 26 0500 Common Work Results for Electrical 26 0519 Low Voltage Electrical Power conductors and Cables 26 0526 Grounding and Bonding for Electrical Systems 26 0533 Conduits, Raceways, Boxes, Fittings 26 0553 Identification for Electrical Systems 26 2000 Secondary Distribution System 26 2726 Wiring Devices and Plates 26 2816 Disconnect Switches 26 5600 Exterior Lighting 26 5610 Exterior LED Lighting DIVISION 31 EARTHWORK 31 1000 Site Clearing (02110, 02130) 31 2000 Earth Moving (02210, 02220, 02233) 31 2500 Erosion and Sedimentation Controls (02270) 31 3233 Shotcrete Soil Slope Stabilization 31 6220 Steel Piling (02369) DIVISION 32 EXTERIOR IMPROVEMENTS 32 1216 Asphalt Paving (02510, 02512) 32 1217 Chip Seal Paving (02530) 32 1243 Porous Asphalt Paving 32 1313 Concrete Paving (02521) 31 1343 Pervious Concrete Paving 32 1400 Unit Paving (02515) 32 1510 Soft Surface Trails (02540) 32 1540 Crushed Stone Surfacing ‐ Unstabilized 32 1541 Crushed Stone Surfacing ‐ Stabilized 32 1715 Precast Concrete Parking Bumpers (02845) 32 1723 Pavement Marking (02580) 32 1817 Playground Protective Surfacing 32 1824 Infilled Synthetic Turf 32 1825 Bitumen Rubber Track Surfacing (02555) 32 1827 Acrylic Tennis Court Surfacing (02560) 32 1828 Acrylic Basketball Court Surfacing (02562) Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Table of Contents: 00 0110 MASTER – July 31, 2015 Page 6 32 3114 Chain Link Fences (02831) 32 3129 Wood Fences and Gates (02834) 32 3400 Fabricated Bridges 32 8000 Irrigation (02810) 32 9010 Trees, Plants, and Ground Covers (02950) 32 9013 Tree Pruning 32 9020 Lawns and Grasses (02930) 32 9021 Lawn Renovation (02922) 32 9113 Soil Preparation (02920) 32 9114 Soil Preparation for Athletic Fields (02925) 32 9115 Soil Treatment (02360) 32 9219 Seeding 32 9310 Landscape Maintenance DIVISION 33 UTILITIES 33 0500 Common Work Results for Utilities 33 1100 Water Systems (02665) 33 1110 Water Lines (02660) 33 4100 Storm Drainage Systems (02715) 33 4350 Underground Utility Vaults (02667) 33 4600 Subdrainage Systems (02710) 33 4615 Athletic Field Drainage Systems (02716) 33 7719 Electrical Underground Ducts and Manholes END OF TABLE OF CONTENTS Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Temporary Tree and Plant Protection: 01 5639 MASTER – July 31, 2015 Page 1 SECTION 01 5639 TEMPORARY TREE AND PLANT PROTECTION PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Temporary protection of existing trees and plants to remain. 2. Protection includes temporary fencing, barricades and guards. B. Related Sections: 1. Section 31 1000: Site Clearing, for removal of other trees and plants not to remain. 2. Section 32 9013: Tree Pruning, for pruning included in Work of this Section. 3. Division 32: Exterior Improvements, for other Work that may affect Work of this Section. 4. Division 33: Utilities, for other Work that may affect Work of this Section. 1.2 DEFINITIONS A. Certified Arborist: Certified by The International Society of Arboriculture (ISA). B. Owner’s Arborist: A representative of the Urban Forester’s Office. C. Consulting Arborist: A Consulting Arborist registered with the American Society of Consulting Arborists (ASCA), or is certified as a Board Certified Master Arborist (BCMA) with ISA. D. Board Certified Master Arborist: ISA certified. E. Certified Tree Worker: ISA certification. F. Tree and Plant Protection Zone: Area of no disturbance as deemed necessary by a certified arborist and as shown or indicated. Portland Parks & Recreation 1120 S.W. 5th Ave., Suite 1302 Portland, Oregon 97204 Project Name Temporary Tree and Plant Protection: 01 5639 MASTER – July 31, 2015 Page 2 1.3 PERFORMANCE REQUIREMENTS A. Intent of Work of this Section: 1. The preservation, protection, and trimming of existing trees and shrubs, and other vegetation indicated to remain. 2. To provide temporary fencing, barricades and guards to protect trees and plants from damage. 3. To protect trees and plants from stockpiling, material storage, vehicle parking and driving within the tree drip line or Tree and Plant Protection Zone area. B. Tree and Plant Protection Plan: Consulting Arborist is to provide a Tree and Plant Protection Plan, to include the following: 1. Evaluation of plant materials, including root zones within the construction limits, for evidence of pre-existing rot, disease and damage that might otherwise contribute to or cause a decline in the health of materials designated to remain. 2. Location of fencing at the drip line of a single designated tree or the outermost perimeter of the combined drip line areas of a designated group of trees. 1) Location of fencing may be extended as deemed necessary by the Owner’s Arborist. 3. Owner's Arborist will review the Plan and will make the final determination as to the extent of conditions described in the Plan.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages201 Page
-
File Size-