120,000 125,000 130,000 135,000 140,000 145,000 150,000 155,000 160,000 ,000 ,000 525 525 ,000 520 520,000

5

5 ,000 515 515,000

Vijaparimulai Thikkam

Alvai North

5 Mandapam

Thondaimanaru West

Thumpalai Jetty Urani Valvetty NORTH Veeramanikkatevanturai West Kankesanturai Myliddy Coast Kamparmalai Samarapakutevan Nelladai

Kottavattai Vathiri Periyanaddutevanturai Thanakkarukurachchi Katkovalam Alvai Uduppiddy South Manthikai Fishing Ground Palali Valalai Puloli Thaiyiddi ,000 Navindil Puloly South

510 Karanavai 510,000 North Karaveddy Varattuppalai Mulavai Thampalai North Nelliady Imayanan

Myliddy Air Port North Idaikkadu TELLIPPALAI North Myliddy Karanavai South South Kathirippai Maiekaram Kulam Karaveddy Kallikai Pattaimeni West Tholakaddy Vallai

Varuttalaivilan Koddagapulam Vasavilan Mulli Atchuvely

Thunnalai South Karaveddy East Manatkadu Thoppu KARAVEDDI

,000 UDUVIL (CHUNNAKAM) Navakkeeri 505 505,000 Varaivayaipulo Kulam

Avarankai KOPAY Puthur West Kapputhoo Varany North

Puthur East Kudathanai Kudathanai Karaiyoor VADAMARACHCHI EAST Achchelli Antanantidai Koddaikadu Kethuru

Chiruppiddi Vatharawathai Varany Urelu

Koddodai Idaikkurichchi Karampaikurichchi Ampan

Urumpirai CHAVAKACHCHERI

Neerveli Navatkadu 500,000 mN 500,000 120,000 mE 125,000 130,000 135,000 140,000 145,000 150,000 155,000 160,000

LEGEND LIMITATIONS Scale 1 : 50,000 Main Road Province Boundary SEA LEVEL RISE MAP - SHEET 02 The sea level rise predicted by IPCC report is revised time to time as more information and improved modeling techniques 20 10 0 20 40 60 80 100 become available. The IPCC prediction is the world average figure. The local sea level rise and the rising rate may differ from Minor Road District Boundary MAP INFORMATION place to place. Another significant limitation is that the resolution of the modeling is no greater or more accurate than the Other Roads D.S.Div. Boundary Kilometre topographic data used. The resolution of the model also constrains its ability to resolve some small-scale features of the METHOD OF PREPARATION Railway Origin of the grid system is 200,000 metres South and 200,000 metres West of Pidurutalagala. onshore terrain including narrow waterways, and no warranties are made regarding the accuracy of the map, nor the data from Balangoda Village Name Inundation due to predicted sea level rise in 25, 50 75 and 100 year periods shown on the map is based on a computer model which the map was derived. LOCATION simulating the inundation. The sea level rise prediction is according to the IPCC report of 2007. The sea water level increase Bridge / River / Stream / Canal While this sea level rise inundation hazard map has been compiled with the best currently available scientific information and NAGODA D.S.Div. Name due to tidal waves and an adjustment for the change of sea level since the establishment of the datum are superimposed on base data, users are invited to notify CCCRMD/DMC of any map discrepancies. Sea Level Rise Map the IPCC prediction of the sea level rise. Both the inundation due to coastal erosion and submergence of coastal lands from Tank 10 Bathymetrical Contour / Value Published by increased sea level are considered in mapping. Brunn Rule is used to estimate the coastal erosion. DISCLAIMER Index Contour Coastal Research and Design, The topographic data that were used in the sea level rise models uses digital elevation data on grids with a 50 metre spatial The Coast Conservation and Coastal Resource Management Department (CCCRMD), The Engineering Design Centre (EDC) Temple 02 Coast Conservation and Coastal Resource Management Department resolution. The computed inundation is shown on the map in four color-coded areas for: 25, 50, 75 and 100 year inundations. of the University of Peradeniya, The Disaster Management Centre (DMC), and the United Nations Development Programme 20 Intermediate Contour/ Value (UNDP) shall not be liable under any circumstances for any direct, indirect, special, incidental or consequential damages with Kovil with the assistance from PURPOSE OF THIS MAP respect to any claim by any user or any third party on account of or arising from the use of this map. Supplimentery Contour This coastal inundation hazard map shows a slow on-setting hazard and it is intended for use in coastal planning and in public Church Disaster Management Centre awareness activities only. This map, and the information presented therein, is not a legal document and should not be used for No part of this map may be reproduced in any form without prior written permission from the publishers. www.coastal.gov.lk Inundation, 2025 any regulatory purpose. 04 Mosque May 2012 05 Police Station MAP BASE Inundation, 2050 Topography: ASTER digital elevation model and topographic base maps of scales 1:50,000 and 1:10,000 prepared by the School Department of Survey, Sri Lanka. Inundation, 2075 KILINOCHCHI Hospital Historical Site Inundation, 2100 08 10 09 Railway Station Cartographical Enhancement by The Survey Department of Sri Lanka