MESSENGER May 2020 V Olume 79 No 5 P Rice 60P Our Virtual Vicar
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Fulbourn Site Assessment Proforma
South Cambridgeshire Strategic Housing Land Availability Assessment (SHLAA) Report August 2013 Appendix 7i: Assessment of 2011 'Call for Sites' SHLAA sites Index of Fulbourn Site Assessment Proforma Site Site Address Site Capacity Page Number Land at Fulbourn Old Drift (south of Site 037 Cambridge Road and north of Shelford 921 dwellings 766 Road), Fulbourn Site 038 Land north of Cambridge Road, Fulbourn 166 dwellings 775 Site 074 Land off Station Road, Fulbourn 186 dwellings 783 Site 108 Land south of Hinton Road, Fulbourn 52 dwellings 794 Land to the South of Fulbourn Old Drift & Site 109 78 dwellings 802 Hinton Road, Fulbourn Site 136 Land at Balsham Road, Fulbourn 62 dwellings 810 Land between Teversham Road and Cow Site 162 92 dwellings 818 Lane, Fulbourn Land at east of Court Meadows House, Site 213 166 dwellings 829 Balsham Road, Fulbourn Site 214 Land off Home End, Fulbourn 14 dwellings 837 Site 245 Bird Farm Field, Cambridge Road, Fulbourn 85 dwellings 845 SHLAA (August 2013) Appendix 7i – Assessment of 2011 ‘Call for Sites’ SHLAA sites Minor Rural Centre Fulbourn Page 765 South Cambridgeshire Local Development Framework Strategic Housing Land Availability Assessment (SHLAA) Site Assessment Proforma Proforma July 2012 Created Proforma Last July 2013 Updated Location Fulbourn Site name / Land at Fulbourn Old Drift (south of Cambridge Road and north of address Shelford Road), Fulbourn Category of A village extension i.e. a development adjoining the existing village site: development framework boundary Description of promoter’s 3,050 dwellings with public open space proposal Site area 76.78 ha. (hectares) Site Number 037 The site lies to the south of Cambridge Road and north of Shelford Road on the south western edge of Fulbourn. -
Land at Hinxton Response to Matters and Issues Raised by the Inspector
M4/23548 Land at Hinxton Response to matters and issues raised by the Inspector Representation prepared by Terence O’Rourke on behalf of Hinxton Land Ltd Matter 4 Employment and retail c. Will the proposed amounts of land for economic development uses meet the needs for all foreseeable types of economic development? Summary 1. The employment land allocations will not meet all foreseeable types of economic development over the plan period. 2. The pressure for growth is significant to the South of Cambridge where most of the major high technology research facilities are located. 3. E/9 provides flexibility for delivering additional economic development over the plan period in the most sustainable locations and where businesses want to locate. These developments can be delivered in addition to, and in parallel with, the allocated sites over the plan period. Economic need and Policy E/9 During the consultation on the submission version of the local plan, Hinxton Land Ltd supported the inclusion of Policy E/9 (ID 60757, 60758) and Policy E/10 in principle (60759). These policies will facilitate the delivery of cluster-related economic development in sustainable locations during the plan period, which will help to maintain the Cambridge area as one of the leading concentrations of high technology and research clusters in the UK. Matter 4 c is relevant to these earlier representations prepared by Hinxton Land Ltd. We do not consider that the proposed amount of land allocated for economic development will meet the needs for all foreseeable types of economic development. Hinxton Land Ltd has not sought an allocation in the current plan, because policy E/9 provides policy support to deliver cluster-related development in sustainable locations, such as to the south of Cambridge on land beyond the green belt, in a flexible manner and in response to market demand. -
South Cambridgeshire District Council Report To
SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 7 December 2016 AUTHOR/S: Head of Development Management Application Number: S/1991/16/OL Parish(es): Newton Proposal: Outline application for residential development (up to 30 dwellings) and details of means of access Site address: Land to the north of Whittlesford Road, Newton Applicant(s): Rural Solutions and Mr Henry Hurrell Recommendation: Refusal Key material considerations: Housing Land Supply Principle of Development Character and Appearance of the Area Impact upon Green Belt (adjacent) Housing Density Housing Mix Affordable Housing Developer Contributions Trees and Landscaping Biodiversity Highway Safety and Sustainable Travel Flood Risk Neighbour Amenity Committee Site Visit: 06 December 2016 Departure Application: Yes Presenting Officer: Chris Morgan, Senior Planning Officer Application brought to The application proposal raises considerations of wider Committee because: than local interest. Date by which decision due: Extension of time agreed until 9th December 2016 Executive Summary 1. This proposal seeks outline permission (access only for approval) for a residential development of up to 30 dwellings on a greenfield site within the countryside, outside the designated Development Framework of an infill village as identified in the adopted and emerging plans and adjacent to the Green Belt. The development would not normally be considered acceptable in principle when set against current adopted policy as a result of its scale and location. However, the district does not currently have a 5 year housing land supply and therefore the adopted LDF policies in relation to the supply of housing are not up to date for the purposes of the NPPF. However, the Local Planning Authority must still determine the weight to be applied to the policies even when out of date. -
Green Belt Study 2002
South Cambridgeshire District Council South Cambridgeshire Hall 9-11 Hills Road Cambridge CB2 1PB CAMBRIDGE GREEN BELT STUDY A Vision of the Future for Cambridge in its Green Belt Setting FINAL REPORT Landscape Design Associates 17 Minster Precincts Peterborough PE1 1XX Tel: 01733 310471 Fax: 01733 553661 Email: [email protected] September 2002 1641LP/PB/SB/Cambridge Green Belt Final Report/September 2002 CONTENTS CONTENTS SUMMARY 1.0 INTRODUCTION 2.0 CAMBRIDGE GREEN BELT: PLANNING CONTEXT 3.0 METHODOLOGY 4.0 BASELINE STUDIES Drawings: 1641LP/01 Policy Context: Environmental Designations 1641LP/02 Policy Context: Cultural and Access Designations 1641LP/03 Topography 1641LP/04 Townscape Character 1641LP/05 Landscape Character 1641LP/06 Visual Assessment 5.0 SETTING AND SPECIAL CHARACTER Drawings: 1641LP/07 Townscape and Landscape Analysis 1641LP/08 Townscape and Landscape Role and Function 6.0 QUALITIES TO BE SAFEGUARDED AND A VISION OF THE CITY Drawings: 1641LP/09 Special Qualities to be Safeguarded 1641LP/10 A Vision of Cambridge 7.0 DETAILED APPRAISAL EAST OF CAMBRIDGE Drawings: 1641LP/11 Environment 1641LP/12 Townscape and Landscape Character 1641LP/13 Analysis 1641LP/14 Special Qualities to be Safeguarded 1641LP/15 A Vision of East Cambridge 8.0 CONCLUSIONS Cover: The background illustration is from the Cambridgeshire Collection, Cambridge City Library. The top illustration is the prospect of Cambridge from the east and the bottom illustration is the prospect from the west in 1688. 1641LP/PB/SB/Cambridge Green Belt Final Report/September 2002 SUMMARY SUMMARY Appointment and Brief South Cambridgeshire District Council appointed Landscape Design Associates to undertake this study to assess the contribution that the eastern sector of the Green Belt makes to the overall purposes of the Cambridge Green Belt. -
Annual Report 2018
Red RGB:165-29-47 CMYK: 20-99-82-21 Gold RGB: 226-181-116 CMYK: 16-46-91-1 Blue RGB: 39-47-146 CMYK: 92-86-1-0 Annual Report 2018 Published 12 June 2019 Ely Diocesan Board of Finance We pray to be generous and visible people of Jesus Christ. Nurture a confident people of God Develop healthy churches Serve the community Re-imagine our buildings Target support to key areas TO ENGAGE FULLY AND COURAGEOUSLY WITH THE NEEDS OF OUR COMMUNITIES, LOCALLY AND GLOBALLY TO GROW GOD’S CHURCH BY FINDING DISCIPLES AND NURTURING LEADERS TO DEEPEN OUR COMMITMENT TO GOD THROUGH WORD, WORSHIP AND PRAYER. ENGAGE • GROW • DEEPEN | 3 Contents 04 Foreword from Bishop Stephen 05 Ely2025 – A Review 06 Safeguarding 09 Ministry 11 Mothers' Union 12 Mission 15 Retreat Centre 16 Church Buildings and Pastoral Department 20 Secretariat 21 Programme Management Office 23 Changing Market Towns 24 Parish Giving Scheme 25 Contactless Giving (Card Readers) 26 Communications and Database 29 Education 32 Finance 34 Houses Sub-Committee 35 Diocesan Assets Sub-Committee 37 Ministry Share Tables 4 | ENGAGE • GROW • DEEPEN Foreword from Bishop Stephen As a Diocese we are seeking to be People Fully Alive, as we One of the most important ways in which we serve our pray to be generous and visible people of Jesus Christ. We communities is through the Diocesan family of schools, as we are seeking to do this as we engage with our communities educate over 15,000 children. These are challenging times for locally and globally, as we grow in faith, and as we deepen in the education sector and especially for small and rural schools. -
Trumpington to Hauxton and the Shelfords
TRUMPINGTON HISTORY TRAILS Trumpington to Hauxton and the Shelfords Local Villages and the River Granta 7 Walk or cycle approximately 6.5 miles/10.5 km walk on pavements and footpaths, including grass paths which can be muddy, but there are tarmac alternatives; cycle on roads and dual use paths. Return route can be combined with Trail 8 1. Start at the green by the shops, Anstey Way Go along Anstey Way to the High Street, turn left to the pedestrian crossing, cross the road and continue left along Hauxton Road past the Park & Ride site. Stop at the milestone just before the Addenbrooke’s Road junction (Trail 3). 2. Turnpike milestone III, 1729 The milestone is the third in a series erected by Trinity Hall along the turnpike from Cambridge to Barkway. ‘Cambridge’ was removed during World War II and recut later; and the date below ‘AD’ was lost when the stone was damaged by a vehicle (‘MDCCXXIX’, 1729). The milestone was renovated in 2011 when the road was realigned. Go on to the junction and take the cycle path to the right. Now part of the Trumpington Meadows development, the area to the left was a Prisoner of War Camp in World War II (Trail 3). Continue to the left turn. 3. Anstey Hall Farm Shepherd’s Cottage When Trumpington parish was enclosed in 1804- 09, most of the field between Hauxton Road and the river was awarded to Christopher Anstey. It had been known as Hauxton Field or Church Field. It became Anstey Hall Farm, which was taken over by the Plant Breeding Institute in 1950 (Trail 3), although the tenant (the Parsons family) continued to farm most of the land until 1971. -
South Cambridgeshire District Council – Harston & Comberton Ward
South Cambridgeshire District Council – Harston & Comberton Ward Report to Hauxton Parish Council November 2020 Covid 19 The council will soon be working with other councils to operate a local system of test and trace. Details are still being worked up but it should go 'live' later this month and Environmental Health officers will be working within a rota with officers from the other authorities in Cambridgeshire and Peterborough. The decision by the government not to extend free school meals outside of term to eligible children has prompted a number of initiatives in the district, both raising money and donating meals. In case the government’s position on this remain unchanged, SCDC is in talks with the County Council and other District Councils with a view to providing more support for hungry children during the Christmas break. During the lockdown earlier in the year, people were less inclined to contact their GP with non-Covid matters and hospitals prepared for the expected rise in Covid patients by emptying their wards to make space. A side-effect of this has been a rise is the number of people needing treatment now for acute illnesses. Local hospitals report that, as a result, they are nearly at capacity treating patients who are too ill to be discharged as well as having to treat a rising number of severe cases of Covid-19. Since they will be unable to empty their wards as they did in the spring, if Covid case numbers rise significantly as expected. This has been a major driver for the second lockdown. -
Capturing the Economic Impact of the Babraham Institute
Babraham Institute Capturing the Economic Impact of the Babraham Institute January 2013 Alacrita LLP Alacrita LLC The London BioScience Innovation Centre One Broadway, 14th Floor 2 Royal College Street Kendall Square London NW1 0NH Cambridge MA 02142 www.alacritaconsulting.com alacrita Copyright © 2013 Alacrita LLP Babraham Institute alacrita Copyright © 2013 Alacrita LLP Babraham Institute Table of Contents Figures ......................................................................................................................................................... 1 Tables ........................................................................................................................................................... 2 Abbreviations................................................................................................................................................ 3 Chapter 1. Executive summary ....................................................................................................................... 4 Chapter 2. Background, methodology & policy context .................................................................................. 6 2.1 BIS policy objectives & investment ..................................................................................................... 6 2.2 BBSRC policy objectives & investment ................................................................................................ 7 2.3 RCUK policy objectives ...................................................................................................................... -
Great Shelford & Stapleford
Services and Facilities Study South Cambridgeshire March 2012 District Council GREAT SHELFORD & STAPLEFORD Settlement Size Settlement Population Dwelling Stock Village Category (mid-2010 estimate) (mid-2010 estimate) Great Shelford 4,010 1,920 Rural Centre Stapleford 1,880 790 Total 5,890 2,710 Transport Bus Service: A) Summary Bus Service Monday – Friday Saturday Sunday Cambridge / Market Town Frequency Frequency Frequency To / From Cambridge 20 Minute 20 Minute 30 Minute To / From Saffron Walden Hourly Hourly 1 Bus B) Detailed Bus Service Monday - Friday Cambridge / Market Service 7:00-9:29 9:30-16:29 16:30-18:59 19:00-23:00 Town Citi 7 20 Minute 20 Minute 20 Minute Hourly To Cambridge 31 1 Bus 3 Buses No Service No Service 132 (Sun) No Service No Service No Service No Service Citi 7 20 Minute 20 Minute 20 Minute Hourly From Cambridge 31 No Service 2 Buses 1 Bus No Service 132 (Sun) No Service No Service No Service No Service Citi 7 Hourly Hourly 2 Buses No Service To Saffron Walden 132 (Sun) No Service No Service No Service No Service From Saffron Citi 7 Hourly Hourly 2 Buses No Service Walden 132 (Sun) No Service No Service No Service No Services Services & Facilities Study March 2012 43 South Services and Facilities Study Cambridgeshire District Council March 2012 Saturday Cambridge / Market Service 7:00-9:29 9:30-16:29 16:30-18:59 19:00-23:00 Town Citi 7 20 Minute 20 Minute 20 Minute Hourly To Cambridge 31 1 Bus 3 Buses No Service No Service 132 (Sun) No Service No Service No Service No Service Citi 7 20 Minute 20 Minute 20 Minute -
South Cambs District Councillor Report
SOUTH CAMBS DISTRICT COUNCILLOR REPORT NOVEMBER 2020 CLLRS CLARE DELDERFIELD & BRIAN MILNES A reminder that information about South Cambs response to coronavirus can be found on the regularly updated coronavirus pages on the SCDC website: https://www.scambs.gov.uk/coronavirus/ COMMUNITY GOVERNANCE REVIEW The Parish Councils request to adjust the boundary to incorporate both new development on Babraham Road will be considered by the Civic Affairs committee on 16 Nov 2020 FREE SCHOOL MEALS Following the MPs vote to not extend Free School Meals in the middle of a pandemic to vulnerable children, the District Council agreed to match fund the County Council if they were willing to fund the scheme over the Christmas break. As it now transpires, the Marcus Rashford campaign has again proved effective, as the Government has changed its mind and agreed to fund the scheme. POLICE CUTS Police cuts have been announced by Cambridgeshire’s Police Chief Constable. Changes have to be made in a bid to save £1.7m next year. Chief Constable Nick Dean said the force will receive a proportion of the 20,000 extra police officers promised by the government but Cambridgeshire “also needs to make considerable cost savings to avoid using financial reserves”. Public facing proposed changes include: - Reduction of PCSOs from 80 to 40 but with the guarantee of at least one in “every single neighbourhood”. - Removal of the community safety team, resulting in the reduction of six community safety officer posts across the force - Closure of nine enquiry offices, Including Sawston, with the promise of an appointment-based service in each area to enable the public to speak with an officer. -
The Babraham Research Campus – Supporting the UK Bioscience Industry
The Babraham Research Campus – supporting the UK bioscience industry The Babraham Research Campus, near Cambridge, UK, provides around 115,000 square foot of Campus growth laboratory and office space or early-stage bioscience companies alongside the world-renowned Since it was founded in 1998 the Campus has expanded from Babraham Institute. The aim of the Campus, which was established in 1998, is to support 15,000 sq ft to more than 115,000 sq ft by 2014 new bioscience companies and catalyse the commercial exploitation of biomedical research. Companies on the site have access to research facilities, infrastructure and support services, as well Campus buildings have been 85% to 100% occupied since the Campus opened (lettable floor space in square eet, based on when buildings were officially opened) as being in close proximity to the scientific expertise at the Bab aham Institute and elsewhere in the Cambridge area. The Campus is managed by Babraham Bioscience Technologies Ltd (BBT), which oversees the 1998 2006 2007 2010 2012 2013 2014 administration and development of the site. This case study shows how the Campus has developed since the bioincubator was established in 1998, and how three companies currently based on the Campus are benefitting rom the facilities The Babraham Research Campus in 2014. it offers. Image: The Babraham Institute 1998 2006 2009 2011 2012 Bennett adds 20,000 sq ft (115,000 sq ft total) 1998 2006 2009 2011 2012 The Babraham bioincubator is The Minerva building is officially Bioinformatics company Eagle BBSRC sets out its strategy to The bioincubator building Moneta established. -
Venue Brochure
The Venue at Fulbourn Lodge is a purpose built events barn situated in the heart of the beautiful South Cambridgeshire countryside. With idyllic rural views, The Venue offers a picturesque and relaxed setting for those celebrating their special day. • The premises include a beautiful timber frame barn which can accommodate up to 200 seated guests or more with an informal party style arrangement For further information & viewings please contact: • Landscaped garden areas providing the perfect setting Rachel Kindred for an outdoor ceremony and drinks reception Office: 01223 880888 Mobile: 07836 229296 • Picturesque lake offering ample photo opportunities [email protected] • Separate fully stocked bar available throughout the day The Venue at Fulbourn Lodge • Situated just 5 miles from Cambridge city centre and Lodge Farm Babraham Road easily accessible via the A11 / A14 road links Fulbourn • Hire of tables and chairs included Cambridge CB21 5HR • Fully heated for year round celebrations • Extensive on site parking Venue Hire & Prices All wedding parties at Fulbourn Lodge hire the The Venue on an exclusive basis for the day. We charge a venue fee for the hire of the premises and, if appropriate, a separate ceremony fee. We can accommodate up to 200 guests in a formal seating arrangement or up to 350 with a more open party style setting. Venue Hire includes: • Exclusive use of the premises for the day • Access to dress the barn for the two days before the event • Round banqueting tables, straight trestle tables and chairs • Staff