MADHYA PRADESH POWER GENERATING CO. LIMITED (Govt

Total Page:16

File Type:pdf, Size:1020Kb

MADHYA PRADESH POWER GENERATING CO. LIMITED (Govt MADHYA PRADESH POWER GENERATING CO. LIMITED (Govt. of M.P. Undertaking ) SATPURA THERMAL POWER STATION P.O. SARNI: DISTRICT-BETUL (M.P.) 460447 No. 08-004/Sr.CC/STP/PE-271 / 419 Sarni; dtd. 03 /08/2019 To, M/s ………………..…………………….. …………………………………………… Sub: - Enquiry for the Purchase of Assmann Psychrometer for Chemical Laboratory of, STPS:Sarni. Dear Sirs, Please quote your lowest rates for the supply of material as per the Schedule. Your offer should be in accordance with the terms and conditions described below:-. 1- DUE DATE - Your offer should reach this office by 28-08-2019. At 16.00hrs. 2- VALIDITY - Validity of your offer should be up to 120 days from the date of opening of offer. 3- Earnest Money Deposit :- Offer should be accompanied with EMD/worth Rs. Nil/- in the form of DD/drawn in favour of the Sr. Account Officer , MPPGCL,STPS, Sarni/ Cash receipt. Following are exempted from depositing EMD, after submission of supporting documents for exemption. (a) Purchase of Materials through DGS&D/ GeM rate contracts. (b) PSUs/ Govt. Sector companies (State & Central) like BHEL, NTPC, Railways/ RITES/ IOCL/ HPCL/ BPCL/ CIL etc & reputed technical institutes like GEC/IIT/NIT etc. (c) MPLUNL, M.P. Agro Industries Development Corporation Limited, NSIC, DIC, and SSIC Industries registered with the Directorate of Industries, GoMP per following rules- (i) Exemption shall be provided to the firms whose average turnover for preceding three years is less than Rs. 25 Cr. For availing the same, they will have to provide related documentary evidences certified by practicing CA. (ii) Bid must specify to provide Notarized valid Competency Certificate issued to these industries for the respective work/ item (and not the acknowledgment given by department for the application submitted) for claiming such exemption. (iii) In case, the industries fail to provide such certificate, it shall not be entitled to avail the benefit of exemption from EMD. 4- SPECIFICATION / MAKE:- Full specification of the offered terms may please be given, Deviation if any should be mentioned clearly. 5- PRICE- The price quoted by you shall be firm in rupees F.O.R. Sarni including all charge like packing and forwarding charge, freight, insurance etc, for the delivery of goods the nearest station Ghoradongri is a railway station or, Itarsi-Nagpur section of Central Railway in Betul District. In case extra charges are applicable over & above the quoted prices, the same should be clearly mentioned separately. 6- GST : MPPGCL. is a registered Dealer under GST which is applicable w.e.f. 01-07-2017, as per notification of departmental of Revenue central Board of Excise and customs, GOI. GST No. of MPPGCL 23AADCM4472A1ZZ. It is necessary to provide firms GST registration No. and also provide applicable rate of GST on Good & Services supplied by you against the tener with documentary evidence i.e. material/work, HSN/SAC code no. as per GST Guide lines. Freight/ Transportation charges in firm’s account if not so then please specify Fright charges in% including taxes i.e. GST etc. 7- PAYMENT - Payment would ordinarily be made within 45 days or on turn as per queue whichever is later. The MPPGCL shall not be liable to pay any interest. 8- DELIVERY : The goods are required urgently and hence preference will be given to ex-stock or with shorter delivery period. The date of delivery in respect of each of the items of the schedule be clearly specified. 9- PENALTY : The date of the delivery of the store stipulated in the offer will be deemed to be the essence of tender. In case of any delay in execution of the order (i) this office will recover from the supplier as penalty a sum of ½% (Half percent) per week of the total supply value of material undelivered up to a maximum of 10% of the total supply value (ii) to purchase material from elsewhere at suppliers risk cost. 10- SECURITY DEPOSIT : Not Applicable 11- PACKING CONDITION : The material shall have to be packed according to railway packing tariff condition. If any loss in the consignment is caused due to failure of above condition by the supplier loss shall be made good by the Supplier free of all charges to the purchaser. 12- GUARANTEE : The supplier shall guarantee that if during the course of 12-18 months from the date of commission/receipt of the goods is found to be defective in material or workmanship the same will be replaced by him/them free of all charges to the purchaser. 13- SAMPLE: In case the parties are required to submit samples for approval before bulk supplies, the time required for the submission of sample and time required for dispatch after approval of sample should be clearly indicated. 14- DESPACH OF MATERIAL;- (a) THROUGH RAILWAY:- The material should be dispatched upto Betul Railway Station which is situated on Itarsi- Nagpur of Central Railway in Betul Distt. of (M.P.) Destination code is Betul. (b) THROUGH ROAD:- Material should be dispatched preferably through TCI of door delivery basis Nearest TCI Godown is at betul, 15. JUSTIFICATION OF QUOTED PRICE:- In this regard please enclosed the following:- (a) Manufacturer’s original price list. (b) Photo copies of the order same/similar items received from other Govt./Semi Govt./Public Sector U/T, Elec. Boards/Companies etc. 16. SUBMISSION OF OFFER:- Overwriting, on the offer is not acceptable. The offer should be submitted in 2 separate sealed envelope - (a) The offer envelope should be sealed and shall have prominently super scribed with Enquiry No., due date, Subject and Firm’s contact no. & E-mail ID. (b) The EMD envelope. Encl:- One schedule Yours faithfully, (R.A.Khan) SENIOR CHIEF CHEMIST, MPPGCL;Sarni “SAVE ELECTRICITY SAVE ENVIRONMENT” No. 08-004/Sr.CC/STP/PE-271/419 Sarni dt. 03/08/2019 Schedule for procurement of Assmann Psychrometer for chemical laboratory of STPS, MPPGCL, Sarni. S.No. Description Qty. 01 Assmaan Psychrometer, Spring wound mode. 01 No. Specification :- Range (-) 30ᵒ C to 50ᵒ C (0.2ᵒ C graduations) Spring Driven system, Measure highly accurate Humidity, Assmaan type model. (Material Code- 7132495004-4-01) Assmann Psychrometer : Psychrometer are measuring instrument, designed to determine the relative humidity of the atmosphere in the vicinity of the instrument. 1. Psychrometer ASSMANN type model with spring wound motor. 2. Running time approx. 8 Mint. 3. Temperature measuring Range (-) 30ᵒC to 50ᵒC 4. Accuracy +/-0.2 K (Thermometer according to DINM 5861.) 5. Scale Graduation 0.2 K 6. Ventilation Speed 2….4 m/s 7. Accuracy of system +2% relative humidity. 8. Dimension 420X90 mm. 9. Weight 3.5 Kg 10. Case, device to moisten the wet bulb thermometer, psychrometer chart Accessories. (Rohit Sharma) Shift Chemist O/o Sr. Chief Chemist STPS. MPPGCL, Sarni .
Recommended publications
  • 24 Part Xii-A Village and Town Directory
    CENSUS OF INDIA 2011 MADHYA PRADESH SERIES -24 PART XII-A DISTRICT CENSUS HANDBOOK HARDA VILLAGE AND TOWN directory DIRECTORATE OF CENSUS OPERATIONS MADHYA PRADESH 2011 SID RT TCI INDIA ES H S O ER MADHYA PRADESH A DISTRICT HARDA D e r o W d I KILOMETRES n I ! S 4 2 0 4 8 12 16 E ! o ! T D . ! R ! I C T ada T R N arm ! ! T ! ! ! ! ! R ! ! S ! ! R ! BOUNDARY : DISTRICT I ! I ! D HANDIYA ! C C.D.BLOCK ! ! ! " ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! T d TAHSIL ! ! a " ! b ! ga N ! ! n D H ha P R ( ! ! s HEADQUARTERS : DISTRICT , TAHSIL , C.D.BLOCK ! o 5 ! E H 9 ! o ! T H A ! ! ! ! VILLAGES HAVING 5000 AND ABOVE POPULATION ! ! ! Sodalpur ! ! O WITH NAME ! ! S ! ! R ! ! ! ! ! ! ! ! ! ! ! L ! ! ! ! ! ! ! URBAN AREA WITH POPULATION SIZE- II, III ! ! ! A ! ! ! ! S J ! ! ! ! ! ! ! ! ! ! ! N ! ! ! ! ! (R ! ! ! ! HS 51 ! A ! ! ! C . D . B L O C K H A R D! A ! ! ! ! STATE HIGHWAY ! ! ! ! ! ! ! ! ! ! ! TIMARNI ! H ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! C . D . B L O C K ! IMPORTANT ROADS ! ! HARDA ! ! ! A ! ! ! RS ! ! ! T I M A R N I ! ! ! ! ! Sodalpur N RAILWAY LINE WITH STATION : BROAD GAUGE ! ! ! P G ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! RIVER AND STREAM ! ! G ! 15 ! ! H ! S ! ! C J ! DEGREE COLLEGE ! ! A ! ! ! F G ! ! HOSPITAL ! ! ! B ! ! ! ! ! T ! o ! D ! B ! e A ! ! tu ! l ! ! ! ! ! REHATGAON ! ! D I ! ! ! ! ! ! R ! ! ! ! ! ! ! ! S ! ! ! Rehatgaon A ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! T ! ! ! ! ! S ! ! ! ! ! ! ! ! ! ! i ! ! t ! ! tul ! ! ! Be ! o h ! T ! ! ! ! ! M a ! KHIRKIYA ! ! ! A R ! ! ! n C ! ! ! ! ! H i ! A ! S ! ! K R R ! ! ! ! R ! R ! ! . ! ! ! ! ! I ! SIRALI ! ! ! ! ! ! ! ( ! wa R! ! ! d ! an J Sirali ! ! om Kh ! r ! ! F ! C ! ! a ! ! ! ! ! TAHSIL w ! d C .
    [Show full text]
  • Government of India Ministry of Jal Shakti Department Of
    GOVERNMENT OF INDIA MINISTRY OF JAL SHAKTI DEPARTMENT OF WATER RESOURCES, RD & GR CENTRAL GROUND WATER AUTHORITY 18/11, JAMNAGAR HOUSE, MANSINGH ROAD, NEW DELHI – 110011 Ph- 23383824 Fax- 23382051, 23386743, E-mail: [email protected] Minutes of first meeting of the Expert Appraisal Committee held on 13.04.2021 and 16.4.2021 held through video conferencing. First meeting of the Expert Appraisal Committee was held on 13.04.2021 and 16.4.2021 online through video conferencing to review the impact assessment report/Comprehensive Hydro- geological report submitted by the firm for grant of No Objection Certificate for abstraction of groundwater as per the guidelines. List pf participants is enclosed. Dr. Uma Kapoor, Regional Director, Central Ground Water Authority & Convenor welcomed all the members of the committee. After a brief introduction of all the participants, Chairman gave his opening remarks. He informed the Committee Members about the NGT order, in pursuance of which the present committee had been constituted. As per the revised guidelines notified by the Ministry of Jal Shakti, all industries located in Over-exploited, Critical and Semi-critical (OCS) assessment units drawing ground water in excess of 100 KLD are required to submit impact assessment report. Further, infrastructure dewatering projects are required to submit impact assessment report along with groundwater modelling covering area within 5 km radius. Furthermore, all mining projects irrespective of dewatering are required to submit comprehensive hydrogeological reports of core and buffer zones in the radius of 2 and 10 sq.km respectively. Further industries and mining projects located in OCS assessment units and drawing > 500 KLD in areas underlain by hard rock and > 1000 KLD in areas underlain by soft rock/ alluvium are required to conduct modelling studies to predict the impact and plan mitigation measures in all categories of assessment units.
    [Show full text]
  • Kharif Fallow Utilization for Groundwater Recharge
    Int.J.Curr.Microbiol.App.Sci (2019) 8(12): 284-290 International Journal of Current Microbiology and Applied Sciences ISSN: 2319-7706 Volume 8 Number 12 (2019) Journal homepage: http://www.ijcmas.com Original Research Article https://doi.org/10.20546/ijcmas.2019.812.039 Kharif Fallow utilization for Groundwater Recharge Shobhana Bisen1*, Preeti Choudhary2, M. K. Awasthi3 and Deepak Patle3 1Department of Irrigation and Drainage Engineering, MPKV, Rahuri, Maharastra, India 2Department of Irrigation and Drainage Engineering, GBPUAT, Pantnagar, Uttrakhand, India 3Department of Soil and Water Engineering, JNKVV, Jabalpur, Madhya Pradesh, India *Corresponding author ABSTRACT Ground water withdrawal for irrigation, if not done correctly, leads to falling water table below critical level. In Madhya Pradesh, out of 313 blocks, 23 blocks extended to over exploited category, 09 blocks are in critical stage and 57 blocks are in semi critical stage (MP Dynamic Ground Water Assessment, 2015). As per rules of CGWB, the areas where the water level could not recuperated upto 3m depth after the monsoon K e yw or ds season, will essential artificial recharge. The solution lies in harvesting rainwater in farmers‟ field which are kept or left fallow for one reason or another. Though, all Groundwater these fields may not be good enough to recharge groundwater like percolation tanks recharge, Kharif but transfer water well below at least @4 mm/day even in clayey soils. So, to decide fallow, Priority which area is to be taken first in present study a method of identification of priority is Article Info proposed. Four basic criteria to decide the priority namely, amount of annual rainfall, the soil type, stage of ground water development stage and extent of kharif fallow.
    [Show full text]
  • Service Electors Voter List
    FINAL ELECTORAL ROLL - 2021 STATE - (S12) MADHYA PRADESH No., Name and Reservation Status of Assembly Constituency: 131-BETUL(GEN) Last Part No., Name and Reservation Status of Parliamentary Service Constituency in which the Assembly Constituency is located: 29-BETUL(ST) Electors 1. DETAILS OF REVISION Year of Revision : 2021 Type of Revision : Special Summary Revision Qualifying Date :01/01/2021 Date of Final Publication: 15/01/2021 2. SUMMARY OF SERVICE ELECTORS A) NUMBER OF ELECTORS 1. Classified by Type of Service Name of Service No. of Electors Members Wives Total A) Defence Services 585 5 590 B) Armed Police Force 0 0 0 C) Foreign Service 0 0 0 Total in Part (A+B+C) 585 5 590 2. Classified by Type of Roll Roll Type Roll Identification No. of Electors Members Wives Total I Original Mother roll Integrated Basic roll of revision 587 5 592 2021 II Additions Supplement 1 After Draft publication, 2021 1 0 1 List Sub Total: 1 0 1 III Deletions Supplement 1 After Draft publication, 2021 3 0 3 List Sub Total: 3 0 3 Net Electors in the Roll after (I + II - III) 585 5 590 B) NUMBER OF CORRECTIONS/MODIFICATION Roll Type Roll Identification No. of Electors Supplement 1 After Draft publication, 2021 0 Total: 0 Elector Type: M = Member, W = Wife Page 1 Final Electoral Roll, 2021 of Assembly Constituency 131-BETUL (GEN), (S12) MADHYA PRADESH A . Defence Services Sl.No Name of Elector Elector Rank Husband's Address of Record House Address Type Sl.No. Officer/Commanding Officer for despatch of Ballot Paper (1) (2) (3) (4) (5) (6) (7) Assam Rifles
    [Show full text]
  • Tawa Bridge Itarsi Mandi Road Initial Environmental Examination
    Initial Environmental Examination March 2015 IND: Madhya Pradesh District Connectivity Sector Project Tawa Bridge Itarsi Mandi Road Prepared by Madhya Pradesh Road Development Corporation for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 31 March 2015) Currency unit – Indian rupees (INR/Rs) Rs1.00 = $ 0.016 $1.00 = Rs 62.5096 ABBREVIATIONS AAQ – ambient air quality AAQM – ambient air quality monitoring ADB – Asian Development Bank APHA – American Public Health Association BGL – below ground level BOD – biological oxygen demand BOQ – bill of quantity CO – carbon monoxide COD – chemical oxygen demand CPCB – Central Pollution Control Board CSC – construction supervision consultant MPRDC – Madhya Pradesh Road Development Corporation DG – diesel generating set DO – dissolved oxygen DPR – detailed project report E&S – environment and social EA – executing agency EAC – Expert Appraisal Committee EIA – environmental impact assessment EMP – environmental management plan EMOP – environmental monitoring plan GHG – greenhouse gas GIS – geographical information system GOM – Government of Madhya Pradesh GRC – grievance redress committee GRM – grievance redress mechanism HFL – highest flood level IEE – initial environmental examination IMD – Indian Meteorological Department IRC – Indian Road Congress LHS – left hand side LPG – liquefied petroleum gas Max – Maximum Min – Minimum MJB – major bridge MNB – minor bridge MORT&H – Ministry of Road Transport and Highways MOEF – Ministry of Environment and Forests MPRSD – Master Plan Road Sector Development
    [Show full text]
  • Directory Establishment
    DIRECTORY ESTABLISHMENT SECTOR :RURAL STATE : MADHYA PRADESH DISTRICT : Anuppur Year of start of Employment Sl No Name of Establishment Address / Telephone / Fax / E-mail Operation Class (1) (2) (3) (4) (5) NIC 2004 : 0501-Fishing 1 HARFEEN H.NO.23 VILLAGE BAWDHWATOLA THASIL ANUPPUR DIST. ANUPPUR PIN CODE: NA , STD CODE: 2000 10 - 50 NA , TEL NO: NA , FAX NO: NA, E-MAIL : N.A. NIC 2004 : 1010-Mining and agglomeration of hard coal 2 PRINCIPAL GOVERNMENT HIGH SCHOOL GIRARI TEHSIL PUSHPRAJGARH DISTRICT ANUPPUR PIN CODE: 2000 101 - 500 484881, STD CODE: NA , TEL NO: NA , FAX NO: NA, E-MAIL : N.A. 3 COLE MINES VILLAGE BARTARAI TAHSIL KOTMA DIST. ANUPPUR PIN CODE: NA , STD CODE: NA , TEL NO: 1999 > 500 NA , FAX NO: NA, E-MAIL : N.A. NIC 2004 : 1531-Manufacture of grain mill products 4 AMA TOLA SWA SAYATHA SAMOH VILLAGE UFARIKHURD TASHIL PUSHPARAJGARH DISTRICT ANUPPUR PIN CODE: 484881, STD 2002 10 - 50 CODE: NA , TEL NO: 1, FAX NO: NA, E-MAIL : N.A. NIC 2004 : 1544-Manufacture of macaroni, noodles, couscous and similar farinaceous products 5 AMARBATI SWA SAYATHA SAMOH VILLAGE BENDI TAHSIL PUSHPRAJGARH DISTRTCT ANUPPUR PIN CODE: 484881, STD CODE: 2001 10 - 50 NA , TEL NO: NA , FAX NO: NA, E-MAIL : N.A. 6 NARMADA SWA SAYATHA SAMOH H.NO.31, KARRA TOLA TAHSIL ANUPPUR DISTRICT ANUPPUR PIN CODE: NA , STD CODE: NA , 2002 10 - 50 TEL NO: NA , FAX NO: NA, E-MAIL : N.A. 7 BACHHE LAL SINGH VILLAGE DHANPURI PUSAHPRAJGARH DIST. ANUPPUR PIN CODE: NA , STD CODE: NA , TEL NO: 2002 10 - 50 NA , FAX NO: NA, E-MAIL : N.A.
    [Show full text]
  • Mapping the Impact of Coal Mines and Their Closure: a Case of Betul
    Mapping the Impact of Coal Mines and their Closure: A Case of Betul Ruchi Gupta THE ENERGY AND RESOURCES INSTITUTE Creating Innovative Solutions for a Sustainable Future MAPPING THE IMPACT OF COAL MINES AND THEIR CLOSURE A CASE OF BETUL RUCHI GUPTA Electricity and Fuels Division The Energy and Resources Institute THE ENERGY AND RESOURCES INSTITUTE Creating Innovative Solutions for a Sustainable Future © THE ENERGY AND RESOURCES INSTITUTE 2021 The material in this publication is copyrighted. Content from this Report may be used for non-commercial purposes, provided is attributed to the source. Author Ruchi Gupta, Electricity and Fuels Division, TERI Advisors Dr Ajay Mathur, Director General, TERI Mr Ajay Shankar, Distinguished Fellow, TERI Mr K Ramanathan, Distinguished Fellow, TERI Mr Sanjay Mitra, Distinguished Fellow, TERI Reviewers: Mr AK Saxena, Senior Fellow & Senior Director, Electricity & Fuels Division, TERI Mr Amit Kumar, Senior Fellow & Senior Director, Rural Energy and Livelihoods Division, TERI Mr Girish Sethi, Senior Fellow & Senior Director, Industrial Energy Efficiency Division, TERI Suggested Format for Citation Gupta, Ruchi. 2021. Mapping the Impact of Coal Mines and their Closure: A Case of Betul. New Delhi: The Energy and Resources Institute Editorial and Design Team Ms Ipshita Mitra, Ms Sushmita Ghosh, Mr Rajiv Sharma, Mr Santosh Gautam and Mr Vijay Nipane Published by The Energy and Resources Institute, New Delhi, India For more information Project Monitoring Cell The Energy and Resources Institute, Darbari Seth Block, IHC Complex, Lodhi Road, New Delhi 110003, India Tel: +91 11 2468 2100 | Fax: +91 11 2468 2144 | Email: [email protected] | Web: www.teriin.org TABLE OF CONTENTS Acknowledgements ................................................................................................................................
    [Show full text]
  • 47270-001: Itarsi-Dulriya-Tigria Road Initial Environmental Examination
    Initial Environmental Examination March 2015 IND: Madhya Pradesh District Connectivity Sector Project Itarsi- Dulriya -Tigria Road Prepared by Madhya Pradesh Road Development Corporation for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 31 March 2015) Currency unit – Indian rupees (INR/Rs) Rs1.00 = $ 0.016 $1.00 = Rs 62.5096 ABBREVIATIONS AAQ – ambient air quality AAQM – ambient air quality monitoring ADB – Asian Development Bank APHA – American Public Health Association BGL – below ground level BOD – biological oxygen demand BOQ – bill of quantity CO – carbon monoxide COD – chemical oxygen demand CPCB – Central Pollution Control Board CSC – construction supervision consultant MPRDC – Madhya Pradesh Road Development Corporation DG – diesel generating set DO – dissolved oxygen DPR – detailed project report E&S – environment and social EA – executing agency EAC – Expert Appraisal Committee EIA – environmental impact assessment EMP – environmental management plan EMOP – environmental monitoring plan GHG – greenhouse gas GIS – geographical information system GOM – Government of Madhya Pradesh GRC – grievance redress committee GRM – grievance redress mechanism HFL – highest flood level IEE – initial environmental examination IMD – Indian Meteorological Department IRC – Indian Road Congress LHS – left hand side LPG – liquefied petroleum gas Max – Maximum Min – Minimum MJB – major bridge MNB – minor bridge MORT&H – Ministry of Road Transport and Highways MOEF – Ministry of Environment and Forests MPRSD – Master Plan Road Sector Development
    [Show full text]
  • Hoshangabad District Madhya Pradesh
    HOSHANGABAD DISTRICT MADHYA PRADESH Ministry of Water Resources Central Ground Water Board North Central Region Government of India 2013 HOSHANGABAD DISTRICT AT A GLANCE S. ITEMS Statistics No. 1. GENERAL INFORMATION i) Geographical area 6704 Sq.Km. ii) Administrative Divisions (As on 2013) Number of Tehsils 8 (Babai, Bankhedi, Hoshangabad, Itarsi, Pipria, Seonimalwa, Dolaria and Sohagpur) Number of Blocks 7 (Babai, Bankhedi, Hoshangabad, Kesla, Pipria, Seonimalwa and Sohagpur Number of Panchayats 391 Village Panchayats, 07 Block Panchayats and 14 Revenue Zonal Panchayats. Number of Villages 975 iii)Population (As per 2011 census) 1,240,975 iv)Nornal Rainfall (mm) 1225.9 mm 2. GEOMORPHOLOGY i) Major Physiographic Units (1) Satpura range in the south, (2) Alluvial plain in the middle and (3) Badland topography zone confined to the vicinity of Narmada river Narmada river and its tributaries, ii) Major Drainage namely, Tawa river, Denwa river, Morand river, Banjal river, Ajnal river, Ganjal river and Keolari, Hather and Indra Nadi. 3. LAND USE (Sq. Km.) i) Forest area: 2561 ii) Net area sown: 3009 iii) Cultivable area: 3150 4. MAJOR SOIL TYPES Soil Type Black soils and ferruginous red lateritic soils, Sandy clay loam, sandy loam and clay loam (area lying west of Ganjal river). Taxonomy (Ustocherpts/ Ustorthents/ Haplustalfs/Haplusterts as per pedological taxonomy) 5. PRINCIPAL CROPS 1.Wheat 2.Soyabean 3.Gram 4.Paddy 5.Tuar 6. IRRIGATION BY DIFFERENT SOURCES Number Area (Sq. Km.) Dugwells 23495 535 Tube wells/Bore wells 4853 523 Tanks/Ponds 9 11 Canals (Tawa Canal Command) 6 1474 Other Sources 163 Net Irrigated Area 2703 7.
    [Show full text]
  • Babai Bankhedi Hoshangabad Itarsi Pipariya Seoni-Malwa
    Name of village falling under different suitability classes for mulberry plants in Hoshangabad Districts NAME OF TALUKAS IN HOSHANGABAD DISTRICT BABAI BANKHEDI HOSHANGABAD ITARSI PIPARIYA SEONI‐MALWA SOHAGPUR Marginally Marginally Marginally Marginally Suitable Suitable Suitable Highly Suitable Suitable Marginally Suitable Marginally Suitable Aharkheda Amhora Amupura Chartekra Aliwada Aaypa Ajabgaon Bachhwada Anhai Andhiyari Chichadhana Amadeh Mal Achanagaon Ajera Bankhedi Bachavani Aonri Dhala Mau Amadeh Ryt Agra Khurd Badai Khedi Bhatwadi Baghedi Bai Khedi Kaveli Anhoni Amlada Dongar Bankhedi Rewa Chandla Baghraj Barandua Palaniya Bakanj Amlada Khurd Bareli Dondhai Baharwan Barodya Khurd Silwani Bans Kheda Babadiya Bhau Bhatgaon Ganera Bankhedi Chandpura Taku Bari Devi Babri Bhaukhedi Kalan Marginally Gudla Banwari Kishor Deshmohni Suitable Binda Kheda Baghwada Bhonkhedi Khurd Guradiyakhurd Barchhi Diwla Khedi Amjhira Bodna Thakur Banada Bichhua Jawali Bedar Dolariya Bhargada Bor Banapura Bija Kheri Jhalon Bijanhai Gunaura Bhatti Bori Bandi Chargaon Khargawali Chargaon Kharar Bhilakhedi Buchal Barakhad Kalan Chhedka Kotgaon Chhater Khedla Bisarodha Chakar Barakhad Khurd Dunda Khapa Mahendrawadi Chillod Khoksar Bordha Dabka Barhanpura Dundadeh Mangrol Dahalwada Kala Kulhda Borkheda Gadroli Basaniya Keer Ghoghari Meghli Dahalwada Khurd Misrod Chandkiya Ghana Batki Alias Iklani Ghurkhedi Mudiya Kheda Dangarhai Nimsadiya Chandon Ghogri Begania Godikhedi Ryt. Nasirabad Deori Palanpur Chartekra Hatani Khapa Bejanpur Gohanadeh Malgujari Pawar
    [Show full text]
  • District Census Handbook, Betul
    CENSUS,' OF INDIA 1961 MADHYA PRADESH DISTRICT CENSUS HANDBOOK BETUL DISTRICT Q. JAGATHPATHI OF THE INDIAN ADMIN1STRATIVE SERVICE SUPERINTENDENT OF CENSUS QPERATIONS. MADHYA PRADESH PUBLISHED BY THE GOVERNMENT OF MADHYA PRADESH 1964 1961 CENSUS PUBLICATIONS, MADHYA PRADESH :All the Census Publications- of this State wiU bear Volume No. VIII) • PART I General Report including Subsidiary Tables {in Sub-Parts) PART II-A Genera} Population Tables PART II-B Economic Tables (in Sub-parts) PART II-C Cultural and Migration Tables (in Sub-Parts) PART III Household Economic Tables PART IV Housing and Establishment Tables (in­ (in Sub-parts) cluding Subsidiary Tables) and Report PARTV Special Tables for Scheduled Castes and (in Sub-parts) Scheduled Tribes PART VI Village Survey Monographs (A Separate Sub­ part for each Village Surveyed) PART VII Survey of Handicrafts of the State (A Separate Sub-part for each Handicraft Surveyed) PART VIII-A Administration Report - Enumeration PART VIII-B Administration Report-Tabulation PART IX Maps STATE PUBLICATIONS DISTRICT CENSUS HAND BOOKS District Census Hand-books for each o~'tPe 43 Districts in Madhya Pradesh PREFACE The publication Df Distrkt Census Hand-books, which was blegun in tne 1951 Cen$us., represents a significant step in the process of making census statistics available for the smaller territDrial units basic to executive and develDpmental administratiDn. Apart frDm the fact that the prDper implementation of pDlicy depends Dn the ability Df the administrative authDrities . cDncerned to. quantify accurately the vari~bles involved, it is at these levels that pDlicies get really thoroughly tested; also, pDlicies can fail-arid prDbably have failed-because their statistical basis was weak.
    [Show full text]
  • Railway Projects in Madhya Pradesh
    GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA UNSTARRED QUESTION NO. 1485 TO BE ANSWERED ON 27.12.2017 RAILWAY PROJECTS IN MADHYA PRADESH †1485. SHRI MANOHAR UTAWAL: Will the Minister of RAILWAYS be pleased to state: (a) the details of various railway projects being undertaken in Madhya Pradesh and the current status thereof, project-wise; (b) the number of projects running behind schedule and the reasons therefor, project-wise; (c) the details of the cost overrun for delayed projects, project-wise; and (d) the current status of the survey for a new railway line between Dewas and Shajapur? ANSWER MINISTER OF STATE IN THE MINISTRY OF RAILWAYS (SHRI RAJEN GOHAIN) (a) to (d): A Statement is laid on the Table of the House. ***** STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (d) OF UNSTARRED QUESTION NO. 1485 BY SHRI MANOHAR UTAWAL TO BE ANSWERED IN LOK SABHA ON 27.12.2017 REGARDING RAILWAY PROJECTS IN MADHYA PRADESH (a): At present, 36 projects consisting of 8 New Lines, 5 Gauge Conversion and 23 Doublings falling partly or fully in the State of Madhya Pradesh are in different stages of execution. Details of these projects are as under: (` in crore) S. Name of Length Year of Latest Expen- Outlay Present status No. Project (in km) sanction anti- diture 2017-18 cipated upto cost March, 2017 NEW LINES 1. Lalitpur- 541 1997-98 3500 1210 301 Lalitpur-Khajuraho- Satna, Rewa- Mahoba (229.5 km): Singrauli, & Commissioned. Mahoba- Khajuraho-Panna Khajuraho (70.55 km) & Sidhi- Singrauli (78 km): Land acquisition has been taken up.
    [Show full text]