Northern Railway Important Statistics As on 31-03-2016
Total Page:16
File Type:pdf, Size:1020Kb
HDN (HIGH DENSITY) ROUTE ROUTES CLEARED FOR RUNNING OF CC + 8 + 2T TRAINS NORTHERN RAILWAY STATISTICAL SUMMARY (INCLUDING FEEDER ROUTE TO DFC) SECTION KM (N. R. FINANCIAL RESULTS & IMPORTANA STATISTICAL HIGHLIGHTS 2011-2012 to 2014-2015) New Delhi-Ghaziabad-Chipyana Buzurg UP & DN Line SECTIONS ROUTE KM NORTHERN RAILWAY 29.33 AS on March 31 2011-12 2012-13 2013-14 2014-15 New Delhi-Tughlakabad-Palwal UP & DN Line 57.68 Assets Lucknow-PBH-BSB-Mughalsarai including LKO Bye Pass Line, Moradabad- IMPORTANT STATISTICS Saharanpur-Ambala Cantt.-Sirhind, Delhi-Panipat-Ambala cantt., Delhi- Financial Position DETAILS OF (25 T) FEEDER ROUTES TO DFC Shakurbasti-Bathinda, Panipat-Kukrana, Palwal-Delhi Area, Ghaziabad-Delhi Area via (i) @ Capital at charge (Rs. in Crore) 24016.99 30439.03 36832.18 45659.39 DAL/GAL, Delhi Area via DAL, Delhi Area via GAL, Varanasi-Zafarabad-Lucknow, (ii) @ Investment from Capital Funds Zafarabad-Akbarpur, Janghai-Phaphamau-Unchahar including bye pass line, AS ON 31-03-2016 SECTION KM (Rs. in Crore) 7502.58 7502.58 7502.58 8023.66 Rajpura-Bathinda including bye pass line, Kanpur-Lucknow, Lucknow-Bareilly- RJP-DUI-BTI = 148.22 Moradabad, Rampur-Kathgodam, Barabanki-Ayodhya-Akbarpur-Tanda, 4237.72 (iii) @ Total Investment (Rs. in Crore) 31519.57 37941.61 44334.76 53683.05 SIR-RPAR-NLDM = 103.95 457.61 Raebareli-Daryapur, Harduaganj-Chandausi- Moradabad, Ghaziabad-Meerut City, LDH-HSR = 205.44 Ghaziabad-Moradabad, Rosa-Sitapur Cantt, Chandausi-Bareilly including Chanethi Link, Earning (Rs. in Crore) LDH-BEAS-GWSB = 121.60 121.60 Laksar-Harrawala, Ambala-Chandigarh, ChuraruTakarla-Sirhind-Ludhiana- JUC-JAT, (i) Passenger 3764.81 4097.40 4741.46 5641.02 Jakhal-Dhuri-Ludhiana, Jalandhar City-Amritsar, Ludhiana-Firozpur Cantt, MGS-UCR via JNH, PFM = 219.15 Delhi-Shakurbasti-Rewari, Jakhal-Hisar, Varanasi-Manduadih, Bara Banki-Jahangirabad, (ii) Other Coaching 556.44 608.65 706.27 760.30 ZBD-ABP-TD = 100.84 615.78 Moradabad-Kashipur, Jind-Sonipat BSB-SLN-UTR-AMG = 295.79 (iii) Goods 5299.72 6243.13 6838.91 7314.17 DIVISION WISE COACHING DEPOT STATEMENT SHOWING CATEGORY WISE NUMBER OF STATIONS AMG-RAC = 151.09 151.09 (iv) Sundry 877.48 1383.90 2722.54 1364.85 No. Gross Traffic Earnings (i + ii + iii + iv) 10498.45 12333.08 15009.18 15080.34 DIVISION of LOCATION DIVISION A-1 A B D E F TOTAL TOTAL 1346.08 ROUTES NOT CLEARED FOR RUNNING OF CC + 6 + 2T TRAINS STN. Route Kilometer Ambala, Saharanpur, Chandigarh, Kalka, Shimla, DIVISION SECTIONS ROUTE KM AMBALA 7 Nangal Dam, Bathinda AMBALA 2 7 2 21 83 18 133 PROPOSED ROUTE FOR UP-GRADATION TO CC+8 +2 T Electrified 1256.29 1599.64 1753.89 2345.80 AMBALA Nil Total 6989.90 7124.60 7196.43 7221.30 Jind, Rohtak, Delhi, Meerut City, Panipat, New DELHI 4 15 10 40 90 63 222 DELHI 9 Delhi, Delhi Sarai Rohilla, Hazrat Nizamuddin, SECTIONS ROUTE KM DELHI Nil Running Track Kilometer Anand Vihar Terminal FIROZPUR 5 7 3 22 158 65 260 Amritsar- Khemkaran, Firozpur City -Fazilka, Jalandhar City-Nakodar, Khurja - Meerut - Saharanpur, Delhi Shahdara - Shamli - FIROZPUR Electrified 2267.86 2948.56 3181.89 4028.78 Verka-Dera Baba Nanak 437.95 Jammu Tawi, Pathankot, Baijnath Paprola, Saharanpur, Janghai - Jafarabad - Jaunpur, Allahabad - LUCKNOW 2 12 5 27 111 35 192 Total 9103.57 9238.29 9310.10 9364.69 Ludhiana, Jalandhar City, Amritsar, Firozpur Pratapgarh - Faizabad, Unchahar - Unnao - Balamao - Sitapur FIROZPUR 12 1108.98 LUCKNOW Faizabad-Prayag-Allahabad, Zafarabad-Janghai Cantt., Moga, Fazilka, Hoshiarpur, Udhampur, City, Jind - Panipat, Rohtak - Panipat, Kurukshetra - Narwana, Number of Stations 993 993 1001 1008 Joginder Nagar MORADABAD 3 7 5 29 108 50 202 Jammu - Udhampur MORADABAD Nil Rolling Stock (in Units) Lucknow, Faizabad, Sultanpur, Jaunpur, LUCKNOW 8 Varanasi, Prayag, Partapgarh, Raebareli TOTAL 16 48 25 139 550 231 1009 Locomotives 989 953 968 982 DIVISION WISE DETAILS OF LEVEL CROSSING DETAILS OF STEEPEST GRADIENT, SHARPEST CURVATURE & Coaching Stock Moradabad, Bareilly, Shahjahanpur, Balamau, (EXCEPT 'D' CLASS) LONGEST TUNNEL (B.G. ROUTE) MORADABAD 8 Passenger Carriages 5470 5318 5623 5876 Hapur, Najibabad, Haridwar, Dehradun NEW DELHI, DELHI, H. NIZAMUDDIN, ANAND VIHAR TERMINAL AMRITSAR, JAMMU TAWI, A-1 CATEGORY DIVISION MANNED UNMANNED TOTAL IN BETWEEN TOTAL/MAX. JALANDHAR CITY, LUDHIANA, SHRI MATA VAISHNO DEVI KATRA LUCKNOW, VARANASI DIVISION DESCRIPTION SECTION EMU/DMU/DHMU 160 173 195 198 TOTAL 44 STATIONS STATION LENGTH HARIDWAR, BAREILLY, DEHRADUN AMBALA CANTT., CHANDIGARH AMBALA 437 84 521 Steepest Gradient CDG-KLK UMB-KLK 1 in 40/7.586Km Rail Cars 4 4 4 4 Other Coaching Vehicles 308 614 417 466 DIVISION WISE RUNNING ROOM DELHI 512 170 682 AMBALA Sharpest Curvature NLDM-NNGL SIR-AADR 5 Degree/350m Wagons 37832 37143 31346 31952 No. of DIVISION LOCATION FIROZPUR Longest Tunnel STN. ACTION PLAN FOR REDEVELOPMENT OF STATIONS (65 Nos.) 701 321 1022 NIL NIL NIL TOTAL 43774 43252 37585 38496 Ambala, Saharanpur, Dhuri, Bathinda, LUCKNOW 626 183 809 Steepest Gradient DLI-SZM DLI-PNP 1 in 335/1000m Personnel AMBALA 8 Nangal Dam, Shimla, Chandigarh, Ropar Other DIVISION A-1 Category A Category No. of Regular Employee 153523 149016 155373 153107 Thermal Plant Category MORADABAD 599 217 816 DELHI Sharpest Curvature DSJ-BRSQ LPNR-PTNR DAL 8Degree/980m Ghaziabad, Panipat, Palwal, Rohtak, Jind, Wage Bill (Rs. in Crores) 6136.71 6778.17 7957.43 8856.95 Jakhal, Shamli, Meerut City, Anand Vihar Longest Tunnel NIL NIL NIL Average Wage per Regular Employee per year TOTAL 2875 975 3850 400393 455589 512932 579325 DELHI 15 Terminal, Hazrat Nizamuddin, Tughlakabad, Through Indian AMBALA Chandigarh (Rs.) Steepest Gradient UHP-CRWL JAT-SVDK 1 in 93/110m Shakurbasti, Delhi, Delhi Sarai Rohilla, New Railway Station Development Delhi ROUTE WISE LEVEL CROSSING (EXCEPT 'D' CLASS) Sharpest Curvature MNVL-RMJK 5 Degree/727m Corporation (IRSDC) FIROZPUR JAT-SVDK DETAILS OF LAND AREAS Ludhiana, Jalandhar City, Amritsar, Jammu DELHI Anand Vihar Terminal Bijwasan ROUTE MANNED UNMANNED TOTAL Longest Tunnel QG-BAHL Tawi, Pathankot, Baijnath Paprola, BAHL-BRML 11.215Km DIVISION LAND AREA (IN HECTARE) Udhampur, Budgam, Firozpur Cantt., FIROZPUR 15 AMBALA Ambala Cantt. A 18 - 18 Steepest Gradient PRG-PYG PRG-PYG 1 in 150/510m Fazilka, Jaijon Doaba, Shri Mata Vaishno AMBALA 6811.68 Devi Katra, Lohian Khas, Kotkapura, Banihal Prefeasibility/Redevel B 856 31 887 LUCKNOW Sharpest Curvature ZBD-JOP ZBD-SLN(UP Line) 8Degree/160m opment under MOU DELHI New Delhi DELHI 9842.77 C Lucknow, Alam Nagar, Varanasi, Sultanpur, with Foreign Countries 7 - 7 Longest Tunnel NIL NIL NIL Jammu Tawi, Ludhiana LUCKNOW 12 Partapgarh, Faizabad, Jaunpur, Shahganj, FIROZPUR FIROZPUR 10911.20 D Spl 373 102 475 Steepest Gradient Tanda, Phulpur, Unchahar, Prayag HW-DDN LRJ-DDN 1 in 75/11.510Km LUCKNOW Varanasi D 298 36 334 LUCKNOW 7178.84 Moradabad, Bareilly, Rosa, Dehradun, MORADABAD Sharpest Curvature DWO-HRW LRJ-DDN 4.5Degree/1118m MORADABAD Haridwar, Laksar, Najibabad, Chandausi, Bathinda, Kalka, Saharanpur, Patiala, E 1269 800 2069 10 AMBALA Longest Tunnel HW-MOTC LRJ-DDN 278.60m MORADABAD 7149.37 Balamau, Hapur Sirhind, Rajpura, Jagadhari, MAIN LINE (NG) 51 4 55 TOTAL 60 TOTAL 41893.86 Delhi Shahdara, Meerut City, DIVISION WISE Nos. OF LOCATION & TOTAL LENGTH OF CURVES WHICH ARE EQUAL SIDING 3 2 5 Ghaziabad, Rohtak, Panipat, Karnal, OR SHARPER THAN 4 DEGREE (B.G. ROUTE) DIVISION WISE SUMMARY OF STATIONS HAVING Delhi, Hazrat Sonipat, Meerut Cantt., Ballabhgarh, DELHI TOTAL TOTAL LENGTH ORIGINATING LOADING & PASSENGER FIGURES PI/RRI/EI Nizamuddin Faridabad, Gurgaon, Delhi Sarai Rohilla, 2875 975 3850 Nos OF DIVISION SECTION ROUTE OF CURVE AND ITS EARNINGS 2014-2015 Delhi Cantt., Adarsh Nagar, LOCATION NOS. OF STATIONS WITH PI/RRI/EI Through open bid from (Metre) interested parties Muzaffarnagar, DIVISION STATE WISE LEVEL CROSSING (EXCEPT 'D' CLASS) DUI-JHL E 1 730 LOADING PASSENGER > 100 (Swiss Challenge < 100 ROUTES TOTAL Amritsar, Jalandhar Beas, Udhampur, Phagwara, Firozpur ROUTES Method) UMB-KLK B 3 1690 FIROZPUR City, Shri Mata Vaishno Cantt., Pathankot, Jalandhar Cantt., STATE MANNED UNMANNED TOTAL Devi Katra Pathankot Cantt. RJP-DUI E 2 708 DIVISION AMBALA 21 104 125 MILLION EARNING Nos. OF PASSENGERS EARNING Raebareli, Barabanki, Ayodhaya, CHANDIGARH 4 - 4 CDG-MRND E 1 520 TONNES (in Cr. of Rs) (in Cr.) (in Cr. of Rs) AMBALA SRE-UMB(UP & DN Line) DELHI Janghai, Jaunpur, Sultanpur, Akbarpur, B 2 160 8 88 96 LUCKNOW Lucknow (9.836 KM) Partapgarh, Unnao, Shahganj, DELHI 32 1 33 MRND-AAD E 8 2671 FIROZPUR 12 120 132 Faizabad, Bhadoi, TPZ-SRE E 1 140 AMBALA 14.37 1906.22 6.81 647.43 HARYANA 361 109 470 TPZ-KJGY E 2 642 Dehradun, Haridwar, Moradabad, Roorkee, Shahjahanpur, LUCKNOW 8 87 95 MORADABAD KJGY Bypass E 1 320 Bareilly Chandousi, Hapur, Hardoi, Rampur HIMACHAL PRADESH DELHI 18.86 2554.14 29.75 4569.65 49 6 55 HNC-KJGY UP & DN Line) E 4 2255 MORADABAD 6 50 56 TOTAL 16 48 1 JAMMU & KASHMIR 34 1 35 HNZM-DLI A, D 14 3770 FIROZPUR 10.65 2130.59 8.70 1331.02 TOTAL 55 449 504 PUNJAB 991 391 1382 DLI-PNP B 4 870 DLI-ROK D 4 980 LUCKNOW 3.00 301.48 8.08 1189.83 DLI-DEE E 6 820 DETAILS OF BRIDGES RAJASTHAN 8 13 21 TRAFFIC BOTTLENECK ON NORTHERN RAILWAY GHH-FN E 1 400 DELHI MORADABAD 4.94 491.02 8.26 691.40 DIVISION IMPORTANT MAJOR MINOR TOTAL UTTAR PRADESH 1336 448 1784 DSA-TPZ C 3 760 (18.693 KM) OKA-LPNR DAL-1 C 4 1420 AMBALA 8 299 2560 2867 ITEM DLI FZR LKO MB UMB UTTARAKHAND 60 6 66 HNZM-LPNR DAL C 2 2814 TOTAL 51.82 7383.45 61.60 8429.33 DELHI LPNR-PTNR-DBSI DAL C 5 2849 6 270 3278 3554 MGS-BSB, TOTAL 2875 975 3850 DLI-A-Panel, DBSI-ANDI DAL C 1 838 BSB-JNH, FIROZPUR 24 535 5272 5831 SBB-GZB, DLI-SZM, PTNR-DKZ EMU C 1 1142 PATCHES OF BAD FORMATION DURING MONSOON JNH-PBH, NDLS-DKZ, DLI-SZM, LKO-MB, KJGY-DOA, PTNR-DKZ EMU C 5 2030 Congested Section PBH-LKO, SECTIONS HAVING VERY HIGH DENSITY OF U/M LC LUCKNOW 8 132 3943 4083 DKZ-DBSI, NBD-MZM, UMB-CDG, having more than LDH-JRC SKN-CDRL, (AV.