Vision Document
Total Page:16
File Type:pdf, Size:1020Kb
VISION OF A SUSTAINABLE FUTURE FOR FAILAND SITE PROMOTION DOCUMENT PREPARED BY HARROW ESTATES DECEMBER 2020 VISION FOR A SUSTAINABLE COMMUNITY AT FAILAND, BRISTOL ‘Placemaking underpins everything we do’ Harrow Estates Date: December 2020 Prepared by Boyer Project code: 20.2025 Written by CR Checked by AB This document is designed to be read at A3 size The contents of this document are not to be copied or reproduced without the written consent of Harrow Estates Ltd and Boyer. www.harrowestates.co.uk2 CONTENTS VISION Our Placemaking led approach for land at Failand Sustainable and Connected - Failand offers the best of town and country 1. Background living ... close to Bristol and Clifton and benefitting from frequent bus services and a network of walking and cycling routes, Failand lies on an existing under- 1.1 Planning Context 8 utilised transport corridor which connects Clevedon, Nailsea and Failand to 1.2 Why Failand? 10 Bristol via the B3128 (Clevedon Road). This corridor has been upgraded in 1.3 Supporting the District’s approach to growth 12 recent years and offers significant potential for growth. 1.4 An active and sustainable community at Failand 14 Minimising Green Belt Impacts - Well defined and visually enclosed by 2. Site Appraisal defining plantations to the south, Failand is also home to the playing fields of several Bristol schools, sports clubs and its supporting facilities. The site 2.1 The Site 22 sits at the interface of the settlement edge and these surrounding landscape 2.2 Growth of Failand 23 features and therefore presents the opportunity to create a well defined, 2.3 Green Belt 24 contained and sensitively considered addition to the settlement. 2.4 Landscape Character, Topography & Views 25 2.5 Ecology and Trees 28 Enhancing Failand through Placemaking - The land at Failand is available, 2.6 Heritage and Historic Field Boundaries 29 viable and deliverable. With the benefits of it’s sustainable location and 2.7 Access Strategy 30 setting, the land at Failand offers significant potential to deliver sustainable new homes whilst meeting the Council’s spatial objectives. The evolving 2.8 Flooding, Drainage and Services 31 masterplan shows how the new development would integrate with the 2.9 Summary of site characteristics 32 existing community and provide significant benefits for Failand residents. 3. Proposals Through a Place-making led approach, Harrow Estates is committed to 3.1 Framework Masterplan | Failand in Future 36 working collaboratively with the Council, stakeholders and the community 3.2 Commitment to Placemaking 38 and create beautiful new homes in a landscape-led setting. A place with a 3.3 Commitment to Sustainability 39 strong identity which Failand residents would be proud to call home. 3.4 Masterplan Principles 40 3.5 Evolving Landscape led Masterplan 42 3.6 Landscape and Bio-diversity Opportunities 43 3.7 Landscape led Masterplan Site A 44 3.8 Landscape led Masterplan Site B & C 45 3.9 Working with you 46 VISION FOR A SUSTAINABLE COMMUNITY AT FAILAND, BRISTOL OUR PLACEMAKING-LED APPROACH FOR LAND AT FAILAND This document has been prepared by Harrow Estates in support of a The overall interest of Harrow Estates consist of three parcels of land The proposal will open up the land to the vision for a sustainable and beautiful community at Failand in North around the existing settlement of Failand, in total adding to a land Somerset District. area of 39.90 hectares (98.59 acres). The land parcels include (as community and provide up to 500 high quality Harrow Estates, part of Redrow Homes, is a Master developer with shown on the plan overleaf) - new homes and community infrastructure, a holistic approach to planning promotion, masterplanning and • Site A - Land east of Weston Road (21.31Ha/52.66Acres) will make significant bio-diversity net delivery of sites for sustainable and beautiful new communities. • Site B - Land west of Flax Bourton Road (14.32Ha/35.38Acres) With a vision embraced by landscape and bio-diversity net gain, we gain through considered landscape-led • Site C - Land north of Clevedon Road (4.27Ha/10.55Acres) ensure that high quality design is at the heart of everything we do. proposals and create a softer transition Coupled with the inclusive consultations involving key stakeholder The land parcels are in proximity to Clevedon Road/B3128 and are groups, we specialise in securing positive planning and technical physically well contained and defined by existing landscape features between settlement edge of Failand and the outcomes which deliver very high quality new homes in exceptional including the plantations to the south and west, sports pitches to surrounding landscape features. settings. the east and tall existing hedgerows, trees and woodlands further to the north. With detailed technical assessments undertaken by The current illustrative masterplan represents We are proud of our reputation to create thriving communities and specialist consultants, Harrow Estates is currently proposing a vision our placemaking led approach embraced by the Redrow 8 principles to create a sensitively designed new community to support Failand’s the culmination of this technical work but will provides a framework to ensure this approach consistently leads the future. The site currently includes privately owned land that lies at evolve as more detailed work is undertaken design and delivery of all of our new developments with a focus on the interface of the settlement edge and existing landscape features. the quality of life, health and well-being of existing and new residents. and during discussions with key stakeholders. The project team is as follows - Planning and Masterplanning Landscape and Heritage Ecology Highways and Infrastructure 4 Redrow 8 Placemaking Principles VISION FOR A SUSTAINABLE COMMUNITY AT FAILAND, BRISTOL LOCATION PLAN Clevedon Road (B3128) Manor Farm Bristol and Clifton Golf Course and Fifty Acre Wood SNCI Fifty Acre Wood SITE C Beggar Bush Lane Flax Bourton Road Wraxall Piece SITE B Failand Durnford Wraxall Quarry Clevedon Road (B3128) Tyntesfield Plantation Weston Road (B3129) Sports Hub SITE A Long Ashton Golf Club Ashton Hill Plantation Planning and Masterplanning Nailsea Landscape and Heritage George`s Hill Plantation Ecology 39.9 HA Long Ashton 98.59 ACRES Highways and Infrastructure SITE AREA N Flax Bourton 5 BAC KG R O U 1 N D VISION FOR A SUSTAINABLE COMMUNITY AT FAILAND, BRISTOL Pill 1.1 PLANNING CONTEXT M5 A369 Bristol The land at Failand lies within the unitary authority area of North The site Somerset and within the civil Parish of Long Ashton Parish Council and Wraxall and Failand Parish Council. Nailsea Long Ashton THE DEVELOPMENT PLAN Key The statutory development plan comprises the North Somerset Site location Core Strategy (adopted 2012 with remitted policies re-adopted in Settlement 2015 and 2017), the Development Management Policies (adopted Barrow Gurney Administrative boundary 2016) and the Site Allocations Plan (adopted 2018). There is no Reservoirs adopted or emerging Neighbourhood Plan for the Wraxall and Motorway Failand Parish. Primary road Railway However North Somerset Council are in the process of preparing a new Local Plan which will guide development over the period 2023- Train stop 2038 and replace the above documents. As part of the process, the Council has held ‘Challenges’ and ‘Choices’ consultations during to Worcester to Cardiff 2020. It is clear from these consultations that North Somerset will need to plan for a significantly increased number of homes and M5 that in order to ensure development is sustainable and deliverable M4 within the plan period, release of land from the Green Belt is likely Avonmouth to be necessary. Portishead to London Failand benefits from its proximity to the urban area of Bristol and its location on a key transport corridor from Clevedon/Nailsea to South Bristol, which provide it with a unique strategic growth opportunity. Clifton Downs Gloucestershire North Somerset aim to prioritise the location of new development A369 North Somerset close to places with a wide range of services and which have access to high-quality and effective transport infrastructure. Failand Failand Bristol satisfies these aims. Clevedon B3128 In addition, in response to an upward pressure on housing numbers, North Somerset acknowledge that they will need to review the Nailsea Long Ashton approach to the role of settlements and settlement boundaries to ensure that no settlements are overlooked in their potential to Keynsham accommodate growth. M5 Bath and NE A370 A38 A37 Somerset Winford N Yatton To Exeter Bristol Airport Wider location map 8 VISION FOR A SUSTAINABLE COMMUNITY AT FAILAND, BRISTOL Current Local Plan Current Standard Method Proposed New Standard Method Local Planning Authority HOUSING REQUIREMENT Requirement Requirement Requirement * Bath and North East Somerset 720 648 1,216 Policy CS13 of the North Somerset Core Strategy makes provision for 20,985 new dwellings across the 20 year plan period (2006- Bristol 1,320 2,368 2,490 2026), which equates to a requirement of 1,049 new dwellings per annum. However, since the adoption of the Core Strategy, the UK North Somerset 1,049 1,365 1,708 Government has published a standard method for calculating local South Gloucestershire 1,360 1,601 2,544 housing need (LHN), which forms the starting point for planning authorities in establishing their requirement. As acknowledged in the TOTAL 4,449 5,982 7,958 Choices consultation, the requirement is expected to rise sharply in the new Local Plan given the LHN figure is 1,365 dwellings per Comparison of increasing housing requirements across the West of England annum. In addition to the above, North Somerset is bound by the Somerset districts of Sedgemoor and Mendip The UK Government are reviewing the standard methodology in to the south. Both these authorities are also experiencing increased housing need.