World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document Public Disclosure Authorized GUANG'AN WORLD BANK LOAN MEDIUM-TERM ADJUSTMENT PROJECT - QIANFENG SUBPROJECT Public Disclosure Authorized ENVIRONMENTAL MANAGEMENT PLAN Public Disclosure Authorized GUANG'AN XINHONG INVESTMENT HOLDINGS CO., LTD. ANHUI SIWEI ENVIRONMENTAL ENGINEERING CO., LTD. October 2018 Public Disclosure Authorized - 1 - Table of Contents 1 OVERVIEW 1.1 Project Background 1.2 Project Description 1.3 Objectives of the Environmental Management Plan 1.4 Environmental Management Plan Structure 2 ENVIRONMENTAL LAWS, POLICIES AND REGULATIONS 2.1 Relevant domestic laws and regulations 2.2 World Bank Security Assurance Policy 3 ENVIRONMENTAL MANAGEMENT ROLES AND RESPONSIBILITIES 3.1 Institutions involved in environmental management 3.2 Environmental Management Agency Responsibilities 3.3 Environmental management duties during the construction period 3.4 Contractor Management 3.5 Environmental Management Agency during Operation 4 ENVIRONMENTAL PROTECTION MEASURES AND THEIR ECONOMIC AND TECHNICAL ARGUMENTATION 4.1 Environmental protection measures and recommendations during the design period 4.2 Environmental protection measures and recommendations during construction period 4.3 Environmental protection measures and recommendations during the operation period 5 ENVIRONMENTAL SUPERVISION AND MONITORING PLAN 5.1 Objectives, scope and stage 5.2 Environmental Management Content 5.3 Environmental Monitoring Plan 6 CONTRACTOR ENVIRONMENTAL SPECIFICATIONS 6.1 Contractor Environmental Protection Plan 6.2 on-site facilities 6.3 code of Conduct 6.4 Health and safety 6.5 Storage of fuels, oils and dangerous toxic substances 6.6 Waste management 6.7 Wastewater and stormwater management 6.8 Noise control 6.9 Communication between the construction stage and the public - 2 - 6.10 Material cultural resources 7 SOIL AND WATER CONSERVATION PLAN 7.1 Construction bidding 7.2 Supervision of Soil and Water Conservation Engineering Construction 7.3 Soil and Water Conservation Monitoring 7.4 Construction Management 7.5 Soil and Water Conservation Completion Inspection and Acceptance 7.6 Source of funds and management of use 8 INFORMATION DISCLOSURE AND PUBLIC PARTICIPATION 8.1 Public participation 8.2 Complaints and Grievance Mechanism Environmental Management Plan 9 ENVIRONMENTAL PROTECTION TRAINING 9.1 Environmental Technology and Skills Training 9.2 Training methods and training costs 10. ENVIRONMENTAL INVESTMENT - 3 - 1 Overview The Environmental Management Plan (EMP) applies to the subproject newly proposed in Qianfeng during the Mid-term Review (MTR) of Sichuan-Chongqing Cooperation: (Guang’an) Demonstration Area Infrastructure Development Project , which is implemented by Guang’an Xinhong Investment Holdings Limited. The environmental impacts of the project have been clearly stated in the EIA form for Qian’feng Subproject as the Mid-term Review (MTR) component of Sichuan-Chongqing Cooperation: (Guang’an) Demonstration Area Infrastructure Development Project. The EIA form was prepared by Anhui Siwei Environmental Engineering Co., Ltd. (hereinafter referred to as “Anhui Siwei” ). The EIA report includes environmental regulations and policy analysis, project overview and engineering analysis, environmental and social baseline, survey of existing environmental quality, project impact assessment, information disclosure and public consultation, risk assessment and emergency response plan, environmental management. In general, the newly added subproject in Qianfeng involves no significant and irreversible environmental impacts during construction and operation. However, an additional Bank’s safeguards policy (OP4.37 Safety of Dam) is triggered because the Xiejiawan Park proposed under the subproject will be developed around an existing reservoir, namely Xiejiagou Reservoir. This EMP was updated based on the original EMP for Qianfeng Component of Sichuan-Chongqing Cooperation: (Guang’an) Demonstration Area Infrastructure Development Project (dated October 2014) and follows both the national laws, regulations, and technical guidelines and the applicable Bank's safeguard policies, as well as the World Bank Group Environmental, Health, and Safety Guidelines. The latest available and more economical strategies are adopted in the EMP to mitigate the project impacts. 1.1 Project Background In November 2012, the National Development and Reform Commission issued the “Reply on the Overall Plan for the Construction of the Sichuan-Chongqing Cooperation Demonstration Zone (Guang'an Area)” (Development and Reform Zone [2012] No. 3558). In May 2013, the National Development and Reform Commission issued “About Sichuan Guangan Accepts the Implementation Plan of the Industrial Transfer Demonstration Zone (Development and Reformation West [2013] No. 660). Qianfeng District, as the jurisdiction of Guang'an City, is located in the one-hour economic circle of Chongqing, adjacent to Chongqing Lianglu Cuntan Bonded Port Area and Liangjiang New area, Chongqing and mountains and rivers, cultural similarities, complementary resources, economic blending, a Chengdu-Chongqing economic zone, Sichuan, Chongqing and cooperation demonstration zone, undertake industrial transfer demonstration zone bridgehead. The Qianfeng District actively undertakes the industrial transfer of Chongqing's enterprises. At the same time, according to the urban development concept of “integrating the city and integrating the city”, the Qianfeng City will be built into a suitable - 1 - and livable city suitable for industrial development and suitable for tourism and leisure. The Qianfeng District relies on the geographical advantages of two major cities (Chengdu) and Chongqing (Chongqing), adheres to the scientific development model of people-oriented, industrial integration and ecological priority, and actively integrates into the development of urban clusters in the Chengdu-Chongqing Economic Belt, in line with China's new urbanization plan. (2014-2020), also in line with the World Bank's 2013-2016 National Cooperation Strategy (CPS Report No.: 67566-CN), a strategic theme for green growth and the promotion of comprehensive development. In 2015, Qianfeng District obtained the loan amount of 40 million US dollars from the World Bank-financed Sichuan- Chongqing Cooperation (Guang'an) Demonstration Zone Qianfeng District Industrial Park Infrastructure Construction Project, and invested in the construction of sewage interceptors, Luxi River Landscape Engineering and Industrial Avenue., Bin Henan Road, Riverside Road and other projects. Up to now, the sewage intercepting main pipe and the Luxi River landscape project have been completed, and the Industrial Avenue and Binhe South Road are advancing as scheduled. Due to the adjustment of industrial park planning and other reasons, the original Binhe North Road project was cancelled from the World Bank loan project. Due to the savings from bidding and the cancellation of the Binhe North Road project, the loan saving for Qianfeng Component is approximately $13.4 million. To improve the living environment of Qianfeng urban area and industrial park and to improve the living standards of industrial workers and urban residents, Qianfeng District proposed the landscaping of Luxi River (Logistics Park section) and the construction of Xiejiawan Park as the new subprojects during the MTR of World Bank loan project, as listed below: (1) Landscaping of Luxi River (Logistics Park section): The project include river embankment for flood control and landscaping along the river banks. The total length of the project is about 1.559 km. (2) Xiejiawan park project: with a total area of 166,400m 2, including reservoir water 2. area of 51,986 m2 and landscaping area of 114,407 m - 2 - Figure 1.1-1 Project Location 1.2 Project Description The development goal of the project is to meet the current and projected development needs of the forwards and support them to improve the service levels of transportation, sewage, labor skills and investment promotion. To achieve this goal, the project will support the following activities: (1) Landscaping Project of Luxi River (Logistics Park section): The main project of the Luoxi River Logistics Park section landscape project is the construction of flood control dikes and the construction of landscape projects along the line. The total length of the project is approximately 1.559 km. Among them, the landscaping works involves paving, greening, plank roads, rest structures, national fitness facilities, and small sculptures. (2) Xiejiawan Park Project: The planned area of Xiejiawan Park is 166400m 2, wherein the water reservoir area is 51986m2, and the landscaping area is 114407m2. The project contents include - 3 - landscaping, road paving, greening, plank roads, parking lot, park buildings, amusement and fitness facilities, sketch sculpture and so on. 1.3 Objectives of the Environmental Management Plan The Environmental Management Plan presents mitigation measures in response to the identified environmental impacts and supervise the effectiveness of the measures during the lifespan of the Project. The Environmental Management Plan based on the Environmental Impact Assessment, Plan Environmental Assessment is compiled according to the Chinese environmental laws and guidelines, safeguard policies of World Bank, and optimal practices of similar projects. The purpose of Environmental Management Plan is to ensure the consistency between Environmental Impact Assessment and Environmental Management Plan, to satisfy the relevant standards
Recommended publications
  • World Bank Document
    Public Disclosure Copy The World Bank Implementation Status & Results Report Sichuan Chongqing Cooperation: Guang'an Demonstration Area Infrastructure Development Project (P133456) Sichuan Chongqing Cooperation: Guang'an Demonstration Area Infrastructure Development Project (P133456) EAST ASIA AND PACIFIC | China | Social, Urban, Rural and Resilience Global Practice Global Practice | IBRD/IDA | Investment Project Financing | FY 2015 | Seq No: 2 | ARCHIVED on 10-Dec-2015 | ISR21618 | Public Disclosure Authorized Implementing Agencies: Guangan Municipality Key Dates Key Project Dates Bank Approval Date:16-Mar-2015 Effectiveness Date:27-Aug-2015 Planned Mid Term Review Date:31-Oct-2017 Actual Mid-Term Review Date:-- Original Closing Date:30-Sep-2020 Revised Closing Date:30-Sep-2020 Public Disclosure Authorized Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project Development Objective is to improve Linshui County and Qianfeng District infrastructure and investment support services. Has the Project Development Objective been changed since Board Approval of the Project Objective? No PHRPDODEL Public Disclosure Authorized Components Name Technical Assistance:(Cost $0.60 M) Linshui County Town:(Cost $64.39 M) Qianfeng District Town:(Cost $42.62 M) Project Management and Capacity Building:(Cost $1.77 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Public Disclosure Authorized Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Substantial Substantial 12/10/2015 Page 1 of 9 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report Sichuan Chongqing Cooperation: Guang'an Demonstration Area Infrastructure Development Project (P133456) Implementation Status and Key Decisions The project is making good progress and is on track to improve Linshui County and Qianfeng District infrastructure and investment support services.
    [Show full text]
  • World Bank Document
    China: Proposed Sichuan and Chongqing Cooperation: Guang’an Demonstration Area Infrastructure Development Project Updated Procurement Plan I. General Public Disclosure Authorized 1. Project information: Country: The People’s Republic of China Borrower: The People’s Republic of China Project Name: China: Proposed Sichuan and Chongqing Cooperation: Guang’an Demonstration Area Infrastructure Development Project Loan/Credit No: Project ID: P133456 Public Disclosure Authorized Project Management Offices: Guang’an Prefecture PMO (at Prefecture Development and Reform Commission); Linshui County PMO (at County Development and Reform Commission) and Qianfeng District PMO (at District Development and Reform Commission) Project Implementing Agencies: Linshui County Yuanfeng Industry Development Company; Linshui Vocational School; and Qianfeng Xinhong Company. Subproject PMOs PIAs Public Disclosure Authorized Linshui County Yuanfeng Industry Development Linshui PMO Linshui Company; and Linshui Guang’an PMO Vocational School Qianfeng Xinhong Qianfeng PMO Qianfeng Company 2. Bank’s approval Date of the procurement Plan: Original approved on November 10, 2014; updated on August. 15, 2017 Public Disclosure Authorized 3. Date of General Procurement Notice: November 10, 2014 (WB5651-11/14) 4. Period covered by this procurement plan: December 2015 to April, 2020. China: Proposed Sichuan and Chongqing Cooperation: Guang’an Demonstration Area Infrastructure Development Project Ⅱ. Goods and Works and Non-Consulting Services 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Procurement Guidelines (January 2011). Expenditure Contract Procurement Method Bank Prior Review Category Value (US$) Goods, IT ≥ 10 million ICB Systems & ≥ 500k to NCB All contracts ≥ USD 4 Non- < 10 million Remarks: Where goods are not million.
    [Show full text]
  • Table of Codes for Each Court of Each Level
    Table of Codes for Each Court of Each Level Corresponding Type Chinese Court Region Court Name Administrative Name Code Code Area Supreme People’s Court 最高人民法院 最高法 Higher People's Court of 北京市高级人民 Beijing 京 110000 1 Beijing Municipality 法院 Municipality No. 1 Intermediate People's 北京市第一中级 京 01 2 Court of Beijing Municipality 人民法院 Shijingshan Shijingshan District People’s 北京市石景山区 京 0107 110107 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Haidian District of Haidian District People’s 北京市海淀区人 京 0108 110108 Beijing 1 Court of Beijing Municipality 民法院 Municipality Mentougou Mentougou District People’s 北京市门头沟区 京 0109 110109 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Changping Changping District People’s 北京市昌平区人 京 0114 110114 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Yanqing County People’s 延庆县人民法院 京 0229 110229 Yanqing County 1 Court No. 2 Intermediate People's 北京市第二中级 京 02 2 Court of Beijing Municipality 人民法院 Dongcheng Dongcheng District People’s 北京市东城区人 京 0101 110101 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Xicheng District Xicheng District People’s 北京市西城区人 京 0102 110102 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Fengtai District of Fengtai District People’s 北京市丰台区人 京 0106 110106 Beijing 1 Court of Beijing Municipality 民法院 Municipality 1 Fangshan District Fangshan District People’s 北京市房山区人 京 0111 110111 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Daxing District of Daxing District People’s 北京市大兴区人 京 0115
    [Show full text]
  • Completion Report
    Completion Report GFDRR TF0A8646 Integrating Disaster Risk Management in China Urban Operations (P169232) Public Disclosure Authorized June 2020 Public Disclosure Authorized Public Disclosure Authorized Credit: Beijing Normal University East Asia Urban, Resilience and Land (SEAU2) Public Disclosure Authorized Completion Report: Integrating DRM in China Urban Projects Highlights 3.17 million beneficiaries (1.57 million women) 865,000 people provided with access to improved drainage and sanitation facilities 3 major knowledge products developed 40 Coastal & urban flood risk management investments informed 8 Cultural & natural heritage sites protected from disaster risk 5 Innovative resilient urban financing mechanisms developed 4 Earthquake reconstruction sub-projects 4 Former mine and industrial zones rehabilitated 2 include emergency preparedness plans and safety GFDRR SUPPORT procedures among areas of extreme urban poverty. The Global Facility for Disaster Reduction and For the 16 projects, GFDRR support primarily Recovery (GFDRR) supported: (i) mainstreaming focused on the review of specific engineering disaster risk management principles across 16 infrastructure designs to ensure they not only investment projects in the urban and DRM team’s added but met the standards of appropriate climate China portfolio; and (b) creation of three major and disaster risk considerations, such as using knowledge products, one of them led by the China higher seismic-proof standards and flood risk Water GP. management codes. Equally important, the funds allowed for numerous training and capacity building INVESTMENT PROJECTS opportunities for the clients and related teams on a SUPPORTED variety of topics such as urban flood modeling, prioritizing risk-based planning and specific ways to The 16 projects across China supported by the embed climate and disaster risk considerations in GFDRR embed resilience within themes covering: policy planning and asset management.
    [Show full text]
  • Development Operational Report Quarter 3 & 4 2013 China
    Development Operational Report Quarter 3 & 4 2013 China PROGRAMME INFORMATION Implementing Secretariat body/host National Geographical coverage: Society: IFRC East Asia Regional Delegation Sichuan Province, China Red Cross Society of China (RCSC) Number of people to be reached: Estimated direct and indirect: 4 million Project manager: Project Project title: Annual budget (CHF): Code: Baktiar Mambetov PCN022 Livelihood support programme 177,826 Martin Faller PCN165 Response preparedness 1,623,510 Baktiar Mambetov PCN002 Organizational development 139,739 Hong CHEN PCN009 Community health 1,019,231 56,978 Hong CHEN PCN401 Health and care Barbara Tai PCN024 Psychosocial support 311,193 Kazutaka Isaka PCN021 Construction and disaster 1,085,972 preparedness centre Baktiar Mambetov PCN026 Community Resilience project 1,569,403 Total Total annual budget 5,983,851 Partner National Societies: American Red Cross, British Red Cross, Canadian Red Cross/Canadian government, Finnish Red Cross/Finnish government, Japanese Red Cross Society (JRCS) and Swedish Red Cross/Swedish government. RCSC has active programmes of bilateral cooperation with other members of the Red Cross Red Crescent Movement, including its special autonomous branches in Hong Kong and Macao, the American, Australian, Canadian, Netherlands, Norwegian and Swiss Red Cross and the International Committee of the Red Cross (ICRC). The RCSC coordinates closely with the ministry of health and civil affairs at local and national levels, ensuring that Red Cross activities are focused in areas where they have greater impact and cooperation from the local governments. Local organizations and community groups are important local partners for implementing activities, as well as reaching groups that might otherwise be difficult to access, such as minority communities.
    [Show full text]
  • THE ROOTED STATE: PLANTS and POWER in the MAKING of MODERN CHINA's XIKANG PROVINCE by MARK E. FRANK DISSERTATION Submitted In
    THE ROOTED STATE: PLANTS AND POWER IN THE MAKING OF MODERN CHINA’S XIKANG PROVINCE BY MARK E. FRANK DISSERTATION Submitted in partial fulfillment of the requirements for the degree of Doctor of Philosophy in East Asian Languages and Cultures in the Graduate College of the University of Illinois at Urbana-Champaign, 2020 Urbana, Illinois Doctoral Committee: Associate Professor Dan Shao, Chair Associate Professor Robert Morrissey Assistant Professor Roderick Wilson Associate Professor Laura Hostetler, University of Illinois Chicago Abstract This dissertation takes the relationship between agricultural plants and power as its primary lens on the history of Chinese state-building in the Kham region of eastern Tibet during the early twentieth century. Farming was central to the way nationalist discourse constructed the imagined community of the Chinese nation, and it was simultaneously a material practice by which settlers reconfigured the biotic community of soils, plants, animals, and human beings along the frontier. This dissertation shows that Kham’s turbulent absorption into the Chinese nation-state was shaped by a perpetual feedback loop between the Han political imagination and the grounded experiences of soldiers and settlers with the ecology of eastern Tibet. Neither expressions of state power nor of indigenous resistance to the state operated neatly within the human landscape. Instead, the rongku—or “flourishing and withering”—of the state was the product of an ecosystem. This study chronicles Chinese state-building in Kham from Zhao Erfeng’s conquest of the region that began in 1905 until the arrival of the People’s Liberation Army in 1950. Qing officials hatched a plan to convert Kham into a new “Xikang Province” in the last years of the empire, and officials in the Republic of China finally realized that goal in 1939.
    [Show full text]
  • Primark Does Not Own Any Factories and Is Selective About the Suppliers with Whom We Work
    Information last updated November 2020 Global Sourcing Map Factory List - Bangladesh Factory Name Address Country Total Men Women Number of Workers A&A Trousers Ltd Haribaritek Pubail College Gate Gazipur Dhaka 1721 Bangladesh 2250 996 (44.3)% 1254 (55.7)% Afiya Knitwear Ltd 10/ 2 Durgapur Ashulia Savar Dhaka 1341 Bangladesh 496 232 (46.8)% 264 (53.2)% AKH Apparels Ltd 128 Hemayetpur Savar Dhaka 1340 Bangladesh 2136 855 (40.0)% 1281 (60.0)% Alpha Clothing Ltd Tenguri, BKSP Ashulia Savar Dhaka Bangladesh 1971 968 (49.1)% 1003 (50.9)% Ananta Huaxiang Ltd 222, 223, H2-H4, Adamjee EPZ Shiddirgonj Narayanganj Dhaka Bangladesh 2038 982 (48.2)% 1056 (51.8)% Anowara Knit Composite Ltd Mulaid Mawna Sreepur Gazipur Bangladesh 2276 1329 (58.4)% 947 (41.6)% Aspire Garments Ltd 491 Dhalla Singair Manikganj 1822 Bangladesh 2992 1389 (46.4)% 1603 (53.6)% ASR Sweater Limited Mulaied Maona Sreepur Gazipur Bangladesh 1458 927 (63.6)% 531 (36.4)% Primark does not own any factories and is selective about the suppliers with whom we work. Every factory which manufactures product for Primark has to commit to meeting internationally recognised standards, before the first order is placed and throughout the time they work with us. The factories featured on Primark’s Global Sourcing Map are Primark’s suppliers’ production sites which represent over 95% of Primark products for sale in Primark stores. A factory is detailed on the Map only after it has produced products for Primark for a year and has become an established supplier. During the first year a factory has to demonstrate that it can consistently work to Primark’s ethical standards, as well as meet our commercial requirements in areas such as quality and timely delivery.
    [Show full text]
  • SUPPLIER LIST OCTOBER 2019 Cotton on Group - Supplier List 2
    SUPPLIER LIST OCTOBER 2019 Cotton On Group - Supplier List _2 REGION SUPPLIER NAME FACTORY NAME SUPPLIER ADDRESS PRODUCT TOTAL % OF % OF % OF TYPE WORKERS FEMALE MIGRANT TEMP WORKERS WORKERS WORKERS BANGLADESH APTECH DESIGN LTD DESIGNER FASHION LTD GOHAILBARI SHIMULIA APPAREL 3422 72% 0% 0% SAVAR DHAKA BANGLADESH APTECH DESIGN LTD Y-FRONTS ACCESSORIES (NEW HOUSE 24, WARD # 01, ARSHINAGOR MAIN ROAD APPAREL 24 0% 0% 0% LOCATION) ARSHINAGOR, KERANIGONJ DHAKA BANGLADESH BELAMY TEXTILES LTD BELAMY TEXTILES LTD KHOWAZ NAGAR, AZIMPARA APPAREL KARNAFULLY CHITTAGONG BANGLADESH BIG BOSS CORPORATION LTD (of aptech BIG BOSS CORPORATION LTD (NEW) APTECH INDUSTRIAL PARK APPAREL group) 30 SHARABO,KASIMPUR GAZIPUR BANGLADESH CLASSIC FASHIONS FOUR DESIGN PVT LTD (NEW) PLOT NO. B-201, 202, BSCIC HOSIERY I/E APPAREL 305 64% 0% 0% SHASONGAON, ENAYETNAGAR, FATULLAH NARAYANGANJ BANGLADESH CLASSIC FASHIONS FOUR DESIGN PVT LTD (TEMPORARY) PLOT NO. B327/328, BSCIC HOSIERY I/E APPAREL 380 60% 0% 0% SHASONGAON, ENAYETNAGAR, FATULLAH NARAYANGANJ BANGLADESH IMPRESS NEWTEX COMPOSITE TEXTILES B2B EXCELLANCE LTD MIRZAPUR PURBAPARA, APPAREL 1355 76% 0% 0% LTD 8 NO. MIRZAPUR MOUZA, GAZIPUR SADAR,GAZIPUR BANGLADESH IMPRESS NEWTEX COMPOSITE TEXTILES IMPRESS NEWTEX COMPOSITE TEXTILES GORAI INDUSTRIAL AREA APPAREL 2124 56% 0% 0% LTD LTD MIRZAPUR TANGAIL BANGLADESH IRIS FABRICS LIMITED IRIS FABRICS LIMITED ZIRANIBAZAR APPAREL 2984 47% 0% 0% KASHIMPUT, JOYDEVPUR GAZIPUR BANGLADESH JERICHO IMEX JERICHO IMEX LTD MONTREE BARI ROAD APPAREL 700 62% 0% 0% SOUTH SHANLA, SHANLA BAZAR
    [Show full text]
  • CHENGDU Brought to You by Our Guide to Southwest China’S Thriving Megacity
    C H E N G D U CHENGDU Brought to you by Our guide to Southwest China’s thriving megacity Our third Sinopolis guide This is the third in our Sinopolis series of city guides. They Chengdu has likewise made major strides in moving up are designed to give you insights into China’s larger cities, the industrial value chain. Its high-tech special zone plays and are written with the business person in mind. host to the likes of Intel chip factories, as well as the As we pointed out in our first Sinopolis (which looked at Foxconn assembly lines that make many of the world’s Hangzhou), we know that knowledge of Beijing and iPads. The city has also become a hub for software Shanghai is already quite strong, so our goal here is to engineers, partly because property prices are dramatically Chengdu was a create a series of useful overviews of China’s other, less cheaper than those of Beijing and Shanghai (see our starting point for well-known major cities. This guide focuses on the chapter on the property market), and likewise its high the ancient Silk Southwestern metropolis of Chengdu, the provincial quality local universities. But the other reason why skilled Road and is capital of Sichuan and one of China’s biggest cities by engineers like the city is its liveability. Famed for its reprising that population (16 million). It is also one of the country’s most teahouse culture, Chengdu is also a gastronomic capital: role thanks to ancient cities: thanks to its silk trade it was a starting point Sichuanese cuisine is one of China’s four great culinary President Xi Jinping’s for the Silk Road.
    [Show full text]
  • WIC Template
    Visitor information Chunxilu in Chengdu VISITOR INFORMATION Finding your way Central Chengdu here are 20 districts or sub-cities under the Tianfu Square, the shopping spots continue almost is surrounded by jurisdiction of Chengdu. This Sinopolis city guide without interruption, amassing in the sprawling a ring road that will only focus on the central few since they host pedestrianised area of Chunxilu and Taikoo Li. follows the the majority of Chengdu’s economic drivers and This area is always bustling with fashionable young perimeter of the Tthe seat of government – and are thus of most interest to people and white-collar workers. Luxury retailers and high ancient city walls visitors and tourists. street brands abound, abridged by fast food joints, snack The centre of Chengdu is neatly divided by a road stalls and restaurants. The western frontier of Chunxilu is running north to south, and is surrounded by a ring road perhaps a 20-minute walk from Tianfu Square, and taken that follows the perimeter of the ancient city walls. There together this zone is the city’s commercial hub. are two more ring roads beyond that, framing the South and west of Tianfu Square is Wuhou district, historical districts, modern residences, and thriving tech arguably the city’s cultural zone. The district has the main hubs. campus of Sichuan University, Southwest China’s Ethnic The dividing central thoroughfare is Renmin Road Minority University, and the Sichuan Sports University. (People’s Road). It splits to circumvent Tianfu Square, It is also home to the Wuhou Memorial Temple. This adorned with a statue of Mao Zedong, and converges again popular tourist attraction is a memorial to Zhuge Liang, on the south side to become Renmin South Road.
    [Show full text]
  • World Bank Document
    Public Disclosure Copy The World Bank Implementation Status & Results Report Sichuan Chongqing Cooperation: Guang'an Demonstration Area Infrastructure Development Project (P133456) Sichuan Chongqing Cooperation: Guang'an Demonstration Area Infrastructure Development Project (P133456) EAST ASIA AND PACIFIC | China | Urban Development Global Practice | IBRD/IDA | Investment Project Financing | FY 2015 | Seq No: 1 | ARCHIVED on 19-Jun-2015 | ISR19443 | Public Disclosure Authorized Implementing Agencies: Guangan Municipality Key Dates Key Project Dates Board Approval date:16-Mar-2015 Effectiveness Date:-- Planned Mid Term Review Date:31-Oct-2017 Actual Mid-Term Review Date:-- Original Closing Date:30-Sep-2020 Revised Closing Date:30-Sep-2020 Public Disclosure Authorized Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project Development Objective is to improve Linshui County and Qianfeng District infrastructure and investment support services. Has the Project Development Objective been changed since Board Approval of the Project Objective? No PHRPDODEL Public Disclosure Authorized Components Name Technical Assistance:(Cost $0.60 M) Linshui County Town:(Cost $64.39 M) Qianfeng District Town:(Cost $42.62 M) Project Management and Capacity Building:(Cost $1.77 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO -- Satisfactory Public Disclosure Authorized Overall Implementation Progress (IP) -- Satisfactory Overall Risk Rating -- Substantial 6/19/2015
    [Show full text]
  • World Bank Document
    PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC1139 Public Disclosure Authorized Project Name Sichuan Chongqing Cooperation: Guangan Demonstration Area Infrastructure Development Project (P133456) Region EAST ASIA AND PACIFIC Public Disclosure Copy Country China Sector(s) Urban Transport (65%), General water, sanitation and flood protection sector (33%), Vocational training (2%) Theme(s) City-wide Infrastructure and Service Delivery (65%), Infrastructure services for private sector development (35%) Lending Instrument Investment Project Financing Project ID P133456 Public Disclosure Authorized Borrower(s) People's Republic of China Implementing Agency Guang'an Project Management Office Environmental A-Full Assessment Category Date PID Prepared/ 07-Aug-2013 Updated Date PID Approved/ 20-Sep-2013 Disclosed Estimated Date of 01-Sep-2014 Appraisal Completion Public Disclosure Authorized Estimated Date of 26-Jan-2015 Board Approval Concept Review Track I - The review did authorize the preparation to continue Decision Public Disclosure Copy I. Introduction and Context Country Context Urbanization has played a significant role in the country’s economic development, facilitating the export-led growth which transformed the country from low-income to middle-income status in just a few decades. The recent urban expansion of cities and towns has provided the resources necessary to build infrastructure for industrial and urban development and create space for in-migration. However, this has happened at rates much higher than actual urban population growth and has resulted in a growing urban footprint which is impacting on rural space and ecosystems and is Public Disclosure Authorized increasing demands for transport, resources and energy. Other challenges brought about by the country's rapid economic ascendance include high inequality, regional imbalances, environmental pollution, an overreliance on investment, manufacturing and exports and an increasing number of migrants without access to services.
    [Show full text]