ENGINEERING YOUR SOLUTIONS HBPW LLP, 43 Bridgegate, Retford, Nottinghamshire, DN22 7UX Tel: 01777 869 896 Fax: 01777 862 491 ISSUE TWENTY THREE Email:
[email protected] www.hbpw.co.uk HBPWNEWS By Royal Appointment – CONTINUED FROM PAGE 1 Welcome Land Ahoy! Inventive collapsed, putting Network Almost! Windsor Bridge Rail into overdrive, and Design At Immingham threatening to wipe millions of Isambard Kingdom Brunel’s Grade II listed pounds off the local economy. bridge, which forms part of Windsor Viaduct Rail services in the South in Berkshire, is being given a new lease of West were cut off from the rest life thanks to the 21st engineering skills of the county and prompted of HBPW. one of the biggest media Opened in 1849, Windsor Railway Bridge is flurries for some time! The a wrought iron ‘bow and string’ bridge and, weather has been varied to say the least! as well as being one of the British engineer’s masterpieces - it is the World’s oldest Ironically, as the economy wrought iron bridge still in regular service - it in the South West takes is also in eye shot of HM the Queen’s London an unexpected battering, residence at Windsor! scaffolding which, in turn, was also fortunes in the country are Paul Withers - Managing Partner covered with a membrane, so that the structure getting much better with Paul Withers of HBPW, said: “In the normal could be grit blasted and re-painted. a prediction that the wider The freed up land adjacent to ABP’s shortened building, and ABP’s new shortened building & access road course of bridge assessments, Network Rail economy will finally surpass This edition of the HBPW considered that certain elements of the structure The bridge, which is a single-span structure its pre-recession peak in the newsletter cannot be allowed had deteriorated as a result of corrosion, and comprising three bowstring trusses, carries second half of this year.