SHETH MIDORI” (Expansion in EC)
Total Page:16
File Type:pdf, Size:1020Kb
FORM – 1& 1A “SHETH MIDORI” (Expansion in EC) At Plot Bearing CTS No 2400/E Village Dahisar Tal- Borivali, Mumbai. By M/s. SHETH INFRAWORLD PVT. LTD. Sheth House, Behind Dindoshi Fire Station, Opp. Oberoi Mall, Gen. A. K. Vaidya Marg, Malad (East), Mumbai, Maharashtra. FORM – 1 “SHETH MIDORI” (Expansion in EC) At Plot Bearing CTS No 2400/E Village Dahisar Tal- Borivali, Mumbai. By M/s. SHETH INFRAWORLD PVT. LTD. Sheth House, Behind Dindoshi Fire Station, Opp. Oberoi Mall, Gen. A. K. Vaidya Marg, Malad (East), Mumbai, Maharashtra. APPENDIX - I (See paragraph - 6) FORM 1 (I) Basic Information No. Item Details 1. Name of the project/s ‘Sheth Midori’ 2. S. No. in the schedule 8 (a) 3. Proposed capacity/area/ length/ tonnage to be Total plot area : 13,392.70 Sq. m. handled/ command area/lease area/ number of Deduction: 1,490.90 Sq. m. wells to be drilled Net plot area : 11,901.80 Sq. m. Built-up area as per FSI : 33,896.49 Sq. m. (Including Fungible area) Total Construction Built-up area : 60,871.08 Sq. m. Project Proposal Total 3 Nos. of Buildings with total Flats 564 nos. Building A: 3 Wings Basement + Stilt + 22 Upper (A1, A2, A3) Floors Building B: 3 Wing 2 Basements + Lower Ground + (B1, B2, B3) Stilt + 12 Upper Floors Building C: 3 Wings 2 Basements + Lower Ground + (C1, C2, C3) Stilt + 12 Upper Floors 4. New/Expansion/Modernization Expansion in EC 5. Existing Capacity/ Area etc. The project has Received prior Environmental Clearances (EC) • 1st EC dated 17th May 2013 • 2nd EC (Expansion in EC) dated 14th July 2014 It is referred as Enclosure 1. Reapplied for Environmental Clearance as there is vertical expansion. Total Constructed area (FSI + Non FSI): 44854.99 Sq. m. 6. Category of project i.e.’ A’ or ‘B’ 8 (a) B2 7. Does it attract the general condition? If yes, Not Applicable please specify. 8. Does it attract the specific condition? If yes, Not Applicable please specify. 9. Location Dadar Plot/Survey/Khasra No. CTS No. 2400 E Villages Dahisar Tehsil Borivali District Mumbai Suburban District State Maharashtra 10. Nearest railway station Dahisar railway station: Within 1.90 Km Nearest airport Mumbai Chhatrapati Shivaji Terminus Airport: Within 20.20 Km 11. Nearest Town, city, District headquarters Borivali (Mumbai) along with distance in kms. 12. Village Panchayats, Zilla Parishad, Municipal Municipal Corporation of Greater Mumbai (M.C.G.M.) Corporation, Local body (complete postal address with telephone nos. to be given) 13. Name of the applicant M/s. Sheth Infraworld Pvt. Ltd. 14. Registered Address "SHETH HOUSE", Behind Dindoshi Fire Station, Opp. Oberoi Mall, Gen. A. K. Vaidya Marg, Malad (East), Mumbai, Maharashtra – 400 097 Form I- “Sheth Midori” by M/s. Sheth Infraworld Pvt. Ltd. 1 No. Item Details 15. Address for correspondence "SHETH HOUSE", Behind Dindoshi Fire Station, Opp. Oberoi Mall, Gen. A. K. Vaidya Marg, Malad (East), Mumbai, Maharashtra – 400 097 Name Mr. Chintan Sheth Designation (Owner/Partner/CEO) Director Address "SHETH HOUSE", Behind Dindoshi Fire Station, Opp. Oberoi Mall, Gen. A. K. Vaidya Marg, Malad (East), Mumbai, Maharashtra Pin Code 400 097 E-mail [email protected] , [email protected] Telephone No. 022 – 42602400, 3400 Fax No. -- 16. Details of Alternative Sites examined, if any. Not Applicable Location of these sites should be shown on a topo-sheet. 17. Interlinked Projects No 18. Whether separate application of interlinked Not applicable. project has been submitted? 19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves Not applicable approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 22. Whether there is any Government Order/ -- Policy relevant/ relating to the site? 23. Forest land involved (hectares) Not Applicable 24. Whether there is any litigation pending against No the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Order /directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist confirmation Yes / Details thereof (with approximate No. No quantities/ rates, whenever possible) with source of information data 1.1 Permanent or temporary change in land No The project site was an open land; the site use, land cover or topography including will be developed into a residential increase in intensity of land use (with development. respect to local land use plan) The project site is in residential zone as per the development plan. 1.2 Clearance of existing land, vegetation and No -- buildings? 1.3 Creation of new land uses? No -- Form I- “Sheth Midori” by M/s. Sheth Infraworld Pvt. Ltd. 2 Sr. Information/Checklist confirmation Yes / Details thereof (with approximate No. No quantities/ rates, whenever possible) with sour ce of in formation data 1.4 Pre-construction investigation e.g. bore Yes Geotechnical Investigation has been carried houses, soil testing? out is attached as Enclosure 2. 1.5 Co nstructi on work s? Yes Residential development 1.6 Demolition works? No -- 1.7 Temporary sites used for construction Yes Provision of temporary hutments with works or housing of construction facilities like drinking water, toilets etc. workers? 1.8 Above ground buildings, Yes Excavation material generated is already structures or earthworks including linear partly reused on site and partly disposed to structures, cut and fill or excavations the authorized sites. Construction waste material generated shall be shall be partly reused and partly disposed to the authorized sites. 1.9 Underground works including mining or No. -- tunnel ing? 1.10 Reclamation works? No. -- 1.11 Dredging? No. -- 1.12 Offshore structures? No. -- 1.13 Production and manufacturing processes? No. -- 1.14 Facilities for storage of goods or Yes Temporary storage facilities to store the mater ials? construction raw material 1.15 Facilities for treatment or Disposal of Yes • STP for treatment of sewage solid waste or liquid effluents? • Segregation of solid waste into non- biodegradable and biodegradable garbage • Treatment of biodegradable waste in Organic Waste Converter • Non-biodegradable waste: To recyclers • Dried sludge from STP: As manure 1.16 Facilities for long term housing of No -- operational workers? 1.17 New road, rail or sea traffic No -- during construction or operation? 1.18 New road, rail, air waterborne or other No -- transport infrastructure including new or altered routes and stations, ports, airports etc.? 1.19 Closure of diversion of existing No -- transport routes or infrastructure leading to change in traffic movements? 1.20 New or diverted transmission lines No -- or pipelines? 1.21 Impoundment, damming, culverting, No -- realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No -- 1.23 Abstraction or transfers of water form No -- ground or surface waters? 1.24 Changes in water bodies or the land Yes By considering the runoff prior to Form I- “Sheth Midori” by M/s. Sheth Infraworld Pvt. Ltd. 3 Sr. Information/Checklist confirmation Yes / Details thereof (with approximate No. No quantities/ rates, whenever possible) with sour ce of in formation data surface affecting drainage or run-off? development and runoff after development there is some increment in runoff of storm water. Incremental Runoff = 0.15 m 3/sec 1.25 Transport of personnel or materials for Yes Transport of construction materials construction, operation or Precautions shall be taken to reduce the decommissioning? impact of the vehicular movement by trying to avoid the vehicular trips during peak hours. 1.26 Long-term dismantling or No -- decommissioning or restoration works? 1.27 Ongoing activity during decommission No -- which could have an impact on the environment? 1.28 Influx of people to an area in either Yes Since this is a residential development temporarily or permanently? project there will be influx of ~ 2820 Persons. 1.29 Introduction of alien species? No -- 1.30 Loss of native species or genetic No -- diversity? 1.31 Any other action s? No -- 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or ion short supply): Sr. Information/Checklist Details thereof (with approximate quantities / Yes / No. confirmation rates, whenever possible) with source of No information data 2.1 Land especially undeveloped or The land is in developed infrastructure area. No agricultural land (ha) 2.2 Water (expected source & competing During Constructional Phase – users) unit : KLD For Workers : From M.C.G.M.: 12 KLD For Construction: From Water tankers: 10 - 20 KLD Yes (Depending upon the activity) During Operational Phase – Fresh water from M.C.G.M.: 254 KLD (Domestic) 2.3 Minerals (M.T.) No -- 2.4 Construction material – stone, aggregates, Quantity : As per requirement and / soil (expected source-MT) Sources: The material required for construction Yes activities procured from company’s authorized / approved vendors only. 2.5 Forest and timber (source-MT) Timber required for doors sourced from local Yes suppliers. 2.6 Energy including electricity and fuels During Construction Phase - (source, competing users) Unit: fuel (MT), Tata power: 112 KW energy (MW) D.G. Sets: As per requirement Yes During Operational Phase - Source: Tata power Connected load 4105 KW Form I- “Sheth Midori” by M/s. Sheth Infraworld Pvt. Ltd. 4 Sr. Information/Checklist Details thereof (with approximate quantities / Yes / No. confirmation rates, whenever possible) with source of No in formation data Maximum demand 2025 KW D.G sets (In case of 1 No.