No. Item Details 1. Name of the project/s ‘Sheth Midori’ 2. S. No. in the schedule 8 (a) 3. Proposed capacity/area/ length/ tonnage to be Total plot area : 13,392.70 Sq. m. handled/ command area/lease area/ number of Deduction: 1,490.90 Sq. m. wells to be drilled Net plot area : 11,901.80 Sq. m. Built-up area as per FSI : 33,896.49 Sq. m. (Including Fungible area) Total Construction Built-up area : 60,871.08 Sq. m. Project Proposal Total 3 Nos. of Buildings with total Flats 564 nos. Building A: 3 Wings Basement + Stilt + 22 Upper (A1, A2, A3) Floors Building B: 3 Wing 2 Basements + Lower Ground + (B1, B2, B3) Stilt + 12 Upper Floors Building C: 3 Wings 2 Basements + Lower Ground + (C1, C2, C3) Stilt + 12 Upper Floors

4. New/Expansion/Modernization Expansion in EC 5. Existing Capacity/ Area etc. The project has Received prior Environmental Clearances (EC) • 1st EC dated 17th May 2013 • 2nd EC (Expansion in EC) dated 14th July 2014 It is referred as Enclosure 1. Reapplied for Environmental Clearance as there is vertical expansion. Total Constructed area (FSI + Non FSI): 44854.99 Sq. m. 6. Category of project i.e.’ A’ or ‘B’ 8 (a) B2 7. Does it attract the general condition? If yes, Not Applicable please specify. 8. Does it attract the specific condition? If yes, Not Applicable please specify. 9. Location Dadar Plot/Survey/Khasra No. CTS No. 2400 E Villages Dahisar Tehsil Borivali District State Maharashtra 10. Nearest railway station Dahisar railway station: Within 1.90 Km Nearest airport Mumbai Chhatrapati Shivaji Terminus Airport: Within 20.20 Km 11. Nearest Town, city, District headquarters Borivali (Mumbai) along with distance in kms. 12. Village Panchayats, Zilla Parishad, Municipal Municipal Corporation of Greater Mumbai (M.C.G.M.) Corporation, Local body (complete postal address with telephone nos. to be given) 13. Name of the applicant M/s. Sheth Infraworld Pvt. Ltd. 14. Registered Address "SHETH HOUSE", Behind Dindoshi Fire Station, Opp. Oberoi Mall, Gen. A. K. Vaidya Marg, Malad (East), Mumbai, Maharashtra – 400 097

Form I- “Sheth Midori” by M/s. Sheth Infraworld Pvt. Ltd. 1

No. Item Details 15. Address for correspondence "SHETH HOUSE", Behind Dindoshi Fire Station, Opp. Oberoi Mall, Gen. A. K. Vaidya Marg, Malad (East), Mumbai, Maharashtra – 400 097 Name Mr. Chintan Sheth Designation (Owner/Partner/CEO) Director Address "SHETH HOUSE", Behind Dindoshi Fire Station, Opp. Oberoi Mall, Gen. A. K. Vaidya Marg, Malad (East), Mumbai, Maharashtra Pin Code 400 097 E-mail [email protected] , [email protected] Telephone No. 022 – 42602400, 3400 Fax No. -- 16. Details of Alternative Sites examined, if any. Not Applicable Location of these sites should be shown on a topo-sheet. 17. Interlinked Projects No 18. Whether separate application of interlinked Not applicable. project has been submitted? 19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves Not applicable approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 22. Whether there is any Government Order/ -- Policy relevant/ relating to the site? 23. Forest land involved (hectares) Not Applicable 24. Whether there is any litigation pending against No the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Order /directions of the Court, if any and its relevance with the proposed project.

(II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist confirmation Yes / Details thereof (with approximate No. No quantities/ rates, whenever possible) with source of information data 1.1 Permanent or temporary change in land No The project site was an open land; the site use, land cover or topography including will be developed into a residential increase in intensity of land use (with development. respect to local land use plan) The project site is in residential zone as per the development plan. 1.2 Clearance of existing land, vegetation and No -- buildings? 1.3 Creation of new land uses? No --

Form I- “Sheth Midori” by M/s. Sheth Infraworld Pvt. Ltd. 2

Sr. Information/Checklist confirmation Yes / Details thereof (with approximate No. No quantities/ rates, whenever possible) with sour ce of in formation data 1.4 Pre-construction investigation e.g. bore Yes Geotechnical Investigation has been carried houses, soil testing? out is attached as Enclosure 2. 1.5 Co nstructi on work s? Yes Residential development 1.6 Demolition works? No -- 1.7 Temporary sites used for construction Yes Provision of temporary hutments with works or housing of construction facilities like drinking water, toilets etc. workers? 1.8 Above ground buildings, Yes Excavation material generated is already structures or earthworks including linear partly reused on site and partly disposed to structures, cut and fill or excavations the authorized sites.

Construction waste material generated shall be shall be partly reused and partly disposed to the authorized sites. 1.9 Underground works including mining or No. -- tunnel ing? 1.10 Reclamation works? No. -- 1.11 Dredging? No. -- 1.12 Offshore structures? No. -- 1.13 Production and manufacturing processes? No. -- 1.14 Facilities for storage of goods or Yes Temporary storage facilities to store the mater ials? construction raw material 1.15 Facilities for treatment or Disposal of Yes • STP for treatment of sewage solid waste or liquid effluents? • Segregation of solid waste into non- biodegradable and biodegradable garbage • Treatment of biodegradable waste in Organic Waste Converter • Non-biodegradable waste: To recyclers • Dried sludge from STP: As manure 1.16 Facilities for long term housing of No -- operational workers? 1.17 New road, rail or sea traffic No -- during construction or operation? 1.18 New road, rail, air waterborne or other No -- transport infrastructure including new or altered routes and stations, ports, airports etc.? 1.19 Closure of diversion of existing No -- transport routes or infrastructure leading to change in traffic movements? 1.20 New or diverted transmission lines No -- or pipelines? 1.21 Impoundment, damming, culverting, No -- realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No -- 1.23 Abstraction or transfers of water form No -- ground or surface waters? 1.24 Changes in water bodies or the land Yes By considering the runoff prior to

Form I- “Sheth Midori” by M/s. Sheth Infraworld Pvt. Ltd. 3

Sr. Information/Checklist confirmation Yes / Details thereof (with approximate No. No quantities/ rates, whenever possible) with sour ce of in formation data surface affecting drainage or run-off? development and runoff after development there is some increment in runoff of storm water. Incremental Runoff = 0.15 m 3/sec 1.25 Transport of personnel or materials for Yes Transport of construction materials construction, operation or Precautions shall be taken to reduce the decommissioning? impact of the vehicular movement by trying to avoid the vehicular trips during peak hours. 1.26 Long-term dismantling or No -- decommissioning or restoration works? 1.27 Ongoing activity during decommission No -- which could have an impact on the environment? 1.28 Influx of people to an area in either Yes Since this is a residential development temporarily or permanently? project there will be influx of ~ 2820 Persons. 1.29 Introduction of alien species? No -- 1.30 Loss of native species or genetic No -- diversity? 1.31 Any other action s? No --

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or ion short supply): Sr. Information/Checklist Details thereof (with approximate quantities / Yes / No. confirmation rates, whenever possible) with source of No information data 2.1 Land especially undeveloped or The land is in developed infrastructure area. No agricultural land (ha) 2.2 Water (expected source & competing During Constructional Phase – users) unit : KLD For Workers : From M.C.G.M.: 12 KLD For Construction: From Water tankers: 10 - 20 KLD Yes (Depending upon the activity)

During Operational Phase – Fresh water from M.C.G.M.: 254 KLD (Domestic) 2.3 Minerals (M.T.) No -- 2.4 Construction material – stone, aggregates, Quantity : As per requirement and / soil (expected source-MT) Sources: The material required for construction Yes activities procured from company’s authorized / approved vendors only. 2.5 Forest and timber (source-MT) Timber required for doors sourced from local Yes suppliers. 2.6 Energy including electricity and fuels During Construction Phase - (source, competing users) Unit: fuel (MT), Tata power: 112 KW energy (MW) D.G. Sets: As per requirement Yes During Operational Phase - Source: Tata power Connected load 4105 KW

Form I- “Sheth Midori” by M/s. Sheth Infraworld Pvt. Ltd. 4

Sr. Information/Checklist Details thereof (with approximate quantities / Yes / No. confirmation rates, whenever possible) with source of No in formation data Maximum demand 2025 KW D.G sets (In case of 1 No. of D.G. Set of power failure) capacity 625 kVA

2.7 Any other natural resources (use -- No appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which would be harmful to human health or the environment or raise concern about actual or perceived risks to human health. Details thereof (with approximate quantities / Sr. Yes / Information/Checklist confirmation rates, wherever possible) with source of No. No information data 3.1 Use of substances or materials, which No -- are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or No -- affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by No -- changing living conditions? 3.4 Vulnerable groups of people who could No be affected by the project e.g. hospital -- patients, children, the elderly etc., 3.5 Any other causes No --

4. Production of solid wastes during construction or operation or decommissioning (MT/ month) Sr. Information/Checklist confirmation Yes / Details thereof (with approximate quantities / rates, No. No wherever possible) with source of information data. 4.1 Spoil, overburden or mine wastes. No -- 4.2 Municipal waste (domestic and or Yes During Construction Phase: commercial wastes) Total quantity of solid waste = 15 kg/day (Biodegradable and Non-biodegradable)

During Operation Phase: The total quantity of solid waste: 1269 Kg/day. (Biodegradable and Non -biodegradable) 4.3 Hazardous wastes (as per Hazardous Yes Waste oil shall be stored at separate location duly Waste Management Rules) Waste marked and will be sold to the CPCB authorized recyclers. 4.4 Other i ndustr ial p roce ss wast es. No -- 4.5 Surplus product No -- 4.6 Sewage sludge or other sludge from Yes Dried sludge from STP will be used as manure for the efflu ent tr eatment. plants. 4.7 Construction or demolition wastes. Yes Excavation material generated is already partly reused on site and partly disposed to the authorized sites.

Construction waste material generated shall be shall be partly reused and partly disposed to the authorized sites. 4.8 Redundant machinery or equipment. No --

Form I- “Sheth Midori” by M/s. Sheth Infraworld Pvt. Ltd. 5

Sr. Information/Checklist confirmation Yes / Details thereof (with approximate quantities / rates, No. No wherever possible) with source of information data. 4.9 Contaminated soils or other materials. No -- 4.10 Agricultural wastes. No -- 4.11 Other Solid Wastes. No --

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) Sr. Information/Checklist Yes / Details thereof (with approximate quantities / rates, No. confirmation No wherever possible) with source of information data. 5.1 Emissions from combustion of fossil fuels Yes CPCB approved D.G. Sets will be used during power from stationary or mobile sources. failure. 5.2 Emissions from production process. No -- 5.3 Emissions from materials handling Yes Frequent water sprinkling done to minimize the fugitive including storage or transport. dust emissions due to handling and loading-unloading activities 5.4 Emissions from construction activities Yes Precautions taken to reduce dust generation during including plant and equipment. construction phase: Water sprinkling at regular intervals to reduce dust generation 5.5 Dust or odors from handling of materials Yes Dust generation will be controlled as described above. including construction materials, sewage Proper ventilation will be provided around STP and and waste. SWM. 5.6 Emissions from incineration of waste. No -- 5.7 Emissions from burning of waste in open No -- air (e.g. slash materials, construction debris). 5.8 Emissions from any other sources. No --

6. Generation of Noise and Vibration, and Emissions of Light and Heat: Sr. Information/Checklist Yes / Details thereof (with approximate quantities/rates, No. confirmation No wherever possible) with source of information data. 6.1 From operation of equipment e.g. engines, Yes For control of noise following measures shall be ventilation plant, crushers adopted: • Regular noise monitoring scheduled to maintain the noise level within the levels prescribed by CPCB during day and night time • Provision of ear plugs to workers • Use of high efficiency mufflers • No noise polluting work in night shifts • Provision of barricades along the periphery of the site 6.2 From industrial or similar processes No -- 6.3 From construction or demolition. Yes Noise levels may increase due to operation of machinery as well as transportation vehicles. This may cause nuisance to the nearby area. Following precautions shall be taken to control noise pollution: • Regular noise monitoring to maintain the noise level within the levels prescribed by CPCB during day and night time • Provision of ear plugs to workers • Use of high efficiency mufflers • No noise polluting work in night shifts • Provision of barricades along the periphery of the

Form I- “Sheth Midori” by M/s. Sheth Infraworld Pvt. Ltd. 6

Sr. Information/Checklist Yes / Details thereof (with approximate quantities/rates, No. confirmation No wherever possible) with source of information data. site • Trees Plantation 6.4 From blasting or piling. No --- 6.5 From construction or operational traffic. Yes During Construction phase: Transport of materials. Precautions shall be taken to reduce the impact of the vehicular movement such as vehicular trips not at peak traffic hours.

Operation Phase : The vehicular parking will be restricted only in the adequate parking area provided, which would help in reducing noise pollution due to traffic congestion Adequate tree plantation will also help to reduce the noise level and enhance air quality. 6.6 From lighting or cooling system. No -- 6.7 From any other sources. No --

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: Sr. Information/Checklist Yes / Details thereof (with approximate quantities / No. confirmation No rates, wherever possible) with source of information data. 7.1 From handling, storage, use or spillage of No -- hazardous materials. 7.2 From discharge of sewage or other No During Construction Phase: effluents to water or the land (expected Disposal of sewage to municipal sewer line. mode and place of discharge) During Operation Phase: The treated sewage will be reused for flushing and gardening within the premises. Excess treated sewage will be disposed to sewer line. 7.3 By deposition of pollutants emitted to air No Dust during construction phase from earthworks and into the land or into water. movement of vehicles. Provision of dust control measures, including water sprinkling of exposed areas and dust covers for trucks, to minimize any impacts. Stack height of DG set shall be as per CPCB guidelines. 7.4 From any other sources. No -- 7.5 Is there a risk of land term buildup of No -- pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment Sr. Information/ Checklist Yes / No Details thereof (with approximate quantities / rates, No. confirmation wherever possible) with source of information data. 8.1 From explosions, spillages, fires, etc. from No -- storage, handling, use or production of hazardous substances. 8.2 From any other causes. No -- 8.3 Could the project be affected by natural No Landslides are not expected in the area. disasters causing environmental damage Management plan for flood and earthquake is as (e.g. floods, earthquakes, landslides, follows

Form I- “Sheth Midori” by M/s. Sheth Infraworld Pvt. Ltd. 7

Sr. Information/ Checklist Yes / No Details thereof (with approximate quantities / rates, No. con firmation wherever possible) with source of information data. cloudburst etc)? Floods : • Storm water system would be checked at regular interval for its proper functioning. • Mapping the areas within or leading in or out of the building that may be water logged due to the flood. The areas will be marked after completion of the project (as final ground levels etc. will be available after completion). • Drain pumps shall be installed to avoid basement flooding

Earthquake : The structure of the building is designed as per IS codes for zone III.

9. Factors which should be considered (such as consequential development) which could lead to environmental effected or the potential for cumulative impacts with other existing or planned activities in the locality Sr. Information/Checklist Yes / No Details thereof (with approximate quantities / rates, No. confirmation wherever possible) with source of information data. 2.1 Lead to development of supporting facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: • Supporting infrastructure (roads, No Supporting infrastructure is already in existence power supply, waste or waste water treatment, etc.) • housing development Yes The project is residential development. • extractive industries • supply industries • other 9.2 Lead to after-use of the site, which could No --- have an impact on the environment. 9.3 Set a precedent for later developments Yes Will create job opportunity for support staff like Security, Maintenance, Household Workers etc. 9.4 Have cumulative effects due to proximity Yes Impacts on water availability, storm water drainage, to other existing or planned projects with availability of electricity, traffic congestion etc. similar effects.

(III) Environmental Sensitivity Sr. Name / Aerial distance (within15km) No. Areas Identity Proposed project location boundary 1. Area protected under international Sanjay Gandhi Approx.: 1.00 km conventions, national or local legislation National Park for their ecological, landscape, cultural or other related value. 2. Areas which are important or Arabian sea Approx.: 14.00 km sensitive for ecological reasons - Wetlands, water courses or other water bodies, coastal zone, biospheres,

Form I- “Sheth Midori” by M/s. Sheth Infraworld Pvt. Ltd. 8

Sr. Name / Aerial distance (within15km) No. Areas Iden tity Propos ed pro ject lo cation bo unda ry mountains, forests 3. Areas used by protected, Sanjay Gandhi Approx.: 1.00 km important or sensitive species of flora National Park or fauna for breeding, nesting, foraging, restin g, over winter ing, migration. 4. Inland, coastal, marine or underground Gorai Creek Approx.: 5.00 km waters. Malad Creek Approx.: 11.00 km Arabian sea Approx.: 14.00 km 5. State, National boundaries None -- 6. Routes or facilities used by the public None -- for access to recreation or other tourist, pilgrim areas 7. Defense installations No -- 8. Densely populated or built-up Mumbai -- area Metropolitan City. 9. Areas occupied by sensitive man-made Mumbai -- land uses (hospitals, schools, places of Metropolitan City. worship, community facilities) 10. Areas containing important, high quality No -- or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11. Areas already subjected to pollution or No -- environmental damage. (those where existing legal environmental standards are exceeded) 12. Areas susceptible to natural hazard which No -- could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or e xtreme or adverse climatic conditions)

(IV)Proposed Terms of Reference for EIA studies: Not Applicable