Pre-Bid Queries for NIT for Installation of 13179 Nos. of 300Wp Solar Home Power Packs and 4184 Nos

Total Page:16

File Type:pdf, Size:1020Kb

Pre-Bid Queries for NIT for Installation of 13179 Nos. of 300Wp Solar Home Power Packs and 4184 Nos Pre-Bid Queries for NIT for Installation of 13179 Nos. of 300Wp Solar Home Power Packs and 4184 Nos. of 40Wp Solar Street Lights including 5 years’ Comprehensive Maintenance for Electrification of 895 Nos. of Off-Grid Villages in Arunachal Pradesh under Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY) including Supply of LED Bulbs, BLDC Fans, Poles, Sign Boards & other material etc. NIT No: RECPDCL/ANP/DDG/16-17/3740 Dated: 23.02.2017 Page No. / S. No. Parameter Technical Specifications as per RFP Queries / Modifications / Changes Suggested Amendments / Clarifications / Remarks Clause No. Comprehensive warranty - For NIT 2 Bidders whoever supply the material will be responsible for guarantee / warranty for (installation work) - Here the entire project period. comprehensive warranty will include what The Execution Agency will maintain critical spares at site/Service Centers and - As per NIT 2 the major work is coordinate with Supply Agencies for other spares. Execution Agency will be responsible 1- - - installation and supply of pole and few for comprehensive maintenance. small items. How can installer take warranty of the material supplied by the other party. Authorized person of the JV/consortium Lead Member’ shall be authorized shall be authorized on behalf of on behalf of Consortium/Joint Consortium/Joint Venture Firm to deal Venture Firm to deal with the with the tender/RECPDCL, sign the General tender/RECPDCL, sign the agreement or enter into contract in condition for agreement or enter into contract in respect of the said tender, JV has to consortium respect of the said tender, to open a JV account to receive payment 2 /joint venture - receive payment and such activities and such activities in respect of the said No change firms point 6 in respect of the said tender/ tender/ contract. All notices/ (page no-23) contract. All notices/ correspondences with respect to the correspondences with respect to contract would be sent only to address of the contract would be sent only to the Consortium/Joint Venture Firm. this ‘Lead Member’ of Consortium/Joint Venture Firm. All formalities in respect of All formalities in respect of submission of submission of tender shall be done General tender shall be done in the name of only in the name of ‘Lead Member’ condition for Consortium/Joint Venture. and not in the name of consortium Authorized person having legal power of Consortium/Joint Venture Firm. 3 /joint venture - attorney from the JV has to make all No change However, name & other details of firms point 2 formalities. However, name & other both the members of Consortium/ (page no-23) details of both themembers of Joint Venture Firm should be Consortium/ Joint Venture Firm should be clearly mentioned in the clearly mentioned in the Bid/Response. Bid/Response. General Required EMD shall be submitted condition for either by the ‘Lead Member’ or by consortium Required EMD shall be submitted either the ‘Joint Venture/Consortium 4 /joint venture - by the ‘Lead Member’ or “Consortium No change Firm’ itself. EMD submitted by firms point 7 ( Partner”. Consortium Partner shall not be page no-23) considered. Notice Inviting Tender (Bid Invited through e-Tendering mode only) for Installation of 13179 Nos. of 300Wp Solar Home Power Packs and 4184 Nos. of 40Wp Solar Notice Inviting Tender (Bid Invited through e-Tendering mode only) for Installation & Street Lights including 5 years’ Commissioning of 13179 Nos. of 300Wp Solar Home Power Packs and 4184 Nos. of Title of Comprehensive Maintenance for 40Wp Solar Street Lights including 5 years’ Comprehensive Maintenance and supply of 5 (Page no: 1) NIT/Tende N/A Electrification of 895 Nos. of Off- LED Bulbs, Poles, Sign Boards & other material etc. for Electrification of 895 Nos. of Off- r Grid Villages in Arunachal Pradesh Grid Villages in Arunachal Pradesh under Deen Dayal Upadhyaya Gram Jyoti Yojana under Deen Dayal Upadhyaya (DDUGJY). Gram Jyoti Yojana (DDUGJY) including Supply of LED Bulbs, BLDC Fans, Poles, Sign Boards & other material etc. Financial Eligibility Criteria (Annual Trunover as per Sl. No. 2): This Financial Eligibility Criteria (Avg. Annual turnover) (100%) should be met by all Section IV, Eligibility 6 criteria (100%) should be jointly met consortium members collectively and Lead Bidder should meet atleast 50% of the (Page no: 7) Criteria by Lead bidder and consortium criteria. partner. Amendment: Cable 2C, 4 sq. mm max. 20 mtr per household DETAILED Cable 2C, 1.5 sq. mm max. 20 mtr per household SCOPE Fresh Addition: OF WORK Cable 2C, 4 mm approx. 20 mtr Section V, All Cable required quantity mentioned in this tender is tentative only, may vary as per & each lot 7 Clause A, f N/A site prevailing requirements. Bidder will consider actual cable length to be required at CONDITIO Cable 2C, 1.5 mm approx. 20 mtr (Page no: 10) site without any extra cost. NS OF each lot CONTRA Streelighting - CT Cable 2C, 4 sq. mm min. 5 mtr per Streetlight. DETAILED SCOPE 1 No. three pin socket + 6 Nos. 7 Nos. On/Off switches (5 for LED lamps, 1 for DC Fan, 1 for TV socket). 5 lamp Section V, OF WORK On/Off switches on switchboard holders, 2 DC sockets (each for TV and Fan), 1nos. USB port 24V/1Amp, 1nos. DC Claue A, f & 8 N/A MCB 5 amp. (Page no: 9 CONDITIO All required Thimbles, ferrule, lugs, and 10) NS OF PVC Conduit pipe, Cable Ties etc. CONTRA CT Bidder should have successfully Bidder should have successfully executed similar solar power projects (Grid Connected/ executed similar solar power Off-grid/ Mini-grid) or power sector projects (Generation/ Transmission/ Distribution) in projects (Grid Connected/ Off-grid/ last 7 Financial Years of value as below: Mini-grid) or power sector projects For Single Bidder: (Generation/ Transmission/ One Work Order of 12.0 Crores Distribution) of value a below: OR For Single Bidder: Two Work Orders of 7.0 Crores One Work Order of 12.0 Crores OR OR Three Work Orders of 6.0 Crores Two Work Orders of 7.0 Crores For Consortium/JV: OR Two Work Orders of 7.0 Crores Three Work Orders of 6.0 Crores OR For Consortium/JV: Three Work Orders of 6.0 Crores Two Work Orders of 7.0 Crores OR OR Three Work Orders of 6.0 Crores The bidder must have successfully erected, tested and commissioned power generation or power sub-transmission or distribution projects/system in a single turnkey contract in last 7 years as on the date of bid opening, having installation of at least 40% of the KW capacity* considered in proposed bid and the system so created must be in satisfactory operation for at least one (1) year as on date of opening of techno-commercial bid. OR The bidder must have successfully erected, tested and commissioned power generation we are interested to participate in the or power sub-transmission or distribution projects/system in a Two contracts in last 7 Section IV, tender. So, we hereby request you to Eligibility years as on the date of bid opening, having installation of at least 25% of the KW 9 Sl. No. 3 kindly reduce the Financial Eligibility Criteria capacity* considered in proposed bid and the system so created must be in satisfactory (Page no: 7) Criteria if possible so that we can operation for at least one (1) year as on date of opening of techno-commercial bid. contentedly participate. OR The bidder must have successfully erected, tested and commissioned power generation or power sub-transmission or distribution projects/system in a Three contracts in last 7 years as on the date of bid opening, having installation of at least 20% of the KW capacity* considered in proposed bid and the system so created must be in satisfactory operation for at least one (1) year as on date of opening of techno-commercial bid. OR Technical experience of erection, testing and commissioning of renewable energy solar offgrid/ grid project in single contract whose generation capacity shall be at-least 5% of total KW capacity* proposed in the bid and the system so created must be in satisfactory operation for at least one (1) year as on date of opening of techno- commercial bid. #Proposed bid capacity (in KW) means [(Total Nos. of Households covered * 0.3 KW/HH for standalone system) + (Total Nos. of street lights covered * 0.04 KW/street light fitting)]. Total sanctioned period for DETAILED complete design, engineering, SCOPE manufacture, testing, supply OF WORK including transportation up to Section V, Total sanctioned period for execution as per scope of work defined at the tender is 4 & Central Locations, insurance, 10 Claue B,1,1 N/A (Four) Months from the date of Allocation Letter/Work Order which can be extended CONDITIO unloading of material is 2 (Two) (Page no: 12) subject to approval of RECPDCL. NS OF Month from the date of Allocation CONTRA Letter/Work Order which can be CT extended subject to approval of RECPDCL. a. If the Successful Bidder is not COMMER able to supply of materials to the CIAL satisfaction of RECPDCL within a. If the Successful Bidder is not able to excute the work to the satisfaction of TERMS, Section VII, sanctioned period, PBG amount RECPDCL within sanctioned period, PBG amount submitted shall be forfeited. CONDITIO 11 Clause no: 3 submitted shall be forfeited. N/A NS & (Page no: 17) b. If the supplier does not fulfill its b. If the supplier does not fulfill its obligations as mentioned Section-V, Clause No. B, OTHER obligations as mentioned Section- (4), PBG amount shall be forfeited. PROVISIO V, Clause No. A (5) & A (6), PBG NS amount shall be forfeited.
Recommended publications
  • History of Project Vartak
    Brig JS Ishar Chief Engineer HISTORY OF PROJECT VARTAK The Beginning 1. During the second meeting of BRDB on 13 May 1960, late Pandit Jawaharlal Nehru, the then Prime Minister directed that the work on the construction of Road Bhalukpong- Tenga should commence on 01 Jun 1960. Accordingly, Project Tusker was raised on 07 May 1960. Thus Project Tusker was the first in Border Roads Organisation to commence road construction activity. 2. Project Tusker was also made responsible for the maintenance of road Missamari- Foothills-Chaku-Tenga, which had been constructed by PWD. Elephant Gate: Entry To Bomdila-Tawang Road 3. Work on the improvement of the Road Bhalukpong-Tenga-Bomdila was continued by 14 BRTF, which was raised in early 1962. The most difficult stretch on this high priority road was between Sessa and Bomdila. The task was completed in 6 months and the road was made trafficable by Oct 1962. Further improvements continued. Shri YB Chavan, the then Defence Minister formally opened the road in Apr 1963. 4. In 1962, a jeepable track Bomdila-Dirang-Sela-Tawang was also attempted. A Signals Task Force was raised for laying of telephone lines for Bomdila-Tawang, North Lakhimpur-Lekhabali-Along, Kimin-Ziro and Along-Daporijo sector. Initial Problems 5. During the initial induction of the Project, there were many teething problems. Maj Gen OM Mani, the first Chief Engineer (then Brigadier) of the Project later recalled:- “The Administrative Offices functioned under the cover of tarpaulins spread over bamboos. The office furniture comprised of a few packing cases and even these were in short supply.
    [Show full text]
  • Our Human Resources
    DEPARTMENT OF POWER COMMISSIONER (POWER) Chief Engineer Chief Engineer Chief Engineer Chief Engineer Chief Electrical Inspector (Transmn. P & M Zone) Eastern Electrical Zone (19/03/2005) Central Electrical Zone (19/04/2012) Western Electrical Zone (13/09/2005) (20/03/12) SF & AO SE (PLG).-I SE (PLG)-II SE (PLG.) SE (PLG.) SE (PLG.) EE(PLG.) -I EE(PLG.) -II EE(PLG.)-III EE-I EE-II EE-III EE(PLG.)-I EE(PLG.)-II EE(PLG.)-III EE(PLG.)-IV EE(PLG.)-I EE(PLG.)-II EE(PLG.)-III Administrative Officer AE (PLG.) - I AE (PLG.) - II AE (PLG.) - I AE (PLG.) - II AE (PLG.) - I AE (PLG.) - II AE (PLG.) - I AE (PLG.) - I APEC-VII, Tezu APEC - III, Miao APEC-VI, Aalo APEC - II, Pasighat APEC - V, Ziro APEC - I, Nlgn APEC - IV, Dirang APEC-VIII, SUBU Transmission Circle, Itanagar EE (PLG.) EE (PLG.) EE (PLG.) EE (PLG.)-IEE (PLG.)-II EE (PLG.) EE(PLG.)-I EE(PLG.)-II EE (PLG.) EE (PLG.) SEI, SEI, WEST EAST Itanagar Pasighat AE (PLG.) AE (PLG.) AE (PLG.) AE (PLG.) AE (PLG.) AE (PLG.) AE (PLG.) AE (PLG.) Anini Roing Namsai Miao Yatdam Deomali Longding Aalo Basar Pasighat Ziro Daporijo Itanagar Sagalee Naharlagun Tawang Bomdila Rupa Seppa Transmn. & Hayuliang Rumgong Yingkiong Transmn. Transmn. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Sangram Elect. Division Elect. Elect. Elect. Elect. Elect. Elect. Elect. SLDC Division - I Division - III Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division - II HQ Bomdila HQ, Tezu EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE Tawang, West Kameng, Lohit, Namsai, East Kameng Anjaw HQ, Roing HQ, Itanagar AE(PLG.) AE(PLG.) AE(PLG.) AE(PLG.) AE(PLG.) AE(PLG.) AE(PLG.) AE(PLG.) AE(PLG.) AE(PLG.) Dibang Valley, Papum Pare Lower Dibang Valley HQ, Ziro Ind.
    [Show full text]
  • SP's Aviation
    SPECIAL ISSUE 85TH ANNIVERSARY OF INDIAN AIR FORCE SP’s AN SP GUIDE PUBLICATION Aviation 100.00 (INDIA-BASED BUYER ONLY) BUYER 100.00 (INDIA-BASED Sharp Content for Sharp Audience ` www.sps-aviation.com vol 20 ISSUE 9 • SEptEmbEr • 2017 MILITARY: INDIA's NEw DEFENCE mINIStER P11 / INDIA & Us: NEw phASE IN DEFENCE pARTNERSHIP P14 / TRIBUTE tO AN ICON P16 CHALLENGES BEFORE THE INDIAN AIR FORCE TÊTE-À-TÊTE wIth ChIEF OF thE AIR sTAFF AIR ChIEF mARSHAl b.S. DhANOA P21 / CHALLENGEs bEFORE thE IAF P25 / CHALLENGEs IN thE NORth EASt P27 / FORMAtION OF spACE COmmAND P29 / WOmEN IN INDIAN AIR FORCE P32 / LASt wORD: SELECt thE RIGHT COMBAt PLATFORm P40 CIVIL AIRPORTs: OVER-lOADED hUBs P4; REGIONAl AVIAtION: { bIg OR smALL, sAFETY Is UTMOSt P6 & LEt's gO DUTCH! P9 { RNI NUMBER: DELENG/2008/24199 SeaGuardian MULTI-ROLE SINGLE SOLUTION • 40 hour endurance provides superior mission area coverage • Powerful 360° maritime search radar with Inverse Synthetic Aperture Radar (ISAR) • All weather, day/night, high definition full motion video and imagery • Enhanced situational awareness via teaming with manned air/surface needs • Tailored to fulfill the maritime security needs of India’s Navy www.ga-asi.com ©2017 General Atomics Aeronautical Systems, Inc. Leading the Situational Awareness Revolution table of contents vol 20 ISSUE 9 • SEptEmbEr • 2017 SPECIAL ISSUE 85TH ANNIVERSARY OF INDIAN AIR FORCE SP’s AN SP GUIDE PUBLICATION Aviation 100.00 (INDIA-BASED BUYER ONLY) BUYER 100.00 (INDIA-BASED Sharp Content for Sharp Audience ` www.sps-aviation.com vol 20 ISSUE 9 • SEptEmbEr • 2017 MILITARY: INDIA's NEw DEFENCE mINIstER P11 / INDIA & Us: NEw phAsE IN DEFENCE pARTNERSHIP P14 / TRIBUtE tO AN ICON P16 CHALLENGES BEFORE THE INDIAN AIR FORCE têtE-À-TÊTE wIth ChIEF OF thE AIR sTAFF AIR ChIEF mARshAl b.S.
    [Show full text]
  • The Strategic Postures of China and India: a Visual Guide
    MARCH 2020 The Strategic Postures of China and India: A Visual Guide Frank O’Donnell Alex Bollfrass Force Tables Reference Sheet This document contains the accompanying tables for “The Strategic Postures of China and India: A Visual Guide.” See the full report and the accompanying interactive maps at belfercenter.org/StrategicPostures The Strategic Postures of China and India: A Visual Guide | Belfer Center for Science and International Affairs | March 2020 1 Ground Forces: China Icon Name Parent Force Type Force Numbers Location Command Tibet Military 52nd Mountain Infantry Brigade HQ Infantry Brigade ~ 4,600 (total) Link District (MD) Unit 77675, 52nd Mountain Infantry Tibet MD Infantry Battalion ~ 700 Link Brigade Unit 77678, Artillery Regiment, 52nd Tibet MD Artillery Regiment ~ 1,100 Link Mountain Infantry Brigade 1st Battalion, 52nd Mountain Infantry Tibet MD Infantry Battalion ~ 700 Link Brigade 2nd Battalion, 52nd Mountain Infantry Tibet MD Infantry Battalion ~ 700 Link Brigade 3rd Battalion, 52nd Mountain Infantry Tibet MD Infantry Battalion ~ 700 Link Brigade 4th Battalion, 52nd Mountain Infantry Tibet MD Infantry Battalion ~ 700 Link Brigade 53rd Mountain Infantry Brigade HQ Tibet MD Infantry Brigade ~ 4,600 (total) Link Unit 77680, 53rd Mountain Infantry Tibet MD Infantry Battalion ~ 700 Link Brigade Artillery Regiment, Unit 77683, 53rd Tibet MD Artillery Regiment ~ 1,100 Link Mountain Infantry Brigade 1st Battalion, 53rd Mountain Infantry Tibet MD Infantry Battalion ~ 700 Link Brigade 2nd Battalion, 53rd Mountain Infantry
    [Show full text]
  • ROADS I N D E X of AOP 2007-2008 (5054 ROADS & 3054 ROADS) PART-I ======Sl
    GOVERNMENT OF ARUNACHAL PRADESH PUBLIC WORKS DEPARTMENT SPECIAL ASSISTANCE PACKAGE (SAP) ANNUAL OPERATING PLAN 2007-2008 VOLUME – A COMMUNICATION SECTOR ROADS I N D E X OF AOP 2007-2008 (5054 ROADS & 3054 ROADS) PART-I ======================= Sl. No. Name of Circles Sub- Name of Division Page No Serial From To A. FORMATS R-1 - R-20 1. RUPA CIRCLE i) Tawang 1 - 2 ii) Jang 3 iii) Bomdila 4 - 6 iv) Kalaktang 7 - 9 v) Bameng 10 - 12 vi) Seppa 13 - 15 2. CAPITAL CIRCLE i) Capital-A 16 - 22 ii) Capital-B 23 - 28 iii) Naharlagun 29 - 33 3. NAHARLAGUN CIRCLE i) Doimukh 34 - 36 ii) Sagalee 37 - 40 iii) Ziro 41 - 44 iv) Sangram 45 - 47 4. BASAR CIRCLE i) Daporijo 48 - 56 ii) Dumporijo 57 - 59 iii) Basar 60 - 65 5. ALONG CIRCLE i) Along 66 - 67 ii) Yomcha 68 - 70 iii) Rumgong 71 - 72 iv) Mechuka 73 - 74 6. BOLENG CIRCLE i) Mariyang 75 - 77 ii) Yingkiong 78 - 80 iii) Boleng 81 - 84 iv) Pasighat 85 - 87 7. TEZU CIRCLE i) Anini 88 - 89 ii) Roing 90 - 91 iii) Hayuliang 92 - 94 iv) Namsai 95 - 96 v) Tezu 97 - 99 8. JAIRAMPUR CIRCLE i) Jairampur 100 - 102 ii) Changlang 103 - 105 iii) Khonsa 106 - 108 iv) Longding 109 - 111 Roads Formats FAOP 07-08-last,INDEX(Pt-I) Page : R-8 DETAIL STATEMENT ON DISTRIBUTION OF ALLOCATION UNDER SPECIAL ASSISTANCE PACKAGE (SAP Roads Bridges P/Tracks S/Bridges RIDF CRF (E&I) NLCPR NEC Total Sl. Name of Division No. Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Allocation Allocation Allocation Allocation Allocation Allocation Allocation Allocation Allocation Cost Cost Cost Cost
    [Show full text]
  • Map of Arunachal Pradesh Μ N !( " 0 ' 0
    92°0'0"E 93°0'0"E 94°0'0"E 95°0'0"E 96°0'0"E 97°0'0"E MAP OF ARUNACHAL PRADESH µ N !( " 0 ' 0 Gelling ° N 9 " 2 0 ' Tuting 0 ° *#!( !( 9 !( 2 Mipi Dambuen Migging !( !( !( ANINI !( Monigong Palling Singa !( !(") UPPER SIANG SHI YOMI YINGKIONG DIBANG VALLEY !(!( !( Mechuka !( Etalin !( Jengging *# Pidi !( !(") TATO Payum !( Jengging Mariyang !( !( !( Anelih !( UPPER SUBANSIRI SIANG *# Arzoo Riga Geku Kaying !(") !(") !(") !( Nacho Taksing ")!( !( Siyum Hunli !( BOLENG ")!( !( Limeking *# !( WEST !(*#Boleng !( Dambuk !( Chaglagam !( Kamba !( !( *# Katan *#!( Desali Kibithoo KodakPayeng SIANG *#!( Jomlu Mobuk *#!( !( !( !( AALO !(") Mebo Matengliang Darak !( Pangin !( *#!( ROING !( !( !( Yomcha !( !( !(!( Goiliang Walong Pipsorang Giba *#!( Namsing Hayuliang Nikte-Kodum !( N !(") !( Liromoba PASIGHAT *#")Hayuliang " !( !( L. DIBANG VALLEY 0 Gusar !(") !( !( ' !( 0 Damin !( Tirbin Bagra ° N !( Koronu 8 " Nyapin Tali !(") !( ANJAW EAST SIANG 2 0 !( ' Nilling !( *#!( ChetamDAPORIJO BASAR 0 KURUNG KUMEY *# Koyu Parbuk !( ° !( !( !( LEPAR!(ADA!( !(") Yagrung TEZU 8 !( *# Baririjo !( Manchal 2 !( !( Maro !( !( !( HAWAI KRA-DAADI !( ")!( !( !( !( Sarli Parsiparlo Kora Paglam !( !( Gepen Bilat !( LOHIT !( !( Sunpura !( !( Gensi *#!( Oyan !(") Chongkham KOLORIANG !(") Daring !(") Sangram Chambang Gangte Puchi Geko Nari Ruksin Sunpura !( ")!( !( !( RAGA *#!( Yangte !( !(!( LOWER SIANG Zemithang Nyapin !( !( !( !( !( *#!( !( Kamporijo *# !( Tarak Langdi Sibe New Seren Lathao Zemithang EAST KAMENG *# NAMSAI TAWANG !( Phassang JAMIN !( LIKABALI !( *#!(
    [Show full text]
  • Aviation Regulator DGCA on Saturday Suspended a First Officer of Spice
    1 Revue de presse du 29 aout au 13 septembre 2019 Mumbai: Aviation regulator DGCA on Saturday suspended a first officer of SpiceJet for three months for mishearing an Air Traffic Control clearance, due to which he gave incorrect direction to the pilot-in-command (PIC), causing runway incursion at Mumbai airport, said a source. "DGCA probe found that Atul Yadav, who was first officer on Surat-Mumbai flight on July 5, told the PIC that their plane was cleared by ATC to cross runway 14. The truth is the clearance was given to the IndiGo plane that was ahead of his plane," the source told PTI. The SpiceJet plane had the call sign SEJ2763. When the regulator issued a show-cause notice to Yadav on August 19, he responded by admitting his mistake and stating the incursion happened on July 5 because another plane with a similar call sign which was ahead of their plane had received the ATC clearance to cross runway 14, the source said. The aircraft ahead of the SpiceJet plane was of IndiGo and it had a call sign IGO063, the source said. 31/08/19 PTI/Business Today New Delhi: In the last 2.5 years, IndiGo Airbus A320 Neos have on an average seen one faulty Pratt & Whitney (PW) engines powering these planes being changed every week. The Directorate General of Civil Aviation (DGCA) has in a RTI reply said 126 PW engines on IndiGo Neos have been replaced from 2016 to June 30, 2019. The almost once-a-week average of faulty engine replacement comes with 46 engines being replaced in calendar years 2017, 2018 each and 27 in the first six months of this year (remaining 7 in 2016).
    [Show full text]
  • Sl. Name Hoo Code Hoo Name Hoo Email
    Sl. Name hoo_code hoo_name hoo_email 1 10001 VEHICLE FACTORY, JABALPUR [email protected] 2 10002 GUN CARRIAGE FACTORY JABALPUR [email protected] 3 10003 ARMOURED VEHICLE HQRS. CHENNAI [email protected] 4 10004 HEAVY ALLOY PENETRATOR PROJECT TIRUCHI [email protected] 5 10005 ENGINE FACTORY, AVADI,CHENNAI [email protected] 6 10006 WORKS MANAGER, ORDNANCE FACTORY,YEDDUMAILARAM [email protected] 7 10007 ORDNANCE FACTORY, AMBERNATH [email protected] 8 10008 ORDNANCE EQUIPMENT FACTORY [email protected] 9 10009 HEAVY VEHICLES FACTORY [email protected] 10 10010 ORDNANCE FACTORY BOARD, KOLKATA [email protected] 11 10011 ORDNANCE FACTORY ITARSI [email protected] 12 10012 MACHINE TOOL PROTOTYPE FACTORY AMBERNATH [email protected] 13 10013 HIGH EXPLOSIVE FACTORY [email protected] 14 10014 ORDNANCE PARACHUTE FACTORY KANPUR [email protected] 15 10015 ORDNANCE CABLE FACTORY CHANDIGARH [email protected] 16 10016 ORDNANCE FACTORY, CHANDA [email protected] 17 10017 ORDNANCE CLOTHING FACTORY, SHAHJAHANPUR [email protected] 18 10018 ORDNANCE FACTORY BHANDARA [email protected] 19 10019 ORDNANCE FACTORY KATNI [email protected] 20 10020 O.F.B. REGIONAL MARKETING CENTRE NEW DELHI(RMCDL) [email protected] 21 10021 RIFLE FACTORY ISHAPORE [email protected] 22 10022 GREY & IRON FOUNDRY, JABALPUR [email protected] 23 10023 ORDNANCE FACTORY NALANDA gm‐ofn‐[email protected] 24 10024 FIELD GUN FACTORY, KANPUR [email protected] 25 10025 ORDNANCE CLOTHING FACTORY, AVADI [email protected] 26 10026 ORDNANCE FACTORY INSTITUTE OF LEARNING , AMBERNATH ofilam‐[email protected] 27 10027 OFB,
    [Show full text]
  • Vayu Issue V Sep Oct 2016
    V/2016 Aerospace & Defence Review The Indian Air Force at 84 Dassault Rafales Ordered Saving the Tejas Challenges and Opportunities Smarter Eyes in Skies Securing of Air Power Aerial Threats & Defences Lockheed Martin FOR INDIA. FROM INDIA. EXPORTED TO THE WORLD. AT LOCKHEED MARTIN, WE’RE ENGINEERING A BETTER TOMORROW. © 2016 LOCKHEED MARTIN CORPORATION Live: H: NA Trim: H: 280mm W: 215mm Job Number: FG16-03934T Designer: Kevin Gray Bleed: H: 286mm W: 221mm Publication: Vayu Aerospace Q/A: Becky Maddux Gutter: None Visual: F-16 India Communicator: Carla Krivanek Resolution: 300 DPI Country: India Due Date: 7/13/16 Density: 300 Color Space: CMYK V/2016 V/2016 Aerospace & Defence Review The IAF at 84: Securing India’s This second part of the articles, covers 36 62 Vayu’s visit to Airbus Defence & Interview with CAS Air Power Space in Germany, that to the Airbus Helicopters site at Donauworth in Germany, engaged in production of several rotorcraft including the Tiger The Indian Air Force at 84 and NH90. Dassault Rafales Ordered Saving the Tejas Challenges and Opportunities Smarter Eyes in Skies Securing of Air Power Aerial Threats & Defences 92 Smarter Eyes Cover: Dassault Rafale, the IAF’s new generation in the Skies multi role combat aircraft (photo: Dassault) In his exclusive interview with Vayu, Air Air Vice Marshal Manmohan Bahadur Chief Marshal Arup Raha gives answers of the Centre for Air Power Studies, EDITORIAL PANEL to various questions on state of the IAF lays down the Master Document, today and imminent acquisitions of new considered the Indian Union War Book, MANAGING EDITOR generation fighters – and much else.
    [Show full text]
  • Details of Trainees of the Short Term Technician’S Training on Solar Energy Conducted in Arunachal Pradesh (For Four Nos
    Details of trainees of the short term technician’s training on Solar Energy conducted in Arunachal Pradesh (For Four Nos. of Training) Training at Itanagar-1 Sl. Name of Participant Address Phone No. Photo No. 1 Hmmar Ete Bene Village, 09774335427 West Siang District, Arunachal Pradesh. 2 Pratyush Kumar Village : Chhuchani 09774835693 P.O. : Belsondi PS : Bichan Dist. : Sawatipur Bihar 3 Dinehs Rai Village : Gysapur, 8794666126 Block : Paroo District : Muzaffarpur, Bihar 4 Brijesh Kumar Singh Vill : Yarmahmmadpur, 9402278940 Block : Daryiapur, District : Chapra, Bihar 5 Memar Sora Village : Dari, 9402484071 Block : Aalo, District : West Siang, Arunachal Pradesh 6 Taha Rotu Village : Enchi, 9612560691 B/ock : Doimukh, District : Papum Pare, Arunachal Pradesh. 7 Priya Singh Near Govt. Higher 9863029595 Secondary School, Naharlagun, P.O.- Modal Village, Itanagar 8 Saurav Kumar Village: Marwan, 9402279989 Block: Sakra, District : Muzaffarpur, Bihar 9 Moti Pertin Village: Bomi, 9402261437 Block : Mariyang, Dist.: Upper Siang, Arunachal Pradesh. 10 Kargo Doke Village : Piri 8575575260 P.O. – Basar, West Siang District, Arunachal Pradesh. 11 Lukri Niji Village: MiJi, 9402278448 Block : Daporijo District: Upper Subansiri Arunachal Pradesh. 12 Pokken Yongam Village: Akkar Yongam, 9436623245 Block: Aalo, District: West Siang, Arunachal Pradesh. 13 Tenzing Wandi Thondok Village: Shergaon, District: West Kamang, Bomdila, Arunachal Pradesh. 14 Ngilyang Tagia Vill : Tajang, 8014233460 Block : Ziro, District: LowerSubansiri, Arunachal Pradesh 15 Tamchi Wadie Village: Hote, 9089687297 Block: Sangram, District: Kurung Kumey, Arunachal Pradesh. 16 Michi Yami Village: Bamin (Michi), 9774979310 Block: Ziro, Distric : Lower Subansiri, Arunachal Pradesh. 17 Mukesh Kumar Yadav Village : Giyaspur, 9402282995 Block : Paru, District : Muzafferpur, Bihar 18 Orik Ratan Village: Damroh, 9862107547 Block: Mariyang, District: Upper Siang, Arunachal Pradesh.
    [Show full text]
  • Aero India 2017 Show Dailies Official Media Partner
    www.aeromag.in September - October 2016 Vol : X Issue : 5 Aeromag10 years in Aerospace Asia Rafale Rumble in Indian Skies Aero India 2017 Show Dailies Official Media Partner A Publication in association with the Society of Indian Aerospace and Defence Technologies & Industries AMARI 280 x 205_Layout 1 20/07/2016 10:36 Page 1 © 2016 SCHUNK GmbH & Co. KG GmbH & Co. SCHUNK © 2016 www.gb.schunk.com/robotaccessories The metals service provider linking More than 1,200 Modules Feed-through Rotary feed-through DDF 2 for your Robot India with the UK n ON-TIME, IN-FULL deliveries throughout the whole of Asia from one of the world’s largest metals suppliers The unique standard line of modules for mechanical, Connecting Adapter plate n Key supplier to high-tech industries including aerospace, defence and motorsport sensor and power connections of handling modules n Reliable, cost effective supply of semi-finished metal products to near net shape... in plate, bar, sheet, and robots. tube and forged stock Monitoring n From an extensive specialist inventory: aluminium, steels, titanium, copper and nickel alloys Collision and overload sensor OPR n Fully approved by all major OEM's and to ISO 9001:2008, AS9100 REV C accreditations Preferred strategic supply partner to India's aerospace manufacturing sector. Joining and compensating Compensation unit TCU Changing Gripping Quick-change system SWS SCHUNK gripper PGN-plus consisting of 2-finger universal gripper with Jens Lehmann, German goalkeeper legend, SWK ( quick-change head) and multi-tooth guidance Tel: +44 (0)23 8074 2750 Fax:+44 (0)23 8074 1947 [email protected] SCHUNK brand ambassador since 2012 SWA (quick-change adapter) for safe, precise gripping and holding.
    [Show full text]
  • MINISTRY of CIVIL AVIATION NOTIFICATION New Delhi, the 30Th
    62 THE GAZETTE OF INDIA : EXTRAORDINARY [P ART II—SEC . 3(i)] MINISTRY OF CIVIL AVIATION NOTIFICATION New Delhi, the 30th September, 2015 G.S.R.751 (E).–– The Central Government, being of opinion that it is necessary and expedient to do so for the safety of aircraft operations, proposes to make the following certain rules, in exercise of the powers conferred by sub-section (1) and clause (o) and clause (r) of sub-section (2) of section 5 read with section 9A of the Aircraft Act, 1934 (XXII of 1934) (hereinafter referred to as the said Act), and in supersession of the Ministry of Civil Aviation notification number S.O.84(E), dated the 14 th January, 2010 published in the Gazette of India, Part II, section 3, sub-section (ii), except as respect things done or omitted to be done before such supersession. The objections or suggestions on the draft S.O. were called from the stakeholders and are considered by the Government to the extent admissible. In the public interest the rules are notified by seeking exemption from putting the rules again in the public domain. 1. Short title and commencement.–– (1) These rules may be called the Ministry of Civil Aviation (Height Restrictions for Safeguarding of Aircraft Operations) Rules, 2015. (2) They shall come into force on the date of their publication in the Official Gazette. 2. Application .–– These rules shall apply to all civil and defence aerodromes listed in Schedule III to Schedule VII, as amended from time to time. 3. Definitions.–– In these rules, unless the context otherwise requires, ––
    [Show full text]