698 Central Avenue BROOKLYN, NY 11207

Total Page:16

File Type:pdf, Size:1020Kb

698 Central Avenue BROOKLYN, NY 11207 Bushwick Industrial building for sale 698 Central Avenue BROOKLYN, NY 11207 212-875-1800 / developmentsiteadvisors.com 698 Central Avenue BROOKLYN, NY 11207 TABLE OF CONTENTS Property Information 3 Interior Photos 4 Property Location 5 Points of interest in the area 6 Contact Information 7 2 212-875-1800 / developmentsiteadvisors.com 698 Central Avenue BROOKLYN, NY 11207 PROPERTY INFORMATION Frontage Current Zoning Gross Bldg. SF 250’ WA M1-1 ±15,000 Location: Corner formed by Chauncey Street and Central Avenue Block: 3446 Lot: 37 Lot Dimensions: 150’ x 100’ Lot SF: ± 15,000 SF Building Class: F5 Gross Square Footage: 15,000 SF Zoning: M1-1 Neighborhood: Bushwick Development Site Advisors® is pleased to announce that we have been exclusively hired to market and arrange for the sale Ceiling heights: 14 Feet Overhead Doors: 2 of 698 Central Avenue, Brooklyn, NY 11207 (“The Property”). Curb cuts: 2 Smaller Entry Doors: 2 The M1-1 Zoned property consists of a 15,000 SF lot improved by a Light Manufacturing Frontage: 250 Feet (100 feet on Central Avenue 150 feet on Chauncey Street) building with a total Gross Square Footage of 15,000. The Property is located in Brooklyn, Occupancy: Two 7,500 SF spaces. The right portion of the building is leased until January 3, 2021. in the neighborhood of Bushwick, at the northwesterly corner formed by the intersection of Chauncey Street and Central Avenue. The building is subdivided into two 7,500 SF units, one of which is vacant and the other is leased through 1/3/2021. The building features 14-foot ceilings, 2 overhead doors, 2 smaller doors and 2 curb cuts. The property ASKING PRICE: $6,000,000 is available for purchase by itself, or as a portfolio with the addition of the adjacent property at 769 Chauncey Street, Brooklyn, NY 11207. This portfolio opportunity would bring the total warehouse space to 30,000 SF. The property is not in an IBZ zone which allows for multiple uses. 3 212-875-1800 / developmentsiteadvisors.com 698 Central Avenue BROOKLYN, NY 11207 INTERIOR PHOTOS 4 212-875-1800 / developmentsiteadvisors.com 698 Central Avenue BROOKLYN, NY 11207 PROPERTY LOCATION Myrtle-Wyckoff Avenues Subway Station Knickerbocker Avenue M L 3446 / 37 M L Halsey Street Station Block: 3446 Lot: 37 Gates Avenue Air Rights Station Wilson Avenue Lot J Z Station L Subject Property • Two blocks away from the L Train at the Wilson Avenue station as well as the J & Z train Halsey Street at the Chauncey Street Train Stop. J L at Wilson Av 0.15 miles at Bushwick Av 0.32 miles • Close proximity to major roadways like Jackie Robinson highway, Atlantic Avenue, and Chauncey Street L Station the Eastern Parkway J Z at Chauncey St 0.36 miles J Z • Close to the Broadway retail corridor in Bushwick which is one of the most bustling J at Halsey St 0.5 miles corridors in Brooklyn. L at Halsey St 0.59 miles • The building benefits from being in Bushwick one of the most culturally diverse neighborhoods in the city and attracts people from all over NYC due to its unique dining options and emerging arts scene. 5 212-875-1800 / developmentsiteadvisors.com 698 Central Avenue BROOKLYN, NY 11207 POINTS OF INTEREST IN THE AREA 6 7 5 8 4 9 1 2 3 1. The Evergreen (Bar) 6. Alex Lunchunette 2. Salud Bar And Grill 7. Queens Brewery 3. Armando Pizza 8. Habinero 4. Bushwick Taco Company 9. The Muse 5. Angelas Bakery 6 212-875-1800 / developmentsiteadvisors.com 698 Central Avenue BROOKLYN, NY 11207 135 East 57th Street, 18th Floor Rubin Isak Lev Kimyagarov Jake Kaiser New York, NY 10022 Managing Principal, Co-Founder Managing Principal, Co-Founder Director developmentsiteadvisors.com 212-875-1800 x 1 212-875-1800 x 2 212-875-1800 x 7 [email protected] [email protected] [email protected] The depiction in the included photograph of any person, entity, sign, logo or property, other than Development Site Advisors’ (DSA) client and the property offered by DSA, is incidental only, and is not intended to connote any affiliation, connection, association, sponsorship or approval by or between that which is incidentally depicted and DSA or its client. This listing shall not be deemed an offer to lease, sublease or sell such property; and, in the event of any transaction for such property,7 no commission shall be earned by or payable to any cooperating broker except if otherwise provided pursuant to the express terms, rates and conditions of DSA’s agreement with its principal, if, as and when such commission (if any) is actually received from such principal. (A copy of the rates and conditions referred to above with respect to this property is available upon request.) 212-875-1800 / developmentsiteadvisors.com.
Recommended publications
  • A Retrospective of Preservation Practice and the New York City Subway System
    Under the Big Apple: a Retrospective of Preservation Practice and the New York City Subway System by Emma Marie Waterloo This thesis/dissertation document has been electronically approved by the following individuals: Tomlan,Michael Andrew (Chairperson) Chusid,Jeffrey M. (Minor Member) UNDER THE BIG APPLE: A RETROSPECTIVE OF PRESERVATION PRACTICE AND THE NEW YORK CITY SUBWAY SYSTEM A Thesis Presented to the Faculty of the Graduate School of Cornell University In Partial Fulfillment of the Requirements for the Degree of Master of Arts by Emma Marie Waterloo August 2010 © 2010 Emma Marie Waterloo ABSTRACT The New York City Subway system is one of the most iconic, most extensive, and most influential train networks in America. In operation for over 100 years, this engineering marvel dictated development patterns in upper Manhattan, Brooklyn, and the Bronx. The interior station designs of the different lines chronicle the changing architectural fashion of the aboveground world from the turn of the century through the 1940s. Many prominent architects have designed the stations over the years, including the earliest stations by Heins and LaFarge. However, the conversation about preservation surrounding the historic resource has only begun in earnest in the past twenty years. It is the system’s very heritage that creates its preservation controversies. After World War II, the rapid transit system suffered from several decades of neglect and deferred maintenance as ridership fell and violent crime rose. At the height of the subway’s degradation in 1979, the decision to celebrate the seventy-fifth anniversary of the opening of the subway with a local landmark designation was unusual.
    [Show full text]
  • Target Hardening at a New York City Subway Station
    TARGET-HARDENING AT A NEW YORK CITY SUBWAY STATION: DECREASED FARE EVASION — AT WHAT PRICE? by Robert R. Weidner Rutgers, The State University of New Jersey Abstract: This paper evaluates the effect of the installation of "high-wheel" turnstiles on the incidence of fare evasion at a subway station in New York City. Ridership, summons and arrest data at the treatment station and two adjacent control stations suggest that the new high-wheel turnstiles were somewhat effective in reducing fare evasion, with little evidence of displace- ment. In light of these results, this article addresses the issue of whether the marginal success of these measures, which some say create a draconian, prison-like environment, justifies their detrimental effects on station aesthetics. INTRODUCTION Fare evasion results in significant losses of revenue to transit systems worldwide. It can take any of three forms, contingent upon the charac- teristics of the system in which it occurs: (1) blatant types, such as turnstile vaulting; (2) surreptitious avoidance of proper fare payment, which occurs in systems in which riders are "on their honor" to pay the appropriate fare for the distance they are traveling; and (3) use of slugs {counterfeit forms of fare). There are many subtle differences in the way these types of fare evasion occur, depending upon the traits of individual systems. Of the handful of studies that examine the effectiveness of situation- specific measures in combating fare evasion, all focus on variations of the latter two forms (Clarke, 1993; Clarke et al., 1994; DesChamps et al., 1991; Hauber, 1993; van Andel, 1989).
    [Show full text]
  • Statement of Needs for Fiscal Year 2018
    INTRODUCTION The annual Statements of Community District Needs (CD Needs Statements) and Community Board Budget Requests (Budget Requests) are Charter mandates that form an integral part of the City's budget process. Together, they are intended to support communities in their ongoing consultations with city agencies, elected officials and other key stakeholders and influence more informed decision making on a broad range of local planning and budget priorities. This report also provides a valuable public resource for neighborhood planning and research purposes, and may be used by a variety of audiences seeking information about New York City's diverse communities. HOW TO USE THIS REPORT This report represents Brooklyn Community Board 4’s Statement of Community District Needs and Community Board Budget Requests for Fiscal Year (FY) 2018. This report contains the formatted but otherwise unedited content provided by the Community Board, collected through an online form available to community boards from September to November 2016. Community boards may provide substantive supplemental information together with their Statements and Budget Requests. This supporting material can be accessed by clicking on the links provided in the document or by copying and pasting them into a web browser, such as Chrome, Safari or Firefox. If you have questions about this report or suggestions for changes please contact: [email protected] This report is broadly structured as follows: a) Overarching Community District Needs Sections 1 – 4 provide an overview of the community district and the top three pressing issues affecting this district overall as identified by the community board. Any narrative provided by the board supporting their selection of their top three pressing issues is included.
    [Show full text]
  • Uptown Square District
    LANDMARK DESIGNATION REPORT UPTOWN SQUARE DISTRICT PROPERTIES GENERALLY FRONTING ON WEST LAWRENCE AVENUE FROM NORTH MAGNO- LIA AVENUE TO EAST OF NORTH SHERIDAN ROAD, AND ON NORTH BROADWAY BETWEEN WEST WILSON AVENUE AND WEST GUNNISON STREET, AND ON NORTH RACINE AVENUE BETWEEN WEST LELAND AVENUE AND WEST LAWRENCE AVENUE, AND ON WEST LELAND AVENUE BETWEEN NORTH RACINE AVENUE AND NORTH WINTHROP AVENUE Final Landmark Recommendation adopted by the Commission on Chicago Landmarks, October 6, 2016 CITY OF CHICAGO Rahm Emanuel, Mayor Department of Planning and Development David Reifman, Commissioner 1 The Commission on Chicago Landmarks, whose nine members are appointed by the Mayor and City Council, was established in 1968 by city ordinance. The Commission is respon- sible for recommending to the City Council which individual buildings, sites, objects, or dis- tricts should be designated as Chicago Landmarks, which protects them by law. The landmark designation process begins with a staff study and a preliminary summary of information related to the potential designation criteria. The next step is a preliminary vote by the landmarks commission as to whether the proposed landmark is worthy of consideration. This vote not only initiates the formal designation process, but it places the review of city per- mits for the property under the jurisdiction of the Commission until a final landmark recom- mendation is acted on by the City Council. This Landmark Designation Report is subject to possible revision and amendment dur- ing the designation process.
    [Show full text]
  • Eotf 0317 0218.Pdf
    MTA - Eye on the Future Page 1 of 2 Welcome to the latest MTA "Eye on the Future," in which we present currently funded capital projects that are planned to be advertised from March 2017 through February 2018. The "Eye" is hosted along with other information and resources about the MTA Capital Program i one convenient location. It is part of our commitment to improve business practices and we hope it is useful to you. The MTA Capital Program is very important for the safety and reliability of the MTA transportation system and is vital for the regional economy. As described in this issue of the "Eye," the MTA is preparing to undertake 147 projects valued at approximately $4.2 billion in capital work. This work spans many areas, including civil, structural, and electrical, as well as new technologie These projects are crucial for the reliability, growth and resiliency of the system and contribute to the regional economy This amount of investment is projected to generate approximately $7.5 billion in economic activity for the New York region. Contractors and suppliers have a critical stake in the success of the Capital Program. We appreciate your interest in an support of the projects included in this issue of the "Eye," and we look forward to your participation. Yours truly, Veronique Hakim Interim Executive Director Click here for Eye on the Future http://wp1.mtahq.org/mta/capital/eotf.htm 5/9/2017 MTA - Eye on the Future Page 1 of 6 Print Page Information About Contracts that Will Be Advertised for Professional Services, Construction,
    [Show full text]
  • Transit & Bus Committee Meeting
    Bus Company Transit & Bus Committee Meeting July 2015 Committee Members F. Ferrer, Committee Chairman J. Banks III, Committee Vice Chairman J. Ballan A. Cappelli J. Kay S. Metzger C. Moerdler J. Molloy P. Trottenberg I. Weinshall A. Albert E. Watt New York City Transit and Bus Committee Meeting 2 Broadway - 20th Floor Board Room New York, NY 10004 Monday, 7/20/2015 10:30 AM - 12:00 PM ET 1. PUBLIC COMMENT PERIOD 2. APPROVAL OF MINUTES – JUNE 22, 2015 June Committee Meeting Minutes - Page 4 3. COMMITTEE WORK PLAN Committee Workplan - Page 9 4. OPERATIONS PERFORMANCE SUMMARY a. May Operations Report May Operations Report - Page 18 5. FINANCIAL REPORTS a. May NYCT Financial & Ridership Report NYCT Financial Report - Page 55 b. May SIR Financial & Ridership Report SIR Financial Report - Page 76 c. May MTA Bus Financial & Ridership Report MTA Bus Financial Report - Page 87 d. Capital Program Status Report Capital Program Status Report - Page 100 6. PROCUREMENTS NYCT July Procurement Staff Summary and Resolution - Page 109 a. Non-Competitive NYCT, MTA Bus Non-Competitive Actions - Page 113 b. Competitive NYCT, MTACC Competitive Actions - Page 118 c. Ratifications NYCT, MTACC Ratifications - Page 135 7. SERVICE CHANGES a. NYCT Request for Public Hearing for Station Access Changes at Two Stations NYCT Request for Public Hearing for Station Access Changes at Two Stations in Brooklyn - Page 142 8. SPECIAL REPORTS & PRESENTATIONS a. MetroCard Report MetroCard Report - Page 148 9. MTACC Report MTACC Report - Page 152 Minutes of Regular Meeting Committee on Operations of the MTA New York City Transit Authority, Manhattan and Bronx Surface Transit Operating Authority, Staten Island Rapid Transit Operating Authority, Capital Construction Company and Bus Company June 22, 2015 Meeting Held at: Metropolitan Transportation Authority Two Broadway New York, New York 10004 10:30 AM The following Members were present: Hon.
    [Show full text]
  • The Benefit of E-Scooters During the L Train Shutdown
    THE BENEFIT OF E-SCOOTERS DURING THE L TRAIN SHUTDOWN FINAL REPORT | DECEMBER 2018 PREPARED BY: HR&A Advisors, Inc. NYC E-Scooter L Train Benefits | 1 CONTENTS Executive Summary 3 What’s a Bird? 6 L Train Shutdown 8 Proposal 10 Benefits 15 User Profiles 19 Appendix A: Ridership Estimate 21 Appendix B: Comparison of Travel Times by Mode 23 Appendix C: Value of Time 26 Appendix D: User Profiles Travel Times & Fares 27 FIGURES Figure 1: Home Zones 11 Figure 2: Home Zones by the Numbers 12 Figure 3: Work Zones 13 Figure 4: Ridership Estimate Calculation 14 Figure 5: Travel Time Savings Enabled by Bird by Zone 15 Figure 6: Generalized Cost Ratio Comparing Cost of Walking vs. Bird 16 Figure 7: VMT Estimate Calculation 18 Figure 8: Commuters from Home Zones to Work Zones (One-Way) 21 Figure 9: Commuter Mode Share – Subway 22 Figure 10: Commuters Using Subway from Home Zones to Work Zones (One-Way) 22 Figure 11: Average Travel Time Between Home and Work Zones by Transportation 25 Alternative Figure 12: Zone 1 Commute Times & Fares 27 Figure 13: Zone 2 Commute Times & Fares 27 Figure 14: Zone 3 Commute Times & Fares 27 HR&A Advisors, Inc. NYC E-Scooter L Train Benefits | 2 EXECUTIVE SUMMARY On June 29, 2017, Governor Cuomo signed an executive order declaring a state of emergency for New York City’s subways, triggering $1 billion to expedite sorely need repairs.1 Since then, the system has continued to be plagued by more than 1,000 major incidents—defined by the MTA as "incidents that delay 50 or more trains”2—peaking in January at 105.
    [Show full text]
  • New York City Maps
    Keith Haring Magnets Developed for the Keith Haring Pop Shop. Proceeds support the programs of the Keith Haring Foundation. 2 ¼” Magnets $1.50 wholesale Please order in 6’s Dancing Figure Angel Baby (white) Baby (red) Dancing Figures Smiling Face # 30976 # 30977 # 30978 # 30979 # 30980 # 30981 Snake Lightbulb Batman Safe Sex Holding Heart Barking Dog # 30982 # 30983 # 30984 # 30985 # 30986 # 30987 2” x 3” Magnets $1.50 wholesale Please order in 6’s DJ Dog No Evil Alien Barking Dog DJ (Color) Batman # 31000 # 31001 # 31002 # 31003 Not Available # 31005 Pop Holding Shop Heart # 31006 # 31007 3” x 3” Magnets $1.75 wholesale Please order in 4’s Stop AiDS Holding Heart South Africa Baby (red) Baby (black) Face (yellow) Face (orange) # 30988 # 30989 # 30990 # 30991 # 30992 # 30993 # 30994 4 ½” x 1 ½” Magnets $1.75 wholesale Please order in 6’s Snake Figures (on Orange) Figures (on Blue) Dancing Dogs # 30996 # 30997 # 30998 # 30999 Stacked Figures # 30995 2 ½" × 3 ½" Magnets $1.75 wholesale Please order in 5’s Houston Street Mural Keith in Subway Car Keith with Blimp Dancing Figure # 2535-30971 # 2535-30972 # 2535-30973 # 2535-32874 MTA Recycled Products 2 × 3 Magnet 6 × 9 Journal Wrapping Paper 2-pack $5.50 - 6 min $1.50 - 6 min $1.50 - 6 min Item # 15333 Item # 15334 Mousepad Item # 15329 $5.00-6min Neoprene Coaster 4-pack $5.00-6min Item # 15327 Item # 15326 1" Buttons 50¢ wholesale Please order in 35’s Dancing Figure Baby (red) Baby (orange) Baby (white) Batman Dancing Dog # 99878 # 99879 # 99880 # 99881 # 99882 # 99883 Angel Conjoined Figure
    [Show full text]
  • Transit & Bus Committee Meeting
    , Transit & Bus Committee Meeting December 2016 _____________________ Committee Members F. Ferrer, Committee Chairman A. Albert D. Jones S. Metzger C. Moerdler J. Molloy J. Samuelsen P. Trottenberg V. Vanterpool P. Ward New York City Transit and Bus Committee Meeting 2 Broadway - 20th Floor Conference Room New York, NY 10004 Monday, 12/12/2016 10:00 AM - 11:30 PM ET 1. PUBLIC COMMENT PERIOD 2. APPROVAL OF MINUTES – NOVEMBER 14, 2016 November Committee Meeting Minutes - Page 4 3. COMMITTEE WORK PLAN a. Committee Work Plan Committee Work Plan - Page 10 b. Proposed 2017 Transit & Bus Committee Work Plan Proposed 2017 Transit and Bus Committee Work Plan - Page 18 4. OPERATIONS PERFORMANCE SUMMARY a. October Operations Report October Operations Report - Page 26 5. FINANCIAL REPORTS a. October NYCT Financial & Ridership Report October NYCT Financial and Ridership Report - Page 56 b. October SIR Financial & Ridership Report October SIR Financial and Ridership Report - Page 79 c. October MTA Bus Financial & Ridership Report October MTA Bus Financial and Ridership Report - Page 92 d. Capital Program Status Report Capital Program Status Report - Page 107 6. PROCUREMENTS NYCT December Procurement Staff Summary and Resolution - Page 116 a. Non-Competitive NYCT Non-Competitive Actions - Page 120 b. Competitive NYCT Competitive Actions - Page 123 c. Ratifications MTACC Ratifications - Page 130 7. ACTION ITEMS a. NYCT 2017 Final Proposed Budget NYCT 2017 Final Proposed Budget - Page 135 b. SIR 2017 Final Proposed Budget SIR 2017 Final Proposed Budget - Page 146 c. MTA Bus 2017 Final Proposed Budget MTA Bus 2017 Final Proposed Budget - Page 157 8. SERVICE CHANGES a.
    [Show full text]
  • Cultural Resources
    Chapter 6.3: Cultural Resources A. INTRODUCTION This chapter assesses the potential for cultural resources (including architectural and archaeological resources) to be affected by the construction and/or operation of the project alternatives. B. METHODOLOGY REGULATORY CONTEXT The Federal Highway Administration (FHWA) and the Port Authority of New York and New Jersey (PANYNJ) are serving as co-lead agencies for this Tier I EIS. This evaluation of cultural resources has been performed in accordance with Section 106 of the National Historic Preservation Act of 1966 (NHPA), as amended; Section 4(f) of the United States Department of Transportation Act of 1966; the New York State Historic Preservation Act of 1980 (SHPA); and the New Jersey Register of Historic Places Act of 1970 (NJSA). Section 106 of NHPA, as implemented by federal regulations appearing in 36 CFR Part 800, mandates that federal agencies consider the effect of their actions on historic properties, defined as “any prehistoric or historic district, site, building, structure, or object included in, or eligible for inclusion in, the National Register of Historic Places.” Historic properties include properties listed on the National Register of Historic Places (NR) or the State Register of Historic Places (SR) or determined eligible for such listing. Section 106 of NHPA also includes specific guidelines for the treatment of National Historic Landmarks (NHLs). NHLs are properties of national significance designated by the United States Department of Interior because they possess exceptional historic value. In addition, Section 110 of NHPA mandates additional protection of NHLs by requiring that federal agencies undertake planning and actions as necessary to minimize harm when considering undertakings that may directly and adversely affect NHLs.
    [Show full text]