1. Dolo Stone(Gitti, Boulder) Mine at Araji No.-7536Ga Mi, Khand No.- 02, Villlage- Billimarkundi, Tehsil-Robertsganj, Sonbhadra, Area -4.0 Ha
Total Page:16
File Type:pdf, Size:1020Kb
Minutes of 442nd SEAC Meeting Dated 06/01/2020 The 442nd meeting of SEAC was held in Directorate of Environment, U.P. on 06/01/2020 following members were present in the SEAC: 1. Dr. (Prof.) S.N. Singh, Chairman 2. Dr. Sarita Sinha, Member 3. Dr. Virendra Misra, Member 4. Dr. Pramod Kumar Mishra, Member 5. Dr. Ranjeet Kumar Dalela, Member 6. Dr. Ajoy Kumar Manda, Member 7. Shri Meraj Uddin, Member 8. Shri Rajive Kumar, Member The Chairman welcomed the members to the 442nd SEAC meeting. The SEAC unanimously took following decisions on the agenda points discussed: 1. Dolo Stone(Gitti, Boulder) Mine at Araji No.-7536Ga Mi, Khand No.- 02, Villlage- Billimarkundi, Tehsil-Robertsganj, Sonbhadra, Area -4.0 ha. File No. 4736/Proposal No. SIA/UP/MIN/34334/2019 RESOLUTION AGAINST AGENDA NO-01 The project proponent did not appear. The committee discussed and deliberated that the project file should be closed and be opened only after request from the project proponent. The file shall not be treated as pending at SEAC. The matter will be discussed only after submission of online request on prescribed online portal. 2. Dolo Stone (Gitti, Boulder) Mine at Araji No.-5593 ka, Khand No.-08, Villlage-Billimarkundi, Tehsil-Robertsganj, District-Sonbhadra, U.P, M/s Amit Enterprises, Leased Area -4.230 ha. File No. 4737/Proposal No. SIA/UP/MIN/34345/2019 RESOLUTION AGAINST AGENDA NO-02 The project proponent did not appear. The committee discussed and deliberated that the project file should be closed and be opened only after request from the project proponent. The file shall not be treated as pending at SEAC. The matter will be discussed only after submission of online request on prescribed online portal. 3. Sand Mining (Khand No.-Part of 50, 52/1, 53, 54, 55, 56, 57, 58, 59 & 60/1/3 Near Village- Sadimadanpur, Tehsil- Pailani, District-Banda, U.P., M/s Esteem Infrbuild Pvt. Ltd., Area- 28.33 ha). File No. 4578/Proposal No. SIA/UP/MIN/ 29998/2018 A presentation was made by the project proponent along with their consultant M/s Paramarsh (Servicing Environment and Development). The committee discussed the matter and directed the project proponent to submit following information: 1. Project proponent should provide the raw data of test reports including free silica in area sample. 2. The information related to ecology study should be provided. The matter shall be discussed after submission of online information on prescribed portal. Minutes of 442nd SEAC Meeting Dated 06/01/2020 4. Sand Mining from Ganga River Bed at khasra no. 5, Near Village- Manikapur Kham, Tehsil- Sahawar, District- Kasganj, U.P., (Leased Area- 23.225 ha.). File No. 4664/Proposal No. SIA/UP/MIN/31235/2019 A presentation was made by the project proponent along with their consultant M/s Earthood Services Pvt. Ltd. The project proponent through the submitted documents, presentation made before the SEAC and informed accordingly:- 1. The environmental clearance is sought for Sand Mining from Ganga River Bed at khasra no. 5, Near Village- Manikapur Kham, Tehsil- Sahawar, District- Kasganj, U.P., (Leased Area- 23.225 ha.). 2. Terms of reference in the matter were issued through SEIAA, U.P. letter no. 142/Parya/SEAC/4664/2018, dated 03/07/2019. 3. Public hearing was organized on 11/10/2018. Environment Impact Assessment Report (EIA) submitted by the project proponent on 15/11/2019. 4. Salient features of the project as submitted by the project proponent: 1. On-line proposal No. SIA/UP/MIN/31235/2019 2. File No. allotted by SEIAA, UP 4664 3. Name of Proponent Shri Mukesh Bhadoria S/o Shri Kushal Pal Singh M/s Hind Constructions 4. Full correspondence address of proponent R/o Mohla Kenal Road, Ganjdundwara District Kasganj, Uttar Pradesh and mobile no. 5. Name of Project Manikapur Kham Sand Mining Project 6. Project location (Plot/ Khasra /Gata No.) khasra No. 5 7. Name of River Ganga 8. Name of Village Manikapur Kham 9. Tehsil Sahawar 10.District Kasganj 11. Name of Minor Mineral Sand 12. Sanctioned LeaseArea (inHa.) 23.225 ha. 13. Mineable Area (in Ha.) 20.79 ha. 14.Zero level mRL 162.5 mRL 15.Max.&Min mrl within lease area 162.2 mRL- 163 mRL 16.Pillar Coordinates (Verified by OMO) Pillars Latitude Longitude A 27°54'7.32"N 78°53'27.88"E B 27°54'9.81"N 78°53'26.94"E C 27°54'27.80"N 78°53'58.53"E D 27°54'11.13"N 78°53'59.98"E 18.Total Mineable Reserves in LOI 26,49,168 cum 19.Total Proposed Production (in five year) 2,50,000 cum/ Annum 20.Proposd Production for 5 years Year Production 1st 2,50,000 cum/ Annum 2nd 2,50,000 cum/ Annum 3rd 2,50,000 cum/ Annum 4th 2,50,000 cum/ Annum 5th 2,50,000 cum/ Annum 21.Sanctioned Period of Mine lease 5 Years 22.Production of mine/day 1000 m3 23.Method of Mining Opencast Semi-Mechanized 24.No.of working days 250 days 25.Working hours/day 8 Hours/Day 26.No.Of workers 75 27.No.Of vehicle movement /day 90 28.Type of Land Govt. land(River bed) 29.Ultimate Depth of Mining 3 Meter Page 2 of 37 Minutes of 442nd SEAC Meeting Dated 06/01/2020 30.Nearest metalled road from site 502 m 31. Water Requirement PURPOSE REQUIREMENT (KLD) Drinking& Domestic 3.37 Suppression of dust 1.5 Plantation 0.8 Others( if any) ------ Total 5.67 32. Name of QCI Accredited Consultant with Earthood Services Pvt. ltd. QCI No and period of validity. NABET/EIA/1821/IA0036 424A, Tower B3, Spaze I-Tech Park, Sector-49, Sohna Road, Gurugram-122018 Validity- 11th May 2021 33. Any litigation pending against the project or No land in any court 34. Details of 500 m Cluster Map & certificate Letter No. 284/(Khanij)/ (2018-19), dated 03, April, 2019 Verified by Mining Officer 35. Details of Lease Area in approved DSR Page No. 8, S.No. 3 36. Proposed CER cost 1.7 Lakh 37. Proposed EMP cost 4.25 Lakh 38. Length and breadth of Haul Road. Length-502 m, Width- 6.0 meter 39. No. of Trees to be Planted 33% of the lease area- 760 plants 5. The mining would be restricted to unsaturated zone only above the phreatic water table and will not intersect the ground water table at any point of time. 6. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 7. The mining operation will not be carried out in safety zone of any bridge or embankment or in eco- fragile zone such as habitat of any wild fauna. 8. There is no litigation pending in any court regarding this project. 9. The project proposal falls under category–1(a) of EIA Notification, 2006 (as amended). RESOLUTION AGAINST AGENDA NO-04 The committee discussed the matter and recommended grant of environmental clearance for the project proposal along with general and specific conditions as annexed at annexure-2 & 3 to these minutes regarding mining project. The committee also stipulated following specific conditions: 1. Environment management in according to environmental status and impact of the project. 2. Selection of plants for green belt should be on the basis of pollution removal index. 3. No mining activity should be carried out in-stream channel as per SSMMG, 2016. 4. Pakka motorable haul road to be maintained by the project proponent. 5. A separate Environmental Management Cell with suitable qualified personnel shall be set-up under the control of a Senior Executive, who will report directly to the Head of the Organization. 6. Permission from the competent authority regarding evacuation route should be taken. 7. Project proponent should ensure survival of tree saplings. Mortality should be replaced from time to time. 8. Site Pit photographs should be submitted with date, time and point-coordinate within 15 days. 9. One month monitoring report of the area for air quality, water quality, Noise level. Besides flora & fauna should be examined twice a week and be submitted within 45 days for a record. 10. Provision for cylinder to workers should be made for cooking. Page 3 of 37 Minutes of 442nd SEAC Meeting Dated 06/01/2020 11. The capacity of trucks/tractor for loading purpose will be in tonnes as per Transport Department applicable norms and standard fixed by the Government. 12. Provide suitable mask to the workers. 13. Approach road kaccha is to be made motarable and tree saplings to be planted on both sides of the road. 14. Indigenous plants should be planted according to CPCB guidelines and in consultation with local Divisional Forest Officer. 15. The project proponent shall in 2 years conduct detailed replenishment study duly authenticated by a QCI-NABET accredited consultant, and the District Mines Officer. 16. Provision for two toilets and hand pumps should be made at mining site. 17. Drinking water for workers would be provided by tankers. 18. Mining should be done by Bar scalping methods extraction (typically 0.3 -0.6 m or 1 - 2 ft) as per sustainable sand mining management guidelines 2016. 19. A buffer/safe zone shall be maintained from the habitation as per mining guidelines. 20. Corporate Environmental Responsibility (CER) plan with minimum Rs. 1.7 Lakh/annum shall be prepared by the project proponent and the details of the various heads of expenditure to be submitted as per the guidelines provided in the recent CER notification No.