Alba Port Capacity Upgrade Project Environmental and Social Impact Assessment Aluminium Bahrain July 2018 1B071301 Rev 01 Office 901, 9th Floor, The Address Tower P.O. Box 10379 AlSeef Area Kingdom of Bahrain Tel: +973 1753 3259 Fax: +973 1753 3754
[email protected] Alba Port Capacity Upgrade Project Title Environmental and Social Impact Assessment Report Date July 2018 Dr Andy Booth, Rafaela Konialidis, Eman Rafea, Kate Elsworth, Antonella Contributors Paci, Mike Arora, Sarah Ben Arfa, John Drabble Document History File Name, Revision Number Status Date 1B071301, ESIA Report, Rev 00 First Draft 21.6.18 1B071301, ESIA Report, Rev 01 Final 3.7.18 Checked By Andy Booth Initials/Date 3.7.18 Approved By Halel Engineer Initials/Date 3.7.18 Copyright©2018, Environment Arabia, All Rights Reserved. The information in this report shall not be disclosed, duplicated, used in whole or in part for any purpose. A written approval from Environment Arabia shall be obtained prior to use of this document. TABLE OF CONTENTS Page 1 INTRODUCTION 1 1.1 Background 1 1.2 Scope of ESIA 1 1.3 Statement of Need 1 1.4 Consideration of the ‘Do-Nothing’ Option 1 1.5 Engineering Team 2 1.6 ESIA Consultants 2 1.7 ESIA Report Structure 3 2 PROJECT DESCRIPTION 5 2.1 Introduction 5 2.2 Existing Infrastructure 5 2.3 Proposed Infrastructure 8 2.4 Upgrade of Existing Grab and Conveyor on Jetty 1 15 2.5 Construction Methodologies 15 2.6 Commissioning Activities 16 2.7 Decommissioning Activities 16 2.8 Construction Programme 17 2.9 Traffic Movements 17 2.10 Shipping