Tender: NOTICE INVITING TENDER NO. 08 / KSD OF 2021-2022 BY AE, KSD, P.H.E. DTE. 1. General Information

Type NIT Category Mode Method

District Inviting Authority Assistant Engineer, Sub- Division

NOTICE INVITING TENDER NO. 08 / KSD OF 2021-2022 BY AE, Tender Id Memo No 634/KSD Memo Date 31-08-2021 KSD, P.H.E. DTE.

Description NOTICE INVITING TENDER NO. 08 / KSD OF 2021-2022 BY AE, KSD, P.H.E. DTE

Estimated Work Value -

2. EMD (Earnest Money Deposit) Details

Exempted? No Fee Type Demand Draft Payable To Payable At

3. Critical Dates

Tender Publish Date 31-08-2021 02:00 PM Sale/Submission Start Date

Download Start Date Sale/Download End Date 10-09-2021 03:30 PM

Last Date of Application 08-09-2021 02:00 PM Last Date of Permission 08-09-2021 04:00 PM

Last Date of Submission 10-09-2021 03:30 PM Tech Bid Opening Date

Tech Bid Uploading Date Fin Bid Opening Date 10-09-2021 04:00 PM Time

Uploading Bid Date Time

4. Pre-bid Meeting Details

Date Venue Address

5. Work Details

Sl No Description Estimated Cost (Rs.) Completion Time EMD (Rs.)

Laying extra HDPE pipeline to cover Gangnala (230) mouza for construction and commissioning of ‘FHTC (Functional House Hold Tap Connection)’ by retrofitting of Piped Water Supply Scheme for Phulberia & 1 269139.00 15 (Fifteen) Days 5390.00 Its Adjoining Mouzas at Block- Sarenga, Dist.- Bankura under Jal Swapna & Jal Jeevan Mission Programme under Khatra Sub-Division of Bankura Division, P.H.E. Dte.

Laying extra HDPE pipeline to cover Kaliapathar (89) mouzas for construction and commissioning of ‘FHTC (Functional House Hold Tap Connection)’ by retrofitting Zone-Q (Jambedia) of Khatra-- 2 330340.00 15 (Fifteen) Days 6610.00 Ranibandh Water Supply Scheme (BRGF Ph-I) at Block- Hirbandh, Dist.- Bankura under Jal Swapna & Jal Jeevan Mission Programme under Khatra Sub-Division of Bankura Division, P.H.E. Dte. Laying extra UPVC pipeline to cover Baragram (86) mouza for construction and commissioning of ‘FHTC (Functional House Hold Tap Connection)’ by retrofitting Zone-O (Madandihi) of Khatra-Hirbandh-Ranibandh Water 3 429720.00 15 (Fifteen) Days 8600.00 Supply Scheme (BRGF Ph-I) at Block- Ranibandh, Dist.- Bankura under Jal Swapna & Jal Jeevan Mission Programme under Khatra Sub-Division of Bankura Division, P.H.E. Dte. (Part-A)

Laying extra UPVC pipeline to cover Baragram (86) mouza for construction and commissioning of ‘FHTC (Functional House Hold Tap Connection)’ by retrofitting Zone-O (Madandihi) of Khatra-Hirbandh-Ranibandh Water 4 352382.00 15 (Fifteen) Days 7050.00 Supply Scheme (BRGF Ph-I) at Block- Ranibandh, Dist.- Bankura under Jal Swapna & Jal Jeevan Mission Programme under Khatra Sub-Division of Bankura Division, P.H.E. Dte. (Part-B)

Laying extra UPVC pipeline to cover Dhadkidihi (92) & Puada (94) mouzas for construction and commissioning of ‘FHTC (Functional House Hold Tap Connection)’ by retrofitting Zone-O (Madandihi) of Khatra-Hirbandh- 5 450087.00 15 (Fifteen) Days 9010.00 Ranibandh Water Supply Scheme (BRGF Ph-I) at Block- Ranibandh, Dist.- Bankura under Jal Swapna & Jal Jeevan Mission Programme under Khatra Sub-Division of Bankura Division, P.H.E. Dte.

Laying extra UPVC pipeline to cover Malcharar (100) mouza for construction and commissioning of ‘FHTC (Functional House Hold Tap Connection)’ by retrofitting Zone-O (Madandihi) of Khatra-Hirbandh- 6 436733.00 15 (Fifteen) Days 8740.00 Ranibandh Water Supply Scheme (BRGF Ph-I) at Block- Ranibandh, Dist.- Bankura under Jal Swapna & Jal Jeevan Mission Programme under Khatra Sub-Division of Bankura Division, P.H.E. Dte.

Laying extra UPVC pipeline to cover Nutandihi (93) mouza for construction and commissioning of ‘FHTC (Functional House Hold Tap Connection)’ by retrofitting Zone-O (Madandihi) of Khatra-Hirbandh-Ranibandh Water 7 488484.00 15 (Fifteen) Days 9770.00 Supply Scheme (BRGF Ph-I) at Block- Ranibandh, Dist.- Bankura under Jal Swapna & Jal Jeevan Mission Programme under Khatra Sub-Division of Bankura Division, P.H.E. Dte.

Laying extra UPVC pipeline to cover Purnapani (89) & Pirargari (95) mouzas for construction and commissioning of ‘FHTC (Functional House Hold Tap Connection)’ by retrofitting Zone-O (Madandihi) of Khatra-Hirbandh- 8 135383.00 15 (Fifteen) Days 2710.00 Ranibandh Water Supply Scheme (BRGF Ph-I) at Block- Ranibandh, Dist.- Bankura under Jal Swapna & Jal Jeevan Mission Programme under Khatra Sub-Division of Bankura Division, P.H.E. Dte.

Repairing of damaged Rising Main and Distribution Main near Ghoradhara village (Due to widening of Akkhuta-Raipur Road) of Zone-O (Madandihi) 9 under Khatra-Hirbandh-Ranibandh Water Supply Scheme (BRGF Ph-I) under 234091.00 15 (Fifteen) Days 4690.00 Khatra Sub-Division of Bankura Division, P.H.E. Dte.

Laying, fitting, fixing and joining of 200 mm dia D.I. pipes Distribution Main 10 at Kamarkuli Village for Improvement of , Khatra W/S 346376.00 15 (Fifteen) Days 6930.00 Scheme under Khatra Sub- Division of Bankura Division, P.H.E. Dte.

Laying, fitting, fixing and joining of 200 mm dia MS pipe of distribution Main along with all allied works at Kamarkuli Village for Improvement of 11 499008.00 15 (Fifteen) Days 9980.00 Mukutmanipur, Khatra W/S Scheme under Khatra Sub- Division, Bankura Division, P.H.E. Dte.

Carriage & stacking of DI pipe from Rampur Campus under Bishnupur Sub- 12 Division to Ambikanagar Head work site under Khatra Sub-Division of 25537.00 5 (Five) Days 640.00 Bankura Division, P.H.E. Dte.

Supplying, laying by UPVC pipe (6 Kg/Sq. Cm. Water Pressure, class III) for distribution network along with ancillary works at village Karbhanga due to Strengthening - Widening of Sarenga Chowrasta More to Goaltore road 13 by PWD (Roads) Dte. under Water supply scheme for Gargaria Zone-B of 499597.00 15 (Fifteen) Days 10000.00 Sarenga Water Supply Scheme (BRGF Ph - I) under Khatra Sub-Division of Bankura Division, P.H.E. Dte. (Part-A) (Under Jal Swapna & Jal Jeevan Mission Programme Fund)

Supplying, laying by UPVC pipe (6 Kg/Sq. Cm. Water Pressure, class III) for distribution network along with ancillary works at village Karbhanga due to Strengthening - Widening of Sarenga Chowrasta More to Goaltore road 14 by PWD (Roads) Dte. under Water supply scheme for Gargaria Zone-B of 489490.00 15 (Fifteen) Days 9790.00 Sarenga Water Supply Scheme (BRGF Ph - I) under Khatra Sub-Division of Bankura Division, P.H.E. Dte. (Part-B) (Under Jal Swapna & Jal Jeevan Mission Programme Fund)

Laying extra HDPE pipeline to cover Dhadanga (97) & (102) Mouzas for construction and commissioning of ‘FHTC (Functional House Hold Tap Connection)’ by retrofitting Zone-O (Madandihi) of Khatra- 15 Hirbandh-Ranibandh Water Supply Scheme (BRGF Ph-I) at Block- 337268.00 15 (Fifteen) Days 6750.00 Ranibandh, Dist.- Bankura under Jal Swapna & Jal Jeevan Mission Programme under Khatra Sub-Division of Bankura Division, P.H.E. Dte. (Part-A)

Laying extra HDPE pipeline to cover Dhadanga (97) & Haludkanali (102) Mouzas for construction and commissioning of ‘FHTC (Functional House Hold Tap Connection)’ by retrofitting Zone-O ( Madandihi) of Khatra- 16 Hirbandh-Ranibandh Water Supply Scheme (BRGF Ph-I) at Block- 348715.00 15 (Fifteen) Days 6980.00 Ranibandh, Dist.- Bankura under Jal Swapna & Jal Jeevan Mission Programme under Khatra Sub-Division of Bankura Division, P.H.E. Dte. (Part-B) Construction of 2 Nos. Community Tank - 4000 Ltr. Capacity (Size- 1900x1500x1400) including connection with existing PHED water supply 17 297754.00 30 (Thirty) Days 5960.00 pipe line at S.D.O. Office Compound, Khatra under Khatra Sub Division of Bankura Division, P.H.E. Dte.

Sinking of 2 (Two) Nos. Rig bore Tube Well 125mm X 115mm dia 90 Mtr. deep (by DTH Rig machine) fitted with Mark -II Hand Pump at Gopinathpur 18 259000.00 5 (Five) Days 5180.00 village in Khatra Block under Khatra Sub-Division of Bankura Division, P.H.E Dte.

Extension of distribution main by UPVC pipe (6Kg/Sq. Cm. Water Pressure, class III) along with installation of Street Stand Post etc. at Khatra Sub- 19 Divisional Hospital and installation of street stand post at Hirbandh Model 72801.00 3 (Three) Days 1820.00 School (Covid Safe Home) under Khatra Sub-Division of Bankura Division, P.H.E. Dte.

6. Attachments

Sl No File Name

1 Schedule- 13.pdf

2 Schedule- 12.pdf

3 Schedule- 10.pdf

4 Tender Notice with Annexure.pdf

5 Schedule- 1.pdf

6 Schedule- 17.pdf

7 Schedule- 6.pdf

8 Schedule- 18.pdf

9 Schedule- 2.pdf

10 Schedule- 8.pdf

11 Schedule- 7.pdf

12 Schedule- 5.pdf

13 Schedule- 15.pdf

14 Schedule- 14.pdf

15 WBF_2911_28 Pages.pdf

16 Schedule- 4.pdf

17 Schedule- 9.pdf

18 Schedule- 16.pdf

19 Schedule- 19.pdf

20 Schedule- 11.pdf

21 Schedule- 3.pdf