World Bank Document
Total Page:16
File Type:pdf, Size:1020Kb
Procurement Plan for KRWSS (P121774) I. General 1. Bank’s approval Date of the procurement Plan [April 2017 ] Public Disclosure Authorized 2. Date of General Procurement Notice: [30 August 2011 ] 3. Period covered by this procurement plan: January 2017 onwards II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: 2. Procurement Method Prior Review Threshold US$ 1. ICB and LIB (Goods) Above US$ 500,000 2. NCB (Goods) Above US$ 100,000 3. ICB (Works) Above US$ 40 million Public Disclosure Authorized 4. NCB (Works) Above US$ 10 million 5. (Non-Consultant Services) Below US$ 100,000 2. Prequalification for Bidders _Not applicable_ 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: NA 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project P121774 by Jalanidhi Public Disclosure Authorized 5. Any Other Special Procurement Arrangements: In addition, the justification for all contracts to be issued on the basis of LIB, single-source or direct contracting (except for contracts less than US$50,000 in value) will be subject to prior review. Justification for all contracts to be issued on the basis of LIB, single-source or direct contracting (except for contracts less than US$50,000 in value) will be subject to prior review. III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Public Disclosure Authorized Selection Method Prior Review Threshold 1. Competitive Methods (Firms) Above US$ 500,000 2. Single Source (Firms) Above US$ 50,000 3. Individual Above US$ 200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. PROCUREMENT India : IN 2nd Kerala Rural Water Supply and Sanitation Project (Jalanidhi II) PLAN General Information Country: India Banks Approval Date of the Original Procurement Plan: 2017-10-10 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-03-26 Project ID: P121774 GPN Date: Project Name: IN 2nd Kerala Rural Water Supply and Sanitation Project (Jalanidhi II) Loan / Credit No: IDA / 50270 Executing Agency(ies): Kerala Rural Water Supply and Sanitation Agency, Regional Management Project Unit Malappuram, Regional Project Management Unit Kannur WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 06/RPMU/MPM/KVKD- PLVTA/KVKD/NSP/16-17 / Design, supply, installation and commissioning of 2 Nos. of Iron removal plants, 2 Nos. of Request for Single Stage - One Under IDA / 50270 Infrastructure Development Post Limited 69,566.67 0.00 2017-04-04 2017-05-30 2017-11-26 Pressure sand filters and a Quotations Envelope Implementation chlorine dosser for Karuvarakund WSS and Pulvetta WSS in Karuvarakund GP in Malappuram district. IN-RPMUK-11618-CW-RFB / Single Stage - Two Pending IDA / 50270 Infrastructure Development Post Request for Bids Open - National 381,600.00 0.00 2017-04-05 2017-04-10 2017-05-22 2017-08-04 2017-09-08 2018-03-07 EAST ELERI LWSS Package III Envelope Implementation IN-RPMUK-14990-CW-RFB / Single Stage - Two Pending LWSS - Pakage 2 Kaithakolly - IDA / 50270 Infrastructure Development Post Request for Bids Open - National 150,700.00 0.00 2017-05-12 2017-05-17 2017-06-28 2017-09-10 2017-10-15 2018-04-13 Envelope Implementation Thavinjal Gp IN-RPMUK-14994-CW-RFB / Single Stage - Two Pending LWSS - Thavinjal GP , IDA / 50270 Infrastructure Development Post Request for Bids Open - National 265,500.00 0.00 2017-05-12 2017-05-17 2017-06-28 2017-09-10 2017-10-15 2018-04-13 Envelope Implementation Kappikalam IN-RPMUK-15071-CW-RFB / ALAKKODE - CONSTRUCTION Single Stage - Two Under IDA / 50270 Infrastructure Development Post Request for Bids Open - National 133,100.00 0.00 2017-05-19 2017-05-24 2017-07-05 2017-09-17 2017-10-22 2018-04-20 OF VENTED WEIR ACROSS Envelope Implementation RAYAROM RIVER IN-RPMUK-15223-CW-RFB / Single Stage - Two Pending THONDERNAD - ADAI LWSS - IDA / 50270 Infrastructure Development Post Request for Bids Open - National 269,100.00 0.00 2017-05-15 2017-05-20 2017-07-01 2017-09-13 2017-10-18 2018-04-16 Envelope Implementation Package II IN-RPMUK-25809-CW-RFQ / Purchase and installation of Request for Single Stage - One Pending Water Treatment Plant at IDA / 50270 Infrastructure Development Post Open - National 18,150.00 0.00 2017-08-23 2017-08-23 2017-08-23 Quotations Envelope Implementation Cheruparamba WSS, Kunnothuparamba GP IN-RPMUK-25812-CW-RFQ / Purchase and installation of Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 11,400.00 0.00 2017-08-23 2017-08-23 2017-08-23 Water Treatment Plant at Quotations Envelope Implementation Thonichal WSS, Edavaka G P IN-RPMUK-25814-CW-RFQ / Purchase and installation of Request for Single Stage - One Pending Water Treatment Plant at IDA / 50270 Infrastructure Development Post Open - National 21,000.00 0.00 2017-08-23 2017-08-23 2017-09-22 Quotations Envelope Implementation Thuvakunnu WSS, Kunnothuparamba G P IN-RPMUK-25817-CW-RFQ / Purchase and installation of Request for Single Stage - One Pending Water Treatment Plant at IDA / 50270 Infrastructure Development Post Open - National 27,500.00 0.00 2017-08-23 2017-08-23 2017-09-22 Quotations Envelope Implementation Varadhur WSS Kaniyambetta GP IN-RPMUK-26280-CW-RFQ / Purchase and installation of Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 32,250.00 0.00 2017-08-26 2017-09-16 2017-10-16 Treatment Plant - Mahatma Quotations Envelope Implementation WSS - Edavaka GP IN-RPMUK-25819-CW-RFQ / Purchase and installation of Request for Single Stage - One Pending Water Treatment Plant at Ganga IDA / 50270 Infrastructure Development Post Open - National 19,000.00 0.00 2017-08-23 2017-08-23 2017-08-23 Quotations Envelope Implementation Mathamangalam BG, Poothadi G P IN-RPMUK-26281-CW-RFQ / Purchase and installation of Request for Single Stage - One Pending Water Treatment Plant - IDA / 50270 Infrastructure Development Post Open - National 21,900.00 0.00 2017-08-26 2017-09-16 2017-10-16 Quotations Envelope Implementation Koonanchal WSS, MUNDERI GRAMA PANCHAYATH 20/RPMU/MPM/MNKR/NCB/16- 17 / rehabilitation of water supply scheme in Mankara Single Stage - Two Pending Gramapanchayath with a IDA / 50270 Infrastructure Development Post Request for Bids Open - National 474,800.00 0.00 2017-09-22 2017-09-27 2017-11-08 2018-01-21 2018-02-25 2018-08-24 Envelope Implementation coverage of water supply to house holds in ward 1,2,3,4 and 14. IN-RPMUK-25831-CW-RFQ / Purchase and installation of Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 19,500.00 0.00 2017-08-23 2017-08-23 2017-09-22 Water Treatment Plant at Quotations Envelope Implementation Padannottu WSS Mundery G P IN-RPMUK-25837-CW-RFQ / Purchase an installation of Water Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 52,100.00 0.00 2017-08-23 2017-08-23 2017-09-22 Treatment Plant at Quotations Envelope Implementation Chadalapuzha WSS, Kadirur G Page 1 IN-RPMUK-25839-CW-RFQ / Purchase and installation of Request for Single Stage - One Pending Water Treatment Plant at Nila IDA / 50270 Infrastructure Development Post Open - National 17,100.00 0.00 2017-08-23 2017-09-13 2017-10-13 Quotations Envelope Implementation Ashankavala WSS, Poothadi G P IN-RPMUK-26278-CW-RFQ / Purchase and installation of Request for Single Stage - One Pending Water Treatment Plant at IDA / 50270 Infrastructure Development Post Open - National 39,150.00 0.00 2017-08-26 2017-08-26 2017-09-25 Quotations Envelope Implementation Santhwanam SLEC, Edavaka Gramapanhayath IN-RPMUK-25840-CW-RFQ / Purchase and installation of Request for Single Stage - One Pending Water Treatment Plant at IDA / 50270 Infrastructure Development Post Open - National 40,200.00 0.00 2017-08-23 2017-08-23 2017-09-22 Quotations Envelope Implementation Ellumannam WSS, Edavaka G P IN-RPMUK-26279-CW-RFQ / Purchase and installation of Request for Single Stage - One Pending Water Treatment Plant at IDA / 50270 Infrastructure Development Post Open - National 42,800.00 0.00 2017-08-26 2017-08-26 2017-09-25 Quotations Envelope Implementation Janasakthi SLEC, Edavaka Gramapanchayath KRWSA-PMU/3468/2017-TA- TECH / Batch I-Nenmeni GP- Augmentation of Water Supply Single Stage - Two Pending IDA / 50270 Infrastructure Development Post Request for Bids Open - National 784,615.00 0.00 2017-08-30 2017-09-04 2017-10-16 2017-12-29 2018-02-02