S23 Bus Time Schedule & Line Route

Total Page:16

File Type:pdf, Size:1020Kb

S23 Bus Time Schedule & Line Route S23 bus time schedule & line map S23 North Scale - Barrow Sixth Form College View In Website Mode The S23 bus line (North Scale - Barrow Sixth Form College) has 2 routes. For regular weekdays, their operation hours are: (1) Furness Abbey: 8:02 AM (2) North Scale: 3:25 PM Use the Moovit App to ƒnd the closest S23 bus station near you and ƒnd out when is the next S23 bus arriving. Direction: Furness Abbey S23 bus Time Schedule 28 stops Furness Abbey Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 8:02 AM Teasdale Road, North Scale Tuesday 8:02 AM Leighton Drive, North Scale North Scale, United Kingdom Wednesday 8:02 AM Promenade, North Scale Thursday 8:02 AM Friday 8:02 AM Mill Lane, North Scale Saturday Not Operational School, North Scale Baden Powell St, Vickerstown Powerful Street, United Kingdom S23 bus Info Albert Place, North Scale Direction: Furness Abbey Stops: 28 The Ferry, North Scale Trip Duration: 27 min Line Summary: Teasdale Road, North Scale, Jubilee Bridge, Walney Leighton Drive, North Scale, Promenade, North Scale, Mill Lane, North Scale, School, North Scale, Baden Powell St, Vickerstown, Albert Place, North Scale, The Stewart Street, Hindpool Ferry, North Scale, Jubilee Bridge, Walney, Stewart A590, United Kingdom Street, Hindpool, Earle Street, Barrow Island, Shipyard, Barrow Island, Bae Systems, Barrow Earle Street, Barrow Island Island, Coffee House, Barrow Island, Vsel, Barrow Ferry Road, United Kingdom Island, Craven House, Barrow-In-Furness, Alfred Shipyard, Barrow Island Barrow Health Centre, Barrow-In-Furness, School Street, Risedale, Salthouse Road, Risedale, Bowling Newry Street, United Kingdom Club, Salthouse, Washington Hotel, Roosegate, Friars Lane, Roosegate, Holcroft Hill, Abbotsmead, Bae Systems, Barrow Island Priors Path, Abbotsmead, Friars Lane, Newbarns, Harrel Lane Terminus, Newbarns, St Bernards Rc Coffee House, Barrow Island School, Furness Abbey, Sixth Form College, Furness Abbey Vsel, Barrow Island Craven House, Barrow-In-Furness Burlington Street, United Kingdom Alfred Barrow Health Centre, Barrow-In-Furness 4 Duke Street, United Kingdom School Street, Risedale Salthouse Road, Risedale Bowling Club, Salthouse Raglan Street, United Kingdom Washington Hotel, Roosegate Cambridge Street, Barrow-in-Furness Friars Lane, Roosegate Holcroft Hill, Abbotsmead 1 Monks Brow, Barrow-in-Furness Priors Path, Abbotsmead 51 Friars Lane, Barrow-in-Furness Friars Lane, Newbarns 90 Flass Lane, Barrow-in-Furness Harrel Lane Terminus, Newbarns 18 Flass Lane, Barrow-in-Furness St Bernards Rc School, Furness Abbey Sixth Form College, Furness Abbey Direction: North Scale S23 bus Time Schedule 27 stops North Scale Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 3:25 PM Sixth Form College, Furness Abbey Tuesday 3:25 PM St Bernards Rc School, Furness Abbey Wednesday 3:25 PM Meadowlands Avenue, Furness Abbey Thursday 3:25 PM 2 Meadowlands Avenue, England Friday 3:25 PM Gleaston Avenue, Abbotsmead 96 Friars Lane, Barrow-in-Furness Saturday Not Operational Monk's Brow, Abbotsmead 44 Friars Lane, Barrow-in-Furness St Luke's Avenue, Roosegate S23 bus Info 91-93 Roose Road, Barrow-in-Furness Direction: North Scale Stops: 27 Salthouse Pavilion, Salthouse Trip Duration: 22 min Frederick Street, United Kingdom Line Summary: Sixth Form College, Furness Abbey, St Bernards Rc School, Furness Abbey, Bowling Club, Salthouse Meadowlands Avenue, Furness Abbey, Gleaston Raglan Street, United Kingdom Avenue, Abbotsmead, Monk's Brow, Abbotsmead, St Luke's Avenue, Roosegate, Salthouse Pavilion, Marsh Street, Salthouse Salthouse, Bowling Club, Salthouse, Marsh Street, Salthouse, Ramsden Street, Risedale, Rawlinson Ramsden Street, Risedale Street, Risedale, School Street, Risedale, Alfred Marsh Street, United Kingdom Barrow School, Risedale, Alfred Barrow Health Centre, Barrow-In-Furness, Craven House, Barrow- Rawlinson Street, Risedale In-Furness, Vsel, Barrow Island, Coffee House, Barrow Island, Bridge Road Works, Barrow Island, School Street, Risedale Shipyard, Barrow Island, Earle Street, Barrow Island, Roundabout, Hindpool, The Ferry, North Scale, Alfred Barrow School, Risedale Dawsons Steps, North Scale, Powerful Street, Stark Street, United Kingdom Vickerstown, School, North Scale, Mill Lane, North Scale, Teasdale Road, North Scale Alfred Barrow Health Centre, Barrow-In-Furness Dalton Road, United Kingdom Craven House, Barrow-In-Furness Burlington Street, United Kingdom Vsel, Barrow Island Coffee House, Barrow Island Buxton Street, United Kingdom Bridge Road Works, Barrow Island Bridge Road, United Kingdom Shipyard, Barrow Island Earle Street, Barrow Island Ferry Road, United Kingdom Roundabout, Hindpool A590, United Kingdom The Ferry, North Scale Promenade, United Kingdom Dawsons Steps, North Scale Powerful Street, Vickerstown Baden Powell Street, United Kingdom School, North Scale Mill Lane, North Scale Teasdale Road, North Scale S23 bus time schedules and route maps are available in an o«ine PDF at moovitapp.com. Use the Moovit App to see live bus times, train schedule or subway schedule, and step-by-step directions for all public transit in North West. Check Live Arrival Times About Moovit MaaS Solutions Supported Countries Mooviter Community © 2021 Moovit - All Rights Reserved.
Recommended publications
  • THE LOCAL GOVERNMENT BOUNDARY COMMISSION for ENGLAND Farm O P Violet Pit (Dis) Pond D
    SHEET 9, MAP 9 Proposed electoral division boundaries in Barrow-in-Furness borough Pond A Ethel Pit 5 9 (dis) 5 Sandscale Haws (Nature Reserve) Roanhead Housethwaite Peggy Pit Iron Mines Pond Hill (dis) South Lakes (disused) 90 Pond Wild Animal Park 5 k A c e B Chapel Hills a Sandscale k a THE LOCAL GOVERNMENT BOUNDARY COMMISSION FOR ENGLAND Farm o P Violet Pit (dis) Pond D i s DALTON NORTH ED nel m n ELECTORAL REVIEW OF CUMBRIA ll l Tu a Gi inda n Pit No 2 agg L t H l (17) e (dis) d Ponds Tip R a i l w ASKAM AND IRELETH CP Gill a Dub Nursery Final recommendations for electoral division y boundaries in DALTON NORTH WARD Maidenlands Elliscales P Rickett Quarry the county of Cumbria July 2012 Quarry o Hills a LINDAL AND MARTON CP Pond k (dis) (dis) a B e c Maidenlands Sheet 9 of 9 k Hawthwaite 'S N Farm House E Re L Elliscale Farm d Gutter E H T S Allotment Allotment HA Gardens Sports WTHWAITE Gardens LANE D Field D A A O O R R N O M T Our Lady of G A H This map is based upon Ordnance Survey material with the permission of Ordnance Survey on behalf of K George Romney G o S U The Rosary RC l d A Junior School O the Controller of Her Majesty's Stationery Office © Crown copyright. m R Primary School B i r Golf e T Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings.
    [Show full text]
  • PLANNING COMMITTEE 25 November 2008
    PLANNING COMMITTEE th 25 November 2008 PLAN NUMBER: APPLICANT: AGENT: 2008/1008 Atherton Development Mr M Gadsden M & P Gadsden Consulting Engineers WARD/PARISH: CASE OFFICER: DATE RECEIVED: Dalton North Ian Sim 28/10/2008 Askam & Ireleth Parish 01229 876384 STATUTORY DATE: Council 22/12/2008 LOCATION: Land off Lord Street, Askam-in-Furness PROPOSAL: Erection of 6 No. dwellings and a detached garage with new access road and improvement to existing road SAVED POLICIES OF THE FORMER LOCAL PLAN: POLICY B3 Applications for residential development on unallocated sites will be permitted where they accord with the sequential approach of the Structure Plan and also satisfy the following criteria: i) The site is located within the built up area of existing settlements or the development cordons identified in Policy B13; and ii) The siting, scale, layout and design (in the materials and form of the buildings) of the development is sensitive to the local environment, it promotes the principles of ‘Secure by Design’ and adequate parking provision is made; and iii) Adequate access arrangements can be provided, including servicing the site by the public transport and by cycle routes; and iv) The development is laid out in a way that maximises energy efficiency; and v) The development will not result in the loss of land which has a recognised or established nature conservation interest; and vi) The development must not cause an undue increase in traffic passing through existing residential areas such as to be detrimental to residential amenity or highway safety; and Page 1 of 35 PLANNING COMMITTEE th 25 November 2008 vii) Adequate water supplies, foul and surface water sewers and sewerage treatment facilities exist or can be provided; and viii) 'A risk-based approach will be adopted for development in or affecting flood risk areas to minimise the risk of flooding associated with the site and the potential effect development of the site might have elsewhere through increased run off or a reduction in the capacity of flood plains.
    [Show full text]
  • Hawcoat Health Profile
    Hawcoat This resource gives an overview of the health profile for wards within Hawcoat. Inequalities in people’s experience of health still present significant challenges in Cumbria, with people in the most affluent areas living up to 20 years longer than those in more disadvantaged circumstances. These unfair and avoidable differences in health between social groups are what we mean by health inequalities. In Cumbria there are a number of areas of concern, including; Relatively large numbers of people living in housing that is in poor condition High levels of fuel poverty A low proportion of the workforce educated to degree level or higher Low employment levels amongst people with disabilities On average men in Cumbria lose 10 months of life, and women 4.5 months, directly attributable to alcohol 50-60 suicides each year. Ward profiles Administrative geographies – and particularly wards – have traditionally been used for collecting and publishing statistics. Wards are well-established and, unlike Electoral Divisions, they will not change. Ward profiles enable us to gain a deeper understanding or the differences in health status between areas. % of Electoral Division's Electoral Division Wards in Electoral Division Population that fall within the Ward Hawcoat Hawcoat 77.5 Newbarns 22.5 The below data, as well as insights you gain from talking with communities and through working with community groups, are invaluable in gaining an understanding of the health needs and priority in that community. Other sources of data Area profiles for
    [Show full text]
  • Building Better Opportunities
    Building Better Opportunities Project outline For use in England only Project title Project 3 of 3 – Barriers to Work (Barrow and South Lakeland) LEP area Cumbria Project reference number Cum/2/3 ESF Thematic Objective 9: Promoting social inclusion and combating poverty ESF Investment Priority 1.4: Active inclusion Funding available £1,368,400 Project start period July 2016 to November 2016 Latest date for completion December 2019 Date open for applications 8 October 2015 Deadline for stage one applications 12 noon on 30 November 2015 Important information about this project outline This project outline represents just one strand of the overall funding that is available through Building Better Opportunities. As this is a joint programme with the European Social Fund, we will only consider applications that clearly meet a project outline and meet the requirements set out in our programme guide. As you read this project outline, please note the following: This project outline is subject to any changes made by the European Commission or the Managing Authority to the rules governing ESF in England. The Big Lottery Fund will upload any updates to https://www.biglotteryfund.org.uk/esf. It is your responsibility to review the page regularly to keep abreast of any changes that may have an impact on your application. You must apply for the full amount of funding available shown, which we will award to just one applicant or partnership to deliver the project described in this outline. The project must be delivered in the LEP area(s) shown and within any specific project location we’ve identified within this outline.
    [Show full text]
  • Contract Leads Powered by EARLY PLANNING Projects in Planning up to Detailed Plans Submitted
    Contract Leads Powered by EARLY PLANNINGProjects in planning up to detailed plans submitted. PLANS APPROVEDProjects where the detailed plans have been approved but are still at pre-tender stage. TENDERSProjects that are at the tender stage CONTRACTSApproved projects at main contract awarded stage. Planning authority: Rugby Job: Detailed Pawnshop Passage, Mercer Row, Louth, Client: Gracewell Healthcare Ltd Agent: Church Street, Altrincham, Greater Education Agent: Norwich City College of GrimsbyInstituteofFurther&,Laceby units Client: Lazarus Properties Ltd Plans Submitted for 9 flats & 3 townhouses Lincolnshire, LN11 9JQ Tel: 01507 611155 Gelder & Kitchen LLP, Rosner Studios, 28a Manchester, WA14 4DW Contractor: Further & Higher Education, Norwich City RoadHigherEducationNunsCorner Developer: MPSL Planning & Design Ltd, MIDLANDS/ Client: Mr. Richard Overton Agent: H B PETERBOROUGH £1.7M Market Place, Richmond, North Yorkshire, Calderpeel, Market Court, 20 - 24 Church College, Ipswich Road, Norwich, Norfolk, NR2 Planning authority: North East Lincolnshire Commercial House, 14 West Point Enterprise Architects, 17 Warwick Street, Rugby, CrownRecordsManagement,Mallard DL10 4QG Tender return date: Tenders are Street, Altrincham, Greater Manchester, WA14 2LJ Contractor: Graham Construction, 5 Job: Detailed Plans Submitted for theatre/ Park, Clarence Avenue, Trafford Park, EAST ANGLIA Warwickshire, CV21 3DH Tel: 01788 576137 RoadBretton currently invited. The tender return date is 4DW Tel: 0161 929 7622 Ballygowan Road, Hillsborough, Co Down,
    [Show full text]
  • With a Lack of Investment in Technology for a Decade, This Is How a Community-Based Primary School Caught up and Are Now in a St
    With a lack of investment in technology for a decade, this is how a community-based Primary School caught up and are now in a strong position to improve the education of all of their pupils The background Vickerstown Primary and Brambles Nursery School is a beautiful setting in the idyllic coastal town of Barrow-in-Furness in Cumbria in North West England. Given the remote location, employment can be limited, so the school is seen as a beacon in the local environment. This is reflected in a clear vision to provide an outstanding education at the heart of their community, making every effort for the children at Vickerstown to have the best academic start and grounding possible to enable them to become successful members of society. The 159 pupils come from a mixed catchment – some with Education, Health and Care Plans – bringing added obligations on the staff to help ensure all children receive the very best care and support. The school has a proven local reputation for the support they provide to children with autism. The challenge Vickerstown Primary moved to new purpose-built premises in 2011 and received significant investment to help embed the use of technology in teaching and learning across the school at that time. However, since then – almost 10 years ago – there has been very little further investment in technology, and a technical audit undertaken in February 2020 concluded: • the underlying server operating systems and the majority of user device operating systems were unsupported and posed a potential security risk • student devices were aging and impacting the learning within the school.
    [Show full text]
  • Housing Chapter Alteration 2006
    BOROUGH OF BARROW-IN-FURNESS LOCAL PLAN REVIEW 1996-2006 HOUSING CHAPTER ALTERATION 2006 BOROUGH OF BARROW-IN-FURNESS LOCAL PLAN REVIEW 1996-2006 HOUSING CHAPTER ALTERATION 2006 Adopted 2 June 2006 Director of Regeneration Barrow-in-Furness Borough Council Town Hall Duke Street Barrow in Furness Cumbria LA14 2LD Contact: Local Development Framework Officer (01229) 894249 Email: [email protected] FOREWORD The Borough of Barrow-in-Furness Local Plan Review (1996-2006) is a statutory document prepared by the Borough Council to set out its policies guiding the development and use of land for the period up to 2006. Adopted, together with the County’s Minerals and Waste Local Plan and the Cumbria and Lake District Joint Structure Plan and the Regional Spatial Strategy and Local Development Documents of the new Local Development Framework, these form the statutory Development Plan for the area. There are also national guidelines in relation to planning issues that the Local Plan must interpret into local policy. At the time the plan was being written, the Government were in the process of revising the national planning guidance in relation to housing, ‘Planning Policy Guidance Note 3’. To keep the plan up to date the Borough Council resolved to alter the Housing Chapter to bring it up to date with this guidance. As a result of the provisions of the Planning and Compulsory Purchase Act 2004, the Local Plan Review, and the Housing Chapter Alteration once adopted, will be saved for the period set out below, or until they are revoked or replaced by the documents in the Local Development Framework.
    [Show full text]
  • Cleator Moor Together Council Services
    Inside: Free A-Z guide to council services Spring 2010 Aiming high for the county’s disabled children Win tickets to see Jools Holland visit cumbria.gov.uk for regular updates on the issues affecting you Welcome to YourCumbria 10 magazine It’s been a harsh winter for Cumbria with some very extreme weather. From the floods in November to the ice and snow of December and January, day to day life for many people in our county has been a struggle. Following the flooding the county council has been working hard to come up with solutions to the problems that our communities face. There’s been an impressive roll call of achievements and progress made but for many people this is far from over. Read more about what we’ve done so far and our plans for the future on page six. Cumbria did not escape lightly when the temperature Contents Your Cumbria on CD! dropped and the ice and snow If you would like an audio CD of arrived. The gritters stepped this magazine call 01228 221008 into action to keep Cumbria Keeping the moving and you can find out 04 county moving more about how we deal with these treacherous conditions on Stronger communities Cumbrian page four. 06 are safer communities 18 floods And throughout it all, the county council continues to Win tickets to see Your diary provide a wide range of services, 08 Jools Holland 20 See it. Do it day in, day out. I hope this issue gives you an insight into just Better care Your A–Z guide to services some of the work we do on 09 and support 23 around the county your behalf.
    [Show full text]
  • Walney Island
    Cumbria Coastal Strategy Technical Appraisal Report for Policy Area 11c14 Walney Island (Technical report by Jacobs) CUMBRIA COASTAL STRATEGY - POLICY AREA 11C14 WALNEY ISLAND Policy area: 11c14 Walney Island Figure 1 Sub Cell 11c Arnside to Hodbarrow Point Location Plan of policy units. Baseline mapping © Ordnance Survey: licence number 100026791. 1 CUMBRIA COASTAL STRATEGY - POLICY AREA 11C14 WALNEY ISLAND 1 Introduction 1.1 Location and site description Policy units: 11c14.1 South End Hawes to Biggar (east side) 11c14.2 Biggar to Lenny Hill (east side) 11c14.3 South End Hawes to Hare Hill (open coast) 11c14.4 Hare Hill to Hillock Whins 11c14.5 Hillock Whins to Nanny Point Scar 11c14.6 Nanny Point Scar to Mill Scar 11c14.7 Mill Scar to north of West Shore Park 11c14.8 North Walney – from north of West Shore Park to Lenny Hill (both coasts) Responsibilities: Barrow Council Cumbria Country Council Private landowners Location: The policy area covers the entire frontage of Walney Island, both open coast (west coast) and channel (east coast) shorelines. Site Overview: Walney Island is composed of glacial deposits overlaying a rock platform; cliffs along the open coast are cut into these glacial sand and gravels, which provide little resistance to erosion. The two shorelines of Walney Island experience very different exposure conditions; the west coast is exposed to the Irish Sea whilst, in contrast, the east coast is sheltered from wave action. At either end of the Island, large sand and shingle spits extend towards the Duddon Estuary to the north and Morecambe Bay to the south.
    [Show full text]
  • Development Division Planning Committee 15
    DEVELOPMENT DIVISION PLANNING COMMITTEE 15 September, 2015 Delegated Decisions made between 24th July 2015 and 13th August 2015 For Information Ladies and Gentlemen, Town & Country Planning Act 1990 (As Amended) Town & Country Planning (Development Management Procedure) (England) Order 2010 Decisions made between 24th July, 2015 and 13th August, 2015 The applications in this report have been determined by the Director of Regeneration and Community Services under delegated authority (Minute No. 254, Planning Committee, 3rd September, 2002, confirmed by Council 24th September, 2002). The decisions are reported for your information. The Building Act 1984/The Building Regulations 2010 Decisions made between 24th July, 2015 and 13th August, 2015 The applications in this report have been determined by the Building Control Manager & Access Officer under delegated authority. The decisions are reported for your information and have been ACCEPTED, APPROVED, APPROVED WITH CONDITIONS, REFUSED OR REGULARISED. Assistant Director of Regeneration and Built Environment PLANNING Reference Address Ward Number 45 The Headlands Askam-in-Furness Dalton North B21/2015/0451 Proposal Parish Decision Rear ground floor orangery extension forming Askam and Ireleth Approved with dining room and alterations to garage including Case Officer conditions raising the ridge height by 400mm and the front Jennifer Dickinson doorway being modified to a single pedestrian Decision Date 06-AUG-2015 opening Reference Address Ward Number Elliscales Askam Road Dalton-in-Furness Dalton North B18/2015/0426 Proposal Parish Decision Retrospective approval for stable one, the erection Askam and Ireleth Approved with of stable two, the relocation of stable three Case Officer conditions including the goat pen and visitor and equipment Maureen Smith parking area.
    [Show full text]
  • 6 Bus Time Schedule & Line Route
    6 bus time schedule & line map 6 Windermere & Ulverston - Barrow View In Website Mode The 6 bus line (Windermere & Ulverston - Barrow) has 4 routes. For regular weekdays, their operation hours are: (1) Barrow-In-Furness: 5:30 AM - 9:23 PM (2) Croftlands: 5:45 AM - 11:10 PM (3) Newby Bridge: 7:15 AM (4) Windermere: 5:45 AM - 4:20 PM Use the Moovit App to ƒnd the closest 6 bus station near you and ƒnd out when is the next 6 bus arriving. Direction: Barrow-In-Furness 6 bus Time Schedule 79 stops Barrow-In-Furness Route Timetable: VIEW LINE SCHEDULE Sunday 9:31 AM - 11:31 PM Monday 5:30 AM - 9:23 PM Bus Rail Interchange, Windermere 1 The Terrace, Windermere Tuesday 5:30 AM - 9:23 PM Barclays Bank, Windermere Wednesday 5:30 AM - 9:23 PM 2a Crescent Road, Windermere Thursday 5:30 AM - 9:23 PM Library, Windermere Friday 5:30 AM - 9:23 PM 56 Main Road, Windermere Saturday 6:55 AM - 9:23 PM Brook Court, Goodley Dale New Road, Windermere Baddeley Clock, Goodley Dale Lake Road, Windermere 6 bus Info Direction: Barrow-In-Furness Oakleigh Guest House, Goodley Dale Stops: 79 1 Thornbarrow Road, Windermere Civil Parish Trip Duration: 45 min Line Summary: Bus Rail Interchange, Windermere, Beresford Road, Bowness on Windermere Barclays Bank, Windermere, Library, Windermere, Brook Court, Goodley Dale, Baddeley Clock, Goodley Royalty Cinema, Bowness on Windermere Dale, Oakleigh Guest House, Goodley Dale, Beresford South Terrace, Windermere Civil Parish Road, Bowness on Windermere, Royalty Cinema, Bowness on Windermere, St Martins Church, St Martins Church,
    [Show full text]
  • DEVELOPMENT DIVISION PLANNING COMMITTEE 20 May 2014 Delegated Decisions for Information Assistant Director of Regeneration and B
    DEVELOPMENT DIVISION PLANNING COMMITTEE 20th May 2014 Delegated Decisions For Information Ladies and Gentlemen, Town & Country Planning Act 1990 (As Amended) Town & Country Planning (Development Management Procedure) (England) Order 2010 Decisions made between 12th April 2014 and 5th May 2014 The applications in this report have been determined by the Director of Regeneration and Community Services under delegated authority (Minute No. 254, Planning Committee, 3rd September, 2002, confirmed by Council 24th September, 2002). The decisions are reported for your information. The Building Act 1984/The Building Regulations 2010 Decisions made between 12th April 2014 and 6th May 2014 The applications in this report have been determined by the Building Control Manager & Access Officer under delegated authority. The decisions are reported for your information and have been ACCEPTED, APPROVED, APPROVED WITH CONDITIONS, REFUSED OR REGULARISED. Assistant Director of Regeneration and Built Environment PLANNING Reference Address Ward Number Rathvale Marsh Street Askam-in-Furness Dalton North B21/2014/0179 Proposal Parish Decision Erection of a double garage in place of existing Askam and Ireleth Approved with single garage. Case Officer conditions Maureen Smith Decision Date 25-APR-2014 Reference Address Ward Number 25 The Headlands Askam-in-Furness Dalton North BLHC/2014/000 Proposal Parish 4 Prior Approval (Larger Homes Extensions) for a Askam and Ireleth Decision rear conservatory (Length from rear wall of the Case Officer Approved with original
    [Show full text]