GHP by M/s Stanford Developers , , ( July 2017)

APPENDIX I (See paragraph-6) FORM 1 (I) Basic Information S. No. Item Details 1. Name of the project/s Proposed Amendment in Group Housing Project, promoted by M/s Stanford Developers, at Khasra No. 58,Village Janaksingpura, Tehsil - Neemrana, District Alwar, 2. S. No. in the schedule Category ‘B’ under item 8(a) of the schedule of Gazette Notification dated September 14th, 2006. 3. Proposed The proposed project will involve construction of 926 capacity/area/length/tonnage to flats. The area statistics of proposed construction is be handled/command area/lease tabulate below:- area/number of wells to be drilled Details of Proposed Construction

S. Existing Plant (as With Proposed N Parameter per E.C. issued Expansion/Mo Total o. dated 31.01.2014 ) dernization

1. Net Plot Area (after 11079.51 sq. m - 11079.51 sq. m land surrender) 2. Gross Built up area 29838.85 sq. m +20328.25sq.m 50167.1 sq.m Permissible Ground 3. 3877.829sq. m - 3877.829sq. m Coverage +1128.29 sq.m 2816.89 sq. M Achieved Ground 4. 1688 sq. m (25.42 % of Net Coverage Plot Area) 30935.473 sq. M 5. Permissible F.A.R. 20742.323 sq. m +10193.15 sq.m (with betterment levy) Residentia 23733.65 sq. m +5066.37 sq.m 28800.02 sq. m l Utilize 6. Commerci d F.A.R. 687.42sq. m +154.26 sq.m 841.680 sq. m al Total 24421.07 sq. m +5220.61 sq.m 29641.68 sq. m 7. Permissible Height 45m - 45 m 45 upto Terrace 44.95 upto Terrace +0.05 upto level; 8. Achieved Height level; Terrace level; 45.50m OHT 49.50m OHT level -4 m OHT level level 9. Achieved Green Area 2299.15 sq. m -15.67sq.m 2283.48 sq. m

M/s Stanford Developers. TEAM Institute of Science & Technology Pvt. Ltd

Authorized Signatory 1 EIA Consultant GHP by M/s Stanford Developers , Neemrana ,Alwar ( July 2017)

Amendment/M odernization in 926 flats (Number- 1BHK - 84 547 926): 2BHK - 112 1BHK - 107 1BHK - 84 No. of Flats 2BHK+STUDY- 10. 2BHK - 224 2BHK - 112 28 STUDIO - 164 2BHK+STUDY- STUDIO - 616 EWS/LIG - 49 28 ROOM - 2 STUDIO - 616 EWS - 84 ROOM - 2 4. New/Expansion/Modernization Previously, EC waEsWSgr-a8n4ted vide letter no. F1(4)/SEIAA/SEAC-Raj/Sectt/Project/Cat.8(a)B2 (15057)/15-16 dated 24 Oct., 2016, reference copy of same is enclosed as Annexure 1. No work on site has so far been done and proponent assures, no work will be done till amendment in EC will be granted. 5. Existing Capacity / Area etc. - 6. Category of Project i.e. ‘A’ or B ‘B’ 7. Does it attract the general No condition? If yes, please specify 8. Does it attract the specific No condition? If yes, please specify 9. Location Neemrana Plot/Survey/Khasra No. Khasra No. 58 Village Janaksingpura Tehsil Neemrana District Alwar State Rajasthan 10. Nearest railway station/airport  Rewari Railway Station is at a distance of about along with distance in Kms. 32.00 km towards NE of proposed site.  Indira Gandhi International Airport is at a distance of at about 95.00 km towards NE of proposed site.  NH-71 B is at about 34 Km towards NE side of proposed site.  NH-8 is at about 0.20 Km towards ESE side of proposed site.  SH-14 is at about 11.30 Km towards SSW side of proposed site. 11. Nearest Town, city, District Nearest Town is Neemrana at about 1.80 Km towards Headquarters along with NW of project site.

M/s Stanford Developers. TEAM Institute of Science & Technology Pvt. Ltd

Authorized Signatory 2 EIA Consultant GHP by M/s Stanford Developers , Neemrana ,Alwar ( July 2017)

distance in Kms. head quarter I at abour 52.50 Km towards SE of project site. 12. Village Panchayats, Zila Panchayat Samiti Kendra, Main City, Neemrana, Parishad, Municipal Alwar - 301705, Municipal Corporation, U. I. T. Corporation, Local body [Local body] Nagar Vikas Nyas (U.I.T). (complete postal addresses with telephone nos. to be given) 13. Name of the applicant M/s Stanford Developers. 14. Registered Address Plot No 31P, Adjacent to Medanta Parking, Near Alpine Convent School, Sector-38, Gudgaon Haryana. 122018 15. Address for correspondence: Name Mr. Bijender Singh Designation (Owner/ Partner/ Authorized Signatory CEO) Address Plot No 31P, Adjacent to Medanta parking, Near Alpine Convent School, Sector-38, Gudgaon Haryana. Pin Code 122018 E-mail [email protected] Telephone No. Fax No. 16. Details of Alternative Sites The Government Body “U. I. T.,” , sanctioned examined, if any. Location of the said land to M/s Stanford Developers for the these sites should be shown on a purpose of Construction of Group Housing at Village.- topo sheet. Janaksingpura, Tehsil-Neemrana, Distt.- Alwar Geographical location of the proposed project is- Latitude - 27°58'53.02"N Longitude - 76°24'7.41"E 17. Interlinked Projects No 18. Whether separate application of Not Applicable interlinked project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable 21. Whether the proposal involves No approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification,

M/s Stanford Developers. TEAM Institute of Science & Technology Pvt. Ltd

Authorized Signatory 3 EIA Consultant GHP by M/s Stanford Developers , Neemrana ,Alwar ( July 2017)

1991? 22. Whether there is any No Government Order/Policy relevant/relating to the site? 23. Forest land involved (hectares) No 24. Whether there is any litigation No pending against the project and /or land in which the project is proposed to be set up? (a)Name of the court (b)Case No. (c)Orders/directions of the Court, if any and its relevance with the proposed project.

(II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. Information/ Checklist Yes/No Details thereof (with approximate no. confirmation quantities/rates, wherever possible) with source of information data 1.1 Permanent or temporary Yes Land use change in land use, land cover The proposed site is in the developing area of or topography including Neemrana Tehsil which has mixed land use increase in intensity of land pattern of residential and commercial use. The use (with respect to local land area is having mixed land use pattern use plan). comprising of residential and commercial establishments. There will be minimal change in land use pattern of study area, and thus will not be inconsistent with the existing surroundings. Yes Land cover Due to human activities, land cover is either directly affected from activity like construction of road-building leading to deforestation or indirectly from water diversion leading to lowering of the water table. The proposed project will not involve any deforestation; only small work of site clearance will be done in which some shrubs and grasses will be removed. It will be balanced by planed landscaping on the site. Excavation of soil will be involved. The total

M/s Stanford Developers. TEAM Institute of Science & Technology Pvt. Ltd

Authorized Signatory 4 EIA Consultant GHP by M/s Stanford Developers , Neemrana ,Alwar ( July 2017)

expected quantity of earthwork involved is about 3000 m³.The excavated soil will be balanced within site by back filling. Therefore the changes will be localized and insignificant. No Topography The site is plane and will not involve any leveling activities. The proposed site does not involve any major natural drainage channel of locality therefore no changes in drainage pattern are envisaged. 1.2 Clearance of existing land, Yes The proposed site is not having any structures. vegetation and buildings? There are some seasonal shrubs and grasses in the proposed project site. Clearing of vegetation during the construction stage is very minimal. List of observed vegetations is enclosed as Annexure XI. This shall be compensated by planting 60 trees in addition to shrubs. The proposed landscaping and plantation will have positive impact on the prevailing environment. Details of flora are enclosed as Annexure- XI. 1.3 Creation of new land uses? No The proposed site is located near RIICO Industrial area Neemrana. The Neemrana Tehsil has mixed land use pattern of residential and commercial use. The proposed use of site is for residential. Therefore, the proposed project will not create new land uses that significantly differ from existing land use of locality as per the master plan. 1.4 Pre-construction investigations Yes The soil investigation was carried out. The e.g. bore houses, soil testing? detailed Soil investigation report is enclosed as Annexure No XVII. 1.5 Construction works? Yes The proposed project will involve construction of 926 flats. The area statistics of proposed construction is tabulate below:-

M/s Stanford Developers. TEAM Institute of Science & Technology Pvt. Ltd

Authorized Signatory 5 EIA Consultant GHP by M/s Stanford Developers , Neemrana ,Alwar ( July 2017)

S. No Floor FAR Area Total Builtup Area

1 Basement Floor 5933.45 2 Stilt Floor 850.3 3072 3 1St Floor 2054.39 2940.1 4 2nd Floor 2069.33 2940.1 5 3rd Floor 2054.39 2940.1 6 4th Floor 2054.39 2940.1 7 5th Floor 2054.39 2940.1 8 6th Floor 2054.39 2940.1 9 7th Floor 2054.39 2940.1 10 8th Floor 2054.39 2940.1 11 9th Floor 2054.39 2940.1 12 10th Floor 2054.39 2940.1 13 11th Floor 2054.39 2940.1 14 12th Floor 2069.33 2940.1 15 13th Floor 2054.39 2940.1 16 14th Floor 2054.39 2940.1 17 Total 29641.64 50167.1

1.6 Demolition works? No The proposed site is not having any structures which will need demolition. 1.7 Temporary sites used for Yes They will be housed in temporary houses construction works or housing of supported by flush WCs during construction construction workers? period only. 1.8 Above ground buildings, Yes The proposed maximum height of the project will structures or earthworks be 45 m upto Terrace Level and 45.50 m upto including linear structures, cut OHT level. Expected quantity of earth work involved is about 3000 M3. and fill or excavations. 1.9 Underground works including No No tunneling activity is involved. mining or tunneling? 1.10 Reclamation works? No No reclamation works involved 1.11 Dredging? No Not involved 1.12 Offshore structures? No Not applicable 1.13 Production and manufacturing No Not applicable processes? 1.14 Facilities for storage of goods or Yes Temporary stores or sheds will be constructed for materials? storage of construction materials. 1.15 Facilities for treatment or Yes STP for treatment of sewage. STP treated effluent disposal of solid waste or liquid will be used for gardening and flushing of toilets. effluents? All excess treated water (75 KLD) will be discharged in drains maintained by UIT after

M/s Stanford Developers. TEAM Institute of Science & Technology Pvt. Ltd

Authorized Signatory 6 EIA Consultant GHP by M/s Stanford Developers , Neemrana ,Alwar ( July 2017)

taking necessary permission from UIT. All solid waste from different sections will be collected in separate bins. The non-organic waste shall be disposed off to authorized vendors. The organic waste will be converted into manure and used within premises for green belt development. 1.16 Facilities for long term housing Yes Cabins for watchmen, gardeners etc and persons of operational workers? engaged in essential services. 1.17 New road, rail or sea traffic No The existing infrastructure is sufficient to catch- during construction or operation? up for the need of such a small project, insignificant increase in traffic for transport of men & material is envisaged. 1.18 New road, rail, air, waterborne or No The proposed project site has well connectivity other transport infrastructure through road; rail and air-transport therefore will including new or altered routes not require any change in existing infrastructure. and stations, ports, airports etc? 1.19 Closure or diversion of existing No No public road or infrastructure is crossing or transport routes or infrastructure within the proposed site. leading to changes in traffic movements? 1.20 New or diverted transmission No No pipeline or transmission line is crossing or lines or pipelines? within the proposed site. 1.21 Impoundment, damming, No The proposed site does not involve any major culverting, realignment or other natural drainage channel of locality therefore no changes to the hydrology of changes in drainage pattern are envisaged. watercourses or aquifers? 1.22 Stream crossings? No The proposed plot is small in size and no natural drain is crossing the plot. 1.23 Abstraction or transfers of water Yes Water will be taken from underground water from ground or surface waters? abstraction. No ground water will be abstracted without obtaining prior NOC from CGWA. An affidavit regarding same is attached as Annexure III. 1.24 Changes in water bodies or the No The excess treated water will discharged in sewer land surface affecting drainage line maintained by UIT after obtaining necessary or run-off? permission. The proposed site does not involve any major natural drainage channel of locality therefore no such changes were envisaged. 1.25 Transport of personnel or Yes During construction phase material of materials for construction, construction will be transported to site from local operation or decommissioning? market and other sources depending on availability. During operation stage the transportation

M/s Stanford Developers. TEAM Institute of Science & Technology Pvt. Ltd

Authorized Signatory 7 EIA Consultant GHP by M/s Stanford Developers , Neemrana ,Alwar ( July 2017)

activities will be due to cars, two wheelers and other vehicles of the residents. 1.26 Long-term dismantling or No Not applicable, as the land is vacant. No decommissioning or restoration structures are present at the site; hence, no works? dismantling, decommissioning or restoration work is required. 1.27 Ongoing activity during No Not applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in Yes During construction phase, there will be inward either temporarily or and outward movement of local labour in the permanently? construction site. However during the post construction phase, there will be regular movement of residents, visitors and other related persons. The residential apartment will house about 3133 persons which will not bring any significant increment in total population of locality. 1.29 Introduction of alien species? No Only the plant/ trees of local species and suitable for the region will be planted. 1.30 Loss of native species or genetic No There are no grown trees on the proposed site, diversity? some shrubs and grasses will be removed. The same will be amply compensated by proposed plantation and landscaping. 1.31 Any other actions? No -

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non- renewable or in short supply): S. No. Information/checklist Yes/ Details thereof (with approximate confirmation No quantities/rates, wherever possible) with source of information data 2.1 Land especially undeveloped Yes The proposed site is in developing urban area and or agricultural land (ha) the site has been converted for residential purpose by UIT and allocated to project proponent. 2.2 Water (expected source & Yes  During construction phase water requirement competing users) unit: KLD will be 16.00 KLD which will be met from authorized water suppliers.  During post construction phase daily water requirement will be about 264.33 KLD.  162.30 KLD- Fresh water from ground water abstraction after obtaining NOC from CGWA

M/s Stanford Developers. TEAM Institute of Science & Technology Pvt. Ltd

Authorized Signatory 8 EIA Consultant GHP by M/s Stanford Developers , Neemrana ,Alwar ( July 2017)

 101.80 KLD- Recycled water from STP. 2.3 Minerals (MT) No - 2.4 Construction material – stone, Yes The construction will involve use of Stone, Stone aggregates, and /soil Grit, Sand, bricks and timber. (expected source-MT) The Stone and Stone grit is available from various queries operative around Bhiwadi City. Details are enclosed as Annexure XXI. 2.5 Forests and timber (source – Yes Timber will be obtained from authorized local MT). timber merchant. 2.6 Energy including electricity During construction phase : 20 KW and fuels (source, competing Yes During operation phase: 400 KW users) Unit: fuel (MT), energy The power will be received from JVVNL at 11 (MW) KV supply voltage, it will be stepped down to 0.433 KV through two transformer of capacity 750 kVA. To supplement above during power failure, it is proposed to provide one D.G. Set of capacity 250kVA, and two DG sets each of capacity 500 kVA to cater the emergency load only. 2.7 Any other natural resources Yes Solar energy will be utilized for lighting of (use appropriate standard common areas and solar water heaters for units) providing hot water to residents. 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S. No Information/checklist Yes Details thereof (with approximate confirmation /No quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, No The proposed project will not use any hazardous which are hazardous (as per material. Hazardous material in proposed project MSIHC rules) to human health will be generated only as used lubricating oil from or the environment (flora, DG Set which can cause health hazard. This used fauna, and water supplies) oil will be sold to authorized recyclers. 3.2 Changes in occurrence of No The project is of a building construction. The waste disease or affect disease water as well as MSW is proposed to be disposed vectors (e.g. insect or water of in appropriate manner therefore the project will borne diseases) not lead to change in occurrence of diseases or affect disease vectors. 3.3 Affect the welfare of people Yes The urban cities including Jaipur are suffering from e.g. by changing living shortage of adequate and hygienic living conditions? conditions. This has resulted in mushrooming of unauthorized Colonies which lacks basic amenities. The proposed project will provide all basic

M/s Stanford Developers. TEAM Institute of Science & Technology Pvt. Ltd

Authorized Signatory 9 EIA Consultant GHP by M/s Stanford Developers , Neemrana ,Alwar ( July 2017)

amenities and hygienic and comfortable living conditions.

3.4 Vulnerable groups of people No There are a number of Schools, Colleges, Hospitals who could be affected by the etc but it is a small group housing project and will project e.g. hospital patients, not affect vulnerable group of people. children, the elderly etc., 3.5 Any other causes No -

4. Production of solid wastes during construction or operation or decommissioning (MT/month) S. No. Information/checklist Yes/ Details thereof (with approximate confirmation No quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine No Not applicable. wastes 4.2 Municipal waste (domestic Yes According to the building construction manual and commercial wastes) of MoEF&CC the rate of waste generation in residential building is 0.41 Kg/day/person. In the Residential Section of project, Out of total domestic waste 60 % will be wet garbage and rest (40 %) will be dry garbage. The solid waste so generated will be first segregated as plastic, glass, paper and other waste separately and disposed off as per MSW Rules, 2000 and amended Rules, 2008. Generation of Waste from Residential = 0.41 x 2270 Section(kg/day) = 930.70 kg/day = 0.41 X Estimated Population Wet Garbage @ 40% Total Waste Generated = 372.28 kg/day Dry waste @60% Total Waste Generated = 558.42Kg/day

Management of Solid Waste at project Site:- Segregation will be practiced at the source level itself. Dry waste will be stored in the area marked for it, from where it will be sent for further disposal. Green waste will be converted into manure along with S.T.P. sludge by Organic Waste Converter at the project site -provisions are made close to STP. A waste converter is a machine used for the treatment and recycling of solid and liquid refuse material. A converter is a self-contained system capable of performing the functions like pasteurization of organic waste, sterilization of pathogenic or biohazard waste, grinding and pulverization of refuse into unrecognizable output, trash compaction and dehydration. The manure will be used to develop the greenbelt within the premises. Area specified for waste convertor will be surrounded by fast growing and canopy

M/s Stanford Developers. TEAM Institute of Science & Technology Pvt. Ltd

Authorized Signatory 10 EIA Consultant GHP by M/s Stanford Developers , Neemrana ,Alwar ( July 2017)

forming trees. 4.3 Hazardous wastes (as per Yes Used lubricating oil from DG Set will be Hazardous waste Management generated during construction of the building. Rules) Waste oil will be properly stored and sold to authorized recyclers. 4.4 Other industrial process No Not applicable as the proposed project is of wastes construction and will not involve any industrial activity. 4.5 Surplus product No Not applicable , Residential Apartment 4.6 Sewage sludge or other sludge Yes Dried sludge from STP will be used as manure from effluent treatment for plants after treatment. 4.7 Construction or demolition Yes Construction wastes will be used for road wastes construction. 4.8 Redundant machinery or No All machinery after construction will be equipment removed from site. 4.9 Contaminated soils or other No No such material envisaged materials 4.10 Agricultural wastes No Not applicable 4.11 Other solid wastes No Not applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S.No. Information/checklist Yes/ Details thereof (with approximate confirmation No quantities/rates, wherever possible) with source of information data 5.1 Emissions from combustion Yes The only point source of pollution will be one of fossil fuels from stationary D.G. Set of capacity 250kVA, and two DG sets or mobile sources each of capacity 500 kVA. The emissions will be discharged through vent of proper height. D.G Set will conform to emission limits as prescribed under E P Act- 1986 and having acoustic arrangement as per EP Act- 1986. The D.G Set will carry ‘Type approval Certificate’. 5.2 Emissions from production No - processes 5.3 Emissions from materials Yes Dust will be generated during transportation and handling including storage or unloading of material. The measures to minimize transport the effects are given in Environmental Management Plan. 5.4 Emissions from construction Yes The measures to minimize the effects are given activities including plant and in Environmental Management Plan. equipment 5.5 Dust or odours from handling Yes The measures to minimize the effects are given of materials including in Environmental Management Plan.

M/s Stanford Developers. TEAM Institute of Science & Technology Pvt. Ltd

Authorized Signatory 11 EIA Consultant GHP by M/s Stanford Developers , Neemrana ,Alwar ( July 2017)

construction materials, sewage and waste. 5.6 Emissions from incineration No No such operations are envisaged. No burning of of waste waste will be practiced. 5.7 Emissions from burning of No Waste would be collected and handed over to the waste in open air (e.g. slash authorized vendor and biodegradable waste will materials, construction debris) be converted into manure by Organic Waste Converter. 5.8 Emissions from any other No - sources

6. Generation of Noise and Vibration, and Emissions of Light and Heat: S. No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data with source of information data 6.1 From operation of equipment Yes but Noise generated by equipment will be e.g. engines, ventilation plant, negligible nominal. The measures to minimize the crushers effects are given in Environmental Management Plan. 6.2 From industrial or similar No It is a construction project. processes 6.3 From construction or Yes But insignificant to result in any adverse demolition effect on environment. 6.4 From blasting or piling No Not involved

6.5 From construction or Yes During construction phase the noise will be operational traffic generated from movement of vehicles, earthwork, concrete mixer etc. 6.6 From lighting or cooling No Silent generators will be used. systems 6.7 From any other sources No -

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

S. No. Information/checklist Yes/ Details thereof (with approximate confirmation No quantities/rates, wherever possible) with source of information data 7.1 From handling storage, use or Yes Used lubricating oil from D.G Set will be spillage of hazardous properly stored and sold to authorized recyclers. materials 7.2 From discharge of sewage or Yes The Sewage generated will be treated and other effluents to water or the handled properly to minimize the impact.

M/s Stanford Developers. TEAM Institute of Science & Technology Pvt. Ltd

Authorized Signatory 12 EIA Consultant GHP by M/s Stanford Developers , Neemrana ,Alwar ( July 2017)

land (expected made and During construction phase septic tank soak pit place of discharge) system would be provided and during operation phase STP would be provided. 7.3 By deposition of pollutants No The only source of air pollution will be two D.G. emitted to air into the land or Sets of capacity 500 kVA each & one of 250 into water kVA, which would have vent of proper height. Beside the DG set will be housed in acoustic enclosure as per prevailing rules. 7.4 From any other sources No - 7.5 Is there a risk of long term No Not envisaged. build up of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

S. No. Information/checklist Yes/ Details thereof (with approximate confirmation No quantities/rates, wherever possible) with source of information data 8.1 From explosions, spillages, No These operations are not involved. fires from storage, handling, use or production of hazardous substances 8.2 From any other causes No - 8.3 Could the project be affected Yes The site is located in the seismic zone-III, which by natural disasters causing is the zone of moderate seismic intensity, as per environmental damage (e.g. the seismic zoning map of India given in BIS floods, earthquakes, code IS: 1893(Part 1)-2002.As such there is no landsides, cloudburst etc)? history of such disasters in the area till now. Proper safety measures as per Disaster Management Plan will be adopted to face such incidents. 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality. S. No. Information/checklist Yes/ Details thereof with approximate confirmation No quantities/rates, wherever possible) with source of information data

M/s Stanford Developers. TEAM Institute of Science & Technology Pvt. Ltd

Authorized Signatory 13 EIA Consultant GHP by M/s Stanford Developers , Neemrana ,Alwar ( July 2017)

9.1 Lead to development of The proposed site is located near RIICO supporting cities, ancillary Industrial Area Neemrana. The area has well development or development developed infrastructure and provision of proper stimulated by the project basic amenities. which could have impact on the environment e.g.:  Supporting infrastructure This is a small project and will not exert any (Roads, power supply, waste No significant negative impact. or waste water treatment etc.)  Housing development  Extractive industries  Supply industries  Other 9.2 Lead to after-use of the site, No This is a construction project. which could have an impact on environment 9.3 Set a precedent for later No The project will be developed strictly as per JDA developments bye laws. 9.4 Have cumulative effects due No It is a construction project and will be used for to proximity to other existing non polluting activities with full civic facilities or planned projects with like water supply, sewage treatment and similar effects. ventilation etc.

(III) Environmental Sensitivity S. No. Areas Name/Identity Aerial distance (within 15 km.) Proposed project location boundary 1 Areas protected under No No such areas exist. international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are Tankri PF 10.85 Km towards NNE of project site. important or sensitive Kiratsingpura PF 4.70 Km towards South of project site. for ecological Barud PF 7.60 Km towards SSW of project site. reasons –Wetlands, Kolila PF 6.50 Km towards SSW of project site. watercourses or other Nimrana PF 0.10 Km towards NW of project site. water bodies, coastal Kanti PF 13.60 Km towards NW of project site. zone, biospheres, Humzapur PF 7.60 Km towards SW of project site. mountains, forests Banganga River 9.50 Km towards SE of project site. Sabi River 7.00 Km towards SE of project site. 3 Areas used by No No such areas exist.

M/s Stanford Developers. TEAM Institute of Science & Technology Pvt. Ltd

Authorized Signatory 14 EIA Consultant GHP by M/s Stanford Developers , Neemrana ,Alwar ( July 2017)

protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine Banganga River 9.50 Km towards SE of project site. or underground waters Sabi River 7.00 Km towards SE of project site. 5 State, National Yes Rajasthan–Haryana interstate boundary boundaries at a distance of 7.80 km towards NE from the proposed project site. 6 Routes or facilities SH-14 11.30 Km towards SSW side of used by the public for proposed site access to recreation or NH-8 0.20 Km towards ESE side of proposed other tourist, pilgrim site. areas 7 Defense installations - - 8 Densely populated or Village Jonaicha kalan 4.70 Km towards NNE of project site. built-up area Village Kutina 9.40 Km towards NNE of project site. Village Giglana 12.50 Km towards North of project site. Village Rajgarh 13.00 Km towards NNE of project site. Village Tankari 12.70 Km towards NE of project site. Village Khandora 9.10 Km towards NE of project site. Village Mohanpura 12.00 Km towards NE of project site. Village Gugal Kota 8.00 Km towards NE of project site. Village Shajahanpur 4.00 Km towards ENE of project site. Town Neemrana 1.80 Km towards NW of project site. Village Mirzapur 7.60 Km towards NE of project site. Village Janaksingpura 0.40 Km towards ESE of project site. Village Bahror Jat 4.60 Km towards SE of project site. Village Kankara Barud 10.70Km towards SSW of project site. Village Sodawas 14.10 Km towards South of project site. Village Madhosingura 2.50 Km towards SW of project site. Village Gondla 10.40 Km towards WSW of project site. Town Shivpuri 4.00 Km towards West of project site. Village Dosod 12.00 Km towards WNW of project site Village Majrikhurd 8.70 Km towards WNW of project site. Village Kanti Khas 11.60 Km towards NW of project site. Village Kheri 9.30 Km towards NW of project site. Village Majro 7.10 Km towards NW of project site. Village Madhan 13.50 Km towards NNW of project site. Village Gilot 6.40 Km towards North of project site. 9 Areas occupied by Health Care Facility/Hospitals Facilities sensitive man-made Dispensary at Giglana 12.50 Km towards North of project land uses (hospitals, site. schools, places of Veterinary Hospital at 13.50 Km towards NNW of project

M/s Stanford Developers. TEAM Institute of Science & Technology Pvt. Ltd

Authorized Signatory 15 EIA Consultant GHP by M/s Stanford Developers , Neemrana ,Alwar ( July 2017)

worship, community Madhan site. facilities) Hospital & Veterinary 1.80 Km towards NW of project site. hospital at Neemrana Dispensary at Kutina 9.40 Km towards NNE of project site. Dispensary at Kanti 11.60 Km towards NW of project site. Khas Hospital at Shajahanpur 4.00 Km towards ENE of project site. Worship & Community Facilities Temple Post office & At Neemrana 1.80 Km towards NW Police Station of project site. Post office & Temple At Shajahanpur 4.00 Km towards ENE of project site. Post Office At Bahror Jat 4.60 Km towards SE of project site. Post Office & police At Village Kankara Barud 10.70 Km Station towards SSW of project site. School and Educational Facilities Govt. School At Neemrana 1.80 Km towards NW of project site. Rajkiya Ucchya At Dharuhera 9.00 Km towards NW Madhyamik School side of project site. Govt. School At Shajahanpur 4.00 Km towards ENE of project site. Govt. School At Bahror Jat 4.60 Km towards SE of project site. Govt. School At Village Kankara Barud 10.70 Km towards SSW of project site. Primary School At Village Janaksingpura 0.40 Km towards ESE of project site. Rajkiya Ucchya At Shivpuri 4.00 Km towards West Madhyamik School of project site. 10 Areas containing Banganga River 9.50 Km towards SE of project site. important, high quality or scare resources (ground water Sabi River 7.00 Km towards SE of project site. resources, surface resources, forestry, agriculture, fisheries, tourism minerals) 11 Areas already No Project is coming up near the RIICO subjected to pollution Industrial Area Neemrana, which is at or environmental a distance of about 4.35 km towards damage.(those where SW from Project Site.

M/s Stanford Developers. TEAM Institute of Science & Technology Pvt. Ltd

Authorized Signatory 16 EIA Consultant GHP by M/s Stanford Developers , Neemrana ,Alwar ( July 2017)

existing legal environmental standards are exceeded) 12 Areas susceptible to No Neemrana is located in semi-arid natural hazard which region and there is no history of floods could cause the project or land slide. Soil in Alwar is to present generally sandy and cohesion less; environmental mildly sloping hence there is no threat problems of subsidence. The site is located in (earthquakes, the seismic zone-III, which is the zone subsidence, landslides, of moderate seismic intensity, as per erosion, flooding or the seismic zoning map of India given extreme or adverse in BIS code IS: 1893(Part 1)-2002.As climatic conditions) such there is no history of such disasters in the area till now. Map of India showing seismic zones of India is enclosed as Annexure- XIX.

(b) “I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost.”

Date: Place: Bijender Singh (Authorized signatory) M/s Stanford Developers Plot No 31P, Adjacent to Medanta parking, Near Alpine Convent School, Sector-38, Gudgaon Haryana. 122018

M/s Stanford Developers. TEAM Institute of Science & Technology Pvt. Ltd

Authorized Signatory 17 EIA Consultant