ASSOCIATION OF SOUTHEAST ASIAN NATIONS (ASEAN) PHYSICAL CONNECTIVITY AND THE PHILIPPINE INFRASTRUCTURE

ADG Ruben S. Reinoso, Jr.

4th ASEAN Connectivity Forum Seoul, Republic of Korea 07-08 November 2016 1 OUTLINE

ENERGY COOPERATION

TRANSPORT STRATEGIES

ICT MASTERPLAN

2 OUTLINE

ENERGY COOPERATION

TRANSPORT STRATEGIES

ICT MASTERPLAN

3 ENERGY COOPERATION

A. ASEAN Power Grid (APG)

Source: ASEAN Plan of Action for Energy Cooperation (APAEC) 2016-2025 (Phase I: 2016-2020)

4 ENERGY COOPERATION

A. ASEAN Power Grid PALAWAN,

 Currently, an off-grid area.

 Due to the growing electricity demand in said area and limited funds, the private sector is encouraged to put up power generation facilities as New Power Providers (NPPs).

5 ENERGY COOPERATION B. Trans -ASEAN Gas Pipeline (TAGP)

Source: DOE 6 ENERGY COOPERATION B. Trans -ASEAN Gas Pipeline (TAGP) Project Target Year Luzon Pipeline Projects 105 km. Batangas- (BatMan 1) Pipeline 2015-2017 15-km. Sucat-Fort Bonifacio Pipeline 2017 35-km. Sucat-Malaya (Su-Ma) Pipeline 2017 38-km. Sucat-Quirino Pipeline 2020 140-km. Bataan-Manila (BatMan2) Pipeline 2020 40-km. / EDSA-Taft Gas Pipeline – ET Loop 2020 40-km. Subic Pipeline (from proposed BatMan2 to Clark) 2022 25-km. Clark Pipeline (from proposed BatMan2 to Clark) 2022 40-km. Bataan-Cavite (BatCave) Pipeline 2022 Refilling Stations CNG Refilling Stations in Metro Manila 2013-2015 Liquefied Natural Gas (LNG) Terminals LNG Hub Terminal in Pagbilao, Quezon 2013-2014 LNG Terminal in Batangas 2021-2030 LNG Terminal in Bataan 2025 7 ENERGY COOPERATION

B. Trans -ASEAN Gas Pipeline (TAGP) Project Target Year Mindanao PHASE I Floating Storage and Regasification Unit (FSRU) FSRU Facility in Macajalar Bay, Misamis Oriental 2014-2016 Storage Facilities Satellite Supply Terminal (2 Storage Tanks each with 120 cu.m.) in South 2014-2016 Iligan Satellite Supply Terminal (1 Storage Tanks each with 120 cu.m.) in North 2014-2016 Iligan Pipeline Projects 27.4 km. Pipeline System for Cagayan de Oro and PHIVIDEC Area 2014-2016 2x2 km. Distribution Pipeline in Iligan City 2014-2016 Refilling Stations Liquefied Compressed Natural Gas (LCNG) Refueling Stations in Iligan 2016-2017 City, CDO and PHIVIDEC Areas

8 ENERGY COOPERATION

B. Trans -ASEAN Gas Pipeline (TAGP)

Project Target Year Mindanao PHASE II Liquefied Natural Gas (LNG) Terminals 3 Satellite LNG Terminals in Davao via General Santos TBD Pipeline Projects 53 km. Pipeline in General Santos 2016-2018 Refilling Stations Liquefied Compressed Natural Gas (LCNG) Refueling Stations in 2016-2018 General Santos and Davao

 Enactment of Natural Gas Bill

9 ENERGY COOPERATION

C. Renewable Energy (RE)

 National Renewable Energy Program (NREP) • Triple the installed RE capacity by 2030 o From 5,438 MW in 2010 to 15,236 MW in 2030

 RE Act of 2008 (Republic Act (RA) 9513) • Utilize RE sources for power generation on grid and missionary/off-grid areas

10 OUTLINE

ENERGY COOPERATION

TRANSPORT STRATEGIES

ICT MASTERPLAN

11 TRANSPORT STRATEGIES

Marine Transport: ASEAN Single Shipping Market (ASSM)

9 Philippine Ports in the ASEAN Roll on-Roll off (RORO) Network

12 TRANSPORT STRATEGIES

Marine Transport: General Santos - Bitung, Indonesia RO-RO

13 TRANSPORT STRATEGIES

Marine Transport:Asian Highway Sea Routes

14 Source: TRANSPORT STRATEGIES

Air Transport

Transfer of general aviation from NAIA to another airport

Public-private partnership (PPP) arrangements for airport projects

15 TRANSPORT STRATEGIES

Logistics: Multimodal Logistics System

16 OUTLINE

ENERGY COOPERATION

TRANSPORT STRATEGIES

ICT MASTERPLAN

17 ICT MASTER PLAN

Creation of the Department of Information and Communications Technology (DICT)

• Legislated through RA No. 10844 (signed on 23 May 2016)

• Mandated to plan, develop, and promote the national ICT development agenda

18 ICT MASTER PLAN

Economic Development th and Transformation Baguio City (95 ) Manila (2nd) Clark (98th)

 Philippines as top Laguna (82nd) global destination for

outsourcing: Iloilo (91st) • Eight (8) cities Cebu (8th) included in the

2015 Top Bacolod (86th) Outsourcing Destinations Source: Tholons Davao City (69th)

19 ICT MASTER PLAN

Improve infrastructure and people’s access to ICT

• Provision of free Wi-Fi in Free WiFi public places to access e- commerce, e-learning, e- Project health and e-government tools

• Establish new Community Tech4ED e-Centers (CeCs) in municipalities and priority Project areas where there are no shared access facilities

20 ICT MASTER PLAN

Improve infrastructure and people’s access to ICT

Local • Allows direct local Internet exchange of traffic to Protocol reduce latency, hence, (IP) improve broadband connectivity Peering

TV White • TVWS technology uses Space un-allocated TV frequency spectrum to (TVWS) provide data connectivity Initiative in unserved areas

21 ICT MASTER PLAN

Baseline Target Promote Innovation 2015 2020 Philippine 100 500 Startups (early stage)

Total Funding USD40 million USD200 million

Cumulative - USD2 billion Valuation High-Skilled 1,700 8,500 Jobs Created

Founders 250 1,250

Users Acquired - 15 million

Paying - 700,000 Customers Worldwide 22 END

THANK YOU

23