(Asean) Physical Connectivity and the Philippine Infrastructure
Total Page:16
File Type:pdf, Size:1020Kb
ASSOCIATION OF SOUTHEAST ASIAN NATIONS (ASEAN) PHYSICAL CONNECTIVITY AND THE PHILIPPINE INFRASTRUCTURE ADG Ruben S. Reinoso, Jr. 4th ASEAN Connectivity Forum Seoul, Republic of Korea 07-08 November 2016 1 OUTLINE ENERGY COOPERATION TRANSPORT STRATEGIES ICT MASTERPLAN 2 OUTLINE ENERGY COOPERATION TRANSPORT STRATEGIES ICT MASTERPLAN 3 ENERGY COOPERATION A. ASEAN Power Grid (APG) Source: ASEAN Plan of Action for Energy Cooperation (APAEC) 2016-2025 (Phase I: 2016-2020) 4 ENERGY COOPERATION A. ASEAN Power Grid PALAWAN, PHILIPPINES Currently, an off-grid area. Due to the growing electricity demand in said area and limited funds, the private sector is encouraged to put up power generation facilities as New Power Providers (NPPs). 5 ENERGY COOPERATION B. Trans -ASEAN Gas Pipeline (TAGP) Source: DOE 6 ENERGY COOPERATION B. Trans -ASEAN Gas Pipeline (TAGP) Project Target Year Luzon Pipeline Projects 105 km. Batangas-Manila (BatMan 1) Pipeline 2015-2017 15-km. Sucat-Fort Bonifacio Pipeline 2017 35-km. Sucat-Malaya (Su-Ma) Pipeline 2017 38-km. Sucat-Quirino Pipeline 2020 140-km. Bataan-Manila (BatMan2) Pipeline 2020 40-km. Metro Manila / EDSA-Taft Gas Pipeline – ET Loop 2020 40-km. Subic Pipeline (from proposed BatMan2 to Clark) 2022 25-km. Clark Pipeline (from proposed BatMan2 to Clark) 2022 40-km. Bataan-Cavite (BatCave) Pipeline 2022 Refilling Stations CNG Refilling Stations in Metro Manila 2013-2015 Liquefied Natural Gas (LNG) Terminals LNG Hub Terminal in Pagbilao, Quezon 2013-2014 LNG Terminal in Batangas 2021-2030 LNG Terminal in Bataan 2025 7 ENERGY COOPERATION B. Trans -ASEAN Gas Pipeline (TAGP) Project Target Year Mindanao PHASE I Floating Storage and Regasification Unit (FSRU) FSRU Facility in Macajalar Bay, Misamis Oriental 2014-2016 Storage Facilities Satellite Supply Terminal (2 Storage Tanks each with 120 cu.m.) in South 2014-2016 Iligan Satellite Supply Terminal (1 Storage Tanks each with 120 cu.m.) in North 2014-2016 Iligan Pipeline Projects 27.4 km. Pipeline System for Cagayan de Oro and PHIVIDEC Area 2014-2016 2x2 km. Distribution Pipeline in Iligan City 2014-2016 Refilling Stations Liquefied Compressed Natural Gas (LCNG) Refueling Stations in Iligan 2016-2017 City, CDO and PHIVIDEC Areas 8 ENERGY COOPERATION B. Trans -ASEAN Gas Pipeline (TAGP) Project Target Year Mindanao PHASE II Liquefied Natural Gas (LNG) Terminals 3 Satellite LNG Terminals in Davao via General Santos TBD Pipeline Projects 53 km. Pipeline in General Santos 2016-2018 Refilling Stations Liquefied Compressed Natural Gas (LCNG) Refueling Stations in 2016-2018 General Santos and Davao Enactment of Natural Gas Bill 9 ENERGY COOPERATION C. Renewable Energy (RE) National Renewable Energy Program (NREP) • Triple the installed RE capacity by 2030 o From 5,438 MW in 2010 to 15,236 MW in 2030 RE Act of 2008 (Republic Act (RA) 9513) • Utilize RE sources for power generation on grid and missionary/off-grid areas 10 OUTLINE ENERGY COOPERATION TRANSPORT STRATEGIES ICT MASTERPLAN 11 TRANSPORT STRATEGIES Marine Transport: ASEAN Single Shipping Market (ASSM) 9 Philippine Ports in the ASEAN Roll on-Roll off (RORO) Network 12 TRANSPORT STRATEGIES Marine Transport: General Santos - Bitung, Indonesia RO-RO 13 TRANSPORT STRATEGIES Marine Transport:Asian Highway Sea Routes 14 Source: Rappler TRANSPORT STRATEGIES Air Transport Transfer of general aviation from NAIA to another airport Public-private partnership (PPP) arrangements for airport projects 15 TRANSPORT STRATEGIES Logistics: Multimodal Logistics System 16 OUTLINE ENERGY COOPERATION TRANSPORT STRATEGIES ICT MASTERPLAN 17 ICT MASTER PLAN Creation of the Department of Information and Communications Technology (DICT) • Legislated through RA No. 10844 (signed on 23 May 2016) • Mandated to plan, develop, and promote the national ICT development agenda 18 ICT MASTER PLAN Economic Development th and Transformation Baguio City (95 ) Manila (2nd) Clark (98th) Philippines as top Laguna (82nd) global destination for outsourcing: Iloilo (91st) • Eight (8) cities Cebu (8th) included in the 2015 Top Bacolod (86th) Outsourcing Destinations Source: Tholons Davao City (69th) 19 ICT MASTER PLAN Improve infrastructure and people’s access to ICT • Provision of free Wi-Fi in Free WiFi public places to access e- commerce, e-learning, e- Project health and e-government tools • Establish new Community Tech4ED e-Centers (CeCs) in municipalities and priority Project areas where there are no shared access facilities 20 ICT MASTER PLAN Improve infrastructure and people’s access to ICT Local • Allows direct local Internet exchange of traffic to Protocol reduce latency, hence, (IP) improve broadband connectivity Peering TV White • TVWS technology uses Space un-allocated TV frequency spectrum to (TVWS) provide data connectivity Initiative in unserved areas 21 ICT MASTER PLAN Baseline Target Promote Innovation 2015 2020 Philippine 100 500 Startups (early stage) Total Funding USD40 million USD200 million Cumulative - USD2 billion Valuation High-Skilled 1,700 8,500 Jobs Created Founders 250 1,250 Users Acquired - 15 million Paying - 700,000 Customers Worldwide 22 END THANK YOU 23.