CONCEPT FRAMEWORK Introduction
Total Page:16
File Type:pdf, Size:1020Kb
CONCEPT FRAMEWORK Introduction Major transport links Crossrail Cambridge to London Liverpool Street Railway line Context Site Boundary Gilston Area Settlements Green Belt Area Peterborough Vision & Objectives Ely Huntington Newmarket Northhampton Cambridge Baseline Summary Railway Bedford Royston Haverhill Milton Keynes Stevenage Bishop’s Stortford Braintree Spatial Framework Luton Stansted A1 M11 Harlow Chelmsford M25 Sheneld Delivery & Implementation High Wycombe Brentwood Basildon London Liverpool Street Crossrail Slough Abbey Wood Reading Heathrow Major transport links Crossrail Cambridge to London Liverpool Street Railway line Next Steps Site Boundary Gilston Area Settlements Green Belt Area Strategic Rail Routes 115 HIGHWAY IMPROVEMENT STRATEGY The Principal Landowners and the Council have Local Improvements in Harlow Elsewhere on the network, only local traffic is liaised closely with the transport authorities (Essex anticipated to pass through locations such as and Hertfordshire County Council’s Highways There are a series of other highway improvements Widford and Hunsdon since these communities England), in order to identify the local and that are being promoted in Harlow by Essex are not on a route to any major origins/ strategic highway mitigation measures that may County Council. These focus on the A414 destinations to the north. Furthermore, the B180 be required to facilitate delivery of the Gilston corridor and Allende Avenue/Velizy Avenue and B1004 will not be attractive routes to access Area, along with development in the wider towards the town centre. The improvements the development as they are minor roads with Harlow area. could enhance bus priority as well as traffic longer journey times than the primary routes. In capacity. addition, the links between the development and It is recognised that links between the urban these roads will be designed to be only for local area of Harlow and land to the north of the Stort Improvements in Hertfordshire access. Valley are critical to the successful development of the Gilston Area as well as meeting the growth One of the advantages of the location of the Funding of Highway Improvements requirements of the wider Harlow area as a whole. proposed development is that the majority of the generated traffic is anticipated to use the A414 The highway improvements identified above Strategic Links and routes through Harlow Town. Therefore, the are to facilitate growth in the Harlow and East impact on the existing highway network in East Herts area. A number of sources of are available The key strategic links for the Gilston Area and the Hertfordshire is minimised. The primary effect to fund the highway improvements including growth of the wider Harlow area continue to be is likely to be additional trips generated to/from the Growth Fund, Enterprise Zone and Road discussed with the highway authorities. Potential Bishop Stortford on the A1184 and additional Investment Strategy. The Principal Landowners Stort Crossings are shown below. trips to the west of the Gilston Area on the A414. will assist with the funding of the works to the extent that is appropriate based on current Central Stort Crossing: Signalisation of the West Road/Station Rd/A1184 legislation and guidance. Adjacent to the existing Eastwick crossing this will junction in Sawbridgeworth is likely to be required enhance capacity for private traffic, buses, cyclists as a result of proposed growth in Sawbridgeworth The Principal Landowners and the Council are and pedestrians. The location and design build as identified within the District Plan, and continuing to work with the transport authorities on preliminary work undertaken by Essex County upgrades to the High Wych Rd/A1184 junction to further develop the detail of the highway Council. may also be required as a result of the same improvement strategy and in particular the growth. Consideration will be given to both of phasing. Second Stort Crossing: these locations, particularly the High Wych Road VISUM modelling has demonstrated that an junction, in order to minimise the potential effects additional crossing of the River Stort is likely to of through traffic. Other traffic management be required within the plan period in order to measures will also be considered along High Wych facilitate growth, both within the Gilston Area, Road to minimise the effects of changes in traffic but also within the wider Harlow area. Whilst flow. The Amwell junction on the A414 will also the crossing is likely to be needed whether the need to be considered Gilston Area development proceeds or not, the development will assist with the delivery of the scheme. There are two options for the crossing. To the east or west of the Eastwick crossing. Following engagement with Essex County Council, the east route is preferred but the west route offers a feasible alternative. ACCESS STRATEGY The eastern route utilises the existing rail crossing on River Way before passing over previous mineral extraction works and terminating at Eastwick Road, at the location of the eastern access into the site. The route would be on structure over the floodplain. In addition a “bypass” to Pye Corner will be provided. This will pass from the location of the access to Terlings Park to join with the proposed Eastern Crossing. This will allow the section of Eastwick Road between the western end of the Pye Corner bypass and the eastern HERTFORDSHIRE site access to be closed to through traffic thus enhancing conditions for the existing community. The potential Western Crossing commences at the proposed Village 6 site access and passes south over the existing floodplain and railway on structure before joining to the A1169 (Elizabeth Way) at a roundabout. M11 Junction 7a: Essex County Council have been progressing with studies into a new Junction 7a on the M11 to the north east of Harlow, close to Gilden Way. This is linked to the regeneration of Harlow and is the ESSEX top priority highway scheme within Essex. Public consultation took place in early 2014 and 2016. Both the Principal Landowners and the Council Potential Western EXISTING COUNTY BOUNDARY support the provision of Junction 7a in order to Crossing facilitate growth in the wider area, and to support the regeneration of Harlow. Indicative Stort Crossings Plan GILSTON AREA | CONCEPT FRAMEWORK CONCEPT FRAMEWORK Introduction SUMMARY A summary of the transport strategy is shown below and comprises: Context • A walking and cycling orientated development Village centre bus stop with strong links across the River Stort to Proposed bus route Harlow; • A comprehensive bus strategy that builds on Primary Road the existing bus routes in the town and East Secondary Roads Herts; Potential Stort Valley crossings • Good links to the nearby Harlow Town rail Primary Pedestrian paths station which provides access to services to Secondary Pedestrian paths London, Cambridge and Stansted airport; New Village Boundary Vision & Objectives • A targeted highway improvement strategy Existing Settlements including new links across the Stort valley. • Comprehensive provision and funding of all Railway Line River Stort on-site infrastructure, as well as substantial Site boundary funding toward off-site infrastructure (some of which serves the wider Greater Harlow Area). EASTWICK WOODS Baseline Summary HIGH WYCH HUNSDON Spatial Framework GILSTON PARK Delivery & Implementation TEMPLE FIELDS STORT VALLEY ProposedVillage centre bus stops bus station HARLOW TOWN ProposedProposed bus bus routes route STATION PrimaryPrimary road Road SecondarySecondary road Roads PotentialPotential Stort Stort Valley Valley crossings crossings PrimaryPrimary pedestrian Pedestrian paths paths SecondarySecondary pedestrian Pedestrian paths paths NewNew village Village boundary Boundary ExistingExisting settlements Settlements Next Steps HARLOW TOWN RailwayRailway line Line CENTRE River Stort PINNACLES River Stort SiteSite boundary boundary Indicative Transport Strategy Plan 117 EASTWICK WOODS HIGH WYCH HUNSDON GILSTON PARK TEMPLE FIELDS STORT VALLEY HARLOW TOWN STATION HARLOW TOWN CENTRE PINNACLES F. Sustainability Framework INTRODUCTION The Gilston Area development is underpinned by a strong sustainability agenda. In developing the scheme, sustainability has not been considered as a separate discipline, rather an ideology and approach that has remained at the forefront across all levels of the design and decision making. Gilson Area Concept Framework – Sustainability Introduction Key themes and associated design principles were identified in stakeholder workshops forming the basis of a Sustainability Framework for the Gilston Area. Reduced ecological footprint Successful communities Climate friendly & resilient GILSTON AREA | CONCEPT FRAMEWORK Introduction Context Vision & Objectives Baseline Summary Spatial Framework Delivery & Implementation Next Steps 119 CONCEPT FRAMEWORK Copyright - Gehl Architects SUCCESSFUL COMMUNITIES IDENTITY QUALITY OF LIFE FOR GENERATIONS TO New places shaped by the landscape, with distinct and varied character, firmly COME rooted in the local heritage, and respectful of the integrity and setting of historic sites and neighbouring settlements The Gilston Area has been designed to create a strong sense of community from the outset. This will be achieved through the delivery of key social PRINCIPLES infrastructure such as schools, pubs, leisure and community facilities and through the creation of • Green buffer zones to create a defined boundary; spaces that