World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document The World Bank Report No: ISR13583 Implementation Status & Results Yemen, Republic of Second Rural Access Project (P085231) Operation Name: Second Rural Access Project (P085231) Project Stage: Implementation Seq.No: 18 Status: ARCHIVED Archive Date: 21-Jun-2014 Country: Yemen, Republic of Approval FY: 2006 Public Disclosure Authorized Product Line:IBRD/IDA Region: MIDDLE EAST AND NORTH AFRICA Lending Instrument: Adaptable Program Loan Implementing Agency(ies): Key Dates Board Approval Date 08-Nov-2005 Original Closing Date 30-Nov-2010 Planned Mid Term Review Date 15-Nov-2008 Last Archived ISR Date 27-Dec-2013 Public Disclosure Copy Effectiveness Date 07-Jun-2006 Revised Closing Date 30-Nov-2015 Actual Mid Term Review Date 26-Oct-2008 Project Development Objectives Project Development Objective (from Project Appraisal Document) The objective of the Rural Access Program (RAP) and of the Second Rural Access Project (RAP2) is to improve year-round access of the rural population to markets and services. Has the Project Development Objective been changed since Board Approval of the Project? ● Yes No Public Disclosure Authorized Component(s) Component Name Component Cost Rural Access Roads 67.20 Institutional Support and Capacity Building 3.45 Road Maintenance 12.33 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Public Disclosure Authorized Overall Risk Rating Substantial Substantial Implementation Status Overview The Project team conducted its latest supervision mission in June 2014, and expressed satisfaction with the progress. Most contracts are poised to be awarded and signed by June 30, 2014. Public Disclosure Copy Locations Page 1 of 8 Public Disclosure Authorized The World Bank Report No: ISR13583 Country First Administrative Division Location Planned Actual Yemen Muhafazat Ta`izz Al Man`um Yemen Not Entered Al Qabi`i Yemen Muhafazat al Hudaydah Zabid Yemen Not Entered Republic of Yemen Yemen Muhafazat Ibb Al `Udayn Yemen Omran Thila' Public Disclosure Copy Yemen Muhafazat Ta`izz At Ta`izziyah Yemen Muhafazat Ta`izz Muhafazat Ta`izz Yemen Omran Shaharah Yemen Omran Shaharah Yemen Muhafazat Shabwah Muhafazat Shabwah Yemen Sanaa Sanaa Yemen Muhafazat Dhamar Risabah Yemen Muhafazat Ibb An Nadirah Yemen Muhafazat Ibb Mudhaykhirah Yemen Muhafazat al Hudaydah Al Madan Yemen Muhafazat Abyan Lawdar Yemen Muhafazat Hajjah Kuhlan `Afar Yemen Sanaa Jihanah Yemen Muhafazat Shabwah Bayhan Yemen Muhafazat al Hudaydah Az Zaydiyah Yemen Muhafazat Hadramawt Az Zahir Yemen Muhafazat Ta`izz At Turbah Public Disclosure Copy Yemen Muhafazat Dhamar `Ans Yemen Muhafazat Ibb An Nadirah Page 2 of 8 The World Bank Report No: ISR13583 Country First Administrative Division Location Planned Actual Yemen Omran `Amran Yemen Omran `Amran Yemen Muhafazat Ibb Al `Udayn Yemen Muhafazat al Hudaydah Al Qanawis Yemen Muhafazat Shabwah Al Kura` Yemen Muhafazat Shabwah Al Huwaymi Public Disclosure Copy Yemen Muhafazat al Hudaydah Muhafazat al Hudaydah Yemen Muhafazat al Bayda' Muhafazat al Bayda' Yemen Muhafazat Abyan Muhafazat Abyan Yemen Muhafazat al Hudaydah Al Kadan Yemen Muhafazat Dhamar Sharih Yemen Muhafazat Dhamar Ribat `Umran Yemen Omran Muhafazat `Amran Yemen Muhafazat Ta`izz Ash Shamayatayn Yemen Muhafazat Ta`izz Jabal Habashy Yemen Muhafazat Dhamar Dawran Aness Yemen Muhafazat Ibb As Saddah Yemen Muhafazat Ibb Mudhaykhirah Yemen Muhafazat Abyan Mudiyah Yemen Muhafazat Abyan Al Mahfad Yemen Muhafazat Ta`izz Shara'b Ar Rawnah Yemen Muhafazat Ta`izz Shara'b As Salam Yemen Muhafazat Hajjah Kuhlan Affar Public Disclosure Copy Yemen Muhafazat al Hudaydah Ad Dahi Yemen Muhafazat al Hudaydah Al Mighlaf Page 3 of 8 The World Bank Report No: ISR13583 Yemen Muhafazat al Hudaydah Al Qanawis Yemen Muhafazat Hadramawt Adh Dhlia'ah Yemen Muhafazat Hadramawt Amd Yemen Muhafazat Dhamar Jahran Yemen Muhafazat Shabwah Rudum Yemen Muhafazat Shabwah Habban Yemen Muhafazat Shabwah Mayfa'a Public Disclosure Copy Yemen Muhafazat Shabwah Ar Rawdah Yemen Sanaa Attyal Yemen Omran Thula Yemen Muhafazat Ibb Al Haqlayn Yemen Muhafazat Ibb Al Misqah Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Reduction in access time from the village to the Percentage Value 0.00 0.00 20.00 closest markets and services in the project Date 01-Jul-2005 27-May-2014 30-Nov-2015 districts Comments This indicator will be measured at the end of RAP program. Average travel time on the Project Roads Minutes Value Date 30-Nov-2015 Comments Manar- An'as Minutes Value 150.00 150.00 125.00 Sub Type Date 01-Jul-2009 27-May-2014 30-Nov-2015 Breakdown Comments RAP2 AF road Al Abdiah District Center Road Minutes Value 60.00 60.00 50.00 Public Disclosure Copy Sub Type Date 01-Jul-2009 27-May-2014 30-Nov-2015 Breakdown Comments RAP2 AF road Page 4 of 8 The World Bank Report No: ISR13583 Al Tahriah-Al Qaqa'a-Ja'wan Minutes Value 40.00 40.00 34.00 Sub Type Date 01-Jul-2013 27-May-2014 30-Nov-2015 Breakdown Comments RAP2 AF road Al Kadan-Melhan Minutes Value 140.00 140.00 120.00 Sub Type Date 01-Jul-2005 27-May-2014 30-Nov-2015 Breakdown Comments RAP2 road Rehabilitation completed. Actual travel time will be measured by December 2014. Khwal-Al Sha'ar Minutes Value 30.00 30.00 25.00 Sub Type Date 01-Jul-2005 27-May-2014 30-Nov-2015 Public Disclosure Copy Breakdown Comments RAP2 road Rehabilitation completed. Actual travel time will be measured by December 2014. Jabal Al Rabwah-Al Thanbah Minutes Value 20.00 20.00 17.00 Sub Type Date 01-Jul-2009 27-May-2014 30-Nov-2015 Breakdown Comments RAP2 AF road Orod-Souq Al Huriah ( rehabilitation Minutes Value 46.00 46.00 39.00 +construction) Sub Type Date 01-Jul-2009 27-May-2014 30-Nov-2015 Breakdown Comments RAP2 AF road Al Qaw'ah-Al Safsaf-Shab Al Melh-Al Lafj Minutes Value 50.00 50.00 42.00 Sub Type Date 01-Sep-2009 27-May-2014 30-Nov-2015 Breakdown Comments RAP2 AF road Al Sudan-Shehab+Farghan-Qarn Qased Minutes Value 40.00 40.00 34.00 Sub Type Date 01-Jul-2009 27-May-2014 30-Nov-2015 Breakdown Comments RAP2 AF road Al Sadah Al Radhal RR Minutes Value 130.00 130.00 110.00 Sub Type Date 01-Jul-2005 27-May-2014 30-Nov-2015 Breakdown Comments RAP2 road Rehabilitation completed. Actual travel time will be measured by July 2014 Akamat Hubaish-Talouq-Ambeyan (Phase 1) Minutes Value 60.00 60.00 50.00 Sub Type Date 01-Jul-2005 27-May-2014 30-Nov-2015 Breakdown Comments RAP2 road Rehabilitation completed. Actual travel time will be measured by July 2014. Public Disclosure Copy Magharabat Al Harish Minutes Value 70.00 70.00 60.00 Page 5 of 8 The World Bank Report No: ISR13583 Sub Type Date 01-Jul-2005 27-May-2014 30-Nov-2015 Breakdown Comments RAP2 road Rehabilitation completed. Actual travel time will be measured by July 2014. Share of rural population with access to an all- Percentage Value 18.00 30.00 44.00 season road Date 01-Jul-2005 27-May-2014 30-Nov-2015 Comments Number of rural people with access to an all- Number Value 250000.00 425000.00 624000.00 season road Sub Type Supplemental Public Disclosure Copy Direct project beneficiaries Number Value 0.00 175000.00 374000.00 Date 07-Aug-2013 27-May-2014 30-Nov-2015 Comments Female beneficiaries Percentage Value 0.00 50.00 50.00 Sub Type Supplemental Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target At least 2 decentralized rural road Text Value 0 1 management offices are functional. Date 12-Dec-2005 27-May-2014 30-Nov-2015 Comments Taiz rural road management The end target has been office is fully functional. revised from 2 to 1 because a second office has been canceled as there are not enough sub-projects to justify a second decentralized management office. At least 400 local professionals/technicians Text Value 0.00 400.00 from the private and public sector have Date 12-Dec-2005 27-May-2014 30-Nov-2015 received on average 10 days of relevant training. Comments Only the wording of this Procurement of additional indicator has been slightly training consultant is on- revised with no change to the going. actual meaning or target. Public Disclosure Copy Page 6 of 8 The World Bank Report No: ISR13583 A modern Pavement Management System Text Value No No Yes (PMS) is functional and able to produce sound Date 12-Dec-2005 27-May-2014 30-Nov-2015 assessments of priority maintenance and improvement expenditure for the primary road Comments Only the wording of this network of Yemen. indicator has been slightly revised with no change to the actual meaning or target. Implementation of the Rural Access Program is Text Value Yes Yes Yes managed professionally and in compliance with Date 12-Dec-2005 27-May-2014 30-Nov-2013 legal and fiduciary requirements Comments RAPCMO continues to be a center of excellence. Value Public Disclosure Copy Roads rehabilitated, Rural Kilometers 0.00 82.50 214.00 Date 12-Dec-2005 27-May-2014 30-Nov-2015 Comments Roads Maintained, Rural Kilometers Value 0.00 275.00 320.00 Date 12-Dec-2005 27-May-2014 30-Nov-2015 Comments Data on Financial Performance (as of 14-Apr-2014) Financial Agreement(s) Key Dates Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P085231 IDA-41210 Effective 08-Nov-2005 09-Nov-2005 07-Jun-2006 30-Nov-2010 30-Nov-2015 P085231 IDA-H5430 Effective 17-Dec-2009 16-Mar-2010 14-Jul-2010 30-Nov-2013 30-Nov-2015 Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P085231 IDA-41210 Effective XDR 26.60 26.60 0.00 23.67 2.93 89.00 P085231 IDA-H5430 Effective XDR 25.20 25.20 0.00 4.03 21.17 16.00 Disbursement Graph Public Disclosure Copy Page 7 of 8 The World Bank Report No: ISR13583 Public Disclosure Copy Key Decisions Regarding Implementation The project continues to achieve its project development objectives and implementation has picked up some what since the restructuring.
Recommended publications
  • Civilian Impact Monitoring Report
    Civilian Impact Monitoring Report February 2018 Mountain Town, Yemen by Rod Waddington A bi-monthly report on civilian impact from armed violence in Al-Hudaydah, Sa’ada, Sana’a, Capital and Marib. December 2017 - January 2018. Table of content Executive Summary 3 Introduction 6 Methodology 6 Section 1: Overall Data trends 7 Section 4: Capital 32 1.1. Conflict developments December & January 7 4.1. Conflict developments December & January 32 1.2. Civilian impact 8 4.2. Civilian impact & protection implication 33 1.3. Direct protection implication 10 4.3. Geographical spread 35 1.4. Indirect protection implication 11 4.4. Type of armed violence and casualties over time 37 1.5. Geographical spread of incidents 12 1.6. Type of armed violence 14 Section 5: Sana’a 38 1.7. Type of impact per governorate 15 5.1. Conflict developments December & January 38 1.8. Civilian casualties 16 5.2. Civilian impact & protection implication 39 1.9. Casualties per type of armed violence 18 5.3. Geographical spread 41 5.4. Type of armed violence and casualties over time 43 Section 2: Al-Hudaydah 19 2.1 Conflict developments December & January 19 Section 6: Marib 44 2.2 Civilian impact & protection implication 20 6.1. Conflict developments December & January 44 2.3 Geographical spread 22 6.2. Civilian impact & protection implication 45 2.4 Type of armed violence and casualties over time 24 6.3. Geographical spread 47 6.4. Type of armed violence and casualties over time 49 Section 3: Sa’ada 25 3.1. Conflict developments December & January 25 3.2.
    [Show full text]
  • Tentative Lists Submitted by States Parties As of 15 April 2021, in Conformity with the Operational Guidelines
    World Heritage 44 COM WHC/21/44.COM/8A Paris, 4 June 2021 Original: English UNITED NATIONS EDUCATIONAL, SCIENTIFIC AND CULTURAL ORGANIZATION CONVENTION CONCERNING THE PROTECTION OF THE WORLD CULTURAL AND NATURAL HERITAGE WORLD HERITAGE COMMITTEE Extended forty-fourth session Fuzhou (China) / Online meeting 16 – 31 July 2021 Item 8 of the Provisional Agenda: Establishment of the World Heritage List and of the List of World Heritage in Danger 8A. Tentative Lists submitted by States Parties as of 15 April 2021, in conformity with the Operational Guidelines SUMMARY This document presents the Tentative Lists of all States Parties submitted in conformity with the Operational Guidelines as of 15 April 2021. • Annex 1 presents a full list of States Parties indicating the date of the most recent Tentative List submission. • Annex 2 presents new Tentative Lists (or additions to Tentative Lists) submitted by States Parties since 16 April 2019. • Annex 3 presents a list of all sites included in the Tentative Lists of the States Parties to the Convention, in alphabetical order. Draft Decision: 44 COM 8A, see point II I. EXAMINATION OF TENTATIVE LISTS 1. The World Heritage Convention provides that each State Party to the Convention shall submit to the World Heritage Committee an inventory of the cultural and natural sites situated within its territory, which it considers suitable for inscription on the World Heritage List, and which it intends to nominate during the following five to ten years. Over the years, the Committee has repeatedly confirmed the importance of these Lists, also known as Tentative Lists, for planning purposes, comparative analyses of nominations and for facilitating the undertaking of global and thematic studies.
    [Show full text]
  • Yemen) (611) / Ville Historique De Zabid (Yémen) (611)
    World Heritage 31 COM Patrimoine mondial Paris, 23 May /23 mai 2007 Original: English / anglais Distribution limited / limitée UNITED NATIONS EDUCATIONAL, SCIENTIFIC AND CULTURAL ORGANIZATION ORGANISATION DES NATIONS UNIES POUR L'EDUCATION, LA SCIENCE ET LA CULTURE CONVENTION CONCERNING THE PROTECTION OF THE WORLD CULTURAL AND NATURAL HERITAGE CONVENTION CONCERNANT LA PROTECTION DU PATRIMOINE MONDIAL, CULTUREL ET NATUREL WORLD HERITAGE COMMITTEE / COMITE DU PATRIMOINE MONDIAL Thirty-first session / Trente et unième session Christchurch, New Zealand / Christchurch, Nouvelle Zélande 23 June - 2 July 2007 / 23 juin - 2 juillet 2007 Item 7 of the Provisional Agenda: State of conservation of properties inscribed on the World Heritage List and/or on the List of World Heritage in Danger. Point 7 de l’Ordre du jour provisoire: Etat de conservation de biens inscrits sur la Liste du patrimoine mondial et/ou sur la Liste du patrimoine mondial en péril MISSION REPORT / RAPPORT DE MISSION Historic Town of Zabid (Yemen) (611) / Ville historique de Zabid (Yémen) (611) 17 - 26 January 2007/ 17 - 26 janvier 2007 This mission report should be read in conjunction with Document: Ce rapport de mission doit être lu conjointement avec le document suivant: WHC-07/31.COM/7A WHC-07/31.COM/7A.Add WHC-07/31.COM/7B WHC-07/31.COM/7B.Add World Heritage Centre/ICOMOS Zabid Joint Monitoring Mission 17th - 26th January 2007 March 2007 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied
    [Show full text]
  • On Conservation and Development: the Role of Traditional Mud Brick Firms in Southern Yemen*
    On Conservation and Development: The Role of Traditional Mud Brick Firms in Southern Yemen* Deepa Mehta Graduate School of Architecture, Planning & Preservation** Columbia University in the City of New York New York, NY 10027, USA [email protected] ABSTRACT A study of small and medium enterprises that make up the highly specialized mud brick construction industry in southern Yemen reveals how the practice has been sustained through closely-linked regional production chains and strong firm inter-relationships. Yemen, as it struggles to grow as a nation, has the potential to gain from examining the contribution that these institutions make to an ancient building practice that still continues to provide jobs and train new skilled workers. The impact of these firms can be bolstered through formal recognition and capacity development. UNESCO, ICOMOS, and other conservation agencies active in the region provide a model that emphasizes architectural conservation as well as the concurrent development of the existing socioeconomic linkages. The primary challenge is that mud brick construction is considered obsolete, but evidence shows that the underlying institutions are resilient and sustainable, and can potentially provide positive regional policy implications. Key Words: conservation, planning, development, informal sector, capacity building, Yemen, mud brick construction. * Paper prepared for GLOBELICS 2009: Inclusive Growth, Innovation and Technological Change: education, social capital and sustainable development, October 6th –
    [Show full text]
  • Supply Annual Report 2019 Scaling up for Impact 2 UNICEF Supply Annual Report 2019 SCALING up for IMPACT 3
    Supply Annual Report 2019 Scaling Up for Impact 2 UNICEF Supply Annual Report 2019 SCALING UP FOR IMPACT 3 Students smile at the camera in front of their school in the village of Tamroro, in the centre of Niger 4 UNICEF Supply Annual Report 2019 SCALING UP FOR IMPACT 5 Contents Foreword 7 SCALING UP FOR IMPACT Innovation at the heart of humanitarian response 10 From ships to schools: Finding construction solutions in local innovation 12 Warehouse in a pocket app scales up to improve supply chain efficiency 14 Scaling vaccine procurement in an evolving landscape of supply and demand 16 Strengthening domestic resources to deliver life-saving commodities 18 WORKING TOGETHER Keeping vaccines safe through the last mile of their journey 20 The UNICEF Supply Community behind our results 42 Improving nutrition supply chains for children 22 Supply Community testimonials 44 Strategic collaboration 46 Supply partnerships 48 RESPONDING TO EMERGENCIES UNICEF on the front lines 26 UNICEF supply response in the highest-level ACHIEVING RESULTS emergencies in 2019 28 Procurement overview 2019 52 Emergency overview highlights by country 30 Major commodity groups 54 Scaling up supply response Services 56 for global health emergencies 32 Country of supplier / Region of use 57 Juliette smiles on Responding with supplies the playground inside to Cyclones Idai and Kenneth 36 Savings overview 2019 58 Reaching new heights, a youth-friendly space in the Mahama Refugee Camp, home to thousands of Strategic prepositioning of supplies Burundian children, in South Sudan 38 ANNEXES such as herself for every child. Scaling up construction in Yemen 39 UNICEF global procurement statistics 60 6 UNICEF Supply Annual Report 2019 Foreword 7 Scaling up for impact In 2019, UNICEF annual procurement of goods and services for children reached a record $3.826 billion.
    [Show full text]
  • Newsletter-2013-Q4 0.977 MB
    SOCIAL FUND FOR DEVELOPMENT 16 pages Newsletter – Edition No. 64, October– December 2013 EDITORIAL SFD’s BoD Holds a Meeting Reading the sectoral distribution The Board of Directors (BoD) of the Social Fund for Development (SFD) held of SFD’s 2013 investments a meeting on November 25, 2013 headed by Mohammed Salem Basendwah, Prime Minister and BoD Chairman. The meeting discussed SFD’s draft budget (commitments), one finds that the for 2014 financial year, which amounts to 36.6 billion Yemeni Riyals (equivalent annual share of each of the Cash-for- to $170.4 million)––increasing by 9% compared to 2013 budget. Work (CfW) Program and water has The draft budget is expected to finance the implementation of 1,391 projects nationwide distributed among the sectors of education, water and environment, been steadily increasing since 2011. health, roads, training and institutional support, microfinance, special-need For instance, while the share of SFD’s groups, labor-intensive works program, agriculture & the integrated interventions contribution to the CfW in 2011 was program. 8%, in 2013 it has reached 20.4%. As The meeting praised the successes achieved by the SFD and its vital role in contributing to poverty alleviation through the provision of job opportunities as for water, there has been an increase well as its active developmental role in improving the living conditions of poor from 13% to 18% for the same period. communities by providing basic needs, facilitating access to social services and raising income through creating temporary and permanent employment. This clearly emphasizes the increasing role of SFD in providing safety net to the most vulnerable Yemenis and responding to critical needs in the country.
    [Show full text]
  • Amran, Al Mahwit, Hajjah and Sa'ada
    YEMEN - Amran, Al Mahwit, Hajjah and Sa'ada governorates For Humanitarian Use Only The lowest temperatures recorded between December and February (1970-2000) Production date : 04 October 2017 Final District Final District Governorate District Governorate District Priority Priority Al Mahwit Al Khabt Medium Sa'ada Al Dhaher Low or none Al Mahwit Al Mahwait Medium Sa'ada Al Hashwah High Al Mahwit Al Mahwait City Critical Sa'ada As Safra Critical Al Mahwit Ar Rujum Medium Sa'ada Baqim Critical Qatabir Baqim Al Mahwit At Tawilah High Sa'ada Ghamr Medium Al Mahwit Bani Sa'd Critical Sa'ada Haydan Medium Al Mahwit Hufash High Sa'ada Kitaf wa Al Boqe'e Critical Al Mahwit Milhan Medium Sa'ada Majz Critical Al Mahwit Shibam Kawkaban Medium Sa'ada Monabbih Medium Kitaf wa Amran Al Ashah Critical Sa'ada Qatabir Medium As Safra Al Boqe'e Majz Amran Al Madan Critical Sa'ada Razih Medium Monabbih Amran Al Qaflah Critical Sa'ada Sa'adah Critical Amran Amran Critical Sa'ada Sahar Critical Ghamr Amran As Sawd High Sa'ada Saqayn Critical As Safra Sa'ada Amran As Sudah Medium Sa'ada Shada'a Low or none Razih Sa'adah Amran Bani Suraim Medium Amran Dhi Bin Critical Shada'a Saqayn Al Hashwah Amran Habur Zulaymah High Sahar Amran Harf Sufyan Critical Amran Huth Critical Amran Iyal Surayh Critical Amran Jabal Iyal Yazid Critical Al Dhaher Haydan Amran Khamir Critical Amran Kharif Critical Amran Maswar Critical Amran Raydah Critical Bakil Al Mir Harf Amran Shaharah High Sufyan Amran Suwayr Critical Al Ashah Amran Thula High Haradh Qarah Hajjah Abs Critical Hajjah
    [Show full text]
  • Annual-Report-2005 10.167 MB
    5 Annual Report 2005 Social Fund for Development Faj Ettan, P.O. Box 15485 Sana’a Republic of Yemen Republic of Yemen [email protected] Social Fund for Development www.sfd-yemen.org Republic of Yemen | Social Fund for Development Annual Report 200 In the Name of Allah, the Gracious, the Merciful His Excellency Ali Abdullah Saleh President of the Republic of Yemen Imprint Social Fund for Development, Sana’a Annual Report 2005 Published by the Social Fund for Development, Sana’a Photos: Social Fund for Development staff, Christine Wawra, Volker Mantel All texts and pictures are subject to the copyright of the relevant institutions. © Social Fund for Development, Sana’a 2006 This document can be obtained from the Social Fund for Development Faj Ettan, P.O.Box 15485 Sana’a, Republic of Yemen Tel.: +967-1-449 668-9, 449 671-77 Fax: +967-1-449 670 Email: [email protected] Website: www.sfd-yemen.org Graphic design and layout: MEDIA DESIGN, Volker Mantel, [email protected] 4 | Social Fund for Development - Annual Report 2005 Contents The Social Fund for Development - At a Glance 6 Board of Directors 7 Statement of the Chairman of the Board of Directors 8 Statement of the Managing Director 9 Executive Summary 10 The Institutional Impact of the Social Fund for Development 12 2005 Operations 16 Targeting and allocation of funds 16 Education 18 Cultural Heritage and Rural Roads 24 Water and Environment 28 Health and Social Protection 31 Training and Organizational Support 39 Small and Micro-Enterprise Development 44 SFD’s Institutional Management 48 Monitoring and Evaluation 51 Funding Situation 53 Annexes 58 References 68 5 The Social Fund for Development At a Glance Yemen’s government established the Social Fund for Development (SFD) in 1997 to help in mitigating the ef- fects of economic reforms, fighting poverty and implementing the government’s social and economic plans.
    [Show full text]
  • Yemen Sanaá Humanitarian Hub District Level 4W Emergency Food
    Yemen Sanaá Humanitarian Hub: District Level 4W/Emergency Food Assistance (In Kind, Cash, & Voucher Transfers) Response and Gap Analysis - November 2019 FSAC Partners 128% People Targeted in % ASSISTED Bani Al Harith Sanaá hub in Sanaá hub BY GOVERNORATE Targeted in Sanaá hub 59% 14 Amanat Al Asimah Sa'ada Al Bayda 99% Hamdan 3 Million Bani Hushaysh Amanat Alasimah 122% *PARTNERS THAT REPORTED Ath'thaorah 111% 89% People Assisted NOV Amran 89% Assisted FOR THE MONTH OF 174% Dhamar 95% 109% in Sana’a Shu'aub Marib 200% Ma'ain Sana'a 3.3 Million Sanaá 106% 107% Old City 121% PERCENTAGE OF PEOPLE ASSISTED PEOPLE OF PERCENTAGE 121% At Tahrir 64% Az'zal Amran Al Wahdah Assafi'yah District Names In kind(Food) Cash Voucher Al Ashah WFP/CARE 125% 103% 129% Bani Matar Al Madan WFP/CARE As Sabain Al Qaflah WFP/CARE Al94% Jawf Sanhan Amran WFP/MOE 111% 101% As Sawd WFP/IRY CARE Harf Sufyan As Sudah WFP/IRY CARE Bani Suraim WFP/IRY Amanat Alasimah 102% Al Ashah Dhi Bin WFP/MOE District Names In kind(Food) Cash Voucher 101% Amran Al Qaflah 98% Harf Sufyan WFP/CARE Al Wahdah WFP/MoE Huth WFP/CARE As Sabain WFP/MoE 57% Huth Iyal Surayh WFP/MOE Assafi'yah WFP/MoE Al Madan Jabal Iyal Yazid WFP/CARE CARE At Tahrir WFP/MoE Shaharah Khamir WFP/IRY Ath'thaorah WFP/NRC Kharif WFP/MOE Az'zal WFP/NRC 100% 100% Bani Suraim Maswar WFP/IRY Bani Al Harith WFP/NRC Suwayr 100% Ma'ain WFP/MoE Habur Zulaymah Raydah WFP/MOE 0% Dhi Bin Shaharah WFP/NFDHR Old City WFP/RI Khamir 100% 100% Suwayr WFP/CARE Shu'aub WFP/RI As Sudah 100% Thula WFP/CARE 101% Iyal Surayh 100% Kharif
    [Show full text]
  • Amanat Al Asimah Al Bayda Dhamar Sana'a Amran Marib
    Yemen: Sana'a Hub - Hard-to-reach districts by principal access impediment (as of 29 April 2019) SA'ADA Arhab Harf Sufyan Al Ashah Hamdan Al Qaflah AMRAN AL JAWF Bani Al Harith Huth Al Madan HADRAMAUT Shaharah AMANAT AL ASIMAH Bani Suraim Suwayr Habur Zulaymah Bani Hushaysh Dhi Bin Khamir As Ath'thaorah Sudah Shu'aub Ma'ain Majzar Old City Kharif Az'zal HAJJAH As Raydah At Tahrir SANA'A Jabal Sawd Raghwan Al Wahdah Assafi'yah Iyal Arhab Yazid Sanhan Marib As Sabain Amran Raydah Nihm Iyal Surayh AMANAT AL ASIMAH Medghal Maswar Thula Bani Al Harith Hamdan Legend Bani Hushaysh Harib Al MARIB Principal impediment Qaramish Sirwah Marib Bidbadah City AL MAHWIT Attyal Bureaucracy (8) Al Haymah Ad Khwlan Dakhiliyah Sanhan Conflict (1) Bani Matar Jihanah Al Jubah Manakhah Conflict + Logistics (0) SANA'A Sa'fan Bani Dhabyan Jabal Murad Bilad Ar Rus Al Husn Bureaucracy + Logistics (2) Al Haymah Al Rahabah Harib Kharijiyah Conflict + Bureaucracy (9) Dawran Aness SHABWAH Al Hada Jabal Ash Conflict + Bureaucracy + Logistics (0) Jahran Sharq Al Abdiyah DHAMAR Wald Mahliyah Na'man Accessible (77) RAYMAH Al Manar Rabi' Dhamar Wald City Rabi' Mayfa'at Anss Governorate Boundary Utmah Al Quraishyah As Sawadiyah Maghirib Radman Ans Anss Al Awad Nati' District Boundary Wusab Al Ali Al A'rsh Al Malagim *This map reflects the operational situation as of April 2019, Rada' Ash Sharyah Wusab Sabah but frontline dynamics have changed in subsequent weeks, AL BAYMaDswAarah As Safil Ar Ryashyyah creating a more impermissive environment (Az Zahir) for many humanitarian partners. At Taffah IBB Dhi Na'im AL HUDAYDAH Al Bayda Az Zahir* ¯ AL DHALE'E Mukayras Km LAHJ ABYAN TAIZZ 0 50 The boundaries and names shown and the designations used on this map do not imply official endorsement or acceptance by the United Nations.
    [Show full text]
  • Informationen Für Unsere Jemen - Reisenden
    Info-Broschüre Jemen 2007 – Djoser Reisen GmbH Informationen für unsere Jemen - Reisenden Mehr als 3000 Jahre dokumentierter Geschichte haben im Jemen ein einzigartiges kulturelles Erbe hinterlassen. Besonders auffallend ist der traditionelle jemenitische Baustil, der jeden Besucher sofort an Tausendundeiner Nacht denken lässt. Seit wenigen Jahren werden westliche Einflüsse im Jemen zunehmend stärker, was sich auch in der Architektur der Hauptstadt widerspiegelt. „Arabia Felix“, das Glückliche Arabien, wie es von den Römern genannt wurde, befindet sich heute an der Schwelle von orientalischer Tradition zu westlicher Moderne. Zur Vorbereitung Einreisedokumente Obwohl die Angaben auf unserer Homepage ständig aktualisiert werden, können sich die Einreisebestimmungen unter Umständen kurzfristig ändern. Die gültigen Bestimmungen erfahren Sie auch bei den Botschaften / Konsulaten / Fremdenverkehrsämtern des jeweiligen Landes oder auf der Homepage des Auswärtigen Amtes unter: www.auswaertiges-amt.de Für den Jemen benötigen Sie einen gültigen Reisepass, der mindestens noch sechs Monate nach der Ausreise gültig ist. Ihr Pass darf keinen Israel-Stempel aufweisen. Darüber hinaus braucht man ein Visum, das bei der Botschaft vom Jemen beantragt wird. Nach Ihrer Buchung erhalten Sie von uns einen Visumsantrag. Die Kosten für das Visum betragen derzeit EUR 40,-. Botschaft der Republik Jemen - Konsularabteilung - Budapester Str. 37 10787 Berlin Tel: 030 - 897305-0 Fax: 030 - 897305-62 E-Mail: [email protected] www.botschaft-jemen.de Geld Die Währungseinheit im Jemen ist der Ryal. Es sind Münzen im Wert von 5 und 10 Ryal und Scheine im Wert von 1, 5, 10, 20, 50, 100, 500 und 1000 Ryal im Umlauf. Am besten nehmen Sie Bargeld in EURO oder in US$ mit, da es sich leichter und günstiger wechseln lässt.
    [Show full text]
  • Resources for the Study of Islamic Architecture Historical Section
    RESOURCES FOR THE STUDY OF ISLAMIC ARCHITECTURE HISTORICAL SECTION Prepared by: Sabri Jarrar András Riedlmayer Jeffrey B. Spurr © 1994 AGA KHAN PROGRAM FOR ISLAMIC ARCHITECTURE RESOURCES FOR THE STUDY OF ISLAMIC ARCHITECTURE HISTORICAL SECTION BIBLIOGRAPHIC COMPONENT Historical Section, Bibliographic Component Reference Books BASIC REFERENCE TOOLS FOR THE HISTORY OF ISLAMIC ART AND ARCHITECTURE This list covers bibliographies, periodical indexes and other basic research tools; also included is a selection of monographs and surveys of architecture, with an emphasis on recent and well-illustrated works published after 1980. For an annotated guide to the most important such works published prior to that date, see Terry Allen, Islamic Architecture: An Introductory Bibliography. Cambridge, Mass., 1979 (available in photocopy from the Aga Khan Program at Harvard). For more comprehensive listings, see Creswell's Bibliography and its supplements, as well as the following subject bibliographies. GENERAL BIBLIOGRAPHIES AND PERIODICAL INDEXES Creswell, K. A. C. A Bibliography of the Architecture, Arts, and Crafts of Islam to 1st Jan. 1960 Cairo, 1961; reprt. 1978. /the largest and most comprehensive compilation of books and articles on all aspects of Islamic art and architecture (except numismatics- for titles on Islamic coins and medals see: L.A. Mayer, Bibliography of Moslem Numismatics and the periodical Numismatic Literature). Intelligently organized; incl. detailed annotations, e.g. listing buildings and objects illustrated in each of the works cited. Supplements: [1st]: 1961-1972 (Cairo, 1973); [2nd]: 1972-1980, with omissions from previous years (Cairo, 1984)./ Islamic Architecture: An Introductory Bibliography, ed. Terry Allen. Cambridge, Mass., 1979. /a selective and intelligently organized general overview of the literature to that date, with detailed and often critical annotations./ Index Islamicus 1665-1905, ed.
    [Show full text]