Bid Summary Page 1 of 1 Letting Date: December 03, 2020

Total Page:16

File Type:pdf, Size:1020Kb

Bid Summary Page 1 of 1 Letting Date: December 03, 2020 Colorado Department Of Transportation Printed On: 12/03/2020 Low Bid Summary Page 1 of 1 Letting Date: December 03, 2020 Call # of Percent of Overrun (+) Order Contract ID Project(s) Bids Low Bidder Estimated Cost Corrected Bid Estimate Underrun (-) 002 C23182 C133A-049 5 Geovert, LLC $3,583,197.80 $2,799,915.60 78.14% -$783,282.20 Letting Totals 5 $3,583,197.80 $2,799,915.60 78.14% -$783,282.20 Colorado Department Of Transportation Printed On: 12/03/2020 Vendor Ranking Page 1 of 1 Contract ID: C23182 Contract Description: SH 133 ROCKFALL NORTH OF MCCLURE This project consists of rockfall hazard mitigation at multiple sites along SH 133 between McClure Pass summit and Carbondale, in Pitkin County. Rockfall mitigation will include rock scaling and stabilization, rock excavation and blasting, rockfall wire mesh installation, and building a rockfall catchment structure. This project also includes temporary and permanent erosion control, traffic control, localized highway repair, and grading the Placita waste site at MP 47.1. Mandatory pre-bid conference will be held on November 16, 2020 beginning at 9:00 AM at the CDOT office located at 202 Centennial Street, Glenwood Springs, CO, 81601. Percent Of Percent Of Rank Vendor ID Vendor Name Total Bid Low Bid Estimate 1 1698 Geovert, LLC $2,799,915.60 100.00% 78.14% 2 192B MIDWEST ROCKFALL, INC. $3,295,100.02 117.69% 91.96% 3 297A ROCK SOLID SOLUTIONS CORPORATION $3,486,512.65 124.52% 97.30% 0 -EST- Engineer's Estimate $3,583,197.80 127.98% 100.00% 4 244A Kissner General Contractors, Inc. $3,599,283.24 128.55% 100.45% 5 379A HARRISON WESTERN CONSTRUCTION CORPORATION $3,902,624.77 139.38% 108.91% Colorado Department Of Transportation Printed On: 12/03/2020 Tabulation of Bids Page 1 of 10 Contract ID: C23182 (0) -EST- (1) 1698 (2) 192B Engineer's Estimate Geovert, LLC MIDWEST ROCKFALL, INC. Ext Ext Ext Item Code Description Quantity Unit Price Amount Unit Price Amount Unit Price Amount SECTION: 0001 ROADWAY LCC: 201-00000 Clearing and Grubbing 1.000 L S 10,000.00000 10,000.00 8,000.00000 8,000.00 13,000.00000 13,000.00 202-00240 Removal of Asphalt Mat (Planing) 5,139.000 SY 4.00000 20,556.00 1.20000 6,166.80 4.00000 20,556.00 203-00400 Rock Excavation 830.000 CY 400.00000 332,000.00 240.00000 199,200.00 235.00000 195,050.00 203-01500 Blading 20.000 HOUR 170.00000 3,400.00 149.00000 2,980.00 200.00000 4,000.00 203-01582 Truck (Dump) 146.000 HOUR 150.00000 21,900.00 100.00000 14,600.00 160.00000 23,360.00 203-01590 Front End Loader (Rubber Tire) 73.000 HOUR 175.00000 12,775.00 111.00000 8,103.00 185.00000 13,505.00 203-01597 Potholing 40.000 HOUR 250.00000 10,000.00 530.00000 21,200.00 225.00000 9,000.00 203-02300 Rock Scaler 400.000 HOUR 100.00000 40,000.00 160.00000 64,000.00 160.00000 64,000.00 206-00010 Structure Excavation (Special) 263.000 CY 40.00000 10,520.00 24.50000 6,443.50 85.00000 22,355.00 206-00510 Filter Material (Class A) 2,101.000 CY 95.00000 199,595.00 75.00000 157,575.00 96.00000 201,696.00 206-00530 Filter Material (Class C) 96.000 CY 95.00000 9,120.00 93.00000 8,928.00 165.00000 15,840.00 208-00002 Erosion Log Type 1 (12 Inch) 200.000 LF 7.00000 1,400.00 4.75000 950.00 7.00000 1,400.00 208-00035 Aggregate Bag 100.000 LF 10.00000 1,000.00 5.25000 525.00 10.00000 1,000.00 208-00046 Pre-fabricated Concrete Washout Structure 1.000 EACH 2,000.00000 2,000.00 5,720.00000 5,720.00 2,000.00000 2,000.00 (Type 1) 208-00103 Removal and Disposal of Sediment (Labor) 60.000 HOUR 75.00000 4,500.00 54.00000 3,240.00 60.00000 3,600.00 Colorado Department Of Transportation Printed On: 12/03/2020 Tabulation of Bids Page 2 of 10 Contract ID: C23182 (0) -EST- (1) 1698 (2) 192B Engineer's Estimate Geovert, LLC MIDWEST ROCKFALL, INC. Ext Ext Ext Item Code Description Quantity Unit Price Amount Unit Price Amount Unit Price Amount SECTION: 0001 ROADWAY LCC: 208-00105 Removal and Disposal of Sediment 60.000 HOUR 150.00000 9,000.00 42.00000 2,520.00 150.00000 9,000.00 (Equipment) 208-00106 Sweeping (Sediment Removal) 30.000 HOUR 150.00000 4,500.00 114.00000 3,420.00 200.00000 6,000.00 208-00107 Removal of Trash 5.000 HOUR 50.00000 250.00 47.00000 235.00 125.00000 625.00 211-01110 Rock Reinforcement (Dowels) 100.000 EACH 2,000.00000 200,000.00 1,500.00000 150,000.00 1,275.00000 127,500.00 211-01115 Rock Reinforcement (Number 10) 500.000 LF 175.00000 87,500.00 100.00000 50,000.00 110.00000 55,000.00 212-00006 Seeding (Native) 1.000 ACRE 5,000.00000 5,000.00 1,150.00000 1,150.00 1,250.00000 1,250.00 212-00032 Soil Conditioning 1.000 ACRE 6,000.00000 6,000.00 6,100.00000 6,100.00 6,500.00000 6,500.00 213-00012 Spray-on Mulch Blanket 1.000 ACRE 4,000.00000 4,000.00 5,900.00000 5,900.00 6,300.00000 6,300.00 240-00000 Wildlife Biologist 40.000 HOUR 125.00000 5,000.00 88.00000 3,520.00 125.00000 5,000.00 240-00010 Removal of Nests 40.000 HOUR 75.00000 3,000.00 88.00000 3,520.00 125.00000 5,000.00 240-00020 Netting 100.000 SY 15.00000 1,500.00 3.00000 300.00 15.00000 1,500.00 304-07000 Aggregate Base Course (Class 7) 55.970 TON 50.00000 2,798.50 156.00000 8,731.32 100.00000 5,597.00 403-00720 Hot Mix Asphalt (Patching) (Asphalt) 150.000 TON 200.00000 30,000.00 260.00000 39,000.00 275.00000 41,250.00 403-34701 Hot Mix Asphalt (Grading SX) (75) 593.540 TON 120.00000 71,224.80 112.00000 66,476.48 118.00000 70,037.72 411-03352 Asphalt Cement Performance Grade (PG 35.610 TON 550.00000 19,585.50 600.00000 21,366.00 630.00000 22,434.30 58-28) Colorado Department Of Transportation Printed On: 12/03/2020 Tabulation of Bids Page 3 of 10 Contract ID: C23182 (0) -EST- (1) 1698 (2) 192B Engineer's Estimate Geovert, LLC MIDWEST ROCKFALL, INC. Ext Ext Ext Item Code Description Quantity Unit Price Amount Unit Price Amount Unit Price Amount SECTION: 0001 ROADWAY LCC: 411-10255 Emulsified Asphalt (Slow-Setting) 270.000 GAL 6.00000 1,620.00 4.25000 1,147.50 4.40000 1,188.00 504-04440 Facing (Special) 16,770.000 SF 50.00000 838,500.00 32.50000 545,025.00 47.50000 796,575.00 506-01020 Geogrid Reinforcement 10,320.000 SY 5.00000 51,600.00 8.50000 87,720.00 15.00000 154,800.00 601-40401 Structural Concrete Stain 9,160.000 SF 6.00000 54,960.00 3.50000 32,060.00 3.60000 32,976.00 602-00000 Reinforcing Steel 100.000 LB 12.00000 1,200.00 4.50000 450.00 60.00000 6,000.00 605-83001 Geocomposite Drain without Pipe 8.000 SY 95.00000 760.00 60.00000 480.00 377.00000 3,016.00 607-11525 Fence (Plastic) 250.000 LF 5.00000 1,250.00 3.50000 875.00 5.00000 1,250.00 607-55040 Mesh Anchor 17.000 EACH 1,500.00000 25,500.00 1,200.00000 20,400.00 1,135.00000 19,295.00 607-55050 Mesh Anchor (Special) 100.000 EACH 2,200.00000 220,000.00 2,300.00000 230,000.00 1,700.00000 170,000.00 607-55100 Wire Mesh (Draped) 82,560.000 SF 4.00000 330,240.00 3.30000 272,448.00 3.25000 268,320.00 607-55103 Cable Net (Special) 28,635.000 SF 10.00000 286,350.00 7.50000 214,762.50 8.80000 251,988.00 612-00001 Delineator (Type I) 10.000 EACH 25.00000 250.00 52.00000 520.00 55.00000 550.00 612-00002 Delineator (Type II) 6.000 EACH 28.00000 168.00 57.00000 342.00 60.00000 360.00 620-00020 Sanitary Facility 2.000 EACH 2,500.00000 5,000.00 1,500.00000 3,000.00 6,500.00000 13,000.00 625-00000 Construction Surveying 1.000 L S 20,000.00000 20,000.00 7,500.00000 7,500.00 8,500.00000 8,500.00 626-00000 Mobilization 1.000 L S 250,000.00000 250,000.00 174,100.00000 174,100.00 230,000.00000 230,000.00 Colorado Department Of Transportation Printed On: 12/03/2020 Tabulation of Bids Page 4 of 10 Contract ID: C23182 (0) -EST- (1) 1698 (2) 192B Engineer's Estimate Geovert, LLC MIDWEST ROCKFALL, INC. Ext Ext Ext Item Code Description Quantity Unit Price Amount Unit Price Amount Unit Price Amount SECTION: 0001 ROADWAY LCC: 626-01113 Public Information Management (Tier III) 270.000 DAY 110.00000 29,700.00 41.00000 11,070.00 75.00000 20,250.00 627-00013 Pavement Marking Paint (High Build) 60.000 GAL 36.00000 2,160.00 104.00000 6,240.00 135.00000 8,100.00 630-00000 Flagging 4,000.000 HOUR 28.00000 112,000.00 30.00000 120,000.00 32.00000 128,000.00 630-00001 Pilot Car Operation 200.000 HOUR 50.00000 10,000.00 57.00000 11,400.00 60.00000 12,000.00 630-00007 Traffic Control Inspection 55.000 DAY 300.00000 16,500.00 305.00000 16,775.00 330.00000 18,150.00 630-00012 Traffic Control Management 125.000 DAY 900.00000 112,500.00 770.00000 96,250.00 825.00000 103,125.00 630-80341 Construction Traffic Sign (Panel Size A) 46.000 EACH 50.00000 2,300.00 20.00000 920.00 22.00000 1,012.00 630-80342 Construction Traffic Sign (Panel Size B) 118.000 EACH 60.00000 7,080.00 31.00000 3,658.00 33.00000 3,894.00 630-80355 Portable Message Sign Panel 2.000 EACH 5,500.00000 11,000.00 9,800.00000 19,600.00 10,500.00000 21,000.00 630-80360 Drum Channelizing Device 25.000 EACH 30.00000 750.00 20.00000 500.00 25.00000 625.00 630-80363 Drum Channelizing Device (With Light) 15.000 EACH 35.00000 525.00 40.00000 600.00 45.00000 675.00 (Flashing) 630-80364 Drum Channelizing Device (With Light) 15.000 EACH 35.00000 525.00 40.00000 600.00 45.00000 675.00 (Steady Burn) 630-80371 Reset Concrete Barrier (Temporary) 959.000 LF 25.00000 23,975.00 17.50000 16,782.50 20.00000 19,180.00 630-80380 Traffic Cone 120.000 EACH 8.00000 960.00 1.00000 120.00 2.00000 240.00 630-85010 Impact Attenuator (Temporary) 1.000 EACH 6,000.00000 6,000.00 2,600.00000 2,600.00 3,000.00000 3,000.00 Colorado Department Of Transportation Printed On: 12/03/2020 Tabulation of Bids Page 5 of 10 Contract ID: C23182 (0) -EST- (1) 1698 (2) 192B Engineer's Estimate Geovert, LLC MIDWEST ROCKFALL, INC.
Recommended publications
  • Colorado's Full-Scale Field Testing of Rockfall Attenuator Systems
    TRANSPORTATION RESEARCH Number E-C141 October 2009 Colorado’s Full-Scale Field Testing of Rockfall Attenuator Systems TRANSPORTATION RESEARCH BOARD 2009 EXECUTIVE COMMITTEE OFFICERS Chair: Adib K. Kanafani, Cahill Professor of Civil Engineering, University of California, Berkeley Vice Chair: Michael R. Morris, Director of Transportation, North Central Texas Council of Governments, Arlington Division Chair for NRC Oversight: C. Michael Walton, Ernest H. Cockrell Centennial Chair in Engineering, University of Texas, Austin Executive Director: Robert E. Skinner, Jr., Transportation Research Board TRANSPORTATION RESEARCH BOARD 2009–2010 TECHNICAL ACTIVITIES COUNCIL Chair: Robert C. Johns, Director, Center for Transportation Studies, University of Minnesota, Minneapolis Technical Activities Director: Mark R. Norman, Transportation Research Board Jeannie G. Beckett, Director of Operations, Port of Tacoma, Washington, Marine Group Chair Paul H. Bingham, Principal, Global Insight, Inc., Washington, D.C., Freight Systems Group Chair Cindy J. Burbank, National Planning and Environment Practice Leader, PB, Washington, D.C., Policy and Organization Group Chair James M. Crites, Executive Vice President, Operations, Dallas–Fort Worth International Airport, Texas, Aviation Group Chair Leanna Depue, Director, Highway Safety Division, Missouri Department of Transportation, Jefferson City, System Users Group Chair Robert M. Dorer, Deputy Director, Office of Surface Transportation Programs, Volpe National Transportation Systems Center, Research and Innovative
    [Show full text]
  • Rockfall Catchment Area Design Guide
    ROCKFALL CATCHMENT AREA DESIGN GUIDE FINAL REPORT SPR-3(032) Metric Edition by Lawrence A. Pierson, C.E.G., Senior Engineering Geologist Landslide Technology and C. Fred Gullixson, C.E.G., Senior Engineering Geologist Oregon Department of Transportation and Ronald G. Chassie, P.E. Geotechnical Engineer for Oregon Department of Transportation – Research Group 200 Hawthorne Avenue SE – Suite B-240 Salem, OR 97301-5192 and Federal Highway Administration 400 Seventh Street SW Washington, DC 20590 December 2001 1. Report No. 2. Government Accession No. 3. Recipient’s Catalog No. FHWA-OR-RD-02-04m 4. Title and Subtitle 5. Report Date December 2001 ROCKFALL CATCHMENT AREA DESIGN GUIDE Final Report (Metric Edition) 6. Performing Organization Code 7. Author(s) 8. Performing Organization Report No. Lawrence A. Pierson, C.E.G., Landslide Technology, Portland, OR, USA SPR-3(032) C. Fred Gullixson, C.E.G., Geo/Hydro Section, Oregon Dept. of Transportation Ronald G. Chassie, P.E. Geotechnical Engineer, FHWA (Retired) 9. Performing Organization Name and Address 10. Work Unit No. (TRAIS) Oregon Department of Transportation Research Group 11. Contract or Grant No. 200 Hawthorne Ave. SE Salem, OR 97301-5192 12. Sponsoring Agency Name and Address 13. Type of Report and Period Covered Research Group and Federal Highway Administration Final Report Oregon Department of Transportation 400 Seventh Street, SW 200 Hawthorne Ave. SE Washington, DC 20590 14. Sponsoring Agency Code Suite B-240 Salem, OR 97301-5192 15. Supplementary Notes 16. Abstract The data gathered from an exhaustive research project consisting of rolling a total of approximately 11,250 rocks off vertical; 4V:1H;2V;1H;1.33V:1H;1.0V:1.0H slopes of three different heights (12.2, 18.3, and 24.4 meters) into three differently inclined catchment areas (flat, 1V:6H and 1V:4H) has been used to develop design charts for dimensioning rockfall catchment areas adjacent to highways.
    [Show full text]
  • Sr 520: I-5 (Seattle) to Sr 202(Redmond Vic)
    SR 520, I-5 (SEATTLE) TO SR 202(REDMOND VIC) ARM 0.00 TO ARM 12.82, SR MP 0.00 TO SR MP 12.83 CHARACTERISTICS Segment Description: SR 520, I-5 (Seattle) to SR 202(Redmond Vic) ARM 0.00 to 12.82, SR MP 0.00 to SR MP 12.83 . County/Counties: King Cities/Towns Included: There are number of cities located along the routes: Seattle, Medina, Hunts Point, Yarrow Point, Clyde Hill, Bellevue, and Redmond. Number of lanes in the corridor: 2 to 6 Lane width: 12 to 24 feet. Speed limit: 40 to 60 mph. Median width: 4 to 157 feet. Shoulder width: 3 to 24 feet. Highway Characteristics: SR 520 has been designated as HSS and as NHS for the entire corridor. SR 520 has been assigned the functional class Urban Principal Arterial. Also, the SR 520 corridor is designated T-2 with annual tonnage of 7,486,969. Special Use Lane Information (HOV, Bicycle, Climbing): There is one Transit lane on the left in the vicinity of Arm 0.97 - 1.09. There are high occupancy vehicle (HOV) lanes on the Left in the vicinity of ARM 4.18-6.90 and 7.53-10.47 and on the right in the vicinity of ARM 7.37- 9.47 and 9.78-11.17. There are Weave/Speed Change lanes located on the right in the vicinity of ARM 6.31-6.69, 7.20-7.34, 9.59-11.50 and on the left in the vicinity of ARM 7.05-7.28, 9.53-9.78.
    [Show full text]
  • Us82 Rockfall Mitigation Project
    US82 ROCKFALL MITIGATION PROJECT May, 2009 BY Mohammed Ghweir Engineering Geologist Geotechnical Design Section New Mexico DOT SACRAMENTO MTS Rock Fall Signs Back Ground • US82 Connects the Town of Alamogordo, Holloman Air Force Base, and White Sands Missile Range with the Village of Cloudcroft and A Major Route US285 to the East. • The Mountain Range is Over 10,000 ft. High and Subjected to Snowfall and Freeze in the Winter. • The Road Was Built In+ the Early Fifties. • Rockfall Catchment Is Non-Existing or Very Narrow. • This Terrain is Rocky and Very Costly to Blast or Excavate. • Road Cuts Were Mostly Made in Unfavorably Orientation with Respect to Dip Angles. US82 UP MTS. GEOLOGY • The Sacramento Mountains Range is Located in the Basin and Range Province of Southern New Mexico. It is Primarily an Uplift of Large Faulted Blocks of Anticlines and Synclines. • It Comprises Quaternary Alluvial/Pediment thin Deposits That overlies Very Massive and Mostly competent Paleozoic Sedimentary Rocks of Limestone, sandstone and Shale. Geologic Map of US82 Rock Mitigation Project San Andres Limestone Yeso Fm EXISTING CONDITIONS • The Project Includes Four Road Cuts Extend From MP 14.2 to MP 15.2. • Gabion Wall and Concrete Barriers were Place Some Thirty Years Ago As Fallen Rocks Catchment. • Gabions Were Placed on Top of Standard Concrete Barriers. • Over time, Rocks filled the Space Behind the Barriers and the Walls and Spilled Over Into the Narrow Shoulder and the Driving Lanes. • The Concrete Barriers Started to Deteriorate and Chip off which will Later Undermine the Gabion Stack. GEOTECHNICAL INVESTIGATION • These Cuts Were Rated “A” and “B” Using Oregon Rockfall Rating System.
    [Show full text]
  • About CTC OUR TEAM Technical Communications for Transportation
    Technical communications for transportation professionals Show the value of your research program in clear, about CTC PROGRAM compelling ways. CTC & Associates will help you COMMUNICATIONS develop performance measures, annual reports, CTC & Associates provides technical newsletters (print and online), videos and communications services for the websites that drive change. transportation sector. Based in Madison, Wisconsin, the firm serves state departments of transportation, local road agencies, associations, universities and national Capture the impacts of your research projects research programs. We help our clients for internal and external audiences. CTC & Associates will develop tailored research drive change with effective TECHNOLOGY summaries for your projects that tell the story communication of research results, peer TRANSFER of the problem, solution and benefits – in practices and management strategies. technically accurate yet interesting language that is accessible to both managers and specialists. Don’t reinvent the wheel. CTC & Associates will OUR TEAM conduct quick-turnaround research for you INFORMATION on any transportation topic. We’ll comb the literature, interview experts and conduct surveys CTC’s writers, editors, research managers SERVICES – then package it all in a readable report that and web designers work closely with our highlights gaps and potential next steps. clients in transportation research to develop the most effective ways to communicate technical and policy information. We carefully tailor communications for top management, Maximize your research investment. CTC & practitioners, partner organizations and Associates will help you fill gaps in your research RESEARCH program. We will manage contract research, the public, and we pride ourselves on administer pooled fund studies, facilitate peer delivering high-quality, effective products MANAGEMENT exchanges, develop RFPs, and revise guidance and services on time and on budget.
    [Show full text]
  • Table of Contents
    Qualified Products Lists Table of Contents List 1. TRAFFIC CONTROL MATERIALS Section A. Snowplowable Reflective Pavement Markers and Replacement Lenses 1. Snowplowable Reflective Pavement Markers 2. Replacement Lens for Snowplowable Markers 3. Raised Reflective Pavement Markers Section B. Preformed Plastic Pavement Markings 1. Type 1 – 60 mils 2. Preformed Thermoplastic Section C. Temporary Tape (Removeable and Non-Removeable) 1. Permanent Preformed Tape 2. Preformed Contrast Tape 3. Temporary Removeable Preformed Tape 4. Preformed Blackout Tape Section D. Alternative Pavement Marking Materials 1. Audible Pavement Markings 2. Wet Reflective Pavement Markings Section E. Bituminous Pavement Marker Adhesive Section F. Flexible Surface- and Ground-Mounted Delineator Posts Section G. Guardrail and Barrier/Parapet Delineation 1. Concrete Barrier/Parapet Delineation 2. Guardrail Post Delineation 3. Guardrail Beam Delineation 4. Concrete Barrier/Parapet Delineation Enhancement Section H. Workzone Traffic Drums List 2. Waterproofing Membranes and Materials Section A. Bridge Deck Waterproofing Membranes Section B. Joint Waterproofing Membranes (12” Plus Width) List 3. Structural Steel Coatings Section A. NEPCOAT List A – 3-Coat System 1. Inorganic Zinc/Epoxy or Urethane/Aliphilic Urethane 2. Organic Zinc/Epoxy or Urethane/Aliphilic Urethane 3. Organic Zinc Primer/Topcoat 4. Inorganic Zinc Primer/Topcoat 5. Epoxy Spot and Full Prime and Finish Coat 6. Non-Epoxy Spot and Full Prime and Finish Section B. Two-Coat System – Epoxy Spot and Full Prime and Finish Coat Section C. Two-Coat System – Non-Epoxy Spot and Full Prime and Finish Coat List 4. Air-Entraining and Chemical Admixtures for Concrete Section A. Air-Entraining Admixtures Section B. Chemical Admixtures 1. Type A – Water Reducers 2.
    [Show full text]
  • A Review of Rockfall Mechanics and Modelling Approaches Luuk K.A
    Progress in Physical Geography 27,1 (2003) pp. 69–87 A review of rockfall mechanics and modelling approaches Luuk K.A. Dorren Institute for Biodiversity and Ecosystem Dynamics, Universiteit van Amsterdam, Nieuwe Achtergracht 166, NL-1018 WV Amsterdam, the Netherlands Abstract: Models can be useful tools to assess the risk posed by rockfall throughout relatively large mountainous areas (>500km 2), in order to improve protection of endangered residential areas and infrastructure. Therefore the purpose of this study was to summarize existing rockfall models and to propose modifications to make them suitable for predicting rockfall at a regional scale. First, the basic mechanics of rockfall are summarized, including knowledge of the main modes of motion: falling, bouncing and rolling. Secondly, existing models are divided in three groups: (1) empirical models, (2) process-based models and (3) Geophysical Information System (GIS)-based models. For each model type its basic principles and ability to predict rockfall runout zones are summarized. The final part is a discussion of how a model for predicting rockfall runout zones at a regional scale should be developed. AGIS-based distribution model is suggested that combines a detailed process-based model and a GIS. Potential rockfall source areas and falltracks are calculated by the GIS component of the model and the rockfall runout zones are calculated by the process-based component. In addition to this model, methods for the estimation of model parameters values at a regional scale have to be developed. Key words: distributed model, GIS, modelling, natural hazard, rockfall. IIntroduction In mountainous areas rockfall is a daily occurrence.
    [Show full text]
  • Limestone Cliff Stability Assessment R EPO
    May 2017 Limestone Cliff Stability Assessment Submitted to: Chief Executive Officer Shire of Augusta and Margaret River PO Box 61 MARGARET RIVER WA 6285 Attn: Jared Drummond Report Number. 1666765-001-R-Rev0 Distribution: REPORT 1 Electronic Copy – Golder Associates 1 Electronic Copy – Shire of Augusta and Margaret River LIMESTONE CLIFF STABILITY ASSESSMENT Table of Contents 1.0 INTRODUCTION ........................................................................................................................................................ 1 2.0 SCOPE OF WORK .................................................................................................................................................... 1 3.0 DESKTOP STUDY ..................................................................................................................................................... 1 4.0 GEOLOGICAL ASSESSMENT ................................................................................................................................. 2 5.0 GEOLOGY AND GEOMORPHOLOGY ..................................................................................................................... 2 5.1 Geology ........................................................................................................................................................ 2 5.2 Geomorphology ............................................................................................................................................ 4 6.0 GEOLOGICAL/GEOMORPHOLOGICAL MAPPING
    [Show full text]
  • Slope Stability and Rock Fall Hazard Assessment of Volcanic Tuffs Using
    Slope stability and rock fall hazard assessment of volcanic tuffs using RPAS with 2D FEM slope modelling Ákos Török1, Árpád Barsi2, Gyula Bögöly1, Tamás Lovas2, Árpád Somogyi2, and Péter Görög1 1Department of Engineering Geology and Geotechnics, Budapest University of Technology and Economics, Budapest, H- 5 1111, Hungary 2Department of Photogrammetry and Geoinformatics, Budapest University of Technology and Economics, Budapest, H- 1111, Hungary Correspondence to: Ákos Török ([email protected]) Abstract. Low strength rhyolite tuff forms steep, hardly accessible cliffs in NE Hungary. The slope is affected by rock falls. 10 RPAS (Remotely Piloted Aircraft System) was used to generate a digital terrain model (DTM) for slope stability analysis and rock fall hazard assessment. Cross sections and joint system data was obtained from DTM. Joint and discontinuity system was also verified by field measurements. On site and laboratory tests provided additional engineering geological data for modelling. Stability of cliffs and rock fall hazard were assessed by 2D FEM (Finite Element Method). Global analyses of cross-sections show that weak intercalating tuff layers may serve as potential slip surfaces, however at present the highest 15 hazard is related to planar failure along ENE-WSW joints and to wedge failure. The paper demonstrates that without RPAS no reliable terrain model could be made and it also emphasizes the efficiency of RPAS in rock fall hazard assessment in comparison with other remote sensing techniques such as terrestrial laser scanning (TLS) and tachymetry. 1 Introduction In the past years, technological development of RPAS revolutionized the data gathering of landslide affected areas (Rau et 20 al.
    [Show full text]
  • AND SR 167 - SR 512(PUYALLUP) to I-405 (RENTON) CHARACTERISTICS Segment Description: the SR 167 and SR 512 Highways Function As the Eastern Bypass to I-5
    SR 167/SR 512, SR 512- I-5 (LAKEWOOD) TO SR 167 (PUYALLUP) AND SR 167 - SR 512(PUYALLUP) TO I-405 (RENTON) CHARACTERISTICS Segment Description: The SR 167 and SR 512 highways function as the eastern bypass to I-5. These two highways work together in tandem and need to be recognized and evaluated as one corridor. Traveling from south to north, SR 512 begins at I-5, in Lakewood, connecting with SR 167, in Puyallup, continuing north on SR 167 intersecting with I-405 at the north end in Renton. County/Counties: Pierce and King Cities/Towns Included: There are number of cities located along the routes: Lakewood, Puyallup, Sumner, Algona, Pacific, Auburn, Kent and Renton. Number of lanes in the corridor: 1 to 4 Lane width: 12 to 24 feet. Speed limit: 30 to 60 mph. Median width: 0 to 200 feet. Shoulder width: 1 to 22 feet. Highway Characteristics: SR 167 and SR 512 have been designated as both HSS and NHS. SR 167 and SR 512 have been assigned the functional class Urban Principal Arterial. Also, the SR 167 and SR 512 corridor is designated T-1 with annual tonnage up to 43,000,000. Special Use Lane Information (HOV, Bicycle, Climbing): SR 512 has two speed change/weaving lanes. One of the speed change lanes is on the left in the vicinity of ARM 0.27 - 0.63 and the other is on the right in the vicinity of ARM 0.32 - 0.64. There is one climbing lane on SR 512 on the left in the vicinity of 8.85 - 9.79.
    [Show full text]
  • Summary Report on the Arthur's Seat Rockfall, Edinburgh, February 2007
    Summary report on the Arthur’s Seat rockfall, Edinburgh, February 2007 Physical Hazards Programme Internal Report IR/07/033 BRITISH GEOLOGICAL SURVEY PHYSICAL HAZARDS PROGRAMME INTERNAL REPORT IR/07/033 Summary report on the Arthur’s Seat rockfall, Edinburgh, February 2007 N R Golledge The National Grid and other Ordnance Survey data are used with the permission of the Controller of Her Majesty’s Stationery Office. Licence No: 100017897/2007. Keywords Arthur’s Seat; Edinburgh; Scotland; rockfall; natural hazard; mass movement; slope failure. Bibliographical reference N R GOLLEDGE. 2007. Summary report on the Arthur’s Seat rockfall, Edinburgh, February 2007. British Geological Survey Internal Report, IR/07/033. 13pp. Copyright in materials derived from the British Geological Survey’s work is owned by the Natural Environment Research Council (NERC) and/or the authority that commissioned the work. You may not copy or adapt this publication without first obtaining permission. Contact the BGS Intellectual Property Rights Section, British Geological Survey, Keyworth, e-mail [email protected]. You may quote extracts of a reasonable length without prior permission, provided a full acknowledgement is given of the source of the extract. Maps and diagrams in this book use topography based on Ordnance Survey mapping. © NERC 2007. All rights reserved Keyworth, Nottingham British Geological Survey 2007 BRITISH GEOLOGICAL SURVEY The full range of Survey publications is available from the BGS British Geological Survey offices Sales Desks at Nottingham, Edinburgh and London; see contact details below or shop online at www.geologyshop.com Keyworth, Nottingham NG12 5GG The London Information Office also maintains a reference 0115-936 3241 Fax 0115-936 3488 collection of BGS publications including maps for consultation.
    [Show full text]
  • Analysis of Rockfall Hazards
    Analysis of rockfall hazards Introduction Rockfalls are a major hazard in rock cuts for highways and railways in mountainous terrain. While rockfalls do not pose the same level of economic risk as large scale failures which can and do close major transportation routes for days at a time, the number of people killed by rockfalls tends to be of the same order as people killed by all other forms of rock slope instability. Badger and Lowell (1992) summarised the experience of the Washington State Department of Highways. They stated that ‘A significant number of accidents and nearly a half dozen fatalities have occurred because of rockfalls in the last 30 years … [and] … 45 percent of all unstable slope problems are rock fall related’. Hungr and Evans (1989) note that, in Canada, there have been 13 rockfall deaths in the past 87 years. Almost all of these deaths have been on the mountain highways of British Columbia. Figure 1: A rock slope on a mountain highway. Rockfalls are a major hazard on such highways Analysis of rockfall hazards Figure 2: Construction on an active roadway, which is sometimes necessary when there is absolutely no alternative access, increases the rockfall hazard many times over that for slopes without construction or for situations in which the road can be closed during construction. Mechanics of rockfalls Rockfalls are generally initiated by some climatic or biological event that causes a change in the forces acting on a rock. These events may include pore pressure increases due to rainfall infiltration, erosion of surrounding material during heavy rain storms, freeze-thaw processes in cold climates, chemical degradation or weathering of the rock, root growth or leverage by roots moving in high winds.
    [Show full text]