Annex-I: PROCUREMENT SCHEDULE FOR GOODS Country: 75583 Borrower Government of India, Ministry of Finance, North Block, New Delhi, India-110 001 Project: National Cyclone Risk Mitigation Project (NCRMP) GoAP (Values in Millions) Revision No. 2 Date : 20.02.2013 Sl. Package No. Description Method of Schedul Procurement Quantity Estimated Estimated Stage Initiate Preparation of Preparati Approval of Publicatio Beginnin Opening of Submission Approval of Issue of Signing of Issue of 100% Completion Public Disclosure Authorized No. Procurement e/Slice Authority (Numbe Cost Cost preparation IFB and on of the IFB and Bid n of IFB in g of Sale Bids of BER to BER notification the contract delivery of r) (Million (Million of submission to Bid documents Newspap of Bid Bank for of Award contract award complete contractual local USD)* Specificatio the Bank Docume by the World ers and documen approval notice obligations currency) n and Bid nt Bank UNDB t Document 1 NCRMP/D/SPIU- Procurement of Appraisal AP/Air Networking,Fax Machines,Air Revised 15-Feb-12 29-Feb-12 21-Mar-12 20-May-12 25-May-12 9-Jun-12 9-Jul-12 Conditioners&Appli Conditioners,Multimedia Actual ances/1 Projector,Interactive Board & Panel,Visual Presentor,Refrigerator,Godrej Shopping 1 State PIU 1 1.35 0.03 Office file Almirahs and other appliances for office of SPIU NCRMP in the new premises

Public Disclosure Authorized ''H'' Block North Wing 4th Floor A.P.Secretartiat Hyderabad.

2 NCRMP/D/SPIU- Procurement of Furniture for Appraisal AP/Furniture /2 office of SPIU NCRMP in the Revised 15-Jun-11 29-Jun-11 13-Jul-11 20-Jul-11 25-Jul-11 24-Aug-11 23-Sep-11 new premises ''H'' Block North Shopping 1 State PIU 1 1.37 0.03 Actual 28-Jul-11 25-Aug-11 26-Aug-11 29-Aug-11 Wing 4th Floor A.P.Secretartiat Hyderabad.

3 NCRMP/D/SPIU- Procurement of Computers Appraisal AP/ Computers and and Peripherals, Printers, Revised 22-Jun-11 6-Jul-11 13-Jul-11 27-Jul-11 1-Aug-11 31-Aug-11 30-Sep-11 Peripherals/ 3 Laptops, Xerox Machine, etc., Shopping 1 State PIU 1 1.35 0.03 Actual 12-Sep-11 14-Dec-11 9-Jan-12 9-Jan-12 for SPIU NCRMP. 4 NCRMP/D/PIA-AP/ Procurement of Desktops and Appraisal

Public Disclosure Authorized Computers and Printers for PR Line Shopping 1 State PIU 1 1.90 0.04 Revised 20-Apr-12 4-May-12 11-May-12 18-May-12 25-May-12 1-Jun-12 8-Jun-12 11-Jun-12 14-Jun-12 5-Jul-12 4-Aug-12 Peripherals/ 4 Department. Actual 5 NCRMP/D/PIA-AP/ Procurement of Computer Appraisal Computers and Peripherals, Laptops, Revised 20-Apr-12 4-May-12 11-May-12 18-May-12 25-May-12 1-Jun-12 8-Jun-12 11-Jun-12 14-Jun-12 5-Jul-12 4-Aug-12 Shopping 1 State PIU 1 1.60 0.03 Peripherals/ 5 Scanners, Xerox Machine, etc., Actual for PR Line Department. 6 NCRMP/D/PIA-AP/ Printing of Cyclone Shelter Appraisal Printing of Management, Maintenance Revised 20-Feb-13 27-Feb-13 6-Mar-13 13-Mar-13 20-Mar-13 27-Mar-13 3-Apr-13 6-Apr-13 9-Apr-13 30-Apr-13 30-May-13 CSMMWC and Welfare Committees Shopping 1 State PIU 1 0.50 0.0108 Actual mannuals/ 6 (CSMMWC) manual booklets 7 NCRMP/D/PIA-AP/ Developement of Website for Appraisal Website/ 7 SPIU NCRMP Shopping 1 State PIU 1 0.30 0.0065 Revised 28-Feb-13 7-Mar-13 14-Mar-13 21-Mar-13 28-Mar-13 4-Apr-13 11-Apr-13 14-Apr-13 17-Apr-13 8-May-13 7-Jun-13 Actual 8 NCRMP/D/PIA-AP/ Procurement of Zerox Machine Appraisal Printers/ 8 for use of Commissioner for Revised 2-Mar-13 9-Mar-13 16-Mar-13 23-Mar-13 30-Mar-13 6-Apr-13 13-Apr-13 16-Apr-13 19-Apr-13 10-May-13 9-Jun-13 Public Disclosure Authorized Shopping 1 State PIU 1 0.30 0.0065 Disaster Management & E.O. Actual Prl. Secretary . AP Total 8.67 0.19

* The conversion rate applied is 1 USD : INR 46.17 Annex-II: PROCUREMENT SCHEDULE FOR WORKS Country: India Borrower Government of India, Ministry of Finance, North Block, New Delhi, India-110 Project: National Cyclone Risk Mitigation Project (NCRMP) (Values in Millions) Revision No. Nil Date 01.07.2011 Total Initiate Approval Submission Publication Method Quantit Estimated Estimated preparation Preparation of IFB and of BER to Total bid Issue of Completion Preparation of IFB in Beginning of of Procurement y Cost Cost of of IFB and Bid Opening of Bank for Approval of Signing of Name of the value contract 50% work 100% work of Sno Package No. Description Stage of the Bid Newspaper Sale of Bid Procur Authority (Numb (Million (Million Specificatio submission documents Bids approval/ BER the contract contractor (million local award complete complete contractual Document s and document ement er) local USD) n and Bid to the Bank by the Preparation currency) notice obligations UNDB currency) Document World Bank of BER Panchayat Raj Department Andhra Pradesh- Cyclone shelters Phase I

NCB PRED, GoAP 2 21.94 0.48 Appraisal 3-Oct-09 13-Oct-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of two cyclone shelters in NCRMP/B- Revised 15-Apr-10 13-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Jan-12 30-Sep-12 30-Dec-12 Santhabommali mandal, 1 W/AP/MPCS/PRED/01/ Sri K.Anantha 1). Kollipadi Santhabommali/005 Re Revised 30-Apr-11 Rao 22.41 30-Apr-11 11-Dec-11 23-Jul-12 6-Sep-12 2). Runku Actual Actual NCB PRED, GoAP 1 10.49 0.23 Appraisal 3-Oct-09 13-Oct-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 . 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Revised 15-Apr-10 13-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 NCRMP/B- Construction of C type cyclone shelter in M/S Coastal 2 W/AP/MPCS/PRED/03/ Tikkavanipalem, Vishakhapatnam district Engineering Paravada/001 Re Revised 14-Oct-11 constructions 10.81 14-Oct-11 1-Mar-12 13-Jul-12 15-Sep-12 Actual NCB PRED, GoAP 3 28.34 0.61 Appraisal 3-Oct-09 13-Oct-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of three cyclone shelters in Revised 15-Apr-10 13-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Jan-12 30-Sep-12 30-Dec-12 Nakkapalli mandal, Vishakhapatnam M/S Coastal NCRMP/B- district 1.cyclone shelters in Engineering 3 W/AP/MPCS/PRED/03/ Bangarrampeta 2.cyclone Re Revised 3-Oct-11 constructions 29.70 3-Oct-11 15-May-12 2-Jan-13 15-Mar-13 Nakkapalli/002 shelters in Mullaparra 3.cyclone shelters in Patimeeda Actual NCB PRED, GoAP 2 13.90 0.30 Appraisal 3-Oct-09 13-Oct-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of two cyclone shelters in Revised 15-Apr-10 13-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 30-Dec-11 30-Jun-12 9-Sep-12 NCRMP/B- Payakaraopeta mandal, Vishakhapatnam 4 W/AP/MPCS/PRED/03/ district. M/S Coastal Payakaraopeta/003 1. cyclone shelters in Gajapathinagaram Engineering 2. cyclone shelters in Ratnayampeta Re Revised 3-Oct-11 constructions 14.71 3-Oct-11 3-Apr-12 2-Oct-12 15-Dec-12 Actual NCB PRED, GoAP 1 8.06 0.17 Appraisal 3-Oct-09 13-Oct-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Revised 15-Apr-10 13-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 NCRMP/B- Construction of B type cyclone shelter in M/S Coastal 5 W/AP/MPCS/PRED/03/ Venkayyapalem, Vishakhapatnam district Engineering Rambilli/004 Re Revised 3-Oct-11 constructions 7.51 3-Oct-11 15-Feb-12 2-Jul-12 15-Sep-12 Actual NCB PRED, GoAP 2 15.27 0.33 Appraisal 3-Oct-09 13-Oct-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of two cyclone shelters in Revised 15-Apr-10 13-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 30-Dec-11 30-Jun-12 9-Sep-12 Thondangi mandal, NCRMP/B- M/s Tirumala 1.Construction of cyclone shelter at 6 W/AP/MPCS/PRED/04/ Re Revised 17-Oct-11 Constructions 16.04 17-Oct-11 14-Apr-12 11-Oct-12 25-Nov-12 Avulamanda Thondangi/001 2. Construction of cyclone shelter at Lakshmanudupeta Actual NCB PRED, GoAP 1 10.57 0.23 Appraisal 3-Oct-09 13-Oct-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 NCRMP/B- Construction of C type cyclone shelter in Revised 15-Apr-10 13-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 7 W/AP/MPCS/PRED/04/ Pedaraghavulupeta, East Godavari M/s Tirumala Uppalaguptha/002 District Re Revised 17-Oct-11 Constructions 11.11 17-Oct-11 28-Feb-12 15-Jun-12 30-Sep-12 Actual NCB PRED, GoAP 1 10.44 0.23 Appraisal 3-Oct-09 13-Oct-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Revised 15-Apr-10 13-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 NCRMP/B- Construction of D type cyclone shelter in Sri 8 W/AP/MPCS/PRED/08/ Chakicherla, Prakasam District V.Satyanaryana Ulavapadu/001 Re Revised 28-Aug-11 Reddy 9.89 28-Aug-11 10-Jan-12 24-May-12 8-Jul-12 Actual

NCB PRED, GoAP 1 7.52 0.16 Appraisal 3-Oct-09 13-Oct-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 NCRMP/B- Construction of B type cyclone shelter in Revised 15-Apr-10 13-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 9 W/AP/MPCS/PRED/08/ Thopupalem Kanuparthy, Prakasam M/S Masters N.G. Padu/003 District Re Revised 24-Aug-11 Constructions 7.01 24-Aug-11 20-Feb-12 18-Aug-12 2-Oct-12 Actual Andhra Pradesh- Cyclone shelters- Phase I Total 14 126.53 2.74 129.19

Andhra Pradesh- Roads to Cyclone Shelter Phase I

Construction of roads to cyclone shelters NCB PRED, GoAP 4 12.60 0.27 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 in Srikakulam 1). Road from NP Road to Revised 15-Apr-10 12-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 30-Dec-11 30-Jun-12 9-Sep-12 URK Puram NCRMP/B- 2). Deppuru Bahadapalli road to Onkuluru Re Revised 20-Sep-11 M/S NSN Reddy 10.40 20-Sep-11 20-Mar-12 20-Sep-12 20-Nov-12 1 W/AP/RCS/PRED/01/ & to Cyclone Shelter V.Kotturu/002 3). R&B road to Devunaltada 4). Pollada to Komarlathada & to Cyclone Shelter Actual Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to cyclone shelters NCB PRED, GoAP 4 9.85 0.21 in Srikakulam 1).Road from Koyyam R&B road to Moosavanipeta 2 of 35 NCRMP/B- 2). Road Form Mentada to Dovupeta 2 W/AP/RCS/PRED/01/ 3).Road from Kotcherla road to Etcherla/005 Kollibheemavaram & Cyclone Shelter 4). Road from Kotcherla road to Pathasundarapalem Total Initiate Approval Submission Publication Method Quantit Estimated Estimated preparation Preparation of IFB and of BER to Total bid Issue of Completion Preparation of IFB in Beginning of of Procurement y Cost Cost of of IFB and Bid Opening of Bank for Approval of Signing of Name of the value contract 50% work 100% work of Sno Package No. Description Stage of the Bid Newspaper Sale of Bid Procur Authority (Numb (Million (Million Specificatio submission documents Bids approval/ BER the contract contractor (million local award complete complete contractual Document s and document ement er) local USD) n and Bid to the Bank by the Preparation currency) notice obligations UNDB currency) Document World Bank of BER Construction of roads to cyclone shelters in Srikakulam 1).Road from Koyyam R&B Revised 15-Apr-10 12-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 road to Moosavanipeta NCRMP/B- Re Revised 7-Sep-11 M/S NSN Reddy 7.90 7-Sep-11 20-Jan-12 7-Jun-12 15-Jul-12 2). Road Form Mentada to Dovupeta 2 W/AP/RCS/PRED/01/ 3).Road from Kotcherla road to Etcherla/005 Kollibheemavaram & Cyclone Shelter 4). Road from Kotcherla road to Pathasundarapalem Actual NCB PRED, GoAP 1 1.35 0.03 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Revised 15-Apr-10 12-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 NCRMP/B- Construction of roads to cyclone shelters Sri M V 3 W/AP/RCS/PRED/03/ in Vishakhapatnam Satyanarayana Anandapuram/001 1. Road form NH5 to Ramaraidupalem Re Revised 15-Sep-11 Raju 1.36 15-Sep-11 1-Feb-12 15-Jun-12 15-Aug-12 Actual NCB PRED, GoAP 3 15.20 0.33 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to cyclone shelters Revised 15-Apr-10 12-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 30-Dec-11 30-Jun-12 9-Sep-12 in Vishakhapatnam NCRMP/B- 1.Road from R&B road to Rajakoduru Sri A.Kasi 4 W/AP/RCS/PRED/03/ 2.Road from R&B road Kattubolu to Re Revised 15-Sep-11 Visweswara Rao 15.91 15-Sep-11 15/3/2012 15-Sep-12 15-Nov-12 Rambilli/002 Marripalem 3.Road from R & B Road to Krishnampalem Actual NCB PRED, GoAP 2 9.90 0.21 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to cyclone shelters Revised 15-Apr-10 12-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 in Vishakhapatnam NCRMP/B- Sri 1.Road from R&B Road Pedateenarla to 5 W/AP/RCS/PRED/03/ T.Ramakrishna Chinateenarla Nakkapalli/003 Re Revised 15-Sep-11 Raju 9.40 15-Sep-11 1-Feb-12 15-Jun-12 15-Aug-12 2. Road form Upmaka-Rajayyapeta R&B Road to Janakayyapeta Actual NCB PRED, GoAP 1 5.60 0.12 Construction of roads to cyclone shelters Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 NCRMP/B- in East Godavari . Revised 15-Apr-10 12-May-10 19-Jun-10 28-Oct-10 4-Nov-10 29.07.2010 31.08.2010 15-May-11 30-May-11 27-Apr-11 20-Apr-11 15-Oct-11 30-Mar-12 30-Jun-12 6 W/AP/RCS/PRED/04/ 1.Approach road to Cyclone shelter M/S Viswateja Karapa/001 Adavipudi Re Revised 20-May-11 Constructions 4.23 20-May-11 15/10/11 20-Feb-12 20-Apr-12 Actual NCB PRED, GoAP 1 8.00 0.17 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to cyclone shelters Revised 15-Apr-10 12-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 NCRMP/B- in East Godavari. M/s Tirumala 7 W/AP/RCS/PRED/04/ 1. Road from R&B road to Re Revised 23-Sep-11 Constructions 0.84 23-Sep-11 15-Feb-12 23-Jun-12 31-Jul-12 Uppalaguptham/003 Chinaragavulapeta cylcone shelter Actual

Construction of roads to cyclone shelters NCB PRED, GoAP 6 10.00 0.22 in East Godavari. Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 1.Road from R&B road to G. Musalayyapeta Revised 15-Apr-10 12-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 2.Road from R&B road to Danavaipeta NCRMP/B- 3. Road from R&B road to Hukumpeta Re Revised 7-Sep-11 M/S NSN Reddy 8.07 7-Sep-11 15-Feb-12 9-Jun-12 31-Jul-12 8 W/AP/RCS/PRED/04/ cyclone shelter Thondangi/004 4.Road from R&B road to K.Chodipallipeta 5. Road from R&B road to P.Chodipallipeta 6.Road from R&B road to Gaddipeta Actual NCB PRED, GoAP 3 10.90 0.24 Construction of roads to cyclone shelters Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Revised 15-Apr-10 12-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 in Krishna M/S Sri 1. Road from Potlapalem ZP road to NCRMP/B- Vallabhaneni Pothepalli 9 W/AP/RCS/PRED/06/ Constructions Pvt 2.Road from R & B road to Chennepuram /001 Re Revised 2-Sep-11 Ltd 10.30 2-Sep-11 20-Jan-12 2-Jun-12 7-Feb-12 to Gundupallem, 3.Road from Bhogireddipalli R & B road to Ramkhandam,. Actual NCB PRED, GoAP 2 6.50 0.14 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to cyclone shelters Revised 15-Apr-10 12-May-10 19-Jun-10 28-Oct-10 29-Oct-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 in NCRMP/B- Sri 1.Road from R&B road to 10 W/AP/RCS/PRED/07/ P.Lakshminaraya Mandevaripalem PV Palem/001 Re Revised 1-Nov-11 na 6.69 1-Nov-11 15-Feb-12 30-Jul-12 30-Sep-12 2. Road from R&B road Alluru to Yadavapalem Actual

3 of 35 Total Initiate Approval Submission Publication Method Quantit Estimated Estimated preparation Preparation of IFB and of BER to Total bid Issue of Completion Preparation of IFB in Beginning of of Procurement y Cost Cost of of IFB and Bid Opening of Bank for Approval of Signing of Name of the value contract 50% work 100% work of Sno Package No. Description Stage of the Bid Newspaper Sale of Bid Procur Authority (Numb (Million (Million Specificatio submission documents Bids approval/ BER the contract contractor (million local award complete complete contractual Document s and document ement er) local USD) n and Bid to the Bank by the Preparation currency) notice obligations UNDB currency) Document World Bank of BER

Construction of roads to cyclone shelters NCB PRED, GoAP 5 13.50 0.29 in Guntur Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 1.Road from Ganapavaram R&B road to Pedamarupuvaripalem Revised 15-Apr-10 12-May-10 19-Jun-10 28-Oct-10 29-Oct-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 30-Dec-11 30-Jun-12 9-Sep-12 2.Road from R&B roadto Sri NCRMP/B- Chinapuluguvaripalem Re Revised 1-Nov-11 K.Varaparasad 13.82 1-Nov-11 15-Feb-12 30-Jul-12 30-Sep-12 11 W/AP/RCS/PRED/07/ 3. Road from R&B road to /002 Yaramvripalem 4.Road from R&B road to Pedagollapalem Cycloneshelter 5. Peddagollapalem P.R road to Bonthagorlapalem Actual NCB PRED, GoAP 3 8.70 0.19 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to cyclone shelters Revised 15-Apr-10 12-May-10 19-Jun-10 28-Oct-10 29-Oct-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 in Guntur Sri NCRMP/B- 1. Road from R&B road to P.Lakshminaraya 12 W/AP/RCS/PRED/07/ Gurunadhanagar Re Revised 16-Oct-11 na 9.11 16-Oct-11 1-Feb-12 15-Jul-12 15-Sep-12 /003 2. Road from R&B road to Adavala H/O Bavajipalem 3.Road from R&B road to Atlavaripalem Actual NCB PRED, GoAP 2 2.65 0.06 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to cyclone shelters NCRMP/B- in Guntur Revised 15-Apr-10 12-May-10 19-Jun-10 28-Oct-10 29-Oct-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 Sri 13 W/AP/RCS/PRED/07/ 1.Road from R&B road to Re Revised 13-Oct-11 K.Varaparasad 2.64 13-Oct-11 1-Feb-12 15-Jul-12 15-Sep-12 /004 Hanumanthanagar 2. Road from R&B road to Adarshanagar Actual Construction of roads to cyclone shelters NCB PRED, GoAP 5 12.45 0.27 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 in Prakasam 1.R&B road to cyclone shelter at Revised 15-Apr-10 12-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 30-Dec-11 30-Jun-12 9-Sep-12 Mankeravaripalem M/S Mithra 2. R&B road to Jeevarakshanagar Engineering NCRMP/B- cyclone shelter Re Revised 30-Sep-11 Constructions 12.89 30-Sep-11 31-Mar-12 30-Sep-12 30-Nov-12 14 W/AP/RCS/PRED/08/ 3. R&B road to Vijayanagar colony Vetapalem/001 cyclone shelter 4. R&B road to Ramanagar cyclone shelter 5. Road from NH road to Challareddypalem Actual Construction of roads to cyclone shelters NCB PRED, GoAP 2 4.50 0.10 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 in Prakasam NCRMP/B- Revised 15-Apr-10 12-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 1. R&B road to Devinuthala cyclone 15 W/AP/RCS/PRED/08/ Sri shelter Chirala/002 Re Revised 27-Aug-11 M.Ramakrishna 4.82 27-Aug-11 15-Jan-12 27-May-12 27-Jul-12 2.R&B road to Keerthivaripalem cyclone shelter Actual NCB PRED, GoAP 2 6.32 0.14 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to cyclone shelters Revised 15-Apr-10 12-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 NCRMP/B- in Sri L.Ramasiva 16 W/AP/RCS/PRED/09/ (1) Road from R&B Road to A.S.Puram Re Revised 10-May-11 Reddy 5.32 10-May-11 25-Sep-11 10-Feb-12 10-Apr-12 Kota/001 (2) Road from GD road to Vavillapalem. Actual Construction of roads to cyclone shelters NCB PRED, GoAP 1 8.40 0.18 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 NCRMP/B- in Nellore Revised 15-Apr-10 12-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 Sri Alla Sudhakar 17 W/AP/RCS/PRED/09/ 1) Road from R&B Road Re Revised 21-Apr-11 Reddy 6.42 21-Apr-11 1-Sep-11 21-Jan-12 31-Mar-12 Muthukur/002 Kappalapadoruvu to Bandlapalem H.Wada Actual NCB PRED, GoAP 1 4.50 0.10 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to cyclone shelters NCRMP/B- Revised 15-Apr-10 12-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 in Nellore 18 W/AP/RCS/PRED/09/ Sri B.Mastan (1) Road from Kakuvaripalem R&B Road Chillakur/004 Re Revised 23-May-11 Reddy 3.69 23-May-11 15-Sep-11 23-Feb-12 15-Apr-12 to Vellapalem Actual NCB PRED, GoAP 1 6.80 0.15 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to cyclone shelters NCRMP/B- Revised 15-Apr-10 12-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 in Nellore 19 W/AP/RCS/PRED/09/ M/S Bhavani (1) Road from 7/2 MC road to T.P./005 Re Revised 17-May-11 Constructions 5.15 17-May-11 25-Sep-11 17-Feb-12 15-Apr-12 Venkannapalem Pattapupalem Actual NCB PRED, GoAP 1 12.80 0.28 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to cyclone shelters NCRMP/B- in Nellore Revised 15-Apr-10 12-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 30-Dec-11 30-Jun-12 9-Sep-12 20 W/AP/RCS/PRED/09/ (1) Road connecting R&B road through M/S Bhavani /006 Voturu Village Re Revised 21-Sep-11 Constructions 12.37 21-Sep-11 15-Mar-12 21-Sep-12 30-Nov-12 Actual Construction of roads to cyclone shelters NCB PRED, GoAP 1 13.90 0.30 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 in Nellore Revised 15-Apr-10 12-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 30-Dec-11 30-Jun-12 9-Sep-12 NCRMP/B- 1) Road from Kotha Satram R&B Road Sri Alla Sudhakar 21 W/AP/RCS/PRED/09/ to Indira Nagar (via) Thumalapenta Re Revised 29-Aug-11 Reddy 13.16 29-Aug-11 15-Mar-12 29-Aug-12 30-Oct-12 Kavali/007 palem, Patharavadu palem, Ramudu palem, Karaduvari Palem & Sreeramapuram. Actual NCB PRED, GoAP 1 13.11 0.28 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to cyclone shelters NCRMP/B- in Nellore 4 of 35 22 W/AP/RCS/PRED/09/ (1) Road from R&B Road Sullurupeta DV.Satram/008 Mallam to Berijangalapalli Cyclone Shelter. Total Initiate Approval Submission Publication Method Quantit Estimated Estimated preparation Preparation of IFB and of BER to Total bid Issue of Completion Preparation of IFB in Beginning of of Procurement y Cost Cost of of IFB and Bid Opening of Bank for Approval of Signing of Name of the value contract 50% work 100% work of Sno Package No. Description Stage of the Bid Newspaper Sale of Bid Procur Authority (Numb (Million (Million Specificatio submission documents Bids approval/ BER the contract contractor (million local award complete complete contractual Document s and document ement er) local USD) n and Bid to the Bank by the Preparation currency) notice obligations UNDB currency) Document World Bank of BER Construction of roads to cyclone shelters NCRMP/B- in Nellore Revised 15-Apr-10 12-May-10 19-Jun-10 28-Oct-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 22 W/AP/RCS/PRED/09/ (1) Road from R&B Road Sullurupeta Sri V.Prabhakar DV.Satram/008 Mallam to Berijangalapalli Cyclone Re Revised 9-May-11 Reddy 8.54 9-May-11 20-Sep-11 9-Feb-12 15-Apr-12 Shelter. Actual NCB PRED, GoAP 2 12.25 0.27 Appraisal 2-Nov-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to cyclone shelters in Nellore Revised 15-Apr-10 19-Jun-10 25-Jul-11 31-Jul-11 30-Aug-11 31-Dec-11 15-Feb-12 21-Feb-12 28-Feb-12 27-Aug-12 27-Feb-13 27-Mar-13 NCRMP/B- (1) Road from @ Km 56/8 of CK Road to Sri L. Ramasiva 23 W/AP/RCS/PRED/09/ Periyavettu Kuppam Re Revised 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 Reddy 10-Jan-00 5-Aug-12 1-Feb-13 31-Jul-13 14-Sep-13 Tada/009 (2) Providing BT road to Peda Pannamgadu. Actual Andhra Pradesh- Roads to Cyclone shelters- Phase I Total 54 197.53 4.28 183.46

Andhra Pradesh- Roads to Habitations Phase I

NCB PRED, GoAP 3 15.40 0.33 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations in Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 26-Oct-11 26-Apr-12 15-Jul-12 Srikakulam 1).Road from Borubhadra, Malagam to NCRMP/B- Re Revised 30-Apr-11 Sri.K.H.V. Prasad 15.67 30-Apr-11 30-Oct-11 30-Apr-12 30-Jun-12 Kollipadu via Seepuram, Gantapeta 1 W/AP/RHB/PRED/01/ 2). Road from DPN R&B road to Santhabommali/003 Udandapalem 3).Road from K. Umilada Junction To Koduru (Link Road) Actual NCB PRED, GoAP 1 7.61 0.16 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations in NCRMP/B- Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 Srikakulam 2 W/AP/RHB/PRED/01/ M/S KSR 1). Road from R&B road Edulavalasa – Polaki/005 Re Revised 30-Apr-11 Constructions 7.50 30-Apr-11 15-Sep-11 30-Jan-12 31-Mar-12 Killam to Jonnam via Tlasamudram Actual Construction of roads to habitations in NCB PRED, GoAP 2 14.34 0.31 Appraisal 3-Oct-09 13-Oct-09 30-Nov-09 15-Dec-09 5-Mar-10 6-Mar-10 6-Apr-10 6-May-10 3-Jun-10 4-Jun-10 1-Dec-10 28-Aug-11 26-Nov-11 Talasamudram mandal, Srikakulam Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 26-Oct-11 26-Apr-12 15-Jul-12 NCRMP/B- District 1).Road from R&B road Mobagam M/S KSR 3 W/AP/RHB/PRED/01/ to Dubbakavanipeta via Re Revised 30-Apr-11 Constructions 14.51 30-Apr-11 30-Oct-11 30-Apr-12 30-Jun-12 Polaki/006 Gajapathinagaram 2). Road from Talasamudaram to Dola Regulator Actual NCB PRED, GoAP 1 13.70 0.30 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations in Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 26-Oct-11 26-Apr-12 15-Jul-12 NCRMP/B- Vishakhapatnam M/S Sri 4 W/AP/RHB/PRED/03/ 1.) Providing BT to the road from Venkateswara Nakkapalli/001 Vempudi to Patimeda Re Revised 11-Jan-11 Constructions 9.98 11-Jan-11 11-Jun-11 10-Jan-12 15-Mar-12 Actual NCB PRED, GoAP 1 6.82 0.15 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations in NCRMP/B- Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 Vishakhapatnam 5 W/AP/RHB/PRED/03/ 1.) Road from R&B road to Mulaparra Nakkapalli/002 Re Revised 27-Jan-11 M/S N.S.N Reddy 9.98 27-Jan-11 15-Jun-11 27-Oct-11 31-Dec-11 upto Beach end Actual NCB PRED, GoAP 1 5.52 0.12 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations in Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 NCRMP/B- Vishakhapatnam Sri. 6 W/AP/RHB/PRED/03/ 1) .Road from R&B B.P Kallalu to D.Narasimham Anandapuram/003 Matchvanipalem Re Revised 10-Mar-11 Murthy 4.38 10-Mar-11 31-Jul-11 10-Dec-11 31-Jan-12 Actual NCB PRED, GoAP 2 9.45 0.20 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 Construction of roads to habitations in NCRMP/B- Vishakhapatnam Re Revised 28-Mar-11 Sri. K.Rama Rao 7.33 28-Mar-11 15-Aug-11 28-Dec-11 28-Feb-12 7 W/AP/RHB/PRED/03/ 1.) Road from R & B road to Pothu Paravada/004 Rajannapalem 2.) Road from R & B road to Jalaripeta

Actual NCB PRED, GoAP 1 8.20 0.18 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations in NCRMP/B- Vishakhapatnam Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 8 W/AP/RHB/PRED/03/ 1.) Road from R & B road to T.Ramakrishna Rambilli/006 Venkayyapalem Re Revised 1-Nov-11 Raju 5.94 1-Nov-11 15-Apr-12 1-Aug-12 30-Oct-12 Actual NCB PRED, GoAP 2 4.35 0.09 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations in Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 NCRMP/B- Vishakhapatnam M/S NGR 9 W/AP/RHB/PRED/03 / 1.) Road from R&B road to Re Revised 27-Apr-11 Constructions 4.29 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 Atchutapuram/007 A.Somavaram 2) Road from R&B road to Avarajam Actual NCB PRED, GoAP 1 5.30 0.11 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations in Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 10.11.2010 21.01.2011 21-Mar-11 19-Apr-11 27-Apr-11 7-May-11 15-Sep-11 26-Jan-12 15-Apr-12 NCRMP/B- East Godavari M/S Viswateja 10 W/AP/RHB/PRED/04/ 1.) Road from Gurajanapalli to Re Revised 27-Apr-11 Constructions 5.25 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 Karapa/001 Bandulavaripalem 5 of 35 Total Initiate Approval Submission Publication Method Quantit Estimated Estimated preparation Preparation of IFB and of BER to Total bid Issue of Completion Preparation of IFB in Beginning of of Procurement y Cost Cost of of IFB and Bid Opening of Bank for Approval of Signing of Name of the value contract 50% work 100% work of Sno Package No. Description Stage of the Bid Newspaper Sale of Bid Construction of roads to habitations in Procur Authority (Numb (Million (Million Specificatio submission documents Bids approval/ BER the contract contractor (million local award complete complete contractual NCRMP/B- Document s and document East Godavari ement er) local USD) n and Bid to the Bank by the Preparation currency) notice obligations 10 W/AP/RHB/PRED/04/ UNDB 1.) Road from Gurajanapalli to currency) Document World Bank of BER Karapa/001 Bandulavaripalem Actual

6 of 35 Total Initiate Approval Submission Publication Method Quantit Estimated Estimated preparation Preparation of IFB and of BER to Total bid Issue of Completion Preparation of IFB in Beginning of of Procurement y Cost Cost of of IFB and Bid Opening of Bank for Approval of Signing of Name of the value contract 50% work 100% work of Sno Package No. Description Stage of the Bid Newspaper Sale of Bid Procur Authority (Numb (Million (Million Specificatio submission documents Bids approval/ BER the contract contractor (million local award complete complete contractual Document s and document ement er) local USD) n and Bid to the Bank by the Preparation currency) notice obligations UNDB currency) Document World Bank of BER

NCB PRED, GoAP 1 10.00 0.22 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations in NCRMP/B- East Godavari Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 11 W/AP/RHB/PRED/04/ 1.) Road from PR road to Dasarivaripeta Katreni kona/003 and to cylcone shelter Re Revised 27-Apr-11 M/S N.S.N Reddy 9.94 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 Actual Construction of roads to habitations in West Godavari NCB PRED, GoAP 5 18.80 0.41 Appraisal 10-Jan-00 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 1) .NH 214 A at Ragna Statue center to Harijanawada of Kalipatnam (E) Revised 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 15-Dec-11 26-Jul-12 15-Oct-12 2). R&B Road at Panchayat Office to Pulaparthivarithota via Badava NCRMP/B- M/S Maruthi 3).Mogaltur Vempa R&B Road at 12 W/AP/RHB/PRED/05/ Re Revised 27-Apr-11 Constructuions 17.98 27-Apr-11 15-Jan-12 26-Jul-12 15-Sep-12 Uchintha Kalava Bridge to Gogulamma Mogaltur/001 Harijanapeta 4.) From Narsapur Mogaltur R&B road to Dayadaldaspeta via Venkateshwara Swamy temple 5). Road from NH 214 A road to Harijanapeta of Kothota Actual NCB PRED, GoAP 3 12.70 0.28 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations in Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 26-Oct-11 26-Apr-12 15-Jul-12 West Godavari NCRMP/B- 1) .R&B road to Indira Nagar (via) Re Revised 9-May-11 Sri.Muthyala Rao 11.98 20-Apr-11 9-Nov-11 8-May-12 8-Jul-12 13 W/AP/RHB/PRED/05/ Pochamma temple Narsapur/002 2).Road from R&B road to Pedalanka 3). Road from LB Cherla CC road to Chillapalemm of LB Cherla Actual NCB PRED, GoAP 2 9.00 0.19 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations in Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 NCRMP/B- West Godavari 1.From A-U R&B Road to M/S Tirumala 14 W/AP/RHB/PRED/05/ Satyanarayanapuram Re Revised 19-Apr-11 Constructions 8.50 26-May-11 20-Apr-11 11-Oct-11 25-Feb-12 Kalla/003 2. From A-U R&B Road to Mekaladibba Actual NCB PRED, GoAP 1 8.30 0.18 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations in Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 NCRMP/B- Krishna M/S Raghava & 15 W/AP/RHB/PRED/06/ 1). Road connection R & B road to Re Revised 27-Apr-11 Co 7.95 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 Machipatnam/001 Gantalammapalem Actual NCB PRED, GoAP 2 3.40 0.07 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 Construction of roads to habitations in Kanaka Durga NCRMP/B- Krishna Highways 16 W/AP/RHB/PRED/06/ 1.) Road from R & B road to BV Thota, Re Revised 27-Apr-11 Builders 3.08 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 Machipatnam/002 2) Road from Potlapalem ZP road to Chikativaripalem,

Actual

NCB PRED, GoAP 2 5.20 0.11 Construction of roads to habitations in Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Krishna Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 NCRMP/B- 1.) Road from Interu R & B road to Sri.K.V.Padmana 17 W/AP/RHB/PRED/06/ Rangaraopet, Re Revised 27-Apr-11 bham 5.26 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 Kruthivennu/003 2.) Road from R & B road to Cyclone shelter at Chandala Est. Rs. 52.00 lakhs Actual NCB PRED, GoAP 1 1.40 0.03 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 Construction of roads to habitations in Sri.Md.Ameer NCRMP/B- Guntur Re Revised 27-Apr-11 Baig 1.42 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 18 W/AP/RHB/PRED/07/ 1.) Road from Ganapavarm R&B road to Karlapalem/001 Kesavapuri ST colony

Actual NCB PRED, GoAP 2 10.87 0.24 Construction of roads to habitations in Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 NCRMP/B- Guntur Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 26-Oct-11 26-Apr-12 15-Jul-12 19 W/AP/RHB/PRED/07/ 1 ).R&B road to Mohammad Alipalem Sri.P.Lakshmi Nagaram/002 2). Road from R&B road to Re Revised 27-Apr-11 Narayana 11.96 27-Apr-11 26-Oct-11 26-Apr-12 15-Jul-12 Katurivaripalem Actual

7 of 35 Total Initiate Approval Submission Publication Method Quantit Estimated Estimated preparation Preparation of IFB and of BER to Total bid Issue of Completion Preparation of IFB in Beginning of of Procurement y Cost Cost of of IFB and Bid Opening of Bank for Approval of Signing of Name of the value contract 50% work 100% work of Sno Package No. Description Stage of the Bid Newspaper Sale of Bid Procur Authority (Numb (Million (Million Specificatio submission documents Bids approval/ BER the contract contractor (million local award complete complete contractual Document s and document ement er) local USD) n and Bid to the Bank by the Preparation currency) notice obligations UNDB currency) Document World Bank of BER

Construction of roads to habitations in NCB PRED, GoAP 3 13.15 0.28 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Prakasam 1.) Pakala PR road to Avulavaripalem Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 26-Oct-11 26-Apr-12 15-Jul-12 NCRMP/B- Somarajupalli village M/S Mithra Engg. 20 W/AP/RHB/PRED/08/ 2). Road from MC R&B road to Re Revised 25-Apr-11 Constructions 9.85 25-Apr-11 24-Oct-11 24-Apr-12 15-Jul-12 S.Konda/001 Somarajupalli 3). Road from Pakala ZP road to Narravaripalem Actual Construction of roads to habitations in NCB PRED, GoAP 4 15.05 0.33 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Prakasam Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 26-Oct-11 26-Apr-12 15-Jul-12 1.) Road from MC road to Mulaguntapadu village NCRMP/B- 2).Road from R&B road to Chalivendram Re Revised 10-Feb-11 Sri G.Anil Reddy 11.10 10-Feb-11 11-Sep-11 10-Feb-12 15-Apr-12 21 W/AP/RHB/PRED/08/ dibba, Wollapalem S.Konda/002 3) .Road from R&B road to Musaladinne, Pakala village 4). Road from R&B road to Binginapalli H.wada cyclone shelter, Binginapalli viillage Actual NCB PRED, GoAP 1 10.92 0.24 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations in NCRMP/B- Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 26-Oct-11 26-Apr-12 15-Jul-12 Prakasam 22 W/AP/RHB/PRED/08/ M/S DDR & 1).Road from R&B road to Alluru to MTR Kothapatnam/003 Re Revised 27-Apr-11 Company 11.72 27-Apr-11 26-Oct-11 26-Apr-12 15-Jul-12 colony in Alluru village Actual Construction of roads to habitations in NCB PRED, GoAP 2 19.38 0.42 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Prakasam NCRMP/B- Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 15-Dec-11 26-Jul-12 15-Oct-12 1.) Road from KEM R&B road to 23 W/AP/RHB/PRED/08/ M/S DDR & Sankuvanigunta Kothapatnam/004 Re Revised 27-Apr-11 Company 19.24 27-Apr-11 15-Dec-11 26-Jul-12 15-Oct-12 2). Road from KEM R&B road to Pullareddypalem Actual NCB PRED, GoAP 1 14.20 0.31 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations in NCRMP/B- Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 26-Oct-11 26-Apr-12 15-Jul-12 Prakasam 24 W/AP/RHB/PRED/08/ M/S Mithra Engg. 1.) Road from MC road to Subbarayudu Ulavapadu/07 Re Revised 27-Apr-11 Constructions 14.25 27-Apr-11 26-Oct-11 26-Apr-12 15-Jul-12 satram Actual NCB PRED, GoAP 1 16.40 0.36 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations in NCRMP/B- Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 26-Oct-11 26-Apr-12 15-Jul-12 Prakasam 25 W/AP/RHB/PRED/08/ Sri.S.Venugopal 1.) Road from R&B road to Tettu to Ulavapadu/08 Re Revised 27-Apr-11 Reddy 16.32 27-Apr-11 26-Oct-11 26-Apr-12 15-Jul-12 Ramayapatnam Actual NCB PRED, GoAP 1 14.45 0.31 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations in NCRMP/B- Prakasam Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 26-Oct-11 26-Apr-12 15-Jul-12 26 W/AP/RHB/PRED/08/ 1).Road from R&B road to Pellure to M/S DDR & Tangutur/09 Vasepallipadu in Tangutur Mandal Re Revised 16-Mar-11 Company 11.09 16-Mar-11 16-Sep-11 16-Mar-12 15-May-12 Actual NCB PRED, GoAP 1 11.10 0.24 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations in NCRMP/B- Prakasam Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 27 W/AP/RHB/PRED/08/ 1).Road from R&B road to Kesupalem, Sri.Ajay kumar Tangutur/10 Ananthavaram village Re Revised 19-Apr-11 Ghosh 8.39 19-Apr-11 1-Sep-11 19-Jan-12 1-Apr-12 Actual Construction of roads to habitations in NCB PRED, GoAP 2 19.87 0.43 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Nellore Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 15-Dec-11 26-Jul-12 15-Oct-12 NCRMP/B- (1) Road from NH5 to Sambasivapuram 28 W/AP/RHB/PRED/09/ M/S Raghava (2) Road from 9/6 of Zuvvaladinne R&B Bogole/001 Re Revised 19-Jan-11 Constructions 15.04 19-Jan-11 30-Aug-11 30-Apr-12 30-Jun-12 Road to 11/0 of Zuvvaladinne R&B (via) Venkideshpalem. Actual

NCB PRED, GoAP 1 8.60 0.19 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations in NCRMP/B- Nellore Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 29 W/AP/RHB/PRED/09/ (1) Road from1/6 of Zuvvaladinne R&B Sri B.Ravindra Bogole/002 Road to Tellagunta Re Revised 7-Feb-11 Reddy 6.90 7-Feb-11 20-Jun-11 7-Nov-11 30-Jan-12 Actual Construction of roads to habitations in NCB PRED, GoAP 2 19.91 0.43 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Nellore NCRMP/B- Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 15-Dec-11 26-Jul-12 15-Oct-12 (1) Road from R&B road to Muttembaka 30 W/AP/RHB/PRED/09/ L.Rama Siva (via) Pittuvani palli Chittamur/003 Re Revised 18-Jan-11 Reddy 12.90 18-Jan-11 30-Aug-11 18-Apr-12 30-Jun-12 (2) Road from R&B Chittamur to Soma Samudram. Actual

8 of 35 Total Initiate Approval Submission Publication Method Quantit Estimated Estimated preparation Preparation of IFB and of BER to Total bid Issue of Completion Preparation of IFB in Beginning of of Procurement y Cost Cost of of IFB and Bid Opening of Bank for Approval of Signing of Name of the value contract 50% work 100% work of Sno Package No. Description Stage of the Bid Newspaper Sale of Bid Procur Authority (Numb (Million (Million Specificatio submission documents Bids approval/ BER the contract contractor (million local award complete complete contractual Document s and document ement er) local USD) n and Bid to the Bank by the Preparation currency) notice obligations UNDB currency) Document World Bank of BER

NCB PRED, GoAP 3 18.32 0.40 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations in Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 15-Dec-11 26-Jul-12 15-Oct-12 Nellore Sri L.Rama Siva (1) Road from K.T. R&B Road to NCRMP/B- Re Revised 17-Jan-11 Reddy 15.10 17-Jan-11 30-Aug-11 17-Apr-12 30-Jun-12 Alliguntapalem 31 W/AP/RHB/PRED/09/ (2) Road from Km 5/8 of Chinneyapalem Kavali/004 Road to Gummadi Badala (3) Road from Pedapattpupalem R&B Road to Chennayapalem H.Wada Actual NCB PRED, GoAP 2 21.31 0.46 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations in Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 15-Dec-11 26-Jul-12 15-Oct-12 Nellore M/S Bhavani NCRMP/B- (1) Road from R&B Road to Alaganipadu Re Revised 27-Apr-11 Constructions 22.09 27-Apr-11 15-Dec-11 26-Jul-12 15-Oct-12 32 W/AP/RHB/PRED/09/ to Vavilla Vidavalur/005 (2) Road from R&B road Kancharapalem H.W to Alaganipalem Actual

NCB PRED, GoAP 1 3.90 0.08 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations in NCRMP/B- Nellore Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 33 W/AP/RHB/PRED/09/ (1) Road from R&B Road to Patuvari Muthukur/006 M/S SSR Kandriga. Re Revised 27-Apr-11 Constructions 4.26 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 Actual NCB PRED, GoAP 2 12.03 0.26 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations in Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 26-Oct-11 26-Apr-12 15-Jul-12 Nellore NCRMP/B- V.Prabhakar (1) Survepalli-Pudiparthi Road to Srikanth 34 W/AP/RHB/PRED/09/ Re Revised 26-Jun-11 Reddy 12.64 26-Jun-11 26-Dec-11 26-Jun-12 30-Aug-12 Colony, V.Chalam/007 (2) Road from R&B Road to Edagali Kandriga. Actual NCB PRED, GoAP 1 21.25 0.46 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations in Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 15-Dec-11 26-Jul-12 15-Oct-12 NCRMP/B- Nellore 35 W/AP/RHB/PRED/09/ (1) Road from R&B Road Allur to M/S Paidala Allur/009 Galidibbalu (via) Chukavani dibba. Re Revised 26-Jun-11 Thirupathi Reddy 15.34 26-Jun-11 15-Feb-12 26-Sep-12 26-Nov-12 Actual Construction of roads to habitations in NCB PRED, GoAP 2 8.80 0.19 Appraisal 2-Nov-09 12-Nov-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Nellore Revised 15-Apr-10 12-May-10 19-Jun-10 15-Jul-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 NCRMP/B- (1) Ring Road to T.P.Gudur-Saipeta R&B M/S Sri Sainath 36 W/AP/RHB/PRED/09/ road (via) C.S.Puram and Mandapam Re Revised 19-May-11 Constructions 8.67 19-May-11 30-Sep-11 19-Feb-12 30-Apr-12 T.P.Gudur/012 Village (2) Road from R&B Road CS Puram to Siva Rama Puram. Actual 64 419.00 9.08 Andhra Pradesh- Roads to Habitations - Phase I Total 377.80

Andhra Pradesh- Roads and Buildings department

Andhra Pradesh- Roads and Bridges Phase I

Appraisal 10-Aug-09 12-Oct-09 30-Nov-09 21-Dec-09 6-Mar-10 8-Mar-10 8-Apr-10 8-May-10 5-Jun-10 7-Jun-10 3-Apr-11 31-Aug-11 29-Nov-11 NCRMP/B- Construction of Bridge at Km 11/6-8 of R&B Dept., 1 W/AP/Br/R&B/01/ NH5 to Patnavanipeta connecting NCB 1 35.50 0.77 Revised 01-Apr-10 26-Apr-10 04-May-10 24-May-10 11-Jun-10 14-Jun-10 16-Jul-10 12-Aug-10 9-Nov-10 17-Dec-10 17-Dec-10 16-Sep-11 16-Jun-12 31-Jul-12 GoAP Patnavanipeta/001 Sundarapalem in Srikakulam District M/s. Vardhaman Actual 01-Apr-10 26-Apr-10 04-May-10 24-May-10 11-Jun-10 14-Jun-10 16-Jul-10 12-Aug-10 9-Nov-10 17-Dec-10 Constructions 37.61 17-Dec-10 16-Sep-11 Appraisal 10-Aug-09 12-Oct-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 11-Jun-11 8-Dec-11 7-Mar-12 Construction of Minor Bridge across NCRMP/B- Revised 01-Apr-10 26-Apr-10 04-May-10 24-May-10 11-Jun-10 14-Jun-10 16-Jul-10 12-Aug-10 9-Nov-10 17-Dec-10 17-Dec-10 16-Sep-11 16-Jun-12 31-Jul-12 Uppugada at Km 7/6 of Srikakulam limits R&B Dept., 2 W/AP/Br/R&B/01/ NCB 1 12.60 0.27 to Pukkalapeta via Killipalem in GoAP M/s Coastal Uppugada/ 002 Srikakulam District Engineering Actual 01-Apr-10 26-Apr-10 04-May-10 24-May-10 11-Jun-10 14-Jun-10 16-Jul-10 12-Aug-10 9-Nov-10 17-Dec-10 Constructions 11.96 17-Dec-10 Appraisal 10-Aug-09 12-Oct-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 11-Jun-11 8-Dec-11 7-Mar-12 NCRMP/B- Construction of Minor bridge at Km 12/2-4 Revised 01-Apr-10 26-Apr-10 04-May-10 24-May-10 11-Jun-10 14-Jun-10 16-Jul-10 12-Aug-10 9-Nov-10 15-Dec-10 15-Dec-10 14-Jul-11 14-Mar-12 28-Apr-12 R&B Dept., 3 W/AP/Br/R&B/01/ of NH5 to Surampeta road via Naruva, NCB 1 8.30 0.18 M/s Sri Krishna GoAP Surampeta/003 Menthada in Srikakulam District Engineering Company & Actual 01-Apr-10 26-Apr-10 04-May-10 24-May-10 11-Jun-10 14-Jun-10 16-Jul-10 12-Aug-10 9-Nov-10 15-Dec-10 others 8.47 15-Dec-10 16-Jul-11 Appraisal 10-Aug-09 12-Oct-09 30-Nov-09 21-Dec-09 20-Mar-10 22-Mar-10 22-Apr-10 22-May-10 19-Jun-10 21-Jun-10 21-Jun-11 18-Dec-11 17-Mar-12 NCRMP/B- Construction of High level Bridge (HLB) R&B Dept., Revised 01-Apr-10 26-Apr-10 04-May-10 24-May-10 11-Jun-10 14-Jun-10 16-Jul-10 12-Aug-10 9-Nov-10 17-Dec-10 17-Dec-10 16-Sep-11 16-Jun-12 31-Jul-12 4 W/AP/Br/R&B/01/ across Bendigadda at Km 4/10 of Pundi - NCB 1 33.00 0.71 GoAP M/s Coastal Bendigadda/004 Parlakimindi road in Srikakulam District Engineering Actual 01-Apr-10 26-Apr-10 04-May-10 24-May-10 11-Jun-10 14-Jun-10 16-Jul-10 12-Aug-10 9-Nov-10 17-Dec-10 Constructions 32.78 17-Dec-10 16-Sep-11 Appraisal 10-Aug-09 12-Oct-09 30-Nov-09 15-Dec-09 6-Mar-10 8-Mar-10 8-Apr-10 8-May-10 5-Jun-10 7-Jun-10 3-Jan-11 2-Jun-11 31-Aug-11 NCRMP/B- Improvements to Nowpada - R&B Dept., Revised 01-Apr-10 26-Apr-10 04-May-10 24-May-10 11-Jun-10 14-Jun-10 16-Jul-10 12-Aug-10 9-Nov-10 17-Dec-10 17-Dec-10 16-Sep-11 16-Jun-12 31-Jul-12 5 W/AP/RD/R&B/01/ Venkatapuram road from Km 0/0 to 15/0 NCB 1 46.00 1.00 GoAP M/s. B. Nowpada/006 in Srikakulam District Ramanaiah Actual 01-Apr-10 26-Apr-10 04-May-10 24-May-10 11-Jun-10 14-Jun-10 16-Jul-10 12-Aug-10 9-Nov-10 17-Dec-10 Constructions 46.08 17-Dec-10 16-Sep-11

9 of 35 Total Initiate Approval Submission Publication Method Quantit Estimated Estimated preparation Preparation of IFB and of BER to Total bid Issue of Completion Preparation of IFB in Beginning of of Procurement y Cost Cost of of IFB and Bid Opening of Bank for Approval of Signing of Name of the value contract 50% work 100% work of Sno Package No. Description Stage of the Bid Newspaper Sale of Bid Procur Authority (Numb (Million (Million Specificatio submission documents Bids approval/ BER the contract contractor (million local award complete complete contractual Document s and document ement er) local USD) n and Bid to the Bank by the Preparation currency) notice obligations UNDB currency) Document World Bank of BER

Appraisal 10-Aug-09 12-Oct-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 7-Jan-11 6-Jun-11 5-Sep-11 Construction of Minor Bridge at Km 7/2 Revised 01-Apr-10 26-Apr-10 04-May-10 24-May-10 11-Jun-10 14-Jun-10 16-Jul-10 12-Aug-10 9-Nov-10 1-Dec-10 1-Dec-10 31-Aug-11 31-May-12 15-Jul-12 NCRMP/B- near Puligadda of Konada – R&B Dept., 6 W/AP/Br/R&B/ 02/ Ramatheertham R&B road to NCB 1 15.00 0.32 GoAP Puligadda/007 Konatalapalem via Yerukonda, Pasupam M/s. S.V.S. in Vizianagaram district. Mookambica Actual 01-Apr-10 26-Apr-10 04-May-10 24-May-10 11-Jun-10 14-Jun-10 16-Jul-10 12-Aug-10 9-Nov-10 1-Dec-10 Constructions 14.86 1-Dec-10 31-Aug-11 Construction of Minor Bridge at Km 15/2 Appraisal 10-Aug-09 12-Oct-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 11-Jun-11 8-Dec-11 7-Mar-12 near Chakaligadda of Konada NCRMP/B- Revised 01-Apr-10 26-Apr-10 04-May-10 24-May-10 11-Jun-10 14-Jun-10 16-Jul-10 12-Aug-10 9-Nov-10 8-Dec-10 8-Dec-10 7-Sep-11 7-Jun-12 22-Jul-12 Ramatheertham R&B road to R&B Dept., 7 W/AP/Br/R&B/02/ NCB 1 15.50 0.34 M/s Sri Krishna Konatalapalem via Yrukonda Pasupem, GoAP Chakaligadda/008 Engineering Kollayavalasa (ZP Road) in Vizianagaram Company & District Actual 01-Apr-10 26-Apr-10 04-May-10 24-May-10 11-Jun-10 14-Jun-10 16-Jul-10 12-Aug-10 9-Nov-10 8-Dec-10 others 16.32 8-Dec-10 7-Sep-11 Improvements to Konada-Ramatheertham Appraisal 10-Aug-09 12-Oct-09 30-Nov-09 21-Dec-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 11-Jun-11 8-Dec-11 7-Mar-12 NCRMP/B- road to Konathalapalem road (via) R&B Dept., Revised 01-Apr-10 26-Apr-10 04-May-10 24-May-10 11-Jun-10 14-Jun-10 16-Jul-10 12-Aug-10 9-Nov-10 8-Dec-10 8-Dec-10 7-Jul-11 7-Mar-12 21-Apr-12 8 W/AP/RD/R&B/ 02/ Pasupam, Yerukonda, Kollayavalasa from NCB 1 21.00 0.45 GoAP Konada/009 km.12/0 to 16/5 (km.0/0 to 4/0 i.e. upto M/s. Bhavani NH5 crossing) in Vizianagaram District Actual 01-Apr-10 26-Apr-10 04-May-10 24-May-10 11-Jun-10 14-Jun-10 16-Jul-10 12-Aug-10 9-Nov-10 8-Dec-10 Constructions 20.90 8-Dec-10 7-Apr-11 31-Dec-11 Appraisal 10-Aug-09 12-Oct-09 30-Nov-09 21-Dec-09 20-Mar-10 22-Mar-10 22-Apr-10 22-May-10 19-Jun-10 21-Jun-10 17-Jan-11 16-Jun-11 14-Sep-11 NCRMP/B- Reconstruction of HLB at km 5/2 of R&B Dept., Revised 01-Apr-10 26-Apr-10 04-May-10 24-May-10 11-Jun-10 14-Jun-10 16-Jul-10 12-Aug-10 9-Nov-10 1-Dec-10 1-Dec-10 31-Aug-11 31-May-12 15-Jul-12 9 W/AP/Br/R&B/07/ Bapatla-Suryalanka road in Guntur NCB 1 33.00 0.71 GoAP M/s Siddhardha Bapatla/010 District. Constructions (P) Actual 01-Apr-10 26-Apr-10 04-May-10 24-May-10 11-Jun-10 14-Jun-10 16-Jul-10 12-Aug-10 9-Nov-10 1-Dec-10 Ltd 33.75 1-Dec-10 31-Aug-11 Appraisal 10-Aug-09 12-Oct-09 30-Nov-09 15-Dec-09 20-Mar-10 22-Mar-10 22-Apr-10 22-May-10 19-Jun-10 21-Jun-10 21-Jun-11 18-Dec-11 17-Mar-12 Reconstruction of High Level Bridge NCRMP/B- (HLB) at km 2/4 of Bapatla- R&B Dept., Revised 01-Apr-10 26-Apr-10 04-May-10 24-May-10 11-Jun-10 14-Jun-10 16-Jul-10 12-Aug-10 9-Nov-10 1-Dec-10 1-Dec-10 31-Aug-11 31-May-12 15-Jul-12 10 W/AP/Br/R&B/07/ NCB 1 37.00 0.80 Pandurangapuram across Perali Drain in GoAP M/s. B.V.S.R Perali/011 Constructions (P) Actual 01-Apr-10 26-Apr-10 04-May-10 24-May-10 11-Jun-10 14-Jun-10 16-Jul-10 12-Aug-10 9-Nov-10 1-Dec-10 Ltd 36.75 1-Dec-10 31-Aug-11 Appraisal 10-Aug-09 12-Oct-09 30-Nov-09 21-Dec-09 20-Mar-10 22-Mar-10 22-Apr-10 22-May-10 19-Jun-10 21-Jun-10 21-Jun-11 18-Dec-11 17-Mar-12 NCRMP/B- Construction of High level Bridge at Km R&B Dept., 11 W/AP/Br/R&B/07/ 16/10 of Naguluppalapadu – Kanaparthi NCB 1 16.00 0.35 Revised 01-Apr-10 26-Apr-10 04-May-10 24-May-10 11-Jun-10 14-Jun-10 16-Jul-10 12-Aug-10 9-Nov-10 1-Dec-10 1-Dec-10 31-Aug-11 31-May-11 15-Jul-11 GoAP Kanaparthi/012 road in Prakasam District. Sri. K. Audi Actual 01-Apr-10 26-Apr-10 04-May-10 24-May-10 11-Jun-10 14-Jun-10 16-Jul-10 12-Aug-10 9-Nov-10 1-Dec-10 Sesha Reddy 15.52 1-Dec-10 31-Aug-11

Andhra Pradesh- Roads and Bridges- Phase I Total 11 272.90 5.91 275.00

Andhra Pradesh- Grand Total 143 1015.96 22.00 965.45 * The conversion rate applied is 1 USD : INR 46.17

Legend

Colour Description Green Works Awarded Red Re-Bid works Blue Phase II works to be taken up Purple Works falling in sensitive areas

10 of 35 Annex-II: PROCUREMENT SCHEDULE FOR WORKS Country: India Government of India, Ministry of Finance, North Block, New Delhi, Borrower India-110 001 National Cyclone Risk Mitigation Project Project: (NCRMP) GoAP (Values in Millions) Revision No. 2 Date : 20.02.2013 Total Total bid Initiate Approval of Method Quant Estimated Estimate Preparation Preparatio Publicatio Beginning Name value Issue of Completion preparation of IFB and Bid Signing of of Procurement ity Cost d Cost of IFB and n of the n of IFB in of Sale of Opening Approval of the (million contract 50% work 100% work of Sno Package No. Description Stage Specification documents by Preparatio the Procur Authority (Num (Million (Million submission Bid Newspape Bid of Bids of BER contr local award complete complete contractual and Bid the World n of BER contract ement ber) local USD) to the Bank Document rs document actor currency notice obligations Document Bank currency) )

Andhra Pradesh Panchayat Raj Department Andhra Pradesh- Cyclone shelters Phase I

NCB PRED, GoAP 1 10.40 0.23 Appraisal 3-Oct-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Rev 1 15-Apr-10 19-Jun-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 NCRMP/B-W/AP / Construction of D type cyclone Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 18-Dec-12 2-May-13 16-Jun-13 1 MPCS/PRED/01/ shelter in Idduvanipelam, Srikakulam Rev 3 7-Aug-12 21-Aug-12 21-Sep-12 21-Oct-12 20-Nov-12 11-Dec-12 12-Dec-12 10-Jun-13 7-Dec-13 21-Jan-14 Kaviti /001 district Rev 4 25-Oct-12 17-Nov-12 18-Dec-12 29-Jan-13 28-Feb-13 21-Mar-13 22-Mar-13 18-Sep-13 17-Mar-14 1-May-14 Actual NCB PRED, GoAP 1 11.80 0.26 Appraisal 3-Oct-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Rev 1 15-Apr-10 19-Jun-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 NCRMP/B- Construction of C type cyclone Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 18-Dec-12 2-May-13 16-Jun-13 2 W/AP/MPCS/PRED/01 shelter in Gollavooru, Srikakulam Rev 3 22-Jun-12 5-Jul-12 4-Aug-12 3-Sep-12 3-Oct-12 24-Oct-12 25-Oct-12 23-Apr-13 20-Oct-13 4-Dec-13 /Sompeta/002 district Rev 4 13-Sep-12 18-Sep-12 19-Oct-12 18-Nov-12 18-Dec-12 8-Jan-13 9-Jan-13 8-Jul-13 4-Jan-14 18-Feb-14 Rev 5 25-Oct-12 17-Nov-12 18-Dec-12 29-Jan-13 28-Feb-13 21-Mar-13 22-Mar-13 18-Sep-13 17-Mar-14 1-May-14 Actual PRED, GoAP 5 45.10 0.98 Appraisal 1-Oct-09 30-Nov-09 5-Mar-10 6-Mar-10 6-Apr-10 6-May-10 3-Jun-10 4-Jun-10 1-Dec-10 30-May-11 28-Aug-11 Construction of five cyclone shelters NCB in Vajrapukothuru mandal, NCRMP/B- 1). Amalpadu Rev 1 15-Apr-10 19-Jun-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Jan-12 30-Sep-12 30-Dec-12 3 W/AP/MPCS/PRED/01 2). Angavanipeta Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 18-Mar-13 29-Oct-13 13-Dec-13 / V.Kothuru/003 3). Ch.Batsalavanipeta 4). Chintavanipeta Rev 3 13-Sep-12 18-Sep-12 19-Oct-12 31-Dec-12 30-Jan-13 20-Feb-13 21-Feb-13 18-Nov-13 15-Aug-14 29-Sep-14 5). U.Narasingupalli Actual PRED, GoAP 4 40.20 0.87 Appraisal 3-Oct-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of four cyclone shelters NCB in Vajrapukothuru mandal, NCRMP/B- 1). Bypalli 4 W/AP/MPCS/PRED/01 2). Chinavanka Rev 1 15-Apr-10 19-Jun-10 30-Jun-11 7-Jul-11 7-Aug-11 10-Nov-11 10-Dec-11 15-Dec-11 16-Dec-11 16-Jun-12 1-Jan-13 16-Mar-13 / V.Kothuru/004 3). Chinnakothuru Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 18-Mar-13 29-Oct-13 13-Dec-13 4). Chinnajittuvani palam Rev 3 13-Sep-12 18-Sep-12 19-Oct-12 31-Dec-12 30-Jan-13 20-Feb-13 21-Feb-13 18-Nov-13 15-Aug-14 29-Sep-14 Actual NCB PRED, GoAP 3 31.80 0.69 Appraisal 3-Oct-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of three cyclone shelters Rev 1 15-Apr-10 19-Jun-10 30-Jun-11 7-Jul-11 7-Aug-11 10-Nov-11 10-Dec-11 15-Dec-11 16-Dec-11 16-Jun-12 1-Jan-13 16-Mar-13 NCRMP/B- in Gara mandal, Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 18-Mar-13 29-Oct-13 13-Dec-13 5 W/AP/MPCS/PRED/01 1). Kommaravanipeta /Gara/006 2). Korlam Rev 3 13-Sep-12 18-Sep-12 19-Oct-12 31-Dec-12 30-Jan-13 20-Feb-13 21-Feb-13 4-Oct-13 17-May-14 1-Jul-14 3). Perlavanipeta Rev 4 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 Actual NCB PRED, GoAP 1 9.10 0.20 Appraisal 3-Oct-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Rev 1 15-Apr-10 19-Jun-10 30-Jun-11 7-Jul-11 7-Aug-11 10-Nov-11 10-Dec-11 15-Dec-11 16-Dec-11 15-Apr-12 15-Aug-12 15-Sep-12 NCRMP/B- Construction of A type cyclone Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 18-Dec-12 2-May-13 16-Jun-13 6 W/AP/MPCS/PRED/01 shelter in Ragupalem, Srikakulam Rev 3 13-Sep-12 18-Sep-12 19-Oct-12 18-Nov-12 18-Dec-12 8-Jan-13 9-Jan-13 8-Jul-13 4-Jan-14 18-Feb-14 / Laveru/007 district Rev 4 25-Oct-12 17-Nov-12 18-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 Rev 5 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 Actual NCB PRED, GoAP 1 10.10 0.22 Appraisal 3-Oct-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 NCRMP/B- Construction of A type cyclone Rev 1 15-Apr-10 19-Jun-10 30-Jun-11 7-Jul-11 7-Aug-11 10-Nov-11 10-Dec-11 15-Dec-11 16-Dec-11 15-Apr-12 15-Aug-12 15-Sep-12 7 W/AP/MPCS/PRED/01 shelter in Kommaravanipeta, Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 18-Dec-12 2-May-13 16-Jun-13 /Ranasthalam/008 Srikakulam district Rev 3 13-Sep-12 18-Sep-12 19-Oct-12 31-Dec-12 30-Jan-13 20-Feb-13 21-Feb-13 20-Aug-13 16-Feb-14 2-Apr-14 Actual NCB PRED, GoAP 3 29.00 0.63 Appraisal 3-Oct-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of three cyclone shelters Rev 1 15-Apr-10 19-Jun-10 30-Jun-11 7-Jul-11 7-Aug-11 10-Nov-11 10-Dec-11 15-Dec-11 16-Dec-11 16-Jun-12 1-Jan-13 16-Mar-13 NCRMP/B- in Ranasthalam mandal, Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 18-Mar-13 29-Oct-13 13-Dec-13 8 W/AP/MPCS/PRED/01 1). Ch.Kovvada Rev 3 13-Sep-12 18-Sep-12 19-Oct-12 31-Dec-12 30-Jan-13 20-Feb-13 21-Feb-13 4-Oct-13 17-May-14 1-Jul-14 /Ranasthalam/009 2). Donipeta Rev 4 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 3). Pothyyapeta Actual

NCB PRED, GoAP 1 8.20 0.18 Appraisal 3-Oct-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Rev 1 15-Apr-10 19-Jun-10 30-Jun-11 7-Jul-11 7-Aug-11 10-Nov-11 10-Dec-11 15-Dec-11 16-Dec-11 15-Apr-12 15-Aug-12 15-Sep-12 NCRMP/B- Construction of A type cyclone Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 18-Dec-12 2-May-13 16-Jun-13 9 W/AP/MPCS/PRED/01 shelter in Moosavanipeta, Srikakulam Rev 3 13-Sep-12 18-Sep-12 19-Oct-12 18-Nov-12 18-Dec-12 8-Jan-13 9-Jan-13 8-Jul-13 4-Jan-14 18-Feb-14 /Etcherla/010 district Rev 4 25-Oct-12 17-Nov-12 18-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 Rev 5 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 Actual

11 of 35 Total Total bid Initiate Approval of Method Quant Estimated Estimate Preparation Preparatio Publicatio Beginning Name value Issue of Completion preparation of IFB and Bid Signing of of Procurement ity Cost d Cost of IFB and n of the n of IFB in of Sale of Opening Approval of the (million contract 50% work 100% work of Sno Package No. Description Stage Specification documents by Preparatio the Procur Authority (Num (Million (Million submission Bid Newspape Bid of Bids of BER contr local award complete complete contractual and Bid the World n of BER contract ement ber) local USD) to the Bank Document rs document actor currency notice obligations Document Bank currency) ) NCB PRED, GoAP 2 19.50 0.42 Appraisal 3-Oct-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of two cyclone shelters Rev 1 15-Apr-10 19-Jun-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 30-Dec-11 30-Jun-12 9-Sep-12 NCRMP/B- in Pusapatirega, Vizianagaram Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 18-Dec-12 2-May-13 16-Jun-13 10 W/AP/MPCS/PRED/02 district. 1. At Barripeta H/o Rev 3 7-Aug-12 21-Aug-12 21-Sep-12 21-Oct-12 20-Nov-12 11-Dec-12 12-Dec-12 10-Jun-13 7-Dec-13 21-Jan-14 /Pusapatirega/001 Pathiwada Rev 4 25-Oct-12 17-Nov-12 18-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 2.at Konaiapalem Rev 5 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 Actual NCB PRED, GoAP 1 9.30 0.20 Appraisal 3-Oct-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Rev 1 15-Apr-10 19-Jun-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 NCRMP/B- Construction of A type cyclone 11 W/AP/MPCS/PRED/02 shelters in Thotapalli, Vizianagaram Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 18-Dec-12 2-May-13 16-Jun-13 /Bhogapuram/002 district Rev 3 13-Sep-12 18-Sep-12 19-Oct-12 31-Dec-12 30-Jan-13 20-Feb-13 21-Feb-13 20-Aug-13 16-Feb-14 2-Apr-14 Rev 4 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 Actual NCB PRED, GoAP 2 26.10 0.57 Appraisal 3-Oct-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of two cyclone shelters Rev 1 15-Apr-10 19-Jun-10 30-Jun-11 7-Jul-11 7-Aug-11 10-Nov-11 10-Dec-11 15-Dec-11 16-Dec-11 16-Jun-12 1-Jan-13 16-Mar-13 NCRMP/B- in Nizampatnam mandal, Guntur Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 18-Mar-13 29-Oct-13 13-Dec-13 12 W/AP/MPCS/PRED/07 District. 1. Harbour of Rev 3 13-Sep-12 18-Sep-12 19-Oct-12 31-Dec-12 30-Jan-13 20-Feb-13 21-Feb-13 4-Oct-13 17-May-14 1-Jul-14 /Nizampatnam/001 Nizampatnam village 2.Nakshatranagar of Kothapalem Rev 4 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 Actual NCB PRED, GoAP 1 10.80 0.23 Appraisal 3-Oct-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Rev 1 15-Apr-10 19-Jun-10 30-Jun-11 7-Jul-11 7-Aug-11 10-Nov-11 10-Dec-11 15-Dec-11 16-Dec-11 15-Apr-12 15-Aug-12 15-Sep-12 NCRMP/B- Construction of B type cyclone Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 18-Dec-12 2-May-13 16-Jun-13 13 W/AP/MPCS/PRED/07 shelter in Mollagunta, Guntur District Rev 3 13-Sep-12 18-Sep-12 19-Oct-12 31-Dec-12 30-Jan-13 20-Feb-13 21-Feb-13 20-Aug-13 16-Feb-14 2-Apr-14 //002 Rev 4 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 Actual NCB PRED, GoAP 1 8.90 0.19 Appraisal 3-Oct-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Rev 1 15-Apr-10 19-Jun-10 30-Jun-11 7-Jul-11 7-Aug-11 10-Nov-11 10-Dec-11 15-Dec-11 16-Dec-11 15-Apr-12 15-Aug-12 15-Sep-12 NCRMP/B- Construction of B type cyclone Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 18-Dec-12 2-May-13 16-Jun-13 14 W/AP/MPCS/PRED/08 shelter in Pakala Main, Prakasam Rev 3 13-Sep-12 18-Sep-12 19-Oct-12 18-Nov-12 18-Dec-12 8-Jan-13 9-Jan-13 8-Jul-13 4-Jan-14 18-Feb-14 /S. Konda/002 District Rev 4 25-Oct-12 17-Nov-12 18-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 Rev 5 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 Actual NCB PRED, GoAP 1 9.05 0.20 Appraisal 3-Oct-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Rev 1 15-Apr-10 19-Jun-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 Construction of B type cyclone NCRMP/B- shelters in Epuru Pattapupalem, Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 18-Dec-12 2-May-13 16-Jun-13 15 W/AP/MPCS/PRED/09 1. Epuru Rev 3 22-Jun-12 5-Jul-12 4-Aug-12 3-Sep-12 3-Oct-12 24-Oct-12 25-Oct-12 23-Apr-13 20-Oct-13 4-Dec-13 /Muthukur/001 Pattapupalem Rev 4 13-Sep-12 18-Sep-12 19-Oct-12 31-Dec-12 30-Jan-13 20-Feb-13 21-Feb-13 20-Aug-13 16-Feb-14 2-Apr-14 Rev 5 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 Actual NCB PRED, GoAP 3 35.80 0.78 Appraisal 3-Oct-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of three cyclone shelters Rev 1 15-Apr-10 19-Jun-10 30-Jun-11 7-Jul-11 7-Aug-11 10-Nov-11 10-Dec-11 15-Dec-11 16-Dec-11 16-Jun-12 1-Jan-13 16-Mar-13 NCRMP/B- in Bogole mandal, Nellore District Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 1-Feb-13 31-Jul-13 14-Sep-13 16 W/AP/MPCS/PRED/09 (1) Kothakadapalem /Bogole/002 (2) Pathapalem of Chennayaplem Rev 3 13-Sep-12 18-Sep-12 19-Oct-12 31-Dec-12 30-Jan-13 20-Feb-13 21-Feb-13 4-Oct-13 17-May-14 1-Jul-14 (3) Tenkaya chetlapalem Rev 4 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 Actual NCB PRED, GoAP 8 70.80 1.53 Appraisal 1-Oct-09 30-Nov-09 5-Mar-10 6-Mar-10 6-Apr-10 6-May-10 3-Jun-10 4-Jun-10 15-Apr-11 24-Feb-12 24-May-12 Rev 1 15-Apr-10 19-Jun-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 30-Mar-11 30-Dec-12 30-Mar-13 Construction of eight cyclone shelters in Kavali mandal, Nellore District Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 2-May-13 27-Jan-14 13-Mar-14 1) Chinna Ramudupalem Rev 3 13-Sep-12 18-Sep-12 19-Oct-12 18-Nov-12 18-Dec-12 8-Jan-13 9-Jan-13 6-Oct-13 3-Jul-14 17-Aug-14 (2) Indiranagar Colony of NCRMP/B- Rev 4 25-Oct-12 17-Nov-12 18-Dec-12 29-Jan-13 28-Feb-13 21-Mar-13 22-Mar-13 17-Dec-13 13-Sep-14 28-Oct-14 Tummalapenta W/AP/MPCS/PRED/09 17 (3) Karetivaripalem Actual /Kavali/003 (4) Pallipalem of Thummalapenta (5) Peda Nattu (6) Ramudi Pallipalem (7) Sriramupuram -II (8) Pedda Ramudipalem.

NCB PRED, GoAP 2 18.90 0.41 Appraisal 3-Oct-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of two cyclone shelters Rev 1 15-Apr-10 19-Jun-10 30-Jun-11 7-Jul-11 7-Aug-11 10-Nov-11 10-Dec-11 15-Dec-11 16-Dec-11 16-Jun-12 1-Jan-13 16-Mar-13 NCRMP/B- in Vidavalur mandal, Nellore District Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 1-Feb-13 31-Jul-13 14-Sep-13 18 W/AP/MPCS/PRED/09 (1) Sri Gowripuram of / Vidavalur/004 Ramatheertham Rev 3 13-Sep-12 18-Sep-12 19-Oct-12 18-Nov-12 18-Dec-12 8-Jan-13 9-Jan-13 22-Aug-13 4-Apr-14 19-May-14 (2) Venkatareddy palem. Rev 4 25-Oct-12 17-Nov-12 18-Dec-12 29-Jan-13 28-Feb-13 21-Mar-13 22-Mar-13 2-Nov-13 15-Jun-14 30-Jul-14 Actual Andhra Pradesh- Cyclone shelters- Phase I Total 41 404.85 8.77

12 of 35 Total Total bid Initiate Approval of Method Quant Estimated Estimate Preparation Preparatio Publicatio Beginning Name value Issue of Completion preparation of IFB and Bid Signing of of Procurement ity Cost d Cost of IFB and n of the n of IFB in of Sale of Opening Approval of the (million contract 50% work 100% work of Sno Package No. Description Stage Specification documents by Preparatio the Procur Authority (Num (Million (Million submission Bid Newspape Bid of Bids of BER contr local award complete complete contractual and Bid the World n of BER contract ement ber) local USD) to the Bank Document rs document actor currency notice obligations Document Bank currency) )

Andhra Pradesh- Cyclone shelters- Phase II Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 18-Feb-13 3-Jul-13 17-Aug-13 NCRMP/B- NCB PRED, GoAP 1 8.50 0.18 Construction of cyclone shelter in Ch. 1 W/AP/MPCS/PRED/01 Karrivanipalem, Srikakulam district Revised 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 /Kaviti/011 Actual NCRMP/B- Construction of C type cyclone NCB PRED, GoAP 1 8.50 0.18 Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 18-Feb-13 3-Jul-13 17-Aug-13 2 W/AP/MPCS/PRED/01 shelter in Revised 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 /Sompeta/012 Ramayyapatnam,Srikakulam district Actual Construction of two cyclone shelters NCB PRED, GoAP 2 22.00 0.48 Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 19-May-13 30-Dec-13 13-Feb-14 NCRMP/B- in Vajrapukothuru mandal, Revised 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 3 W/AP/MPCS/PRED/01 1)Metturu / V.Kothuru/013 Actual 2)Nuvvalarevu

NCRMP/B- Construction of cyclone shelters in NCB PRED, GoAP 1 10.50 0.23 Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 4-Apr-13 1-Oct-13 15-Nov-13 4 W/AP/MPCS/PRED/01 Santhabommali mandal, Revised 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 /Santhabommali/014 1). Reddica Sunnapalli Actual Construction of two cyclone shelters NCB PRED, GoAP 2 22.00 0.48 Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 19-May-13 30-Dec-13 13-Feb-14 NCRMP/B- in Gara mandal, 5 W/AP/MPCS/PRED/01 Revised 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 1). Calingapatnam /Gara/015 Actual 2).Bandravanipeta Construction of two cyclone shelters NCB PRED, GoAP 2 16.50 0.36 Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 4-Apr-13 1-Oct-13 15-Nov-13 NCRMP/B- in Ranasthalam mandal, 6 W/AP/MPCS/PRED/01 Revised 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 1). Jaganadhapuram /Ranasthalam/016 2). Kothamukkam Actual

NCB PRED, GoAP 3 27.00 0.58 Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 19-May-13 30-Dec-13 13-Feb-14 Construction of three cyclone shelters Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 NCRMP/B- in Etcherla mandal, 7 W/AP/MPCS/PRED/01 1). Badavanipeta Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 /Etcherla/017 2).Kothadibbalapalem 3).Rallapeta Actual

Construction of two cyclone shelters NCB PRED, GoAP 2 16.50 0.36 Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 19-May-13 30-Dec-13 13-Feb-14 NCRMP/B- in Etcherla man Revised 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 8 W/AP/MPCS/PRED/01 1). Bonthalakoduru /Etcherla/017A 2). Pathadibbalapalem Actual

NCRMP/B- NCB PRED, GoAP 1 8.50 0.18 Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 18-Feb-13 3-Jul-13 17-Aug-13 Construction of cyclone shelter in 9 W/AP/MPCS/PRED/01 Revised 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 Akkuvaram,Srikakulam district /Polaki/018 Actual NCRMP/B- Construction of cyclone shelters in NCB PRED, GoAP 1 8.00 0.17 Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 1-Feb-13 16-Jun-13 31-Jul-13 10 W/AP/MPCS/PRED/02 Boddugurayyapeta, Vizianagaram Revised 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 /Pusapatirega/003 district Actual NCB PRED, GoAP 2 19.00 0.41 Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 4-Apr-13 1-Oct-13 15-Nov-13 Construction of two cyclone shelter in NCRMP/B- Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 Pravada mandal 11 W/AP/MPCS/PRED/03 1.Jalaripeta Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 /Paravada/005 2.Mutyalammpalem Actual

NCB PRED, GoAP 2 19.00 0.41 02-Apr-12 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 4-Apr-13 1-Oct-13 15-Nov-13 Construction of two cyclone shelter in Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 NCRMP/B- Atchutapuram mandal 12 W/AP/MPCS/PRED/03 1.Kadapalem - I Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 / Atchutapuram/006 2.Vadapalem Actual

Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 19-May-13 30-Dec-13 13-Feb-14 NCB PRED, GoAP Construction of four cyclone shelters 4 40.50 0.88 in Payakaraopeta mandal, NCRMP/B- Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 5-Dec-13 1-Sep-14 16-Oct-14 1). Palmanpeta 13 W/AP/MPCS/PRED/03 2).Kumarapuram Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 25-Feb-14 22-Nov-14 6-Jan-15 /Payakaraopeta/007 3).Pentokota 4)Rajayyapeta Actual

13 of 35 Total Total bid Initiate Approval of Method Quant Estimated Estimate Preparation Preparatio Publicatio Beginning Name value Issue of Completion preparation of IFB and Bid Signing of of Procurement ity Cost d Cost of IFB and n of the n of IFB in of Sale of Opening Approval of the (million contract 50% work 100% work of Sno Package No. Description Stage Specification documents by Preparatio the Procur Authority (Num (Million (Million submission Bid Newspape Bid of Bids of BER contr local award complete complete contractual and Bid the World n of BER contract ement ber) local USD) to the Bank Document rs document actor currency notice obligations Document Bank currency) )

NCB PRED, GoAP 2 16.00 0.35 Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 4-Apr-13 1-Oct-13 15-Nov-13 Construction of two cyclone shelter Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 NCRMP/B- in Bheemili mandal, 14 W/AP/MPCS/PRED/03 1).Boyaveedhi (Bheemili Municipality Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 /Bheemili/008 area) 2).Chepala Dibbadapalem Actual

Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 4-Apr-13 1-Oct-13 15-Nov-13 NCRMP/B- NCB PRED, GoAP 1 11.00 0.24 Construction of cyclone shelters in 15 W/AP/MPCS/PRED/03 Revised 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 Bangaram palem I & II H/ o Vakadu /S. Rayavaram/009 Actual NCB PRED, GoAP 1 12.00 0.26 Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 11-Apr-13 8-Oct-13 22-Nov-13 NCRMP/B- Construction of cyclone shelters in Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 16 W/AP/MPCS/PRED/04 Bhyravapalem Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 / I. Polavaram/003 Actual NCB PRED, GoAP 1 9.40 0.20 Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 25-Feb-13 10-Jul-13 24-Aug-13 NCRMP/B- Construction of cyclone shelters in Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 17 W/AP/MPCS/PRED/04 Magasanithippa Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 /Katreni Kona/005 Actual NCB PRED, GoAP 1 12.00 0.26 Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 11-Apr-13 8-Oct-13 22-Nov-13 NCRMP/B- Construction of cyclone shelter in Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 18 W/AP/MPCS/PRED/04 Balusutippa Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 /Katreni Kona/006 Actual NCB PRED, GoAP 4 43.80 0.95 Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 26-May-13 6-Jan-14 20-Feb-14 Construction of four cyclone shelters Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 5-Dec-13 1-Sep-14 16-Oct-14 in Katrenikona mandal, NCRMP/B- 1.Chirrayanam 19 W/AP/MPCS/PRED/04 Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 25-Feb-14 22-Nov-14 6-Jan-15 2.Kothapalem /Katreni Kona/007 3).Molletimogga 4).Neelarevu - I Actual

NCB PRED, GoAP 2 24.00 0.52 Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 26-May-13 6-Jan-14 20-Feb-14 Construction of two cyclone shelter in NCRMP/B- Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 KatreniKona mandal, 20 W/AP/MPCS/PRED/04 1).Pandi Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 /Katreni Kona/008 2).Pallam Kurru Actual

NCB PRED, GoAP 2 20.80 0.45 Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 11-Apr-13 8-Oct-13 22-Nov-13 Construction of two cyclone shelter in NCRMP/B- Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 mandal, 21 W/AP/MPCS/PRED/04 1)Rameshwaram Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 / Allavaram/009 2).Samanthakurru Actual

Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 26-May-13 6-Jan-14 20-Feb-14 Construction of two cyclone shelter in NCB PRED, GoAP 2 24.00 0.52 NCRMP/B- Sakhinetipally mandal, 22 W/AP/MPCS/PRED/04 Revised 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 1)Kesavadasupalem /Sakhinetipally/010 2)Pallipalem Actual Construction of two cyclone shelter in NCB PRED, GoAP 2 24.00 0.52 Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 26-May-13 6-Jan-14 20-Feb-14 NCRMP/B- Malikipur mandal, 23 W/AP/MPCS/PRED/04 1)Padamatipalem Revised 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 /Malikipuram/011 2).Kesanapalli Actual Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 25-Feb-13 10-Jul-13 24-Aug-13 NCRMP/B- NCB PRED, GoAP 1 9.40 0.20 Construction of cyclone shelters in 24 W/AP/MPCS/PRED/04 Revised 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 Karavaka /Mamidikuduru/012 Actual Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 26-May-13 6-Jan-14 20-Feb-14 NCB PRED, GoAP 2 20.80 0.45 Construction of four cyclone shelters NCRMP/B- in Narsapurmandal, Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 25 W/AP/MPCS/PRED/05 (1) Sardupalli palem of Vemulaveedhi /Narsapur/001 (2) Pedamynavani Lanka Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 Actual

14 of 35 Total Total bid Initiate Approval of Method Quant Estimated Estimate Preparation Preparatio Publicatio Beginning Name value Issue of Completion preparation of IFB and Bid Signing of of Procurement ity Cost d Cost of IFB and n of the n of IFB in of Sale of Opening Approval of the (million contract 50% work 100% work of Sno Package No. Description Stage Specification documents by Preparatio the Procur Authority (Num (Million (Million submission Bid Newspape Bid of Bids of BER contr local award complete complete contractual and Bid the World n of BER contract ement ber) local USD) to the Bank Document rs document actor currency notice obligations Document Bank currency) ) Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 11-Apr-13 8-Oct-13 22-Nov-13 Construction of two cyclone shelters NCB PRED, GoAP 2 18.20 0.39 NCRMP/B- in Mogaltur mandal, 26 W/AP/MPCS/PRED/05 Revised 18-Sep-12 16-Oct-12 30-Nov-12 29-Jan-13 28-Feb-13 21-Mar-13 22-Mar-13 2-Nov-13 15-Jun-14 30-Jul-14 (1) Yetimondi of perupalem /Mogaltur/002 2).Bellamkondavari meraka Actual Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 11-Apr-13 8-Oct-13 22-Nov-13 NCB PRED, GoAP 2 20.80 0.45 Construction of two cyclone shelters NCRMP/B- Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 in Mogaltur mandal, 27 W/AP/MPCS/PRED/05 (1) Chinamynavani lanka /Narsapur/003 Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 2). Vemuladeevi East Actual

NCRMP/B- NCB PRED, GoAP 1 8.50 0.18 Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 1-Feb-13 16-Jun-13 31-Jul-13 Construction of cyclone shelters in 28 W/AP/MPCS/PRED/06 Revised 18-Sep-12 16-Oct-12 30-Nov-12 29-Jan-13 28-Feb-13 21-Mar-13 22-Mar-13 18-Sep-13 17-Mar-14 1-May-14 Intheru /Kruthivennu/001 Actual NCB PRED, GoAP 1 10.50 0.23 Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 18-Mar-13 14-Sep-13 29-Oct-13 NCRMP/B- Construction of cyclone shelter at Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 29 W/AP/MPCS/PRED/06 Pedathadika in Kruthivennu mandal, Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 /Kruthivennu/002 Actual

Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 2-May-13 13-Dec-13 27-Jan-14 NCB PRED, GoAP 3 26.50 0.57 Construction of three cyclone shelters NCRMP/B- in Machilipatnam mandal Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 30 W/AP/MPCS/PRED/06 1).Pedapatnam - I /Machilipatnam/003 2).Tallapalem Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 3).V. Actual

Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 18-Mar-13 14-Sep-13 29-Oct-13 NCB PRED, GoAP 2 19.50 0.42 Construction of two cyclone shelters NCRMP/B- Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 in Machilipatnam mandal, 31 W/AP/MPCS/PRED/06 (1) Gilakaladindi /Machilipatnam/004 Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 2).Poletitippa Actual

NCB PRED, GoAP 2 18.50 0.40 Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 18-Mar-13 14-Sep-13 29-Oct-13 Construction of two cyclone shelters Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 NCRMP/B- in Machilipatnammandal, 32 W/AP/MPCS/PRED/06 (1) Kammavari cheruvu Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 /Machilipatnam/005 (2) Pallitummala palem Actual

NCB PRED, GoAP 1 8.50 0.18 Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 18-Feb-13 3-Jul-13 17-Aug-13 NCRMP/B- Construction of cyclone shelter in 33 W/AP/MPCS/PRED/07 Revised 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 Sanjeevanagar of Kothaptnam /Nizampatham/003 Actual

NCB PRED, GoAP 3 29.50 0.64 Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 19-May-13 30-Dec-13 13-Feb-14 Construction of three cyclone shelters in Nizampatnam mandal, Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 (1) Fisherman colony of NCRMP/B- Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 Nizampatnam village 34 W/AP/MPCS/PRED/07 (2) Near M.R.O's office of Nizam Actual /Nizampatham/004 Patnam 3) Padamativeedhi of Nizampatnam village

NCRMP/B- NCB PRED, GoAP 1 11.00 0.24 Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 4-Apr-13 1-Oct-13 15-Nov-13 Construction ofcyclone shelter in 35 W/AP/MPCS/PRED/07 Revised 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 Lankavanidibba /Repalle/005 Actual NCB PRED, GoAP 1 11.00 0.24 Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 24-Apr-13 21-Oct-13 5-Dec-13 NCRMP/B- Construction of cyclone shelter in Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 36 W/AP/MPCS/PRED/08 Odarevu Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 /Chirala/004 Actual Construction of four cyclone shelters Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 8-Jun-13 19-Jan-14 5-Mar-14 in Kothapatnam mandal, NCB PRED, GoAP 4 44.00 0.95 NCRMP/B- 1) K. Pallipalem 37 W/AP/MPCS/PRED/08 2) Motumala Revised 18-Sep-12 16-Oct-12 30-Nov-12 29-Jan-13 28-Feb-13 21-Mar-13 22-Mar-13 17-Dec-13 13-Sep-14 28-Oct-14 /Kothapatnam/005 3) Padarthy Actual 4) Rangaipalem

15 of 35 Total Total bid Initiate Approval of Method Quant Estimated Estimate Preparation Preparatio Publicatio Beginning Name value Issue of Completion preparation of IFB and Bid Signing of of Procurement ity Cost d Cost of IFB and n of the n of IFB in of Sale of Opening Approval of the (million contract 50% work 100% work of Sno Package No. Description Stage Specification documents by Preparatio the Procur Authority (Num (Million (Million submission Bid Newspape Bid of Bids of BER contr local award complete complete contractual and Bid the World n of BER contract ement ber) local USD) to the Bank Document rs document actor currency notice obligations Document Bank currency) )

Construction of two cyclone shelters NCB PRED, GoAP 2 19.50 0.42 Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 24-Apr-13 21-Oct-13 5-Dec-13 NCRMP/B- in Kothapatnam mandal Revised 18-Sep-12 16-Oct-12 30-Nov-12 29-Jan-13 28-Feb-13 21-Mar-13 22-Mar-13 2-Nov-13 15-Jun-14 30-Jul-14 38 W/AP/MPCS/PRED/08 (1) Gamallapalem /Kothapatnam/006 (2) Madanur Actual NCB PRED, GoAP 1 10.50 0.23 Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 24-Apr-13 21-Oct-13 5-Dec-13 NCRMP/B- Construction of cyclone shelters in Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 39 W/AP/MPCS/PRED/08 Peddapallipalem of Karedu Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 /Ulavapadu/007 Actual Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 8-Jun-13 19-Jan-14 5-Mar-14 Construction of two cyclone shelters NCB PRED, GoAP 2 19.00 0.41 NCRMP/B- in Ulavapadu mandal, 40 W/AP/MPCS/PRED/08 (1) Alagayapalem of Karedu Revised 7-Nov-12 20-Nov-12 20-Dec-12 29-Jan-13 28-Feb-13 21-Mar-13 22-Mar-13 2-Nov-13 15-Jun-14 30-Jul-14 /Ulavapadu/008 (2) Kothapallipalem of Karedu Actual

NCB PRED, GoAP 1 11.00 0.24 Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 24-Apr-13 21-Oct-13 5-Dec-13 NCRMP/B- Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 Construction of cyclone shelter in 41 W/AP/MPCS/PRED/08 Pothaiahgari Pattapupalem of Pakala Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 /S. Konda/010 Actual

NCB PRED, GoAP 1 10.50 0.23 Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 10-Mar-13 23-Jul-13 6-Sep-13 NCRMP/B- Construction of cyclone shelters in Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 42 W/AP/MPCS/PRED Chinnapattapupalem H/o. /09/Kavali/005 Chennayapalem Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 Actual

NCB PRED, GoAP 2 21.00 0.45 Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 24-Apr-13 21-Oct-13 5-Dec-13 Construction of two cyclone shelters NCRMP/B- Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 in Indukurpetmandal, 43 W/AP/MPCS/PRED/09 (1) Korutu Pattapupalem Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 /Indukurpet/006 (2) West Pattapupalem of Mypadu Actual

Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 8-Jun-13 19-Jan-14 5-Mar-14 Construction of two cyclone shelters NCB PRED, GoAP 2 16.00 0.35 NCRMP/B- in Vidavalur mandal, Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 44 W/AP/MPCS/PRED/09 (1).Pallipalem of Utukuru / Vidavalur/007 2).Pedapalem of Ponnapudi Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 Actual Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 8-Jun-13 19-Jan-14 5-Mar-14 Construction of two cyclone shelters NCB PRED, GoAP 2 18.50 0.40 NCRMP/B- in Vidavalur mandal, 45 W/AP/MPCS/PRED/09 Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 1).Pedapalem of Utukuru / Vidavalur/012 Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 2).Anjaneyapuram Actual NCB PRED, GoAP 1 8.50 0.18 Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 10-Mar-13 23-Jul-13 6-Sep-13 NCRMP/B- Construction of cyclone shelter in Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 46 W/AP/MPCS/PRED/09 Audhinarayanapur Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 /Alluru/008 Actual NCB PRED, GoAP 1 8.00 0.17 Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 10-Mar-13 23-Jul-13 6-Sep-13 NCRMP/B- Construction of cyclone shelter in Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 47 W/AP/MPCS/PRED/09 Pamanji Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 /Vakadu/009 Actual NCB PRED, GoAP 2 16.50 0.36 Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 24-Apr-13 21-Oct-13 5-Dec-13 Construction of two cyclone shelters NCRMP/B- Rev 1 18-Sep-12 16-Oct-12 30-Nov-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 in Kota mandal 48 W/AP/MPCS/PRED (1) Kothpatnam Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 /09/Kota/011 (2) Srinivasasatram Actual

Andhra Pradesh- Multi Purpose Cyclone Shelters- Phase II Total 85 839.20 18.18

16 of 35 Total Total bid Initiate Approval of Method Quant Estimated Estimate Preparation Preparatio Publicatio Beginning Name value Issue of Completion preparation of IFB and Bid Signing of of Procurement ity Cost d Cost of IFB and n of the n of IFB in of Sale of Opening Approval of the (million contract 50% work 100% work of Sno Package No. Description Stage Specification documents by Preparatio the Procur Authority (Num (Million (Million submission Bid Newspape Bid of Bids of BER contr local award complete complete contractual and Bid the World n of BER contract ement ber) local USD) to the Bank Document rs document actor currency notice obligations Document Bank currency) ) Andhra Pradesh- Roads to Cyclone Shelter Phase I

Appraisal 2-Nov-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 NCB PRED, GoAP 4 14.18 0.31 Construction of roads to cyclone shelters in Srikakulam Rev 1 15-Apr-10 19-Jun-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 1). Road from Chinnavanka to Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 18-Dec-12 2-May-13 16-Jun-13 Gopaladavooru NCRMP/B- 2). Road from MN peta Road to 1 W/AP/RCS/PRED/01/ Rev 3 7-Aug-12 21-Aug-12 21-Sep-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 Kondavooru and to Cyclone Shelter V.Kotturu/001 3). Road from R&B Road to S.J. Actual Puram 4). Road from Kothapeta Road to Sainooru Cyclone Shelter

Construction of roads to cyclone Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 4-Apr-13 1-Oct-13 15-Nov-13 NCB PRED, GoAP 3 6.70 0.15 shelters in Srikakulam district 1. Road from Mulapeta BT road to K. Rev 1 25-Oct-12 17-Nov-12 18-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 NCRMP/B- Lingudu 2 W/AP/RCS/PRED/01/ 2. Road from BT road to Sandipeta Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 Santhabommali/003A 3. Road from R&B road Ch.Gollagandi to Gollagandi Cyclone Actual Shelters

NCB PRED, GoAP 1 7.60 0.16 Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 4-Apr-13 1-Oct-13 15-Nov-13 NCRMP/B- Construction of roads to cyclone Rev 1 25-Oct-12 17-Nov-12 18-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 3 W/AP/RCS/PRED/01/ shelters in Srikakulam district Santhabommali/003B 1. Road NH5 to T.Sasanam Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 Actual Appraisal 2-Nov-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 NCB PRED, GoAP 1 6.02 0.13 Rev 1 15-Apr-10 19-Jun-10 4-Nov-10 10-Nov-10 21-Jan-11 15-May-11 30-May-11 30-Jun-11 30-Jun-11 15-Oct-11 30-Mar-12 30-Jun-12 Construction of roads to cyclone NCRMP/B- shelters in Srikakulam Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 18-Dec-12 2-May-13 16-Jun-13 4 W/AP/RCS/PRED/01/ 1). Road from R&B road to Polaki/004 Rev 3 13-Sep-12 18-Sep-12 19-Oct-12 31-Dec-12 30-Jan-13 20-Feb-13 21-Feb-13 6-Jul-13 18-Nov-13 2-Jan-14 Magathapadu via Killibuchannapeta Rev 4 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 13-Oct-13 25-Feb-14 11-Apr-14 Actual

NCB PRED, GoAP 5 8.25 0.18 Appraisal 2-Nov-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to cyclone shelters in Vizianagaram Rev 1 15-Apr-10 19-Jun-10 25-Jul-11 31-Jul-11 30-Aug-11 31-Dec-11 15-Feb-12 21-Feb-12 28-Feb-12 27-Jun-12 27-Oct-12 27-Nov-12 1. Road from R&B Road to Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 18-Dec-12 2-May-13 16-Jun-13 Gudepuvalasa Cyclone Shelter NCRMP/B- 2. Road from R&B Road to Rev 3 7-Aug-12 21-Aug-12 21-Sep-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 5 W/AP/RCS/PRED/02/ Kavulawada Cyclone Shelter Actual Bhogapuram/001 3. Road from R&B Road to Roluchappidi Cyclone Shelter 4.Road from R&B Road to Chinapathwada Cyclone Shelter 5. Road from R&B Road to BV Peta

NCB PRED, GoAP 1 0.90 0.02 Appraisal 2-Nov-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to cyclone Rev 1 15-Apr-10 19-Jun-10 25-Sep-11 30-Sep-11 30-Oct-11 28-Feb-12 15-Apr-12 21-Apr-12 28-Apr-12 27-Aug-12 27-Feb-13 27-Mar-13 NCRMP/B- shelters in East Godavari. 6 W/AP/RCS/PRED/04/ 1.Road from R&B road to Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 18-Dec-12 2-May-13 16-Jun-13 U. Kothapalli/002 Samanthkurru Pallepalem cylcone Rev 3 13-Sep-12 18-Sep-12 19-Oct-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 23-Jul-13 5-Dec-13 19-Jan-14 shelter Actual

Andhra Pradesh- Roads to Cyclone shelters- Phase I Total 15 43.65 0.95

Andhra Pradesh- Roads to Cyclone shelters- Phase II

NCB PRED, GoAP 1 8.20 0.18 Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 18-Feb-13 3-Jul-13 17-Aug-13 Construction of road to cyclone NCRMP/B-W/ shelter in Srikakulam district Revised 24-Sep-12 5-Nov-12 6-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 23-Jul-13 5-Dec-13 19-Jan-14 1 AP/RCS/PRED/01/ 1. Road from Borubhadra - Santhabommali/008 Actual Meghavaram Road to M. Maruvada

17 of 35 Total Total bid Initiate Approval of Method Quant Estimated Estimate Preparation Preparatio Publicatio Beginning Name value Issue of Completion preparation of IFB and Bid Signing of of Procurement ity Cost d Cost of IFB and n of the n of IFB in of Sale of Opening Approval of the (million contract 50% work 100% work of Sno Package No. Description Stage Specification documents by Preparatio the Procur Authority (Num (Million (Million submission Bid Newspape Bid of Bids of BER contr local award complete complete contractual and Bid the World n of BER contract ement ber) local USD) to the Bank Document rs document actor currency notice obligations Document Bank currency) ) Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 4-Apr-13 1-Oct-13 15-Nov-13 NCB PRED, GoAP 3 17.70 0.38 Construction of roads to cyclone shelters in Srikakulam district Rev 1 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 1. Road from R&B road to NCRMP/B- Kothapalem cyclone shelter 2 W/AP/RCS/PRED/01/ Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 2. Road from NABARD road to Kavity/009 Pukkalapalem Actual 3. Road from Kusumpuram to Kalingapatnam

Construction of roads to cyclone Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 18-Feb-13 3-Jul-13 17-Aug-13 shelters in Srikakulam district 1. Road from Yeeramukkam – Rati NCB PRED, GoAP 4 13.00 0.28 R&B road to Dunnavooru NCRMP/B- 2.Road from Yeeramukkam – Rati 3 W/AP/RCS/PRED/01/ Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 R& B road Geddavooru Mandasa/010 3.Road from R&B road Ganguwada Actual to road to Sigalaputtuga 4. Road from R&B to Akkuvaram Construction of roads to cyclone Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 18-Feb-13 3-Jul-13 17-Aug-13 shelters in Srikakulam NCB PRED, GoAP 2 15.40 0.33 NCRMP/B-W/AP/RCS/ 1. Road from R&B road to Revised 24-Sep-12 5-Nov-12 6-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 4 PRED/01/ Etcherla & Pathadibbalapalem Actual Ranasthalam /012 2. Road from R & B road to Pothayyapeta Cyclone Shelter

Construction of roads to cyclone NCB PRED, GoAP 2 7.30 0.16 Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 18-Feb-13 3-Jul-13 17-Aug-13 shelters in NCRMP/B- 1. Road from R & B road to Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 23-Jul-13 5-Dec-13 19-Jan-14 5 W/AP/RCS/PRED/03/ Chinanagamayyapalem Cyclone Actual Bheemili/005 shelter 2.Road from R & B road to Annavaram cyclone shelter Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 18-Feb-13 3-Jul-13 17-Aug-13 Construction of roads to cyclone NCB PRED, GoAP 1 5.10 0.11 NCRMP/B- shelters in Visakhapatnam district 6 W/AP/RCS/PRED/03/ Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 23-Jul-13 5-Dec-13 19-Jan-14 1. Road from R & B road to S.Rayavaraam/006 Revupolavaram Cyclone Shelter Actual

Construction of roads to cyclone Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 18-Feb-13 3-Jul-13 17-Aug-13 NCRMP/B- NCB PRED, GoAP 1 3.70 0.08 shelters in Visakhapatnam district 7 W/AP/RCS/PRED/03/ Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 8-Jun-13 6-Sep-13 21-Oct-13 1. Road from R & B road to Rambilli/007 Kothapatnam Cyclone Shelter Actual Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 11-Apr-13 8-Oct-13 22-Nov-13 Construction of roads to cyclone NCB PRED, GoAP 3 8.50 0.18 shelters in East Godavari district Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 1. Approach Road from R&B Road to NCRMP/B- Turupupalem Cyclone Shelter 8 W/AP/RCS/PRED/04/ Actual 2.Road from R & B Road to Malikipuram/009 Kesanapalli (New) Cyclone Shelter 3.Road from R & B Road to Padamatipalem Cyclone Shelter.

Construction of roads to cyclone NCB PRED, GoAP 2 5.00 0.11 Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 25-Feb-13 10-Jul-13 24-Aug-13 shelters in East Godavari district NCRMP/B- Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 8-Jun-13 6-Sep-13 21-Oct-13 1. Road from R & B Road to W/AP/RCS/PRED/04/ 9 Katrenipadu Lanka Cyclone Shelter Razole & Actual 2. Road from R & B road to Sakhinetipalli/010 Kesavadasupalem ( New) Cyclone Shelter Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 25-Feb-13 10-Jul-13 24-Aug-13 Construction of roads to cyclone NCB PRED, GoAP 1 3.30 0.07 NCRMP/B- shelters in East Godavari Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 8-Jun-13 6-Sep-13 21-Oct-13 10 W/AP/RCS/PRED/04/ 1. Road from R&B road to Karavaka Mamidikuduru/013 Cyclone Shelter Actual

Construction of roads to cyclone Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 11-Apr-13 8-Oct-13 22-Nov-13 shelters in East Godavari district NCB PRED, GoAP 1 2.90 0.06 NCRMP/B- 1. CC Road from Main proposed road Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 8-Jun-13 6-Sep-13 21-Oct-13 11 W/AP/RCS/PRED/04/ to Neellarevu – II Cyclone shelter in Katrenikona/015 Neellarevu Actual

Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 25-Feb-13 10-Jul-13 24-Aug-13 Construction of roads to cyclone NCB PRED, GoAP 1 4.10 0.09 NCRMP/B- shelters in East Godavari district 12 W/AP/RCS/PRED/04/ Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 8-Jun-13 6-Sep-13 21-Oct-13 1. Road from R&B road to Allavaram/016 Samanthakurru Cyclone shelter Actual

18 of 35 Total Total bid Initiate Approval of Method Quant Estimated Estimate Preparation Preparatio Publicatio Beginning Name value Issue of Completion preparation of IFB and Bid Signing of of Procurement ity Cost d Cost of IFB and n of the n of IFB in of Sale of Opening Approval of the (million contract 50% work 100% work of Sno Package No. Description Stage Specification documents by Preparatio the Procur Authority (Num (Million (Million submission Bid Newspape Bid of Bids of BER contr local award complete complete contractual and Bid the World n of BER contract ement ber) local USD) to the Bank Document rs document actor currency notice obligations Document Bank currency) ) Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 25-Feb-13 10-Jul-13 24-Aug-13 Construction of road to cyclone NCB PRED, GoAP 1 13.60 0.29 NNCRMP/B- shelters in West Godavari district Revised 24-Sep-12 5-Nov-12 6-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 13 W/AP/RCS/PRED/05/ 1. Road from R&B road to Ayodya Achanta/002 lanka Marrimula cyclone shelter Actual

NCB PRED, GoAP 2 4.50 0.10 Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 25-Feb-13 10-Jul-13 24-Aug-13 Construction of roads to cyclone Rev 1 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 23-Jul-13 5-Dec-13 19-Jan-14 shelters in West Godavari district NCRMP/B- 1. Road from R&B road to Modi 14 W/AP/RCS/PRED/05 Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 13-Oct-13 25-Feb-14 11-Apr-14 cyclone shelter /Kalla/003 2.Road from R&B road to S.C Bose colony Cyclone Shleter Actual

Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 25-Feb-13 10-Jul-13 24-Aug-13 NCB PRED, GoAP 1 0.70 0.02 Construction of roads to cyclone NCRMP/B- shelters in West Godavari district Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 8-Jun-13 6-Sep-13 21-Oct-13 15 W/AP/RCS/PRED/05/ 1. Construction of approach road to Bhimavaram/004 Cyclone Shelter in Losari Actual

Construction of roads to cyclone Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 11-Apr-13 8-Oct-13 22-Nov-13 shelters in West Godavari district NCB PRED, GoAP 4 20.60 0.45 1. Road from R&B road to Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 Kothakayalathippa cyclone shelter NCRMP/B- 2.Road from Narsapur Perupalem Actual 16 W/AP/RCS/PRED/05/ R&B road to Mandavarithota Mogaltur/005 3.Road from Mollaparru R & B road to Mollaparru Patha Colony 4.Road from K.P Palem (N) Panchayat office to Metturevu Pallipalem Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 25-Feb-13 10-Jul-13 24-Aug-13 Construction of roads to cyclone NCB PRED, GoAP 3 15.00 0.32 shelters in West Godavari district NCRMP/B- 1. R&B road to Chinamynavanilanka Revised 24-Sep-12 5-Nov-12 6-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 17 W/AP/RCS/PRED/05/ 2.P.R road to Ramanujapuram Narsapur/006 3.Road from P.R road to Actual Prakasapuram Construction of roads to cyclone Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 2-May-13 13-Dec-13 27-Jan-14 shelters in Krishna district NCB PRED, GoAP 4 10.80 0.23 1. Road from R&B Road to Cyclone Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 Shelter at Ullipalem NCRMP/B- 2. Road from R&B to cyclone shelter Actual 18 W/AP/RCS/PRED/06/ at Jaruguvanipalem. Koduru/001 3.Road from R&B road to Cyclone Shelter @ Utagundam 4. Road from R & B Road to Cyclone Shelter at Ramakrishnapuram

Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 2-May-13 13-Dec-13 27-Jan-14 Construction of roads to cyclone NCB PRED, GoAP 3 15.50 0.34 shelters in Krishna district 1. Road from R & B Road to Cyclone Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 NCRMP/B- Shelter at Chintakolla 19 W/AP/RCS/PRED/06/ 2.Road from R & B Road to Cyclone Actual Koduru/002 Shelter at Padalavaripalem 3. Road from R & B Road to Mandapakala Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 2-May-13 13-Dec-13 27-Jan-14 Construction of roads to cyclone NCB PRED, GoAP 2 19.30 0.42 shelters in Krishna district Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 NCRMP/B- 1. Road from R&B Road to 20 W/AP/RCS/PRED/06/ Ramakrishnapuram R & B Road via Actual Nagayalanka/003 Pathaupakali 2 .R & B Road to Cyclone Shelter at Kothaupakali

Construction of roads to cyclone NCB PRED, GoAP 3 15.70 0.34 Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 2-May-13 13-Dec-13 27-Jan-14 shelters in Krishna district Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 1. Road from Uppu Canal drain to NCRMP/B- Cyclone shelter at Nali 21 W/AP/RCS/PRED/06/ Actual 2. Road from Nali R & B Road to Nagayalanka/004 Barrankula Cyclone shelter 3. Road from R&B road to Bhavadevarapalli

19 of 35 Total Total bid Initiate Approval of Method Quant Estimated Estimate Preparation Preparatio Publicatio Beginning Name value Issue of Completion preparation of IFB and Bid Signing of of Procurement ity Cost d Cost of IFB and n of the n of IFB in of Sale of Opening Approval of the (million contract 50% work 100% work of Sno Package No. Description Stage Specification documents by Preparatio the Procur Authority (Num (Million (Million submission Bid Newspape Bid of Bids of BER contr local award complete complete contractual and Bid the World n of BER contract ement ber) local USD) to the Bank Document rs document actor currency notice obligations Document Bank currency) ) Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 2-May-13 13-Dec-13 27-Jan-14 Construction of roads to cyclone NCB PRED, GoAP shelters in Krishna district 4 10.80 0.23 1. Road from R&B road to cyclone shelter at Pedapalem Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 NCRMP/B- 2. Road from Gullalamoda R&B road 22 W/AP/RCS/PRED/06/ to Etimoga Nagayalanka/005 3. Road from R&B to cyclone shelter Actual at China Etimoga 4. Road from R & B Road to Cyclone Shelter at China Kammavaripalem

Construction of roads to cyclone Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 18-Mar-13 14-Sep-13 29-Oct-13 shelters in Krishna district NCB PRED, GoAP 4 21.40 0.46 1. Road from China Zinkapalem to Gollamanda via Peda Zinkapalem NCRMP/B- Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 2. Road from R&B road to Cyclone 23 W/AP/RCS/PRED/06/ Shelter at Gollamanda Nagayalanka/006 3. Road from ZP Road to Cyclone Actual Shelter at Natchugunta 4. Road from to Elichetladibba Cyclone Shelter Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 2-May-13 13-Dec-13 27-Jan-14 Construction of roads to cyclone NCB PRED, GoAP 2 16.10 0.35 shelters in Krishna district NCRMP/B- 1. Road from Domalagondi to Rev 1 18-Sep-12 18-Oct-12 1-Dec-12 31-Dec-12 30-Jan-13 20-Feb-13 21-Feb-13 20-Aug-13 16-Feb-14 2-Apr-14 24 W/AP/RCS/PRED/06/ Nidamarru HW Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 Kruthivennu/007 2. Road from R&B road to Intheru Cyclone Shelter Actual Construction of roads to cyclone shelters in Krishna district Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 2-May-13 13-Dec-13 27-Jan-14 1. Road from Kammavanicheruvu NCB PRED, GoAP 2 25.20 0.55 NCRMP/B- R&B road to Venkata 25 W/AP/RCS/PRED/06/ Revised 24-Sep-12 5-Nov-12 6-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 durgambapuram Machilipatnam/008 2. Road from R&B Road Pedayadara Actual to Harijanawada NCB PRED, GoAP 2 19.60 0.42 Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 18-Mar-13 14-Sep-13 29-Oct-13 Construction of roads to cyclone Rev 1 24-Sep-12 5-Nov-12 6-Dec-12 5-Jan-13 4-Feb-13 25-Feb-13 26-Feb-13 25-Aug-13 21-Feb-14 7-Apr-14 shelters in Krishna district NCRMP/B- 1. Road from R&B road to Giripuram Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 26 W/AP/RCS/PRED/06/ via Sathanapalem Machilipatnam/009 2.Road from R&B Road to Actual Gollagudem

NCB PRED, GoAP 4 14.50 0.31 Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 18-Mar-13 14-Sep-13 29-Oct-13 Construction of roads to cyclone shelters in Krishna district Rev 1 18-Sep-12 18-Oct-12 1-Dec-12 31-Dec-12 30-Jan-13 20-Feb-13 21-Feb-13 4-Oct-13 17-May-14 1-Jul-14 1. Road from R & B Road Karagraharam to Pallipalem. Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 NCRMP/B- 2. Road from R & B Road 27 W/AP/RCS/PRED/06/ Kammavaricheruvu to KPT Palem. Actual Machilipatnam/010 3. Road from R & B Road Kammavaricheruvu to Malakayalanka 4. Road from R & B Road Pallithumalapalem to Nelithippa

Construction of roads to cyclone Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 18-Feb-13 3-Jul-13 17-Aug-13 shelters in Guntur district NCB PRED, GoAP 1 5.20 0.11 NCRMP/B- 1. Road from R & B Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 23-Jul-13 5-Dec-13 19-Jan-14 28 W/AP/RCS/PRED/07/ Koosureiyuvaripalem Road to Nizampatnam/005 Marakavaripalem Actual

Construction of roads to cyclone NCB PRED, GoAP 2 9.80 0.21 Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 18-Feb-13 3-Jul-13 17-Aug-13 shelters in Guntur district Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 NCRMP/B- 1. Road from Adivipallipalem R & B 29 W/AP/RCS/PRED/07/ road to New Tsunami colony (via) Actual Bapatla/006 Krupanagar Colony, Adavi village 2. Road from R & B road to Pattapupalem

20 of 35 Total Total bid Initiate Approval of Method Quant Estimated Estimate Preparation Preparatio Publicatio Beginning Name value Issue of Completion preparation of IFB and Bid Signing of of Procurement ity Cost d Cost of IFB and n of the n of IFB in of Sale of Opening Approval of the (million contract 50% work 100% work of Sno Package No. Description Stage Specification documents by Preparatio the Procur Authority (Num (Million (Million submission Bid Newspape Bid of Bids of BER contr local award complete complete contractual and Bid the World n of BER contract ement ber) local USD) to the Bank Document rs document actor currency notice obligations Document Bank currency) ) Construction of roads to cyclone Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 24-Apr-13 21-Oct-13 5-Dec-13 shelters in Prakasam district NCB PRED, GoAP 5 20.50 0.44 1. Road from R&B road to Motupalli Cyclone Shelter Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 2. Road from Km1/2+186 of Chinaganjam Railway gate- Actual Bapaianagar ZP Road to NCRMP/B- Ramachandranagar H/o Kothapalem W/AP/RCS/PRED/08/ 30 3. Road from Motupalli R&B Road to Chinaganjam & Nirikshanagiri (via) Chirala /006 Rudramambapuram Cyclone Shelter in Motupalli G.P. 4. Road from R&B road to Mattigunta Cyclone Shelter 5. Vedullapalli Vodarevu R & B road to Cyclone Shelter at Vijayalakshmipuram Construction of roads to cyclone NCB PRED, GoAP 2 16.90 0.37 Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 24-Apr-13 21-Oct-13 5-Dec-13 shelters in Prakasam district NCRMP/B- Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 1. Road from ZP road to 31 W/AP/RCS/PRED/08/ Srirampattapupalem Actual Ulavapadu/009 2.Road from ZP road to Pallipalem of Chakicharala Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 10-Mar-13 23-Jul-13 6-Sep-13 NCB PRED, GoAP 4 22.70 0.49 Construction of roads to cyclone shelters in Prakasam district Rev 1 18-Sep-12 18-Oct-12 1-Dec-12 31-Dec-12 30-Jan-13 20-Feb-13 21-Feb-13 4-Oct-13 17-May-14 1-Jul-14 1. Road from Pakala PR Road to Chellammagaripattapupalem Cyclone Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 Shelter NCRMP/B- 2.Road from Pakala PR road to Actual W/AP/RCS/PRED/08/ 32 Pothaiahgaripalem Cyclone Shelter, S.Konda & Tangutur Kranthinagar Revu /010 3.Road from Woollapalem R&B road to Devalampallipalem cyclone shelter. 4. Road from Tangutur to Ananthavaram

NCB PRED, GoAP 1 13.40 0.29 Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 24-Apr-13 21-Oct-13 5-Dec-13 Construction of roads to cyclone NCRMP/B- Rev 1 18-Sep-12 18-Oct-12 1-Dec-12 31-Dec-12 30-Jan-13 20-Feb-13 21-Feb-13 20-Aug-13 16-Feb-14 2-Apr-14 shelters in Prakasam district 33 W/AP/RCS/PRED/08/ 1. Road from Kanuparthy to Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 N.G.Padu/011 Chinamgaripattapupalem. Actual

NCB PRED, GoAP 1 2.30 0.05 Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 10-Mar-13 23-Jul-13 6-Sep-13 NCRMP/B- Construction of roads to cyclone 34 W/AP/RCS/PRED/09/ shelters in Nellore district Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 8-Jun-13 6-Sep-13 21-Oct-13 Alluru/012 1. Approach road to Labbipalem Actual Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 10-Mar-13 23-Jul-13 6-Sep-13 Construction of roads to cyclone NCB PRED, GoAP 1 5.40 0.12 NCRMP/B- shelters in Nellore district Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 23-Jul-13 5-Dec-13 19-Jan-14 35 W/AP/RCS/PRED/09/ 1. Road from R & B road to Bogole/013 Pathakadapalem Actual

Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 8-Jun-13 19-Jan-14 5-Mar-14 NCB PRED, GoAP 1 34.90 0.76 Construction of roads to cyclone NCRMP/B- shelters in Nellore district Revised 24-Sep-12 5-Nov-12 6-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 36 W/AP/RCS/PRED/09/ 1. Road from R&B Road Lingavaram Chillakur/014 to Narravaripalem Actual

NCB PRED, GoAP 1 10.40 0.23 Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 10-Mar-13 23-Jul-13 6-Sep-13 Construction of roads to cyclone NCRMP/B- Revised 24-Sep-12 5-Nov-12 6-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 shelters in Nellore district 37 W/AP/RCS/PRED/09/ 1. Road from R&B Road (via) Chillakur/015 Actual Narravaripalem to Srinivasa Satram

Construction of roads to cyclone NCB PRED, GoAP 1 22.30 0.48 Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 24-Apr-13 21-Oct-13 5-Dec-13 NCRMP/B- shelters in Nellore district 38 W/AP/RCS/PRED/09/ 1. Road from R&B Road to Revised 24-Sep-12 5-Nov-12 6-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 Kota/016 Doruvukatta road (via) Allmpadu, Actual Deyyaladibba

21 of 35 Total Total bid Initiate Approval of Method Quant Estimated Estimate Preparation Preparatio Publicatio Beginning Name value Issue of Completion preparation of IFB and Bid Signing of of Procurement ity Cost d Cost of IFB and n of the n of IFB in of Sale of Opening Approval of the (million contract 50% work 100% work of Sno Package No. Description Stage Specification documents by Preparatio the Procur Authority (Num (Million (Million submission Bid Newspape Bid of Bids of BER contr local award complete complete contractual and Bid the World n of BER contract ement ber) local USD) to the Bank Document rs document actor currency notice obligations Document Bank currency) ) Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 8-Jun-13 19-Jan-14 5-Mar-14 Construction of roads to cyclone NCB PRED, GoAP 2 35.10 0.76 NCRMP/B- shelters in Nellore district Revised 24-Sep-12 5-Nov-12 6-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 39 W/AP/RCS/PRED/09/ 1. Road from Ramudupalem on R&B I. Pet/018 to Pallipalem Actual 2.Road from Korutur to Pattapupalem Construction of roads to cyclone Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 8-Jun-13 19-Jan-14 5-Mar-14 shelters in Nellore district NCB PRED, GoAP 4 22.30 0.48 1. Road from Kotha Kudur – Katepalli Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 road to Patha Pattapupalem NCRMP/B- 2. Road from C.S. Puram to Actual W/AP/RCS/PRED/09/ Edurupalem 40 T.P.Gudur & 3. Road from Mahalakshmipuram to Muthukur /019 Sagara Sangamam (via) Muthyalathopu Pattapupalem 4. Road from R&B road Nelaturu to Ananthavaram Cyclone Shelter

Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 24-Apr-13 21-Oct-13 5-Dec-13 Construction of roads to cyclone NCB PRED, GoAP 1 21.40 0.46 NCRMP/B- shelters in Nellore district Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 41 W/AP/RCS/PRED/09/ 1. Road from 230/6 Km of M.C Raod Kavali/020 to Pedapattapupalem. Actual Construction of roads to cyclone Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 8-Jun-13 19-Jan-14 5-Mar-14 shelters in Nellore district NCB PRED, GoAP 5 47.10 1.02 1. Road from R&B road to Utukuru Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 Pallipalem 2.Road from Ponnapudi R&B Road to Actual NCRMP/B- Ramachendrapuram 42 W/AP/RCS/PRED/09/ 3.Road from Ponnapudi R&B road to Vidavaluru/021 Busagadipalem 4.Road from Ponnapudi R&B Road to Lakshimipuram 5.Road from R&B Road to Ramalingapuram

Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 10-Mar-13 23-Jul-13 6-Sep-13 Construction of roads to cyclone NCB PRED, GoAP 1 8.50 0.18 NCRMP/B- shelters Nellore district Revised 18-Sep-12 18-Oct-12 1-Dec-12 29-Jan-13 28-Feb-13 21-Mar-13 22-Mar-13 4-Aug-13 17-Dec-13 31-Jan-14 43 W/AP/RCS/PRED/09/ 1. Road from @ Km 65/4 of CK Road Tada/024 Actual to Tada Kuppam Cyclone Shelter

Andhra Pradesh- Roads to Cyclone Shelters- Phase II Total 96 615.70 13.34

Andhra Pradesh- Roads to Habitations Phase I

Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 19-May-13 30-Dec-13 13-Feb-14 Construction of roads to habitations NCB PRED, GoAP 5 10.75 0.23 in Srikakulam district Revised 25-Oct-12 17-Nov-12 18-Dec-12 29-Jan-13 28-Feb-13 21-Mar-13 22-Mar-13 2-Nov-13 15-Jun-14 30-Jul-14 1.Road from B.M (R&B ) Road to Simmayyapeta Actual NCRMP/B- 2.Road from R&B road to Marripadu 1 W/AP/RHB/PRED/01/ Addl road Santhabommali/001A 3.Road from R&B Road to Kakarapalli 4.Road from R&B road to Marripadu 5.Road from Mulapeta BT Road to Patha Lingudu

Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 19-May-13 30-Dec-13 13-Feb-14 Construction of roads to habitations NCB PRED, GoAP 1 20.40 0.44 NCRMP/B- in Srikakulam district 2 W/AP/RHB/PRED/01/ 1. Road from DPN road to Gangaram Revised 25-Oct-12 17-Nov-12 18-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 5-Dec-13 1-Sep-14 16-Oct-14 Santhabommali/001B Village via Palatalagam, Actual Srikrishnapuram. Appraisal 2-Nov-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations in Srikakulam NCB PRED, GoAP 4 17.82 0.39 1).Road from Akasalakkavaram road to DPN road via Seetharampuram Rev 1 15-Apr-10 19-Jun-10 25-Sep-11 30-Sep-11 30-Oct-11 28-Feb-12 15-Apr-12 21-Apr-12 28-Apr-12 27-Oct-12 27-Apr-13 27-May-13 2).Road from Jaganadhapuram R&B NCRMP/B- road to R.H. Puram via Gollapeta, 3 W/AP/RHB/PRED/01/ Malapeta Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 1-Feb-13 31-Jul-13 14-Sep-13 Santhabommali/002 3). Road from DPN road to Meghavaram Noupada road to R.S. Rev 3 7-Aug-12 21-Aug-12 21-Sep-12 21-Oct-12 20-Nov-12 11-Dec-12 12-Dec-12 10-Jun-13 7-Dec-13 21-Jan-14 Palli via Rama temple 4). Repairs to road from Umilada Rev 4 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 road Jaganadhapuram road via Uppadapeta Actual

22 of 35 Total Total bid Initiate Approval of Method Quant Estimated Estimate Preparation Preparatio Publicatio Beginning Name value Issue of Completion preparation of IFB and Bid Signing of of Procurement ity Cost d Cost of IFB and n of the n of IFB in of Sale of Opening Approval of the (million contract 50% work 100% work of Sno Package No. Description Stage Specification documents by Preparatio the Procur Authority (Num (Million (Million submission Bid Newspape Bid of Bids of BER contr local award complete complete contractual and Bid the World n of BER contract ement ber) local USD) to the Bank Document rs document actor currency notice obligations Document Bank currency) ) NCB PRED, GoAP 1 47.16 1.02 Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 19-May-13 30-Dec-13 13-Feb-14 Construction of roads to habitations NCRMP/B- Rev 1 24-Sep-12 5-Nov-12 6-Dec-12 5-Jan-13 4-Feb-13 25-Feb-13 26-Feb-13 23-Nov-13 20-Aug-14 4-Oct-14 in Srikakulam district 4 W/AP/RHB/PRED/01/ 1.Road from R&B road Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 25-Feb-14 22-Nov-14 6-Jan-15 Kavity/004 Manikyapuram to Onturu. Actual

NCB PRED, GoAP 1 27.08 0.59 Appraisal 3-Oct-09 30-Nov-09 5-Mar-10 6-Mar-10 6-Apr-10 6-May-10 3-Jun-10 4-Jun-10 1-Dec-10 28-Aug-11 26-Nov-11 Construction of road to habitation in Rev 1 15-Apr-10 19-Jun-10 25-Sep-11 30-Sep-11 30-Oct-11 28-Feb-12 15-Apr-12 21-Apr-12 28-Apr-12 27-Sep-12 27-May-13 27-Jun-13 NCRMP/B- Vizianagaram district, from Gumpam Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 18-Mar-13 29-Oct-13 13-Dec-13 5 W/AP/RHB/PRED/02/ R & B Road to Puligeddapalem (via) Rev 3 13-Sep-12 18-Sep-12 19-Oct-12 18-Nov-12 18-Dec-12 8-Jan-13 9-Jan-13 22-Aug-13 4-Apr-14 19-May-14 Pusapatirega/001 Palanki. Rev 4 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 Actual NCB PRED, GoAP 1 4.10 0.09 Appraisal 2-Nov-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Rev 1 15-Apr-10 19-Jun-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 NCRMP/B- Construction of roads to habitations Rev 2 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 6 W/AP/RHB/PRED/02/ in Vizianagaram district Rev 3 22-Jun-12 5-Jul-12 4-Aug-12 3-Sep-12 3-Oct-12 24-Oct-12 25-Oct-12 9-Mar-13 22-Jul-13 5-Sep-13 Pusapatirega/002 1.R&B Road to Boddugurrayya Peta Rev 4 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 13-Oct-13 25-Feb-14 11-Apr-14 Actual NCB PRED, GoAP 1 7.10 0.15 Appraisal 2-Nov-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations Rev 1 15-Apr-10 19-Jun-10 25-Sep-11 30-Sep-11 30-Oct-11 28-Feb-12 15-Apr-12 21-Apr-12 28-Apr-12 27-Oct-12 27-Apr-13 27-May-13 NCRMP/B- in Vizianagaram Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 1-Feb-13 31-Jul-13 14-Sep-13 7 W/AP/RHB/PRED/02/ 1.Road connecting R&B Road Rev 3 13-Sep-12 18-Sep-12 19-Oct-12 18-Nov-12 18-Dec-12 8-Jan-13 9-Jan-13 24-May-13 6-Oct-13 20-Nov-13 Bhogapuram/003 through Thotapalli Village Rev 4 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 13-Oct-13 25-Feb-14 11-Apr-14 Actual Construction of roads to habitations NCB PRED, GoAP 3 16.80 0.36 Appraisal 2-Nov-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 in Visakhapatnam district Rev 1 15-Apr-10 19-Jun-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 15-Sep-11 26-Jan-12 15-Apr-12 1.Road from R & B road to NCRMP/B- Rajavaram Rev 2 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 19-May-13 30-Dec-13 13-Feb-14 8 W/AP/RHB/PRED/03/ 2.Road from Rajala R & B Road to Payakaraopeta/005 Rajaraidupalem Rev 3 22-Jun-12 5-Jul-12 4-Aug-12 31-Dec-12 30-Jan-13 20-Feb-13 21-Feb-13 4-Oct-13 17-May-14 1-Jul-14 3.Road from R & B road to Actual Gajareddipalem via Venkaypalem. NCB PRED, GoAP 2 5.25 0.11 Appraisal 2-Nov-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations Rev 1 15-Apr-10 19-Jun-10 25-Sep-11 30-Sep-11 30-Oct-11 28-Feb-12 15-Apr-12 21-Apr-12 28-Apr-12 27-Aug-12 27-Feb-13 27-Mar-13 NCRMP/B- in East Godavari Rev 2 7-Apr-12 12-Apr-12 15-May-12 14-Jun-12 14-Jul-12 4-Aug-12 5-Aug-12 18-Dec-12 2-May-13 16-Jun-13 9 W/AP/RHB/PRED/04/ 1.) Road from R&B road to Tallarevu/002 Mansurivaripeta Rev 3 13-Sep-12 18-Sep-12 19-Oct-12 18-Nov-12 18-Dec-12 8-Jan-13 9-Jan-13 8-Jul-13 4-Jan-14 18-Feb-14 2). Road from R&B road to Korangi Rev 4 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 Actual Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 19-May-13 30-Dec-13 13-Feb-14 NCB PRED, GoAP 6 33.05 0.72 Construction of roads to habitations in Guntur district Rev 1 10-Oct-12 9-Nov-12 11-Dec-12 10-Jan-13 9-Feb-13 2-Mar-13 3-Mar-13 14-Oct-13 27-May-14 11-Jul-14 1) Road from Gowdapalem to Mallevaripalem in Perli village in Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 Karlapalem Mandal Actual 2) Road from Komali to Nagarajupalli in P.V.Palem Mandal 3) Road from Muthayapalem to NCRMP/B- Venkatalaksmipuram in Bapatla 10 W/AP/RHB/PRED/ Mandal 07/Bapatla/008 4) Road from Chandole- R&B road to Kothapalem in P.V.Palem Mandal 5) Road from Bethapudi to Stuvartupuram in 6) Road from NH 214 to Dandubata (via) M.V.Rajupalem in Karlapalem Mandal

Appraisal 2-Nov-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations NCB PRED, GoAP 2 8.30 0.18 in Prakasam Rev 1 15-Apr-10 19-Jun-10 25-Jul-11 31-Jul-11 30-Aug-11 31-Dec-11 15-Feb-12 21-Feb-12 28-Feb-12 27-Aug-12 27-Mar-13 27-Apr-13 1). Road from Km 1/5 of Pedaganjam- Katamvaripalem PR Road to AVDK Rev 2 13-Sep-12 18-Sep-12 19-Oct-12 18-Nov-12 18-Dec-12 8-Jan-13 9-Jan-13 8-Jul-13 4-Jan-14 18-Feb-14 NCRMP/B- Gollapalem cyclone shelter in Rev 3 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 11 W/AP/RHB/PRED/08/ Prakasam district. Chinaganjam/005 Actual 2).Road from Chirala-Ongole R&B Road to Bethalavaripalem of Munnamvaripalem in Prakasam district.

23 of 35 Total Total bid Initiate Approval of Method Quant Estimated Estimate Preparation Preparatio Publicatio Beginning Name value Issue of Completion preparation of IFB and Bid Signing of of Procurement ity Cost d Cost of IFB and n of the n of IFB in of Sale of Opening Approval of the (million contract 50% work 100% work of Sno Package No. Description Stage Specification documents by Preparatio the Procur Authority (Num (Million (Million submission Bid Newspape Bid of Bids of BER contr local award complete complete contractual and Bid the World n of BER contract ement ber) local USD) to the Bank Document rs document actor currency notice obligations Document Bank currency) ) NCB PRED, GoAP 1 16.46 0.36 Appraisal 2-Nov-09 30-Nov-09 12-Mar-10 13-Mar-10 13-Apr-10 13-May-10 10-Jun-10 11-Jun-10 8-Dec-10 4-Sep-11 3-Dec-11 Construction of roads to habitations NCRMP/B- Rev 1 15-Apr-10 19-Jun-10 26-Jul-10 29-Jul-10 31-Aug-10 21-Mar-11 19-Apr-11 27-Apr-11 27-Apr-11 26-Oct-11 26-Apr-12 15-Jul-12 in Nellore 12 W/AP/RHB/PRED/09/ Rev 2 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 20-Oct-12 31-Dec-12 31-Aug-13 31-Dec-13 31-Mar-14 (1) Road from Wood housepet to Allur/008 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-Dec-12 31-Aug-13 31-Dec-13 31-Mar-14 C.R.Palem (via) Rayapet. Actual

Andhra Pradesh- Roads to Habitations - Phase I Total 28 214.27 4.64

Andhra Pradesh- Roads to Habitations - Phase II Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 4-Apr-13 1-Oct-13 15-Nov-13 Construction of roads to NCB PRED, GoAP 2 15.40 0.33 habitations in Srikakulam district 1. DPN road to D.L.Puram jn. via Revised 24-Sep-12 5-Nov-12 6-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 NCRMP/B- Koduru, Magathapadu, 1 W/AP/RHB/PRED/01 Actual Guppidipeta. /Polaki/007 2. Guppidipeta road to Chinnakoviripeta

Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 4-Apr-13 1-Oct-13 15-Nov-13 NCB PRED, GoAP 2 10.30 0.22 Construction of roads to habitations in Srikakulam district Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 NCRMP/B- 1. K.C Road to Rajarampuram via 2 W/AP/RHB/PRED/01 Ampalem Revuamplam /Polaki/008 Actual 2. KC road to Amplam (via) Urjam, Nandigam

Construction of roads to Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 18-Feb-13 3-Jul-13 17-Aug-13 NCRMP/B- NCB PRED, GoAP 1 5.80 0.13 habitations in Visakhapatnam 3 W/AP/RHB/PRED/03 Revised 24-Sep-12 5-Nov-12 6-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 23-Jul-13 5-Dec-13 19-Jan-14 district /Payakaraopeta/008 Actual 1.Road from Z.P Road NCB PRED, GoAP 1 2.30 0.05 Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 18-Feb-13 3-Jul-13 17-Aug-13 Construction of roads to NCRMP/B- habitations in Visakhapatnam Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 8-Jun-13 6-Sep-13 21-Oct-13 4 W/AP/RHB/PRED/03 district Actual /Atchutapuram/009 1. Road from R & B Road to Vadapalem.

Construction of roads to NCB PRED, GoAP 2 9.40 0.20 Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 11-Apr-13 8-Oct-13 22-Nov-13 habitations in East Godavari Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 NCRMP/B- district 5 W/AP/RHB/PRED/04 1. Road from R&B road to Actual /Sakhinetipalli/008 Korukondavari Group 2. Road from R&B road to Gondi Kodapa Construction of roads to NCB PRED, GoAP 2 42.10 0.91 Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 11-Apr-13 8-Oct-13 22-Nov-13 habitations in East Godavari Rev 1 24-Sep-12 5-Nov-12 6-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 NCRMP/B- district Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 W/AP/RHB/PRED/04 6 1. Road from Gogullanka to / I.Polavaram & Actual Bhyravalanka Tallarevu /009 2. Road from G. Vemavaram to Gandivaripalem Construction of roads to Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 11-Apr-13 8-Oct-13 22-Nov-13 habitations in East Godavari NCB PRED, GoAP 2 14.80 0.32 district Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 NCRMP/B- 1. BT road from 7 W/AP/RHB/PRED/04 Komaragiripatnam to Kadadari Actual /Allavaram/012 and to cyclone shelter 2. Road from Samanthakurru to Chakkavaripeta Rameswaram

NCB PRED, GoAP 2 15.50 0.34 Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 11-Apr-13 8-Oct-13 22-Nov-13 Construction of roads to Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 habitations in East Godavari NCRMP/B- district Actual 8 W/AP/RHB/PRED/04 1.Road from Guthena deevi to /Katrenikona/014 Gogullanka 2. Road from R & B road to Ramalayampeta Pallamkurru (v)

24 of 35 Total Total bid Initiate Approval of Method Quant Estimated Estimate Preparation Preparatio Publicatio Beginning Name value Issue of Completion preparation of IFB and Bid Signing of of Procurement ity Cost d Cost of IFB and n of the n of IFB in of Sale of Opening Approval of the (million contract 50% work 100% work of Sno Package No. Description Stage Specification documents by Preparatio the Procur Authority (Num (Million (Million submission Bid Newspape Bid of Bids of BER contr local award complete complete contractual and Bid the World n of BER contract ement ber) local USD) to the Bank Document rs document actor currency notice obligations Document Bank currency) ) Construction of roads to NCB PRED, GoAP 1 15.70 0.34 Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 11-Apr-13 8-Oct-13 22-Nov-13 habitations in East Godavari Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 NCRMP/B- district 9 W/AP/RHB/PRED/04 Actual 1.Road from N. Kothapalli to /Katrenikona/016 G.Pora in Katrenikone (v)

NCB PRED, GoAP 1 1.30 0.03 Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 25-Feb-13 10-Jul-13 24-Aug-13 Construction of roads to Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 8-Jun-13 6-Sep-13 21-Oct-13 NCRMP/B- habitations in East Godavari 10 W/AP/RHB/PRED/04 district Actual /Razole/020 1.Road from R&B road to Aravapalem

Construction of roads to NCB PRED, GoAP 1 9.10 0.20 Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 25-Feb-13 10-Jul-13 24-Aug-13 NCRMP/B- habitations in West Godavari Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 23-Jul-13 5-Dec-13 19-Jan-14 11 W/AP/RHB/PRED/05 District /Kalla/004 1. K.G. R&B Road to Mamidipudi Actual of Kalawapudi. Construction of roads to NCB PRED, GoAP 2 7.10 0.15 Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 25-Feb-13 10-Jul-13 24-Aug-13 habitations in West Godavari District Rev 1 18-Sep-12 18-Oct-12 1-Dec-12 31-Dec-12 30-Jan-13 20-Feb-13 21-Feb-13 6-Jul-13 18-Nov-13 2-Jan-14 NCRMP/B- 1. Road from Dongapindi R & B Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 13-Oct-13 25-Feb-14 11-Apr-14 12 W/AP/RHB/PRED/05 Road to Revu (Pallipalem) in /Bhimavaram/005 Dongapindi Actual 2. Road from R & B Road to Sarvodhyanagar H/o Losari

Construction of roads to NCB PRED, GoAP 1 7.70 0.17 Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 25-Feb-13 10-Jul-13 24-Aug-13 habitations in West Godavari Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 23-Jul-13 5-Dec-13 19-Jan-14 NCRMP/B- District 13 W/AP/RHB/PRED/05 Actual 1.Khalipatnam R&B Road to /Mogaltur/006 Khalipatnam ferry

Construction of roads to Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 11-Apr-13 8-Oct-13 22-Nov-13 habitations in West Godavari NCB PRED, GoAP 3 22.40 0.49 District 1. Road from R & B Road at Rev 1 24-Sep-12 5-Nov-12 6-Dec-12 5-Jan-13 4-Feb-13 25-Feb-13 26-Feb-13 25-Aug-13 21-Feb-14 7-Apr-14 Metturevu to Parasavari meraka via Kandulapativari meraka NCRMP/B- 2. Road from Narsapur Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 14 W/AP/RHB/PRED/05 Perupalem R & B Road to /Mogaltur/007 Janakiram Colony in Andevarimeraka of K.P. Palem Actual (S) 3. Road from Narsapur Perupalem R & B road to Dondaparthivarimeraka

Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 26-May-13 6-Jan-14 20-Feb-14 Construction of roads to habitations in West Godavari District NCB PRED, GoAP 4 22.90 0.50 1.Road from Narsapur Perupalem R & B Road to Melamvaripalem Perupalem (S) Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 2. Road from Perupalem NCRMP/B- Mollaparru R & B road via 15 W/AP/RHB/PRED/05 Sattinenivarimeraka to K.D. /Mogaltur/008 Actual Pallavapalem 3. Road from Perupalem – Dibbalapallipalem R & B road to Mellapallvapalem 4. Road from Perupalem beach R & B road to Challavarimeraka via Mucherlavarimeraka

25 of 35 Total Total bid Initiate Approval of Method Quant Estimated Estimate Preparation Preparatio Publicatio Beginning Name value Issue of Completion preparation of IFB and Bid Signing of of Procurement ity Cost d Cost of IFB and n of the n of IFB in of Sale of Opening Approval of the (million contract 50% work 100% work of Sno Package No. Description Stage Specification documents by Preparatio the Procur Authority (Num (Million (Million submission Bid Newspape Bid of Bids of BER contr local award complete complete contractual and Bid the World n of BER contract ement ber) local USD) to the Bank Document rs document actor currency notice obligations Document Bank currency) ) Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 11-Apr-13 8-Oct-13 22-Nov-13 Construction of roads to NCB PRED, GoAP 3 32.00 0.69 habitations in West Godavari Revised 24-Sep-12 5-Nov-12 6-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 District 1. Road from Perupalem R&B NCRMP/B- road to Dindla Actual 16 W/AP/RHB/PRED/05 2. Road from Narsapur /Mogaltur/009 Perupalem R & B road to Nellipallipalem via Ambedkar colony Harijanapeta 3. Road from Perupalem R & B Road to Kouruvaripalem Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 11-Apr-13 8-Oct-13 22-Nov-13 Construction of roads to NCB PRED, GoAP 3 32.40 0.70 habitations in West Godavari Revised 24-Sep-12 5-Nov-12 6-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 District 1. Road from SP R&B road to NCRMP/B- Actual Pasaladeevi 17 W/AP/RHB/PRED/05 2. LT R&B road to Modi /Narsapur/010 3. SP R&B road to Gannabathulavaripalem of Chamakuripalem

Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 11-Apr-13 8-Oct-13 22-Nov-13 Construction of roads to NCB PRED, GoAP 5 20.70 0.45 habitations in West Godavari Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 District 1. Road from R&B road to SC Actual Colony of Pedalanka NCRMP/B- 2. R&B road to Rajeev Nagar of 18 W/AP/RHB/PRED/05 Darbharevu /Narsapur/012 3. SP R&B road to Pedathota of Turputallu 4. R&B road to Peta of Turputallu 5. R&B road to Pedathota of Turputallu Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 11-Apr-13 8-Oct-13 22-Nov-13 NCB PRED, GoAP 4 18.00 0.39 Construction of roads to habitations in West Godavari Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 District NCRMP/B- 1. R&B road to Guttulavarimeraka 19 W/AP/RHB/PRED/05 2. Road from R & B Road to Actual /Narsapur/013 Pulaparthivaripalem 3. R&B road to Pedaedigapalem 4. R&B road to Evanivarimeraka Construction of roads to Appraisal 25-Apr-12 19-May-12 2-Jul-12 3-Jul-12 6-Aug-12 21-Aug-12 20-Sep-12 12-Oct-12 13-Oct-12 11-Apr-13 8-Oct-13 22-Nov-13 habitations in West Godavari NCB PRED, GoAP 3 17.50 0.38 District Revised 24-Sep-12 5-Nov-12 6-Dec-12 29-Jan-13 28-Feb-13 21-Mar-13 22-Mar-13 18-Sep-13 17-Mar-14 1-May-14 1. Road from PR Road to NCRMP/B- Prakashpuram SC colony of Actual 20 W/AP/RHB/PRED/05 Vemuladeevi (E) /Narsapur/014 2. Road from PR road to Vemuladeevi (E) colony (Via) Ralla cheruvu of Vemuladeevi (E) 3. Road from PR road to Addalavarimeraka of Construction of roads to NCB PRED, GoAP 1 15.40 0.33 Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 18-Mar-13 14-Sep-13 29-Oct-13 NCRMP/B- habitations in Krishna District Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 21 W/AP/RHB/PRED/06 1. Road from R&B Road to /Koduru/004 Narsimhapuram Actual Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 18-Mar-13 14-Sep-13 29-Oct-13 Construction of roads to NCB PRED, GoAP 2 19.50 0.42 habitations in Krishna District NCRMP/B- Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 1. Road from R&B Road to 22 W/AP/RHB/PRED/06 Krishnapuram Actual /Koduru/005 2. Road from R&B road to Pedagudumotu

26 of 35 Total Total bid Initiate Approval of Method Quant Estimated Estimate Preparation Preparatio Publicatio Beginning Name value Issue of Completion preparation of IFB and Bid Signing of of Procurement ity Cost d Cost of IFB and n of the n of IFB in of Sale of Opening Approval of the (million contract 50% work 100% work of Sno Package No. Description Stage Specification documents by Preparatio the Procur Authority (Num (Million (Million submission Bid Newspape Bid of Bids of BER contr local award complete complete contractual and Bid the World n of BER contract ement ber) local USD) to the Bank Document rs document actor currency notice obligations Document Bank currency) ) Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 18-Mar-13 14-Sep-13 29-Oct-13 Construction of roads to NCB PRED, GoAP 3 27.70 0.60 habitations in Krishna District Rev 1 18-Sep-12 18-Oct-12 1-Dec-12 31-Dec-12 30-Jan-13 20-Feb-13 21-Feb-13 4-Oct-13 17-May-14 1-Jul-14 1. Road from R&B Road to NCRMP/B- Venugopalapuram via 23 W/AP/RHB/PRED/06 Salempalem Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 /Koduru/006 2. Road from Salempalem R&B Road to Gaba 3. Road from Pittalanka to Actual Bavisettivaripalem

NCB PRED, GoAP 1 23.10 0.50 Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 18-Mar-13 14-Sep-13 29-Oct-13 Construction of roads to NCRMP/B- Rev 1 18-Sep-12 18-Oct-12 1-Dec-12 31-Dec-12 30-Jan-13 20-Feb-13 21-Feb-13 20-Aug-13 16-Feb-14 2-Apr-14 habitations in Krishna District 24 W/AP/RHB/PRED/06 1. Road from R & B road to Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 /Koduru/007 Basavaniapalem Actual

Construction of roads to Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 18-Mar-13 14-Sep-13 29-Oct-13 habitations in Krishna District NCB PRED, GoAP 4 27.40 0.59 1. Road from R&B Road to Parra Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 chivara NCRMP/B- 2. Road from R&B road to Actual 25 W/AP/RHB/PRED/06 Pedagowdapalem /Nagayalanka/008 3. Road from R & B Road to Mulapalem 4. Road from Ganapeswaram R&B Road to Pullaiahgaridibba

Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 2-May-13 13-Dec-13 27-Jan-14 Construction of roads to NCB PRED, GoAP 4 28.90 0.63 habitations in Krishna District Rev 1 18-Sep-12 18-Oct-12 1-Dec-12 31-Dec-12 30-Jan-13 20-Feb-13 21-Feb-13 4-Oct-13 17-May-14 1-Jul-14 1. Road from R & B road to Kammanamolu Village. Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 NCRMP/B- 2. Road from R&B road 26 W/AP/RHB/PRED/06 Dhanunjaya Colony to Actual /Nagayalanka/009 Krishnapuram 3. Road from R&B Road to Nandyalavaridibba 4. Road from R & B Road to Pedakammavaripalem

Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 18-Mar-13 14-Sep-13 29-Oct-13 Construction of roads to NCB PRED, GoAP 4 33.20 0.72 habitations in Krishna District Revised 24-Sep-12 5-Nov-12 6-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 1. Road from R & B Road to Indiramma Tank in Gullalamoda Actual NCRMP/B- 2. Construction of road from ST 27 W/AP/RHB/PRED/06 colony to Uppu drain in Dindi /Nagayalanka/010 3. Road from Z.P.road to Sorlagondi 4. Road from R & B road to MPUP School in Sangameswaram

Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 18-Mar-13 14-Sep-13 29-Oct-13 Construction of roads to NCB PRED, GoAP 4 30.00 0.65 habitations in Krishna District Revised 24-Sep-12 5-Nov-12 6-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 1. Road from Matlam Z.P road to Govindarajuladibba NCRMP/B- 2. Road from R&B road to 28 W/AP/RHB/PRED/06 Actual Amudalapalli (Pennamdibba) /Kruthivennu/011 3. Road from Seethannapalli R&B Road to Gollagudem 4. Road from R&B Road to Bolugondi

27 of 35 Total Total bid Initiate Approval of Method Quant Estimated Estimate Preparation Preparatio Publicatio Beginning Name value Issue of Completion preparation of IFB and Bid Signing of of Procurement ity Cost d Cost of IFB and n of the n of IFB in of Sale of Opening Approval of the (million contract 50% work 100% work of Sno Package No. Description Stage Specification documents by Preparatio the Procur Authority (Num (Million (Million submission Bid Newspape Bid of Bids of BER contr local award complete complete contractual and Bid the World n of BER contract ement ber) local USD) to the Bank Document rs document actor currency notice obligations Document Bank currency) ) Construction of roads to NCB PRED, GoAP 2 33.50 0.73 Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 2-May-13 13-Dec-13 27-Jan-14 habitations in Krishna District NCRMP/B- 1. Road from R&B Road to Revised 24-Sep-12 5-Nov-12 6-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 29 W/AP/RHB/PRED/06 Ramapuram /Kruthivennu/013 2. Road from Chinapandraka R&B Actual Road to Uppuluru

Construction of roads to Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 2-May-13 13-Dec-13 27-Jan-14 NCB PRED, GoAP 2 40.70 0.88 habitations in Krishna District NCRMP/B- 1. Road from B.L road to Matlam Revised 24-Sep-12 5-Nov-12 6-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 30 W/AP/RHB/PRED/06 2. Road from Interu R&B road to /Kruthivennu/014 Actual Parvathipuram

Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 18-Mar-13 14-Sep-13 29-Oct-13 Construction of roads to NCB PRED, GoAP 2 30.00 0.65 habitations in Krishna District Rev 1 24-Sep-12 5-Nov-12 6-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 NCRMP/B- 1. Road from R&B road 31 W/AP/RHB/PRED/06 Tallapalem to Pallipalem Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 /Machilipatnam/016 2. Road from R & B Road at Actual Satravapalem to Jonnalavarimodi

Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 18-Mar-13 14-Sep-13 29-Oct-13 Construction of roads to NCB PRED, GoAP 3 15.70 0.34 habitations in Krishna District Rev 1 18-Sep-12 18-Oct-12 1-Dec-12 31-Dec-12 30-Jan-13 20-Feb-13 21-Feb-13 20-Aug-13 16-Feb-14 2-Apr-14 1. Road from R & B Road to Kamsalipalem Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 NCRMP/B- 2. Road from Gokavaram R & B 32 W/AP/RHB/PRED/06 Actual Road to Sathenapalem /Machilipatnam/017 3. Road from R&B Road Jonnalavanipalem to Vuchalvanipalem via Thallapalem

Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 18-Mar-13 14-Sep-13 29-Oct-13 Construction of roads to NCB PRED, GoAP 3 17.80 0.39 habitations in Krishna District Rev 1 18-Sep-12 18-Oct-12 1-Dec-12 31-Dec-12 30-Jan-13 20-Feb-13 21-Feb-13 4-Oct-13 17-May-14 1-Jul-14 1.Road from Pedapatnam R&B NCRMP/B- road to Sajjalavaripalem Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 33 W/AP/RHB/PRED/06 2. Road from Thallapalem R & B /Machilipatnam/018 Road to Beach Area Actual 3. Road from Pedapatnam R & B Road to Thallapalem

Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 18-Mar-13 14-Sep-13 29-Oct-13 Construction of roads to NCB PRED, GoAP 3 20.40 0.44 habitations in Krishna District 1. Road from R&B road Rev 1 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 Potlapalem to Chinapothepalli NCRMP/B- Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 2. Road from R&B Road to 34 W/AP/RHB/PRED/06 Marridibba /Machilipatnam/019 Actual 3. Road from Pedapatnam R & B Road to Vannaru village via Kanuru

Construction of roads to Appraisal 02-Apr-12 26-Apr-12 8-Jun-12 9-Jun-12 13-Jul-12 28-Jul-12 27-Aug-12 18-Sep-12 19-Sep-12 2-May-13 13-Dec-13 27-Jan-14 habitations in Krishna District NCB PRED, GoAP 4 15.00 0.32 1. Road from Gokavaram R & B Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 road to Vodarevupalem NCRMP/B- 2. Road from Gokavaram R & B Actual 35 W/AP/RHB/PRED/06 road to Baduguvaripalem /Machilipatnam/020 3. Road from R&B Road Thallapalem to Rayapalli 4. Road from Manginapudi R & B Road to Pathareddypalem

28 of 35 Total Total bid Initiate Approval of Method Quant Estimated Estimate Preparation Preparatio Publicatio Beginning Name value Issue of Completion preparation of IFB and Bid Signing of of Procurement ity Cost d Cost of IFB and n of the n of IFB in of Sale of Opening Approval of the (million contract 50% work 100% work of Sno Package No. Description Stage Specification documents by Preparatio the Procur Authority (Num (Million (Million submission Bid Newspape Bid of Bids of BER contr local award complete complete contractual and Bid the World n of BER contract ement ber) local USD) to the Bank Document rs document actor currency notice obligations Document Bank currency) ) Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 4-Apr-13 1-Oct-13 15-Nov-13 Construction of roads to NCB PRED, GoAP 3 30.20 0.65 habitations in Guntur District Rev 1 24-Sep-12 5-Nov-12 6-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 1. Road from Balavaripalem upto NCRMP/B- Gujulavaripalem Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 36 W/AP/RHB/PRED/07 2. Road from R & B Road to /Bapatla/004 Naksatranagar 3. Road from R & B Road to Actual Adavala H/O Dindi.

Appraisal 19-Apr-12 13-May-12 25-Jun-12 26-Jun-12 30-Jul-12 14-Aug-12 13-Sep-12 5-Oct-12 6-Oct-12 18-Feb-13 3-Jul-13 17-Aug-13 Construction of roads to NCB PRED, GoAP 1 12.40 0.27 NCRMP/B- habitations in Guntur District Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 37 W/AP/RHB/PRED/07 1.Road from R&B road to /Nagaram/007 Gatturvaripalem Actual Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 10-Mar-13 23-Jul-13 6-Sep-13 Construction of roads to NCB PRED, GoAP 3 21.70 0.47 habitations in Prakasam district Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 1. Road from Kanuparthy to NCRMP/B- Kukkalavaripalem 38 W/AP/RHB/PRED/08 Actual 2. Road from Kanuparthy to /N.G.Padu/011 Yanadi Sangam 3. Road from Kanuparthy to MS Pattapupalem Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 10-Mar-13 23-Jul-13 6-Sep-13 Construction of roads to NCB PRED, GoAP 3 27.50 0.60 habitations in Prakasam district NCRMP/B- 1. R&B Road to Pulavaripalem Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 39 W/AP/RHB/PRED/08 2. Road from Chinnaganjam Rly /Chinaganjam/012 gate to Bapaiahnagar Actual 3. Road from R & B road to Kothaplem Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 10-Mar-13 23-Jul-13 6-Sep-13 Construction of roads to NCB PRED, GoAP 3 16.70 0.36 habitations in Prakasam district Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 1. Road from Motupalli R&B road NCRMP/B- to Krishna Nagar Actual 40 W/AP/RHB/PRED/08 2. Road from R & B Road to /Chinaganjam/013 Yanadi Sangam 3. Road from Jeedichetlapalem R&B road to Kunkuduchetlapalem

Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 24-Apr-13 21-Oct-13 5-Dec-13 Construction of roads to NCB PRED, GoAP 4 17.80 0.39 habitations in Prakasam district 1. Road from R&B road to Rev 1 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 Nayuripally NCRMP/B- 2. Road from R & B Road to Sai Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 W/AP/RHB/PRED/08 41 Nagar /Vetapalem & 3. Road from Utukuru Actual Chirala/015 Subbaiahpalem to Tenkayachetlapalem 4. Road from R & B road to Kothapalem Construction of road to Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 10-Mar-13 23-Jul-13 6-Sep-13 NCRMP/B- NCB PRED, GoAP 1 37.10 0.80 habitations in Prakasam district 42 W/AP/RHB/PRED/08 Revised 24-Sep-12 5-Nov-12 6-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 1.Road from M.C. road to West /Ulavapadu/016 ST colony of Veerapalli Actual Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 8-Jun-13 19-Jan-14 5-Mar-14 Construction of road to NCB PRED, GoAP 1 5.00 0.11 NCRMP/B- habitations in Prakasam district Rev 1 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 8-Jun-13 6-Sep-13 21-Oct-13 43 W/AP/RHB/PRED/08 1. Road from PR Road to /S.Konda/018 Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 29-Aug-13 27-Nov-13 11-Jan-14 Devalampalli Actual Construction of roads to Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 24-Apr-13 21-Oct-13 5-Dec-13 habitations in Prakasam district NCB PRED, GoAP 5 27.90 0.60 1. Road from KEM R&B Road to Vajiireddypalem - Pattapupalem Revised 24-Sep-12 5-Nov-12 6-Dec-12 29-Jan-13 28-Feb-13 21-Mar-13 22-Mar-13 2-Nov-13 15-Jun-14 30-Jul-14 NCRMP/B- 2. KEM R & B road to 44 W/AP/RHB/PRED/08 Pinnivaripalem Actual /Kothapatnam/019 3. Salt road from Madnur ZP road to Chinnapattapupalem 4. KEM R & B road to E. Pallipalem 5. Road from KEM R & B road to

29 of 35 Total Total bid Initiate Approval of Method Quant Estimated Estimate Preparation Preparatio Publicatio Beginning Name value Issue of Completion preparation of IFB and Bid Signing of of Procurement ity Cost d Cost of IFB and n of the n of IFB in of Sale of Opening Approval of the (million contract 50% work 100% work of Sno Package No. Description Stage Specification documents by Preparatio the Procur Authority (Num (Million (Million submission Bid Newspape Bid of Bids of BER contr local award complete complete contractual and Bid the World n of BER contract ement ber) local USD) to the Bank Document rs document actor currency notice obligations Document Bank currency) ) Construction of roads to Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 8-Jun-13 19-Jan-14 5-Mar-14 NCB PRED, GoAP 6 23.50 0.51 habitations in Prakasam district 1. Road from KEM R & B road to Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 5-Dec-13 1-Sep-14 16-Oct-14 Chinapattapupalem 2. Salt road from Madnur ZP road to Pedapattapupalem Actual NCRMP/B- 3. Road from Madnur ZP road to 45 W/AP/RHB/PRED/08 Swarnandhrapattapupalem /Kothapatnam/020 4. Road from Madnur ZP road to Bapuji yanadi colony 5. Salt road from Madnur ZP road to Namburi yanadi colony 6. Salt road Madnur ZP road to Thotagunta yanadi colony NCB PRED, GoAP 1 14.50 0.31 Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 24-Apr-13 21-Oct-13 5-Dec-13 Construction of road to Rev 1 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 NCRMP/B-W/ habitations in Prakasam district Rev 2 4-Mar-13 9-Mar-13 9-Apr-13 24-Apr-13 9-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 46 AP/RHB/PRED/08/ 1.Road from Tangutur to Tangutur/021 Thallapalem (via) Velagapudi (Km Actual 4/5 to 7/465)

Construction of road to NCB PRED, GoAP 1 14.50 0.31 Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 24-Apr-13 21-Oct-13 5-Dec-13 NCRMP/B-W/ habitations in Prakasam district Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 47 AP/RHB/PRED/08/ 1. Road from Tangutur- Tangutur/022 Ravivaripalem road @1/2 km to Actual Pasukuduru. Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 24-Apr-13 21-Oct-13 5-Dec-13 Construction of road to NCB PRED, GoAP 1 11.70 0.25 NCRMP/B-W/ habitations in Nellore district Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 48 AP/RHB/PRED/09/ 1. Road from R.I Road to C.R. Allur/018 Actual Palem (via) Sambhunipalem Construction of roads to Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 24-Apr-13 21-Oct-13 5-Dec-13 NCB PRED, GoAP 3 24.00 0.52 habitations in Nellore district 1. Salt Road from Iskapalli to Salt Revised 24-Sep-12 5-Nov-12 6-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 NCRMP/B-W/ fields at Kotha Kurrupattapupalem 49 AP/RHB/PRED/09/ 2. Road from R&B road to Allur/019 Actual Zuvvagu Lakshmipuram 3. Road from R&B Road to Zuvvagu Construction of road to Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 10-Mar-13 23-Jul-13 6-Sep-13 NCB PRED, GoAP 1 10.20 0.22 NCRMP/B-W/ habitations in Nellore district 50 AP/RHB/PRED/09/ 1. Road from Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 V.Chalam/021 Thirumalammapalem R&B Road Actual to Gajulapalli Koneru Construction of roads to NCB PRED, GoAP 1 33.10 0.72 Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 8-Jun-13 19-Jan-14 5-Mar-14 NCRMP/B-W/ habitations in Nellore district Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 51 AP/RHB/PRED/09/ 1. Road from R&B road Kota/022 Kothapatnam to Yamadinnepalem Actual (via) Srinivasasatram Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 10-Mar-13 23-Jul-13 6-Sep-13 Construction of road to NCB PRED, GoAP 1 7.50 0.16 NCRMP/B-W/ habitations in Nellore district Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 23-Jul-13 5-Dec-13 19-Jan-14 52 AP/RHB/PRED/09/ 1.Road from at km 22/5 of Kota/023 Yamadinne palem road to Actual Gunnampadia

Construction of roads to Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 24-Apr-13 21-Oct-13 5-Dec-13 NCB PRED, GoAP 2 16.50 0.36 habitations in Nellore district NCRMP/B-W/ 1. Road from Annagaripalem R&B Revised 18-Sep-12 18-Oct-12 1-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 53 AP/RHB/PRED/09/ road to Pedanattu Pattapupalem Kavali/024 2. Road from Pedapattapupalem Actual to Nandempuram

30 of 35 Total Total bid Initiate Approval of Method Quant Estimated Estimate Preparation Preparatio Publicatio Beginning Name value Issue of Completion preparation of IFB and Bid Signing of of Procurement ity Cost d Cost of IFB and n of the n of IFB in of Sale of Opening Approval of the (million contract 50% work 100% work of Sno Package No. Description Stage Specification documents by Preparatio the Procur Authority (Num (Million (Million submission Bid Newspape Bid of Bids of BER contr local award complete complete contractual and Bid the World n of BER contract ement ber) local USD) to the Bank Document rs document actor currency notice obligations Document Bank currency) ) Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 24-Apr-13 21-Oct-13 5-Dec-13 Construction of roads to NCB PRED, GoAP 3 23.70 0.51 habitations in Nellore district Revised 24-Sep-12 5-Nov-12 6-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 1.Ponnapudi-Utukur road to NCRMP/B- Pattapupalem 54 W/AP/RHB/PRED/09 Actual 2. Road from R&B road to /Vidavaluru/025 Venkatareddypalem 3. Ponnapudi R&B road to Anjanayapuram Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 24-Apr-13 21-Oct-13 5-Dec-13 Construction of roads to NCB PRED, GoAP 5 28.70 0.62 habitations in Nellore District 1. Ponnapudi – Utukur road to Revised 24-Sep-12 5-Nov-12 6-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 21-Oct-13 3-Jun-14 18-Jul-14 Srigowripuram 2. Road from Ponnapudi – Utukur NCRMP/B-W/ R&B road to Kothuru Actual 55 AP/RHB/PRED/09/ 3. Road from Ponnapudi – Utukur Vidavaluru/026 R&B road to Prasanthi giri colony 4. Ponnapudi R & B road to Venkatanarayanapuram 5. Road from Ponnapudi R & B road to Ponnapudi Appraisal 05-May-12 29-May-12 12-Jul-12 13-Jul-12 16-Aug-12 31-Aug-12 30-Sep-12 25-Oct-12 26-Oct-12 24-Apr-13 21-Oct-13 5-Dec-13 Construction of roads to NCB PRED, GoAP 2 18.00 0.39 habitations in Nellore district NCRMP/B-W/ Revised 24-Sep-12 5-Nov-12 6-Dec-12 17-Jan-13 16-Feb-13 9-Mar-13 10-Mar-13 6-Sep-13 5-Mar-14 19-Apr-14 1.Road from Mypadu R&B Road 56 AP/RHB/PRED/09/ to Kollimittapalem I.Peta/027 Actual 2.Road from Nellore – Mypadu R&B Road to West Pattapupalem Andhra Pradesh- Roads to Habitations- Phase II Total 138 1122.90 24.32

Andhra Pradesh- Roads and Buildings department

Andhra Pradesh- Roads and Bridges- Phase II

Appraisal 10-Aug-10 11-May-12 2-Jun-12 4-Jun-12 4-Jul-12 19-Jul-12 9-Aug-12 6-Sep-12 6-Sep-12 6-Sep-13 5-Mar-14 3-Jun-14 Construction of High Level Bridge NCRMP/B- (HLB) across river Tandava at km R&B Dept., Rev 1 10-May-12 1-Jun-12 25-Jun-12 26-Jun-12 30-Jul-12 29-Aug-12 28-Sep-12 20-Oct-12 21-Oct-12 18-Jul-13 14-Apr-14 29-May-14 1 W/AP/Br/R&B/03/ 13/7 near Pentakota village of NCB 1 140.00 3.03 GoAP Tandava/013 Payakaraopeta-Pentakota road in Rev 2 2-Apr-13 3-Apr-13 7-May-13 22-May-13 6-Jun-13 28-Jun-13 29-Jun-13 26-Mar-14 21-Dec-14 4-Feb-15 Visakhapatnam District Actual Appraisal 10-Aug-10 11-May-12 2-Jun-12 4-Jun-12 4-Jul-12 19-Jul-12 9-Aug-12 6-Sep-12 6-Sep-12 6-Sep-13 5-Mar-14 3-Jun-14 Construction of Bridge at Km 9/4 of NCRMP/B- Rev 1 10-May-12 1-Jun-12 25-Jun-12 26-Jun-12 30-Jul-12 29-Aug-12 28-Sep-12 20-Oct-12 21-Oct-12 18-Jul-13 14-Apr-14 29-May-14 Vakalapudi - Edatam road across R&B Dept., 2 W/AP/Br/R&B/04/ NCB 1 26.00 0.56 Upputeru vagu in East Godavari GoAP Rev 2 26-Nov-12 1-Dec-12 2-Jan-13 1-Feb-13 3-Mar-13 25-Mar-13 26-Mar-13 21-Dec-13 17-Sep-14 1-Nov-14 Upputeru-vagu/014 District. Actual

Appraisal 10-Aug-10 2-Jun-12 9-Jun-12 11-Jun-12 11-Jul-12 16-Aug-12 16-Aug-12 13-Sep-12 13-Sep-12 11-Apr-13 8-Sep-13 7-Dec-13 Construction of Bridge at Addaripeta NCRMP/B- Rev 1 10-May-12 1-Jun-12 25-Jun-12 26-Jun-12 30-Jul-12 29-Aug-12 28-Sep-12 20-Oct-12 21-Oct-12 18-Jul-13 14-Apr-14 29-May-14 Km 43/10 of Vakalapudi - Edatam R&B Dept., 3 W/AP/Br/R&B/04/ NCB 1 55.00 1.19 road across Pampa Yeru in East GoAP Rev 2 16-Oct-12 25-Oct-12 27-Nov-12 21-Jan-13 20-Feb-13 14-Mar-13 15-Mar-13 10-Dec-13 6-Sep-14 21-Oct-14 Pampa Yeru-1/015 Godavari District. Actual Appraisal 10-Aug-10 2-Jun-12 9-Jun-12 11-Jun-12 11-Jul-12 16-Aug-12 16-Aug-12 13-Sep-12 13-Sep-12 11-Apr-13 8-Sep-13 7-Dec-13 Construction of Bridge at Addaripeta NCRMP/B- Rev 1 10-May-12 1-Jun-12 25-Jun-12 26-Jun-12 30-Jul-12 29-Aug-12 28-Sep-12 20-Oct-12 21-Oct-12 18-Jul-13 14-Apr-14 29-May-14 Km 43/6 of Vakalapudi - Edatam road R&B Dept., 4 W/AP/Br/R&B/04/ NCB 1 36.50 0.79 across Pampa Yeru in East Godavari GoAP Rev 2 16-Oct-12 25-Oct-12 27-Nov-12 21-Jan-13 20-Feb-13 14-Mar-13 15-Mar-13 10-Dec-13 6-Sep-14 21-Oct-14 Pampa Yeru-2/016 District. Actual

Appraisal 10-Aug-10 9-Jun-12 16-Jun-12 18-Jun-12 18-Jul-12 23-Aug-12 23-Aug-12 20-Sep-12 20-Sep-12 18-Apr-13 15-Sep-13 14-Dec-13 Construction of High level Bridge (HLB) across Mogadindi Drain at Km NCRMP/B- 3/2 of road from Km 0/0 of Kalvapudi Rev 1 10-May-12 1-Jun-12 25-Jun-12 26-Jun-12 30-Jul-12 29-Aug-12 28-Sep-12 20-Oct-12 21-Oct-12 18-Jul-13 14-Apr-14 29-May-14 R&B Dept., 5 W/AP/Br/R&B/05/ – Ganapavaram Road to Upputeru NCB 1 82.10 1.78 GoAP Mogadindi/017 (via) Modi including Improvements to Rev 2 4-Mar-13 6-Mar-13 8-Apr-13 23-Apr-13 8-May-13 30-May-13 31-May-13 25-Feb-14 22-Nov-14 6-Jan-15 the road from Km 0.000 to 3.000 in West Godavari District. Actual

31 of 35 Total Total bid Initiate Approval of Method Quant Estimated Estimate Preparation Preparatio Publicatio Beginning Name value Issue of Completion preparation of IFB and Bid Signing of of Procurement ity Cost d Cost of IFB and n of the n of IFB in of Sale of Opening Approval of the (million contract 50% work 100% work of Sno Package No. Description Stage Specification documents by Preparatio the Procur Authority (Num (Million (Million submission Bid Newspape Bid of Bids of BER contr local award complete complete contractual and Bid the World n of BER contract ement ber) local USD) to the Bank Document rs document actor currency notice obligations Document Bank currency) ) Appraisal 10-Aug-10 9-Jun-12 16-Jun-12 18-Jun-12 18-Jul-12 23-Aug-12 23-Aug-12 20-Sep-12 20-Sep-12 18-Apr-13 15-Sep-13 14-Dec-13 Construction of Bridge across salt NCRMP/B- Rev 1 10-May-12 1-Jun-12 25-Jun-12 26-Jun-12 30-Jul-12 29-Aug-12 28-Sep-12 20-Oct-12 21-Oct-12 18-Jul-13 14-Apr-14 29-May-14 creek in Km. 11/4-6 of Tallapalem R&B Dept., 6 W/AP/Br/R&B/06/ NCB 1 65.00 1.41 –Narayanapuram Road in Krishna GoAP Rev 2 4-Mar-13 6-Mar-13 8-Apr-13 23-Apr-13 8-May-13 30-May-13 31-May-13 25-Feb-14 22-Nov-14 6-Jan-15 Tallapalem/018 District Actual Appraisal 10-Aug-10 11-May-12 2-Jun-12 4-Jun-12 4-Jul-12 19-Jul-12 9-Aug-12 6-Sep-12 6-Sep-12 6-Sep-13 6-Sep-14 5-Dec-14 Construction of High Level Bridge Rev 1 10-May-12 1-Jun-12 25-Jun-12 26-Jun-12 30-Jul-12 29-Aug-12 28-Sep-12 20-Oct-12 21-Oct-12 18-Jul-13 14-Apr-14 29-May-14 (HLB) across Campbell canal at NCRMP/B- Bhavani puram to connect Ullipalem R&B Dept., 7 W/AP/Br/R&B/06/ NCB 1 650.00 14.08 at Km. 20/8 of Machilipatnam - GoAP Rev 2 2-Apr-13 3-Apr-13 7-May-13 22-May-13 6-Jun-13 28-Jun-13 29-Jun-13 26-Mar-14 21-Dec-14 4-Feb-15 Bhavanipuram/019 Kammavaricheruvu road via Chinnapuram in Krishna District. Actual

Appraisal 10-Aug-10 12-Jun-12 23-Jun-12 25-Jun-12 25-Jul-12 23-Aug-12 23-Aug-12 20-Sep-12 20-Sep-12 17-Jul-13 14-Dec-13 14-Mar-14 Construction of High Level bridge NCRMP/B- Rev 1 10-May-12 1-Jun-12 25-Jun-12 26-Jun-12 30-Jul-12 29-Aug-12 28-Sep-12 20-Oct-12 21-Oct-12 18-Jul-13 14-Apr-14 29-May-14 (HLB) across Repalle main drain at R&B Dept., 8 W/AP/Br/R&B/07/ NCB 1 90.00 1.95 Km 4/8 of Adavuladeevi – Tummala GoAP Rev 2 4-Mar-13 6-Mar-13 8-Apr-13 23-Apr-13 8-May-13 30-May-13 31-May-13 25-Feb-14 22-Nov-14 6-Jan-15 Repalle/020 road in Guntur District. Actual Appraisal 10-Aug-10 19-Jun-12 30-Jun-12 2-Jul-12 1-Aug-12 30-Aug-12 30-Aug-12 27-Sep-12 27-Sep-12 24-Jul-13 21-Dec-13 21-Mar-14

Reconstruction of High Level Bridge Rev 1 10-May-12 1-Jun-12 25-Jun-12 26-Jun-12 30-Jul-12 29-Aug-12 28-Sep-12 20-Oct-12 21-Oct-12 18-Jul-13 14-Apr-14 29-May-14 NCRMP/B- (HLB) across Pakalagadi main drain R&B Dept., 9 W/AP/Br/R&B/07/ NCB 1 19.50 0.42 Rev 2 6-Nov-12 15-Nov-12 18-Dec-12 21-Jan-13 20-Feb-13 14-Mar-13 15-Mar-13 11-Sep-13 10-Mar-14 24-Apr-14 at Km 1/4 of Mollagunta- Kottapalem GoAP Nizampatnam/021 road in Guntur District Rev 3 4-Mar-13 6-Mar-13 8-Apr-13 23-Apr-13 8-May-13 30-May-13 31-May-13 27-Nov-13 26-May-14 10-Jul-14 Actual Appraisal 10-Aug-10 19-Jun-12 30-Jun-12 2-Jul-12 1-Aug-12 30-Aug-12 30-Aug-12 27-Sep-12 27-Sep-12 24-Jul-13 21-Dec-13 21-Mar-14 Reconstruction of bridge across NCRMP/B- Rev 1 10-May-12 1-Jun-12 25-Jun-12 26-Jun-12 30-Jul-12 29-Aug-12 28-Sep-12 20-Oct-12 21-Oct-12 18-Jul-13 14-Apr-14 29-May-14 Peddapalli drain at km 14/6 of R&B Dept., 10 W/AP/Br/R&B/07/ NCB 1 14.80 0.32 Chandole bridge to Nizampatnam GoAP Rev 2 16-Oct-12 25-Oct-12 27-Nov-12 21-Jan-13 20-Feb-13 14-Mar-13 15-Mar-13 11-Sep-13 10-Mar-14 24-Apr-14 Peddapalli/022 road in Guntur District Actual Appraisal 10-Aug-10 12-Jun-12 23-Jun-12 25-Jun-12 25-Jul-12 30-Aug-12 30-Aug-12 27-Sep-12 27-Sep-12 27-Sep-13 26-Mar-14 24-Jun-14 Reconstruction of High level bridge NCRMP/B- Rev 1 10-May-12 1-Jun-12 25-Jun-12 26-Jun-12 30-Jul-12 29-Aug-12 28-Sep-12 20-Oct-12 21-Oct-12 18-Jul-13 14-Apr-14 29-May-14 (HLB) at Km. 11/10 of Ongole - R&B Dept., 11 W/AP/Br/R&B/08/ NCB 1 46.20 1.00 Kothapatnam road in Prakasam GoAP Ongole/023 Rev 2 13-Dec-12 19-Dec-12 21-Jan-13 20-Feb-13 22-Mar-13 13-Apr-13 14-Apr-13 9-Jan-14 6-Oct-14 20-Nov-14 District Actual Appraisal 10-Aug-10 19-Jun-12 30-Jun-12 2-Jul-12 1-Aug-12 6-Sep-12 6-Sep-12 4-Oct-12 4-Oct-12 4-Oct-13 2-Apr-14 1-Jul-14

Reconstruction of bridge across Rev 1 25-Jun-12 26-Jun-12 30-Jul-12 29-Aug-12 28-Sep-12 20-Oct-12 21-Oct-12 18-Jul-13 14-Apr-14 29-May-14 NCRMP/B- Buckingham canal at Km.26/3 of R&B Dept., 12 W/AP/Br/R&B/09/ NCB 1 80.00 1.73 Rajupalem - Iskapalli road in Nellore GoAP Rev 2 10-May-12 1-Jun-12 4-Mar-13 6-Mar-13 8-Apr-13 23-Apr-13 8-May-13 30-May-13 31-May-13 25-Feb-14 22-Nov-14 6-Jan-15 Buckingham/024 District Actual

Appraisal 10-Aug-10 19-Jun-12 30-Jun-12 2-Jul-12 1-Aug-12 6-Sep-12 6-Sep-12 4-Oct-12 4-Oct-12 4-Oct-13 2-Apr-14 1-Jul-14

Construction of High level bridge Rev 1 10-May-12 1-Jun-12 25-Jun-12 26-Jun-12 30-Jul-12 29-Aug-12 28-Sep-12 20-Oct-12 21-Oct-12 18-Jul-13 14-Apr-14 29-May-14 NCRMP/B- (HLB) at Km 7/2 of road from R&B Dept., 13 W/AP/Br/R&B/09/ NCB 1 42.50 0.92 Rev 2 16-Oct-12 25-Oct-12 27-Nov-12 21-Jan-13 20-Feb-13 14-Mar-13 15-Mar-13 26-Oct-13 8-Jun-14 23-Jul-14 M.C.road to Juvvaladinne via GoAP Juvvaladine/025 Mungamur in Nellore District Rev 3 4-Mar-13 6-Mar-13 8-Apr-13 23-Apr-13 8-May-13 30-May-13 31-May-13 11-Jan-14 24-Aug-14 8-Oct-14 Actual

32 of 35 Total Total bid Initiate Approval of Method Quant Estimated Estimate Preparation Preparatio Publicatio Beginning Name value Issue of Completion preparation of IFB and Bid Signing of of Procurement ity Cost d Cost of IFB and n of the n of IFB in of Sale of Opening Approval of the (million contract 50% work 100% work of Sno Package No. Description Stage Specification documents by Preparatio the Procur Authority (Num (Million (Million submission Bid Newspape Bid of Bids of BER contr local award complete complete contractual and Bid the World n of BER contract ement ber) local USD) to the Bank Document rs document actor currency notice obligations Document Bank currency) )

Andhra Pradesh- Roads and Bridges- Phase II Total 13 1347.60 29.19

Andhra Pradesh- Irrigation & CAD department Restoration of Kona Saline Appraisal 01-Nov-12 01-Dec-12 2-Apr-13 3-Apr-13 7-May-13 22-May-13 6-Jun-13 28-Jun-13 29-Jun-13 29-Jun-14 29-Jun-15 13-Aug-15 NCRMP/B- Embankment to the original 1 W/AP/Emb/I&CAD/06/ standards from Km. 0.000 to Km. ICB I & CAD Dept. 1 439.40 9.52 Revised Kona/01 18.600 in Divi Island of Krishna District Actual Restoration of Kruthivennu Saline Appraisal 01-Nov-12 01-Dec-12 2-Apr-13 3-Apr-13 7-May-13 22-May-13 6-Jun-13 28-Jun-13 29-Jun-13 29-Jun-14 29-Jun-15 13-Aug-15 Embankment to the original NCRMP/B- standards from KM. 0.000 to Km. 2 W/AP/Emb/I&CAD/06/ ICB I & CAD Dept. 1 324.20 7.02 Revised 18.600 in Divi Island of Krishna Kruthiveni/02 District (including outfall sluicees of Actual 43 No.'s) Andhra Pradesh- Irrigation & CAD department Embankments Total 2 763.60 16.54

Andhra Pradesh- Grand Total 418 5351.77 115.91 * The conversion rate applied is 1 USD : INR 46.17

Legend

Colour Description Green Works Awarded Blue To be awarded

33 of 35 Annex-III: PROCUREMENT SCHEDULE FOR NON-CONSULTANCY SERVICES Country: India Borrower Government of India, Ministry of Finance, North Block, New Delhi, India-110 001 Project: National Cyclone Risk Mitigation Project (NCRMP) GoAP (Values in Millions) Revision No. 1 Date 30.04.2012 Sl. No. Package No. Description Method of Schedule Procurement Quantity Estimated Estimated Cost Stage Initiate Preparation Preparation Approval of Publication Beginning of Opening of Submission Approval of Signing of Issue of 50% work 100% work Completion Procurement /Slice Authority (Number) Cost (Million (Million USD)* preparation of IFB and of the Bid IFB and Bid of IFB in sale of Bid Bids of BER to BER the contract contract complete complete of local of submission Document documents Newspapers document Bank for award contractual currency) Specificatio to the Bank by the World and UNDB approval notice obligations n and Bid Bank Document NCRMP/D/PIU-AP/Vehicles/1 Consultancy Services for Hiring of Single Source 1 State PIU 1 3.50 0.08 Appraisal Vehicles for PIA's Sub-Divisions of Selection 1 PR Line Department and SPIU. Revised 15-Feb-12 29-Feb-12 14-Mar-12 21-Mar-12 26-Mar-12 25-Apr-13 2-May-13 Actual

AP Total 3.50 0.08

* The conversion rate applied is 1 USD : INR 46.17 Annex-IV: PROCUREMENT SCHEDULE FOR CONSULTANCY SERVICES Country: India Borrower Government of India, Ministry of Finance, North Block, New Delhi, India-110 001 Project: National Cyclone Risk Mitigation Project (NCRMP) GoAP (Values in Millions)

Revision No. 1 Date 18.02.2013 Sl. No. Package No. Description Method of Quantity (Number) Procureme Estimated Estimated Stage TOR, EOI Estimate Bank’s No Publication of Preparation Approval of Issue RFP Receipt of Evaluation Bank's No Opening of Bank's no Contract Publication Contract Procurement nt Authority Cost Cost SPN and Prepared & Objection to SPN in of shortlist shortlist by to short proposals of technical Objection to financial objection to Signed of Contract Completed (Million (Million RFP drafted Sanctioned TOR, EOI UNDB and Bank listed and opening proposals technical proposals contract Award local USD)* SPN, RFP Newspapers consultants technical and evaluation and financial award currency) Document proposals submission report evaluation recommend of report to ations the Bank

At Andhra Pradesh

I)SERVICES:-

1 NCRMP/D/PIU- Consultancy services for Single Source 1 State PIU 2.80 0.06 Appraisal 17-Apr-09 17-Apr-09 12-May-09 20-Jun-09 29-Aug-09 AP/EC/1 appointment of Environmental Selection Consultants for 2.80 0.06 Revised NCRMP(Phase-I) for AP Actual 2 NCRMP/D/PIU- Consultancy Services for Least-Cost 1 State PIU 27.00 0.58 Appraisal AP/DPR /2 preparation of Detailed Project Selection(LCS) Reports (DPRs) of Investment 27.00 0.58 Revised 29-Mar-10 29-Mar-10 28-Apr-10 5-May-10 11-Jun-10 26-Jun-10 26-Jul-10 2-Aug-10 31-Oct-10 Proposals of National Cyclone Risk Mitigation Actual Project in AP 3 NCRMP/D/PIU- Consultancy services for Single Source 1 State PIU 12.00 0.26 Appraisal AP/EC/3 appointment of Environmental Selection Consultants for 30.00 0.65 Revised 9-May-11 10-Jun-11 1-Jul-11 8-Jul-11 15-Jul-11 24-Jan-12 NCRMP(Phase-II) for AP Actual 9-May-11 21-Jun-11 26-Jul-11 17-Aug-11 4 NCRMP/D/PIU- Consultancy Services for Quality and Cost 1 State PIU 20.00 0.43 Appraisal 20-Nov-09 20-Nov-09 21-Dec-09 10-Mar-10 14-Apr-10 29-Apr-10 6-May-10 21-Jun-10 21-Jul-10 5-Aug-10 12-Aug-10 19-Aug-10 3-Sep-10 11-Sep-10 10-Sep-14 AP/TPQA/4 apointment of Third Party Based Selection Quality Auditor for National (80:20) Cyclone Risk Mitigation 78.00 1.69 Revised 29-Dec-09 25-Jan-10 8-Feb-10 10-Mar-10 26-May-10 22-Oct-10 1-Nov-10 30-Dec-10 18-Feb-11 24-Feb-11 28-Feb-11 31-May-11 31-May-11 14-Jun-11 30-Nov-12 Project (Phase-I) in AP Actual 29-Dec-09 25-Jan-10 8-Feb-10 10-Mar-10 26-May-10 22-Oct-10 1-Nov-10 30-Dec-10 18-Feb-11 24-Feb-11 28-Feb-11 31-May-11 31-May-11 5 NCRMP/D/PIU- Consultancy Services for Quality and Cost 1 State PIU 17.60 0.38 Appraisal AP/PMC/5 Project Management Based Selection Consultant for National (80:20) Cyclone Risk Mitigation Project in AP 32.00 0.69 Revised 1-Apr-10 12-Apr-10 24-Jun-10 8-Jul-10 29-Sep-10 22-Nov-10 24-Nov-10 17-Jan-11 2-Jun-11 16-Jun-11 23-Jun-11 7-Jul-11 14-Jul-11 28-Jul-11 13-Jul-13

Actual 3-Apr-10 22-Nov-10 22-Nov-10 24-Nov-10 21-Feb-11 9-May-11 7-Jun-11 13-Jun-11 17-Aug-11 15-Sep-11 6 NCRMP/D/PIU- Consultancy Services for Quality and Cost 1 State PIU 4.00 0.09 Appraisal 2-Feb-10 2-Feb-10 28-Feb-10 6-Apr-10 21-Apr-10 28-Apr-10 12-Jun-10 12-Jul-10 27-Jul-10 3-Aug-10 10-Aug-10 25-Aug-10 1-Sep-10 31-Aug-14 AP/IA/6 appointment of Internal Based Selection Auditor for National Cyclone (80:20) Risk Mitigation Project in AP. 6.00 0.13 Revised 28-Feb-10 3-Apr-10 4-Jul-11 11-Jul-11 25-Aug-11 24-Sep-11 10-Oct-11 17-Oct-11 8-Nov-11 15-Nov-11 29-Nov-11 14-Nov-13

Actual 7 NCRMP/D/PIU- Consultancy Services for Quality and Cost 1 State PIU 68.90 1.49 Appraisal 16-Jan-13 16-Jan-13 30-Jan-13 1-Feb-13 6-Mar-13 16-Mar-13 19-Mar-13 24-Mar-13 28-Mar-13 31-Mar-13 7-Apr-13 31-Mar-15 AP/TPQA/7 apointment of Third Party Based Selection Quality Auditor for National (80:20) Cyclone Risk Mitigation Actual Project (Phase-II) in AP

AP Total 244.70 5.30

* The conversion rate applied is 1 USD : INR 46.17