BURTON MANOR for Sale > 520 Ninth Street, New Westminster | BC

Total Page:16

File Type:pdf, Size:1020Kb

BURTON MANOR for Sale > 520 Ninth Street, New Westminster | BC BURTON MANOR For Sale > 520 Ninth Street, New Westminster | BC HIGHLIGHTS Colliers International 200 Granville Street | 19th Floor Vancouver, BC | V6C 2R6 > 33-unit residential building located in New Westminster’s Brow of the Hill neighbourhood > Opportunity to significantly increase rents upon suite turnover > Downtown Vancouver less than 30 minutes via SkyTrain from New Westminster station > Suite mix includes: 3 bachelor suites, 22 one-bedroom suites and 8 two-bedroom suites CASEY WEEKS Personal Real Estate Corporation > Opportunity for property transfer tax savings through purchase of shares of the bare trust DIR +1 604 661 0811 > Steps from Moody Park, Moody outdoor pool, Royal City Centre Shopping Centre and New Westminster Public Library [email protected] FOR SALE BURTON MANOR 520 Ninth Street New Westminster BC Located in the Brow of the Hill neighbourhood of New Westminster. The property is within close proximity to Royal City Centre, New Westminster SkyTrain, the Quay and other amenities. The area is serviced by several bus routes and the Expo Line providing easy accessibility throughout Metro Vancouver. SALIENT FACTS Civic Address 520 Ninth Street, New Westminster, BC Lot 13, New West District, Plan NWP2620 Suburban Block 10, Of Lot Legal Address 12, Lot 10, Suburban Block 10, Plan NWP2620, New Westminster Land District, Of Lot 12; PID: 013-606-603, 013-606-590 Site Area 20,693 SF Dimensions 132 feet along Ninth Street and 157 feet of return depth (approx.) Zoning RM-2 Multiple Dwelling District Located midblock along Ninth Street between Fifth and Sixth Avenue Location in the Brow of the Hill neighbourhood of New Westminster Four-storey building comprised of 33 suites, with 19 underground Improvements parking stalls, 14 uncovered parking stalls. 3 Bachelor Suite Mix 22 One-bedroom 8 Two-bedroom Net Operating Income $191,253* 132 feet Year Built 1966 Assessed Value (2018) $6,524,000 Gross Taxes (2017) $24,050.09 157 feet Asking Price $7,750,000 *stabilized from July 2018 Rent Roll BROW OF THE HILL NEIGHBOURHOOD PROSPECTIVE PURCHASERS Prospective purchasers are invited to submit Offers to Purchase Brow of the Hill is significant for its geographical location, stretching uphill from the Fraser River the Property through Colliers for consideration by the Vendor. and culminating the “brow,” the highest part of a hill where the ground begins to flatten out. After signing a Confidentiality Agreement (CA), qualified Within this geographic scope is a neighbourhood of diversity, variety and contrast. interested parties will be provided a Confidential Information Memorandum (“CIM”) an access to the data room which contains As one of New Westminster’s earliest residential neighbourhoods, Brow of the Hill is significant for pertinent information and documents relevant to the Property. its working class history and the architecture that supported it. Early single family homes, some dating back to the 1880s, housed people who held a variety of blue collar jobs and professions, yet the area is also home to many larger dwellings of prominent New Westminster residents. As OFFERING PROCESS the working population grew, areas of apartments emerged and larger homes were divided into All prospective purchasers will be advised of an offer submission multiple dwelling units. date during the initial marketing period. Purchasers are invited to submit offers to Colliers on the Vendor’s preferred Form of Source: New West City database - https://www.newwestcity.ca/database/files/library/5_Brow_of_the_Hill.pdf Offer (available upon request). Metrotown Moody Park Tenth Street Sixth Avenue Ninth Street BURTON MANOR For Sale > 520 Ninth Street, New Westminster | BC Colliers International CASEY WEEKS 200 Granville Street | 19th Floor Personal Real Estate Corporation Vancouver, BC | V6C 2R6 DIR +1 604 661 0811 P: +1 604 681 4111 [email protected] This document/email has been prepared by Colliers International for advertising and general information only. Colliers International makes no guarantees, representations or warranties of any kind, expressed or implied, regarding the information including, but not limited to, warranties of content, accuracy and reliability. Any interested party should undertake their own inquiries as to the accuracy of the information. Colliers International excludes unequivocally all inferred or implied terms, conditions and warranties arising out of this document and excludes all liability for loss and damages arising there from. This publication is the copyrighted property of Colliers International and /or its licensor(s). © 2018. All rights reserved. This communication is not intended to cause or induce breach of an existing listing agreement. Colliers Macaulay Nicolls Inc. JS 06/2018.
Recommended publications
  • Special Commission Skytrain Extension Review Final Report May, 1999 Acknowledgements
    Special Commission SkyTrain Extension Review Final Report May, 1999 Acknowledgements The Special Commissioner gratefully acknowledges the generous and dedicated support and advice of the agencies, organizations and individuals that contributed to the Special Commission SkyTrain Review. The cooperation and assistance of the Greater Vancouver Transportation Authority (TransLink); Greater Vancouver Regional District; City of Vancouver; City of New Westminster; City of Burnaby; City of Coquitlam; City of Port Moody; Canadian Environmental Assessment Agency; Fisheries and Oceans Canada; Environment Canada; Health Canada; Canadian Coast Guard; BC Transportation Financing Authority; BC Assets and Land Corporation; Simon Fraser Health Region; and BC Ministries of Environment, Lands and Parks, Transportation and Highways, Municipal Affairs, Small Business, Tourism and Culture were instrumental to the work of the Special Commission. The cooperation of the BC Environmental Assessment Office in providing considerable technical and administrative resources and support is greatly appreciated. In addition, the Special Commissioner particularly wishes to thank the members of the public and organizations who made submissions or participated in the workshops or public meetings for their efforts in the public interest. Staff Seconded to Special Commission David Johns, Kim Fawthorpe, Michael Price, Paul Finkel, Alan Calder, Mel Turner, Jennifer Kay, Tami Payne, Shari Steinbach, Sylvia Hinks, Eileen Bennett, Tanya Paz, and Joy Cohen. Environmental Assessment
    [Show full text]
  • ATTACHMENT a Page 1 of 5
    ATTACHMENT A Page 1 of 5 November 9, 2010 Mayor Peter Fassbender Chair, Mayors' Council on Regional Transportation c/o City of Langley 20399 Douglas Crescent Langley, BC V3A 4B3 Dear Chair Fassbender, Re: 2011 Supplemental Plans On behalf of the Board of Directors of the South Coast British Columbia Transportation Authority (TransLink), I am forwarding the two enclosed Transportation and Financial Supplemental Plans for 2011 to 2013, and Outlooks for 2014 to 2020, both approved by the Board, to the Mayors' Council on Regional Transportation. The purpose of presenting these supplemental plans is to provide the region's mayors with an opportunity to exercise their authority under the South Coast British Columbia Transportation Authority Act to approve one of the options to expand Metro Vancouver's transportation network and confirm it as TransLink's 'base plan' for the next three years. Alternately, the Mayors Council may choose to not approve either of them and maintain the program in the current base plan. Both options include funding for the Evergreen SkyTrain Line connecting the Lougheed and Coquitlam town centres and for an extension of United Boulevard in Coquitlam as the first phase of the North Fraser Perimeter Road goods movement corridor from the Queensborough Bridge in New Westminster to Highway #1. One option, 'Delivering the Evergreen Line and the North Fraser Perimeter Road,' is confined to the two highest priority projects. The other, 'Moving Forward,' proposes additional road and transit improvements across Metro Vancouver, notably in the South of Fraser and North Shore sub-regions. All of these projects have been long-standing priorities and offer enormous benefits to the people of Metro Vancouver.
    [Show full text]
  • Update to Phase One of the 10-Year Vision 2017–2026 INVESTMENT PLAN
    Update to Phase One of the 10-Year Vision 2017–2026 INVESTMENT PLAN JULY 27, 2017 Approved by the TransLink Board of Directors – July 19, 2017 and the Mayors’ Council on Regional Transportation – July 27, 2017 tenyearvision.translink.ca TRANSLINK MAYORS’ COUNCIL BOARD OF DIRECTORS ON REGIONAL TRANSPORTATION 2017: Gregor Robertson, Chair Maria Harris Lorraine Cunningham, Chair Mayor, City of Vancouver Director, Electoral Area ‘A’ Janet Austin Linda Hepner, Vice Chair Lois Jackson Larry Beasley Mayor, City of Surrey Mayor, Corporation of Delta Jim Chu Wayne Baldwin John McEwen Sarah Clark Mayor, City of White Rock Mayor, Village of Anmore Murray Dinwoodie John Becker Greg Moore Anne Giardini Mayor, City of Pitt Meadows Mayor, City of Port Coquitlam Tony Gugliotta Malcolm Brodie Darrell Mussatto Linda Hepner Mayor, City of Richmond Mayor, City of North Vancouver Gregor Robertson Karl Buhr Nicole Read Marcella Szel Mayor, Village of Lions Bay Mayor, District of Maple Ridge Mike Clay Ted Schaffer 2016: Mayor, City of Port Moody Mayor, City of Langley Don Rose, Chair Derek Corrigan Murray Skeels Larry Beasley Mayor, City of Burnaby Mayor, Bowen Island Municipality Jim Chu Jonathan Coté Michael Smith Lorraine Cunningham Mayor, City of New Westminster Mayor, District of West Vancouver Murray Dinwoodie Ralph Drew Richard Stewart Brenda Eaton Mayor, Village of Belcarra Mayor, City of Coquitlam Barry Forbes Jack Froese Richard Walton Tony Gugliotta Mayor, Township of Langley Mayor, District of North Vancouver Linda Hepner Bryce Williams Gregor Robertson Chief, Tsawwassen First Nation Marcella Szel For the purpose of the South Coast British Columbia Transportation Authority Act, this document constitutes the investment plan for the 2017-2026 period.
    [Show full text]
  • Transportation Challenges and Successes in Metro Vancouver
    Transportation Challenges and Successes In Metro Vancouver Jeffrey Busby Sr Mgr, Infrastructure Planning TransLink October 19, 2013 A shared vision (1975) Realizing Metro Vancouver’s Vision Regional Transport 2021 Transport 2040 Transportation 1993 2008 Strategy 2013‐2014 Regional Vision Livable Region Livable Region Plan Regional Growth 1975 Strategic Plan Strategy 1996 2011 The Region is Growing Today In 30 years 2M 1 million more people 3M 1.25M 500,000 more jobs 1.75M Quality of Life is High but Declining TODAY 2045 Good / Very Good Worse than today 65% 42% Most Important Local Issues We Need to Travel in Different Ways Today In 30 years 6M 9M Car will still play important role. But we don’t physically have the space to accommodate all of these new trips by car 50% of Trips by Walking, Cycling, Transit 50% 1.6 M trips 27% 4.4 M trips 73% 50% 4.4 M trips 4.4 M trips Today In 30 years 2011 andA Steep 2045 HillTarget to Climb Mode Share Percentage of trips by walk, bike, transit Benefits of a 50% target The Vision – Then and Still As a region, we maintain our global position as one of the best places in the world to live because we meet our transportation needs in a way that simultaneously enhances the health of our people and communities, economy, and environment TransLink: The TransLinkTransportation Authority Southfor the Coast Metro BC Transportation Vancouver RegionAuthority Public Transport Roads and Bridges Regional Cycling Intelligent Transportation Transportation Demand Vehicle Emissions Testing Systems Management Transportation
    [Show full text]
  • 992 Metro Time Schedule & Line Route
    992 metro time schedule & line map 992 Expo Line to Edmonds View In Website Mode The 992 metro line (Expo Line to Edmonds) has 6 routes. For regular weekdays, their operation hours are: (1) Expo Line to Edmonds: 8:59 AM - 10:11 AM (2) Expo Line to King George: 12:09 AM - 11:59 PM (3) Expo Line to Lougheed Town Centre: 12:54 AM - 1:11 AM (4) Expo Line to New Westminster: 12:41 AM - 1:31 AM (5) Expo Line to Production Way-University: 12:04 AM - 11:54 PM (6) Expo Line to Waterfront: 12:01 AM - 11:58 PM Use the Moovit App to ƒnd the closest 992 metro station near you and ƒnd out when is the next 992 metro arriving. Direction: Expo Line to Edmonds 992 metro Time Schedule 13 stops Expo Line to Edmonds Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 8:59 AM - 10:11 AM Waterfront Station 439 Granville St, Vancouver Tuesday 8:59 AM - 10:11 AM Burrard Station Wednesday 8:59 AM - 10:11 AM 625 Burrard St, Vancouver Thursday 8:59 AM - 10:11 AM Granville Station Friday 8:59 AM - 10:11 AM 586 Dunsmuir Street, Vancouver Saturday Not Operational Stadium-Chinatown Station 590 Beatty St, Vancouver Main Street-Science World Station 1399 Main St, Vancouver 992 metro Info Direction: Expo Line to Edmonds Commercial-Broadway Station Stops: 13 1715 East Broadway, Vancouver Trip Duration: 23 min Line Summary: Waterfront Station, Burrard Station, Nanaimo Station Granville Station, Stadium-Chinatown Station, Main 2450 E 24th Av, Vancouver Street-Science World Station, Commercial-Broadway Station, Nanaimo Station, 29th Avenue Station, 29th Avenue
    [Show full text]
  • Burnaby & New Westminster
    Compass Cards and Fare Information Effective September 6, 2021 Subject to adjustments. www.translink.ca Compass Cards can be loaded with the fare product of your choice, or you can add Stored Value (replaces FareSavers, and is perfect for single trip use and pay-as you-go travel). For your convenience, add products or Stored Value to your card at Compass Vending Machines, online at Bus Timetable www.compasscard.ca, by phone at 604-398-2042, or at the Compass Customer Service Centre at Stadium-Chinatown Station. Once you have a Compass Card, be sure to register it by visiting www.compasscard.ca or by calling the phone number on the back of your card. Burnaby Compass Tickets - Great for occasional riders (single use trips and New Westminster DayPasses), these limited use tickets are available at Compass Vending Machines. Need more Compass information? Visit www.translink.ca/compasscard Fare Information - Bus-Only travel is ONE zone all the time. For SkyTrain and SeaBus the Peak Fare zone structure is in effect Monday through Friday from the start of service until 6:30pm. During this time, the fare system is divided into three zones. After 6:30pm Monday through Friday, and all day Saturday, Sunday, and holidays Off Peak Fares apply so the system is ONE zone for all modes. Need more Fare Information? Visit www.translink.ca/transit-fares or call Customer Information Services at 604-953-3333 Holiday Service Visit www.translink.ca or call Customer Information Services at 604-953-3333 for details regarding holiday service. Compass is your Key.
    [Show full text]
  • SFU Library Thesis Template
    Household income composition changes with rapid transit implementation: A natural experiment study of SkyTrain, Metro Vancouver, 1981-2016 by Danielle N. DeVries B.Sc. (Hons., Health Sciences), Simon Fraser University, 2016 Project Submitted in Partial Fulfillment of the Requirements for the Degree of Master of Urban Studies in the Urban Studies Program Faculty of Arts and Social Sciences © Danielle N. DeVries 2019 SIMON FRASER UNIVERSITY Spring 2019 Copyright in this work rests with the author. Please ensure that any reproduction or re-use is done in accordance with the relevant national copyright legislation. Approval Name: Danielle N. DeVries Degree: Master of Urban Studies Title: Household income composition changes with rapid transit implementation: A natural experiment study of SkyTrain, Metro Vancouver, 1981-2016 Examining Committee: Chair: Karen Fergusen Professor, Urban Studies & History Meghan L Winters Senior Supervisor Associate Professor, Health Sciences Peter V Hall Supervisor Professor, Urban Studies & Geography Andy Yan External Examiner Director, City Program Adjunct Professor, Urban Studies Date Defended/Approved: March 12, 2019 ii Abstract Background—Rapid transit such as SkyTrain is beneficial to move people efficiently, reduce carbon emissions, and increase physical activity. However, these benefits attract new development resulting in rising housing prices that may consequently change the household income composition. Metro Vancouver has not skirted this phenomenon, with rapid population growth and signs of neighbourhood change near SkyTrain. Research Question—Does the household income composition change in areas nearby new SkyTrain stations? Hypothesis—After a new SkyTrain station opens, lower income households may initially have better access to rapid transit, but over time nearby areas shift towards higher income households.
    [Show full text]
  • 1 Don Bellamy's Rapid Transit Solution (BC Electric Railway Motorman, Retired)
    Don Bellamy’s Rapid Transit Solution (BC Electric Railway Motorman, Retired) “Restore THE POWER OF streetcars NOW” Simple solutions that are based on common sense usually have the greatest impact on society. As is often the case, people with practical experience often have a better understanding of the problem, and can see the most efficient, cost effective solutions first. I spoke with Don Bellamy (former Vancouver City Councilor, Police Officer, and BC Electric Railway Motorman) in July 2008, and his solution is the most efficient and financially viable that I have heard, seen or read about. First let’s get a global perspective. In “The Power of Community – How Cuba Survived Peak Oil” viewers see Americans visiting Cuba in 2006 to learn what Peak Oil really means. When Russia fell in 1991, Cuba lost over 50% of its oil imports from 13-14 million tons down to 4 million tons. While cars produce pollution, buildings and homes consume 40% of world energy and produce 50% of all greenhouse gases. “OIL” Energy is needed for elevators, water supply, heating / cooling, lighting, cooking and food storage, making high rise residential buildings unsustainable. Oil is needed for computers, cosmetics, and plastics. Cubans call the transition to life without Oil the “Special Period”. It took 5 years before the pesticide contaminated soil could be brought back to life with composting. Without the OIL based fertilizers (21,000 tons in 1988 to 1,000 tons in 2006) that produced the 1920’s Green Revolution farm food production increase and oil based pesticides needed to reduce pests associated with mono-agriculture, Cuba had to choose Organic farming.
    [Show full text]
  • Proposal Template
    Expo Line Upgrade Strategy Project Summary May 7, 2012 EXPO LINE UPGRADE STRATEGY SNC-LAVALIN INC. STUDY OBJECTIVES upgrades being considered for an existing system. An alternative approach to a traditional multiple account The Vancouver SkyTrain’s Expo Line is the backbone evaluation methodology was used to evaluate of Metro Vancouver’s rapid transit network. The Expo benefits generated by a series of improvements. Line first opened in January 1986 with an initial 21.4 kilometres of guideway and 15 stations between With this approach in mind, the study team also Waterfront Station and New Westminster Station. Its needed to consider the most appropriate time for subsequent expansion to King George Station in any given upgrade, so that system operation Surrey increased the Expo Line to a 29-kilometre continued normally and service disruptions and system with 20 stations. passenger inconvenience were minimized. Until 2009, the Expo Line operated at capacity, SNC-Lavalin fully satisfied the objectives of the study carrying approximately 12,000 people per hour per and kept within budget and schedule. The key tasks direction (pphpd). A fleet expansion in 2009-2010 included: confirming current passenger demand exceeded demand on the line; however, studies condition; forecasting future ridership over the next revealed that the expected ridership growth over the 30 years; assessing the existing system constraints next several years would again lead to overcrowded preventing the system from achieving full potential conditions. capacity; identifying potential upgrades; and recommending an upgrade implementation strategy. Upgrading the Expo Line is in line with several of the goals outlined in TransLink’s Transport 2040 Strategy.
    [Show full text]
  • A Previous Business Case
    To: GVTA Board of Directors CHAIR From: Sheri Plewes, Vice President, Capital Management and Engineering Malcolm Brodie and Project Director, Evergreen Light Rail Transit Project DIRECTORS Date: October 12, 2006 Kurt Alberts Subject: Evergreen Line Project Definition Phase – Suzanne Anton Business Case and Preferred Preliminary Design Derek Corrigan Marvin Hunt Peter Ladner Staff Recommendation: That the GVTA Board: Sam Sullivan A. Receives, for information, the report entitled “Evergreen Line Light Rail Transit Joe Trasolini Project – Project Definition Phase Business Case”; Richard Walton B. Approves the Preferred Preliminary Design, as described in the report; C. Approves additional funding of $16 million ($12.5 million from the PMC Dianne Watts Municipal Integration Fund included in the 2001 Capital Program and $3.5 Maxine Wilson million from the 2006 Capital Program) for the detailed design for Project 0508 – Scott Young Evergreen Line Project Definition Phase, for a total project budget of $59 million, consisting of $8 million for preliminary design and public consultation ($6 million GVTA and $2 million Province), $35 million for property acquisition and CEO $16 million for detailed design; and Pat Jacobsen D. Directs staff to request additional funding from the provincial and federal governments to close the funding gap of $400 million, with the intention of having full project funding in place by April 2007. PURPOSE The purpose of this report is to provide the Board with: A summary of the Project Definition Phase Business Case; A description of the Preferred Preliminary Design and current capital and operating cost estimates; Status of funding and funding strategy; and Next steps.
    [Show full text]
  • 435 Columbia Street New Westminster, BC
    FOR SALE 435 Columbia Street New Westminster, BC Partnership. Performance. Office Building Located at the Columbia Skytrain Station 100% leased three storey building with future redevelopment potential Michael Emmott, Vice President Josh Sookero*, Principal 604.647.1335 604.647.5091 [email protected] [email protected] *Josh Sookero Personal Real Estate Corportation Bob Levine, Principal Benjamin Temple, Senior Associate 604.647.5066 604.757.4953 [email protected] [email protected] OPPORTUNITY SITE DESCRIPTION Avison Young is pleased to present this opportunity to acquire a 100% freehold interest in 435 Columbia Street, New Westminster, BC (the “Property”) Municipal Address prominently situated on Columbia Street adjacent to the Columbia Street 435 Columbia Street, Skytrain Station. The Property is well positioned to benefit from a renaissance New Westminster, BC along Columbia Street in the Downtown of New Westminster and a coveted PID location near rapid transit. 013-995-791 Prominent Columbia Street Location in Downtown New Westminster Site Area 17,232 sf f Situated adjacent to the Columbia Skytrain Station and four blocks from the New Westminster Skytrain Station Rentable Area 45,617 sf f New Westminster is strategically situated in the geographic centre of Metro Vancouver only 30 minutes from downtown Vancouver Storeys 3 f Surrounded by numerous amenities including The Shops at New West, the River Market, Anvil Centre and Conference Centre, Douglas College, and the Occupancy New Westminster
    [Show full text]
  • Att Translinks 2012 Supplemental Plan
    Attachment A Page 1 of 3 EXECUTIVE SUMMARY This 2012 Transportation and Financial Supplemental Plan and Outlook (2012 Supplemental Plan), entitled "Moving Forward: Improving Metro Vancouver1s Transportation Network/I builds upon previous investment in transportation, including expansion in transitl that occurred in iVletro Vancouver between 2005 and 2009. The transportation investments and funding provided under this 2012 Supplemental Plan will support strong growth in transit ridershipI will continue to support livable communities and will move the region towards conditions required this decade to fulfill Transport 2040 aspirations for a sustainable region. Annual regional greenhouse gas (GHG) emissions from roadway and passenger transportation in the region are forecast to decline by 2 per cent between 2011 and 2014 and remain approximately 4 per cent below 2011 levels through 2021. With the opening of the Evergreen Line, annual transit boardings are forecast to increase by 10 per cent (over 40 million boardings) over the 2012 Base Plan forecast by 2021. Under this plan, the region fulfills the long-standing commitment to provide funding for the Evergreen Line Rapid Transit project, connecting Coquitlam and Port Moody to the region/s rail rapid transit network. Significant upgrades to the existing transit system will also occur under this plan: • By 2014, annual bus and Sea Bus service will increase by 415/000 hours, or 7 per centl providing more service around the region to improve reliability, reduce crowding and serve new demand from population growth and the expanded U-Pass BC program. • A fast, frequent and reliable B-Line service will be introduced in Surrey on 104th Avenue and King George Boulevard to connect Guildford, Surrey Central and White Rock.
    [Show full text]