Western Upper Peninsula Planning & Development Regional Commission

Total Page:16

File Type:pdf, Size:1020Kb

Western Upper Peninsula Planning & Development Regional Commission Western Upper Peninsula Planning & Development Regional Commission th 400 Quincy St., 8 Floor, Hancock, MI 49930 906-482-7205 [email protected] News Release Release Date: September 30, 2020 Media Contact: Rachael Pressley, Assistant Regional Planner 906.482.7205 ext. 116 [email protected] Keweenaw County Hazard Mitigation Plan available for review The Keweenaw County Office of Emergency Measures and the Western Upper Peninsula Planning and Development Region (WUPPDR) have recently made updates to the Keweenaw County Hazard Mitigation Plan. Hazard mitigation is any action taken before, during or after a disaster to eliminate or reduce the risk to human life and property from natural, technological, or human-related hazards. The plan’s purpose is to identify hazard risks throughout the county and to become better prepared for them. The draft of the Keweenaw County 2020-2025 Hazard Mitigation Plan Update will be available through October 30, 2020 for public review and comment prior to plan adoption by all local governments at regular meetings. A formal public hearing will also be held at a County Board meeting to be announced. Copies of the plan draft will be available at WUPPDR (400 Quincy St.) in Hancock and at the Keweenaw County Clerk’s Office (5095 4th St.) in Eagle River, and; online at www.wuppdr.org. Written comments will be considered by WUPPDR in cooperation with Keweenaw County and local governments, as appropriate. Comments must be received by October 30, 2020 and may be mailed to WUPPDR, 400 Quincy St., 8th Floor, Hancock, MI 49930 or emailed to Rachael Pressley, Assistant Regional Planner, at [email protected]. ### 2020-2025 Keweenaw County Hazard Mitigation Plan [DRAFT] PAGE LEFT INTENTIONALLY BLANK Keweenaw County Hazard Mitigation Plan Table of Contents SECTION 1: Introduction ........................................................................................................... 1 Background ......................................................................................................................... 1 Purpose ................................................................................................................................ 2 Scope ................................................................................................................................... 3 Authority ............................................................................................................................. 3 SECTION 2: Planning Process .................................................................................................... 4 Overview of Hazard Mitigation Planning ........................................................................... 4 History of Hazard Mitigation Planning Keweenaw County ............................................... 5 Preparing the 2020 Plan ...................................................................................................... 5 The Planning Team ............................................................................................................. 7 Local Planning Team Meetings .......................................................................................... 9 Involving the Public .......................................................................................................... 10 Involving Stakeholders ..................................................................................................... 11 SECTION 3: Community Profile .............................................................................................. 12 Geography, Environment, and Land Use .......................................................................... 12 Population and Demographics .......................................................................................... 17 Housing and Infrastructure ............................................................................................... 19 Employment and Industry ................................................................................................. 23 Police, Fire, and Emergency Services ............................................................................... 24 Critical Facilities and Cultural Assets............................................................................... 26 Disaster Declarations ........................................................................................................ 33 SECTION 4: Hazard Identification .......................................................................................... 34 SECTION 5: Hazard Analysis ................................................................................................... 40 Study Area ........................................................................................................................ 40 Natural Hazards: Weather Hazards ................................................................................... 40 Extreme Temperatures ................................................................................................ 41 Fog .............................................................................................................................. 44 Hail .............................................................................................................................. 45 Ice and Sleet Storms.................................................................................................... 48 Lightning ..................................................................................................................... 49 Severe Winds .............................................................................................................. 50 Snowstorms and Blizzards .......................................................................................... 54 Tornadoes .................................................................................................................... 56 Hydrological Hazards ....................................................................................................... 60 Dam Failures ............................................................................................................... 61 Riverine and Urban Flooding...................................................................................... 62 Shoreline Flooding and Erosion.................................................................................. 65 Drought ....................................................................................................................... 67 Ecological Hazards ........................................................................................................... 68 Wildfires ..................................................................................................................... 69 Invasive Species .......................................................................................................... 72 iii Keweenaw County Hazard Mitigation Plan Geological Hazards ........................................................................................................... 77 Earthquakes ................................................................................................................. 77 Subsidence (Ground Collapse) ................................................................................... 78 Technological Hazards: Industrial Hazards ...................................................................... 81 Scrap Tire Fire ............................................................................................................ 82 Structural Fires ............................................................................................................ 82 Hazardous Materials: Fixed Site Incident ................................................................... 84 Hazardous Materials: Transportation Accident .......................................................... 86 Petroleum and Natural Gas Incidents ......................................................................... 87 Infrastructure Hazards ....................................................................................................... 90 Infrastructure Failures and Secondary Technological Hazards .................................. 90 Transportation Accidents ............................................................................................ 92 Human-Related Hazards ................................................................................................... 94 Civil Disturbances ....................................................................................................... 94 Public Health Emergencies ......................................................................................... 96 Sabotage and Terrorism ............................................................................................ 100 SECTION 6: Risk Assessment ................................................................................................. 103 Differential Vulnerability................................................................................................ 103 Hazard Priority Risk Index and Ranking ........................................................................ 108 PRI Results................................................................................................................ 111 SECTION 7: Hazard Mitigation ............................................................................................. 115 Overview
Recommended publications
  • Michigan Technological University Archives' Postcard Collection MTU-196
    Michigan Technological University Archives' Postcard Collection MTU-196 This finding aid was produced using ArchivesSpace on February 08, 2019. Description is in English Michigan Technological University Archives and Copper Country Historical Collections 1400 Townsend Drive Houghton 49931 [email protected] URL: http://www.lib.mtu.edu/mtuarchives/ Michigan Technological University Archives' Postcard Collection MTU-196 Table of Contents Summary Information .................................................................................................................................... 3 Biography ....................................................................................................................................................... 3 Collection Scope and Content Summary ....................................................................................................... 4 Administrative Information ............................................................................................................................ 4 Controlled Access Headings .......................................................................................................................... 4 Collection Inventory ....................................................................................................................................... 5 A ................................................................................................................................................................... 5 B ..................................................................................................................................................................
    [Show full text]
  • Discovery & Geology of the Guinness World Record Lake Copper, Lake
    DISCOVERY AND GEOLOGY OF THE GUINNESS WORLD RECORD LAKE COPPER, LAKE SUPERIOR, MICHIGAN by Theodore J. Bornhorst and Robert J. Barron 2017 This document may be cited as: Bornhorst, T. J. and Barron, R. J., 2017, Discovery and geology of the Guinness world record Lake Copper, Lake Superior, Michigan: A. E. Seaman Mineral Museum, Web Publication 2, 8 p. This document was only internally reviewed for technical accuracy. This is version 2 of A. E. Seaman Mineral Museum Web Publication 2 first published online in 2016. The Copper Pavilion at the A. E. Seaman Mineral Museum exhibits a 19-ton mass of native copper recovered on the bottomland of Lake Superior on permanent loan from the State of Michigan, Department of Natural Resources. Discovery This Guinness World Record holding tabular mass of native copper, weighing approximately 19 tons, was recovered from the bottomlands of Lake Superior and is now on exhibit in the Copper Pavilion at the A. E. Seaman Mineral Museum of Michigan Tech referred to here as the "Lake Copper." Figure 1: Location of the Lake Copper shown in context with the generalized bedrock geology along the flank of the Midcontinent rift system (after Bornhorst and Lankton, 2009). 1 It was discovered in July of 1991 by local divers Bob Barron and Don Kauppi on the bottomlands of Lake Superior in about 30 feet of water northwest of Jacob’s Creek, Great Sand Bay between Eagle River and Eagle Harbor (Figure 1 and 2). The tabular Lake Copper was horizontal when discovered rather than vertical in the vein as it had fallen over.
    [Show full text]
  • The Portage Lake Volcanics (Middle Keweenawan) on Isle Roy Ale
    THE PORTAGE LAKE VOLCANICS (MIDDLE KEWEENAWAN) ON ISLE ROYALE, MICHIGAN Prepared in cooperation with the National Park Service GEOLOGICAL SURVEY PROFESSIONAL PAPER 754-C The Portage Lake Volcanics (Middle Keweenawan) on Isle Royale, Michigan By N. KING HUBER GEOLOGY OF ISLE ROYALE NATIONAL PARK, MICHIGAN GEOLOGICAL SURVEY PROFESSIONAL PAPER 754-C Prepared in cooperation with the National Park Service UNITED STATES GOVERNMENT PRINTING OFFICE, WASHINGTON 1973 UNITED STATES DEPARTMENT OF THE INTERIOR ROGERS C. B. MORTON, Secretary GEOLOGICAL SURVEY V. E. McKelvey, Director Library of Congress catalog-card No. 73-600161 For sale by the Superintendent of Documents, U.S. Government Printing Office Washington, D.C. 20402- Price $1.05 (paper cover) Stock Number 2401-02399 CONTENTS Page Page Abstract -------------------------------------------------------------------------·-------------· C1 The Portage Lake Volcanics on Isle Royale--Continued Introduction ·····-·······-···---------------···················-··--········-··············· 1 Volcanic rocks-Continued Historical background ·················--····--············--···--······-····- 1 Stratigraphic units-Continued Scope of study ·····-·-·--··········--·-·············-····-·····················-···· 1 Ophite flows ---------------------------------------------------------- C18 Acknowledgments ··········--·····················--··-····--·········-···-·--· 2 Greenstone Flow-------------------------------------·--- 19 The Portage Lake Volcanics on the Keweenaw Peninsula__ 3 The Portage Lake Volcanics
    [Show full text]
  • 38 Lake Superior 1925 1954 2017
    30 34 1954 35 24 8 4 5 7 3 9 21 36 17 KEWEENAW 25 20 38 32 HOUGHTON 19 10 18 29 28 37 6 39 13 14 15 16 ONTONAGON BARAGA 11 1 2 33 26 23 22 LUCE 31 12 27 GOGEBIC MARQUETTE ALGER CHIPPEWA IRON SCHOOLCRAFT DICKINSON MACKINAC DELTA 120 97 87 69 81 107 95 49 79 75 106 51 83 109 67 56 74 57 94 64 90 70 86 98 40 59 66 85 MENOMINEE 43 41 EMMET 89 78 53 1925 103 104 71 44 CHEBOYGAN PRESQUE ISLE 105102 63 48 CHARLEVOIX 96 73 58 112 60 ANTRIM OTSEGO MONTMORENCY ALPENA 82 LEELANAU 65 45 GRAND KALKASKA CRAWFORD OSCODA ALCONA 110 BENZIE TRAVERSE MANISTEE WEXFORD MISSAUKEE ROSCOMMON OGEMAW IOSCO 55 111 100 ARENAC 42 91 84 99 MASON LAKE OSCEOLA CLAREGLADWIN 54 HURON 92 BAY 108 52 OCEANA MECOSTA ISABELLA MIDLAND NEWAYGO TUSCOLA SANILAC 101 80 MONTCALM GRATIOT SAGINAW 61 MUSKEGON 62 GENESEE LAPEER 46 47 ST. CLAIR KENT SHIAWASSEE 88 OTTAWA IONIA CLINTON 93 50 MACOMB 119 OAKLAND 114 68 ALLEGANIBARRY EATONLNGHAM IVINGSTON 115 113 116 121 72 2017 VAN BURENJKALAMAZOO CALHOUNWACKSON WASHTENAW AYNE 118 76 77 117 BERRIEN CASS ST. JOSEPH BRANCH HILLSDALE LENAWEE MONROE tannard Rock S LAKE SUPERIOR 38 On August 26, 1835, while piloting the American Fur Company remote location. Coastguardsman gave the light station the nickname vessel John Jacob Astor, Capt. Charles C. Stannard blew off course “Stranded Rock” to underscore the isolation, and it was designated during a storm and discovered a previously unrecorded reef about a “stag station,” meaning no wives or other family members could be 25 miles from the Keweenaw Peninsula.
    [Show full text]
  • NOAA Great Lakes Charts Catalog Reference
    Charts on the Great Lakes and Adjacent Waters 96° 94° Data On the Great Lakes System Chart Number Title Scale Chart Number Title Scale Chart Number Title Scale LAKE LAKE LAKE LAKE LAKE LAKE 14500 Great Lakes—Lake Champlain to Lake of the Woods 1:1,500,000 14847 Toledo Harbor 1:20,000 14915 Little Bay de Noc 1:30,000 GENERAL LAKE DIMENSION SUPERIOR MICHIGAN HURON ST. CLAIR ERIE ONTARIO ST. LAWRENCE RIVER Entrance Channel 1:40,000 14916 SMALL-CRAFT BOOK CHART Length in miles 350 307 206 26 241 193 14770 Morristown, N.Y. to Butternut Bay, Ont. 1:15,000 14848 Detroit River 1:30,000 Lake Winnebago and Lower Fox River (book of 34 charts) Various 14850 Lake St. Clair 1:60,000 14917 Menominee and Marinette Harbors 1:15,000 14500 Breadth in miles 160 118(1) 183(2) 24 57 53 14771 Butternut Bay, Ont., to Ironsides lsland., N.Y. 1:15,000 Length in coastline (including islands) 2,730 1,640 3,830(3) 257 871 712 14772 Ironsides lsland, N.Y., to Bingham lsland, Ont. 1:15,000 14852 St. Clair River 1:40,000 14918 Head of Green Bay, including Fox River below De Pere 1:25,000 Area in square miles 14773 Gananoque, Ont., to St. Lawrence Park. N.Y. 1:15,000 Head of St. Clair River 1:15,000 Green Bay 1:10,000 1450 Water Surface, United States 20,600(4) 22,300(5) 9,150(6) 198(7) 4,980 3,560(8) 14774 Round lsland, N.Y., and Gananoque, Ont., to Wolfe l., Ont.
    [Show full text]
  • Life at Michigan Tech
    WELCOME A brief tour of the Michigan Tech campus and the greater community 1 mtu.edu 2 3 Sunrise on the Keweenaw Waterway Welcome to the banks of the largest Welcome to freshwater lake in the world. To Michigan national parks, deep history, and thousands of acres of forestland. Technological Welcome to four seasons, year-round University. adventures, and vibrant community. Welcome to the Copper Country. The community. The campus. Welcome home. Table of Contents Table of Contents The Copper Country 6 The Keweenaw Peninsula 8 The Climate 10 The Great Outdoors 11 The Community 14 Houghton and Hancock 18 Top-Tier Community Schools 19 Healthcare in the UP 20 Commitment to Families 21 Local Athletics 22 Travel 23 The Campus 24 Campus Map 26 Exploring Campus 28 Arts and Recreation 30 Michigan Tech: Beyond the Campus 32 The Copper Country 6 The view from here: Copper Harbor from the Brockway Mountain lookout. Brockway Mountain Drive is the highest paved road between the Rockies and the Alleghenies. Reaching into Lake Superior from the northernmost tip of Michigan’s Upper Peninsula is the Keweenaw Peninsula. Home to hardwoods, sandstone cliffs, and lake-effect snow, the Keweenaw’s beauty is unparalleled. 7 Map courtesy of the The Keweenaw Keweenaw Convention and Visitor’s Bureau Peninsula Pronounced kee-win-awe, the close view of “hawk highway.” Stay forest. Isle Royale boasts no roads peninsula was formed by ancient long enough to watch the sun of any kind—all travel is by foot or lava flows, giant ice sheets, and set and, if you’re lucky, catch the boat.
    [Show full text]
  • City of Houghton Master Plan 2019-2023
    CITY OF HOUGHTON MASTER PLAN 2019-2023 1 Acknowledgements Houghton City Council: Mayor Robert Backon Mayor Pro Tem Robert Megowen Rachel Lankton Mike Needham Daniel Salo John Sullivan Philip Foltz Houghton Planning Commission: Tom Merz, Chairperson Mike Needham, Vice Chairperson Gary Lubinski, Secretary Robert Backon, Mayor Eric Waara Kristine Bradof Dan Liebau Bill Leder Michele Jarvie-Eggart Eric T. Waara, P.E. City Manager Ann Vollrath, Assistant City Manager A special thank you to all Houghton citizens who participated in the community survey and public planning workshops associated with this Master Plan. 2 table of contents Chapter 1: Introduction Chapter 2: The Master Plan Process Chapter 3: Historical Timeline Chapter 4: Demographics Chapter 5: Physical and Natural Setting Chapter 6: Community Facilities Chapter 7: Recreation Chapter 8: Neighborhood Preservation and Development Chapter 9: Transportation Chapter 10: Downtown Chapter 11: M-26 & Sharon Avenue Business Corridor Chapter 12: Economic Development Chapter 13: Zoning Plan and Future Land Use Chapter 14: Sustainable Practices & Energy Conservation Chapter 15: Life in a Winter City Chapter 16: Strategies Appendices 3 - Demographics - Downtown Development Map - Existing Recreational Facilities Map - City of Houghton Vacant Land Map - City of Houghton Future Land Use Map - City of Houghton Zoning Map - City of Houghton Resolutions 4 Glossary ADA – Americans with Disabilities Act of 1990 DDA – Downtown Development Authority EGLE – Michigan Department of Environment, Great Lakes,
    [Show full text]
  • Michigan's Copper Country" Lets You Experience the Require the Efforts of Many People with Different Excitement of the Discovery and Development of the Backgrounds
    Michigan’s Copper Country Ellis W. Courter Contribution to Michigan Geology 92 01 Table of Contents Preface .................................................................................................................. 2 The Keweenaw Peninsula ........................................................................................... 3 The Primitive Miners ................................................................................................. 6 Europeans Come to the Copper Country ....................................................................... 12 The Legend of the Ontonagon Copper Boulder ............................................................... 18 The Copper Rush .................................................................................................... 22 The Pioneer Mining Companies................................................................................... 33 The Portage Lake District ......................................................................................... 44 Civil War Times ...................................................................................................... 51 The Beginning of the Calumet and Hecla ...................................................................... 59 Along the Way to Maturity......................................................................................... 68 Down the South Range ............................................................................................. 80 West of the Ontonagon............................................................................................
    [Show full text]
  • And Natural History
    MICHIGAN BIRDS and Natural History September - October 2009 Volume 16 Number 4 A publication of Michigan Audubon MICHIGAN BIRDS and Natural History September - October 2009 Volume 16 Number 4 Michigan Birds and Natural History is a publication of Michigan Audubon and is published five times a year. Its mission is to provide a forum for the publication of research on the natural history of Michigan with an emphasis on birds. It is also the home of the Michigan Bird Survey, Michigan Butterfly Survey, Michigan Christmas Bird Counts, North American Migration Count, and the proceedings of the Michigan Bird Records Committee. Subscriptions are $25.00 per year in the United States and $30.00 elsewhere. They cover the current calendar year. Subscriptions can be obtained by sending a check along with your name and address to: Michigan Audubon/MBNH 6011 W. St. Joseph Hwy., Suite 403 Lansing, Michigan 48917 If you would prefer to receive your subscription electonically rather than as a mailed paper copy, also include your email address with your subscription request. MBNH Committee Managing Editor .........................................................................................Vacant Layout Editor .................................................................................... Don Tinson II Survey Editor .............................................................................. Adam M. Byrne Photo Editor ............................................................................... Allen T. Chartier Copy Editor ...........................................................................................
    [Show full text]
  • Blue Print for Tomorrow for Print Blue
    7 201 Blue Print for Tomorrow Keweenaw County Planning Commission 5095 4th Street, Eagle River Michigan 906-337-3471 906-337-2253 1 THE KEWEENAW COUNTY BLUEPRINT FOR TOMORROW WAS PREPARED IN 2016 BY THE KEWEENAW COUNTY PLANNING COMMISSION WITH ASSISTANCE FROM THE WESTERN UPPER PENINSULA PLANNING AND DEVELOPMENT REGION AS WELL AS INPUT FROM ALLOUEZ, EAGLE HARBOR, GRANT, HOUGHTON, AND SHERMAN TOWNSHIPS, AHMEEK VILLAGE, KEWEENAW COUNTY BUILDING & GROUNDS, SHERIFF DEPARTMENT, ROAD COMMISSION, ECONOMIC DEVELOPMENT COMMITTEE, HOUGHTON COUNTY PLANNING COMMISSION AND MANY OTHERS. THE PLANNING COMMISSION PROUDLY PRESENTS THE UPDATED BLUE PRINT FOR TOMORROW. Planning Commission Members: Jon Soper, Chairman John Parsons, Vice-Chairman Ray Chase, County Commissioner Tom Hall, Member Ned Huwatschek, Member Richard Schaefer, Member Steven Siira, Member Ann Gasperich, Zoning Administrator Keweenaw County Commissioner 2016 2017 District 1: Don Piche District 1: Don Piche District 2: Ray Chase District 2: James Vivian II District 3: Del Rajala District 3: Del Rajala District 4: Robert DeMarois District 4: Robert DeMarois District 5: Randy Eckloff District 5: Sandra Gayk 2 CONTENTS SECTION 1: BACKGROUND INFORMATION ................................................................................................. 6 1.1 INTRODUCTION ..................................................................................................................................... 6 1.2 Setting ..................................................................................................................................................
    [Show full text]
  • Regional Gravity Investigation of the Eastern Portion of the Northern Peninsula of Michigan
    REGIONAL GRAVITY INVESTIGATION OF THE EASTERN PORTION OF THE NORTHERN PENINSULA OF MICHIGAN By Erdogan Oray A THESIS Submitted to Michigan State University in partial fulfillment of the requirements for the degree of DOCTOR OF PHILOSOPHY Department of Geology 1971 PLEASE NOTE: Some pages may have indistinct print. Filmed as received. University Microfilms, A Xerox Education Company ABSTRACT REGIONAL GRAVITY INVESTIGATION OF THE EASTERN PORTION OF THE NORTHERN PENINSULA OF MICHIGAN By Erdogan Oray A regional gravity investigation was conducted to delineate the Precambrian features of the eastern portion of the Northern Peninsula of Michigan in relation to the tectonic framework of the Lake Superior region and the Southern Peninsula of Michigan. During the survey, an area of 12,000 square miles in the Northern Peninsula of Michigan was covered by a total of 1,003 gravity stations. An additional 851 gravity stations previously observed in the Southern Peninsula of Michigan, Beaver Island, northern Lake Huron, northern Lake Michigan and Sault Ste. Marie area of Canada were used to establish the regional gravity pattern. The Bouguer Gravity Anomaly Map with the aid of a Double Fourier Series Residual Gravity Map indicates that the eastern portion of the Northern Peninsula is associated with two major linear positive gra­ vity anomalies. One of these anomalies trends south from Whitefish Point on the south shore of Lake Superior and is associated with ba­ salts upthrown into a horst within the eastern limb of the Lake Sup­ erior syncline. This anomaly is correlated with the Middle Keweenawan Erdogan Oray volcanics outcropping on Mamainse Point, Ontario.
    [Show full text]
  • A Case Study of Resource Development in the Upper Peninsula of Michigan
    PEQUAMING: A CASE STUDY OF RESOURCE DEVELOPMENT IN THE UPPER PENINSULA OF MICHIGAN Thesis for the Degree of M. S. MICHIGAN. STATE. UNIVERSITY JOSEPH LEWIE LEPCZYK 1971 1" P— l” ‘l / IIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 5). 414073 IIIIIIIIIIIILIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII L ' 293 00627 1062 IIISM '33 19¢; I I 00.21 211031 I AUG 3 21 2005 AUG :2 2 £997 .1111;- 19121115 ABSTRACT PEQUAMING: A CASE STUDY OF RESOURCE DEVELOPMENT IN THE UPPER PENINSULA OF MICHIGAN By Joseph Lewie Lepczyk The problem of economic development is examined for a townsite and its attached land in the Upper Peninsula of Michigan. Due to several factors the town of Pequaming became a "ghost town" in 1942. The factors of location, outside control, resource depletion and changing technology are examined along with alternatives at each stage of development in land use which have arisen since the town was shut down by the Ford Motor Company in a revamping of its holdings. Through several transfers of ownership the property has remained a single holding. A case study approach is used for each ownership period tracing and evaluating actual and proposed development to date. An image-plan model is used in the case study. It essentially tries to determine the plans and goals of the various owners in regard to the site initially, the resources they saw avail- able, methods used by them, and the degree of their success Joseph Lewie Lepczyk with respect to the initial plans and goals. Special atten- tion has been directed to accessing the recreational de- velopment potential of the site at this time.
    [Show full text]