19-044 , AND SIDEWALK REPAIR PRICING SHEET Prices must include the cost of insurance and bonding. *Quantities shown hereon are estimated and approximate for the purpose of pricing and may not represent actual quantities that are constructed. Work locations will Mobil Construction 3D Paving mostly be within residential subdivisions and will be provided periodically throughout the term of the contract JOE FUNK CONSTRUCTION CAM-CRETE

ITEM QTY UNIT DESCRIPTION UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE

1 4000 Sq. Yd. Remove and replace 6” (Street) $ 80.00 $ 320,000.00 $ 80.00 $ 320,000.00 $ 90.52 $ 362,080.00 $ 82.00 $ 328,000.00 2 200 Sq. Yd. Remove and replace 6” concrete (Class “HES”) $ 120.00 $ 24,000.00 $ 138.00 $ 27,600.00 $ 103.52 $ 20,704.00 $ 150.00 $ 30,000.00 3 2000 Sq. Yd. Remove and replace 6” concrete (Alley) $ 82.00 $ 164,000.00 $ 110.00 $ 220,000.00 $ 90.52 $ 181,040.00 $ 82.00 $ 164,000.00 4 250 Sq. Yd. Remove and replace 8” concrete $ 100.00 $ 25,000.00 $ 85.00 $ 21,250.00 $ 110.02 $ 27,505.00 $ 105.00 $ 26,250.00 5 100 Sq. Yd. Remove and replace 8” concrete (Class “HES”) $ 150.00 $ 15,000.00 $ 135.00 $ 13,500.00 $ 116.52 $ 11,652.00 $ 155.00 $ 15,500.00 6 1000 Cu. Yd. Installation of flex base material $ 68.00 $ 68,000.00 $ 55.00 $ 55,000.00 $ 103.52 $ 103,520.00 $ 65.00 $ 65,000.00 Installation of 6” integral in conjunction with 7 2500 L.F. $ 12.00 $ 30,000.00 repairs $ 7.00 $ 17,500.00 $ 32.02 $ 80,050.00 $ 12.00 $ 30,000.00 8 4000 Sq. Yd. Remove and replace 4” sidewalks $ 65.00 $ 260,000.00 $ 60.00 $ 240,000.00 $ 84.02 $ 336,080.00 $ 72.00 $ 288,000.00 9 200 Sq. Yd. Remove and replace 6” approaches $ 86.00 $ 17,200.00 $ 90.00 $ 18,000.00 $ 104.00 $ 20,800.00 $ 92.00 $ 18,400.00 10 200 Sq. Ft. Installation of retaining wall for walk / wall combination $ 62.00 $ 12,400.00 $ 60.00 $ 12,000.00 $ 58.50 $ 11,700.00 $ 70.00 $ 14,000.00 11 30 Each Remove and replace barrier free ramps $ 2,300.00 $ 69,000.00 $ 1,600.00 $ 48,000.00 $ 1,820.00 $ 54,600.00 $ 2,650.00 $ 79,500.00 12 100 Sq. Yd. Remove and replace median pavers $ 220.00 $ 22,000.00 $ 100.00 $ 10,000.00 $ 175.50 $ 17,550.00 $ 25.00 $ 2,500.00 13 150 L.F. Remove and replace 18” curb and gutter $ 38.00 $ 5,700.00 $ 70.00 $ 10,500.00 $ 32.50 $ 4,875.00 $ 50.00 $ 7,500.00 14 50 L.F. Remove and replace 24” curb and gutter $ 40.00 $ 2,000.00 $ 80.00 $ 4,000.00 $ 39.00 $ 1,950.00 $ 50.00 $ 2,500.00 15 50 L.F. Remove and replace 30” curb and gutter $ 52.00 $ 2,600.00 $ 90.00 $ 4,500.00 $ 52.00 $ 2,600.00 $ 50.00 $ 2,500.00 16 1 Each Remove and replace 8’ curb line inlet $ 5,000.00 $ 5,000.00 $ 4,500.00 $ 4,500.00 $ 12,350.00 $ 12,350.00 $ 6,500.00 $ 6,500.00 17 1 Each Remove and replace 8’ curb line inlet top $ 3,000.00 $ 3,000.00 $ 2,500.00 $ 2,500.00 $ 4,225.00 $ 4,225.00 $ 4,000.00 $ 4,000.00 18 1 Each Remove and replace 10’ curb line inlet $ 6,000.00 $ 6,000.00 $ 6,000.00 $ 6,000.00 $ 14,950.00 $ 14,950.00 $ 7,500.00 $ 7,500.00 19 1 Each Remove and replace 10’ curb line inlet top $ 5,000.00 $ 5,000.00 $ 3,500.00 $ 3,500.00 $ 4,745.00 $ 4,745.00 $ 5,200.00 $ 5,200.00 20 2 Each Vertical adjustment of to grade $ 1,000.00 $ 2,000.00 $ 700.00 $ 1,400.00 $ 845.00 $ 1,690.00 $ 850.00 $ 1,700.00 Vertical adjustment of water valve stacks, meter cans, sewer 21 40 Each $ 600.00 $ 24,000.00 cleanouts or irrigation control boxes to grade $ 500.00 $ 20,000.00 $ 325.00 $ 13,000.00 $ 500.00 $ 20,000.00 Rebuild brick mailboxes due to relocation or grade 22 2 Each $ 1,000.00 $ 2,000.00 adjustments $ 1,000.00 $ 2,000.00 $ 4,225.00 $ 8,450.00 $ 2,000.00 $ 4,000.00 23 200 Cu. Yd. Replacement of topsoil fill material $ 35.00 $ 7,000.00 $ 50.00 $ 10,000.00 $ 84.50 $ 16,900.00 $ 80.00 $ 16,000.00 24 1000 Sq. Yd. Replacement of common Bermuda sod $ 10.00 $ 10,000.00 $ 9.00 $ 9,000.00 $ 7.80 $ 7,800.00 $ 10.00 $ 10,000.00 25 1000 Sq. Yd. Replacement of Raleigh St. Augustine sod $ 10.00 $ 10,000.00 $ 9.00 $ 9,000.00 $ 7.80 $ 7,800.00 $ 10.00 $ 10,000.00 Total for all items $ 1,110,900.00 $ 1,089,750.00 $ 1,328,616.00 $ 1,158,550.00

WEST TEXAS REBAR PLACERS, INC NEW WORLD KENDO SAZ ITEM QTY UNIT DESCRIPTION UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 1 4000 Sq. Yd. Remove and replace 6” concrete (Street) $ 86.00 $ 344,000.00 $ 83.00 $ 332,000.00 $ 90.00 $ 360,000.00 $ 90.00 $ 360,000.00 2 200 Sq. Yd. Remove and replace 6” concrete (Class “HES”) $ 143.00 $ 28,600.00 $ 92.00 $ 18,400.00 $ 120.00 $ 24,000.00 $ 104.00 $ 20,800.00 3 2000 Sq. Yd. Remove and replace 6” concrete (Alley) $ 90.00 $ 180,000.00 $ 83.00 $ 166,000.00 $ 85.00 $ 170,000.00 $ 90.00 $ 180,000.00 4 250 Sq. Yd. Remove and replace 8” concrete $ 100.00 $ 25,000.00 $ 95.00 $ 23,750.00 $ 100.00 $ 25,000.00 $ 95.00 $ 23,750.00 5 100 Sq. Yd. Remove and replace 8” concrete (Class “HES”) $ 145.00 $ 14,500.00 $ 100.00 $ 10,000.00 $ 130.00 $ 13,000.00 $ 120.00 $ 12,000.00 6 1000 Cu. Yd. Installation of flex base material $ 28.00 $ 28,000.00 $ 30.00 $ 30,000.00 $ 41.00 $ 41,000.00 $ 50.00 $ 50,000.00 Installation of 6” integral curb in conjunction with pavement 7 2500 L.F. $ 15.00 $ 37,500.00 $ 15.00 $ 37,500.00 repairs $ 14.00 $ 35,000.00 $ 6.50 $ 16,250.00 8 4000 Sq. Yd. Remove and replace 4” sidewalks $ 70.00 $ 280,000.00 $ 69.00 $ 276,000.00 $ 60.00 $ 240,000.00 $ 90.00 $ 360,000.00 9 200 Sq. Yd. Remove and replace 6” driveway approaches $ 89.00 $ 17,800.00 $ 82.00 $ 16,400.00 $ 75.00 $ 15,000.00 $ 90.00 $ 18,000.00 10 200 Sq. Ft. Installation of retaining wall for walk / wall combination $ 28.00 $ 5,600.00 $ 32.00 $ 6,400.00 $ 95.00 $ 19,000.00 $ 50.00 $ 10,000.00 11 30 Each Remove and replace barrier free ramps $ 1,500.00 $ 45,000.00 $ 2,000.00 $ 60,000.00 $ 2,800.00 $ 84,000.00 $ 2,200.00 $ 66,000.00 12 100 Sq. Yd. Remove and replace brick median pavers $ 104.00 $ 10,400.00 $ 100.00 $ 10,000.00 $ 105.00 $ 10,500.00 $ 60.00 $ 6,000.00 13 150 L.F. Remove and replace 18” curb and gutter $ 45.00 $ 6,750.00 $ 25.00 $ 3,750.00 $ 50.00 $ 7,500.00 $ 30.00 $ 4,500.00 14 50 L.F. Remove and replace 24” curb and gutter $ 50.00 $ 2,500.00 $ 25.00 $ 1,250.00 $ 65.00 $ 3,250.00 $ 35.00 $ 1,750.00 15 50 L.F. Remove and replace 30” curb and gutter $ 50.00 $ 2,500.00 $ 35.00 $ 1,750.00 $ 70.00 $ 3,500.00 $ 40.00 $ 2,000.00 16 1 Each Remove and replace 8’ curb line inlet $ 4,500.00 $ 4,500.00 $ 5,800.00 $ 5,800.00 $ 4,200.00 $ 4,200.00 $ 5,000.00 $ 5,000.00 17 1 Each Remove and replace 8’ curb line inlet top $ 4,500.00 $ 4,500.00 $ 5,800.00 $ 5,800.00 $ 2,500.00 $ 2,500.00 $ 4,000.00 $ 4,000.00 18 1 Each Remove and replace 10’ curb line inlet $ 5,000.00 $ 5,000.00 $ 6,500.00 $ 6,500.00 $ 6,000.00 $ 6,000.00 $ 5,800.00 $ 5,800.00 19 1 Each Remove and replace 10’ curb line inlet top $ 5,000.00 $ 5,000.00 $ 6,500.00 $ 6,500.00 $ 3,500.00 $ 3,500.00 $ 4,500.00 $ 4,500.00 20 2 Each Vertical adjustment of manholes to grade $ 400.00 $ 800.00 $ 1,000.00 $ 2,000.00 $ 150.00 $ 300.00 $ 700.00 $ 1,400.00 Vertical adjustment of water valve stacks, meter cans, sewer 21 40 Each $ 300.00 $ 12,000.00 $ 350.00 $ 14,000.00 cleanouts or irrigation control boxes to grade $ 250.00 $ 10,000.00 $ 200.00 $ 8,000.00 Rebuild brick mailboxes due to relocation or grade 22 2 Each $ 1,200.00 $ 2,400.00 $ 1,200.00 $ 2,400.00 adjustments $ 1,000.00 $ 2,000.00 $ 1,200.00 $ 2,400.00 23 200 Cu. Yd. Replacement of topsoil fill material $ 45.00 $ 9,000.00 $ 30.00 $ 6,000.00 $ 25.00 $ 5,000.00 $ 30.00 $ 6,000.00 24 1000 Sq. Yd. Replacement of common Bermuda sod $ 9.00 $ 9,000.00 $ 13.00 $ 13,000.00 $ 7.00 $ 7,000.00 $ 8.00 $ 8,000.00 25 1000 Sq. Yd. Replacement of Raleigh St. Augustine sod $ 12.00 $ 12,000.00 $ 13.00 $ 13,000.00 $ 8.00 $ 8,000.00 $ 8.00 $ 8,000.00 Total $ 1,092,350.00 $ 1,061,300.00 $ 1,078,900.00 $ 1,211,400.00