Shri Narendra Modi Hon’ble Prime Minister New Railway New Parliamentary Constituency PREFACE

Indian Railways is the growth engine of the nation and a catalyst for 's progress and economic development. South Western Railway (SWR) plays a significant role in the Gajanan Mallya socio-economic development of Karnataka General Manager State. Railways have achieved many visible South Western Railway milestones in Karnataka in the recent years. 331 km of new lines and 913 km of doubling have been completed in last 7 years. 144 new Mail- Express and Passenger trains have been introduced. Apart from this, many trains have been extended and the frequency increased. The Railway personnel are vibrant and dedicated, ready to adapt to changing scenario of the transport sector to fulfil the requirements and expectations of people of Karnataka. During the time of Covid19 pandemic, Railway personnel have contributed in various capacities to the society. This brochure is aimed at listing out some of the important accomplishments in recent past and current projects in Chikkaballapur Lok Sabha Constituency in Karnataka State. INPUTS BY RAILWAY IN CHIKKABALLAPUR PARLIAMENTARY CONSTITUENCY

Chikkaballapur Lok Sabha Constuency consists of Gauribidanur, Bagepalli, Chikkaballapur, Yelahanka, Hosakote, Devenahalli, Dodballapur and Nelamangala Vidhan Sabha Constuencies. Important Railway Staons in Chikkaballapur Constuency are Yelahanka, Rajanukun, Dodballapur, Oddarahalli, Makalidurga, Tondebavi, Someswara H, Gauribidanur, Viduraswaha, Doddajala,H, Devanahalli, Avathihalli H, Venkatagiri Kote H, Nandi H, Nelamangala, Solur, Devanagonthi and Gidnahalli H.

Introduction of new trains  Tr.No. 06565/66 KSR Bengaluru-Hindupur-KSR Bengaluru Daily MEMU Spl.  Tr.No. 06561/62 Yelahanka – Mysuru – Yelahanka Daily MEMU Spl.

New Stoppages Provided

T rain At

 Bh ubaneswar – KSR Bengaluru – Bhubaneswar Prashanti Express Gauribidanur

 My suru - Bagalkot – Mysuru Basava Express Gauribidanur Do dballapur  KSR Bengaluru - Hubbal li – KSR Be ngaluru Fast Passenger Nidv anda  KSR Bengalur u - Kolhapu r – KSR Bengaluru Rani Chennamma Express Dodbele

 Kacheguda - Yesvantp ur – Kac heguda Express Dod ballapur  Lokmanya Tilak Ter minus - Coimbatore - Lokmanya Tilak Gau ribidanur Terminus Kurla Ex press  Tr.No 66524 Hindupur-KSR Benga luru-Hindupur MEMU w.e.f 06-04-2019 Viduraswattha  Tr.No 56504 Vijayawada – Bengaluru Cantonment Passenger w.e.f

06-04-2019

Exten sion of Train Services

Train Extended to

 Tr No. 22133/34 S holapur – Yes vantpur – Sholapur Daily Expr ess Ha ssan extended with change in T.No. as 11311/11312 S holapur – Hassan – Sholapur Express  Tr No.16534/33 Yesvantpur-Bhagat Ki Kothi – Yesvantpur extended Jodhpur  Tr No.06595/96 Yesvantpur-Devanahalli-Yesvantpur DEM U Chikkab allapur

 Tr.No.12785/86 Kacheguda – KSR Bengaluru – Kacheguda Express Mysuru

 Tr.No.19301/02 Indore – Yesvantpur – Indore Express Dr Ambedkar Nagar Infrastructure Improvem ents

Project for work Cost (in Rs.)  New Line between Nelamangala - Shravanabel agola as a part of Rs. 86 Crores Bengaluru – Hassan New line project

 Doubling between Yesvantpur– Y elahanka Rs. 44 Crores

 Electrification between Yesvantpur - Yelahanka. Rs. 4 Crores

 Doubling between Yelahanka – Channasandra Rs. 3 Crores  Electrification between Yelahanka - Channasandra.  Electrification between Yelahanka –Penukonda Rs. 45 Cr ores  Doubling with Electrification between Yela hanka-De varapalle (72 kms) Total proj ect

as part of Yelahanka-Penukonda Doubling (120kms) cost in Rs. 860.43 Crores  Kemp egowda International Airpo rt Halt (KIAD) - New Halt Station commissioned b etween Yelahanka- Devanahalli  Intermediate Block Signalling Post commissioned between Yelahanka- Rs. 2.8 Crores Chennasandra  Electrification of Yelahanka – Bangarapet line (149 Route KM) commenced Amenities at Stations Station Amenities Cost (in Rs.)  Foot Over Bridge 1.32 Crores Devangonthi  Extension of Rail Level Platform 18 Lakhs  Raising and Extension of High Level 70 Lakhs Platforms

 Divyang Toilet provided 3 Lak hs

 PF Shelter provided 8 Lak hs  WI- FI (Under CSR)

Gauribidanur & Dodballapur  Provided Platform Shelter 1.26 Crores  Rajankunti Rais ing and Exten sion of Platform 50 L akhs  WI- FI (Under CSR) Gauribidanur  Raising and Extension of Platfo rm 49 L akhs Soladevanahalli  Extens ion of Rail Lev el Platform 18 L akhs Muddalingana Ha lli Halt  New Station Building 11 L akhs Bhairanayakanahall i, Dodbele,  Raising and Extension of Rai l Level 9 Lak hs Muddalinganahalli, Nidvanda and Platforms Dobbspet Dodballapur & Chikkaballapur  Public Anno uncement System 1.5 Lakhs

Yelahanka  Provision of 2 Nos Lifts 1.2 Cr ores  WI- FI (Under CSR) Kempegowda International Airport  New Halt station de veloped 3 Cr ores Halt Railway Station Bhairanayakanahalli, D odbele,  Raising and Extension of High Level 4.75 Lakhs Muddalinganahalli Platforms Oddarahalli, Makalidur ga,  Foot Ove r Bridge 12.6 Crores

Someswara, Thondebavi, Gauribidanur, , Yelahanka (85), Doddaballapur  Provided Stainless steel benches for 30 L akhs (25),Gauribidanur (25) improved seating facility (135 Benches) Dodballapur  WI- FI (Under CSR ) Oddarahalli  WI- FI (Under CSR ) Makalidurga  WI- FI (Under CSR )  WI- FI (Under CSR )  Nelamangal a WI- FI (Under CSR ) Golhalli  WI- FI (Under CSR ) Dodbele  WI- FI (Under CSR ) Nidavanda  WI- FI (Under CSR ) Devanahalli  WI- FI (Under CSR )  Chikkaballpour WI- FI (Under CSR)

Other Works

ROAD OVER BRIDGE CONSTRUCTED Cost (in Rs.)

Between Yelahanka – Rajankunte 28 Crores

ROAD UNDER BRIDG E CONSTRUCTED

Near Devanahalli 1.37 Cr ores Near Avathihalli 1.27 Cr ores Near Nandi village 1.28 Cr ores Ne ar Oddarahalli 1.87 Crores Near Someshwara 1.48 Crores Near Bhairanayakanahalli 50 Lakhs