For SAI PRIYA BEACH RESORTS
Total Page:16
File Type:pdf, Size:1020Kb
SUBMISSION OF FORM – I & IA TOWARDS ENVIRONMENTAL CLEARANCE (EC) For M/s. SAI PRIYA BEACH RESORTS, (Construction of Tourism Beach Resorts) Regd. Office: 5-170, Rushikonda, Andhra Pradesh Site Address: Sy.No 16 & 24 RUSHIKONDA (V), VISAKHAPATNAM Prepared& Submitted by Enviro House, Block –B, B-1, IDA, Auto Nagar, Visakhapatnam – 530 012 Ph: 0891-2755528, Telex: 0891-2755529, E-mail: [email protected] Cell: 9440338628 QCI No – 136 & Recognized by MOEF&CC, New Delhi, Accredited by NABL FORM -1 (I) Basic Information Sl.No. Item Details 1. Name of the project(s) M/s. SAI PRIYA BEACH RESORTS 2. S.No. in the schedule 8 (a) 3. Proposed capacity/area/length/tonnage to Construction of Beach Resorts project in an be handled/command area/lease area of 29.065Acres area/number of wells to be drilled. 4. New/Expansion/Modernization New Construction of Beach Resorts under CRZ-III area. 5. Existing Capacity/Area etc. NIL 6. Category of Project i.e. ‘A’ or ‘B’ Category – B 7. Does it attract the general condition? If No yes, please specify. 8. Does it attract the specific condition? If No yes, please specify. 9. Location Plot/Survey/Khasra No. Sy.No:16 & 24 Village Rushikonda Tehsil Visakhapatnam District VISAKHAPATNAM DISTRICT State ANDHRA PRADESH 10. Nearest Railway Station/Airport along Visakhapatnam Railway station at 12.35 kms with distance in kms. from the project site. Visakhapatnam Airport is at a distance of 18.35 kms from the project site. 11. Nearest Town, City, District Headquarters Visakhapatnam Town at 10.0kms, along with distance in kms. 12. Village Panchayats, Zilla Parishad, Greater Visakhapatnam Limits. Municipal Corporation, Local body Village : Rushikonda ,Visakhapatnam. (complete postal addresses with telephone nos. to be given) 13. Name of the applicant Shri. DRK Prasad M/s. SAI PRIYA BEACH RESORTS 14. Registered Address M/s. SAI PRIYA BEACH RESORTS Sy.No. 16 & 24 Rushikonda Visakhapatnam 15. Address for correspondence: Name Shri. DRK Prasad Designation (Owner/Partner /CEO) Managing Director Pin code 530045 E-mail [email protected] Telephone No. 9848110384 Fax No. -- 16. Details of Alternative Sites examined, if Village- District-State any. Location of these sites should be Rushikonda-Visakhapatnam-Andhra Pradesh shown on a Toposheet. 17. Interlinked Projects Nil 18. Whether separate application of NA interlinked project has been submitted? 19. If yes, date of submission NA 20. If no, reason There are not interlinked projects for our construction of beach resorts project. 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. i. The Forest (Conservation) Act, NA 1980? ii. The Wildlife (Protection) Act, NA 1972? Yes iii. The C.R.Z. Notification, 1991? Obtained CRZ clearance from MOEF&CC, New Delhi vide F.No: 11-27/2017-IA-III DT: 06.11.2017 22. Whether there is any Government G.O No:161 Order/Policy relevant /relating to the site? 23. Forest land involved (hectares) Nil 24. Whether there is any litigation pending against the project and/or land in which Nil the project is propose to be set up? a) Name of the Court b) Case No. c) Orders/directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist confirmation Details thereof (with approximate quantities /rates, wherever Yes/No possible) with source of information data 1.1 Permanent or temporary change in Yes The Land earmarked for Construction land use, land cover or topography of Beach resorts project in an area of including increase in intensity of land 29.065acres use (with respect to local land use Built up area – 27980 Sq.mts plan) Building –A (G+1) = 12078 Sq.m Building –B (GF) – 1224 Sq.mts Building –C (G+1) = 4338 Sq.mts Building-D,EF (Ground floor) = 2340 Sq. m Building –G (G+1floor) = 8000Sq.m This land is sufficient for construction of beach resorts & associated other utilities. Further the above land is barren land. Therefore no change in land use / land cover / topography. 1.2 Clearance of existing land, vegetation No The land is barren and developed and buildings? land. No vegetation or building existing in this land for clearance. 1.3 Creation of new land uses? No The facility having 29.065acres of total site area. Within this land premises only the construction work will be taken up. 1.4 Pre-Construction investigations e.g. Yes For the total area already ground bore houses, soil testing? water and soil testing carried. 1.5 Construction works? Yes Structures comprises of Building – A,B,C,D,E&F& G. The main components of the civil works for the proposed project include the construction of Buildings, Amenities, Water park, DG Set Rooms, generators foundations and structures, Sewage Treatment Plant, etc. 1.6 Demolition works? No The site is leveled one and not contains any temporary / permanent structures. Therefore no demolition works in the proposed area. 1.7 Temporary sites used for construction No Local manpower will be utilized for works Or housing of construction the construction work. Therefore no workers? temporary site used for construction works. 1.8 Above ground buildings, structures or Yes BUILDINGS earthworks including linear Buildings structures, cut and fill or excavations Sewage Treatment Plant Water park DG Set Room 1.9 Underground works including mining No No mining or tunneling activity. or tunneling? 1.10 Reclamation works? No No reclamation work 1.11 Dredging? No Not applicable 1.12 Offshore structures? No Not applicable 1.13 Production and manufacturing No As it is construction of tourism processes? project there is no Production and manufacturing process takes place. 1.14 Facilities for storage of goods or Yes Cement storage materials? Building materials storage 1.15 Facilities for treatment or disposal of Yes Liquid effluents The waste water generated from the solid waste or liquid effluents? proposed project will be in the form of sanitary waste water only and which will be routed to sewage treatment plant and thereby reuse and for firefighting if surplus to local municipal sewerage network. DISPOSAL: The garbage will be segregated into dry waste and wet waste. Wet waste which is bio-degradable will be dump into Organic waste converter of 600Kgs/Day (Model OWC 130) for converting the bio- degradable waste into manure. 1.16 Facilities for long term housing of No Majority of manpower will be Operational workers? recruited from local people only. Therefore no housing scheme proposed. 1.17 New road, rail or sea traffic during No The site is well connected to Construction or operation? roadway. No new road or rail road development required. 1.18 New road, rail, air waterborne or N.A -- other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing N.A -- transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or No -- pipelines? 1.21 Impoundment, damming, culverting, No -- realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No -- 1.23 Abstraction or transfers of water form Yes Meet the water requirements from ground or surface waters? GVMC of 16.0KLD for domestic purpose. 7.0KLD of recycled water for greenbelt development. 1.24 Changes in water bodies or the land No -- surface affecting drainage or run-off? 1.25 Transport of personnel or materials Yes During construction activity, private for construction, operation or tippers will be used for supply of decommissioning? metal, sand, cement and iron & other building material. 1.26 Long-term dismantling or No -- decommissioning or restoration works? 1.27 Ongoing activity during No -- decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes There would be a marginal influx of Temporarily or permanently? people since the construction consists of beach resorts 1.29 Introduction of alien species? No -- 1.30 Loss of native species or genetic No -- diversity? 1.31 Any other actions? Yes The proposed project will develop green belt all along the all sides of boundary wall. 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non- renewable or in short supply): Details thereof (with approximate S.No. Information/Checklist confirmation Yes/No quantities / rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No The present status of land is barren agricultural land (ha) and non-agricultural. 2.2 Water (expected source & competing Yes During operation users) unit: KLD Domestic – 16.0 KLD Sub-Total – 16.0 KLD Recycled water – 7.0 KLD Total – 23.0 KLD 2.3 Minerals (MT) No Not applicable 2.4 Construction material – stone, Yes Stone aggregates – 7000 m3 aggregates, sand / soil (expected (foundation work) source – MT) Soil - no soil will be lifted or excavated. Sand - 13500 m3 2.5 Forests and timber (source – MT) Yes The timber that is required is procured from the approved local contractors. 2.6 Energy including electricity and fuels Yes Electricity will be supplied by (source, competing users) Unit: fuel APEPDCL. (MT), energy (MW) Diesel for DG Sets – 50 Litres/Day 2.7 Any other natural resources (use No -- appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.