Towong Shire Community Recovery Newsletter Edition 8 - November 2020
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Victorian Heritage Database Place Details - 1/1/2014 Darbyshire Hill No.1 & No
Victorian Heritage Database place details - 1/1/2014 Darbyshire Hill No.1 & No. 2 Bridges Location: Wodonga-Cudgewa Railway, midway between Bullioh & Darbyshire, BULLIOH, TOWONG SHIRE Heritage Inventory (HI) Number: 1 Listing Authority: HI Extent of Registration: Statement of Significance: Darbyshire Hill Nos. 1 and 2 Bridges are single-track rail bridges of three-storey pier design and combine standard fifteen feet timber-beam approach spans with twenty feet rolled-steel-joist spans over the main channels. The timber piers on these bridges are fitted with rare double-longitudinal walings. No. 2: timber and steel composite rail bridge 96.6 metres (317 feet) long, with unusually tall 4 pile timber piers (max. height, 21.3 metres, 79 feet), six timber-beam approach spans each of fifteen feet (4.6 metres), eleven rolled-steel-joist spans each of twenty feet (6.1 metres), and a straight deck of standard transverse-timber design. This bridge, 21.3 metres high, is the tallest railway bridge of timber and steel joist construction to survive in Victoria. No. 1 timber and steel composite rail bridge 65.48 metres (215 feet) long, with unusually tall 4 pile timber piers (max. height, 16.45 metres, 54 feet), and a curving transverse-timber deck. This bridge has five timber-beam spans each of standard fifteen feet (4.6 metre) Victorian Railways design, and seven rolled-steel-joist spans each of twenty feet (6.1 metres). Darbyshire Hill Nos.1 and 2 Bridges were built in 1916 as part of the Wodonga-Cudgewa railway. The line was closed in 1981. -
Georgii Quinti Regis
VICTOLUA. ANNO TET5TIO GEORGII QUINTI REGIS. No. 2414. An Act to authorize the Construction hy the State of a Line of Railway from Tallangatta to Cudgewa. [23rd December, 1912.] E it enacted by the King's Most Excellent Majesty by and with B the advice and consent of the Legislative Council and the Legislative Assembly of Victoria in this present Parliament assembled and by the authority of the same as follows (that is to say) :— 1. This Act may be cited as the Tallangatta to Cudgewa Railway Short tuit. Construction Act 1912. 2. In this Act unless the context otherwise requires— interpretation. u Board " means the Board of Land and Works. u Commissioners" means the Victorian Railways Com missioners. u Land " includes all real estate messuages lands tenements hereditaments and easements of any tenure. " Line '* means line of railway. 3. (1) It [wj 311 W°2- 3 GEO. V.] Tallangatta to Cudgewa Railway Construction. [No. 2414 Power to make 3. (1) It shall be lawful for the Board to make and construct the Tallangatta to Cudgewa following railway in the line and upon the lands described in the Railway, Schedule to this Act and within any deviation thereof as herein Schedule provided and all proper works and conveniences in connexion there with (that is to say):— Tallangatta to A five feet three inches gauge railway commencing at the Cudgewa Railway. north-eastern end of Tallangatta Railway Station in the township of Tallangatta and terminating in or near Crown allotment one B of section thirteen parish of Wabba in the county of Benambra in the line and upon the lands Schedule. -
Community Newsletter Upper Murray Community Tuesday, 7Th January 2020
Community Newsletter Upper Murray Community Tuesday, 7th January 2020 Fire Situation What We Don’t Know There are two large fires across the border in southern NSW. There have been property and significant stock losses in the There is a chance these fires and/or other fires to the south areas impacted by fires, but it is too early to be specific. The of Victoria will join with the fires burning in the Upper Murray current focus is on the active fires and protecting the area of Victoria. community. We understand that it is stressful not to know what is happening. The current fire area is estimated to be 190,000ha, with minimal fire behaviour observed on Monday. After the fire threat has passed, and it is safe to do so, the priority will be returning people to their properties. It is hoped Roads are still dangerous due to fire damage and the risks that with milder weather and reduced fire activity further associated with tree damage. As they are assessed and information will become available soon. cleared for use, they will be reopened for residents. In the meantime, there are many road closures still in place. Health and Smoke Impacts MAINTAIN SITUATIONAL AWARENESS at all times. During extreme heat, make sure to: The fire situation has been changing rapidly and this is Drink plenty of water. expected to continue for some time. Always take a bottle with you. Never leave kids, adults or pets in cars. Current Messages as at 10:00am Plan ahead. Schedule activities in the coolest part of the day. -
Community Newsletter Talmalmo Avoca Station Fire Advice for the Upper Murray Community
Community Newsletter Talmalmo Avoca Station Fire Advice for the Upper Murray Community Tuesday 31 December 2019 Situation crew will be deployed to examine infrastructure and ascertain This fire was ignited by lightning in steep forested terrain in any damage but can only do so when the fire has passed, NSW on Sunday 29 December in the Green Valley area access to site is available and when it is safe to do so. What we don’t know. The severe fire weather yesterday and overnight saw the fire There have been property and stock losses in the areas spot into Victoria over the Murray River into the Mt Alfred impacted by fires but it is too early to be specific. The focus area. The fire has increased significantly in size overnight is on the going fires and protecting the community. Rapid with a convective column (a vertical column of heat, smoke, Impact Assessment teams have arrived in the area. ash and burning embers) (6km) and spotting ahead of the Assessments will be undertaken on the ground over the main front. coming days. This is a large and damaging fire that has caused significant We understand that it is stressful to not know what is community damage and is still a very active fire This fire is happening. We are absolutely prioritising people returning to currently approx 100,000 ha. There are over 250 fire crew their properties once the threat of fire has passed and it is and support staff working on this fire. safe to do so. It had a run of nearly 40 kms overnight. -
Fire Operations Plan
o! O l d y m R p a l l i c a H U W w r a a l l J n y a i a n W g R d e d - R l l a a i r c om e R o d T d n i J FINAL J i S n H o g u e u t ll m h ic d R e R d a H n U w r w o a B n y Fire Operations Plan a Rd S iver t R UPPER MURRAY THOLOGOLONG - KURRAJONG WALWA- Walwa M y TRK SNAKE urray R Wym ra iver R ah Rd r r d u e GULLY g v an M i eg R lar DISTRICT e side Rd W den Ar Rd d R g U n r a a g n e d r a a R Pine l R # # # e d a Mountain RA W New South g g # # # a Wales W # # # # # # Ri MT LAWSON SP - E 2014-2015 TO 2016-2017 ve # # # Pine ri na MOTHER # # # H Burrowye Mountain wy DUFF Tinta Bungil RA ldra Rd MT KELLY # # t # # # TINTALDRA S e t ALBURY # # # - JEREMAL a Bungil M # # # # # # NCR HEAPS AIRPORT d WISES # # # # # R t Lake a Jemba RA S lw o! # # # # # # a Tintaldra g CREEK W n Hume - u # # # y o FLORA RESERVE lle Y # # # # # # # # # # # # # # # # # # # # # # he # # # # PINE S THOLOGOLONG # # # # # # # # # # # # # # # # # # # # # # # # # Map Legend t MTN - S WODONGA - BUNGIL # # # # # # # # # # # # # # # # # # # # # # # # # # SANDY CREEK RD s M n u MCFARLANES y i REFERENCE AREA # # # # # # # # # # # # # # # # # # # # # # # # # rra w k y s t # # # # # # # # # # # # # # # # # # # # # # # # # # R A iv HILL C er ln # # # # # # # # # B#URR# OW#YE # # # # # # # # # # # # # R d d d Transportation H o t R c R S u n # # # # # # # # #- CH#ICK#S TR#ACK# # # # # # # # # # # # # # ra a CUDGEWA m i y d y l e L a Bellbridge a F # r n # # # # # # # # # # # # # # # # # # # # # # # # # t wy y r MT LAWSON - Mt Burrowa a - MCNAMARAS TRK in # # -
A Bunch of Dates
Corryong Courier Circulating throughout WALWA, KHANCOBAN, CUDGEWA and CORRYONG DISTRICTS Published by Moscol Group P/L ABN 23 154 875 573. Print Post Approval No. 100002892. Address: 1/41 Hanson St, Corryong, 3707 / PO Box 32, Corryong, 3707. Ph: (02) 6076 1045 Website: www.corryongcourier.com.au. E-mail: editorial: [email protected] / adverts: [email protected] Single copy $1.50 (GST inc.) / $115.00 p.a. posted (GST inc.) / $74.99 p.a. online (GST inc.) INC THURSDAY JANUARY 14, 2021 $1.50 A BUNCH OF DATES 24-30 Hanson St., Corryong. Ph: 6076 1286 Can you put a face to these bums? That’s what you’ll find in the Agmate Rural Services 2021 ‘Beneath the Brim’ calendar - along with some ‘cheeky’ snaps by local photographer Jasmine Pierce. The calendars are available at Agmate Corryong for $10 and all proceeds will go to Braveheart Freedom Fighters, which will organise monthly events in the Upper Murray with a focus on mental health. Corryong Newsagency Recovery funds power up 43 - 49 HANSON STREET, CORRYONG Communities across walking trails and Recovery (LER) program Phone: 02 6076 1381/ FAX: 02 6076 1188 the North East, including improvements to power which is jointly funded the Upper Murray, will sources. by the Australian and Email: [email protected] have a bright start to 2021 Federal Member for Victorian governments.. with the announcement of Indi, Dr Helen Haines, has “A year ago our region $2.7 million in bushfire welcomed the first tranche was in the grip of terrifying recovery funding for six of almost $69 million that bushfires and with the local projects including will flow into bushfire- coronavirus pandemic, the upgrades to community affected communities recovery has been slow.” halls, sports facilities, under the Local Economic Cont. -
North East (Hume) Regionflood Emergency Response Sub Plan – Flood Subplan-Plan, Version 1.3, May 2018 1
North East (Hume) Region Emergency Response Plan North East (Hume) RegionFlood Emergency Response Sub Plan – Flood SubPlan-plan, Version 1.3, May 2018 1 Published by Victoria State Emergency Service Melbourne May 2018 This publication is intended to be consistent with the State Emergency Response Plan (SERP), published by Emergency Management Victoria (EMV) in 2016. Authorised by the Victoria State Emergency Service, 168 Sturt Street, Southbank, VIC, 3006. An electronic version of the plan can be obtained at: www.ses.vic.gov.au Version Control North East (Hume) Region Emergency Response Plan – Flood Sub-plan Version 1.3, May 2018 Final Edit North East (Hume) Region Emergency Response Plan – Flood Sub-plan, Version 1.3, May 2018 2 North East (Hume) Region Emergency Response Plan – Flood Sub-plan Certification The North East (Hume) Region Emergency Response Plan – Flood Sub-plan deals with response to flood incidents within North East (Hume) area of responsibility. The following plan is intended to provide the framework for North East (Hume) Region to effectively and efficiently respond to future emergencies caused by floods, and will remain current until rescinded by authority of the Victoria State Emergency Service (VICSES) Chief Officer Operations. ___________________________________________________ Date: _________________________ Tim Wiebusch Chief Officer Operations This plan is produced by VICSES and has been adapted from the SERP – Flood Sub-plan. All information contained in this plan was current at time of publication. VICSES would like to acknowledge the significant contribution of key stakeholders to ensure the content contained within this plan is of a high quality to support response activities. -
Corryong Courier
Corryong Courier Circulating throughout WALWA, KHANCOBAN, CUDGEWA and CORRYONG DISTRICTS Published by Moscol Group P/L ABN 23 154 875 573. Print Post Approval No. 100002892. Address: 1/41 Hanson St, Corryong, 3707 / PO Box 32, Corryong, 3707. Ph: (02) 6076 1045 Website: www.corryongcourier.com.au. E-mail: editorial: [email protected] / adverts: [email protected] Single copy $1.50 (GST inc.) / $115.00 p.a. posted (GST inc.) / $74.99 p.a. online (GST inc.) INC THURSDAY AUGUST 13, 2020 $1.50 Corryong Newsagency 43 - 49 HANSON STREET, CORRYONG Phone: 02 6076 1381/ FAX: 02 6076 1188 KEEP SAFE Email: [email protected] SUNDAY SEPTEMBER 6TH We stock a great range of cards & gifts • Tatts Packs available HOURS:- Monday to Friday 5.30am Corryong Health staff are undergoing regular testing. - 5.30pm / Saturday 5.30am - 1.00pm / Sunday 7.30am - 12 noon / Public holidays 5.30am - 12 noon. Taking all precautions Although the Upper since the first week of May said CEO, Dominic Murray is being heavily with no positive cases Sandilands. impacted by Stage 3 being recorded. “This testing occurs Covid-19 restrictions and “To maintain a well every time they arrive the NSW border closure, resourced and skilled back in Corryong to ensure 24-30 Hanson St., Corryong. Ph: 6076 1286 it does remain coronavirus workforce, Corryong the safety of staff and free and Corryong Health Health is also swab-testing community members.” is determined to keep it and risk screening its Corryong Health that way. health workers, including conducted 10 tests last More than 300 people general practitioners, week and overall, 118 staff have been tested for the who live in Melbourne tests have been conducted. -
1080 Pest Animal Bait
« *3 1080 Pest Animal Bait L Notification to Neighbours of Vertebrate Pest Control Using 1080 To: THE LANDHOLDER / OCCUPIER MANSFIELD SHIRE COUNCIL The Department of Environment, Land, Water and Planning (DELWP), will be undertaking a 1080 pest animal poisoning program using buried baits and Canid Pest Ejectors on public land at: 2 4 FEB 2021 See Attached Tables and Maps - to control Wild Dogs. Awareness of 1080 bait use on Public Land by DELWP is vital for the safe management of lornesl..... ........... If a property is occupied or used by persons other than yourself, the provision of this informhtinn, hy youlodhaiL- _ may reduce the potentially negative impacts of 1080 on domestic animals such as pets and working dogs. The poison to be used is compound 1080 (sodium fluoroacetate) which is contained within an approved bait type for the pest species. Poisoning will occur from 01/03/2021 to 31/07/2021 after which time DELWP will collect and dispose of untaken and unused baits in accordance with the Directions for the Use of 1080 and PAPP Pest Animal Bait Products in Victoria. The use of the 1080 pest animal bait product will comply with the product label and the Directions for the Use of 1080 and PAPP Pest Animal Bait Products in Victoria. When used in accordance with the product label and the Directions for the Use of 1080 and PAPP Pest Animal Bait Products in Victoria the chances of non-target animal impacts are reduced but there is still some associated risk. By being aware of the dangers you are able to help manage the risk. -
Towong Shire Community Recovery Newsletter Edition 12 - February 2021
Towong Shire Community Recovery Newsletter Edition 12 - February 2021 Wild fish healthy in Happy Sad Man Upper Murray creeks Following on from last year’s Are You Bogged Mate? sessions in There’s good news emerging from the Corryong, which shone a light Upper Murray’s creeks. on depression and men’s mental health, a documentary film, North East Catchment Management screening in Cudgewa on March Authority and Victoria’s Arthur Rylah 5, is changing the dialogue around Institute have been investigating the masculinity and its vulnerability. waterways and the health of fish in Cudgewa, Nariel and Thowgla creeks. Happy Sad Man is about opening up and gaining insight in to how we Genetic samples were taken from can better be there for ourselves, all captured fish to compare future for our mates and our loved ones. catches with natural recruitment versus stocking efforts. The film is touching, funny and tender while it explores hope, anxiety, joy and darkness. It laughs and cries alongside five very different men, All creeks showed some sign of recovery including John Anderson from Cudgewa. It’s raw emotion will inspire or survival of wild fish, including Brown you to hold the men in your life that bit closer. The 2018 film was Trout and Murray Cod. Numbers are produced by Australian filmmaker, Genevieve Bailey, who’s films have extremely low, but the fish are there screened in 50 countries and won more than 30 awards. and in excellent condition. Held at Cudgewa Football Club, the event starts with dinner at 7.30 All waterways appeared to have before an 8.30 screening then Q&A with Ms Bailey. -
Murals Will Highlight Our Heritage 24-30 Hanson St., Corryong
Corryong Courier Circulating throughout WALWA, KHANCOBAN, CUDGEWA and CORRYONG DISTRICTS Published by Moscol Group P/L ABN 23 154 875 573. Print Post Approval No. 100002892. Address: 1/41 Hanson St, Corryong, 3707 / PO Box 32, Corryong, 3707. Ph: (02) 6076 1045 Website: www.corryongcourier.com.au. E-mail: editorial: [email protected] / adverts: [email protected] Single copy $1.50 (GST inc.) / $115.00 p.a. posted (GST inc.) / $74.99 p.a. online (GST inc.) INC THURSDAY FEBRUARY 4, 2021 $1.50 Murals will highlight our heritage 24-30 Hanson St., Corryong. Ph: 6076 1286 Community representatives (from left) Cathy Ross, Margie Walker, Sheril Wilson, Honor Auchinleck and Greg Nankervis with Ken Bailey (right) and artist Sean Burton (front). The Corryong the contribution made by ‘The Athenaeum Art a team to visit Corryong paint and is expected to be Community Recovery military servicemen and Project’ will eventually to bring the project to completed before the 2021 Committee is supporting women from the Upper comprise five life-size fruition. bush festival. a project to commemorate Murray. murals in the Memorial The first part of the The second part of the Hall/RSL Hall precinct project will be to paint project will be four life- in Corryong. The project a mural on the wall of size murals along the side name reflects the history K A Bailey Mechanical entrance to the Memorial of the site now occupied Repairs with an Australian Hall. The themes are still Corryong Newsagency by the two halls, which Light Horse theme and its under discussion but will was originally called the connection to the Upper relate to the Upper Murray 43 - 49 HANSON STREET, CORRYONG Athenaeum Hall. -
Corryong Cemetery Burial Register
Corryong Cemetery Burial Register Bodily Remains Date of Burial (BR) or Cremated R.O.I.No. Surname First Name Second Name Third Name Last Known Permanent Address (if known) Date of Birth Date of Death / Interment Age Remains (CR) 1 Gerecke Albert Edward Corryong 21/07/1889 9 2 Warry Alfred George Corryong 24/09/1889 4 3 Warry Ernest Henry Corryong 14/10/1889 5 4 Collins Agusta Mary Corryong 19/10/1889 8 5 Hoor Isaac Corryong 21/10/1889 80 6 McKenzie Joseph Corryong 12/11/1889 2 7 Taylor Charles Edward Cudgewa 06/07/1890 1m 8 Rock Henry 16/07/1890 1 9 Bowden Sydenham Tintaldra 05/02/1890 42 10 Collins William George Thougla 30/04/1890 5 11 Griffiths Charles Henry Tintaldra 02/05/1890 4m 12 Houston Mary Corryong 12/05/1890 1w 13 Simpson Albert Ernest Nariel 07/07/1890 2 14 McGrath Niel Dark River 09/07/1890 45 15 Joe 15/08/1890 70 16 Smith George Corryong 08/03/1891 77 17 Rawes Thomas Nariel 16/04/1891 56 18 Waters Harriett Alice Corryong 01/06/1891 12 19 Harris James Corryong 02/06/1891 9 20 Bailey John Allan Corryong 17/07/1891 5m 21 Hughes John William Corryong 21/01/1892 38 22 Hutchinson David Khancoban 14/03/1892 51 23 Jackson Ned 11/05/1892 42 24 Harris Jane Corryong 15/05/1892 64 25 Hughes Elizabeth Corryong 12/06/1892 38 26 Wheeler Emily Berringama 28/07/1892 34 27 Playle Elizabeth Corryong 28/07/1892 63 28 Thomas Richard Corryong 28/07/1892 61 29 Taylor Florence Evyline Corryong 28/07/1892 2m 30 Laverty Annio Agnes Berringama 25/02/1893 9m 31 Sutherland Emily Thougla 04/06/1893 6m 32 Fenby George Corryong 10/08/1893 74 33 Greenhill