M/s Sohan Healthcare Pvt Ltd kurkumbh Daund (M.S.) 2016

M/s Sohan Healthcare Private Limited

FORM 1

(I) Basic Information

Sr. Item Details No. 1. Name of the Project/s M/s Sohan Healthcare Pvt Ltd. 2. S. No. in the schedule 5(f) 3. Proposed capacity/ area/ length/ tonnage Expansion 1640MT/Month of API & 2670 to be handled/ command area/ lease area/ MT/Month of DC grade products number of wells to be drilled 4. New/ Expansion/ Modernization Expansion 5. Existing Capacity/ Area etc. 70 MT/Month of API & 70 MT/Month of DC products 6. Category of Project i.e. ‘A’ or ‘B’ B 7. Does it attract the general condition? If No yes, please specify 8. Does it attract the specific condition? If No yes, please specify. 9. Location Plot/ Survey/ Khasra No. Plot No. D-30, MIDC Area Village Kurkumbh Tehsil Daund District Pune State 10. Nearest railway station/ airport along with Daund Railway Station distance in kms. Distance : 10 km in North East direction Distance: 65 km in North East direction 11. Nearest Town, city, District Headquarters Daund 10 km in NE Direction along with distance in kms. 12. Village Panchayats, Zilla Parishad, Municipal Corporation Municipal Corporation, Local body ( Complete postal addresses with Dist.: Pune ( MS) telephone nos. to be given) 13. Name of applicant Mr. Sohan Chakkarwar

14. Registered Address 602, South Wing, Sacred World, Wanowarie, Pune 411040 15. Address for Correspondence D-30 MIDC Kurkumbh, Daund, Pune, Maharashtra. Name Mr. Sohan Chakkarwar

Designation ( Owner/ Partner/ CFO) Chairman and Managing Director

1 sd engineering services pvt ltd. Aurangabad (M.S.)

M/s Sohan Healthcare Pvt Ltd kurkumbh Daund Pune (M.S.) 2016

Address D-30 MIDC Kurkumbh ,Daund ,Pune , Maharashtra. Pin Code E-mail [email protected] Telephone No. 91-02117-202033 Fax No. 91-2117-235333 16. Details to Alternative Sites examined, if No any. Location of these sites should be shown on a toposheet 17. Interlinked Projects None 18. Whether separate application of NA interlinked project has been submitted? 19. If yes, date of submission NA 20. If no. reason NA 21. Whether the proposal involves approval/ None clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z. Notification, 1991? 22. Whether there is any Government Order/ None Policy relevant/ relating to the site? 23. Forest land involved (hectares) None 24. Whether there is any litigation pending None against the project and / or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/ directions of the Court, if any and its relevance with the proposed project.

• Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,)

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.):

Sr. Information/Checklist Yes/ Details thereof (with approximate

2 sd engineering services pvt ltd. Aurangabad (M.S.)

M/s Sohan Healthcare Pvt Ltd kurkumbh Daund Pune (M.S.) 2016

No. confirmation No quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in No Already an existing MIDC industrial land use, land cover or topography area. Same status continues including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, No Already an existing MIDC industrial vegetation and buildings? area. Same status continues 1.3 Creation of new land uses? No Already an existing MIDC industrial area. Same status continues 1.4 Pre-construction investigations e.g. Yes Done bore, houses, soil testing? Soil-Strong with load bearing capacity 1.5 Construction works? Yes Shall be done systematically, with economy of materials and with environmental care. More of a fabrication job. No explosives will be used. 1.6 Demolition works? No Barren land 1.7 Temporary sites used for No No housing for workers proposed, construction works or housing of workers will come from nearby area. construction workers? 1.8 Above ground buildings, structures Yes Not Applicable or earthworks including linear structures, cut and fill or excavations 1.9 Underground works including No Not Applicable mining or tunneling? 1.10 Reclamation works? No Not Applicable 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and manufacturing Yes Detailed manufacturing processes are processes? given in prefeasibility report 1.14 Facilities for storage of goods or Yes Separate storage yard will be materials? provided for the storage of raw materials and finish goods 1.15 Facilities for treatment or disposal of Yes Liquid Waste: Shall be treated in own solid waste or liquid effluents? ETP upto MPCB limits then sent to CETP for further treatment Non Hazardous Solid Waste: Shall be sold out to authorized vendors Hazardous waste: To CHWTSDF, . 1.16 Facilities for long term housing of No There will be no workers staying in operational workers? the factory premises No Housing in premises is Proposed

1.17 New road, rail or sea traffic during No Existing approach Road is available

3 sd engineering services pvt ltd. Aurangabad (M.S.)

M/s Sohan Healthcare Pvt Ltd kurkumbh Daund Pune (M.S.) 2016

construction or operation? 1.18 New road, rail, air waterborne or No Existing approach Road is available other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not applicable/ Not Required transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or No Not applicable/ Not Required pipelines? 1.21 Impoundment, damming, culverting, No Not applicable/ Not Required realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not applicable 1.23 Abstraction or transfers of water Yes 440 CMD water required for form ground or surface waters? expansion and supplied by MIDC. No abstraction of ground water by this new project 1.24 Changes in water bodies or the land No Not applicable surface affecting drainage or run-off? 1.25 Transport of personnel or materials Yes This will be in small extent and for for construction, operation or limited period of time decommissioning? 1.26 Long-term dismantling or No Not applicable decommissioning or restoration works? 1.27 Ongoing activity during No Not applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes Existing 75 workers & for temporarily or permanently? Expansion 80 Workers 1.29 Introduction of alien species? No Not applicable

1.30 Loss of native species or genetic No Not applicable diversity? 1.31 Any other actions? No Not so major action are required

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

4 sd engineering services pvt ltd. Aurangabad (M.S.)

M/s Sohan Healthcare Pvt Ltd kurkumbh Daund Pune (M.S.) 2016

Sr. Information/checklist confirmation Yes/No Details thereof (with approximate No. quantities /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No The land is part of notified Industrial agricultural land (ha) Estate of Govt. of Maharashtra. 2.2 Water (expected source & competing Yes Source- Surface water supplied by users) unit: KLD MIDC. Existing 48.50 CMD & proposed 440 CMD

No competing user. No encroachment on other’s supply 2.3 Minerals (MT) No 2.4 Construction material – stone, Yes The construction shall include more aggregates, sand / soil (expected of a fabrication work. source – MT)

2.5 Forests and timber (source – MT) No 2.6 Energy including electricity and fuels Yes Electricity available from State (source, competing users) Unit: fuel Electricity Board. DG set of capacity (MT), energy (MW) 300 KVA & 750 KVA(Existing) and DG Set 1500KVA for Proposed 2.7 Any other natural resources (use No appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health:

Sr . Information/Checklist confirmation Yes/No Details thereof (with approximate No . quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, which No Many chemical are used and some are are hazardous (as per MSIHC rules) to of Hazardous in Nature. List & human health or the environment quantity of chemicals used is enclosed (flora, fauna, and water supplies) in prefeasibility report. 3.2 Changes in occurrence of disease or No affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by Yes Shall be favorable by way of changing living conditions? employment 3.4 Vulnerable groups of people who No could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No

5 sd engineering services pvt ltd. Aurangabad (M.S.)

M/s Sohan Healthcare Pvt Ltd kurkumbh Daund Pune (M.S.) 2016

4. Production of solid wastes during construction or operation or decommissioning (MT/Month):

Sr. Information/Checklist Yes/No Details thereof (with approximate No. confirmation quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes No

4.2 Municipal waste (domestic and or No commercial wastes)

4.3 Hazardous wastes (as per Hazardous Yes Various Types of Hazardous waste Waste Management Rules) falling under categories 34.3, 28.1, 28.2, 28.4, 5.1 & 5.2, 28.4, 33.3, 34.3, 28.5 & 20.3 will b e generated. Details about quantity, disposals etc. are given in prefeasibility report 4.4 Other industrial process wastes Yes Same as above

4.5 Surplus product No 4.6 Sewage sludge or other sludge from Yes ETP Sludge-3600kg/day effluent treatment 4.7 Construction or demolition wastes No

4.8 Redundant machinery or equipment No New venture

4.9 Contaminated soils or other materials No Virgin Land being used for the proposed project 4.10 Agricultural wastes No

4.11 Other solid wastes Yes Garden leaves and road sweepings. Not burnt. Used for mulching/composting. Quantity negligible

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr):

Details thereof (with approximate Sr. Information/Checklist confirmation Yes/No quantities/rates, wherever possible) No. with source of information data 5.1 Emissions from combustion of fossil Yes Boiler Capacity- Existing 1.5T/Hour & fuels from stationary or mobile sources Proposed-7.50T/Hour. Fuel Used – (Existing) Briquette-8 MT/Day or Coal -6 MT / Day & (proposed)Briquette -45 MT/ Day or

6 sd engineering services pvt ltd. Aurangabad (M.S.)

M/s Sohan Healthcare Pvt Ltd kurkumbh Daund Pune (M.S.) 2016

Coal -35MT/Day Boiler Emission- SPM<150mg/NM 3 SO 2< 36.8 kgs/day DG Sets Capacity (Existing) - 300 KVA- 750 KVA 2 No. Fuel Used-350 litrs/hr DG set Capacity (Proposed) - 1500 KVA- 1 No. Fuel Used 700 Litres/Hour DG set Emission-SPM<150 mg/NM 3, SO 2< 12 kgs /day

5.2 Emissions from production processes Yes Acid Fumes, CO2, HCL, H2, Ammonia & Nitrous Acid will be emitted during process 5.3 Emissions from materials handling Yes Fugitive emissions due to transport. including storage or transport Precautions shall be taken 5.4 Emissions from construction activities No Insignificant including plant and equipment 5.5 Dust or odours from handling of No All precautions to suppress dust such materials including construction as water sprinkling. Sanitary facilities materials, sewage and waste for construction workers shall be provided. 5.6 Emissions from incineration of waste No Not Applicable 5.7 Emissions from burning of waste in No No open Burning of Waste open air (e.g. slash materials, construction debris)

5.8 Emissions from any other sources No Not envisage

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Yes/No Details thereof (with approximate Sr. Information/Checklist confirmation quantities/rates, wherever possible) No. with source of information data with source of information data 6.1 From operation of equipment e.g. Yes Precautions taken as sturdy engines, ventilation plant, crushers foundations, acoustic enclosures and tree covers. Refer details in pre- feasibility report 6.2 From industrial or similar processes Yes As above 6.3 From construction or demolition No No demolition involved. Construction of short duration 6.4 From blasting or piling No 6.5 From construction or operational traffic Yes Limited quantity of Raw material and products

7 sd engineering services pvt ltd. Aurangabad (M.S.)

M/s Sohan Healthcare Pvt Ltd kurkumbh Daund Pune (M.S.) 2016

6.6 From lighting or cooling systems No Nil

6.7 From any other sources No Nil

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

Sr. Information/Checklist confirmation Yes/No Details there of (with approximate No. quantities/rates, wherever possible) with source of information data 7.1 From handling, storage, use or spillage Yes Precautions taken, wherever possible of hazardous materials with source of information data

7.2 From discharge of sewage or other Yes Industry will provide full fledged effluents to water or the land (expected effluent treatment plant mode and place of discharge)

7.3 By deposition of pollutants emitted to No Will be assessed in EIA report and air into the land or into water mitigation measures will be taken 7.4 From any other sources No Not envisage 7.5 Is there a risk of long term build up of No Risk assessment and preventive pollutants in the environment from measures will be taken these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment :

Sr. Information/Checklist confirmation Yes/No Details thereof (with approximate No. quantities/rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc No No use of explosives. Fire fighting from storage, handling, use or precautions shall be taken as per CIF production of hazardous substances requirement. EMP will be prepared. 8.2 From any other causes No Precautionary measures will be taken 8.3 Could the project be affected by No Site is selected carefully. Natural natural disaster s causing disasters are not expected. However environmental damage? (e.g. floods, off site plan is prepared by MIDC/ earthquakes, landslides, cloudburst etc) Dist. Authority. 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality :

Sr. Information/Checklist confirmation Yes/No Details there of (with approximate

8 sd engineering services pvt ltd. Aurangabad (M.S.)

M/s Sohan Healthcare Pvt Ltd kurkumbh Daund Pune (M.S.) 2016

No. quantities/rates, wherever possible) with source of information data 9.1 Lead to development of supporting No • Infrastructure already available facilities, ancillary development or from MIDC development stimulated by the project • Project does not provide housing which could have impact on the environment e.g.: • Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) • Housing development • Extractive industries • Supply industries • Other 9.2 Lead to after-use of the site, which No Site will be used as per application could have an impact on the environment 9.3 Set a precedent for later developments No

9.4 Have cumulative effects due to No proximity to other existing or planned projects with similar effects.

(III) Environmental Sensitivity

Aerial distance (within 15 km.) Sr. Name/ Areas Proposed project location No. Identity boundary 1 Areas protected under international conventions, national or local No None legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, No coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or

sensitiv e species of flora or fauna for No breeding, nesting, foraging, resting, over

wintering, migration 4 Inland, coastal, marine or underground No None waters 5 State, National boundaries None No

6 Routes or facilities used by the public for access to recreation or other tourist, No pilgrim areas.

9 sd engineering services pvt ltd. Aurangabad (M.S.)

M/s Sohan Healthcare Pvt Ltd kurkumbh Daund Pune (M.S.) 2016

7 Defense installations No 8 Densely populated or built-up area Yes Daund Village which is 10 km from North East 9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of No worship, community facilities) 10 Areas containing important, high quality or scarce resources (ground water Not Applicable. It is notified No resources, surface resources, forestry, industrial area agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or No Not applicable environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard -- -- which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions )

10 sd engineering services pvt ltd. Aurangabad (M.S.)