Hurricane Florence Recovery Report 4:00 PM November 8, 2018 SCDOT Operations Mode: Recovery
Total Page:16
File Type:pdf, Size:1020Kb
Hurricane Florence Recovery Report 4:00 PM November 8, 2018 SCDOT Operations Mode: Recovery Statewide Summary – There are 20 road closures on primary and secondary routes due to damage or flooding throughout the affected area. Please find a current road closure report attached below. SCDOT is focused on recovery efforts as a result of the damage caused by Hurricane Florence. Crews and contractors continue to make repairs to damaged roadways. Please find a report on the current status of the repair efforts attached below. Debris removal operations continue in Horry and Marion Counties. The last day for residents in Marion County to bring residential structural debris associated with flooding from Hurricane Florence to the right of way for pickup by SCDOT will be Sunday, Nov. 11, 2018. The final pass for debris removal in Marion County will begin on November 12th. To date, 10,184 cubic yards of flood debris have been removed. In areas affected by flooding, motorists are urged to obey all road closures. Never move or drive around barricades. Remember: It is NEVER safe to drive or walk into flood waters. Turn around, don’t drown! Hurricane Florence Resources South Carolina Hurricane Guide: http://www.scemd.org SCDOT Storm Resources and Road Closures: http://www.scdot.org Updates of activities will be reported through SCDOT’s Twitter and Facebook accounts. Check for the most up to date traffic information through the SC DOT 511 mobile app. 855-GO-SCDOT www.scdot.org (855-467-2368) Hurricane Florence 20 CLOSURES Closure Report 11 Road and 9 Bridge Road and Bridge Closures as of Closures – See attached List 4:00 PM November 8, 2018 Chesterfield County Road Name Direction From To Description Anticipated Opening Bo Melton Loop BOTH Woodward Mill McNair Scour from Floodwater By June 1 (S-13-138) Road (S-13- Cemetary Rd flow has caused S- 138 159) (L-390) substructure of the bridge Mile Mile to fail. Point:02.15 Point:04.00 Buchanan BOTH S-60 Jackson S-644 Closed for culvert By June 1 Bridge Rd S-243 Mile Campbell replacement associated S- 243 Point:00.00 Mile with Hurricane Florence Point:02.17 Davis Rivers BOTH Highway 742 Sweeney Bridge ends have scoured By June 1 Road (S-13-757) (SC 742) Road (L-274) and all supporting piles S- 757 Mile Mile have lost bearing Point:00.00 Point:00.98 Dogwood Lane BOTH Park Street Highway 145 Closed due to road By December (S-13-265) (S-13-97) (SC 145) washout. The road washed 1 S- 265 Mile Mile out during the event and Point:00.00 Point:00.10 was closed by City of Chesterfield Forces Repairs are underway. Darlington County Road Name Direction From To Description Anticipated Opening New Hopewell BOTH Sherrills Mill Tol Road Closed due to road By December Road Road Mile washout. 1 S- 366 Mile Point:02.57 Point:02.05 SC 34 BOTH S-495 Marlboro Closed due to road By January 1 SC 34 Georgetown County shoulder washouts. The Rd Mile roadway will be closed Mile Point:27.66 during the day from 8:00 Point:24.75 AM to 5:00 PM Monday through Friday until the work completes. Dillon County Road Name Direction From To Description Anticipated Opening Academy St. BOTH Old Magnolia US-301 Damage to any portion of By December S- 51 Mile Mile bridge (deck, rail, median 1 Point:00.92 Point:01.71 barrier, column, beam, pier, etc.). Judson Road BOTH Milepoint 1.25 Milepoint Closed due to road By January 1 (S-17-192) Mile 1.70 washout. S- 192 Point:01.25 Mile Point:01.70 Marion County Road Name Direction From To Description Anticipated Opening HIghway 76 BOTH Gilchrist Road SC-9 in Closed due to road By February US 76 S-34-309 Nichols washout. Infrastructure 1 (Local traffic Mile damage near Pee Dee only to Point:25.65 Island Road Intersection. Mile Point:23.10 Marlboro County Road Name Direction From To Description Anticipated Opening Academy Road BOTH Adamsville SC 381 Closed due to By December (NW of McColl) Road S-28 Mile road/shoulder washout at 1 S- 17 Mile Point:06.90 McNairs Millpond mp 6.77 Point:06.08 Billy Wallace BOTH Hatcher Hill White Creek Closed due to washout at By Jan 1 Rd/Hairetown Road S-203 S-406 bridge at Wallace Pond mp 2020 Road (N. of Mile Mile 3.27 and road 4.0, mp 6.2 Wallace) Point:02.50 Point:06.80 S- 97 Coxe Road (N. BOTH Sandy Grove Odom Road Bridge washout mp 3.93 By December of Blenheim) Road S-350 S-440 1 S- 29 Mile Mile Point:00.00 Point:10.14 David''s Mill BOTH Kennedy Road Williamette Bridges damaged over By December Pond (NW of S-548 Road SC 912 Naked Creek mp 2.6 and 1 Bennettsville) Mile Mile mp 3.24 S- 33 Point:01.87 Point:04.47 Highway 1 (N. of BOTH SC 9 Delta Heights Road closed due to road By February Wallace) Mile Road S-262 and culvert damage over 1 US 1 Point:01.10 Mile Husband''s Creek mp 1.41 Point:01.55 Highway 381 BOTH Old McColl-Clio New Bridge Bridge at McLaurins By December (South of Road S-497 Road S-27 Millpond is washed out, mp 1 McColl) Mile Mile 14.19 SC 381 Point:14.09 Point:14.58 Ivey Cemetary BOTH S-35-40 Lauris S-35-380 Closed due to road By December Road Willis Road Cottingham washout. 1 S- 197 Mile Road Point:00.40 Mile Point:00.40 Level Green BOTH SC 9 Wafer Road missing approaches to By December Church Road Mile S-387 bridge over Herndon Creek 1 (NW of Point:00.00 Mile mp 0.6 Bennettsville) Point:00.86 S- 400 Odom Road (S. BOTH Daniels Lane Wagon Train Closed due to washout at By December of Bennettsville) Mile Circle bridge over Carter's 1 S- 440 Point:00.43 Mile Branch mp 0.92. Point:01.32 Old Wire Road BOTH Ebenezer Road Aaron Closed due to road By December (NE of Wallace) S-30 Temple washout mp 5.1 1 S- 165 Mile Church Road Point:04.82 S-257 Mile Point:07.54 Old Wire Road BOTH Kollock Road Ebenezer Closed due to washout at By December (NE of Wallace) S-203 Road S-30 bridge over Wolf Creek 1 S- 165 Mile Mile Point:02.90 Point:04.82 SC 34 BOTH Darlington S-35-44 Closed due to road By January 1 SC 34 County Line Arcadia Rd shoulder washout repairs. Mile Mile The roadway will be during Point:00.00 Point:03.82 the day from 8:00 AM to 5:00 PM Monday through Friday until the work completes. SCDOT is focused on recovery efforts as a result of the damage caused by Hurricane Florence. Status of repairs as of 4:00PM November 8, 2018: 273 Identified Damage Sites 217 – Repairs are complete 20 – Anticipate completion within 30 days 22 – Anticipate completion within 60 days 6 – Anticipate completion within 90 days 8 – Anticipate completion in excess of 90 days .