Translation from Bulgarian Attachment No. 1 MINISTRY OF ENVIRONMENT AND WATER Regional Environmental and Water Inspectorate – Varna 9000 Varna, 4, Yan Palah Str., e‐mail: riosv‐
[email protected], tel.: 052/ 634‐589, fax: 052/ 634‐593 Entry No. 26‐00‐7758/ 27.12.2005 DECISION No. 12‐ПР/2006 ON EVALUATION THE NEED FOR PREPARING AN ENVIRONMENTAL IMPACT ASSESSMENT Pursuant to Article 93, Paragraph 1, item 1 and Article 5, item 3 from the Environmental Protection Act and submitted written information by the Investor under Attachment No. 2 from the Regulation on the conditions and procedure for performing an Environmental Impact Assessment of investment proposals in terms of construction, activities and technologies, I hereby RULE an Environmental Impact Assessment to be performed in terms of investment proposal for Wind Farm developing. Location of the investment proposal: the land of the town of Suvorovo, Suvorovo municipality. Assignor: “EOLICA BULGARIA” AD, city of Sofia, 8, Bacho Kiro Str. Characteristics o the investment proposal: The key processes are related to production of electricity generated from wind power. On the site shall be built 30 wind turbines with capacity of 2,3 MW each. They shall be installed on 80 m high steel towers with blade diameter of 90 m. The wind farm shall have total capacity of 60‐80 MW. GROUNDS: 1. For the purpose of developing the wind farm on site having surface area of about 1000 decares there should be performed an Environmental Impact Assessment with regards to noise, birds, landscape and inhabitants health in terms of landscape characteristics.