A vision for

The + Rugby Pavilion, Hartington Road, Chiswick

Design and Access Statement

On behalf of the Quintin Hogg Trust + Quintin Hogg Memorial Fund Trustees

28th September 2018 2 Contents

Part 1 Context Page Part 4 Strategy in Use/Access Page

1. Executive introduction by Godfrey Cole 18. Public space + Landscape 119 (Trustee) 6 2. The Quintin Hogg Memorial Fund and Quintin a. PROW route/ROA route Hogg Trust 8 b. Security 3. History of Sport at the University of 12 4. History of The Quintin Boat Club 15 5. Existing Site and Buildings 23 6. The Established Brief 31 19. Parking + Bike Storage 120

Part 2 Evolution a. Vehicle Parking b. Visitor Parking 7. Design Statement 37 c. Bike Parking (Secure + Visitor) 8. Planning Context* + Consultation with LBH 41 d. Trialer + Minibus Parking 9. Use + Quantum 42 e. Launch Storage 10. Concept Development 44 f. Boat Storage a. Layout b. Composition 20. Access + Servicing 122 c. Continuity d. Visual Impact + Form a. New Road Junction 11. TVIA Executive Summary 86 b. Service road/turning head c. Refuse Collection Part 3 Design d. Boat Trailer Turn

12. Site Plans 90 21. Maintenance + FM 123 13. Site Sections 94 14. Site Axonometrics 97 a. Rugby Club 15. Detail Design 99 b. Boat House (New Build) a. Artists Impressions c. Boat House (Existing)

Part 5 Appendices 127 . Planning Statement ii. TVIA iii. Statement of Community Engagement iv. Landscape Design v. Highways Design

* Planning Context to be read in conjunction with Panning Statement

3 The Polytechnic Sports Ground 1939 4 Part 1: Context + Narrative

5 1. Executive introduction:

The Quintin Hogg Memorial Sports Ground, owned by the Quintin Hogg Trust (QHT) and the 6. To create a new landmark building on the Thames, part of the continual narrative Quintin Hogg Memorial Fund (QHMF), is a unique legacy to be preserved and maintained of boat houses and boating architecture providing modern facilities that are fit- for the benefit of students of the University of Westminster and young people within the for-purpose wider community. Through a programme of community engagement and a series of pre-application meetings Together the two Trusts have the ambition to create a centre of sporting excellence with Officers at the Borough of , we have shaped the project briefto for athletes of all abilities, with modern 21st century facilities, fit for purpose and fully provide facilities that both expand sporting uses on the site and will assure the continuation accessible to all. To achieve this, the Trusts are developing a comprehensive masterplan for of from the site into the future. the whole site from the river to the railway. These proposals will grow the membership of QBC, invigorate the University Rowing Club, Phase 1 is the site to south of Hartington Road, home to the Quintin Boat Club (QBC) provide a permanent home for University Rugby and create a new modern sporting facility founded in 1907 to allow the ‘non gentlemen’ rowers of the Polytechnic (now within the London Borough of Hounslow with opportunities for the Trusts to work with other the University of Westminster) to row at the Henley Regatta. education providers and sporting organisations to establish a wider outreach programme to young people across the community. This project is based on the founding principles of the two Trusts of effecting social change through education and sport for the betterment of the lives of University of Westminster Godfrey Cole students and young people across the community. Chairman of the Quintin Hogg Trust and the Quintin Hogg Memorial Fund Our professional team has considered the condition of the existing buildings on the site, studied the Club’s rowing year and the needs of the students of the University. Together with the Trustees it has been agreed that the following objectives would guide the project:

1. To create a centre of sporting excellence for the whole community welcoming athletes of all ages, but particularly young people, of all abilities – male and female and those with disabilities.

2. To revitalise rowing within the University and QBC

3. To re-introduce rugby to the site and create a home ground for University Rugby

4. To create a new outreach agenda across the community working with partner clubs, schools, the Local Authority and others to broaden the appeal of Rugby and Rowing to groups who do not currently have the opportunity to participate in either sport.

5. To continue the work of Quintin Hogg of improving life chances through sport (initially rowing and rugby) – nurturing talent with the possibility of scholarships to the best Universities – including Westminster.

6 “Amateur sport helped to define the Polytechnic while enabling it to establish a meaningful presence in suburbs far removed from Regent Street, notably at Chiswick, site of the boathouse and the Quintin Hogg Memorial Playing Fields”

Dr Dilwyn Porter, De Montford University

Application submitted on behalf of:

7 varify all dimensions on site on dimensions all varify

2.0 Our Client: Quintin Hogg Memorial Fund and Quintin Hogg Trust *

1 3 S 5 J .0

7

L

O

O

K

R

I G

T H

F T

E

L

K

O

O

L

L

O

O

K

R

I G

H O T T S B O P

The client for this project is two separate but related charitable trusts represented by the T S T O S P O P 0m 7m 14m 21m 28m OK LEFT 7.40 LO S T 2 O .4 T B 7 S O

O B

P

R

I G H T L O O K 7.39 VISUAL SCALE 1:500

7.0 7 0 .

LOOK T LEF S T same group of Trustees, namely O 7.0 P

7.0

. 0

0 7 7.0 7.

7.0

T S O 0 P 7. 7.0

T

S T O F P 7 E

. L

0

L K

O O

O O

K L

R

IG

H

T 7.0

T S O The Quintin Hogg Trust QHT, and P T S O T P S O P

7 .

0

0 . The Quintin Hogg Memorial Fund (QHMF) 7

6.0 Both of these charities own land included in the application. levels should and and check readbe shall DRAWING:only dimensions FROM All from THIS Contractor SCALE NOT DO drawing. those the on values stated text in

8

.

0

6.0

0

.

6 ting

6.0

7

.

0

0 . 6.0 O 7 6.0 B

6

. The Trustees have delegated day to day responsibility to a dedicated project group of four 0 6.0

E N D

9

. Trustees with the appropriate skill set all of whom are Trustees of both charities. 0

6

.

0

0

. 8

6 .

0

rawings or otherwise unless otherwise agreed in wri

7

. 0 The history of these two trusts, and of sport at the University of Westminster, underpins the project brief and the ambition of QHT and QHMF to create a centre of sporting excellence

9

.

0

0 .

6 6

.

0

8

.

for the University, and to generate through partnership an outreach programme which 0

7 . spans across the London Borough of Hounslow and beyond. 0

L C T

6.0 whether by provision of copies or original of the d of the original or of copies provision by whether party third any to granted is, or been, has kind y

9

.

0

0

.

6

6

.

1

0

0

.

H 0 S U B The belief that participation in sport by young people is linked to attaining academic and H S U B 8

.

0

H S T U S T B O S P O T P S O P

H S U B

7 . 0

H S U personal growth, wellbeing and health sits at the heart of both Trusts, in particular in B

5 .0

H S U B 5.0

O B O relation to their founder Quintin Hogg (born 14th February 1845 died 1903) a philanthropic B

0 . 5

5.0

9

.

0 merchant, passionate about sport, and in particular football and rowing. of an assignment or license no and TALENTS* SKILLS 5 . H

0 S 6 U 1

B . 0

0 .

0

0 8 . 5 . 0

7 .0

5 . 0

.61 8.60 8.60 8

8.60

5

. 0

T

S

6 O

. P 0

7.10 9 14 4

0 10.

0 .

1 .

. 0 7

0

5 . 1

6

8

8

0

1

7 .

.

1 7

0 .

Quintin Hogg was the seventh son of Sir James Hogg 1st Baronet. He became a successful 7.08 1

0

1

0 . 7

H S U

B

0 0

7.0 5.70 7

.

7 .

5 11.73

2

5

7 0 .

. 1 1

5

O B

merchant working in South America to revolutionise the sugar trade, where he amassed his © SKILLSASSORTED TALENTS* ASSORTED in vested is this in drawing copyright the

5

. 0

P

S rev description date drawn check

5 Revision Schedule . T 0 S O P

3 6 B 5 .9 N 1 client: own fortune. 1

5 . 0 Quintin Hogg Memorial Fund + Quintin Hogg Trust

p

tm

S

0 . 5

5

. project:

4.0 0

0 . 5 Site Model, Chiswick 5.56

5.0 3.0

0 0 5. . 5

4

. 0 . 0 5

He spent his early life in the heart of London, during a period where the population growth 5.0 5.0 5.0 title: Site Model 3.0 4.0 4.0 2.0 4.0 Existing Site Plan 4.0 3.0 2.0 2.0 3.0 1.0 3.0 2.0

1.0 and the industrial revolution had swamped the city, leading to appalling living conditions 2.0

1.0

1.0 1.0 1.0 scale: date: 1 : 500 @A1 07/09/18 1.0

2 3 5 for many. Education, religion and health through sporting activity were all at the core of his B 5 . N 2 1 project no: drawing no: 0. Originator -1. Location - 2. Level - 3. Type - 4. Role - 5. Drawing Series -6. Drawing Number 17013 AST -SM -ZZ -DR -A -20 - 005 beliefs. issued for: rev: Application boundary (redline) NTS PLANNING

He set about his life’s work helping others less fortunate through these core beliefs, in Assorted Skills + Talents* particular establishing a “ragged” school in , which eventually moved to London: +44 (0)2037010403 Manchester: +44 (0)161 7130517 * Existing Site Plan 48 Charlotte Street, W1T 2NS 3 Cobourg Street, M1 3GY 111 1 : 500 St Johns Wood and became the Quintin Kyanston School, and setting in motion his most (w) www.assortedskillstalents.com (e) [email protected] important legacy the Young Men’s Christian Institute (later the Regent Street Polytechnic) which opened on Regent Street in September of 1881 and The Women’s branch ohat followed suit as a joint enterprise in 1888.

The two were known together as the Regent Street Polytechnic, a further education “University” at which the ordinary men and women of London could gain a higher education and vocational and professional qualifications.

8

[email protected] (e) www.assortedskillstalents.com (w)

3 Cobourg Street, M1 3GY M1 Street, Cobourg 3 2NS W1T Street, Charlotte 48 London: +44 (0)2037010403 +44 London:

Manchester: +44 (0)161 7130517 (0)161 +44 Manchester: 2.0 Our Client: The Quintin Hogg Memorial Fund and Quintin Hogg Trust

Assorted Skills + Talents* Talents* + + Skills Skills Assorted Assorted Assorted Skills + Talents* Talents* + + Skills Skills Assorted Assorted

PLANNING

rev: issued for: issued

-20 - 003 - -20 -A -DR -ZZ -SM

AST 17013

project no: project 6. Drawing Number Drawing 6. - Series Drawing 5. - Role 4. - Type 3. - Level 2. - Location 1. - Originator 0.

drawing no: drawing

29/08/18 2000 : 1

date: scale: @A3 @A3

Site Boundary Plan Boundary Site

title:

Site Model, Chiswick Model, Site

project:

Quintin Hogg Memorial Fund + Quintin Hogg Trust Hogg Quintin + Fund Memorial Hogg Quintin

client:

Revision Schedule Revision

aedancheck drawn date description rev granted to any third party whether by provision of of provision by whether party third ASSORTED in any to vested granted is drawing this in copyright the ©ASSORTED TALENTS* SKILLS copies or original of the drawings or otherwise unl otherwise or drawings the of original or copies y kind has been, or is, is, kindbeen, or an y has of assignment TALENTS*or andSKILLS license no RiverThames ess otherwise agreed in writing

in text on the drawing. Contractor shall check and shallcheck Contractor drawing. the on text in NOTDO SCALE FROM THIS DRAWING: Alldimensions and * varifyall dimensions on site levels shouldbe read onlyfrom thosevalues stated

Application boundary (redline) showing land in control of the applicant (blueline) NTS

9 2.0 Our Client: The Quintin Hogg Memorial Fund and Quintin Hogg Trust

For Quintin Hogg sport and religion played a key role in both academic success, physical and mental wellbeing through education. It was his love of sports that led him to purchase land at in south west London in 1880 for the use of the Hanover Athletic Club, an amateur sporting association connected to the original Young Men’s Christian Institute.

These sports and playing fields were later given over to the students of the Polytechnic. This land was sold off by Quintin Hogg for development in 1902.The Polytechnic Athletics Club,which catered for all sporting disciplines from football to hockey, water polo and rowing, moved to the Recreation Ground sports fields, before the sudden and untimely death of Quintin Hogg at just 58 years old in 1903.

“Following his death an appeal was launched at the Poly to finance a sports ground in his memory and, three years after he was laid to rest, the Quintin Hogg Memorial Ground was opened in the West London suburb of Chiswick. The Memorial Ground was presented as a testament to the huge contribution of Quintin Hogg to the development of sports at the Polytechnic, and also a fitting tribute to his life’s work and his values.” Mark Clapson An Education in Sport

The Polytechnic Sports Ground at Chiswick was bought with the funds from this “crowd funding” effort by former students, graduates and past associates. Its location chosen to link with the existing Hanover Rowing Club, now the Polytechnic Rowing Club on the bend at Ibis, purchased by Quintin Hogg in 1888. His legacy was bequeathed to the Regent Street Polytechnic which became the University of Westminster in 1992.

The Quintin Hogg Trust owns the 6.7 acres of playing fields to the south of Hartington Lane. The Quintin Hogg Memorial Fund owns the Sports Ground north of Hartington Road, the Rowing club and the adjacent 0.9 acres.

Clearing the land in 1903

The opening in 1905 of the Cricket Pavilion

10 2.0 Our Client: The Quintin Hogg Memorial Fund and Quintin Hogg Trust

(1) The object of the trust is the advancement of education. Object. The object of the Charity shall be to promote the educa- tion of the students of the University of Westminster by the provi- (2) The trustee may allow the land and buildings belonging to sions of facilities for their recreation and such other facilities for the trust described in part 2 of the schedule to this Scheme to the advancement of every aspect of their education and subject continue to be appropriated either wholly or in part for use for thereto, the education of other young persons as the Trustees the purposes of the University of Westminster. think fit.

Use of property. (1) The land belonging to the Charity and the buildings thereon shall continue to be appropriated as a recrea- tion ground and for other uses ancillary thereto in furtherance of the object of the Charity for as long as the Trustees think fit.

(2) The Trustees may provide buildings on that land for the better attainment of the object of the Charity and may meet the cost out of capital or income of the Charity.

Clearing the land in 1903

11 3.0 History of Sport at the University of Westminster

1880 - Quintin Hogg leases land at Barnes for sports 1883 - The Hanover Harriers are formed 1883 - Land at Merton Hall bought for the use of sports clubs 1887 - The Polytechnic Athletic Club is formed 1888 - The Polytechnic Boathouse is opened 1889 - The Studd trophy is awarded for the first time for best annual performance by a Poly athlete 1900 - Merton Hall ground sold for development 1903 - Quintin Hogg dies far to soon.... 1906 - The Quintin Hogg Memorial Sports Ground is opened over 40 acres of sports fields for the use of the Poly athletes 1907 - Quintin Boat Club formed 1908 - The London IV Olympic Games held at White City 27 Poly athletes compete 1909 - The Polytechnic Marathon is held for first time - its runs until 1996 1912 - The Stockholm Olympic Games 12 medals are won by Poly athletes 1920 - The Antwerp Olympic Games 9 medals are won by Poly athletes 1920 – new QBC is built 1921 - The Rowing Tank opens in memorial for fallen comrades from the QBC 1924 - The Paris Olympic Games 2 medals are won by Poly athletes 1928 - The Amsterdam Olympic Games 4 medals are won by Poly athletes 1932 - The Los Angeles Olympic Games 4 medals are won by Poly athletes (including a first ladies medal) 1936 - The Berlin Olympic Games 5 Poly athletes compete 1938 - The QHMF Polytechnic Sports Ground is extended and the grandstand is built - its design is radical + innovative 1939-45 QBC bombed and part destroyed by fire (back of building rebuilt in 1950’s 1948 - The London XIV Olympic Games 5 medals are won by Poly athletes 1952 - The Helsinki Olympic Games 4 medals are won by Poly athletes 1956 - The Melbourne Olympic Games 8 Poly athletes compete 1960 - The Rome Olympic Games 2 Poly athletes compete 1964 - The Tokyo Olympic Games 1 medal is won by a Poly athletes 1968 - The Mexico City Olympic Games 5 Poly athletes compete 1972 - The Munich City Olympic Games 1 medal is won by a Poly athletes 1976 - The Mexico City Olympic Games 3 Poly athletes compete 1992 - The Polytechnic becomes the University of Westminster Top left - The Stadium built in 1938 Middle - The Boat House in 1929 Bottom left - Alan Pascoe 400m Hurdles 1978 Bottom Left - Polytechnic Javelin sportswoman 12 3.0 History of Sport at the University of Westminster

The University of Westminster, and before it the Regent Street Polytechnic, has a glittering past in sporting achievement that spans the period from 1880 to 1976. The acquisition of the Memorial Sports Ground and the later development of the Polytechnic Stadium in 1938 led to a golden age of sport for the Poly.

Between the 1908 London Olympic Games held at , where 27 athletes from the Polytechnic Athletics Club took part, to the 1976 Munich games where Alan Pascoe won the 400m for team GB, over 155 Polytechnic Athletics Club members competed, and 44 medals were won.

The Polytechnic Athletics Club, the Polytechnic Rowing Club and the Quintin Boat Club co-ex- isted for over a century on the Polytechnic Sports Ground and the land south of Hartington Road. The achievements of the separate sports clubs over that period established the Poly- technic as central to UK sport, with the Stadium to the North being the home of UK athletics for over 35 years.

13 14 4.0 History of The Quintin Boat Club

The Rowing Club at Chiswick, the heart of this project, sits alongside and Anglian Rowing Club, formerly Ibis Rowing club, which was once the boat house of Grove Park Manor, built 1850 (circa).

In 1888 Quintin Hogg purchased the land adjacent to the original wooden structure from the Duke of Devonshire’s estate at , and funded the opening of the Polytechnic boathouse on the River Thames.

“Hogg had paid for the construction of the boathouse, and also to have it stocked with rowing boats. Such generosity was rewarded with a flow of hurrahs and expressions of thanks.”

Mark Clapson, An Education in Sport

The opening of the boathouse in 1888 was one of the most celebrated events at the Poly, and in Victorian Rowing. In addition to members of the Polytechnic Rowing Club, participants from other clubs and societies went along to celebrate the inauguration of the boathouse, and to take in a fine day of rowing and sport. Many sportsmen and sportswomen also attended to catch a glimpse of some amateur competitors of the later Victorian years.

“The investiture of the boathouse saw boating races, amusing tub races, processions of illuminated boats as the sun set, fireworks, a military band and a concert. Opening ceremonies are usually opportunities to bring together old acquaintances and to demonstrate élite connections, and this ceremony was no exception. The reflection of the boathouse on the surface of the Thames was given an extra glint by the reflected glories of Eton and Oxbridge…”

Mark Clapson, An Education in Sport

Left - The opening of the first Polytechnic Rowing Club on the site of the current boat house in 1888.

15 1746 1800

1840 1880 16 DESTROYED BADLY DAMAGED LIGHT DAMAGE

1900 Bomb Damage map - showing QBC hit by incendiary 1946

1953 2018 17 title1899 Regatta from the Polytechnic Boat Club 18 4.0 History of The Quintin Boat Club

At the heart of the establishment of the rowing club, was an act of subversion. The Polytechnic Rowing Club was in fact a merger/renaming of the Hanover Athletic Rowing Club, a more elite ex-Etonian group. The name Quintin would be a further 30 years in waiting, but all three were set up to allow rowing to be an “access for all” sport. The education and Christian principals of the Polytechnic extended to the River and Quintin Hogg’s love of rowing is clear from this commitment and investment.

Over the fullness of time the Polytechnic Rowing Club became a route to rowing at the highest level for those from less aristocratic and wealthy backgrounds.

Even on that opening day the mission of the club was clear in its key members:

“The fact that Robert Mitchell was on the podium with past members of the University is a powerful reminder of class-mixing in the ostensibly élite sport of rowing. Mitchell was from a skilled working-class background, and had been enthused by a Bible class held by Quintin Hogg in 1881, since when he had become a devout and hard-working member of the Institute.”

Mark Clapson An, Education in Sport

Over the next 40 years the club did all it could to row at , bending the institutions strictest class-based establishment rules, an institution that did all in its power to stop non-amateur rowers competing.

By non-amateur, this did not refer to the payment of rowers for rowing, but for their payment by any means other than private means, no artisan or clerk could work and row to the highest level.

Quintin Hogg and the Polytechnic Rowing Club set out to unpick this rule, creating a club within the Polytechnic Rowing Club specifically to gain entry to Henley.

Various possible names were considered, including Quintinian Rowing Club, but in October 1907 Polytechnic Boat Club formally changed its name to Quintin Boat Club. This was in honour of Quintin Hogg, who had died in 1903, poisoned by fumes from a gas heater whilst in the bath of his room at the Polytechnic.

Eventually in 1920 the club rowed at Henley and continues to do so each year. 2020 is the centenary anniversary of the first team to compete. This is a major factor in the project’’s timing.

19 Thetitle Quintin and Ibis Boat Club’s in 1933 20 4.0 History of The Quintin Boat Club 1920 Quintin’s first appearance at Henley Royal Regatta, in the Thames Cup. Quintin 1966 Quintin’s traditional racing tops (white zephyrs with a dark blue ribbon) were has had crews at every Henley since then, except for 1921. replaced by the present singlets of a slightly lighter blue with two diagonal white A rowing tank and a wooden building to house it were built by club members as a hoops. memorial to those who died in the Great War. 1971 A Quintin coxed four won the national selection trials and represented Great 1924 The wooden boathouse boat house was destroyed by fire in 1920s and rebuilt Britain in the European Championships. 1920-24. 1973 Quintin’s eight won at the National Championships. Quintin took part in the first . Quintin is one of a handful of 1975 Graeme Mulcahy represented Great Britain in quad sculls at the World clubs that have competed in every one. Championships. 1926 Quintin reached four Henley semi-finals in five years. 1976 Sally Parsons (now Mrs Sally Peters) became only the second woman ever to 1931 First HRR appearance of our long-running president until his death in 2015, Dick compete at HRR. She was coxing Quintin’s second Thames Cup eight, which was Hylton-Smith. He rowed in the Thames Cup for Polytechnic Schools Boat Club. racing as Townmead RC. Graeme Mulcahy won the . Freddie Peters retired as boatman after 45 years and was succeeded by his son, 1976 The wooden building housing the rowing tank had become increasingly Tom. The Peters family are still members of Quintin and Toms son was born in dilapidated. It was demolished and replaced by the present brick and concrete the kitchen of the club. structure, but leaving the tank unaffected. 1937 Quintin raced at a regatta in Paris, probably the club’s first ever foreign trip. 1977 Graeme Mulcahy again represented Great Britain in quad sculls at the World 1938 ARA and NARA clubs were at last allowed to enter each other’s regattas. Although Championships. this removed the need to have Quintin Boat Club separate from Polytechnic Row 1991 Bobby Thatcher represented Great Britain in the world junior championships in ing Club, there seems to have been no immediate desire to merge the two clubs. both years, winning gold in the coxless four in 1992. In later years he raced at 1944 The rear of the boathouse was hit by an incendiary bomb and over 50 boats were senior level in the Olympics and World Championships. In 1992 Alistair Lees- destroyed, including all the racing boats. The only boats that were salvaged Jones also represented Great Britain in the world junior championships. and capable of repair were a tub four, a double skiff, a gig 1997 Internal rebuilding of part of the boathouse removed the committee room and scull and a “coach and pair”. Luckily, the damage to the building was not as great creation of a women’s changing room. as was first feared. Although the ground floor was burnt out, the first floor suf- 2001 Quintin Head started. fered much less damage and the structure of the building was relatively 2009 ‘Learn to row’ courses started. Raw recruits had previously been taught on an ad unscathed. hoc basis. 1951 Polytechnic Rowing Club amalgamated with Quintin Boat Club. The combined 2012 The rowing tank was boarded over and the building was converted into a gym. club took the name of Quintin Boat Club, which was now the more well-known The tank had been out of bounds for some years prior to this, after being club, rather than that of the older Polytechnic Rowing Club. declared a safety hazard by the University of Westminster. 1950 After the wartime damage the boathouse was rebuilt. Apart from extending the boathouse at the rear, most of the work was internal. One of the two large windows at opposite ends of the clubroom was bricked up and replaced by the present fireplace and chimney. The refurbished clubroom also incorporated a bar. 1951 The boathouse was formally reopened in August 1951. John Peters (one of Tom’s sons) won his first pot for Quintin, as a 12 year old cox. 1962 An annual eights race between Quintin and the University of London was instituted for the Canada Challenge Bowl. The bowl had originally been presented to Polytechnic Rowing Club in 1908. The race has not been held for many years. 1964 Having represented Great Britain as a sculler in the European Championships in August, Bill Barry was brought into the coxless four for the Tokyo Olympics in October. The four won the silver medal.

21 J.M.W Turner’s River Thames from the North Bank; Bridge and Grove Park 22 5.0 Existing Site and buildings The Boat House over time:

The existing site of QBC was purchased by Quintin Hogg in 1888 for the construction of a simple wooden boat house with a timber frame, much the same as the many boat houses that dot the river Thames from to Henley and beyond. The Thames-Cam-Isis-Axis of clubs that could compete at Henley under the ARA rules all had boat houses, of a roughly similar nature. The original structure was destroyed by fire in the early 1900’s and rebuilt in 1920-4. The back half of the boat store was then destroyed by a German Incendiary in World War II and subsequently replaced in the 1950’s.

The larger site around the club, to the south of Hartington Road was purchased at sometime after 1888 and formed a large grass playing field for both football and rugby, this site has not been altered over time and has always lacked the facilities of the North site in terms of changing and storage.

Arranged over two storeys with a balcony on the river frontage for spectators; the boat house was symmetrically proportioned with a hipped roofline and large double height space containing a club or committee room.

There is no record of the interiors of this space, but it is safe to assume this was a social club for the rowers who had ventured west from the campus at Regent Street, a good hours carriage or horse ride away, however it is more likely that the club members would have travelled here by boat.

Boat storage at the time was limited to less than 10 or 20 boats which were larger and of timber construction.

The traditional timber construction of the first Boat House was sympathetic to the rural setting. By 1888 this was changing, the pastoral landscape can be seen in the few photographs of the time, and is perhaps best shown in the work of J.M.W Turner who painted the Thames at just ½ a mile north of the site in 1805 (left) The scene shows Grove Park House further down river, and the smoke from the new railway at Chiswick Station.

Right - The Boathouse in 1890

23 varify all dimensions on site on dimensions all varify

*

1 3 S 5 J .0

7

L

O

O

K

R

I G

T H

F T

E

L

K

O

O

L

L

O

O

K

R

I G

H O T T S B O Hartington Road P

T S T O S P O P 0m 7m 14m 21m 28m OK LEFT 7.40 LO S T 2 O .4 T B 7 S O

O B

P

R

I H G T L O O K 7.39 VISUAL SCALE 1:500

7.0 7 0 .

LOOK T LEF S T O 7.0 P

7.0

. 0

0 7 7.0 7.

7.0

T S O 0 P 7. 7.0

T

S T O F P 7 E

. L

0

L K

O O

O O

K L

R

IG

H

T 7.0

T S O P

T S O T P S O P

7 .

0

0

. 7

6.0 DO NOT SCALE FROM THIS DRAWING: All dimensions and levels should and and check readbe shall DRAWING:only dimensions FROM All from THIS Contractor SCALE NOT DO drawing. those the on values stated text in

8

.

0

6.0

0

.

6 ting

6.0

7

.

0

0 . 6.0 O 7 6.0 B

6

. 0 6.0 Ibis

E N D

9

. Lane 0

6

.

0

0

. 8

6 .

0

rawings or otherwise unless otherwise agreed in wri

7 . Playing Field 0

9

.

0

0 .

6 6

.

0

8

.

0

7

. 0

L C T

6.0 whether by provision of copies or original of the d of the original or of copies provision by whether party third any to granted is, or been, has kind y

9

.

0

0

.

6

6

.

1

0

0

.

H 0 S U B H S U B 8

.

0

H S T U S T B O S P O T P S O P

H S U B

7 . 0

H S U B

5 .0

H S U B 5.0

O B O B

0 . 5

5.0

9

.

0 SKILLS TALENTS* and no license or assignment of an assignment or license no and TALENTS* SKILLS

5 . H 0 S U 6 1

B . 0

0 .

0

0 8 . 5 . 0

7 .0

5 Mortlake + Albion . 0

.61 8.60 8.60 8

8.60

5 . Quintin Boat Club 0 T

S

6 O . P Boat Club 0

7.10 9 14 4

0 10.

0 .

1 .

. 0 7

0

5 . 1

6

8

8

0

1

7 .

.

1 7

0 .

7.08 1

0

1

0 . 7

H S U

B

0 0 AssortedAssorted Skills Skills+ +Talents* Talents* (w) www.assortedskillstalents.com (e) Charlotte48 2NS Street, W1T London: (0)2037010403 +44

7.0 5.70 7

AssortedAssorted Skills Skills+ +Talents* Talents*

.

7

. 5 3

e description rev 11.7

2

5

7 0 . Revision Schedule

. 1 1

5 issued for: issued no: project scale:

title: project: client: O B 1 : 2000

© SKILLSASSORTED TALENTS* ASSORTED in vested is this in drawing copyright the

5

. 0 Site Boundary Plan Chiswick Model, Site

P

S rev description date drawn check 17013

Quintin Hogg Memorial Fund + Quintin Hogg Trust

5 Revision Schedule . T 0 S O P

3 6 B 5 .9 N 1 client: 1

5 . 0 Quintin Hogg Memorial Fund + Quintin Hogg @A3 @A3 Trust

p

tm

S

0 .

5 River Thames

5

. project:

4.0 0

0 . 5 Site Model, Chiswick 5.56 drawing no: drawing

5.0 3.0

AST

0. Originator0. date: 0 0 5. . 5 PLANNING

4

. 0 .

0 5

5.0 5.0 * 5.0 title: Site Model 3.0 4.0 4.0

0 -

2. Location 1. -SM 4.0 Existing Site Plan 4.0 3.0 2.0 2.0 3.0 1.0 3.0 2.0

1.0 2.0

1.0 -ZZ Manchester: 7130517 (0)161 +44 - 2. Level Level 2. 1.0

3 Cobourg3 Street, 3GY M1 1.0 1.0 scale: date: 1 : 500 @A1 07/09/18 [email protected] 1.0

-DR 2 3 - 29/08/18 B 5 3. Type 3. .5 N 2 1 project no: drawing no: 0. Originator -1. Location - 2. Level - 3. Type - 4. Role - 5. Drawing Series -6. Drawing Number 17013 River Thames AST -SM -ZZ -DR -A -20 - 005 - River Thames Role 4. issued for: rev: aedancheck drawn date -A PLANNING - -20 - 003 -20 5. Drawing Series Series Drawing 5. rev: - 6. Drawing6. Number Assorted Skills + Talents*

© ASSORTED SKILLS TALENTS* Existing Site Plan the copyright in this drawing is vested in ASSORTED SKILLS TALENTS* and no license or assignment of any kind has been, or is,London: DO+44 Existing NOT (0)2037010403 SCALE FROM THISManchester: DRAWING:site +44All layoutdimensions (0)161 7130517 and levels should be read only from those values stated * Existing Site Plan granted to any third party whether by provision ofcopies or original of the drawings or otherwise unless otherwise agreed in writing48 Charlottein textStreet, on theW1T drawing. 2NS Contractor3 Cobourg shall check Street, and varify M1 all 3GY dimensions on site 111 1 : 500 (w) www.assortedskillstalents.com (e) [email protected] 24 5.0 Existing Site and buildings

The original boat house was replaced with an almost exact facsimile of the existing, a two- storey structure of the same proportions, but this time of brick and mortar.

The building is in fact a very modern structure using steel and concrete to create a light frame, with a considerable amount of glazing to the river frontage now allowing a fabulous vista of the bridge at Chiswick, which at the time had not been constructed, so the view was of the few houses and brewery on the opposite bank at Mortlake and across to the fields and trees to Richmond.

During the rebuild, the rear of the structure was enlarged, above a narrow boat house. The concrete frame was again, clad in brickwork, using Crittall style windows, modern at the time, for light in both. The upper storey of the rear was dedicated to changing rooms and a small flat, comprised a kitchen living room and two small bedrooms along a spine corridor parallel to the changing rooms and accessed from the bar, as well as an outside access stair and porch.

The design of the new boat house, while very much a copy of the general form of the former timber structure, is arts and crafts in nature, the brick work is expressive but simple, it is not a fussy building but has been built with generous spaces wrapped in a well-considered envelope of local red brick.

The balcony or veranda is timber framed on a concrete cantilevered base, and the painted wood work is domestic in scale, similar to that found on homes built at the same time aping the rustic style favoured on large country estates across the land in Edwardian period.

The Boathouse in 2017

25 The boat houses of Quintin, Mortlake (fromerly Ibis) and the existing Gym 26 5.0 Existing Site and buildings The historically significant QBC committee room was lit from all sides with large steel framed windows, wood panelled with a barrel vaulted ceiling under a slate roof. Commanding and club like, the space had a bar and a long table for rowing matters to be debated.

The committee room is still accessed from the veranda, itself accessed from the symmetrical stair which branches to access the flat. The room has purpose and feels both nostalgic and establishment. It is slightly forbidding, and while the walls are lined with memories of the interior clubs success, the victories are sometimes so long ago that new members cannot connect with them. The lack of young faces, new blades inscribed with the names of a victorious crew, or the prow of a winning boat from a recent Henley Royal Regatta is a symptom of the relative decline of the club since the 1980/90’s.

The chimney to the west of the room was added later, and replaced a large arched window echoing east gable which commanded a view up to Kew. The proximity of the Ibis Boat Club, now Mortlake & Anglian Boat Club, meant that window no longer had a river view and was replaced with a much need fire place in the 1930’s.

In terms of current condition, the boat house is in a very poor state of repair with many major elements at the end of their life, from structure to windows and the roof. In the front part of the building, all major windows are now rotting (some of these frames are no longer safe and are not fixed into the window opening securely) while the walls of the rear part of Above - the committee room in 1900 the block are of poor brickwork. The roof structure is too light to cope with self-loading and Below - the post war fire place (1930’s) Below - memories of QBC since 1888 is leaking badly in many areas.

The facilities are poor, with no lift access for those who are unable to walk or have impeded movement, There is a serious issue over gender and junior/senior split changing as well as a lack of storage. There is no accessible WC provision on the upper floors. The accessible WC on the ground floor is outdoor and has a step at the threshold.

The main roof to the front part of the building is original slate and is in fair order, but not thermally insulated. The brickwork walls and steps are in places deteriorating due to flooding which is historic. Since the opening of the the site has not flooded.

Finally there is a structural crack in the short elevation of the front building, which is being monitored and may require underpinning.

Overall the quality of the front portion of the building, the original pre-war boat club room and access, is excellent in design terms. It is of local merit and has landmark status on the river. The team have worked from the outset to treat this building as being of significant value architecturally and historically.

27 Space behind Gym Gym adjacent to River Thames

Existing Boat Storage View from veranda

28 N

0m 2.8m 5.6m 8.4m 11.2m

VISUAL SCALE 1:200

COPYRIGHT. The copyright of this drawing is held by AST* - Assorted Skills + Talents Limited and no reproduction is allowed without prior permission. This drawing must be checked and verified by the contractor prior to work commencing on site. Liability shall not be taken for any defects in this drawing unless, prior to commencing, this drawing and all its dimensions have been so checked and verified. All drawings issued prior to being checked to be treated as draft. DO NOT SCALE.

a l t E S 5.0 Existing Site and buildings b u S

Cha in link fence ht 1.9m e Chain link fence ht 1.9m g Ta 's Tarmac rmac V S G Brick a rass Paving Slabbing 's During the inter-war period the boat club members An agreement dated 15 March 1999 entered into V M Brick pav t ing S W M Tarmac W P Chain link L fence ht 1.9m t Slabbing

Gr o as T s Grass T .7 0 D T T C Tarmac Grass T

B 8 1 9 r

V . S Slabbin

6 J g e

S i r

Grass r Chain link a

fence ht 1.9 B

.7 m 0 d e

D Slabb

ing a o

Gras Tarmac R s Gra Grass h ss c Slabbing Chai a n link fence ht 1.9m P m rm T L a T G r raised money and built a ‘rowing tank’ in a wooden shed between Hounslow Council, the Owner and the University a rass .6 mac T 0 D

Gr S 9 as lab L

s bing S 2 P T O

L Grass .4

.6 7 O T K

0 Tarmac T

. D R

I

G

H

T T 6 G T F r arm ass .6 ac E 0 L D T armac K Slabbing O T O

T L Grass

L

T

c L

a P O

m L O

r 7 K

.

a H 0 R

Existing site areas A Proposed Buildings GEA I GIA NIA

T R G

T D

I H T NG T TO S N O RO O B A P P D C in memory of the fallen from the Great War, this was of Westminster and made pursuant to Section 106 of L oncrete

T B 0 .0 V 7 S c H T a Slabb F 5 m ing .9 S Grass r 6 O a TT P .7 T T 0 S D O T P B 1 c .0 a 7 TT rm Slabbing P a sqm Tarmac acres hectaresL T sqm sqft sqm sqft sqm sqft Post and rail fenc e ht 0.9m T S T 6 B 2 . O .0 0 P 7 D Grass P Slabbing L W a T ll B 4 LOOK LEFT h .0 Grass t 7 2 Tarmac T O later upgraded in the mid 1970’s to a brick enclosure as the Town and Country Planning Act 1990 (the Section .2 c B m Chain link fen T a O ce ht T 1.9m rm B

T a

Grass T H T G I K R L O L T O Slabbing m P .3 .2 T 0 2 D ht Chain link fe G ll nce ht 1.9m Slabb rass c a ing a W G rm rass a T Root o .6 f Hedge 0 Slabbing D Grass ion Hedge Ht 3.0m .6 at .7 T 1 0 et 0 B 1 D eg D . Tarmac f v Chain link fence ht 1 7 t o .9m Slabbing P n G .6 L d te rass 0 e ) Ex Root of H D h n edge L s o T OOK d ti Tar S LE V a mac FT S te c m O seen today. (See illustrations to left). 106 Agreement) is listed on the title. The Section 106 a o 1 P d l S i x 1 labbing p o t la r H QHT/QHMF/UK i p 200e 0.05 0.02 n/a n/a n/a Chain l Boat Club 894 P 9623.82 743.00 7998.32 0.00 0.00 D p ink fence ht 1.9 L a re m ( T c g a in m b r b a la T .5 Root of He S 0 dge D c a rm a T Hedge Ht 3.0m m n Chain link fence 9 io ht 1.9m L . t a r T

1 t e k t g M T h e S V O e Root of Hedg P c e

n

e 0 f T S B 7 T .2 k .7 8

n 7 i He l dge Ht 3.0 m T

n

i S T

Agreement was varied by a deed dated 18 July 2001. a O kr P F

h M E

C

L

a L

e K r O

a T O d B 7 O

7 O e . K

c 7 L n e R f I d G e T T s g T H S lo n T O c vi P n .3 a n E 0 P io D t ck ta ri e B L g T e QHMF V 3656 0.91 0.37 n/a n/a n/a Boat Store 1829 19689.00 1520.00 16362.65 1276.00 13736.01 s s n ra

o

i G

t

a

t

e

g L

e T

v

f

o

The single storey tank has not been used for a decade t

n

e

t

c x a

rm E

a c

T a

m

r

a V T

S

s

s

c a

a r rm G

a

T

g

n

i

c b

b a

a

l

m

c S r a a

rm T a T T y S g n O T ti P S Section from Title search - Farrer & Co Solicitors 2018 n O la P P a or more due to the weight of water pushing the whole T 3 B .1 6 m 1 1 t QHT 26800H 6.70 2.68 n/a n/a n/a Rugby Club 1178 12681.05 1014.00 10915.61 991.00 10668.02

w e r e e

r i

T r r

V a

S B

p d

a

o R

P i L

l

c a S rm c a a concrete base structure into the river over time, leading T m r a T n tio ta e V g S e V s V s S ra s G s a m r

9 G

.

1

t

h .5

e 0

c D

n

e

Application Site 30656 7.66 3.07 n/a n/a n/a TOTAL 3901.00 f 41993.87 3277 35276.5773 2267.00 24404.03 5.2 The Section 106 Agreement contains various provisions

s k .5 s

n

0 a i r l

D G

n

i

a

h

s C s s a to a structural failing in the tank wall meaning that the s r G ra

G

c a

c m a r

m a r T a T

s in connection with planning permission granted in 1997 over n s o ti ra ta G e c g a e rm V a water had to be drained. The enclosure is single leaf Existing BuildingsT GEA GIA NIA Pitches/Parking GEA GIA NIA

n

o i V t a S t s e s a

g r r

e G e

v i

r f both this title and the land falling within the larger northern r

o a E

t B

c n

a 4 e d . t m N a r 0 x

a D o T E

T R B 9 .4 A

6 s m

s 9 ra .

1 G L

t

h

e c sqm sqft sqm sqft sqm sqft PROPOSED sqm sqft sqm sqft sqm sqft n concrete block walls and a flat roof. Both are prone to e f

S k

n

i

l

n I i

c a

a h m r C a B T s .3 s 0 a site. The permission related to the installation of floodlighting, I r 's D V G S

l

l

a

W

s s leaking. At present the space is kitted out for use as a ra G .3 0 D

V hockey pitches, the erection of a sports and fitness centre and S

n tio Boat Club 800.00 8611.92 689.00 7417.02 n/a n/a Rugby Field 11990.00 129071.15a n/a n/a n/a n/a t e g e V O B

m c 1 a

1 t m

H r

e a

re T T

c a gym with a small ancillary storage area given over to m c c r a a a T rm rm a a related car parking and landscaping. The relevant conditions T T .3 0 D

V P S L

.3 0 D

d e e p T 3 p m B 4 S a blades and a small workshop space. . R that continue to affect the land on Plan A are: Gym 6 205.00 2206.80 189.00 2034.57 n/a n/a Parking (hard) 2500.00 26912.25 n/a n/a n/a n/a s s ra G

V S

E N D

s s ra G

P c T c a a rm rm a a T T P L

s m s

9

ra .

1

Boat Store 165.00 1776.21 163.00 1754.68 n/a n/a Parking (grasscrete) G 850.00 9150.17 n/a n/a n/a n/a g V S t n

i h

t

n e

c a

l

n

P

e

f n io k t n

i

l 3

ta c .

0 e a

n

5.2.1 a riverside walkway should have been (and continue .5 g i D e m

0 a

V r

D h T a

C B 6 T Finally, a single storey metal shed is used for boat .1 6

g s n s i t ra n G

a

l

P

V S

n

o

i

t

a to be) provided as per the route highlighted yellow on Plan B t

e

g

c c e

a a v

rm rm f a o a T T t storage and a large area of the site is laid grass used n

e

t

m

x

TOTAL 9 1170.00 12594.93 1041 11206.261 TOTAL 15340.00 165133.57

. E n

1 io t t a 4 h t . e 0 e g D

c e

n V

e

f

g

k n

n

i i

t l

5 n .

n

i a 0 l D

a P s s h s s a a C r .3 r G 0 G D V (which appears to fall within the land tinted blue on Plan A). S

c for overspill parking and launch storage. The existing a s rm s a ra T G c a s s rm a a r T G c a rm a T .3 0 The path is described as being between Chiswick Bridge and D P L

s s .4 ra 0 G D g m n i 1 t 1 n t H a l e Boat House and other buildings are arranged in a loose P re T

c a c Ibis Lane and; rm a a rm T a T

s s ra G

grouping around a poorly defined yard. Fundamentally .4 P 0 T D

s s ra T 1 g B 0 G n . 3 i . t 6 0 n D

a l

P P L

V S s s ra G

c a each is in the wrong place; the gym (the former rowing m c r a a n T rm tio a ta T e g e V (a) the walkway should not be less than 1.8 metres wide .4 0 D

g

n i t

n

a l c

P V a

S m

r

a T

n

o

i c t a

a t tank) sits too close to the boat store and club house e rm c a a g T m e r v a T f

o

throughout its length unless otherwise approved by the Local t

n

e

t

x

E

m

9 m .

1 1

1

t t

H h c a e e e n

rm r c

g T io 2 n a t n i T a 9 t e t

f e n g

a k

l e n

i V

P l

n

s i s ra a G h leaving a narrow access route to the river. The storage C .4 0 Planning Authority. D

g n ti n

la s

s

P a

r G

m

9

.

1

t

h

e

c

c n

a e

f rm a k

T n i l Ro ot of Hedge Hed c n ge Ht 3 i .0 a m m a r h Fe V a nce ht 2.0m

shed is located perpendicular to the existing boat house S T C D

c a Fence ht 2.0 A rm m a

T

O s R n s

T io ra 4 B 9 t .9 s ta G 5 s e Fence ht l a 2.0m l r g

a G e V

W

P Y 8 c T a Fence ht 2.0m rm

a E

T m 0

.

3

H

S t

e S H

U g

e

B d

g e

(b) the Owner should permit the public access to and along d

H

H e

d S f T

H o

e

e p U t

p m B o

and as such blocks off the top corner of the site from S o a R R R c a

rm H E a S T U

B H

T C S T O S P O P

s T H s S

S a O

r P 4 U the riverside walkway at all times (other than Christmas Day); B G

V 7 d S e e p p m S a

the boat house and restricts the use of the site to the R

m 0

H . 2

S

U t h

B

c e

a c

m s n 0 r s a e c T c ra a a G F rm rm a a T T

4 c

a

m

r a

and T s s ra G north of it. c a rm H a S T U

B

s s

O a B P r

T n G tio O ta B e g e

V P m ost and rail fence

ht 1.0m 9

. 1

Post an

d rail fence ht 1.0m t

h

e

c

n P e

T f

k

n

i

l

n

i

a

h C

(c) if within 25 years (i.e. prior to 15 6 March 2024) the 4 rev description date drawn check T 7 B .8 0 1 Finally a footpath, part of a 2006 S106 agreement, Revision Schedule T 4 P B .0 L 1 1

H Council serves a written request on the Owner, the Owner S U B

s

which is not a public right of way but is a right of access, e c a rm a shall dedicate the riverside walkway as a public highway T

s

2 g . 8 in 0 . b D 0 b D la S

u s s Steps a Assorted Skills + Talents* r G Iron railing fence ht 1.0m

.2 which runs around the perimeter of the site between two 0 North Studio D

.4 o 0

maintainable at public expense, to which the public should be D

m

m

0

0

.

.

3

2

t

t 3 Cobourg Street, Manchester, M1 3GY.

h

H

s Steps e p T e Ste

S c

g e

O n

d g

P e e

H

d

F

H e

H Studio South

f

o

t o

o T

R S O P .3 48 Charlotte Street, London, W1T 2NS. 0 D high fences, over grown trees/shrubs which in effect s

entitled access at all times. d

g n

t i r b k Steps b la Steps S s s

c ra a G H S U www.assortedskillstalents.com o e B a

D t l b l u a l c a cuts off the access to the wider site, acting as a visual o

s G o rm s T a a T T r s T C G s T a s r

p G

e

t B O S B

B

P L

s s ra client: G c a rm

a g

T n i and physically barrier. Root of footpath shown to right in plan. c P b a S b

rm a

Ta l S

T S --- O P

y a w lip .5 S S 0 3 teps D B N G M

n tio c ta a .0m e 3 g rm Ht e a e V T edg H G M 7 O .6 S 0 1 e dg He s t of s p o c ra Ro a G tm rm S Ta p te S G

m M 0 . project:

2 Hedge Ht 3.0m

t h

This tunnel like pathway is equally off-putting to dog e

d c n

e y m F .0 r t 2 h ce en a a Root of Hedge F s s 4 t a . w il r 0 D

S G m

l 3

.

1

t p

H

l l Tarmac l Fence ht 2.0m a i G W o d M l walkers and pedestrians in the summer evenings as B u S M

Tarmac

P V

n tio ta n e tio g ta e e V g .4 e 0 V D .4 0 D n P o n L ti tio ta ta e e g g e e during the winter months due to it’s “funnel” like nature. V V drawing: .0 1 .0 D 1 D

Unnamed

g

n

i

b

b

a

l S

ilt S ilt S

ilt S

ilt S ilt S

ilt S

ilt S drawing no: project - originator - volume - level - type - role - drawing number rev: drawn:

123456 -002 11/23/17

m

3

.

1

t

H

l

l

a W

2 B N original by: Author issue status: scale: Project Status 1 : 500 @A1 checked by: Checker 29 Aerial Photograph of the application site (red) and Polytechnic Sports Ground (blue) 30 6.0 The established brief

“Refurbishment and redevelopment of new sports and recreation facilities on the site to include; Demolition of rear section of boat house, gym structure and boat shed; Refurbishment of retained section of boat club building and reconstruction of rear section; Two new sports pavilions; New 3G pitch for dual rugby and football use, new junior 3G pitch with running track; New access road and circulation drive for vehicle and pedestrian movements, car, cycle and motorbike parking; Floodlighting to playing pitch; associated landscape works”.

31 Current Boat Storage at QBC 32 6.0 The established brief

The client vision was established at the outset of the project with an RIBA stage 1 report, this The Project will also ensure the future of rowing on the site by ensuring the existing facility set out a number of options for the physical works and then generated some key objectives for QBC is brought up to modern standards in an economically efficient manner refurbishing which are then answered by the built form, and social inclusion/outreach strategy proposed; the fabric to a quality appropriate for the local heritage value of this building. Refurbishment will allow for the provision of access for all and changing facilities of a modern standard for 1. To create a centre of sporting excellence for the whole community welcoming all gender definitions across youth and adult rowing. athletes of all ages, but particularly young people, of all abilities – male and female and those with disabilities. A final part of the project will see provision of a new boat house for 130 single, double, fours and eight boats with changing, WC, studio/training rooms and a large dedicated indoor 2. To revitalise rowing within the University and QBC rowing and cardio fitness space.

3. To re-introduce rugby to the site and create a home ground for University Rugby A secure courtyard will be created between the two rowing facilities, and this will in turn link to a site fence designed to allow security of the Rugby 3G sports pitch and all three 4. To create a new outreach agenda across the community working with partner buildings. clubs, schools, the Local Authority and others to broaden the appeal of Rugby and Rowing to groups who do not currently have the opportunity to participate in A lower security fence (post and rail) will be provided around the parking along Hartington either sport. Road and connecting across the site at the Rugby Pavilion with the existing wall at Ibis Lane. The design of this will allow for the existing right of way between the two land holdings to be 5. To continue the work of Quintin Hogg of improving life chances through sport aligned safely through the site in a passively supervised manner and for the route along the (initially rowing and rugby) – nurturing talent with the possibility of scholarships foreshore to be opened up when the club sees fit and it is safe to do so. to the best Universities – including Westminster. Finally Floodlighting and ball stop fences will be provided if required to the pitch and will 6. To create a new landmark building on the Thames, part of the continual narrative form part of the planning application. of boat houses and boating architecture providing modern facilities that are fit- for-purpose 1. A 3G artificial sports pitch 2. New Access Road and car parking, as shared surface 3. New build Rugby Facility of circa 1178 sqm over two floors with associated land The professional team have undertaken design work sufficient to seek planning consent scape/external works and banked grass for 200+ spectators. from London Borough of Hounslow for a development on land owned by the QHT and QHMF 4. The refurbishment, extension and renovation of the existing QBC, with the front at Hartington Lane. pavilion retained and renovated to the highest quality heritage standards. Rear parts will undergo external envelope redesign, uplift to modern standards of ther This development will entail a new 3G artificial grass sports pitch (RFU global standards) mal and energy performance, internal layout changes, new access lift and other pitch to be dual marked for both Football and Rugby Football Union. Adjacent to this will works associated. be a well-designed robust pavilion building wholly on land owned by the QHT for the use of 5. A new build boat storage facility of 1829 sqm to match the architectural language the students of the University of Westminster as changing, gym, treatment, WC, domestic of the Rugby pavilion, this to house boats and ancillary uses for rowing. kitchen and social events space associated with the above sports. Facility will be fully 6. All landscape and site related works, including external flood lighting and lighting accessible and designed to allow use by schools and wider community as well as by all for buildings (terraces/external spaces) users of the southern site (including Quintin Boat Club and University Rowers. 7. Security fences and boundary treatments

As part of this application works will be undertaken to create a new highway access point and parking for circa 40 cars, drop off and parking for 3/4 coaches allowing access to the south for QBC vehicles (large vans with 18+ m trailers) for rowing. 33 Early CGI concept image of the triptych at Quintin Boat Club 34 Part 2: Concepts + Evolution

35 The men of the Quintin Boat Club (Polytechnic Boat Club) in 1905 36 7.0 Design Statement

To be granted an opportunity to work on the River Thames is an honour for our practice, the The Amateur Rowing Association (ARA) was a deeply class based sporting elite. The call for this project was both unexpected and a source of pride and delight for the team at exclusion of the ordinary man was not unique to rowing, most sporting bodies were there AST*. exclusively for the wealthy and well educated to enjoy.

We had been established only a few months when we won this project in competition but For the time the educational and sporting vision of a man like Quintin Hogg was radical. He have worked together over the last decade as colleagues at larger practices. wanted to push down class barriers for both men and women and to deal with the issue head on. There is a timeless quality about the river at Mortlake, its historic pastoral landscape seems closer, feels stronger, than at other places on the river further downstream. A wealthy man with ideals and morals of the highest regard, he set out to subvert the rules and bring rowing to the young people who studied and prayed with him at the Polytechnic The mature trees along the banks, the open spaces and greenery of Dukes Meadow, the Rowing Club. Cemetery and Crematorium and the Polytechnic sports ground create a man made, but green landscape which seems timeless. The legacy of Quintin Hogg lives on in the institution of the University of Westminster, but to most who pass through the marble halls of 139 Regent Street, this seems a distant Formerly the grounds of both Chiswick House and Grove Park, the land that makes up the memory compared to the modern, multi-cultural, academic teaching establishment that Polytechnic sports ground has changed little in over a century, but its impact on rowing and the University has become. However it was exactly this outcome to which Quintin Hogg sport has been radical. dedicated his life.

The buildings and sports fields centred around the Arts and Crafts Boat House at Ibis Lane Here on the River Thames there is a moment frozen in time, rowing is a sport which has are from a confused historic period. changed little in its traditions or format since Edwardian times, it is close knit and welcoming as we found out. The end of a Victorian era, was the beginning of a more global world, but one held in the grip of European political strife, the slaughter of the Somme a recent memory. The terrors of The elite level of the sport is more open than it was, thanks to Quintin Hogg, whilst attainment the next World War were already on the horizon and would soon to take so many more lives. in sport is still linked closely to attainment in life as it has always been.

When the men of the Quintin Boat Club posed for those group photos (see illustration left) This project is about what a building can do, not just through its good design, but by means in 1905 it was in a time when class and gender were foremost in the minds of all social of its place in the social fabric of the city, how it will enable activity to flourish and how it groups. A time when one simply had a “place” in life that was prescribed by birth, wealth or can change lives. lack of it, and by class not by achievement.

37 Rowing; the application of power, geometry + balance 38 7.0 Design Statement

The design of the new facilities proposed here are aspirational and modern. They link closely to the part timbered boat sheds and ornamental boat houses of the river, and are deeply rooted in a modern vernacular with expressed structure, patterned decorative brick work and a roof clad in blackened timber on an elegantly finished concrete base.

The team are keenly aware of the nature of the area in planning terms, as protected metropolitan open land (MOL) the site is seen as being equal in standing to green belt and is part of the soft green cushion around London.

In terms of use and the development of the site for sport, the Polytechnic Sports Ground is critically located on the river. For both rowing and other sports it sits amidst a varied and developing sports district for London. The recent application and consent at Dukes Meadow (00503/B/S1) will bring further sporting investment which establishes the areas sporting credentials for the next 100 years.

The sport of rowing is about simplicity, weight and power. Geometry and physics play a role in the creation of the beautiful light weight skulling boats which glide across the water, razor sharp hulls pushing forward, oars cutting patterns in the surface as the boat moves. We have drawn influence from the boats, the rigging and from the rowers themselves, the patterns they create and their love of the light weight, but with muscular solidity in their human engines.

We are not building luxury or “show” facilities, instead each of the buildings is a simple utilitarian series of spaces connected to the sport they support;

• The Boat House extended over the existing boat store will be of charred timber over a pre-fabricated plywood SIPS panel on steel work structure.

• The Rugby and Boat House will both be of charred timber over a pre-fabricated plywood SIPS panel on exposed glu-lam structure. Interiors are exposed plywood and block work walls, details are simple and avoid fussiness.

• These new buildings are both specifically required to support the sporting efforts of their users, they are well proportioned, well executed and in their simplicity, they will be of the highest design quality.

39 Chiswick Quay The Polytechinic Sports Ground

Hartington Lane

Ibis Lane

Great Road MABC

Playing Fields QBC

The RIver Thames

Duke Meadows

The Application site Chiswick Bridge + Clifford Avenue 40 8.0 Planning Context/Constraints + opportunities

The Planning Statement prepared by Arthurs Planning and Development outlines the key The key influencing policy constraints outlined in the HLP upon the application have been site constraints. The detailed report is contained within the appendices. distilled into a number of key areas and include: The main governing principles are those expressed within both the National Planning Policy Framework (NPPF) and Hounslow Local Plan Policies: - Metropolitan Open Land - Conservation Area In addressing the site’s constraints we have to consider the wider context in which it is - Grade II Listed Building (Chiswick Bridge) situated. The application site is entirely bounded within Metropolitan Open Land (MOL) - Thames Policy Area within the Thames Policy Area. This it also sits within the Grove Park Conservation Area - Advert Special Control Area and is opposite the Mortlake Conservation Area. Chiswick bridge adjoins the site on the south-eastern edge and is a listed structure. Accumulatively, these policy constraints defined the design boundaries and are outlined in greater detail within the Planning Statement. In August, a pre-planning consultation Set against the NPPF and Hounslow Local Plan, this unique context prompted a number explored the proposals in the context of these constraints and highlighted a number of of key drivers which have ultimately guided our architectural proposal and the wider key areas which influenced the final application submission detailed in this Design and landscape design. These key policy issues are focused on: improvement to existing sports Access Statement. and recreation provision; development in the MOL/Green Belt; design in the setting of listed buildings and conservation areas; sustainability; built development impact upon In summary the conclusions and recommendations from this were as follows: open space; new car parking provision, as well as access and road saftey, flood control, archaeology, landscape conservation, protection of trees/hedgerows/biodiversity or 1. MOL Principle & Openness - Consideration given to reduction of scale of new building ecology; contamination. and provision of a more open relationship to reduce bulk and open views up across the site. 3G pitch and floodlighting acceptable in principle. Car parking in overflow area to be Due to the constraints imposed on Green Belt development; exceptions are considered reduced and space to have a dual function. if the development provides appropriate facilities (in connection with the existing use 2. Design and Conservation – General support for form and design of new buildings but of land or a change of use) for outdoor sport and outdoor recreation; as long as the as above they were to be scaled back if possible to allow more ‘openness’ and courtyard facilities preserve the openness of the Green Belt and do not conflict with the purposes of area to have more open feel. Views agreed and car parking to be reduced. including land within it. 3. Neighbours – Distance would reduce impacts from noise and loss of amenity. Lighting assessment for flood lighting required. In respect of this definition, the scale of the buildings and their relationship with both the 4. Transport - The Transport Assessment should include assessment of present use and River Thames and surrounding recreational land were key aspects, particularly during pre- impacts of future activity, visibility splays and swept paths for vehicles, cycle parking and application discussions with the LPA (refer to pages 54-81). pedestrian routes all provided and justified. 5. Ecology – Ecology assessment undertaken and bat survey. In respect to the Local Development Plan Hounslow (LDP) is defined as ‘Outer London’, 6. Consultation – With Sport , GLA and Members suggested. which aims to provide for significant growth in new housing and jobs to meet resident’s needs, whilst requiring high quality sustainable development that protects the unique Above all - the constraints imposed on the application and the respective design solution characteristics and historic assets of the borough that the local communities value. have been weighed against the need for new, modern facilities in promotion of sports and It will guide investment in new buildings and important infrastructure and prioritise recreational use in the local community. The promotion of recreational use is therefore transformation and regeneration, while protecting and enhancing valuable metropolitan justifiable when set against the guiding principles of the NPPF and local plan in as much open land, green belt and open space. that if no investment were permitted on the site then the facilities would deteriorate, rendering sports and recreational use defunct or further reduced; thereby running contrary to the planning framework that governs the use and development on the site.

41 8.0 Planning context/Constraints + opportunities

N

0m 2.8m 5.6m 8.4m 11.2m Key VISUAL SCALE 1:200

COPYRIGHT. The copyright of this drawing is held by AST* - Assorted Skills + Talents Limited and no reproduction is allowed without prior permission. This drawing must be checked and verified by the contractor prior to work commencing on site. Liability shall not be taken for any defects in this drawing unless, prior to commencing, this drawing and all its dimensions have been so checked and verified. All drawings issued prior to being checked to be treated as draft. DO NOT SCALE.

a l t View Sensitive Point E S b u S

Cha in link fence ht 1.9m

C e hain link fence ht 1.9m g Ta 's Tarmac rmac V S G Brick a rass Paving Slabbing 's V M Brick paving t S W M Tarmac W P Chain link L fence ht 1.9m t Slabbing

Gr o as T s Grass T .7 0 D T

T C Tarmac Grass T

B 8 1 9 r

V . JS Slabbin

6 g e

S i r

Grass r Chain link a

fence ht 1.9 B

.7 m 0 d e

D Slabb

ing a o

Gras Tarmac R s Gra Grass h ss c Slabbin C a g hain link fence ht 1.9m P m rm T L a T a Grass .6 rmac T 0 D

Gra Sla 9 ss bb L in

P g S 2 T O

L Grass .4

.6 7 T O

0 Tarmac T K

D

. R

I

G

H

T T 6 G T F r arm ass .6 ac E

0 L D T armac K Slabbing O T O

T L Grass

L

T c L

a P O

m L O

r .7 K

a H 0 R

T A I

RT D G

I H T NG T TO S N O O ROA P B P D C L oncrete

T B 0 0 V . c Soft Boundary/ Hedging 7 S a H T Slabb F 5 S m ing .9 Grass r 6 O a TT P .7 T T 0 S D O T P B 1 c .0 a 7 TT rm Slabbing P a Tarmac L T Post and rai l fence ht 0.9m T S T 6 O B 2 . .0 0 P 7 D Grass P Slabbing L W a T ll B 4 LOOK LEFT h .0 Grass t 7 Ta 2 rmac O .2 T c B m Chain link fen T a O ce ht 1.9m T rm B

T a

Grass T H T G I K R L O L T O Slabbing m P .3 .2 T 0 2 D ht Chain lin l k fence ht 1. Sla Gras c al 9m bbing s a W rm Grass a T

Root .6 of Hedge 0 Slabbing D Grass n Hedge H .6 tio t 3.0m .7 T 0 ta 0 B 1 ge D .1 Tarmac D ve Chain link fenc 7 of e ht 1.9m Slabbing P nt .6 L d te Grass 0 e ) Ex Root of H D h n edge L s o T OOK d ti T S LE V a armac FT S te c m O a o 1 P id l 1 Slabb p x t ing a o H il r C P D p e hain link fence h L p re t 1.9m (a T c g a in m b r b a a T l .5 Root of H S 0 edge D c a rm a T Hedge Ht 3.0m

m n Ch o ain link fenc 9 ti e ht 1.9m L . ta r T 1

e k t g M T

h e S V O e Root of Hedg P c e

n

e 0 f T S B 7 T .2 k .7 8

n 7 i He l dge Ht 3.0 m T

n S

i O T

a r

P k F

h M E

C

L

a L

e K r O

a T O d B 7 O

7 O e . K

c 7 L n e R f I d G e T T s g T H S lo n T O c vi P n .3 a n E 0 P io D t ck ta ri e L g B T e V s s n ra

o

i G

t

a

t

e

g L Restricted Width e T

v

f

o

t

n

e

t

c x a

rm E

a c

T a

m

r

a V T

S

s

s

c a

a r rm G

a

T

g

n

i

c

b

b a

a

l

m

c S r a a

rm T a T T y S g n O T ti P S n O la P P a T B 3 .1 6 m 1 1 t H

w e r

e e r i

T r r

V a

S B

p d

a

o R

P i L

l

c a S rm c a a T rm a T n tio ta e V g S e V s V s S ra s G s a m r

9 G

.

1

t

h .5

e 0

c D

n

e

f

s k .5 s

n

0 a i D r l G

n

i

a

h

s C s s ra PROW s G ra

G

c a

c m a r

m a r T a T

n s o s ti ra ta G e c g a e rm V a T

n

o i V t a S t s

e s a

g r r

e G e

v i

r

f r

o a E

t B

c n

a 4 e d . t m 0 N a r x

a D o T E T R B 9 .4 A

TFL Boundary Line 6 m s s 9 ra .

1 G L

t

h

e

c

n

e

f

S k

n

i

l

n I i

c a

a h m r C a B T s .3 s 0 ra 's I D V G S

l

l

a

W

s s ra G .3 0 D

V S

n tio ta e g e V O B

m c 1 1 a

t m

H r

e a e r T T

c a c c rm a a a T rm rm a a T T .3 0 D

V New Vehicle Access S P L

.3 0 D

d e e p T p m B 3 S a .4 6 R

s s ra G

V S

E N D

s s ra G

P c T c a a rm rm a a T T P L

s m s a 9 r .

G 1

g V

t

n S

i h

t

n e

c a

l

n

P

e

f n io k

t n i 3 a l t c .

0 e a

n

.5 g i D e m

0 a D V r h T a

C B 6 T .1 6

g s

n s i a t r n G

a

l

P

V S

n

o

i

t

a

t

e

g

c c e a a v

rm rm f a o a T T t

n

e

t

m

x

9

. E n

1 io t t a 4 h t . e 0 e g D

c e

n V

e

f

g

k n

n

i i

t l

5 n .

n

i a 0 l D

a P s s h s s a a C r .3 r G 0 G D V Sensitive Neighbouring Views S

c a s rm s a ra T G c a s s rm a a r T G c a rm a T .3 0 D

P L

s s .4 ra 0 G D g m n 1 i t 1 t n H a l e P re T

c a c rm a a rm T a T

s s ra G

.4 P 0 T D

s s a T r g 1 B 0 G n . 3 i . t 6 0 n D

a l

P P L

V S s s ra G

c a rm c a a n T rm tio a ta T e g e V

.4 0 D

g

n i t

n

a l c

P V a

m

S r

a T

n

o

i

t

c a

a t rm c e a a g T m e r v a T f

o

t

n

e

t

x

Proposed Trees E

m

9 m .

1 1

1

t t

H h c a e e e n rm r c

g T io 2 n a t n i T a

9 t e t

f e n g

a k

l e n

i V

P l

n

s i s ra a

G h C

.4 0 D

g n ti n

la s

s

P a

r G

m

9

.

1

t

h

e

c

c n

a e

f rm a k

T n i l Ro ot of Hedge Hed c n ge Ht 3 i .0 a m m a r h Fe V a nce ht 2.0m

S T C D

c a Fence ht 2 A rm .0m a

T

O s R s n a

T io r 4 9 t B 9 s ta G . s e Fence ht l 5 a 2.0m l r g

a G e V

W Y 8 P c T a

Fence ht 2.0m rm

a E

T m

0

.

3

H

S t

e S H

U g

e

B d

g e

d

H

H e

d S f T

H o

e

e p U t

p m B o

S a o R R R c a

rm H E a S T U

B H

T C S T O S P O P

s T H s S

S a O

r P 4 U B G

V 7 d S e e p p m S a

R

m 0

H . 2

S

U t h

B

c e a c

m s n 0 r s a e c T c ra a a G F rm rm a a T T

4 c

a

m

r a

Bunded Earth works/ noise T

s s ra G

c a rm H a S T U

B

s s

O a B P r

T n G tio O ta barrier + spectator viewing B e g e V

P o m st and rail fence h

t 1.0m 9

. 1

Post and

rail fence ht 1.0m t

h

e

c

n P e

T f

k

n

i

l

n

i

a

h C

6 4 rev description date drawn check T 7 B .8 0 1 Revision Schedule T 4 P B .0 L 1 1

H S U B

s

TPO block e

c a rm a T

s

.2 g 0 8 in . b D 0 b D la S

u s s Steps a Assorted Skills + Talents* r G Iron railing fence ht 1.0m

.2 North Studio 0 D

.4 o 0

D

m

m

0

0

.

.

3

2

t

t 3 Cobourg Street, Manchester, M1 3GY.

h

H

s Steps e p T e Ste

S c

g e

O n

d g

P e e

H

d

F

H e

H Studio South

f

o

t o

o T

R S O P .3 48 Charlotte Street, London, W1T 2NS. 0

D

s d

g t in

r b k Steps b la Steps S s s

c ra a G H S U www.assortedskillstalents.com o e B a

D t l b l u a l c a

o s G o m s r a T a r s T T C T G s T a s r

p G

e

t

B S O B

B

P Secure Pitch L

s s ra client: G c a rm

a g

T n i

c P b a S b

rm a

Ta l S

T S --- O P

y a w lip .5 Steps S 0 3 D B N G M

n tio c ta a .0m e 3 g rm Ht e a e V T edg H G M 7 O .6 S 0 1 e dg He s t of s p o c ra Ro a tm rm G S Ta p te S G

m M 0 . project:

2 Hedge Ht 3.0m

t

h

e

d c n

e y m F .0 r t 2 h ce en a a Root of Hedge F s s 4 t a . w il r 0 D

S G m

l 3 .

Parking for Cars + Coaches/ 1

t p

H

l l Tarmac l Fence ht 2.0m a i G W o d M l B u S M

Tarmac

P Buses V n tio ta n e tio g ta e e V g .4 e 0 V D .4 0 n D P o n L ti tio ta ta e e g g e e V V drawing:

.0 1 .0 D 1 D

Unnamed

g

n

i

b

b

a

l S

ilt S ilt S

ilt S

ilt S ilt S

ilt S

ilt S drawing no: project - originator - volume - level - type - role - drawing number rev: drawn:

123456 -002 11/23/17

m

3

.

1

t

H

l

l

a W

2 B N original by: Author issue status: scale: Project Status 1 : 500 @A1 checked by: Checker 42 8.0 Planning Context/ Constraints + opportunities

Key

View Sensitive Point

Soft Boundary/ Hedging

Restricted Width

Thames Path PROW

TFL Boundary Line

New Vehicle Access

Sensitive Neighbouring Views

Proposed Trees

Bunded Earth works/ noise barrier + spectator viewing

TPO block

Secure Pitch

Parking for Cars + Coaches/ Buses

43 Existing Built form on site

QBC 1920 Boat House The location, massing, elevation, composition, and 1920/25 Gym (tank) materiality of each building on the site and the relationship 2005 Store Shed between each has been arrived at with careful consideration Empty pitch spaces (non sports use) of many factors. We have set out a diagrammatic breakdown of our design logic process in the following pages:

Existing context:

The new build blocks are set out to create a secure space between existing and proposed, a grouping of two new build forms harmonised with the existing extended boat house. 1 The footprint of each has been located over/near to the Demolition existing footprint of built form where possible and placed for ease of access from the highway, by pedestrians and remove rear part of QBC 1920 Boat House to maximise the width of the access route to the river, as remove 1920/25 Gym (tank) well as regain lost space behind the existing gym by moving remove 2005 Store Shed the new building closer to the boundary between the QHMF Empty pitch spaces (non sports use) and QHT ownerships.

The existing group TPO on Ibis lane is not affected, and is in fact enhanced with new tree planting. Trees/ landscape

Access/Road:

Placing the access road on the periphery of the QHT owned 2 land adjacent to the protected tree grouping allows for the Access maximisation of the available pitch area and the placement of the rugby pavilion directly on the access road avoiding create new access route from Hartington Road excessive access road construction. create new parking and secure courtyard create bus/coach drop off and turn areas permeable surface/shared surface

443 New rear to QBC 10.0 Concept Development: Layout + Massing As part of a larger site wide masterplan being considered create new access route from Hartington Road by the Trusts and University to improve access, parking, and create new parking and secure courtyard to integrate the site with the Polytechnic Sports Ground, the create bus/coach drop off and turn areas placing of the new access road axial aligns with the rear of permeable surface/shared surface the Grade II listed stadium to the north of Hartington Road. plant new trees to create mini forest A shared surface pedestrian connection is created and the area will be well lit and open to the public when in use. 4 New Boat House

single storey boat storage upper level multi use spaces + changing terrace overlooking Thames creates secure courtyard space gable creates harmonious grouping of built forms spacing between buildings driven by “VII” boat length removal of one TPO tree 5 43G artificial surface pitch

mixed surface capability reuse of existing site pitch for modern games home for rugby at the University of Westminster all weather for community use Earth bund banking for spectators and noise mitigation Match controlled flood lighting (operational hours TBC)

6 45 Extend facility to create Rugby Club Initial studies focussed on creating a more efficient single creates a wall of development building that would accommodate both the QBC expansion, better viewing aspect partner schools and a new rugby club with seating. poor response to setting Thames path obstructed This solution was deemed to be unsuitable as it blocked the views across the site, and blocked the path of the ROA Thames pathway.,

The spaces between each building, are critical to the volumetric relationship of the existing to the proposed. The width of the space between the two Boat Houses will allow for better views through the site and enhanced functionally aiding users on a daily basis. 7 Turn 90 deg to pitch New buildings are placed to allow maximised spacing between each allowing landscaped buffers between break down wall activities. create grouping of built form gable to houses on Ibis lane - narrowest elevation The proposed removal of a single low quality TPO tree seating under cover overlooks pitch (see justification in landscape/arboricultural) allows the Thames path now part of development approach new build Boat House to be positioned to facilitate boat movements, and to make the new yard as wide as possible in order to function more effectively. (see diagram on right)

Finally a wall is set between the boat yard and the parking area to create a sense of enclosure and privacy, while a 8 pathway can be accessed by the public on event days. A new home for sport at the University of Westminster + Quintin Boat Club

clear logical approach to plan form expressive section details and decoration creates safe environment for Thames Path provides match and event parking removes access issues on Ibis Lane responds to setting in a sensitive manner

469 actors / supply chain

and specialist subcontr

the latest British Standards / Codes of Practice

g in paper form, or issued in electronic format,

is drawing have been co-ordinated, but are

Do not scale this drawing (printed or electronic version).

Contractors must check all dimensions from site

This drawing is copyright and is for use on this site only. This drawing should be read in conjunction with all relevant consultants drawings drawings and specifications.

All works to be carried out in accordance with unless specifically directed otherwise in the specification.

Responsibility for the reproduction of this drawin lies with the recipient to check that all information has been replicated in full and is correct when comparedto the original paper or electronic image.

Graphical representations of equipment on th approximations only. Please refer to the specifications and / or details for actual sizes and / or specific contractor construction information. Notes:-

Category A tree, group or hedge

Category B tree, group or hedge

Category C tree, group or hedge

Category U tree, group or hedge

Retained tree

Removed tree

Extents of pruning 10.0 Concept Development: Layout

T23 T26 T21 T24 T25 T22

V's S

SV's

WM

8 9

P WM .

L 6

5 6.8 9 9 . 6

6.86 6

9

. 6

SV 6.80 1 .9 T 6 6.88 B T27 ED KO

6.98

6.79 0

9

6. . 79 6.89 6.88 6 6.80 JS1 7.053

6. 6.81 84 6.81 T28 6.83 6.92

6.84 6.93

6.92

LP 6.93 T29 6.85 LP

6.99 S

T 2

6 6.86 .4 L . O

83 7

6.77 O

K

6 T5 R

.8

H I

3 6.98

AR G T H

I 6.92 NG T T T 6.87 6. 6 O 5 SV 84 .78 N F FH 6.84 R 6.97 O E 6.9 A 9 D L 6.8 G7# 6 K .91 P O L 6.85 O

7 L

.02 TL

6.94 6.90 L O

1 6.88 O 2

.9 K

9

6 . R

6 I

7.04 G H LP T 6.82 5 BT 6.94 .9 7.02 6.97

6 6.87

6

9 9

. 8

.

6 6 6.96 8 6.83 .9 6.89 6.98 6 BT 6.96 6.98

7.0 1 7.04 LP 2 1 6 . .82 7 6.91 6

9

.

6 TP 6.87 6.97 6.96

6.98

6 7

.90 0

6.94 . 7 7.21

4

9 0

. 6.97 1 LOOK LEFT 6 .

6 .89 7.40 7 S T

9

9 6 7.42 . .98

6 7 LP 7.19

.8

6

T H

6 TL G I

.9 R

0 K O O SV 7.16 L 7.39 6.95 8 6.7 BT 6.98 6.97 6.61 7.11

6.37 7.06 7.00 7.22

7.17

7.34 LOOK LEFT 7.50

0

0

.

7 LP

8 0 7.

7. 60

7

9

.

9 6

6 . 7 reet, Manchester M4 6WX 6.42 Mkr

TL

1 0

. T4*

7 P01 09/08/18 Planning T B 7 .7 77.77 S T 8.20

T20* Mkr

T

F E

L L BT O

77 K REV. DATE. DESCRIPTION DRAWN CHK'D . O 7

K O O

R L

7 I 0 G

.

7 H

T SV

L T

5

0 . H6

7

TL 8 6.8

BT

6.13

6

9

. 7

SV 7

9 .

6 7

0

.

7 H6 site on dimensions all varify

SV

2 1

SV . 8 T: 0161 312 3131 W: urbangreen-space.co.uk LP Jactin House, 24 Hood QuintinSt Hogg Trust

9

0

.

7

1

1

. 7 KO T30 Client:

9

0

.

7

9 KO

0

.

T19* 7

4

3 .

8 Tree

9

0

. 7 Quintin Boat House Checked: P01 SV

E

2

0 . 7 N BT Approved: 6.49 A 7

4 Project:

. 8 L 5 0 Removal . Plan 7

8

9 .

6 S I Revision: B

7

9 . I 6 SV's ED

T18* 2 Planning 9 .

6

09/08/18

2

6

. 8

SV Title: Drawn:

4

8 .

6

1 4

8

. 7 . 6

3 8 8 . 6 G2 Date:

SV

G17# 7 5

7

7 . . 11718

6 6

5

7

. 6 Status: BT

6.43

5 9

. 1:500

8

0 9

P . L 8 * SV Project:

6

6

. G17 6

4 UG_11718_ARB_TRP_01

6

.

6

9 Scale

9 .

TP 8

2

0 . 9 @ A1: LP

E

9 N

5 D .

SV 6 Drawing No:

8 The new footprints of each building are set

5 . G9# 6 T8* T31 BT

6.16

2

5

. 6

SV

9

1

.

1

9

5

.

6

9

2

.

9

7

2 .

T16* 9

4

4 . 6 G9* out to reduce GEA, and to follow the setting

SV

3 3

. 28m 9 1 7m 14m 21m

4 0m . 6 T32

4

3

. 6 VISUAL SCALE 1:500

9

2 2 .

6

5 .

T15* 9

8

2

.

6

3

5

. 9

P L of the current Gym/Store. All the building G3#

0

2 .

6 TP

1

2

. 6

BT 1 1 6.01 . 6

LP

0

SV 1 .

6

5

1

.

6 5

T14* 7 . 9 on the site is outside the PLA controlled

6

0

.

6

SV

2

8

. 9 2

9

9 0 .

6

8

1 . T13* 6 T33

3

0

. 6 T1 river bank. T50 H35 G59

V T49 S 4

9 1

9 .

. 0

5 1

4 8 BT 5

9 5.99 . T12* 5

TP

01 6.

3

9 D 2 . 0 5 6.

6.06

A

O

R

1

9

. 4

5

Y

7 E

5 S .88 SV 6

.8 T

5

0

9

4

3

.

.

R

0

0

1

1 E

0 H 4 T60 C

5.61 5.76

5.82

4 5.84

4

. 5 38

5. H34

5

5

. 0 T51 G48 1

H38 H36

6

4 TP

3

6

.

0 1 G47

s T B 87 10.8710.

4 BT e LP

11.011.04

4

9

.

0 1

s

T11* levels should and and check readbe shall DRAWING:only dimensions FROM All from THIS Contractor SCALE NOT DO drawing. those the on values stated text in

u

o

7

0

. 1 T10* 1

H s

d T39 r ting 1 8.60 8.60 8.60 8.6

t a

Dock l

a

l T58

1 3

Gate . 9

7.10 1

0

1 4

. 10.14

o

1

7

.

0 1

o 8

8

0 B

Club .

7

1

.

7 1

7.08 .

0

1

0

1

4

.

1

1 1

B T40 0 0 0

5.7 7

7

.

.

5 5

2 11.73

7

.

1

1

5

6

.

1 1 G56 LP T57

SP

3

7

. 1

T41 G55 1

5

8

.

1 1

3 6 B 95 N 1. H37 1

SO .67 T46 10 Bollard G54# Mud

T42* 8

9

. 1 T44 G45# 1 T43

VP

2

1

.

2 1

LP rawings or otherwise unless otherwise agreed in wri

T52 T53

s River Thame The removal of a small number of poor specimen trees including one TPO tree will allow the development to create a

functional area between existing and d of the original or of copies provision by whether party third any to granted is, or been, has kind y proposed.

Existing Boat Shed SKILLS TALENTS* and no license or assignment of an assignment or license no and TALENTS* SKILLS

Existing Gym © SKILLSASSORTED TALENTS* ASSORTED in vested is this in drawing copyright the

rev description date drawn check Revision Schedule

client:

Quintin Hogg Memorial Fund + Quintin Hogg Trust

project: Site Model, Chiswick

title: Site Model Scope of Works Site Plan

River Thames scale: date: 47 1 : 500 @A1 29/08/18 project no: drawing no: 0. Originator -1. Location - 2. Level - 3. Type - 4. Role - 5. Drawing Series -6. Drawing Number 17013 AST -SM -ZZ -DR -A -20 - 004

issued for: rev:

PLANNING

Assorted Skills + Talents*

* Scope of Works Plan 111 1 : 500 London: +44 (0)2037010403 Manchester: +44 (0)161 7130517 48 Charlotte Street, W1T 2NS 3 Cobourg Street, M1 3GY

(w) www.assortedskillstalents.com (e) [email protected] Concept Development

48 10.0 Concept Development: Layout

Function/Adjacency:

The Boat Houses at Ibis lane were located here because of the naturally occurring beach allowing easy access to the foreshore from the higher banks, and in the late Victorian period this would have been affected by tidal movement even more than today and as such access to the river was critical to the boat men.

The new boat store (as part of the new boat house) naturally sits closest to the river of the new buildings, with its short gable turned to face the water.

The building is positioned here to allow for the new boat bays to face the existing building, turned 90deg to open into a space between the two buildings created as a boat yard. The distance of separation is a little over 30m allowing for the careful movement of the larger VIII boats (which are over 20+m long) from their bay onto trestles located in the yard for rigging. The placement of this building also allows the beach access to be as wide as possible.

The Rugby Pavilion sited to the north of the yard and is fixed in position by the centre line of the pitch allowing the club room and integrated stand to be equally spaced from the two H posts. Its position to the north of, but in close proximity to, the new Boat House is in part due to the centre line, and in part due to the need for both buildings to create adjacencies and to allow for shared Gym and change facilities.

49 10.0 Concept Development: Massing + form

The Boat House from the River The Boat House from the Boat Yard The Rugby Pavilion from the banking

Development Sketch, digital watercolour. June 2018 Development Sketch, digital watercolour. May 2018 Development Sketch, digital watercolour. April 2018

50 10.0 Concept Development: Massing + form

As we set out to develop a design for the group of buildings, the team considered the moments of a day in the life of a boat yard, placing ourselves into the lives of those who will use the facilities, the sports men and women, the coaches and the staff.

The facilities are practical and logically planned, while their spirit is clear in expressive detailing and careful material decoration.

Each has been created to define memories, to capture historic moments acting asa backdrop to sporting participation and success:

• The Boat House, seen from the river as part of the continuation of river side architecture, sitting as the third building of a triptych composed of Mortlake (formerly Isis) and Quintin. The open gable end positively terminates with an expressed glu-lam edge support, over a lattice of glu-lam sub-structure with translucent polycarbonate infill panels. This covers a small outdoor space connected to the “Ergo” cardio vascular rowing and cycle machine room, and orientation space for larger groups of young rowers. The veranda wrapping round the boat yard for spectators and family to observe and applaud.

• From the Boat Yard, the simple timber roof turns down to meet the concrete frame boat store below and a double height entrance porch draws users up to changing rooms and classrooms, through a plywood lined cut in the building, with expressed concrete walls at low level. Utilitarian benches, Wellington boot racks and pegs for rowers line the walls. The space is semi external and large-scale timber doors can close this off at night. A cold crisp morning in the half light of dawn as the rowers set out to the River.

• The Rugby Pavilion seen from the pitch cuts back dramatically to cover the seating, and create views up and down the touchline, seating is merged into the landscape allowing for formal and informal spectators. The new club room is double height overlooking the centre line, with a small bar and kitchen to serve the University Team and their visiting opponents after the match. This new building turns its gable to Ibis lane to minimise visual and noise impact on neighbours.

51 10.0 Concept Development - Continuity

The boat houses of the Thames stretch from the banks at Henley and Marlow, to the East End at Greenwich. There is no set vernacular for a boat house, but they were typically wooden framed, like the boats, and set on the bank with a good access to the water.

The pages here show the variety of styles and periods reflected in the boat house genre over the 4 miles from St Pauls School RC Bridge to Chiswick, a very significant stretch of the river for Rowers. Cygnet/Civil Service RC + Furnival RC Emanuel School RC

Kings College School RC

Mortlake + Anglian/QBC Thames Tradesmen RC

Vesta RC Scullers RC

Putney Town RC

52 10.0 Concept Development - Continuity

Latimer School RC

Furnival RC

Corinthians RC

The River Thames is home to dozens of Boat Clubs, each with their own cultural and social narrative, from the elite schools to the working tradesmens clubs, it was HQ common once for banks, insurance brokers and even the civil service to have a rowing club with a small boat house on the Thames.

The highlight of the rowing year is of course the Oxford and Cambridge Boat Race, at present sponsored by Mellon Investments and gifted each year to the charity Cancer Research, The race runs from Putney to Chiswick Bridge and each year the spectacle of the race ends on the beach at Quintin, with the twin clubs of Mortlake and Quintin acting as back ground to the whole event.

The provision of new facilites here at Quintin, where over the last decades the BBC have set up home, will ensure that the high profile global audience will see, and learn about the work that will be undertaken here at QBC by the QHT/QHMF and the London RC University of Westminster. Imperial University RC

53 10.0 Concept Development

Visual Impact on Protected Metropolitian Open Land

Visual impact has been a key aspect of the design process, and the team are grateful to the LBH Planning officers for their assistance with the views and massing as a result.

The plan

To create a centre of sporting excellence for the whole community welcoming athletes of all ages, but particularly young people, of all abilities – male and female and those with disabilities.

To create a new landmark building on the Thames, part of the continual narrative of boat houses and boating architecture providing modern facilities that are fit- for-purpose form was arrived at following a process of Aerial View West - pre-app 003 diagram studies, each evolving from the last, to create a broken footprint, maximise gaps between buildings to create views through to the TPO tree group beyond and to create a sense of unfolding in the view from Chiswick Bridge in particular.

Aerial View South (Chiswick Bridge) - pre-app 003

54 10.0 Concept Development

Breaking down massing

The massing of the scheme has been carefully considered in alignment with the Townscape Visual Impact Assessment carried out by Urban Green. The views selected were checked with the LBH Planning officers and subsequently used by AST* to develop their approach.

The apex gable block was originally designed to be a single building that ran from the QHT site south to the river presenting a long elevation to the pitch and short to the river. The more efficient form was deemed too long, and too “wall like” blocking views across to the tree grouping on Ibis Lane. The development would have been too intrusive on the views across the site.

As such the block is split and rotated 90deg to sit perpendicular to the pitch, the accommodation is the same and the massing the same. (see pre app Aerial View West - revised proposal documents as submitted)

Following comments from the planning officers at LBH changes were made to the massing to reduce the form and to come into alignment with the heritage and design officers comments.

The final form is lighter in structure with fewer solid panels in the end gables, more open lattice and increased space between the buildings.

Aerial View South (Chiswick Bridge) - revised proposal

55 10.0 Concept Development

Scale

The scale of the existing structure is used as an envelope guide for the new extended boat house and changing areas on first floor. The height and volume of the existing is echoed by the new build extension to the rear (north) of the Boat House, with a cross section based on the pitch of the A frame of the new Boat House and Rugby Pavilion, which in turn share the same section detail allowing for repetition of the key super structure and cladding details.

The forms are apex gables and echo the Boat Houses of the River Thames from Greenwich to Henley-on-thames, steep sided roof section creates a modern interpretation of a traditional form. The roof dominates the massing, sitting lightly on its base of exposed in-situ concrete wrapped in brick where thermally required.

Aerial View East (crossing Clifford Ave / Hartington Road) - pre-app 003

View from Junction Clifford Ave / Hartington Road - pre-app 003 56 10.0 Concept Development

Function/Adjacency:

The limited footprint means that space is at a premium. Given that the site is adjacent to a Conservation area, and forms the North Bank setting of a listed structure (Chiswick Bridge) as well we being in protected metropolitan open land we are limited in the area we can cover with built form, and activity.

The decision to go to two storeys was not taken lightly but with a target uplift in boat capacity of circa 150% over all and a footprint of over 1000sqm already in that one space. The key to creating a successful facility is the provision of distinct gender/age separate changing rooms in both QBC and the new Boat House. This requirement generates significant area and is accommodated in the upper volume.

The ancillary classrooms and exercise/indoor rowing space are then served by “super loos” and a storage Aerial View East (crossing Clifford Ave / Hartington Road) - revised proposal space for equipment and furniture to offer total flexibility,

User/Sports:

The decision to go up to two storeys on the Rugby Pavilion was made in order to make best use of the upper floor and bunded grass mound link created by using on site spoil from the 3G pitch. The upper floor is given over to a club room to create a new home for the University Sports teams who use the facility, whilst giving students and users to a cardio facility gym and weights room.

View from Junction Clifford Ave / Hartington Road - revised proposal 57 10.0 Concept Development

The unfolding view across the River Thames to the application site from Chiswick Bridge is of considerable importance to the setting of the Grade II listed structure. When the team met with planning officers and design/ heritage officers over the course of the spring and summer the views were discussed and agreed (primarily for the TVIA) and these images were created to demonstrate the massing in context.

The images to the left are from Pre App 003 on 27th June 2018 and then amended in Pre App 004 on the 1st August 2018.

View from Chiswick Bridge (south embankment) - pre-app 003

View from Chiswick Bridge (north embankment) - pre-app 003

58 10.0 Concept Development

View from Chiswick Bridge (south embankment) - revised proposal

View from Chiswick Bridge (north embankment) - revised proposal

59 The view from Chiswick Bridge of QBC 60 61 View discussed at Pre App 003 of proposals for QBC 62 63 Please Note; redline shows outline of Pre App 003 scheme

View discussed at Pre App 004 of reduced proposals for QBC 64 65 View of final proposals for QBC 66 67 View from Hartington Lane across the fields to QBC 68 69 View discussed at Pre App 003 of proposals for QBC + Rugby Pavilion 70 71 View discussed at Pre App 04 of reduced proposals for QBC 72 Please Note; redline shows outline of Pre App 003 scheme

73 View of final proposals for QBC 74 75 View of the QBC present day, gym block to RHS 76 77 View discussed at Pre App 003 of QBC Boat Yard 78 79 View of final proposals for QBC 80 81 10.0 Concept Development

Testing Roof Patterns

Early model prototypes of Boat Houses

Testing Rugby Pavilion Canopy

Aerial Views of the site - Early Model Testing Boat house length/footprint

82 10.0 Concept Development

Throughout the design process we have used three dimensional models to explore both the massing and the form of the building. Using digital printed technology we can prototype the blocks and have developed multiple options for both the section and end details of the forms, as well as different roof profiles as alternative internal functions were considered.

-

Detailed model development.

83 10.0 Concept Development

The complete bay structure, concrete base with upper parts in timber, The SIPS roof and charred timber cladding are used to stiffen structure

84 10.0 Concept Development

The two new buildings share a common structural logic, with a concrete ground floor frame, exposed on the boat house as it is not thermally controlled, brick clad on the rugby pavilion where the changing rooms are located in a thermally controlled ground floor area.

The concrete frame then supports, by means of shaped upper floor columns, a frame work of glu-lam beams which create X frames crossing from grid line to grid line at 45deg supporting a secondary light weight timber roof.

The upper floors are then stiffened using a SIPS plywood panel system, sealed and then covered with rainscreen of charred black timbers.

These timbers require little ongoing maintenance and will be off set/hit and miss to create screening offering a varied level of “free area” over plant areas.

The whole bay is then repeated on each building with a “special” bay at the end overlooking the Thames and the 3G pitch which are clad not in timber but in polycarbonate panels allowing diffuse lighting of the terraces underneath for spectators.

The repetition is both cost effective, and reduces time on site as the elements can be prefabricated using modern methods of construction to fabricate off site SIPS (Structural Insulated Panel System) and to then pre- The complete bay is then repeated to reduce costs and time on site install certain MEP items/trunking. This controls quality and reduces site time.

85 11.0 TVIA Executive Summary                              !  !"   #$   %     !  !" &  !"  ' (  )   ! *" 1km #$ %   & +) !"  *  !"  ,  *  ' (  ) &   -    ! *" +) '  *  !"   +* .  / ,  * 0* *!"  &   - 1(( *  $ .,  */ '  23 " !"   +* .     / 4   0* *!" 0$      1(( *  $+    .,  */ 23 " !" '  3  &  %*    #$  $* %   4       "  !  *1 5 6 (%    7 8*   0$     **   !   +   ! (  '  3  (  3  # 3  &  %*& 5 6    #$  $*'    %       " +1 5     !  0 7 *1 5 6 (%   9(  7 8*   ** *  * %  !   ! (  4    1(( *    (  3  # 3  & 5 6   '     +1 5    0 7 9(  REDEVELOPMENT OF THE *  * %QUINTIN BOATHOUSE, CHISWICK 4    1(( *  TOWNNSCAPE CHARACTER

FIGURE 1.2

     

SCALE: 1:8,000 @A3 DRAWN: KS DATE: 21/08/2018 CHECKED: ME

86  11.0 TVIA Executive Summary                 1km

1km

A full Townscape Visual Impact assessment has been undertaken by Urban Green, and the views for this REDEVELOPMENT OF THE wereQUINTIN agreed BOATHOUSE, early CHISWICK on with London Borough of Hounslow planning officers. SITE LOCATION

The  document FIGURE  1.7 can  be  found in the appendices and should   be   consulted     alongside   this design and access statement.

SCALE: 1:8,000 @A3 DRAWN: KS DATE: 21/08/2018 CHECKED: ME

87 The Quintin Boat Club Rowing Centre 88 Part 3: Design Proposal + Digital Impressions

89 12.0 Design Proposals: Site Plans

Existing site areas Proposed Buildings GEA GIA NIA sqm acres hectares sqm sqft sqm sqft sqm sqft

QHT/QHMF/UK 200 0.05 0.02 n/a n/a n/a Boat Club 894 9623.82 743.00 7998.32 0.00 0.00

QHMF 3656 0.91 0.37 n/a n/a n/a Boat Store 1829 19689.00 1520.00 16362.65 1276.00 13736.01

QHT 26800 6.70 2.68 n/a n/a n/a Rugby Club 1178 12681.05 1014.00 10915.61 991.00 10668.02

Application Site 30656 7.66 3.07 n/a n/a n/a TOTAL 3901.00 41993.87 3277 35276.5773 2267.00 24404.03

Existing Buildings GEA GIA NIA Pitches/Parking GEA GIA NIA sqm sqft sqm sqft sqm sqft PROPOSED sqm sqft sqm sqft sqm sqft

Boat Club 800.00 8611.92 689.00 7417.02 n/a n/a Rugby Field 11990.00 129071.15 n/a n/a n/a n/a

Gym 205.00 2206.80 189.00 2034.57 n/a n/a Parking (hard) 2500.00 26912.25 n/a n/a n/a n/a

Boat Store 165.00 1776.21 163.00 1754.68 n/a n/a Parking (grasscrete) 850.00 9150.17 n/a n/a n/a n/a

TOTAL 1170.00 12594.93 1041 11206.261 TOTAL 15340.00 165133.57

Key

Rugby Pavillion

New Boat House

Existing Boat House

Site plan 1:500 Figure Ground (showing section lines refer to sections on pages 96-97) 90 12.0 Design Proposals: Site Plans

Coloured Site plan 1:500 (@ A1) Roof Plan

91 12.0 Design Proposals: Site Plans

Masterplan for whole site, showing new access and parking, new pitches and training surfaces (3G) and enclosures thereof. New Build Rugby Pavilion with terrace seating, covered canopy over.

New Build Boat House with first floor changing, classrooms and activity space.

Extensive refurbishment of existing boat house with extension over first floor including new changing rooms and club room.

For landscape materials and concepts please refer to appendices Landscape Design

92 12.0 Design Proposals: Site Plans

93 13.0 Design Proposals: Site Elevations varify all dimensions on site on dimensions all varify DO NOT SCALE FROM THIS DRAWING: All dimensions and levels should and and check readbe shall DRAWING:only dimensions FROM All from THIS Contractor SCALE NOT DO drawing. those the on values stated text in ting Elevation looking South East * Site Section --- North West 111 1 : 200

combined elevations rawings or otherwise unless otherwise agreed in wri whether by provision of copies or original of the d of the original or of copies provision by whether party third any to granted is, or been, has kind y SKILLS TALENTS* and no license or assignment of an assignment or license no and TALENTS* SKILLS

Site Section South East 0m 2.8m 5.6m 8.4m 11.2m 2* VISUAL SCALE 1:200 22 1 : 200 © SKILLSASSORTED TALENTS* ASSORTED in vested is this in drawing copyright the Elevation looking North West rev description date drawn check Revision Schedule

client:

Quintin Hogg Memorial Fund + Quintin Hogg Trust

project: Site Model, Chiswick

title: Site Model Site Sections Sheet 1 of 3

scale: date: 1 : 200 @A1 24/08/18

project no: drawing no: 0. Originator -1. Location - 2. Level - 3. Type - 4. Role - 5. Drawing Series -6. Drawing Number 17013 AST -SM -ZZ -DR -A -20 - 101

issued for: rev:

PLANNING

Assorted Skills + Talents*

London: +44 (0)2037010403 Manchester: +44 (0)161 7130517 48 Charlotte Street, W1T 2NS 3 Cobourg Street, M1 3GY 94 (w) www.assortedskillstalents.com (e) [email protected] 13.0 Design Proposals: Site Elevations varify all dimensions on site on dimensions all varify DO NOT SCALE FROM THIS DRAWING: All dimensions and levels should and and check readbe shall DRAWING:only dimensions FROM All from THIS Contractor SCALE NOT DO drawing. those the on values stated text in ting

Elevation looking South West * Site Section --- South West 'Rugby Club' 111 1 : 200 combined elevations rawings or otherwise unless otherwise agreed in wri whether by provision of copies or original of the d of the original or of copies provision by whether party third any to granted is, or been, has kind y SKILLS TALENTS* and no license or assignment of an assignment or license no and TALENTS* SKILLS

0m 2.8m 5.6m 8.4m 11.2m Elevation looking South East VISUAL SCALE 1:200 © SKILLSASSORTED TALENTS* ASSORTED in vested is this in drawing copyright the

rev description date drawn check * Site Section --- South West 'Boat Club' Revision Schedule 222 1 : 200 client: Quintin Hogg Memorial Fund + Quintin Hogg Trust

project: Site Model, Chiswick

title: Site Model Site Sections Sheet 2 of 3

scale: date: 1 : 200 @A1 24/08/18

project no: drawing no: 0. Originator -1. Location - 2. Level - 3. Type - 4. Role - 5. Drawing Series -6. Drawing Number 17013 AST -SM -ZZ -DR -A -20 - 102

issued for: rev:

PLANNING

Assorted Skills + Talents*

London: +44 (0)2037010403 Manchester: +44 (0)161 7130517 48 Charlotte Street, W1T 2NS 3 Cobourg Street, M1 3GY (w) www.assortedskillstalents.com (e) [email protected] 95 13.0 Design Proposals: Site Elevations varify all dimensions on site on dimensions all varify DO NOT SCALE FROM THIS DRAWING: All dimensions and levels should and and check readbe shall DRAWING:only dimensions FROM All from THIS Contractor SCALE NOT DO drawing. those the on values stated text in

Section/Elelvation from the Boat Yard looking North West ting * Site Section --- South East 'Existing Boat House' 111 1 : 200

combined elevations rawings or otherwise unless otherwise agreed in wri whether by provision of copies or original of the d of the original or of copies provision by whether party third any to granted is, or been, has kind y

Section/Elelvation from the Boat Yard looking South East

* Site Section --- North West 'Boat Club' of an assignment or license no and TALENTS* SKILLS 222 1 : 200

0m 2.8m 5.6m 8.4m 11.2m

VISUAL SCALE 1:200 © SKILLSASSORTED TALENTS* ASSORTED in vested is this in drawing copyright the

rev description date drawn check Revision Schedule

client:

Quintin Hogg Memorial Fund + Quintin Hogg Trust

project: Site Model, Chiswick

title: Site Model Site Sections Sheet 3 of 3

scale: date: 1 : 200 @A1 24/08/18

project no: drawing no: 0. Originator -1. Location - 2. Level - 3. Type - 4. Role - 5. Drawing Series -6. Drawing Number 17013 AST -EBH-ZZ -DR -A -20 - 103

issued for: rev:

PLANNING Elevstion from the River Thames Assorted Skills + Talents* * Site Section --- South West 'River Bank' 333 1 : 200

London: +44 (0)2037010403 Manchester: +44 (0)161 7130517 48 Charlotte Street, W1T 2NS 3 Cobourg Street, M1 3GY 96 (w) www.assortedskillstalents.com (e) [email protected] 14.0 Design Proposals: Site Axonometrics Site Axonometric looking northwards from the banks of the River Thames.

This view provides a clear illustration of the new external ‘courtyard’ space which is formed between the existing and proposed boat houses. At its focal point a new podium is moulded from concrete; slotting neatly within the footprint of the external stairs. These in turn provide entry up onto the existing balcony spaces and changing facilities within Axonometric of podium entrance to QBC the orignal boathouse.

The additional space immediately in front of this allows for adequate manouvering of boats in and out of the ground floor stores (as depicted).

Axonometric of the Boat Yard and Rugby Pavilion from the South

97 15.0 Detail Design Proposals: Existing Building levels should be read only from those values stated values those from only read be should levels varify all dimensions on site on dimensions all varify

Female Toilets Female Changing Room 12 m² 38 m² DO NOT SCALE FROM THIS DRAWING: All dimensions and and dimensions All DRAWING: THIS FROM SCALE DO NOT in text on the drawing. Contractor checkshall and Corridor 6 m²

Boiler Room 11 m²

Male Toilets 10 m² ess otherwise agreed in writing in agreed otherwise ess

Bathroom 7 m² Toilet 9 m²

Bedroom 12 m² Male Changing Rooms 87 m² no licenseSKILLSand orTALENTS* assignment of has an y orbeen, kind is, copies or original of the drawings or otherwise unl

Boat Store 339 m² BedroomBenching 11 m² Corridor 10 m²

Benching Living Room 12 m²

UTGA SKILLS TALENTS* ASSORTED © the copyright in this drawing isgranted vested to anyin ASSORTEDthird party whether by provision of 2 m² rev description date drawn check Revision Schedule Storage 4 m² client: Corridor 4 m² Kitchen Entry Quintin Hogg Memorial Fund + Quintin Hogg Trust Bar Serving Redundant Room 2 m² 10 m² project: Existing Boat House, Chiswick

Bar Seating title: Existing Ground, First & Roof Plans 74 m²

scale: @A3 date: 1 : 200 24/08/18

drawing no: project no: 0. Originator -1. Location - 2. Level - 3. Type - 4. Role - 5. Drawing Series -6. Drawing Number 17013 AST -EBH-ZZ -DR -A -05 - 002

issued for: rev:

PLANNING

* Existing Ground Floor * Existing First Floor * Existing Roof Plan 111 1 : 200 222 1 : 200 333 1 : 200 Assorted Skills + Talents* Existing plans of Boat House (QBC)

London: +44 (0)2037010403 Manchester: +44 (0)161 7130517 48 Charlotte Street, W1T 2NS 3 Cobourg Street, M1 3GY

(w) www.assortedskillstalents.com (e) [email protected] 98 15.0 Detail Design Proposals: Existing Building The Existing Boat House will be re-formed to provide a more modern facility whilst also maintaining its historical ‘frontage’ which is Upper Ridge one of the defining elements of the site and 20981 the most prominent aspect of the building when viewed from the River Thames. This ‘front section’ will stated values those from only read be should levels be retained but brought up to modern, sustainablesite on dimensions all varify standards 01 - Existing First Floor through the replacement of the main windows 13321 for example. The concept is to upgrade the 00 - Existing Ground Floor existing fabric in line with current building 10321 in in text on the drawing. Contractor checkshall and regulations whilst also and dimensions All DRAWING: THIS FROM SCALE DO NOT maintaining the Existing* Existing Section/Elevation Elevation --- South from East the Boat Yard looking North West 111 1 : 200 building’s pre-war aesthetic.

The rear portion of the writing in agreed otherwise ess boat house will Upper Ridge essentially then be split - with the ground 20981 floor storage area retained and upgraded but with the upper floor being re-constructed. no licenseSKILLSand orTALENTS* assignment of has an y orbeen, kind is,

This approach is two-fold; oncopies or original of the drawings or otherwise unl the one hand it allows for a direct connection with the other 01 - Existing First Floor proposed buildings on the site helping to knit 13321 the architectural language together. Whilst on 00 - Existing Ground Floor the other hand it will also help simplify the © ASSORTED SKILLS TALENTS* SKILLS TALENTS* ASSORTED © the copyright in this drawing isgranted vested to anyin ASSORTEDthird party whether by provision of 10321 rev description date drawn check Revisionrather Schedule cluttered, assymetric facade thereby client:becoming more subservient to the existing Existing Elevation --- North West Quintin Hogg Memorial Fund + Quintin Hogg Trust Existing222* Section/Elevation from Mortlake & Anglian RC Yard looking South West 1 : 200 club room helping to define this as a focal project: point.Existing Boat House, Chiswick

title:TheExisting adjacentElevations elevations illustrate the existing Upper Ridge Upper Ridge 20981 20981 building in its current form.

scale: @A3 date: 1 : 200 24/08/18

drawing no: project no: 0. Originator -1. Location - 2. Level - 3. Type - 4. Role - 5. Drawing Series -6. Drawing Number 17013 AST -EBH-ZZ -DR -A -20 - 102

issued for: rev:

PLANNING 01 - Existing First Floor 01 - Existing First Floor

13321 13321 Assorted Skills + Talents* 00 - Existing Ground Floor 00 - Existing Ground Floor 10321 10321

* Existing Elevation --- North East * Existing Elevation --- South West 333 444 London: +44 (0)2037010403 Manchester: +44 (0)161 7130517 Existing 1Short : 200 Elevations looking South West and North East 1 : 200 48 Charlotte Street, W1T 2NS 3 Cobourg Street, M1 3GY

(w) www.assortedskillstalents.com (e) [email protected]

99 15.0 Detail Design Proposals: Existing Building

1*

20 - 201 stated values those from only read be should levels varify all dimensions on site on dimensions all varify Category / Uses

WC Shower Shower WC Boat Storage Gym 8 m² 7 m² 7 m² 8 m² 49 m² BOH Circulation

Class Room and dimensions All DRAWING: THIS FROM SCALE DO NOT in text on the drawing. Contractor checkshall and Changing 3 Changing 4 35 m² 35 m² Sanitary Boiler Room 11 m² Social

B* ess otherwise agreed in writing in agreed otherwise ess Changing Lobby 12 m² 20 - 201 Changing 1 Changing 2 21 m² 28 m² Storage 14 m²

WC Shower 8 m² 6 m² no licenseSKILLSand orTALENTS* assignment of has an y orbeen, kind is, copies or original of the drawings or otherwise unl

Shower WC 7 m² 9 m² Benching Lift Lift 4 m² 4 m² 0m 2.8m 5.6m 8.4m 11.2m DWC 3 m² 24 m²24 Boat Store Beer Store Crew Room Benching VISUAL SCALE 1:200 288 m² 6 m² 13 m²

Storage Lobby Entrance © ASSORTED SKILLS TALENTS* SKILLS TALENTS* ASSORTED © the copyright in this drawing isgranted vested to anyin ASSORTEDthird party whether by provision of 14 m² Lobby m²15 2 m² rev description date drawn check Revision Schedule A* External Terrace Kitchen 11 m² client: Quintin Hogg Memorial Fund + Quintin Hogg Trust Corridor 20 - 201 Bar 10 m² 14 m² project: Existing Boat House, Chiswick

QBC Club Room title: Proposed Ground, First & Roof Plans 56 m²

scale: @A3 date: 1 : 200 24/08/18

External Terrace drawing no: project no: 0. Originator -1. Location - 2. Level - 3. Type - 4. Role - 5. Drawing Series -6. Drawing Number 28 m² 17013 AST -EBH-ZZ -DR -A -05 - 001

issued for: rev:

PLANNING

Assorted Skills + Talents* Proposed plans of Boat House (QBC)

* Proposed Ground Floor * Proposed First Floor * Proposed Roof Plan 1 2 3 London: +44 (0)2037010403 Manchester: +44 (0)161 7130517 11 1 : 200 22 1 : 200 33 1 : 200 48 Charlotte Street, W1T 2NS 3 Cobourg Street, M1 3GY

(w) www.assortedskillstalents.com (e) [email protected] 100 15.0 Detail Design Proposals: Existing Building Junction Existing/ Upper Ridge Proposed 4 Black PPC alluminium 'vertical rail' balustrading to 20981 external terraces.

Lower Ridge 5 Black timber matchboarded external bi-folding doors to 1 boat stores. 19978

14 Materials Key Blackenened charred timber infill panels formed between 6 stated values those from only read be should levels * roof lattice structure. varify all dimensions on site on dimensions all varify 1 Blackened charred timber rainscreen cladding to roof 7 Translucent polycarbonate infill panels formed between 2 with expressed 10mm gaps between members. lattice roof structure. 14 4 Increased spacing above plant-room for passive 01 - Existing First Floor Existing/ Junction Proposed ventilation. 8 Exposed structural concrete framework with expressed 13321 slotted channel to horizontal framing. Debossed 'QBH' 2 Blackened charred timber rainscreen cladding to upper logo formed within concrete wall to South Elevation. walls with expressed 10mm gaps between members.

00 - Existing Ground Floor 9 Feature lattice brickwork panels formed between 3 Large steel framed 'timber match-boarded' entrance concrete structural framework. 10321 doors with integrated passdoor. DO NOT SCALE FROM THIS DRAWING: All dimensions and and dimensions All DRAWING: THIS FROM SCALE DO NOT in in text on the drawing. Contractor checkshall and 10 Double glazed external bi-folding doors. Proposed Elevation --- South East 1* 11 Section/Elevation 1 : 200 from the Boat Yard looking North West 11 Openable glazed louvred panels to upper light to provide natural ventilation. Junction Existing/ Proposed 12 Exposed structural Glulam beams to support roof. ess otherwise agreed in writing in agreed otherwise ess Upper Ridge 13 Black PPC alluminium framed curtain wall consisting of 20981 toughened double glazed units and charred timber infill panels. Lower Ridge 1 14 Black PPC alluminium double glazed window units. 19978

Black timber matchboarded external 'garage' doors.

15 no licenseSKILLSand orTALENTS* assignment of has an y orbeen, kind is, copies or original of the drawings or otherwise unl 01 - Existing First Floor 2 4 16 External exposed concrete terracing - steps graded into 13321 14 adjacent grass mound/ bund. Junction Existing/ Proposed 17 Brick base with expressed vertical reveals for positioning of inset cast alluminium RWP's as indicated.

00 - Existing Ground Floor © ASSORTED SKILLS TALENTS* SKILLS TALENTS* ASSORTED © the copyright in this drawing isgranted vested to anyin ASSORTEDthird party whether by provision of 10321 rev description date drawn check Revision Schedule Section/Elevation from Mortlake & Anglian RC Yard looking South West client: Proposed Elevation --- North West Existing 'curtain wall' to be replaced with a Quintin Hogg Memorial Fund + Quintin Hogg Trust 2* new and upgraded steel framed double 22 1 : 200 glazed unit to match the existing colour and profile. project: Existing Boat House, Chiswick Proposed new 'feature balustrade' formed in black PPC alluminium.

New 'garage' style doors to infill existing openings. Doors to be finished in black vertical matchboarded timber to match title: Proposed Elevations adjacent new 'boathouse'. Upper Ridge Upper Ridge

20981 20981 scale: @A3 date: As indicated 24/08/18

Lower Ridge Lower Ridge drawing no: project no: 0. Originator -1. Location - 2. Level - 3. Type - 4. Role - 5. Drawing Series -6. Drawing Number

Detail View 17013 AST 19978 19978 -EBH-ZZ -DR -A -20 - 101 issued for: rev:

2 PLANNING

01 - Existing First Floor 4 01 - Existing First Floor Assorted Skills + Talents* 13321 13321 15 15 00 - Existing Ground Floor 00 - Existing Ground Floor

10321 10321 London: +44 (0)2037010403 Manchester: +44 (0)161 7130517 48 Charlotte Street, W1T 2NS 3 Cobourg Street, M1 3GY * Proposed Elevation --- North East * Proposed Elevation --- South West (w) www.assortedskillstalents.com (e) [email protected] 333 Short 1 : 200 Elevations looking South West and North East 444 1 : 200

101 15.a Artist Impression: New Boat House

The Boat House at dawn, as the student team at University of Westminster set out for a training session on the river. 102 15.0 Detail Design Proposals: New Boat House The entrance space to the Boat House is a double height space, accessed via a pair of double height doors, with a small “submarine” pass door.

The entrance aligns with the steps and podium of the historic QBC, and is framed with an exposed concrete arch. The internal space is simple exposed concrete up to first floor level where the upper parts are lined in plywood.

A stair sits along the wall, and at the back of the space is an accessible lift in a cage (to allow heavy lifting of gym/rowing machines to the first floor.

The space behind the stair is lined with a bench, under which metal grills support wellington boots with drying racks and hooks allowing for schools/partners to hang class rowing kit for use by others. Oars are stored here on wall mounted clips.

The Boat store to the lower level is designed to allow maximum racking and will be subdivided by users with chain link fencing strung to the u/s of the first floor.

Up Axonometric of Boat House Entrance and Boat Bays

103 15.a Artist Impression: New Boat House

The Boat House on a cool Autumn evening, as solo rower skulls toward Chiswick Bridge, and the University of Westminster Rugby training session can be heard from the pitch. 104 15.0 Detail Design Proposals: New Boat House 1*

NB-A NB-B NB-C NB-D NB-E NB-A NB-B NB-C NB-D NB-E The new Boat House, storage for over 100 20 -201 boats on racking up to 5 deep. The central aisles have been laid out to accommodate NB10 NB10 launches Categoryused for / Usescoaching purposes and levels should be read only from those values stated values those from only read be should levels officials duringBoat Storage regattas, while spaces along varify all dimensions on site on dimensions all varify Classroom 01 Classroom 02 48 m² 48 m² the back wallBOH will be used for work benches and storage.Circulation NB9 NB9 Class Room Sanitary Boat Store + Workshop The upper floor is given over to four unisex 340 m² Social

changing spaces which can be marked and dimensions All DRAWING: THIS FROM SCALE DO NOT by in text on the drawing. Contractor checkshall and NB8 NB8 gender as required, and allocated for youth Terrace 51 m² Changing 03 Changing 04 40 m² 40 m² change for schools to give adequate safe B* Circulation guarding. Two classrooms are connected by 28 m²

a folding part height screen/curtain, whichwriting in agreed otherwise ess NB7 20 -201NB7 Changing 01 gives some visual privacy or separation. 40 m² Access Hatch Changing 02 (Plant Above) 40 m² A large space with river facing views is NB6 A* NB6 designed for use as an “ergo” rowing machine no licenseSKILLSand orTALENTS* assignment of has an y orbeen, kind is, copies or original of the drawings or otherwise unl Benching Landing Space room, with other cardio kit to be used by 16 m² Entrance Lobby Storage Area

20 -201 Refuge 51 m² 23 m² senior/University and elite rowers. Storage Lift VOID Lift VOID 4 m² 4 m² Oar Clips and WC’s 0mare adjacent.2.8m 5.6m 8.4m 11.2m NB5 NB5 Store 6 m² VISUAL SCALE 1:200

Existing site areas WC's Proposed Buildings GEA GIA NIA sqm acres hectares 27 m² sqm sqft sqm sqft sqm sqft

Large Store Lobby SKILLS TALENTS* ASSORTED © the copyright in this drawing isgranted vested to anyin ASSORTEDthird party whether by provision of 33 m² 8 m² rev description date drawn check QHT/QHMF/UK 200 0.05 0.02 n/a n/a n/a Boat Club Revision Schedule894 9623.82 743.00 7998.32 0.00 0.00 client: NB4 NB4 QHMF 3656 0.91 0.37 n/a n/a n/a Boat Store 1829 19689.00 1520.00 16362.65 1276.00 13736.01 Quintin Hogg Memorial Fund + Quintin Hogg Trust QHT 26800 6.70 2.68 n/a n/a n/a Rugby Club 1178 12681.05 1014.00 10915.61 991.00 10668.02

Application Site 30656 7.66 3.07 n/a n/a n/a TOTAL project:3901.00 41993.87 3277 35276.5773 2267.00 24404.03 Boat Store 339 m² Existing Buildings GEA GIA NIA Pitches/Parking GEA The New Boat House,GIA Chiswick NIA sqm sqft sqm sqft sqm sqft PROPOSED sqm sqft sqm sqft sqm sqft NB3 NB3 Erg / Club Room Boat Club 800.00 1448611.92 m² 689.00 7417.02 n/a n/a Rugby Field 11990.00 129071.15 n/a n/a n/a n/a

Gym 205.00 2206.80 189.00 2034.57 n/a n/a Parking (hard) title:2500.00 26912.25 n/a n/a n/a n/a

Boat Store 165.00 1776.21 163.00 1754.68 n/a n/a Parking (grasscrete) Ground850.00 & First9150.17 Floorn/a Plans n/a n/a n/a

TOTAL 1170.00 12594.93 1041 11206.261 TOTAL 15340.00 165133.57 scale: @A3 date: NB2 NB2 1 : 200 24/08/18

drawing no: project no: 0. Originator -1. Location - 2. Level - 3. Type - 4. Role - 5. Drawing Series -6. Drawing Number 17013 AST External Terrace -BH -ZZ -DR -A -05 - 001 127 m² issued for: rev: NB1 NB1 PLANNING

Assorted Skills + Talents* * Ground Floor GA Plan * GA First Floor 111 1 : 200 222 1 : 200

Ground Floor and First Floor plans of New Boat House London: +44 (0)2037010403 Manchester: +44 (0)161 7130517 48 Charlotte Street, W1T 2NS 3 Cobourg Street, M1 3GY

(w) www.assortedskillstalents.com (e) [email protected]

105 15.a Artist Impression: Rugby Pavilion

An evening Rugby match is underway with loyal University of Westminster Dragons fans gathered on the terraces. 106 15.0 Detail Design Proposals: Rugby Pavilion Site Axonometric looking westwards from the rugby pitch.

Orientated at 90 degrees to the boat houses; the Rugby pavillion adopts a prominent position sitting central to the main pitch. A set of terraced steps blends into a landscaped grass bund which rises gradually from the existing landscape creating a seamless relationship and interface with the terrace and clubroom.

The building adopts the same form as the new boat club but varies slightly in its lattice canopy - which projects out over the viewing terraces affording greater protection from the elements to spectators.

Axonometric of the Boat Yard and Rugby Pavilion from the North

107 15.0 Detail Design Proposals:B* Rugby Pavilion A*

20 - 201 20 - 201

R3 Category / Uses stated values those from only read be should levels Changing 10 m² Changing 1 Boat Storage site on dimensions all varify 32 m² Changing 2 32 m² Shower/WC BOH

5 m² m² 17 Store Store Shower/WC Store Store Weights Room 5 m² Circulation 60 m² Shower 1 WC 2 Shower 2

WC 1 3 m² 10 m² 3 m² 10 m² Class Room Changing 11 m² 11 m² LobbyLobby 2 2 LobbyLobby 2 2 LobbyLobby 1 1 10 m² LobbyLobby 1 1 Store / Riser 1 Store / Riser 2 Sanitary 3 m² 3 m² Corridor Corridor Social and dimensions All DRAWING: THIS FROM SCALE DO NOT in text on the drawing. Contractor checkshall and R2 1* 28 m² 39 m² Store / Riser 3 Store / Riser 4 3 m² 3 m² Office DWCDWCDWC 20 - 201 6 m² 3 m² 19 m² Shower 3 WC 3 WC 4 11 m² 11 m² Shower 4 LobbyLobby 3 3 Treatment 10 m² LobbyLobby 3 3 10 m² 13 m² ess otherwise agreed in writing in agreed otherwise ess 17 m² 17 Store Store LiftLiftLift StoreStore Entrance Lobby 4 m² 40 m² Changing 3 Changing 4 Store 32 m² 32 m² 4 m² R1 no licenseSKILLSand orTALENTS* assignment of has an y orbeen, kind is, copies or original of the drawings or otherwise unl RA RB RC RD RE RF RG RH RI

Proposed Ground Floor Plan 0m 2.8m 5.6m 8.4m 11.2m Ground111* Floor Plan of New Rugby Pavillion 1 : 200 VISUAL SCALE 1:200 © ASSORTED SKILLS TALENTS* SKILLS TALENTS* ASSORTED © the copyright in this drawing isgranted vested to anyin ASSORTEDthird party whether by provision of rev description date drawn check Revision Schedule client: R3 Quintin Hogg Memorial Fund + Quintin Hogg Trust BarBarBar 36 m² project: Kitchen 14 m² 14 24 m² The Rugby Pavillion, Chiswick Gym GymStore Store Gym GymStore Store

GYMGYMGYM title: 116 m² Store Ground Floor & First Floor Plans R2 WCWCWC 11 m² 14 m² Club Room 153 m² m² 80 scale: @A3 date: 1 : 200 24/08/18

Access Hatch HallHallHall drawing no: ExternalExternal Terrace Terrace (Plant Above) 26 m² ExternalExternal Terrace Terrace project no: 0. Originator -1. Location - 2. Level - 3. Type - 4. Role - 5. Drawing Series -6. Drawing Number 17013 AST -RP -ZZ -DR -A -05 - 001

Refuge issued for: rev: Double Height LiftLiftLift Void 4 m² Store PLANNING 8 m²

R1 Assorted Skills + Talents*

RA RB RC RD RE RF RG RH RI

London: +44 (0)2037010403 Manchester: +44 (0)161 7130517 48 Charlotte Street, W1T 2NS 3 Cobourg Street, M1 3GY First Floor* Proposed Plan of First New Floor Rugby Pavillion (w) www.assortedskillstalents.com (e) [email protected] 222 1 : 200 108 15.0 Detail Design Proposals: Rugby Pavilion

Ridge 4 Black PPC alluminium 'vertical rail' balustrading to external terraces. 24021 5 Black timber matchboarded external bi-folding doors to boat stores.

1 Materials Key 6 Blackenened charred timber infill panels formed between 6 * roof lattice structure.

7 1 Blackened charred timber rainscreen cladding to roof 7 Translucent polycarbonate infill panels formed between with expressed 10mm gaps between members. lattice roof structure. stated values those from only read be should levels Plant Level Increased spacing above plant-room for passive

ventilation. site on dimensions all varify 8 Exposed structural concrete framework with expressed 17495 slotted channel to horizontal framing. Debossed 'QBH' 4 2 Blackened charred timber rainscreen cladding to upper logo formed within concrete wall to South Elevation. 2 walls with expressed 10mm gaps between members. U01 9 Feature lattice brickwork panels formed between 14 3 Large steel framed 'timber match-boarded' entrance concrete structural framework. doors with integrated passdoor. 13995 10 Double glazed external bi-folding doors. Grass Mound/ Bund 17 in in text on the drawing. Contractor checkshall and G00 and dimensions All DRAWING: THIS FROM SCALE DO NOT 11 Openable glazed louvred panels to upper light to provide 10755 natural ventilation.

12 Exposed structural Glulam beams to support roof. * North East Elevation Rugby111 1Club : 200 - North East Elevation 13 Black PPC alluminium framed curtain wall consisting of toughened double glazed units and charred timber infill Ridge panels. writing in agreed otherwise ess

24021 14 Black PPC alluminium double glazed window units.

1 15 Black timber matchboarded external 'garage' doors.

16 External exposed concrete terracing - steps graded into 6 7 no licenseSKILLSand orTALENTS* assignment of has an y orbeen, kind is,

adjacent grass mound/ bund. copies or original of the drawings or otherwise unl Plant Level 17 Brick base with expressed vertical reveals for positioning 17495 of inset cast alluminium RWP's as indicated. 4 2

U01 13995 © ASSORTED SKILLS TALENTS* SKILLS TALENTS* ASSORTED © the copyright in this drawing isgranted vested to anyin ASSORTEDthird party whether by provision of Grass Mound/ Bund rev description date drawn check 1 17 G00 Revision Schedule client: 10755 Quintin Hogg Memorial Fund + Quintin Hogg Trust

South West Elevation project: 222* Rugby Club 1 - : 200South West Elevation The Rugby Pavillion, Chiswick

Ridge Ridge

24021 24021 title: Proposed Elevations 11 11 12 scale: @A3 date: 1 : 200 24/08/18

drawing no: project no: 0. Originator -1. Location - 2. Level - 3. Type - 4. Role - 5. Drawing Series -6. Drawing Number 13 13 Plant Level Plant Level 17013 AST -RP -ZZ -DR -A -20 - 101 issued for: 17495 17495 rev: PLANNING 10 U01 U01 13995 13995 17 Assorted Skills + Talents* 16 14 G00 G00

10755 10755

London: +44 (0)2037010403 Manchester: +44 (0)161 7130517 48 Charlotte Street, W1T 2NS 3 Cobourg Street, M1 3GY

(w) www.assortedskillstalents.com (e) [email protected] Rugby* ClubNorth - West North Elevation West Elevation Rugby* South Club East - South Elevation East Elevation 333 1 : 200 444 1 : 200

109 15.0 Detail Design Proposal: Colour Site Elevations

Elevation looking South West

Elevation looking South East

110 15.0 Detail Design Proposals: Colour Site Elevations

Elevation looking South East

Elevation looking North West

111 15.0 Detail Design Proposals: Colour Site Elevations

Section/Elelvation from the Boat Yard looking North West

Section/Elelvation from the Boat Yard looking South East

Elevation from the River Thames

112 15.0 Detail Design Proposal: Boat House Elevation Colour Study

Elevation Study of a Typical Boat House ‘Bay’

113 15.0 Detail Design Proposals: Rugby Pavilion Elevation Colour Study

TITLES Elevational Study of Existing Boat House - Re-working of External Terrace and South West Elevation 114 15.0 Detail Design Proposals: Rugby Pavilion Elevation Colour Study

Elevational Study of Rugby pavillion - External Viewing Terrace

115 Dawn breaks as the University of Westminster Rowing Team take to the water 116 Part 4: Strategy in use + Access

117 Strategy in use

Integrating this proposed group of existing The factors to manage are: and new buildings into a recreation focused landscape required some careful Boat movements / Rigging spaces consideration of the relationship and Boat Storage adjacency of their uses, access and Rugby Spectator movements management therein. Pedestrians (users) Pedestrians (non users) We have worked with both our partners (QBC School use (security/safeguarding) and University of Westminster) to develop an Mixed age/gender balance changing approach and with ATIS Sports Management Non Binary gender needs who have advised on the future FM needs of Club membership space the facility. Vehicles on and off site Parking The team also undertook research visiting Cyclists the state-of-the-art rowing and rugby club Maintenance facilities across the UK; including the boat Cleaning and FM houses at Oxford University, Imperial College, Security Mortlake and Anglian, Tideway Scullers and DDA Access Leander as well as Saracens Rugby Club, Diagram 1a - route of PROW and ROA Uppingham School Sports Facilities and Also of note are: University Sports Campus. Diagram 1a - controlled access to foreshore Event scenarios The diagrams here set out the way that the BBC TV for buildings can be used, maintained, accessed and serviced.

There is a balance between the use of the site by the wider community and “public access” to the river and to the facilities

The boat yard and 3G pitch are not public, and they cannot be left open 24hrs a day. Locked gate access As such security lines and boundary design Permited route play a considerable part in this project. (occasional)

118 Strategy in use 18. Public space + Landscape the river to Chiswick Bridge. CCTV will be used to monitor this route. a Public Right of Way route/Right of Access route A gated access in the control of QBC allows access to the foreshore in events and links The Public Right of Way runs from the to the axial connection to the north. Riverside at Chiswick Bridge to Hartington Road and then down Ibis Lane to the (See diagrams 1a) Chiswick Quay. b Security An existing Right of Access (ROA) route along the edge of the QHMF owned boat yard The team has worked with both the occupiers site, is made up currently of a path of circa of the two buildings, as well as the on site FM 1000mm width between two fences and team at the University of Westminster and heavy planting to both sides. the QBC members to develop an approach to fences and security which addresses current The path is defined by the ownership boundary issues while responding to a more rationally and as such is placed in accordance with the designed series of buildings which them existing 2001 S106 defined in the planning selves allow for better physical security. Diagram 1b - Secure enclosures (2.2m high) statement and referred to here on page 29. Secure lines are shown in diagram 1a.

Diagram 1b - Passive supervision from office The proposed path is placed as close as Sight lines have been considered to allow possible to this existing position but is no passive monitoring of much of the site from longer contained and now sits in a broad the manned office at the Rugby Pavilion. The open landscaped area which surrounds the rest of the site is covered by CCTV. built form. The path enters from Ibis lane and hugs the new boat yard wall, with views into (See Diagrams 1b) the yard through the metal work fence/brick piers.

To the north of the path is the car park and a new pedestrian route via shared surface that links to the Polytechnic Sports Ground, Sightline this space is open with a gated path from Passive monitoring Hartington Road allowing access at all times. The Car Park is open and visibility is excellent 360deg motion ac- across this from the road and Rugby Club. tivated cameras The ROA then turns between the 3G pitch and its ball stop fences/bunding where it follows a route that is typically 8 – 10 m wide with good sightlines and then turns to follow 119 Strategy in use 19. Parking + Bike storage a Vehicle parking

Parking is provided for 44 cars 3 bays are given over to disabled parking and spaces designed to allow access and egress from the site as easily as possible. 9 bays are powered for the future installation of charging points. 10 motorcycle bays are provided (see diagram 2a) b Visitor parking

On match and event days there will be a need for overspill parking, with our calculations delivering a need for 60-70 cars overall. The scheme allows for on site parking for 100 vehicles in total with around 56 on overspill grass (reinforced with either grasscrete or plastic grass mesh) which allows for events where larger numbers of spectators will be arriving.

The day to day operation of the site will have fairly low vehicle numbers and as such permanent parking is allowed/provided with space for visitors as indicated in 2a. (see diagram 2a) c Bike Parking (Secure + Visitor)

Long stay cycles are stored in a secure lockable “lean to” shed as part of the perimeter wall adjacent to the refuse store, this is in addition to visitor cycle hoops adjacent to the Rugby Pavilion and Boat House. The total bike parking allocation is - 20secure (covered long term) and 46 open air on hoops. (see diagram 2b) Diagram 2a - Parking Diagram 2b - Parking 120 Strategy in use

d Trailer + Minibus Parking

Space is provided for 2 x boat trailers and 1 x trailer behind the existing and proposed Boat Houses within the enclosed secure line. (See diagram 2c).

b Boat trailer turn

Of note is the requirement to bring a large mini bus onto the site with a trailer loaded with boats (up to 7m long on the trailer) and to be able to safely move this trailer to unload and park up. The access and route to the boat yard is designed to allow this movement (see diagram 2c)

e Launch Storage

There is a single space for the storage of the clubs long launch mounted on wall brackets from the concrete piers and covered by a light weight roof/canopy. (See diagram 2c).

f Boat Storage

Finally the scheme has been designed around the accommodation needs of a series of partner schools, as well as QBC and the University of Westminster Rowing and Rugby clubs. The storage of boats is critical and in consultation with our future partners a target storage capacity was developed to allow for the maximum number of boats to generate “down time” which can then be traded for “rowing time” available to other schools/local community/Youth Schemes/Apprentices/ college and UTC/FE students as well as other LBH schools where free time is created with the support of QBC and Partner school Diagram 2c - Boat Storage + Boat Trailer movement coaching. (See diagram 2c). 121 Strategy in use 20 Access + Servicing a New Road Junction

A new road junction is created with an adoptable standard access/egress onto Hartington Road. This has been designed in accordance with adoptable standards in line with comment from the Highways team at LBH. (see diagram 3a) b Service road/turning head

The site service road will be shared surface and built to adoptable standards, capable of carrying both coaches and the BBC heavy equipment vehicles. The road will have generous pavements as integral surfaces and will access both the parking and the overspill grass area to the north. The road is designed to allow turning at both the north end and south using one parking spine. (see diagram 3a) c Refuse collection

Refuse collection will be as currently managed from storage built into the perimeter wall of the Boat Yard and accessed from the Ibis Lane gates which are then closed and locked allowing refuse and emergency vehicles a tuning area on Ibis Lane that is not currently provided. (see diagram 3b)

Diagram 3a - Access Road + Turning Head Diagram 3b - Refuse Route 122 Strategy in use 21 Maintenance/FM

Maintenance of the site will be managed by on site FM team and the design allows for such access as follows:

a Rugby club

Maintenance access to Northwest/ Northeast/Southwest façades and roof access via extend-able lifting platform. A hard standing route is provided.

From the pitch side (Southeast) a Mobile Elevated Working Platform (MEWP) on the 3G pitch will be used to access high level windows and the canopy.

Cleaning of all windows by extend-able pole and from terrace.

b Boat House (New build)

Maintenance access to Northwest/ Northeast/Southeast façades and roof access via extendible lifting platform. A hard standing route is provided. From the river side (Southwest) a MEWP on the river grass area will be used to access high level windows and the canopy. A hard standing route is provided.

Cleaning of all windows by extendible pole and from terrace.

c Boat House existing

Access from all façades by means of MEWP and or static access platform, all windows cleaned by extendible pole/access from terraces. See diagram 3c. Diagram 3c - Maintenance Routes

123 The University of Westminster Rugby Pavilion 124 Part 5; Appendices

125 126 Appendices:

1.0 Planning Statement

2.0 Statement of Community Engagement

3.0 Energy Statement

4.0 Highways Design (Transport Statement/Travel Plan)

5.0 Landscape Design (also see drawings)

6.0 Townscape Visual Impact Assessment

7.0 Ecology Report

8.0 Arboriculture Report

9.0 Floor Risk Assessment

10.0 Survey/Ground Investigation

127 48 Charlotte Street London W1T 2NS +44 203 701 0403

3 Cobourg Street Manchester M1 3GY +44 161 713 0517 128