August 28, 2018 Ref. Antidumping Investigation on Aluminum Foil In
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
European Service Innovation Centre Peer Review in Emilia-Romagna
European Service Innovation Centre Peer Review in Emilia-Romagna Policies on service innovation in the ICT sector – regional China experience Bologna, 10 January 2014 Douglas Thompson: [email protected] 1 Policies on service innovation in the ICT sector – regional China experience Motivations for Focus on regional China experience 1) Growing importance of service innovation in China 2) National and regional policies driving service innovation 3) China as a market, partner and competitor for EU companies 2 Policies on service innovation in the ICT sector – regional China experience Content: I. SPI in China II. Service Innovation in China III. Regional Policy Examples 3 Policies on service innovation in the ICT sector – regional China experience SPI | Global SPI’s mission is the management of projects which foster innovation and promote international opportunities; when appropriate, this mission will www.spieurope.eu be accomplished through the creation of strategic partnerships. SPI has a team of more than 60 consultants from different countries and scientific areas, capable to intervene in different points of the globe. SPI is present in Europe, North and South America, Asia and Africa through a number of offices, companies and established professional networks dedicated to specific markets and clients with different needs. 4 Policies on service innovation in the ICT sector – regional China experience SPI | China SPI China (since 1999) has as its mission the offering of high quality consulting services to establish or increase the -
Produzent Adresse Land Allplast Bangladesh Ltd
Zeitraum - Produzenten mit einem Liefertermin zwischen 01.01.2020 und 31.12.2020 Produzent Adresse Land Allplast Bangladesh Ltd. Mulgaon, Kaliganj, Gazipur, Rfl Industrial Park Rip, Mulgaon, Sandanpara, Kaligonj, Gazipur, Dhaka Bangladesh Bengal Plastics Ltd. (Unit - 3) Yearpur, Zirabo Bazar, Savar, Dhaka Bangladesh Durable Plastic Ltd. Mulgaon, Kaligonj, Gazipur, Dhaka Bangladesh HKD International (Cepz) Ltd. Plot # 49-52, Sector # 8, Cepz, Chittagong Bangladesh Lhotse (Bd) Ltd. Plot No. 60 & 61, Sector -3, Karnaphuli Export Processing Zone, North Potenga, Chittagong Bangladesh Plastoflex Doo Branilaca Grada Bb, Gračanica, Federacija Bosne I H Bosnia-Herz. ASF Sporting Goods Co., Ltd. Km 38.5, National Road No. 3, Thlork Village, Chonrok Commune, Konrrg Pisey, Kampong Spueu Cambodia Powerjet Home Product (Cambodia) Co., Ltd. Manhattan (Svay Rieng) Special Economic Zone, National Road 1, Sangkat Bavet, Krong Bavet, Svaay Rieng Cambodia AJS Electronics Ltd. 1st Floor, No. 3 Road 4, Dawei, Xinqiao, Xinqiao Community, Xinqiao Street, Baoan District, Shenzhen, Guangdong China AP Group (China) Co., Ltd. Ap Industry Garden, Quetang East District, Jinjiang, Fujian China Ability Technology (Dong Guan) Co., Ltd. Songbai Road East, Huanan Industrial Area, Liaobu Town, Donggguan, Guangdong China Anhui Goldmen Industry & Trading Co., Ltd. A-14, Zongyang Industrial Park, Tongling, Anhui China Aold Electronic Ltd. Near The Dahou Viaduct, Tianxin Industrial District, Dahou Village, Xiegang Town, Dongguan, Guangdong China Aurolite Electrical (Panyu Guangzhou) Ltd. Jinsheng Road No. 1, Jinhu Industrial Zone, Hualong, Panyu District, Guangzhou, Guangdong China Avita (Wujiang) Co., Ltd. No. 858, Jiaotong Road, Wujiang Economic Development Zone, Suzhou, Jiangsu China Bada Mechanical & Electrical Co., Ltd. No. 8 Yumeng Road, Ruian Economic Development Zone, Ruian, Zhejiang China Betec Group Ltd. -
SGS-Safeguards 04910- Minimum Wages Increased in Jiangsu -EN-10
SAFEGUARDS SGS CONSUMER TESTING SERVICES CORPORATE SOCIAL RESPONSIILITY SOLUTIONS NO. 049/10 MARCH 2010 MINIMUM WAGES INCREASED IN JIANGSU Jiangsu becomes the first province to raise minimum wages in China in 2010, with an average increase of over 12% effective from 1 February 2010. Since 2008, many local governments have deferred the plan of adjusting minimum wages due to the financial crisis. As economic results are improving, the government of Jiangsu Province has decided to raise the minimum wages. On January 23, 2010, the Department of Human Resources and Social Security of Jiangsu Province declared that the minimum wages in Jiangsu Province would be increased from February 1, 2010 according to Interim Provisions on Minimum Wages of Enterprises in Jiangsu Province and Minimum Wages Standard issued by the central government. Adjustment of minimum wages in Jiangsu Province The minimum wages do not include: Adjusted minimum wages: • Overtime payment; • Monthly minimum wages: • Allowances given for the Areas under the first category (please refer to the table on next page): middle shift, night shift, and 960 yuan/month; work in particular environments Areas under the second category: 790 yuan/month; such as high or low Areas under the third category: 670 yuan/month temperature, underground • Hourly minimum wages: operations, toxicity and other Areas under the first category: 7.8 yuan/hour; potentially harmful Areas under the second category: 6.4 yuan/hour; environments; Areas under the third category: 5.4 yuan/hour. • The welfare prescribed in the laws and regulations. CORPORATE SOCIAL RESPONSIILITY SOLUTIONS NO. 049/10 MARCH 2010 P.2 Hourly minimum wages are calculated on the basis of the announced monthly minimum wages, taking into account: • The basic pension insurance premiums and the basic medical insurance premiums that shall be paid by the employers. -
Lista Fornecedores Artigos Hardware.Xlsx
Zeitraum - Produzenten mit einem Liefertermin zwischen 01.01.2020 und 31.12.2020 Produzent Adresse Land Allplast Bangladesh Ltd. Mulgaon, Kaliganj, Gazipur, Rfl Industrial Park Rip, Mulgaon, Sandanpara, Kaligonj, Gazipur, Dhaka Bangladesh Bengal Plastics Ltd. (Unit - 3) Yearpur, Zirabo Bazar, Savar, Dhaka Bangladesh Durable Plastic Ltd. Mulgaon, Kaligonj, Gazipur, Dhaka Bangladesh HKD International (Cepz) Ltd. Plot # 49-52, Sector # 8, Cepz, Chittagong Bangladesh Lhotse (Bd) Ltd. Plot No. 60 & 61, Sector -3, Karnaphuli Export Processing Zone, North Potenga, Chittagong Bangladesh Plastoflex Doo Branilaca Grada Bb, Gračanica, Federacija Bosne I H Bosnia-Herz. ASF Sporting Goods Co., Ltd. Km 38.5, National Road No. 3, Thlork Village, Chonrok Commune, Konrrg Pisey, Kampong Spueu Cambodia Powerjet Home Product (Cambodia) Co., Ltd. Manhattan (Svay Rieng) Special Economic Zone, National Road 1, Sangkat Bavet, Krong Bavet, Svaay Rieng Cambodia AJS Electronics Ltd. 1st Floor, No. 3 Road 4, Dawei, Xinqiao, Xinqiao Community, Xinqiao Street, Baoan District, Shenzhen, Guangdong China AP Group (China) Co., Ltd. Ap Industry Garden, Quetang East District, Jinjiang, Fujian China Ability Technology (Dong Guan) Co., Ltd. Songbai Road East, Huanan Industrial Area, Liaobu Town, Donggguan, Guangdong China Anhui Goldmen Industry & Trading Co., Ltd. A-14, Zongyang Industrial Park, Tongling, Anhui China Aold Electronic Ltd. Near The Dahou Viaduct, Tianxin Industrial District, Dahou Village, Xiegang Town, Dongguan, Guangdong China Aurolite Electrical (Panyu Guangzhou) Ltd. Jinsheng Road No. 1, Jinhu Industrial Zone, Hualong, Panyu District, Guangzhou, Guangdong China Avita (Wujiang) Co., Ltd. No. 858, Jiaotong Road, Wujiang Economic Development Zone, Suzhou, Jiangsu China Bada Mechanical & Electrical Co., Ltd. No. 8 Yumeng Road, Ruian Economic Development Zone, Ruian, Zhejiang China Betec Group Ltd. -
Branch List English
Telephone Name of Branch Address Fax No. No. Central District Branch 2A Des Voeux Road Central, Hong Kong 2160 8888 2545 0950 Des Voeux Road West Branch 111-119 Des Voeux Road West, Hong Kong 2546 1134 2549 5068 Shek Tong Tsui Branch 534 Queen's Road West, Shek Tong Tsui, Hong Kong 2819 7277 2855 0240 Happy Valley Branch 11 King Kwong Street, Happy Valley, Hong Kong 2838 6668 2573 3662 Connaught Road Central Branch 13-14 Connaught Road Central, Hong Kong 2841 0410 2525 8756 409 Hennessy Road Branch 409-415 Hennessy Road, Wan Chai, Hong Kong 2835 6118 2591 6168 Sheung Wan Branch 252 Des Voeux Road Central, Hong Kong 2541 1601 2545 4896 Wan Chai (China Overseas Building) Branch 139 Hennessy Road, Wan Chai, Hong Kong 2529 0866 2866 1550 Johnston Road Branch 152-158 Johnston Road, Wan Chai, Hong Kong 2574 8257 2838 4039 Gilman Street Branch 136 Des Voeux Road Central, Hong Kong 2135 1123 2544 8013 Wyndham Street Branch 1-3 Wyndham Street, Central, Hong Kong 2843 2888 2521 1339 Queen’s Road Central Branch 81-83 Queen’s Road Central, Hong Kong 2588 1288 2598 1081 First Street Branch 55A First Street, Sai Ying Pun, Hong Kong 2517 3399 2517 3366 United Centre Branch Shop 1021, United Centre, 95 Queensway, Hong Kong 2861 1889 2861 0828 Shun Tak Centre Branch Shop 225, 2/F, Shun Tak Centre, 200 Connaught Road Central, Hong Kong 2291 6081 2291 6306 Causeway Bay Branch 18 Percival Street, Causeway Bay, Hong Kong 2572 4273 2573 1233 Bank of China Tower Branch 1 Garden Road, Hong Kong 2826 6888 2804 6370 Harbour Road Branch Shop 4, G/F, Causeway Centre, -
Administration's Paper on the Progress Update of the Construction of The
LC Paper No. CB(4)610/15-16(05) Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Progress Update of the Construction of the Shatin to Central Link (As at 31 December 2015) Introduction This paper reports to Members on the progress of the main construction works of the Shatin to Central Link (“SCL”) as at 31 December 2015. Background 2. SCL, with a total length of 17 kilometres, consists of the following two sections – (a) Tai Wai to Hung Hom section: this is an extension of the Ma On Shan Line from Tai Wai via Southeast Kowloon to Hung Hom where it will join the West Rail Line; and (b) Hung Hom to Admiralty section: this is an extension of the East Rail Line from Hung Hom across the Victoria Harbour to Wan Chai North and Admiralty. 3. SCL will have ten stations. Apart from bringing improvements to the existing Tai Wai Station, the SCL project will involve construction of new stations or extension of existing stations at Hin Keng, Diamond Hill, Kai Tak, To Kwa Wan, Ma Tau Wai, Ho Man Tin, Hung Hom, the Hong Kong Convention and Exhibition Centre, and Admiralty. It is a territory-wide strategic railway project (alignment layout at Annex 1). Admiralty Station and Ho Man Tin Station will become integrated stations providing interchange service to passengers of SCL and South Island Line (East)(“SIL(E)”), as well as passengers of SCL and Kwun Tong Line Extension (“KTE”) respectively. 4. The Approved Project Estimate for the entire SCL project is $79,800 million (in money-of-the-day prices) and the project is funded by the Government under the “concession approach”. -
Archaeological Action Plan for Sacred Hill (North) Works Contract 1109 - Stations and Tunnels of Kowloon City Section
AAP The MTR Corporation Shatin to Central Link - Tai Wai and Hung Hom Section: Archaeological Action Plan for Sacred Hill (North) Works Contract 1109 - Stations and Tunnels of Kowloon City Section September 2012 (Version 2) Environmental Resources Management 21/F Lincoln House 979 King’s Road Taikoo Place Island East, Hong Kong Telephone: (852) 2271 3000 Facsimile: (852) 2723 5660 E-mail: [email protected] http: //www.erm.com MTR Corporation Limited Shatin to Central Link – Tai Wai to Hung Hom Section Archaeological Action Plan for Sacred Hill (North) Works Contract 1109 - Stations and Tunnels of Kowloon City Section (September 2012) Certified by: Winnie Ko Position: Environmental Team Leader Date: 3 September 2012 CONTENTS 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 STRUCTURE OF THE REPORT 2 2 OBJECTIVES & SCOPE 3 2.1 OBJECTIVES 3 2.2 SCOPE OF ARCHAEOLOGICAL SURVEY-CUM-EXCAVATION AND ADDITIONAL INVESTIGATION 3 3 METHODOLOGY 5 3.1 TASK 1 – SETTING OUT ARCHAEOLOGICAL SURVEY-CUM-EXCAVATION AND ADDITIONAL INVESTIGATION BOUNDARY 5 3.2 TASK 2 – MECHANICAL EXCAVATION OF TOPSOIL 5 3.3 TASK 3A – ARCHAEOLOGICAL SURVEY-CUM-EXCAVATION 6 3.4 TASK 3B – ADDITIONAL INVESTIGATION 9 3.5 FIELD RECORDING 10 3.6 CONTINGENCY PLAN 11 3.7 TASK 4 - REPORTING 11 4 WORK PROGRAMME 13 4.1 WORK PROGRAMME 13 5 PERSONNEL 15 5.1 ARCHAEOLOGICAL TEAM 15 ANNEXES ANNEX A SAMPLE OF FIELD RECORDING SHEETS ANNEX B RELEVANT REQUIREMENTS AND GUIDLEINS ANNEX C CURRICULUM VITAE OF KEY STAFF ANNEX D APPENDIX 4.6 OF APPROVED SCL (TAW-HUH) REPORT 1 INTRODUCTION 1.1 BACKGROUND The Shatin to Central Link – Tai Wai to Hung Hom Section (hereafter referred to as SCL (TAW-HUH)) (the Project) is an approximately 11 km long extension of the Ma On Shan Line and connects the West Rail Line at Hung Hom forming a strategic east-west rail corridor. -
Cynomorium Songaricum May Protect Against Spermatogenic Damage Caused by Cyclophosphamide in SD Rats
Revista Română de Medicină de Laborator Vol. 27, Nr. 3, Iulie, 2019 291 Research article DOI:10.2478/rrlm-2019-0031 Cynomorium Songaricum may protect against spermatogenic damage caused by cyclophosphamide in SD rats Xiaoxiao Han1#, Rongsheng Zhou2#, Wei Zheng3#, Xitao Wang2,4, Shuyan Mao5, Zhenbei Li6, Lin Hao2, Zhenduo Shi2, Bo Chen2, Zhiguo Zhang2, Yijuan Cao6, Dianjun Yu7, Kun Pang2,8* , Conghui Han2,8* 1. Department of Reproductive Medicine, Shanghai First Maternity and Infant Hospital. No. 2699 Gaoke West Road, Pudong District, Shanghai, China. 2. Department of Urology, Xuzhou Central Hospital, Jiangsu Xuzhou Jiefang South Road, No. 199, Jiangsu, China. 3. Department of Urology, Kiangwu Hospital. Macao, China. 4. Department of Reproductive Center, Xuzhou Central Hospital, Jiangsu Xuzhou Jiefang South Road, No. 199, Jiangsu, China. 5. Medical school, Southeast University. No. 2, Sipai Building, Xuanwu District, Nanjing, China. 6. Department of Pathology, Xuzhou Central Hospital, Jiangsu Xuzhou Jiefang South Road, No. 199, Jiangsu, China. 7. Department of Urology, Li Huili Hospital, No. 57, Xingning Road, Jiangdong District, Ningbo, Zhejiang, China 8. The third affiliated hospital of Soochow University, No.185, Juqian Street, Changzhou City, Jiangsu Province China Abstract Aim: The aim of the study is to investigate the effect of Cynomorium songaricum (CS) on the damage caused by cy- clophosphamide (CP) in SD rats. Methods: Rats with CP-induced oligoasthenospermia were treated with different concentration of CS. Testicle weight, epididymal sperm count (ESC), sperm motility, and serum testosterone were analyzed, and expression levels of Thy1, Oct4, PLZF, C-kit, and GDNF were detected in testis tissues. Transmis- sion electron microscopy (TEM) was performed to observe the effect of CS on the spermatogenic damage by CP. -
US Counter Notification of China Subsidy Programs Submitted to The
WORLD TRADE G/SCM/Q2/CHN/42 11 October 2011 ORGANIZATION (11-4946) Committee on Subsidies Original: English and Countervailing Measures SUBSIDIES Request from the UNITED STATES to CHINA Pursuant to Article 25.10 of the Agreement The following communication, dated 6 October 2011, is being circulated at the request of the Delegation of the United States. _______________ The United States notes that China has only submitted one notification of subsidies under Article XVI:1 of the General Agreement on Tariffs and Trade 1994 (the GATT 1994) and Article 25.2 of the Agreement on Subsidies and Countervailing Measures (the Agreement) in its ten years of WTO membership. China submitted that notification (G/SCM/N/123/CHN) in 2006, covering the time period from 2001 to 2004. At that time, the United States and several other Members expressed serious concerns about the incompleteness of China's notification. Since 2006, the United States and several other Members have repeatedly requested that China submit its notifications for the periods subsequent to 2004. The United States has obtained information concerning numerous Chinese central government and sub-central government measures, listed below, covering the time period from 2004 to the present that were not included in China's single notification. The United States considers that these measures should be subject to notification to the Committee on Subsidies and Countervailing Measures (the Committee) under Article XVI:1 of the GATT 1994 and Article 25.2 of the Agreement because they appear to provide specific subsidies within the meaning of Articles 1.1 and 2 of the Agreement. -
Shenzhen Bay Bridge - Hong Kong Section
Investigation Report on Prestressing Tendon Failure Incident at Concrete Viaduct of Shenzhen Bay Bridge - Hong Kong Section Highways Department Date of Issue : 18 June 2019 CONTENT EXECUTIVE SUMMARY ............................................................................................ 1 1. INTRODUCTION ............................................................................................... 3 1.1 OBJECTIVE OF INVESTIGATION ................................................................................. 3 1.2 THE INVESTIGATION TEAM ..................................................................................... 3 1.3 BACKGROUND INFORMATION ................................................................................. 4 2. APPROACH OF INVESTIGATION ...................................................................... 11 3. INVESTIGATION FINDINGS ............................................................................. 14 3.1 CONSTRUCTION MATERIALS ................................................................................. 14 3.2 STRUCTURAL DESIGN ........................................................................................... 23 3.3 CONSTRUCTION PROCESS ..................................................................................... 24 3.4 MAINTENANCE ARRANGEMENT............................................................................. 33 4. CAUSES OF TENDON FAILURE ......................................................................... 35 4.1 ANALYSIS OF TENDON FAILURE ............................................................................ -
Table of Codes for Each Court of Each Level
Table of Codes for Each Court of Each Level Corresponding Type Chinese Court Region Court Name Administrative Name Code Code Area Supreme People’s Court 最高人民法院 最高法 Higher People's Court of 北京市高级人民 Beijing 京 110000 1 Beijing Municipality 法院 Municipality No. 1 Intermediate People's 北京市第一中级 京 01 2 Court of Beijing Municipality 人民法院 Shijingshan Shijingshan District People’s 北京市石景山区 京 0107 110107 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Haidian District of Haidian District People’s 北京市海淀区人 京 0108 110108 Beijing 1 Court of Beijing Municipality 民法院 Municipality Mentougou Mentougou District People’s 北京市门头沟区 京 0109 110109 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Changping Changping District People’s 北京市昌平区人 京 0114 110114 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Yanqing County People’s 延庆县人民法院 京 0229 110229 Yanqing County 1 Court No. 2 Intermediate People's 北京市第二中级 京 02 2 Court of Beijing Municipality 人民法院 Dongcheng Dongcheng District People’s 北京市东城区人 京 0101 110101 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Xicheng District Xicheng District People’s 北京市西城区人 京 0102 110102 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Fengtai District of Fengtai District People’s 北京市丰台区人 京 0106 110106 Beijing 1 Court of Beijing Municipality 民法院 Municipality 1 Fangshan District Fangshan District People’s 北京市房山区人 京 0111 110111 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Daxing District of Daxing District People’s 北京市大兴区人 京 0115 -
A Developed Framework for the Multi-District Ecological Compensation Standards Integrating Ecosystem Service Zoning in an Urban Area in China
sustainability Article A Developed Framework for the Multi-District Ecological Compensation Standards Integrating Ecosystem Service Zoning in an Urban Area in China Jia He 1,2, Yu Wan 3, Zhonglin Tang 1,2, Xiaodong Zhu 4,* and Chuanhao Wen 5,* 1 National Research Center for Upper Yangtze Economy, Chongqing Technology and Business University, Chongqing 400067, China 2 School of Economics, Chongqing Technology and Business University, Chongqing 400067, China 3 School of River and Ocean Engineering, Chongqing Jiaotong University, Chongqing 400074, China 4 State Key Laboratory of Pollution Control and Resource Reuse, School of the Environment, Nanjing University, Nanjing 210023, China 5 School of Economics, Yunnan University, Yunnan 650500, China * Correspondence: [email protected] (X.Z.); [email protected] (C.W.); Tel.: +86-138-0903-8178 (X.Z.); +86-185-0234-0601 (C.W.) Received: 26 June 2019; Accepted: 3 September 2019; Published: 6 September 2019 Abstract: Ecological compensation is an effective means to adjust relationships among stakeholders in order to conserve and/or sustainably use ecosystem services. The current ecological compensation standards (ECS) do not well reflect the differences in ecological, social, and economic development. Thus, we took a typical urbanization area (the Suzhou–Wuxi–Changzhou region) in China as an example, because of its prominent contradiction between rapid socio-economic development and fragile ecosystem. Combined with the ecological, economic, and social conditions, the methods of ecosystem service value (ESV) evaluation, cluster analysis, and scenario analysis were used to propose an optimized spatial zoning method and optimal development scenario. Then, the ECS by different zones were determined by using ESV assessment, cost-benefit analysis, and contingent valuation method.