Wenatchee River Basin Washington

Total Page:16

File Type:pdf, Size:1020Kb

Wenatchee River Basin Washington DEPARTMENT OF THE INTERIOR UNITED STATES GEOLOGICAL SUEVEY GEORGE OTIS SMITH, DIEECTOE WATER-SUPPLY PAPER 368 PEOFILE SURVEYS IN WENATCHEE RIVER BASIN WASHINGTON PREPARED UNDER THE DIRECTION OF R. B. MARSHALL, CHIEF GEOGRAPHER Prepared in cooperation with the State of Washington WASHINGTON GOVERNMENT PRINTING OFFICE 1914 DEPARTMENT OF THE INTERIOR UNITED STATES GEOLOGICAL SURVEY GEOKGE OTIS SMITH, DIRECTOR WATER- SUPPLY PAPER 368 PROFILE SURVEYS IN WENATCHEE RIVER BASIN WASHINGTON PREPARED UNDER THE DIRECTION OF 'R. B. MARSHALL, CHIEF GEOGRAPHER WASHINGTON GOVERNMENT PRINTING OFFICE 1914 CONTENTS. Page. General features of Wenatchee River basin__________________ 5 Gaging stations __________________________________ 5 Publications ____________________________________ 6 ILLUSTRATIONS. PI.ATE I. A-K. Plan and profile of Wenatchee Lake, Wenatchee River, and certain tributaries_________A.t end of volume. 49604° WSP 368 14 9 PROFILE SURVEYS IN WENATCHEE RIVER BASIN, WASHINGTON. Prepared under the direction of R. B. MARSHALL, Chief Geographer. GENERAL FEATURES OF WENATCHEE RIVER BASIN. Wenatchee River rises in Cady Pass, in the Cascade Range, Wash­ ington, at an elevation of 4,500 feet, flows southeastward, passing through Wenatchee Lake at an elevation of 1,870 feet, and empties into Columbia River at the town of Wenatchee. With its tributaries it drains a stretch of the eastern slope of the Cascade Mountains about 40 miles long and the territory north of the Yakima River drainage basin, from which it is separated by the Wenatchee Mountains. The river has a number of tributaries, among which may be men­ tioned White River, which flows into Wenatchee Lake near its head, and Chiwawa, Nason, Chumstick, Icicle, Peshastin, and Mission creeks. The upper part of the drainage area is heavily forested, but the extreme lower part consists of timberless hills and ridges, in most places covered with sagebrush. The mean annual precipitation at Wenatchee is 16 inches, a large part of it being in the form of snow. During portions of the winter the streams are icebound. The water is used for irrigation and the development of water power. The Great Northern Railway has built a hydroelectric plant at Leavenworth, where about 7,000 horsepower is developed to operate trains through the Cascade Tunnel. GAGING STATIONS. The Survey has maintained in the basin of Wenatchee River the gaging stations shown by the following list. The stations are arranged in downstream order, the main stem of the river being de­ termined by measuring or estimating its drainage area that is, the headwater stream draining the largest area is considered the continuation of the. main stream, and all stations from source to 5 6 PROFILE SURVEYS IN WENATCHEE RIVER BASIN, WASHINGTON. mouth are presented first; stations on the tributaries, in regular order from source to mouth, follow. Relations of tributaries are indicated by indention. A dash following a date indicates that the station was being maintained June 30, 1913. A period after a date indicates discontinuance. Wenatchee Kiver near Chiwaukum, Wash., 1911-1912. Wenatchee Kiver near Leavenworth, Wash., 1910- Wenatchee Kiver at Dryden, Wash., 1911- Valley Canal at Dryden, Wash., 1911- Wenatchee Kiver at Sherman Spur, above Cashmere, Wash., 1904-1910. Wenatchee Kiver near Cashmere, Wash., 1904-1911. Wenatchee Kiver at Wenatchee, Wash., 1897. White Kiver near Chiwaukum, Wash., -1912. Nason Creek near Chiwaukum, Wash., -1912. Chiwaukum Creek near Chiwaukum, Wash., -1911. Chiawa Creek near Leavenworth, Wash., -1912. Icicle Creek near Leavenworth, Wash., 1911- Peshastin Creek near Blewett, Wash., 1911. Peshastfn Creek near Leavenworth, Wash., 1911. PUBLICATIONS. Information concerning stream flow at the stations listed in the preceding table has been published by the Survey in the following reports: Annual report: Nineteenth, pt. 4. Water-supply papers: 16, 135, 178, 214, 252, 272, 292, 312,1 332,2 362.2 Water-supply papers and other publications of the United States Geological Survey containing data in regard to the water resources of the United States may be obtained or consulted as indicated below. 1. Copies may be obtained free of charge by applying to the Director of the Geological Survey, Washington, D. C., but the edition printed for free distribution is small.and is soon exhausted. 2. Copies may be purchased at nominal cost from the Superin­ tendent of Documents, Government Printing Office, Washington, D. C., who will on application furnish lists giving prices. 3. Sets of the reports may be consulted in the libraries of the prin­ cipal cities in the United States. 4. Complete sets are available for consultation in the local offices of the water-resources branch of the Geological Survey, as follows: Albany, N. Y., Room 18, Federal Building. Atlanta, Ga., Post Office Building. St. Paul, Minn., Old Capitol Building. Helena, Mont., Montana National Bank Building. Denver, Colo., 302 Chamber of Commerce Building. Salt Lake City, Utah, Federal Building. 1 In press June, 1914. 2 In preparation June, 1914. PROFILE SURVEYS IN WENATCHEE RIVER BASIN, WASHINGTON. 7 Boise, Idaho, 615 Idaho Building. Portland, Oreg,, 416 Couch Building. Tacoma, Wash., Federal Building. San Francisco, Cal., 328 Customhouse. Los Angeles, Cal., Federal Building. Santa Fe, N. Mex., Capitol Building. Honolulu, Hawaii, Kapiolani Building. A list of the Geological Survey's publications will be sent on appli­ cation to the Director of the United States Geological Survey, Washington, D. C. O . U. S. GEOLOGICAL SURVEY PLAN AND PROFILE OF GEORGE OTIS SMITH. DIRECTOR WENATCHEE LAKE. WENATCHEE RIVER, STATE OF WASHINGTON M. E. HAY. GOVERNOR AND CERTAIN TRIBUTARIES I HENRY LANDES. STATE GEOLOGIST WASHINGTON WATER-SUPPLY PAPER 368 PLATE I A NOTE: TMESIH-W-SHEETS ARE ALL W/TMIN CHELAN COUNTY, AND ABOVE LEAVC.NWORTH ARC ALSO WITHIN THE WENATCHEE NATIONAL FOREST IYf/fATCfft F L. C H E LA N C WENATCHEE NATIONAL FOREST I WENA TCHEE NATIONAL FOREST R. B. Marshall, Chief Geographer Subject to adjustment 8 SHEETS T. G. Gerdine, Geographer in charge Topography by Chas. Hartmann, Jr. Surveyed in 1911 SURVEYED IN COOPERATION WITH THE STATE OF WASHINGTON 2 Kilometers Vertical scale 1 inch = 40 feet Contour interval on land 25 feet APPROXIMATE MEAN Contour interval on river surface 5 feet DECLINATION 1911 Datum is mean sea, level 1914 U. S. GEOLOGICAL SURVEY PLAN AND PROFILE OF GEORGE OTIS SMITH, DIRECTOR WENATCHEE LAKE. WENATCHEE RIVER, STATE OF WASHINGTON AND CERTAIN TRIBUTARIES Nl. E. HAY, GOVERNOR ENRY LANDES. STATE GEOLOGIST WASHINGTON WATER-SUPPLY PAPER 368 PLATE I B F & 'e/- ^i^ T 34 ,E>M 1882 I 4-7 Miles 44- 44 M/'/es 43 1730 4O 38 1650 I64C > /63C) \ /t>20 \ I6IO /44O \ /60C \ v37 o /42O \\ ^ I4OO 6 /390 ^x A ~JP /380 O £- \^ I37O \ /360 X^ 1350 ^ 31 30 /o/a 22 WE N A T C H E E ! FORES T S/XTH STANDARD 29 Miles R. B. Marshall, Chief Geographer Scale sr,m Subject to adjustment 8 SHEETS 2 Miles T. G. Gerdine, Geographer in charge DIAGRAM OFTOWNSHIP Topography by Clias. Harttnann, Jr., and T. H. Moncure 615 !A- 3 2 I Surveyed in 1911 7 8 9 10 II 12 4,000 2,000 4,000 8,000 Feet SURVEYED IN COOPERATION WITH THE STATE OF WASHINGTON l8!l7M6 15 IVI3 19 2O 21:22 23 2^ 0 2 Kilometers 30129128:27 26 25 Vertical scale 1 inch = 40 feet Contour interval on land 25 feet APPROXIMATE: MEAN Contour interval on river surface 5 feet DECLINATION 1911 Datum is mean sea level 1914 U. S. GEOLOGICAL SURVEY PLAN AND PROFILE OF GEORGE OTIS SMITH. DIRECTOR STATE OF WASHINGTON WENATCHEE LAKE. WENATCHEE RIVER, M. E. HAY, GOVERNOR AND CERTAIN TRIBUTARIES WATER-SUPPLY PAPER 368 PLATE I D p HENRY LANDES. STATE GEOLOGIST WASHINGTON R. B. Marshall, Chief Geographer T. G. Gerdine, Geographer in charge Topography by Wm. C. Tutts and T. H. Moncure Surveyed in 1911 -1912 7:8 !J llO II :I SURVEYED IN COOPERATION WITH THE STATE OF WASHINGTON iailT'F fl5jl4-jl 19 2O 2 t22 23 24. 3OI29 21 27 26;25 Vertical scale 1 inch - 40 feet Contour interval 10 feet APPROXIMATE MEAN Datum, is mean sea level DECLINATION 1911 1914 5 8 § S § 8.8 S 88 m D. S. GEOLOGICAL SURVEY PLAN AND PROFILE OF GEORGE OTIS SMITH. DIRECTOR WENATCHEE LAKE. WENATCHEE RIVER, STATE OF WASHINGTON AND CERTAIN TRIBUTARIES M. E. HAY. GOVERNOR HENRY LANDES STATE GEOLOGIST WASHINGTON WATER-SUPPLY^ PAPER 368 PLATE R. B. Marshall, Chief Geographer 8 SHEETS T. G. Gerdine, Geographer in charge DIAGRAM Or7OWN8HIP Topography by T. H. Moncure Surveyed in 1911 4,000 2,000 4,000 8,000 Feet SURVEYED IN COOPERATION WITH THE STATE OF WASHINGTON 0 1 2 Kilometers Vertical scale 1 inch = 40 feet Contour interval on land 25 feet APPROXIMATE MEAN Contour interval on river surface 5 feet DECLINATION 1911 Datum, is mean sea level 1914 U. S. GEOLOGICAL SURVEY PLAN AND PROFILE OF GEORGE OTIS SMITH. DIRECTOR WENATCHEE LAKE. WENATCHEE RIVER, STATE OF WASHINGTON M. E. HAY, GOVERNOR AND CERTAIN TRIBUTARIES HENRY LANDES, STATE GEOLOGIST WASHINGTON WATER-SUPPLY PAPER ,368 PLATE I G 2//O 2/OO ^LEAVEN WORTH 2O90 2080 ^s. "\ 2070 II \^ it 206O ^\ 2050 20^0 \ . \ ° 2O30 \ ^ 2O20 I\2> \ L 20IO 2000 \ / \ /99O \ /980 \ /97O \ /96O \ /9£0 \ i r t /9t+O V 5 /930 , .... , V\ <: \VQ 'WC /920 \G 23 U.SJGAG/ 19 ,3,0 \ Miles Q / I /9°° \ tarn \ I93 -. / /83O \ m&®f* taao. \ /O -§ Miles, 0 ki \ \ 28 27 25 <\l Oj V \ \ V* *. -C I C L \ 1550 \ \ \ KEY MAP V /370 6 Miles IIOO O Miles R. B. Marshall, Chief Geographer Scale Subject to adjustment 8 SHEETS T. G. Gerdine, Geographer in charge 2 Miles 23*° Topography by Wm. O. Tufts DIAGRAM DFTOWN8HIP Surveyed in 1912 6 I 5 'A- ; 3 2 I 4,000 2,000 0 4,000 8,000 Feet SURVEYED IN COOPERATION WITH THE STATE OF WASHINGTON 7 8 : 9 10 II 12 I8|I7;I6 15 14.
Recommended publications
  • Wenatchee River PCB and DDT Source Assessment
    Wenatchee River PCB and DDT Source Assessment July 2016 Publication No. 16-03-029 Publication information This report is available on the Department of Ecology’s website at https://fortress.wa.gov/ecy/publications/SummaryPages/1603029.html Data for this project are available at Ecology’s Environmental Information Management (EIM) website www.ecy.wa.gov/eim/index.htm. Search Study ID WHOB002. The Activity Tracker Code for this study is 14-040. Suggested Citation: Hobbs, W. and M. Friese. 2016. Wenatchee River PCB and DDT Source Assessment. Washington State Dept. of Ecology. Olympia, WA. Publication No. 16-03-029. https://fortress.wa.gov/ecy/publications/summarypages/1603029.html Contact information For more information contact: Publications Coordinator Environmental Assessment Program P.O. Box 47600, Olympia, WA 98504-7600 Phone: (360) 407-6764 Washington State Department of Ecology - www.ecy.wa.gov o Headquarters, Olympia (360) 407-6000 o Northwest Regional Office, Bellevue (425) 649-7000 o Southwest Regional Office, Olympia (360) 407-6300 o Central Regional Office, Yakima (509) 575-2490 o Eastern Regional Office, Spokane (509) 329-3400 Any use of product or firm names in this publication is for descriptive purposes only and does not imply endorsement by the author or the Department of Ecology. Accommodation Requests: To request ADA accommodation including materials in a format for the visually impaired, call Ecology at 360-407-6764. Persons with impaired hearing may call Washington Relay Service at 711. Persons with speech disability
    [Show full text]
  • GEOLOGIC MAP of the CHELAN 30-MINUTE by 60-MINUTE QUADRANGLE, WASHINGTON by R
    DEPARTMENT OF THE INTERIOR TO ACCOMPANY MAP I-1661 U.S. GEOLOGICAL SURVEY GEOLOGIC MAP OF THE CHELAN 30-MINUTE BY 60-MINUTE QUADRANGLE, WASHINGTON By R. W. Tabor, V. A. Frizzell, Jr., J. T. Whetten, R. B. Waitt, D. A. Swanson, G. R. Byerly, D. B. Booth, M. J. Hetherington, and R. E. Zartman INTRODUCTION Bedrock of the Chelan 1:100,000 quadrangle displays a long and varied geologic history (fig. 1). Pioneer geologic work in the quadrangle began with Bailey Willis (1887, 1903) and I. C. Russell (1893, 1900). A. C. Waters (1930, 1932, 1938) made the first definitive geologic studies in the area (fig. 2). He mapped and described the metamorphic rocks and the lavas of the Columbia River Basalt Group in the vicinity of Chelan as well as the arkoses within the Chiwaukum graben (fig. 1). B. M. Page (1939a, b) detailed much of the structure and petrology of the metamorphic and igneous rocks in the Chiwaukum Mountains, further described the arkoses, and, for the first time, defined the alpine glacial stages in the area. C. L. Willis (1950, 1953) was the first to recognize the Chiwaukum graben, one of the more significant structural features of the region. The pre-Tertiary schists and gneisses are continuous with rocks to the north included in the Skagit Metamorphic Suite of Misch (1966, p. 102-103). Peter Misch and his students established a framework of North Cascade metamorphic geology which underlies much of our construct, especially in the western part of the quadrangle. Our work began in 1975 and was essentially completed in 1980.
    [Show full text]
  • Chelan County Grant No. G0800231 FINAL
    Chelan County Grant No. G0800231 FINAL SHORELINE RESTORATION PLAN for Shorelines in the City of Cashmere Project: Comprehensive Shoreline Master Program Update • Task 10: Prepare a Restoration Plan Prepared for: City of Cashmere 101 Woodring Street Cashmere, Washington 98815 Prepared by: 750 Sixth Street South Kirkland WA 98033 This report was funded in part through a grant from the Washington Department of Ecology. Table of Contents Section ......................................................................................................................... Page No. 1. Introduction ..................................................................................................................... 1 1.1 Purpose ......................................................................................................................... 1 1.2 Restoration Plan Requirements .................................................................................. 2 1.3 Types of Restoration Activities ................................................................................... 2 1.4 Contents of this Restoration Plan ............................................................................... 3 2. Shoreline Inventory Summary ....................................................................................... 3 2.1 Introduction ................................................................................................................. 3 2.2 Shoreline Boundaries .................................................................................................
    [Show full text]
  • Rock Island Land Management Plan
    A guide to Chelan PUD’s program for managing the lands and shorelines within the Rock Island Hydroelectric Project Boundary ROCK ISLAND HYDROELECTRIC PROJECT FERC Project No. 943 Public Utility District No. 1 of Chelan County Wenatchee, Washington Prepared with assistance from Kleinschmidt Associates Gresham, Oregon December 2013 Table of Contents EXECUTIVE SUMMARY ....................................................1 6.2 Geology and Soils ........................................................35 INTRODUCTION ..............................................................3 6.3 Water Quality ..............................................................36 1.1 Project Structures, Operation, and Boundary .....................3 6.4 Aquatic Resources ........................................................37 1.2 Project Licensing History ..................................................4 6.5 Aquatic Habitat ............................................................41 1.3 FERC Regulatory Setting, Requirements 6.6 Terrestrial ....................................................................42 and Authorizations .........................................................5 6.7 Land Use .....................................................................43 1.4 Other Regulatory Jurisdictions and Management Initiatives ...................................................6 6.8 Cultural Resources ........................................................43 6.9 Recreation ...................................................................44 PURPOSE,
    [Show full text]
  • Chelan County Good Neighbor Handbook
    CHELAN COUNTY GOOD NEIGHBOR HANDBOOK A LAND AND RESOURCE GUIDE FOR CHELAN COUNTY RESIDENTS WELCOME TO CHELAN COUNTY The quality of life in Chelan County is unsurpassed, evident by a steadily increasing population and a strong, diverse economy. The area’s natural beauty and abundance of recreational opportunities are two of the many reasons people come to Chelan County. It’s a place characterized by sparkling clear rivers, clean air, flowered hillsides, expansive views, spectacular mountains, brilliant skies, and productive orchards and farms. Whether you are new to the area or a long-time resident, one thing is apparent to all—Chelan County is growing. Since the last time the Good Neighbor Handbook was published in 2008, the area has seen a 10% population increase. In part, this is due to increased awareness of the high quality of life available to those who choose to live and play in Chelan County. In 2017, Wenatchee was ranked by Forbes Magazine as one of the ‘25 Best Places to Retire’ in the Country. Today, the natural heritage that greatly contributes to our high quality of life and economic vitality is in danger due to rapid growth. As the area continues to grow, we all need to take steps to protect the qualities that either brought us here or that preserve the things we have always loved. The Good Neighbor Handbook, originally created by the Chelan- Douglas Land Trust, is an effort by multiple entities to provide information on how we can each do our part in keeping this a special place to live.
    [Show full text]
  • Upper Wenatchee River Stream Corridor Assessment and Habitat Restoration Strategy
    UPPER WENATCHEE RIVER STREAM CORRIDOR ASSESSMENT AND HABITAT RESTORATION STRATEGY YAKAMA NATION FISHERIES | PO BOX 15, FORT ROAD | TOPPENISH, WA 98948 Prepared by INTER‐FLUVE, INC. 1020 WASCO STREET, SUITE I | HOOD RIVER, OR 97031 541.386.9003 | www.interfluve.com This page left blank for printing purposes. UPPER WENATCHEE RIVER STREAM CORRIDOR ASSESSMENT AND HABITAT RESTORATION STRATEGY Prepared for YAKAMA NATION FISHERIES PO Box 15, Fort Road Toppenish, WA 98948 Prepared by INTER-FLUVE, INC. 1020 Wasco Street, Suite I Hood River, OR 97031 (541) 386.9003 www.interfluve.com August 2012 This page left blank for printing purposes. UPPER WENATCHEE RIVER ASSESSMENT Acknowledgements: The Yakama Nation and Inter-Fluve would like to thank numerous entities and individuals for their assistance in this assessment effort. Entities that have provided technical assistance and input include the U.S. Forest Service, Chelan County, U.S. Bureau of Reclamation, Washington Department of Fish & Wildlife, Washington State Parks, and the Upper Columbia Regional Technical Team (RTT). Rob Richardson, with the U.S. Bureau of Reclamation, provided useful input that improved the final report. Numerous landowners along the river corridor allowed for access to the river and provided useful information on site conditions and river history. The Upper Valley Museum, the Wenatchee Valley Museum and Cultural Center, and Bryon Newell provided historical information and photos. Image credit: Unless otherwise noted, aerial imagery used in maps and figures are Bing Maps provided through ESRI ArcMaps. Upper Wenatchee River Stream Corridor Assessment and Habitat Restoration Strategy Yakama Nation Fisheries Page i UPPER WENATCHEE RIVER ASSESSMENT Table of Contents 1 Introduction ...............................................................................................................................1 1.1 Overview ......................................................................................................................................
    [Show full text]
  • WNPS Icicle SEPA Scoping Comments
    Alpine Lakes Protection Society ● Alpine Lakes Foundation Alliance for the Wild Rockies ● American Whitewater ● Aqua Permanente Center for Environmental Law & Policy ● Conservation Congress El Sendero ● Endangered Species Coalition ● Federation of Western Outdoor Clubs Friends of the Bitterroot ● Friends of Bumping Lake ● Friends of the Clearwater Friends of the Enchantments ● Friends of Lake Kachess ● Friends of Wild Sky Great Old Broads for Wilderness ● Issaquah Alps Trails Club Kachess Homeowners Association ● Kachess Ridge Maintenance Association Kittitas Audubon Society ● Kittitas County Fire District #8 ● The Mazamas Middle Fork Recreation Coalition ● North Cascades Conservation Council North Central Washington Audubon Society ● Olympic Forest Coalition River Runners For Wilderness ● Save Our Sky Blue Waters ● Seattle Audubon Society Sierra Club ● Spokane Mountaineers ● Spring Family Trust for Trails Washington Native Plant Society ● Washington Wild ● Western Lands Project Wilderness Watch ● Wild Fish Conservancy May 11, 2016 Via email to: [email protected] Chelan County Natural Resources Department Attention: Mike Kaputa, Director 411 Washington Street, Suite 201 Wenatchee, WA 98801 RE: Icicle Creek Water Resource Management Strategy – SEPA scoping Dear Director Kaputa: Thank you for the opportunity to provide scoping comments on the Icicle Creek Water Resource Management Strategy. As non-profit organizations focused on conservation and recreation with members who live, work and play in the project area, we have a strong interest in current and future management activities in the Icicle Creek watershed and the Alpine Lakes Wilderness. Many of our organizations attended the informational and scoping meetings held in 2013-2016 regarding this proposal, and some of us have participated in Icicle Work Group meetings and have submitted comment letters previously.
    [Show full text]
  • Sportsmans Access on the Wenatchee River
    SPORTSMANS ACCESS ON THE WENATCHEE RIVER Final ROCKY REACH HYDROELECTRIC PROJECT FERC Project No. 2145 December 15, 2000 (Revised July 27, 2001) Prepared by: BioAnalysts, Inc. Boise, Idaho Prepared for: Public Utility District No. 1 of Chelan County Wenatchee, Washington Sportsmans Access TABLE OF CONTENTS SECTION 1: INTRODUCTION ....................................................................................................... 1 SECTION 2: WENATCHEE FISHERIES........................................................................................ 2 2.1 Spring Chinook Salmon................................................................................................................................. 2 2.2 Summer Steelhead ......................................................................................................................................... 2 2.3 Sockeye Salmon ............................................................................................................................................ 2 2.4 Resident Trout ............................................................................................................................................... 2 2.5 Whitefish ....................................................................................................................................................... 2 SECTION 3: WENATCHEE ACCESS............................................................................................ 4 3.1 Reach 4: Lake Wenatchee to Tumwater Canyon (RM 54.1-35.8)................................................................
    [Show full text]
  • Aug-2008-Dct-Order
    IN THE UNITED STATES DISTRICT COURT DISTRICT OF OREGON UNITED STATES OF AMERICA, ) ) Plaintiff, ) and ) ) CONFEDERATED TRIBES and BANDS ) OF THE YAKAMA INDIAN ) Civil No. 68-513-KI NATION, et al. ) ) FINDINGS OF FACT AND Plaintiff-Intervenors, ) CONCLUSIONS OF LAW vs. ) ) STATE OF OREGON, STATE OF ) WASHINGTON, ) ) Defendants, ) ) CONFEDERATED TRIBES OF THE ) COLVILLE INDIAN RESERVATION, ) ) Respondent. ) ) Page 1 - FINDINGS OF FACT AND CONCLUSIONS OF LAW KING, Judge: The Court makes the following Findings of Fact and Conclusions of Law as a result of the dispute between two tribes, the Confederated Tribes and Bands of the Yakama Nation (“Yakama”) and the Confederated Tribes of the Colville Reservation (“Colville”) (representing its constituent tribe, the Wenatchi),1 over fishing rights purportedly granted by an 1894 agreement at the “Wenatshapam Fishery” near the town of Leavenworth, Washington. The dispute is part of a longstanding case brought by the United States to define certain Indian tribes’ treaty rights to take fish at all usual and accustomed places along the Columbia River and its tributaries. Colville sought to intervene in the case on two occasions, once in 1989 and once in 1999, but its requests were denied. See United States v. Oregon, 29 F.3d 481 (9th Cir. 1994) (“Oregon I”). In 2002, instead of moving to intervene yet again, the Colville Wenatchi began fishing at Icicle Creek. On August 18, 2003, I granted Yakama’s motion for injunctive relief, enjoining Colville and its constituent tribes from fishing at Icicle Creek and holding that Colville was precluded by res judicata from asserting the arguments it raised in opposition to Yakama’s motion.
    [Show full text]
  • Wenatchee River Watershed Dissolved Oxygen and Ph Total Maximum Daily Load
    Wenatchee River Watershed Dissolved Oxygen and pH Total Maximum Daily Load Water Quality Improvement Report Revised August 2009 Publication No. 08-10-062 Publication and Contact Information This report is available on the Department of Ecology’s website at http://www.ecy.wa.gov/biblio/0810062.html For more information contact: Washington Department of Ecology Water Quality Program Central Regional Office 15 West Yakima Ave. Yakima, WA 98902-3452 Phone: 509-575-2490 Headquarters (Lacey) 360-407-6000 Regional Whatcom Pend San Juan Office Oreille location Skagit Okanogan Stevens Island Northwest Central Ferry 425-649-7000 Clallam Snohomish 509-575-2490 Chelan Jefferson Douglas Spokane Kitsap Bellevue Lincoln Spokane Grays King Eastern Harbor Ma son Kittitas Grant 509-329-3400 Pierce Adams Lacey Whitman Thurston Southwest Pacific Lewis 360-407-6300 Y akima Franklin Garfield Wahkiakum Yaki m a Columbia Benton Walla Cowlitz Skamania Asotin Walla Klickitat Clark Persons with a hearing loss can call 711 for Washington Relay Service. Persons with a speech disability can call 877-833-6341. Data for this project are available at Ecology’s Environmental Information Management (EIM) website at www.ecy.wa.gov/eim/index.htm. Search User Study ID, WENRTMDL. Ecology’s Study Tracker Code for this study is 08-517. Any use of product or firm names in this publication is for descriptive purposes only and does not imply endorsement by the author or the Department of Ecology. If you need this publication in an alternate format, call 360-407-6404. Persons with hearing loss can call 711 for Washington Relay Service.
    [Show full text]
  • Wenatchee River Watershed Temperature Total Maximum Daily Load: Water Quality Improvement Report
    Wenatchee River Watershed Temperature Total Maximum Daily Load __________________________ Water Quality Improvement Report July 2007 Publication No. 07-10-045 Wenatchee River Watershed Temperature Total Maximum Daily Load __________________________ Water Quality Improvement Report Prepared by David Schneider and Ryan Anderson Washington State Department of Ecology Water Quality Program Post Office Box 47600 Olympia, Washington 98504-7600 July 2007 Publication Number 07-10-045 You can print or download this document from our website at: http://www.ecy.wa.gov/biblio/0710045.html For more information contact: Department of Ecology Water Quality Program Central Regional Office 15 W Yakima Avenue, Suite 200 Yakima, WA 98902 Telephone: (509) 454-7894 Headquarters (Lacey) 360-407-6000 Regional Whatcom Pend San Juan Office Oreille location Skagit Okanogan Stevens Island Northwest Central Ferry 425-649-7000 Clallam Snohomish 509-575-2490 Chelan Jefferson Spokane K Douglas i Bellevue Lincoln ts Spokane a Grays p King Eastern Harbor Mason Kittitas Grant 509-329-3400 Pierce Adams Lacey Whitman Thurston Southwest Pacific Lewis 360-407-6300 Yakima Franklin Garfield Wahkiakum Yakima Columbia Walla Cowlitz Benton Asotin Skamania Walla Klickitat Clark Persons with a hearing loss can call 711 for Washington Relay Service. Persons with a speech disability can call 877-833-6341. If you need this publication in an alternate format, please call the Water Quality Program at 509-454-7888. Persons with hearing loss can call 711 for Washington Relay Service. Persons
    [Show full text]
  • Leavenworth National Fish Hatchery Surface Water Intake Fish Screens and Fish Passage Project Environmental Impact Statement
    Leavenworth National Fish Hatchery Surface Water Intake Fish Screens and Fish Passage Project Environmental Impact Statement Transportation and Traffic Resource Report U.S. Department of the Interior Bureau of Reclamation Columbia-Pacific Northwest Regional Office 1150 N. Curtis Road Boise, ID 83706 November 2020 Mission Statements The Department of the Interior conserves and manages the Nation’s natural resources and cultural heritage for the benefit and enjoyment of the American people, provides scientific and other information about natural resources and natural hazards to address societal challenges and create opportunities for the American people, and honors the Nation’s trust responsibilities or special commitments to American Indians, Alaska Natives, and affiliated island communities to help them prosper. The mission of the Bureau of Reclamation is to manage, develop, and protect water and related resources in an environmentally and economically sound manner in the interest of the American public. Executive Summary The U.S. Department of the Interior, Bureau of Reclamation (Reclamation) has prepared an Environmental Impact Statement (EIS) for the Leavenworth National Fish Hatchery (hereafter, LNFH or Hatchery) Surface Water Intake Fish Screens and Fish Passage (SWISP) Project (Map A-1 in Appendix A). The purpose of this specialist report is to provide a comprehensive environmental baseline and analysis of the potential impacts of the SWISP Project under four separate alternatives, including Alternative A, No Action. The Analysis Area for transportation and traffic includes East Leavenworth Road and Icicle Road from their intersections with United States (U.S.) Highway 2 to the intersection of these two roads north of the LNFH, where Icicle Road turns into Icicle Creek Road; and Icicle Creek Road to the US Department of Agriculture Forest Service (Forest Service) kiosk and construction vehicle turnaround area (Map A-9 in Appendix A).
    [Show full text]