Assam Priority List 2013-14
Total Page:16
File Type:pdf, Size:1020Kb
Priority List- Assam (2013-2014) General Areas Sl. Name of the District & project Project Cost No. (Rs. In lakh) 1. District - Dhemaji 1 Construction of Road from Matikhula Siva Mandir to Dakhin Dhemaji GP Office under 523.30 Dhemaji Dev. Block, Dhemaji 2 Construction of Road from Gutung Na-pam Railway crossing to Pu-dalani Shiva Mandir 344.85 under NLCPR 3 Constn of RCC Bridge No 2/1 over river Gainadi on Sarupam Balijan to Nilakh 3,652.00 Chariali including approach road 4 Constn of RCC Bridge No 3/1, 1/1 and 5/1 on 1,100.00 Amguri to Bangalmari road 2. District - Jorhat Excavation and Desilting of Teri Meri River 1 from Teteliguri to Kakodonga Outfall under 593.48 Titabor Revenue Circle. 2 Developmental works at Auniati Satra, Majuli 763.00 Construction of Railway Over Bridge near Jorhat Railway station replacing railway L.C. 3 3,209.28 Gate No.FM-58 between Jorhat and Rowriah Railway station 4 Basbari Naditali Public Playground 1,031.26 Construction of Road from Bongaon to 5 Takarchuk Road cum Bund by Mt & Bt in 3,135.00 Jorhat Rural Road Division The centre of excellence for promotion of Swimming in particular & Aquatic sports in 6 360.80 general at Aquatic complex,Jorhat swimming society,Jorhat 9,092.82 3. District - Sonitpur D.T.W Irrigation Scheme at 40 points under 1 2,642.34 Bihaguri Development Block, Sonitpur,Assam Improvement of road from Dheraimajuli to Garuduba PWD road including conversion of 2 SPT bridge No 4/3 into RCC Br No 4/3 (4 1,461.10 spans @ 30.00 m =120.00 RM) over Belsiri river under Sonitpur Rural Road Division Infrastructure Development of Chaiduar 3 619.44 College Construction of Rajiv Gandhi Mini Stadium, Community Hall, Library, Children Park, 4 Fishery Pond, Poultry and Banana Plantation 549.59 at Teleria Village under Balipara Dev. Block, Sonitpur PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com Protection of L/B of river Borgang from 5 erosion at d/s of NH-52 to its outfall at river 1,544.19 Brahmaputra . Improvement of connectivity of Dhekiajuli 6 959.00 Town Construction of 150 capacity RCC 3 storied 7 540.64 Boy's Hostel at Darrang College, Tezpur Construction of permanent structure of 8 Baresaharia Bhaona alongwith allied 2,204.00 structures. 10,520.30 4. Golaghat Construction of ROB on Furkating bye pass of Golaghat Merapani Road in the District of 1 4,710.00 Golaghat near Golaghat Furcating Railway Station in replacement of L.C. gate No ST 70. Construction of Road from Dessoi Dhansiri 2 1,314.47 Gelabil to Majchapori Ali Widening of Road from Padumoni Tiniali to NH-37 via Borkathoni,Hatiekhowa Chariali 3 1,723.44 and Nahoroni under Golaghat Rural Road Division 7,747.91 5. District - Cachar Development of Cachar Cancer Hospital & 1 5,050.00 Research Centre, Meherpur( Pvt. Trust) Anti-Erosion measures to protect Singerbond 2 1,128.85 area from erosion of river Barak on its L/B 3 Integrated Assam University W.S.S, Silchar 2,260.78 8,439.63 6. District - Dibrugarh Construction and widening of road from 1 798.73 Khowang Chariali to Chenimari Construction of Moran Sports Complex at 2 888.86 Moran Construction of Swimming pool and Jogging 3 Track(International Standard)at Assam 368.55 MedicalCollege,Dibrugarh. Improvement of Namati to Sukani Road 4 662.64 under PWD Dibrugarh Rural Road Division Rajib Gandhi Rural Sports Complex at 5 660.00 Rajgarh Construction and widening of road from Bamunbari Tiniali to Grab T.E via Aghunibari 6 3,279.39 Dhaman under Dibrugarh Rural Road Division 7 Rangsali Silk Park,Khowang,Dibrugarh 423.95 8 Mezangkari Silk Park 407.72 Extention of anti -erosion measures to 9 Dehing bund left bank from Aghunibari 855.99 Sessughat (protection work at 71st km) PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com Anti erosion measures to extention of Sassoni Tingkhong bund Ph-I on the left 10 1,247.56 bank of river Buridehing (protection work at Bamunibeel and Uriamguri area) A/E measures to T/Dyke along the R/B of 11 river Burhi-Dehing from Deochalli Hill to 865.00 Tipling ghat Ph-I (at konwar Gaon) Proposed project for the Development of Stadium of Naharkatia Cricket Association at 12 500.00 Asomiya Gaon Rajib Gandhi Sports complex,Naharkatia. 10,958.39 7. District - Nalbari Construction of Road from NH-31 to 1 496.00 Kashimpur Suplekuchi via Purbabharati Construction of Akhra Bihampur to Majkuchi- Jowardi via Silakuti,Jowardi-Satra,Madhupur 2 361.00 Block,Kaithalkuchi,Mishrapara,Kanaitola Road. Construction of Road from Hajo Nalbari PWD 3 Road at Betakata to Bezkuchi via Sarukuchi 429.50 including CD works & RCC Bridge Infrastructure Development of M.E.School, 4 574.60 Nakerbari Constn of Storm Water Drainage Network of 5 1,500.00 Nalbari Town,Phase - II 3,361.10 8. District - Sibsagar Construction of BuraGohain Phukuri 1 513.00 swimming complex at Sivsagar Improvement of Namtula Haticamp Road 2 upto Lachai BOP including construction of 576.11 RCC Bridge No.2/2 on Towkak River. 3 Improvement of Santak Na Ali Road . 502.50 Improvement of Rangoli Thanpathar to 4 1,622.41 Bhalukaguri Road. Construction of 100 Beded" Karmashree 5 Hiteswar Saikia" Civil Hospital at Ligiripukhuri 752.29 in Nazira . Imp of connectivity of Greater Sonari area by 6 developing road and footpath cum drainage 1,431.00 Infrastructure. Constn of Ethnic Culture Preservation and 7 538.16 Development Centre ,Sibsagar 5,935.47 9. District - Nagaon Construction of proposed Railway Overbridge at Natun Bazar (Replacing Railway Level 1 3,289.70 Crossing Gate No.JGJN-HJI ST-40) Nilbagan Hojai Tumpreng Road at Hojai, Nagaon. 2 Imt. by widening & strengthening of Kathaltoli 2,478.75 PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com Amlakhi Road (from 1km to 25 km ) including constn. Of RCC Br. No. 10/1, 18/1,19/1 & 22/1. 3 Development of Hojai Bihutoli at Hojai 380.37 Widening & Strengthening of Bebejia Kuruwabahi Jojori Baruati Dhing (MDR) Road 4 3,063.67 including RCC Bridge No.18/1,18/2,19/1 & 23/1 under Nagaon State Road Division. Raising & Strengthening to R/E along right 5 bank of river Nonoi & Haria from Tulshimukh 745.00 to Hariaghat 9,957.49 10. District - Hailakandi Constn of road from 52.00 km point of NH 154 - Katlicherra Grant of District Hailakandi 1 1,872.41 to Veterbond - Dullavcherra NEC road of Dist Karimganj. Construction of RCC Bridge No.4/1 over River Katakhal at Godamghat Ferryon 2 1,953.00 Monacherra Kalacherra Road (proposed to be upgraded as MDR). 3,825.41 11. District - Darrang Improvement and upgradation of Sipajhar Borichowka Mahaliapara road including 1 1,950.00 crossed drainage works under Mangaldoi Rural Road Division. Construction of Road from Ramhari to 2 980.85 Bhalukmari including cross drainage works. Improvement of Bechimari Takimari Road including 2 Nos RCC Bridges No.2/1 & 3 1,204.56 4/1under Darrang District in Mangaldai Rural Road Division. Re-modelling of Kalpani Flow Irrigation 4 1,174.00 scheme. 5,309.41 12. District - Tinsukia Improvement of Roads of Tinsukia Master 1 1,473.00 Plan Area, Tinsukia . Waste Recycling and sustainable sold waste 2 859.00 Management Project of Digoi town 3 Construction of Roads at Tinsukia Town 1,352.85 Constn of road from Khetugate Tinali to 4 Balijan Tinali at Digboi Duliajan road via 1,444.00 Lakhi Pathar R/S to T/Dykealong left bank of Tirap river 5 from Chippibast to Moulang gaon including 746.65 anti erosion measures at different reaches Construction of RCC Footpath/Tiles along 6 612.57 with Culvert at Digboi Arboretum 6,488.07 PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com 13. District - Karimganj Construction of road from Chatal to east Khagail via South Bajarbond, East 1 Bajarbond, Nakirkuna and Belala, Length - 2,464.40 10 km, with 6 numbers of RCC bridges 25 mts each & 25 numbers of Box culvert Construction of Rajib Gandhi Mini Stadium with Library cum communoty Hall,Children 2 park including land development,surface 573.50 drain and construction of boundary wall at Modern Highschool,Morjatcandi, Badarpur. Construction of Stadium at the Site of the 3 existing Chandkhira Football Ground, 515.73 Patha rkandi, Karimganj Constn of road from NH 44 (Brojendra Nagar) to Bahadurpur via Solmara, 4 500.00 Katagram, Boribund, Ratanpur, Akbarpur and Purangram. Development of Stadium at DSA ground, Karimganj (Assam),construction of Club 5 524.31 House, Pavilion, Gallery & Campus Lighting etc 4,577.94 14. District - Lakhimpur Construction of Road from Dhalpur NH-52 to 1 Rangati Maghnowa via Jorhatia under Ganak 588.33 Doloni G.P. of Narayanpur Dev. Block Construction of College building and mini 2 stadium cum sports complex in respect of 722.00 Madhabdev College, Narayanpur. Construction of Road including cross - 3 Drainage structures from Thekeraguri to 1,610.00 Goroimari Market centre Construction of Boys Hostel,boundary wall 4 and raising low site at LTK College College, 547.46 Lakhimpur 5 Rampur Rangajan Flow Irrigation Scheme, 1,458.09 4,925.88 15. District - Morigaon Improvement of Basanaghat Bhuragaon Road (SH-47) Mt &Bt at 8th to 13th KM 1 547.00 widening & Strengthening of the Road from single to intermediate lane Improvement of Borbhagia Mikirbheta Dhing 2 497.40 Road (MDR) from Ch.0m to 7000m Construction of RCC Bridge No.4/1on 3 Hahchora to Borbori Road incluiding 423.10 approaches & protection works.