Assam Priority List 2013-14

Assam Priority List 2013-14

Priority List- Assam (2013-2014) General Areas Sl. Name of the District & project Project Cost No. (Rs. In lakh) 1. District - Dhemaji 1 Construction of Road from Matikhula Siva Mandir to Dakhin Dhemaji GP Office under 523.30 Dhemaji Dev. Block, Dhemaji 2 Construction of Road from Gutung Na-pam Railway crossing to Pu-dalani Shiva Mandir 344.85 under NLCPR 3 Constn of RCC Bridge No 2/1 over river Gainadi on Sarupam Balijan to Nilakh 3,652.00 Chariali including approach road 4 Constn of RCC Bridge No 3/1, 1/1 and 5/1 on 1,100.00 Amguri to Bangalmari road 2. District - Jorhat Excavation and Desilting of Teri Meri River 1 from Teteliguri to Kakodonga Outfall under 593.48 Titabor Revenue Circle. 2 Developmental works at Auniati Satra, Majuli 763.00 Construction of Railway Over Bridge near Jorhat Railway station replacing railway L.C. 3 3,209.28 Gate No.FM-58 between Jorhat and Rowriah Railway station 4 Basbari Naditali Public Playground 1,031.26 Construction of Road from Bongaon to 5 Takarchuk Road cum Bund by Mt & Bt in 3,135.00 Jorhat Rural Road Division The centre of excellence for promotion of Swimming in particular & Aquatic sports in 6 360.80 general at Aquatic complex,Jorhat swimming society,Jorhat 9,092.82 3. District - Sonitpur D.T.W Irrigation Scheme at 40 points under 1 2,642.34 Bihaguri Development Block, Sonitpur,Assam Improvement of road from Dheraimajuli to Garuduba PWD road including conversion of 2 SPT bridge No 4/3 into RCC Br No 4/3 (4 1,461.10 spans @ 30.00 m =120.00 RM) over Belsiri river under Sonitpur Rural Road Division Infrastructure Development of Chaiduar 3 619.44 College Construction of Rajiv Gandhi Mini Stadium, Community Hall, Library, Children Park, 4 Fishery Pond, Poultry and Banana Plantation 549.59 at Teleria Village under Balipara Dev. Block, Sonitpur PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com Protection of L/B of river Borgang from 5 erosion at d/s of NH-52 to its outfall at river 1,544.19 Brahmaputra . Improvement of connectivity of Dhekiajuli 6 959.00 Town Construction of 150 capacity RCC 3 storied 7 540.64 Boy's Hostel at Darrang College, Tezpur Construction of permanent structure of 8 Baresaharia Bhaona alongwith allied 2,204.00 structures. 10,520.30 4. Golaghat Construction of ROB on Furkating bye pass of Golaghat Merapani Road in the District of 1 4,710.00 Golaghat near Golaghat Furcating Railway Station in replacement of L.C. gate No ST 70. Construction of Road from Dessoi Dhansiri 2 1,314.47 Gelabil to Majchapori Ali Widening of Road from Padumoni Tiniali to NH-37 via Borkathoni,Hatiekhowa Chariali 3 1,723.44 and Nahoroni under Golaghat Rural Road Division 7,747.91 5. District - Cachar Development of Cachar Cancer Hospital & 1 5,050.00 Research Centre, Meherpur( Pvt. Trust) Anti-Erosion measures to protect Singerbond 2 1,128.85 area from erosion of river Barak on its L/B 3 Integrated Assam University W.S.S, Silchar 2,260.78 8,439.63 6. District - Dibrugarh Construction and widening of road from 1 798.73 Khowang Chariali to Chenimari Construction of Moran Sports Complex at 2 888.86 Moran Construction of Swimming pool and Jogging 3 Track(International Standard)at Assam 368.55 MedicalCollege,Dibrugarh. Improvement of Namati to Sukani Road 4 662.64 under PWD Dibrugarh Rural Road Division Rajib Gandhi Rural Sports Complex at 5 660.00 Rajgarh Construction and widening of road from Bamunbari Tiniali to Grab T.E via Aghunibari 6 3,279.39 Dhaman under Dibrugarh Rural Road Division 7 Rangsali Silk Park,Khowang,Dibrugarh 423.95 8 Mezangkari Silk Park 407.72 Extention of anti -erosion measures to 9 Dehing bund left bank from Aghunibari 855.99 Sessughat (protection work at 71st km) PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com Anti erosion measures to extention of Sassoni Tingkhong bund Ph-I on the left 10 1,247.56 bank of river Buridehing (protection work at Bamunibeel and Uriamguri area) A/E measures to T/Dyke along the R/B of 11 river Burhi-Dehing from Deochalli Hill to 865.00 Tipling ghat Ph-I (at konwar Gaon) Proposed project for the Development of Stadium of Naharkatia Cricket Association at 12 500.00 Asomiya Gaon Rajib Gandhi Sports complex,Naharkatia. 10,958.39 7. District - Nalbari Construction of Road from NH-31 to 1 496.00 Kashimpur Suplekuchi via Purbabharati Construction of Akhra Bihampur to Majkuchi- Jowardi via Silakuti,Jowardi-Satra,Madhupur 2 361.00 Block,Kaithalkuchi,Mishrapara,Kanaitola Road. Construction of Road from Hajo Nalbari PWD 3 Road at Betakata to Bezkuchi via Sarukuchi 429.50 including CD works & RCC Bridge Infrastructure Development of M.E.School, 4 574.60 Nakerbari Constn of Storm Water Drainage Network of 5 1,500.00 Nalbari Town,Phase - II 3,361.10 8. District - Sibsagar Construction of BuraGohain Phukuri 1 513.00 swimming complex at Sivsagar Improvement of Namtula Haticamp Road 2 upto Lachai BOP including construction of 576.11 RCC Bridge No.2/2 on Towkak River. 3 Improvement of Santak Na Ali Road . 502.50 Improvement of Rangoli Thanpathar to 4 1,622.41 Bhalukaguri Road. Construction of 100 Beded" Karmashree 5 Hiteswar Saikia" Civil Hospital at Ligiripukhuri 752.29 in Nazira . Imp of connectivity of Greater Sonari area by 6 developing road and footpath cum drainage 1,431.00 Infrastructure. Constn of Ethnic Culture Preservation and 7 538.16 Development Centre ,Sibsagar 5,935.47 9. District - Nagaon Construction of proposed Railway Overbridge at Natun Bazar (Replacing Railway Level 1 3,289.70 Crossing Gate No.JGJN-HJI ST-40) Nilbagan Hojai Tumpreng Road at Hojai, Nagaon. 2 Imt. by widening & strengthening of Kathaltoli 2,478.75 PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com Amlakhi Road (from 1km to 25 km ) including constn. Of RCC Br. No. 10/1, 18/1,19/1 & 22/1. 3 Development of Hojai Bihutoli at Hojai 380.37 Widening & Strengthening of Bebejia Kuruwabahi Jojori Baruati Dhing (MDR) Road 4 3,063.67 including RCC Bridge No.18/1,18/2,19/1 & 23/1 under Nagaon State Road Division. Raising & Strengthening to R/E along right 5 bank of river Nonoi & Haria from Tulshimukh 745.00 to Hariaghat 9,957.49 10. District - Hailakandi Constn of road from 52.00 km point of NH 154 - Katlicherra Grant of District Hailakandi 1 1,872.41 to Veterbond - Dullavcherra NEC road of Dist Karimganj. Construction of RCC Bridge No.4/1 over River Katakhal at Godamghat Ferryon 2 1,953.00 Monacherra Kalacherra Road (proposed to be upgraded as MDR). 3,825.41 11. District - Darrang Improvement and upgradation of Sipajhar Borichowka Mahaliapara road including 1 1,950.00 crossed drainage works under Mangaldoi Rural Road Division. Construction of Road from Ramhari to 2 980.85 Bhalukmari including cross drainage works. Improvement of Bechimari Takimari Road including 2 Nos RCC Bridges No.2/1 & 3 1,204.56 4/1under Darrang District in Mangaldai Rural Road Division. Re-modelling of Kalpani Flow Irrigation 4 1,174.00 scheme. 5,309.41 12. District - Tinsukia Improvement of Roads of Tinsukia Master 1 1,473.00 Plan Area, Tinsukia . Waste Recycling and sustainable sold waste 2 859.00 Management Project of Digoi town 3 Construction of Roads at Tinsukia Town 1,352.85 Constn of road from Khetugate Tinali to 4 Balijan Tinali at Digboi Duliajan road via 1,444.00 Lakhi Pathar R/S to T/Dykealong left bank of Tirap river 5 from Chippibast to Moulang gaon including 746.65 anti erosion measures at different reaches Construction of RCC Footpath/Tiles along 6 612.57 with Culvert at Digboi Arboretum 6,488.07 PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com 13. District - Karimganj Construction of road from Chatal to east Khagail via South Bajarbond, East 1 Bajarbond, Nakirkuna and Belala, Length - 2,464.40 10 km, with 6 numbers of RCC bridges 25 mts each & 25 numbers of Box culvert Construction of Rajib Gandhi Mini Stadium with Library cum communoty Hall,Children 2 park including land development,surface 573.50 drain and construction of boundary wall at Modern Highschool,Morjatcandi, Badarpur. Construction of Stadium at the Site of the 3 existing Chandkhira Football Ground, 515.73 Patha rkandi, Karimganj Constn of road from NH 44 (Brojendra Nagar) to Bahadurpur via Solmara, 4 500.00 Katagram, Boribund, Ratanpur, Akbarpur and Purangram. Development of Stadium at DSA ground, Karimganj (Assam),construction of Club 5 524.31 House, Pavilion, Gallery & Campus Lighting etc 4,577.94 14. District - Lakhimpur Construction of Road from Dhalpur NH-52 to 1 Rangati Maghnowa via Jorhatia under Ganak 588.33 Doloni G.P. of Narayanpur Dev. Block Construction of College building and mini 2 stadium cum sports complex in respect of 722.00 Madhabdev College, Narayanpur. Construction of Road including cross - 3 Drainage structures from Thekeraguri to 1,610.00 Goroimari Market centre Construction of Boys Hostel,boundary wall 4 and raising low site at LTK College College, 547.46 Lakhimpur 5 Rampur Rangajan Flow Irrigation Scheme, 1,458.09 4,925.88 15. District - Morigaon Improvement of Basanaghat Bhuragaon Road (SH-47) Mt &Bt at 8th to 13th KM 1 547.00 widening & Strengthening of the Road from single to intermediate lane Improvement of Borbhagia Mikirbheta Dhing 2 497.40 Road (MDR) from Ch.0m to 7000m Construction of RCC Bridge No.4/1on 3 Hahchora to Borbori Road incluiding 423.10 approaches & protection works.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    11 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us