MHI Vestas Beats Rivals to Turbine 10MW Tape
Total Page:16
File Type:pdf, Size:1020Kb
First-class (EPCI) offshore contracting solutions Foundation Installation with Heavy Lift Vessel ‘Innovation’ at the Galloper project (UK) Visit LOC’s experts at WindEnergy Health, Safety & Environment is top priority The ‘Neptune’ installing world’s largest tidal power project Hall B4.EG GeoSea is a specialized company for (EPCI) offshore works, focused on the installation of wind turbine foundations and erection of turbines. Large jack-up platforms and drilling and piling rigs are our plants of choice for working in deep waters. GeoSea GeoSea nv Member of the DEME Group offers first-class offshore contracting solutions to global clients. We have the skills, the Haven 1025 - Scheldedijk 30 technology and the equipment to perform in the most challenging marine environment. B-2070 Zwijndrecht, Belgium Stand 304 T +32 3 250 53 12 - F +32 3 250 55 41 Always working closely with our clients, we understand what it takes to define and [email protected] www.deme-group.com/geosea deliver a project cost-effectively, safely and on time. 26 September 2018 LiVE @ WINDENERGY HAMBURG ‘Golden years’ for wind TRENDING ON power growth in Europe Expansion of wind power will be MHI Vestas a “golden opportunity” for Europe LIVE@ WEH 2018 in the coming decade, according to International Energy Agency executive director Fatih Birol. p2 Dutch deliver blade bond boost beats rivals Pontis Engineering has developed NORDEX REDUX: German a new technology to weld epoxy Put wind at heart manufacturer Nordex has rotor blades for wind turbines using of war on carbon secured a plum contract thermoplastic resin. The pre-fab units The European wind industry is calling to turbine with Vattenfall to supply include a sharp trailing edge that gives on policymakers across the continent 32 N117/3600 turbines a more compact connection, the Dutch to step up plans to decarbonise (pictured) for the 115MW company said. energy by placing wind at the heart of second phase of the electrification to 2050. p3 10MW tape Wieringermeer wind farm ExxonMobil oils wind wheels in the Netherlands. ExxonMobil has released guidance for THE INTERVIEW MHI Vestas has become the also help MHI Vestas meet The deal covers delivery turbine operators to reduce bearing first manufacturer to make a future order volumes. and installation, as well as failure and released a new lubricant double-digit-capacity offshore Type certification is a service agreement for “at specially made for the wind sector. The Today, Nordex chief sales officer Patxi wind turbine commercially expected in 2020 and the least two years”. guidelines include enhancing safety Landa Esparza. p4 available after unveiling its turbine will be available for Vattenfall subsidiary by extending service intervals and V164-10MW unit. commercial installations Nuon is implementing the finding the right protection for extreme The joint venture has starting in 2021. project. Constuction at conditions. immediately started a sales Minor mechanical and the Noord-Holland site is push and will now embark electrical upgrades and a small expected to start later this Nordex giant aces TUV SUD on prototype testing, likely design change to enhance year with commissioning tests to begin next year, head cooling of the converter due by end-2019. Nordex has received certification for of product development allowed the platform to reach Nuon ordered 50 N117s its N149/4.0-4.5 turbine platform from Henrik Bæk Jorgensen told the milestone. in late 2017 for the 180MW TUV SUD in line with international IEC reNEWS on the sidelines of the The “evolution rather than first phase. Construction and German DIBt standards. The N149 WindEnergy Hamburg 2018 revolution” from the previous preparations are underway. complies with design for IEC and type expo. company best of 9.5MW will Nordex chief sales test certificates for DIBt, Nordex said. Plans are already in place not “put our track record at officer Patxi Landa Esparza to deploy a pair of 10MW risk”, added Jorgensen. said: “The new contract… EWT enters Germany units each at two unnamed The V164-10MW can run highlights the mutual EWT of the Netherlands has entered “customer test sites”, for 25 years at a site with confidence that has grown the German market with installation Get ready to ride Jorgensen said. A further wind speeds of 10 metres between the Vattenfall and of a DW61-750kW turbine at a poultry the data tsunami machine will be installed at an per second and is suitable for Nordex teams over the last farm near Schoppingen. Output Ward Thomas, chief executive of onshore test site, he added. global markets, he said. few months.” is mainly for on-site consumption US software outfit Sentient Science, The beefed-up hardware Jorgensen indicated The full 295MW wind by customer Pohlkemper GbR helps WindEurope conference to features a new “stronger the platform can go even farm is expected to Hähnchenmast, which has high cooling explore theme of digital wind and new gearbox”, which will be higher in terms of capacity generate a total of around and heating requirements. Surplus technologies on day two. p5 delivered by a new, unnamed but declined to specify the 1.3 terawatt hours of green power will be fed into the grid. supplier. That company will potential range. electricity annually. Photo: Nordex Maximum transparency for wind turbines with PC-based Control Hall B6, booth 319 LiVE @ WINDENERGY HAMBURG 26 September 2018 02 Join the Global Wind Summit ‘Golden years’ for wind power growth in Europe Day 2 expo and conference highlights Expansion of wind power will be a “golden opportunity” Don’t cry for Argentina for Europe, according to The South American nation is in the midst of a renewables International Energy Agency boom on the back of commitments to meet 20% of its energy executive director Fatih Birol. mix from green sources by 2025. Check out this seminar The sector could be the to get the inside track on an upcoming tender round. Prior leading source of generation registration required. should ongoing cost Conference room Osaka, 09.30-12.20 reductions meet with the right government policies, he told First dates Hamburg a WindEnergy Hamburg 2018 Meet start-ups and established companies to talk new press conference on day one. products and business models at two speed dating sessions. “Right after 2030 wind CERTAINTY SWEET SPOT: Senior German industry figures Pre-registration required. will be the main source of at WindEurope 2018 called for policy certainty from Berlin to B7, Stand 490 11.00-12.00 & 14.00-15.00 electricity generation in reverse a market slowdown. Europe,” he predicted. Enercon managing director Hans-Dieter Kettwig Is bigger better? Elsewhere, China and India (pictured left) told delegates on the morning of day one that This WindEurope conference session will debate where will be major growth markets. policymakers must “learn from (recent) mistakes” when “not offshore turbines are heading in the next decade. Hear from According to IEA figures, completely clear political guidelines” caused job losses and executives from Senvion, LM Wind Power and others on the China will add generation other negative impacts. steps needed to produce next-generation hardware. capacity equivalent to current Eon chief executive Anja-Isabel Dotzenrath (second Room: Hamburg, 13.15-14.30 US levels by 2040 while India left) added that certainty is also required to unleash the “will add another Europe” in “enormous” repowering potential across Germany. Photo: reNEWS Squeezing the pips the same period. Experts discuss how to get the most from the wind resources Birol singled out offshore 200GW of offshore wind to be development in Asia as well at projects once they are built at this WindEurope conference wind and said Europe “can installed in European waters as North America, Birol said. session. Topics include wake effects, yaw strategies and lidar profit from a first-mover by 2040, delegates were told. Offshore wind will also “open operations. advantage”. The rapid expansion an excellent door” to green Room: Bilbao, 15.00-16.15 The IEA expects some in Europe can also spark hydrogen production. A turnkey solution provider for wind energy cable solutions Connecting wind Come and see us at energy from WindEnergy Hamburg end to end Location: Hamburg Messe und Congress Hall B6 – Stand 553 As a single-source, dedicated partner to major companies around Date: 25-28 September 2018 the world, Prysmian Group provides a single point of contact for all their needs for the most advanced offshore wind projects – from design, to manufacturing, WindEnergy installation and testing. Hamburg LiVE @ WINDENERGY HAMBURG 26 September 2018 03 Put wind at heart of war on carbon The European wind industry is is aligned with the EU’s double-digit reductions in Significant upgrades to power committed to by national calling on policymakers across commitments under the investment costs. grids will be needed as well as governments. the continent to step up plans Paris climate deal, outlines Onshore wind investment new infrastructure and use of The electrification to decarbonise energy by how the vast majority of new costs would average €1.1m technologies. strategy is underpinned by placing wind at the heart of generation, around 20GW per megawatt by 2050, a fall However, the cost is likely a significant hike in the use electrification to 2050. a year, could come from of 30% on today’s rates, while to be only marginally more of heat pumps domestically A new WindEurope report onshore and offshore wind. offshore wind costs would than current spending plans and commercially as well as published on day one of The suggested delivery plan decrease by 23% to around envisaged under long-term an increase in deployment of WindEnergy Hamburg 2018 could see the sector meet €2.2m/MW, the report said.