10 Year Parks & Recreation Master Plan

Total Page:16

File Type:pdf, Size:1020Kb

10 Year Parks & Recreation Master Plan 10 YEAR PARKS & RECREATION MASTER PLAN JANUARY 2020 Cover Image courtesy of Eric Barger 10 YEAR PARKS & RECREATION MASTER PLAN JANUARY 2020 ACKNOWLEDGMENTS Ron Woody, Roane County Executive Director Mike Beard, Roane County Parks and Recreation Director Timothy Neal, City of Kingston Mayor Mike “Brillo” Miller, City of Rockwood Mayor Special Thanks to the following for their efforts and contributions Chase Clem, Kingston Parks and Recreation Director Becky Ruppe, Rockwood City Administrator / Coordinator Amber Cofer, Roane County Executive Assistant Jamie Kinard, Roane County Grant Administrator Connie Cook, Roane County Director of Accounts and Budgets Carolyn Brewer, Director of Kingston Finance Department Pam May, President of The Roane Alliance 10 YEAR PARKS & RECREATION MASTER PLAN JANUARY 2020 PREPARED BY Table of Contents ACKNOWLEDGMENTS 1 INTRODUCTION 7 1.1 General Benefits of Parks and Recreation 1.2 Plan Origin and Planning Process 1.3 Parks and Recreation in Roane County 1.4 Other Planning Studies Consulted 2 EXECUTIVE SUMMARY 13 3 EXISTING CONDITIONS 19 3.1 Demographics 3.1.1 Population Health Data 3.1.2 Roane County 3.1.3 Kingston 3.1.4 Rockwood 3.2 Regional Context 3.3 Existing Park and Recreation Facilities 3.3.1 Roane County Park 3.3.2 Kingston Parks 3.3.3 Rockwood Parks 3.3.4 Blueways, Greenways, and Trails TN RiverLine 652 Oak Ridge Natural Asset Plan Caney Creek Recreation Area 3.4 Programs and Community Events 3.4.1Recreational Programs 3.4.2Community Events 3.5 Administration, Budgeting and Management 3.5.1 Roane County 3.5.2 Region-Wide Budget 4 PUBLIC INPUT 59 4.1 Citizen Survey Results 4.2 Community Meeting Feedback 4.3 Draft Plan Meeting Feedback 5 NEEDS ASSESSMENT 67 5.1 Existing Conditions Assessment 5.1.1 Roane County Roane County Park Riley Creek Campground Swan Pond Sports Complex Emory Gap Park Caney Creek Boat Access Area 5.1.2 Kingston 58 Landing and Fort Paws Dog Park Alton Byrd Park Downtown Dock Fort Southwest Point Park Gertrude Porter Park Gravel Pit Park Kingston City Park Kingston Community Center Ladd Park Lakewood Park 5.1.3 Rockwood Brickyard Springs Park and J.B. Olinger Park Dr Tom Fuller Memorial Park Mike Brillo Miller Sports Complex Rockwood Tennis and Basketball Rockwood Community Center 5.2 National Metrics 5.3 Community Comparison 5.3.1 Roane County 5.3.2 Cities of Kingston and Rockwood 5.4 Public Input Priorities 5.5 Prioritization of Needs 5.5.1 Primary Health Priorities 5.5.2 Health Priority Matrix 5.5.3 Roane County Parks 6 CONCEPT PLANS 109 7 5-YEAR BUDGET PLAN 149 7.1 Roane County 7.2 Kingston 7.3 Rockwood 8 RECOMMENDATIONS 155 8.1 Existing and Future Facilities 8.2 Programming, Organizational, and O&M 9 SOURCES 161 APPENDICES (AVAILABLE UPON REQUEST) APPENDIX A: PARKS AND RECREATION BUDGETS APPENDIX B: ROANE County PARKS AND RECREATION SURVEY APPENDIX C: NOTIFICATIONS AND SIGN IN SHEETS APPENDIX D: HEALTH DESIGN ASSESSMENT REPORT APPENDIX E: ON-SITE CHECKLISTS AND ARCHITECTURAL EVALUATION Image Courtesy of The Roane Alliance 6 INTRODUCTION ROANE COUNTY 10-YEAR PARKS AND RECREATION MASTER PLAN | JANUARY 2020 Introduction ROANE COUNTY 10-YEAR PARKS AND RECREATION MASTER PLAN | JANUARY 2020 INTRODUCTION 7 1 Introduction 1.1 GENERAL BENEFITS OF PARKS AND Health Institute, Roane County ranks 28th among Tennessee’s RECREATION 95 counties for health factors. With these statistics in mind, planning for parks and recreation may be particularly Parks play an important role in any community. They serve important to promoting healthy lifestyles in Roane County. as places to gather, relax, compete, play, stroll, and learn. Research shows that contact with the natural world improves 1.2 PLAN ORIGIN AND PLANNING PROCESS physical and psychological health. Additionally, physical In 2018, Roane County was awarded a Tennessee exercise has been proven to increase health and reduce Department of Health Grant. The purpose of the grant is to the risk of diseases. Physical activity also relieves anxiety, award funding to communities to plan, develop, and assess improves mood, and enhances psychological well-being. sustainable projects and programs to increase access to safe and publicly—accessible opportunities for physical activity Evidence indicates when people have access to parks, they for a diverse group of users, including those who live, visit, exercise more. Without accessible parks and open space, work, play, worship and learn in the community. The County people are less likely to exercise regularly. City, suburb, and received the grant for a trail master plan. About the same county residents should be provided park space close to time, IBI Placemaking also initiated conversations with the home. As baby boomers grow into retirement years and the County relative to a County wide parks and recreation 10-year life expectancy of all generations continues to increase, the Master Plan. need for parks and recreation space that meets the needs of seniors will increase. As development continues to sprawl IBI Placemaking was on a team of professional consultants throughout the countryside, the preservation of natural areas that had completed seven city, County, and city/County will be more and more important. partnership parks and recreation plans in 2018. The seven local governments or partnerships were located According to the Tennessee Department of Health, Tennessee in distressed counties that received funding through the ranks 42nd among the 50 states in overall health, as reported Tennessee Department of Environment and Conversation by America’s Health Rankings. According to the Population (TDEC). The state created the new grant program specifically to assist distressed or “Tier 4” counties with the department’s requirement that local governments undertake a planning process in order to receive grant funding through various grant programs available for parks, trails, and greenways. Roane County invited IBI Placemaking to submit proposals for both a County wide trails and Just as water, sewer, and public safety are considered “ Greenways Master Plan funded by TDH, and a County Wide essential public services, parks are vitally important 10 Year Parks and Recreation Master plan funded by the to establishing and maintaining the quality of life in a Counties General Funds. community, ensuring the health of families and youth, and contributing to economic and environmental well-being of Consequently, the County signed a contract with the team of IBI Placemaking , assisted by Brown, Pearman, Russell a community and region. LLC—a Knoxville based planning firm, and MBI Companies, Inc—a Knoxville architectural firm to complete a 10 Year Parks There are no communities that pride themselves on their and Recreation Master Plan in January 2019 for $45,000. quality of life, promote themselves as a desirable location In April of 2019, the County contracted with IBI Placemaking for businesses to relocate, or maintain that they are to provide services in the amount of $31,500 for completion of a trails and Greenways Master Plan. In the weeks that environmental stewards of their natural resources, without followed, and in accordance with the constructing parameters such communities having a robust, active system of parks suggested by TDEC, the County invited each city within and recreation programs for public use and enjoyment. Roane County to participate in the planning process for an additional $5,000 per city. Both the City of Kingston and the - National Recreation and Park Association, Why Parks and Recreation are Essential City of Rockwood made the decision to participate. Public Services 8 INTRODUCTION ROANE COUNTY 10-YEAR PARKS AND RECREATION MASTER PLAN | JANUARY 2020 Roane County is not a distressed County according to • Gathered public input on parks and recreational needs the State’s Department of Economic and Community through public opinion surveys, public meetings, and Development’s guidelines, and therefore was not eligible interviews. to participate in TDEC’s 2017 funding round for Parks and • Prepared recommendations for refurbishment and expansion Recreation Master Plan Grants. However, to ensure that of existing facilities, as well as for new facilities and programs. County and Cities in the County would continue benefiting • Prepared recommendations for capital improvements for the from the State’s other available grants, the County decided short term (1-2 years), mid-term (3-5 years), and long term to follow the same planning process guidelines managed (6-10 years). by the state’s 2017 Parks and Recreation Master Plan Grant Project Manual. 1.3 PARKS AND RECREATION IN ROANE COUNTY The planning process began on March 21, 2019 with a kick-off meeting held with County officials at The Cottage Roane County in Roane County Park. Over the following months, site visits Roane County’s area is 395 square miles, of which 34 square were conducted to document existing conditions at all the miles or 8.7% is covered by water. The latest population existing park and recreation facilities within Roane County. estimate as of 2018, is 53,140. Three rivers, The Tennessee, The preparation of the Master Plan utilized an open planning the Clinch, and the Emory River pass through the County. The process to gain public input and consensus on the results. three rivers are mostly impounded by the Watts Bar Dam which Surveys were developed to gather community input on created Watts Bar Lake, the most predominate recreation existing facilities and priorities for future improvements and resource in the County. Six percent of the Tennessee River new developments. The surveys were distributed in paper is in Roane County. Roane County straddles the geographic format at various public locations, such as the Roane County boundary between the Tennessee Valley and the Cumberland Courthouse, and the City Halls. They could also be filled out Plateau and is centrally located within the Valley.
Recommended publications
  • The John Muir Newsletter, Winter 2010/2011
    University of the Pacific Scholarly Commons John Muir Newsletters John Muir Papers Winter 12-1-2010 The ohnJ Muir Newsletter, Winter 2010/2011 The ohnJ Muir Center Follow this and additional works at: https://scholarlycommons.pacific.edu/jmn Part of the American Studies Commons, Natural Resources and Conservation Commons, and the United States History Commons Recommended Citation The oJ hn Muir Center, "The oJ hn Muir Newsletter, Winter 2010/2011" (2010). John Muir Newsletters. 91. https://scholarlycommons.pacific.edu/jmn/91 This Newsletter is brought to you for free and open access by the John Muir Papers at Scholarly Commons. It has been accepted for inclusion in John Muir Newsletters by an authorized administrator of Scholarly Commons. For more information, please contact [email protected]. Winter 2010/2011 J 0 H N M U I R CENTER SPECIAL JOHN MUIR'S POINTS OF CROSSING OF THE CUMBERLAND INTEREST: By Dan Styer John Muir - who records the intertwined feelings of ecstasy Muir encountered Oberlin College, would later ac­ ("miles and miles of beauty") and of despair ("I mountains for the Oberlin, Ohio quire the nick­ hardly dare to think of home and friends") fa­ first time in his life name John miliar to many long-distance solitary wilderness at the age of o'Mountains - encountered mountains for the travelers.6 twenty-nine years. first time in his life at the age of twenty-nine These three days also held superlative en­ years, on Muir's crossing of ~===-====:--::---==-~==---, counters with nature: On September 10, September Muir "began the ascent of the Cumber- the Cumberland provided some of 10, 11,and land Mountains, the first real mountains the best human 12, 1867, that my foot ever touched or eyes be- stories found in A when he held ..
    [Show full text]
  • Where to Go Camping Guidebook
    2010 Greater Alabama Council Where to Go Camp ing Guidebook Published by the COOSA LODGE WHERE TO GO CAMPING GUIDE Table of Contents In Council Camps 2 High Adventure Bases 4 Alabama State Parks 7 Georgia State Parks 15 Mississippi State Parks 18 Tennessee State Parks 26 Wildlife Refuge 40 Points of Interest 40 Wetlands 41 Places to Hike 42 Sites to See 43 Maps 44 Order of the Arrow 44 Future/ Wiki 46 Boy Scouts Camps Council Camps CAMPSITES Each Campsite is equipped with a flagpole, trashcan, faucet, and latrine (Except Eagle and Mountain Goat) with washbasin. On the side of the latrine is a bulletin board that the troop can use to post assignments, notices, and duty rosters. Camp Comer has two air-conditioned shower and restroom facilities for camp-wide use. Patrol sites are pre-established in each campsite. Most campsites have some Adarondaks that sleep four and tents on platforms that sleep two. Some sites may be occupied by more than one troop. Troops are encouraged to construct gateways to their campsites. The Hawk Campsite is a HANDICAPPED ONLY site, if you do not have a scout or leader that is handicapped that site will not be available. There are four troop / campsites; each campsite has a latrine, picnic table and fire ring. Water may be obtained at spigots near the pavilion. Garbage is disposed of at the Tannehill trash dumpster. Each unit is responsible for providing its trash bags and taking garbage to the trash dumpster. The campsites have a number and a name. Make reservations at a Greater Alabama Council Service Center; be sure to specify the campsite or sites desired.
    [Show full text]
  • Tennessee Reference Stream Morphology and Large Woody Debris Assessment
    Tennessee Reference Stream Morphology and Large Woody Debris Assessment Report and Guidebook Prepared for: Tennessee Department of Environment and Conservation Prepared by: Jennings Environmental, LLC December 2017 EXECUTIVE SUMMARY This report includes reference stream morphology and large woody debris data collected throughout Tennessee in 2015-2017. Hydraulic geometry data are presented as regional curves for Ecoregions 66, 67, 68/69, 71, and 65/74 to support stream assessment and restoration planning. Morphology relationships describe bankfull channel dimensions, pattern, and profile measurements in relation to channel-forming discharge and watershed drainage area. Large woody debris (LWD) data collected at reference streams serve as an indicator of natural stream conditions in forested floodplains. These databases and relationships are valuable for assessing disturbed streams to evaluate degree of departure from equilibrium, selecting and planning restoration projects to improve natural stream functions, and monitoring changes in stream conditions in undisturbed and restored stream systems. These databases should be supplemented with additional information collected during site assessment and restoration planning to improve understanding of local stream conditions throughout Tennessee. The morphology data collection included 114 undisturbed streams ranging in width from 3 to 132 feet with watershed drainage areas ranging from 0.02 to 117 square miles. Wherever available, United States Geological Survey (USGS) gage station sites were surveyed to provide long-term hydrologic information close to the reference stream. Bankfull stage indicators at a USGS gage provided the opportunity to quantify the channel-forming discharge and exceedance probability of this flow event. For reference streams with no gages, natural equilibrium stream segments with clearly identifiable incipient-floodplain bankfull stage indicators were surveyed to determine morphology parameters.
    [Show full text]
  • State Natural Area Management Plan
    OLD FOREST STATE NATURAL AREA MANAGEMENT PLAN STATE OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION NATURAL AREAS PROGRAM APRIL 2015 Prepared by: Allan J. Trently West Tennessee Stewardship Ecologist Natural Areas Program Division of Natural Areas Tennessee Department of Environment and Conservation William R. Snodgrass Tennessee Tower 312 Rosa L. Parks Avenue, 2nd Floor Nashville, TN 37243 TABLE OF CONTENTS I INTRODUCTION ....................................................................................................... 1 A. Guiding Principles .................................................................................................. 1 B. Significance............................................................................................................. 1 C. Management Authority ........................................................................................... 2 II DESCRIPTION ........................................................................................................... 3 A. Statutes, Rules, and Regulations ............................................................................. 3 B. Project History Summary ........................................................................................ 3 C. Natural Resource Assessment ................................................................................. 3 1. Description of the Area ....................................................................... 3 2. Description of Threats .......................................................................
    [Show full text]
  • TCWP Newsletter No
    ISSN 1089-6104 Newsletter No. 291 May 16, 2010 T aking C are of W ild P laces BREAKING NEWS on p. 12 1. Obed and Big South Fork watersheds . p. 3 A. TCWP buys Obed tract to protect it The BIG stories B. Decisions still pending on landfill in BSF watershed C. Measuring water quantity and quality in the Obed System TCWP buys Obed tract to protect it …..……….. ¶1A 2. Frozen Head; Cumberlands . p. 3 A. More land added to park C. Wild pigs at Frozen Head Acreage to be added B. Frozen Head BioBlitz continues D. Alliance for the Cumberlands to Frozen Head ……….. ¶2A 3. The Tennessee legislature: mostly bad news. p. 4 Mostly bad news from A. Land-acquisition funds removed from Governor’s budget State legislature ……...... ¶3 B. Parliamentary ploy kills mountain-top-removal bill C. ATV bills: one postponed, one passes D. Bottle Bill “taken off notice” EPA strong on proposed E. Resolution for Lighthouse Lodge at Norris S.P. is approved MTR regulation ….... ¶5A, B F. Some other bills Senate climate bill 4. Other State news . p. 6 needs strengthening…. ¶7A A. Addition to Cumberland Trail State Park B. Tennessee’s watersheds C. Civil War parks in Tennessee Bill to make CWA work again ...………….. ¶7B 5. Federal regulation of coal-power-related evils . p. 6 A. EPA-proposed guidance on Mountain-Top Removal B. EPA proposes to veto largest MTR mine; our support urgently needed C. EPA proposes two strategies for regulation of coal ash; one is too weak 6. Cherokee NF; Appalachian Trail .
    [Show full text]
  • Fossil Fuels and Water Quality 75
    Chapter 4 Lucy Allen, Michael J. Cohen, David Abelson, and Bart Miller Fossil fuels are essential to the global economy—for electricity production, transporta- tion, plastics and chemicals manufacturing, heating, and many other purposes. How- ever,Fossil the extraction Fuels and processing and of fossil Water fuels, in addition Quality to their use, have profound impacts on the environment and natural resources, including water. Large oil spills— such as the recent Deepwater Horizon drilling rig spill, which leaked over 4.9 million barrels (780,000 cubic meters) of crude oil into the Gulf of Mexico—have focused atten- tion on the potential for disasters associated with oil drilling to cause contamination of the natural environment (Lubchenco et al. 2010). The growing recognition of the seri- ous risks to surface-water and groundwater quality from natural gas fracking operations also raises new questions. And even normal fossil-fuel extraction and refining processes pollute the environment. The connections between water and energy have been studied in recent years, with growing recognition of how closely the two are linked. Water is used, in varying quanti- ties and ways, in every step of fossil-fuel extraction and processing (Ptacek et al. 2004). For example, the amount of coal produced worldwide in 2009 required an estimated 1.3 to 4.5 billion cubic meters (m3) of water for extraction and processing.1 Oil refining requires approximately 4 to 8 million m3 of water daily in the United States alone (the amount of water that two to three million U.S. households use daily) (US DOE 2006).
    [Show full text]
  • TNPS, Vol 42, Num 2
    NEWSLETTER OF THE TENNESSEE NATIVE PLANT SOCIETY Volume 42, Number 2 June 2018 Annual Meeting Highlight Hike In Search of the Hog Plum Chestnut Top Trail Cumberland County March 31, 2018 May 5, 2018 his year was the earliest in the year the annual meeting has n Saturday, May 5 TNPS and TCWP co- been held. And this year the spring flowering time was sponsored an outing to search for the hog T stretched out, with early spring ephemerals like Blood- Oplum (Prunus umbellata) along a new root and Trout Lilies flowering in early March while late flowers section of the Cumberland Trail. Larry Pounds not finished until early May. Many led us on our adventure of the plants on the Chestnut Top which included parts of Trail were just emerging from the the Keyes-Harrison and ground and were not yet flower- Catoosa Wildlife Man- ing, although most were recogniz- agement Areas. Partic- able from the foliage. We did find ipants included seven sweet white trillium (T. simile), humans and one dog, yellow trillium (T. luteum), long- all clad in blaze orange spured violet (Viola rostrata), star since the spring hunt- chickweed (Stellata pubera), and ing season was still ac- bishop’s cap (Mitella diphylla) all tive on at least one of the beginning to flower. The flowers WMAs. Throughout our of bloodroot on the lower part of ramblings we saw abun- the trail were gone as expected, dant upland irises (Iris but as we ascended on up the trail verna) and chinquapins we found bloodroot still in flow- (Castanea pumila); un- er.
    [Show full text]
  • Take It to the Bank: Tennessee Bank Fishing Opportunities Was Licenses and Regulations
    Illustrations by Duane Raver/USFWS Tennessee Wildlife Resources Agency ke2it2to2the2nkke2it2to2the2nk TennesseeTennessee bankbank fishingfishing opportunitiesopportunities Inside this guide Go fish!.......................................................................................1 Additional fishing opportunities and information..........6 Take it to the Bank: Tennessee Bank Fishing Opportunities was Licenses and regulations........................................................1 Additional contact agencies and facilities.....................6 produced by the Tennessee Wildlife Resources Agency and Tennes- Bank fishing tips........................................................................2 Water release schedules..........................................................6 see Technological University’s Center for the Management, Utilization Black bass..................................................................................2 Fishing-related Web sites.................................................... ....6 and Protection of Water Resources under project 7304. Development Sunfish (bream).........................................................................2 How to read the access tables.................................................7 of this guide was financed in part by funds from the Federal Aid in Sportfish Restoration Crappie..................................................................3 Access table key........................................................................7 (Public Law 91-503) as documented
    [Show full text]
  • Inventory of Radionuclides in Bottom Sediment of the Clinch River Eastern Tennessee
    Inventory of Radionuclides in Bottom Sediment of the Clinch River Eastern Tennessee GEOLOGICAL SURVEY PROFESSIONAL PAPER 433-1 Prepared in cooperation with the U.S. Atomic Energy Commission and the Oak Ridge National Laboratory Inventory of Radionuclides in Bottom Sediment of the Clinch River Eastern Tennessee By P. H. CARRIGAN, JR. TRANSPORT OF RADIONUCLIDES BY STREAMS GEOLOGICAL SURVEY PROFESSIONAL PAPER 433-1 Prepared in cooperation with the U.S. Atomic Energy Commission and the Oak Ridge National Laboratory UNITED STATES GOVERNMENT PRINTING OFFICE, WASHINGTON : 1969 UNITED STATES DEPARTMENT OF THE INTERIOR WALTER J. HICKEL, Secretary GEOLOGICAL SURVEY William T. Pecora, Director For sale by the Superintendent of Documents, U.S. Government Printing Office Washington, D.C. 20402 - Price 35 cents (paper cover) CONTENTS Abstract _ _ ________________ II Results continued Introduction. _______________ 1 Retention factors.______________________________ 112 Acknowledgments___ _______ 3 Distribution of radionuclides_____________________ 13 Coring procedures and results.. 4 Longitudinal distribution.___________________ 13 Selection of sampling sites. 4 Vertical distribution_______________________ 14 Coring tools____________ 5 Contribution to inventory from reaches outside of Results of coring. ________ 5 study reach__________________________________ 14 Core processing_____________ 7 Distribution of sediment..-_______________________ 15 Computation of inventory. 9 Physical properties____________________________ 16 Results. _____________________
    [Show full text]
  • Outstandingly Remarkable Values, Obed Wild and Scenic River
    National Park Service OBED WILD AND SCENIC RIVER U.S. Department of the Interior TENNESSEE OUtstANDINGLY REMARKABLE VALUES Dear Friends of the Obed Wild and Scenic River, What comes to mind when you think about the Obed Wild and Scenic River? A wild river and its tributaries flowing through a rugged landscape of spectacular gorges? The thrill of a demanding whitewater boating experience? A family-friendly place to explore the magnificent scenery of the Cumberland Plateau? A place that compels us to learn about the abundant diversity of a fragile ecosystem or to better understand the history of those who thrived on this land before us? The Obed Wild and Scenic River is all of this, and much more. To help us protect this river system for the benefit and enjoyment of future generations, we have contemplated this very question to determine what makes it truly outstandingly remarkable. Based on the hard work of my staff and others within the National Park Service, I am pleased to present to you the outstandingly remarkable values of the Obed Wild and Scenic River. The statements that follow have been developed to provide a strong foundation for the future management and protection of this nationally significant river system—to help us focus our daily attention on the river’s most important aspects. I urge you to read these statements and to share your thoughts with us about what makes the Obed so outstandingly remarkable to you. Thank you for sharing your passion for the Obed Wild and Scenic River by helping to shape its future.
    [Show full text]
  • The Development of Education in Roane County, Tennessee
    University of Tennessee, Knoxville TRACE: Tennessee Research and Creative Exchange Masters Theses Graduate School 8-1958 The Development of Education in Roane County, Tennessee Robert Audubon Ladd University of Tennessee - Knoxville Follow this and additional works at: https://trace.tennessee.edu/utk_gradthes Part of the Educational Administration and Supervision Commons Recommended Citation Ladd, Robert Audubon, "The Development of Education in Roane County, Tennessee. " Master's Thesis, University of Tennessee, 1958. https://trace.tennessee.edu/utk_gradthes/3077 This Thesis is brought to you for free and open access by the Graduate School at TRACE: Tennessee Research and Creative Exchange. It has been accepted for inclusion in Masters Theses by an authorized administrator of TRACE: Tennessee Research and Creative Exchange. For more information, please contact [email protected]. To the Graduate Council: I am submitting herewith a thesis written by Robert Audubon Ladd entitled "The Development of Education in Roane County, Tennessee." I have examined the final electronic copy of this thesis for form and content and recommend that it be accepted in partial fulfillment of the requirements for the degree of Master of Science, with a major in Educational Administration. Orin B. Graff, Major Professor We have read this thesis and recommend its acceptance: ARRAY(0x7f6fff323d18) Accepted for the Council: Carolyn R. Hodges Vice Provost and Dean of the Graduate School (Original signatures are on file with official studentecor r ds.) July 31, 1958 To the Graduate Council: I am submitting herewith a the-sis written by Robert Audubon Ladd entitled "The Development of Education in Roane County, Tennessee." I recommend that it be accepted for nine quarter hours of credit in partial fulfillment of the rewl.irements for the degree of Master of Science, with a major in Educational Aillninistration and Supervision.
    [Show full text]
  • Environmental Report This Subsection Contains Information Withheld Under 10 CFR 2.390(A)(3)
    Clinch River Nuclear Site Early Site Permit Application Part 3, Environmental Report This Subsection contains information withheld under 10 CFR 2.390(a)(3) 2.5.3 Historic Properties This section of the Environmental Report (ER) focuses on a description of the existing archaeological resources and historic properties on and immediately adjacent to the Clinch River Property (Figure 2.5.3-1) and the Melton Hill Dam as well as the historic properties within a 10-mile (mi) radius of the center of the Clinch River Nuclear (CRN) Site (Figure 2.5.3-2). The 10-mi radius includes portions of Anderson, Knox, Loudon, Roane, and Morgan Counties as shown on Figure 2.5.3-2. As defined by Title 36 of the Code of Federal Regulations (36 CFR) 800.16 (I)(1), historic properties are those properties deemed eligible for listing or that are already listed on the National Register of Historic Places (NRHP). As a federal project requesting a permit from a federal agency, the Clinch River (CR) Small Modular Reactor (SMR) Project is subject to review and consultation under Section 106 of the National Historic Preservation Act (16 U.S. Code [USC] § 470 et seq.) and its implementing regulations 36 CFR Part 800. Additionally the CR SMR Project is subject to the Native American Graves Protection and Repatriation Act (25 USC 3001 et seq.), the Archaeological Resources Protection Act (16 USC 470aa-mm), the American Indian Religious Freedom Act (42 USC 1996), and the Archaeological and Historic Preservation Act (16 USC 469). A total of 59 recorded archaeological sites, four isolated finds (IF-1 [2015], IF-1 [2011], IF-2, IF-3), one non-site locality (NS-1), and one cemetery have been identified within or immediately adjacent to the approximately 1305-acre (ac) CR SMR Project archaeological Area of Potential Effect (CR SMR Project archaeological APE).
    [Show full text]