A Methodology for Minimizing the Oscillations in Supply Chains Using System Dynamics and Genetic Algorithms

Total Page:16

File Type:pdf, Size:1020Kb

A Methodology for Minimizing the Oscillations in Supply Chains Using System Dynamics and Genetic Algorithms University of Central Florida STARS Electronic Theses and Dissertations, 2004-2019 2005 A Methodology For Minimizing The Oscillations In Supply Chains Using System Dynamics And Genetic Algorithms Ramamoorthy C.V.V. Lakkoju University of Central Florida Part of the Engineering Commons Find similar works at: https://stars.library.ucf.edu/etd University of Central Florida Libraries http://library.ucf.edu This Masters Thesis (Open Access) is brought to you for free and open access by STARS. It has been accepted for inclusion in Electronic Theses and Dissertations, 2004-2019 by an authorized administrator of STARS. For more information, please contact [email protected]. STARS Citation Lakkoju, Ramamoorthy C.V.V., "A Methodology For Minimizing The Oscillations In Supply Chains Using System Dynamics And Genetic Algorithms" (2005). Electronic Theses and Dissertations, 2004-2019. 463. https://stars.library.ucf.edu/etd/463 A METHODOLOGY FOR MINIMIZING THE OSCILLATIONS IN SUPPLY CHAINS USING SYSTEM DYNAMICS AND GENETIC ALGORITHMS By RAMAMOORTHY C.V.V. LAKKOJU B.Tech., S.V.U.C.E., Tirupati, India, 2002 A thesis submitted in partial fulfillment of the requirements for the degree of Master of Science in the Department of Industrial Engineering and Management Systems in the College of Engineering and Computer Science at the University of Central Florida Orlando, Florida Summer 2005 ABSTRACT Supply Chain Management (SCM) is a critically significant strategy that enterprises depend on to meet challenges that they face because of highly competitive and dynamic business environments of today. Supply chain management involves the entire network of processes from procurement of raw materials/services/technologies to manufacturing or servicing intermediate products/services to converting them into final products or services and then distributing and retailing them till they reach final customers. A supply chain network by nature is a large and complex, engineering and management system. Oscillations occurring in a supply chain because of internal and/or external influences and measures to be taken to mitigate/minimize those oscillations are a core concern in managing the supply chain and driving an organization towards a competitive advantage. The objective of this thesis is to develop a methodology to minimize the oscillations occurring in a supply chain by making use of the techniques of System Dynamics (SD) and Genetic Algorithms (GAs). System dynamics is a very efficient tool to model large and complex systems in order to understand their complex, non-linear dynamic behavior. GAs are stochastic search algorithms, based on the mechanics of natural selection and natural genetics, used to search complex and non-linear search spaces where traditional techniques may be unsuitable. ii ACKNOWLEDGEMENTS This thesis was made possible with the help, cooperation and contribution of many people and I wish to wholeheartedly thank them all very much. First and foremost, I wish to thank and express my utmost gratitude to my advisor, Dr. Luis Rabelo, for his invaluable guidance, support and encouragement through out this research work. This thesis would not have been possible without the efforts and guidance of my advisor. I wish to deeply thank my family, which has been highly instrumental in whatever I have accomplished till today. I deeply thank all my friends for all their support, encouragement and good wishes wherever I go. I thank my best friend Deepak for all his help and support with the C++ programming. Also, I would like to thank my friends Ashish and Hamid for their help in getting me started with Vensim modeling and Genetic Algorithms respectively. Finally, I would like to thank all other UCF staff and faculties who helped me in various ways throughout the duration of my studies. iii TABLE OF CONTENTS CHAPTER 1: INTRODUCTION....................................................................................... 1 1.1 Supply Chain Management....................................................................................... 1 1.2 System Dynamics...................................................................................................... 3 1.3 Genetic Algorithms................................................................................................... 4 1.4 Uniqueness and Contribution of this Thesis ............................................................. 5 1.5 Thesis Outline ........................................................................................................... 6 CHAPTER 2: LITERATURE REVIEW............................................................................ 7 2.1 Supply Chain Management....................................................................................... 8 2.2 System Dynamics and its applications in Supply Chain Management................... 14 2.3 Genetic Algorithms................................................................................................. 17 2.3.1 Working Principle of Genetic Algorithms....................................................... 18 2.3.2. Genetic Operators ........................................................................................... 22 2.3.3. Differences between GAs and other traditional optimization techniques ...... 24 2.4 Genetic Algorithms and their applications in Supply Chain Management............. 25 2.5 Summary................................................................................................................. 28 CHAPTER 3: SUPPLY CHAIN MODEL DESCRIPTION ............................................ 30 3.1 Modeling in System Dynamics............................................................................... 31 3.2 System Dynamics Model of LSMC’s Supply Chain .............................................. 33 3.2.1 Reference Modes for LSMC Supply Chain Modeling .................................... 35 3.2.2 Causal Loop Diagrams..................................................................................... 37 3.2.3 Stocks and Flows Diagram of LSMC Supply Chain ....................................... 44 3.3 Model Validation .................................................................................................... 50 iv 3.4 Important Observations about LSMC Supply Chain.............................................. 52 3.5 Summary................................................................................................................. 53 CHAPTER 4: OPTIMIZATION MODULE DEVELOPMENT...................................... 54 4.1 Optimization Criteria for the problems in LSMC Supply Chain............................ 54 4.2 Development of Real-Coded Genetic Algorithm ................................................... 55 4.2.1. Working Procedure of the RCGA................................................................... 57 4.2.2. Genetic Operators Used in the RCGA............................................................ 61 4.3 The C++ Program for RCGA and its Integration with Vensim System Dynamics Model ............................................................................................................................ 64 4.3.1. Running the Algorithm ................................................................................... 66 4.4 Results and Analysis for LSMC Model.................................................................. 69 CHAPTER 5: CONCLUSION ......................................................................................... 72 5.1 Conclusion .............................................................................................................. 72 5.2 Contribution of the Thesis ...................................................................................... 72 5.3 Scope of the Thesis ................................................................................................. 73 5.4 Ideas for Potential Future Work.............................................................................. 73 REFERENCES ................................................................................................................. 75 v LIST OF FIGURES Figure 3.1 Causal loop diagrams ...................................................................................... 32 Figure 3.2 Stocks and flows in system dynamics ............................................................. 33 Figure 3.3 Increase in production will result in increase in demand ................................ 37 Figure 3.4 More market share, more expansion for LSMC.............................................. 38 Figure 3.5 Increase in profit increases competition, and decrease in profit decreases competition ............................................................................................................... 38 Figure 3.6 Growth of LSMC............................................................................................. 39 Figure 3.8 Impact of competition on LSMC market share............................................... 41 Figure 3.9 Causal loop diagram of LSMC’s SC categorized in managerial action areas. 43 Figure 3.10 Production Model (Reference-Lertpattarapong, 2002) ................................. 45 Figure 3.11 Table for Order Fulfillment........................................................................... 46 Figure 3.12 Inventory, Backlog and Shipping sub-model (Lertpattarapong, 2000)......... 47 Figure 3.13 Market Share sub-model (Lertpattarapong, 2000) ........................................ 48 Figure 3.14 Shipment Model (Lertpattarapong, 2000)
Recommended publications
  • Line Management Factsheet
    Line Management Factsheet 1. Introduction Research has shown that front line managers are critical to the success of any business because they have a considerable influence on the behaviour of employees and their overall attitude towards the organisation. Therefore it is essential that line managers are: • Recruited and selected to ensure they have the right skills and qualities to motivate employees and deal with difficult situations • Trained so that they can carry out their duties effectively and also develop their own careers • Given a balanced workload that allows the necessary time to focus on performance management • Coached by senior managers so that they can develop their management skills, play an active role in decision making and discuss any problems they may be facing 2. What is a line manager? Line managers are known by a number of different names: • manager • supervisor • team leader • project leader Line managers have responsibility for managing individual employees or teams. The line managers, in turn, then report to a higher level of management on the performance and well-being of the employees or teams they manage. Line managers tend to perform the same tasks as their teams or have recent experience of the work. The terms ‘line-manager’ and ‘front-line manager’ are sometimes used interchangeably, however, ‘front-line manager’ tends to be more specific and normally refers to line managers in the lower layers of the management hierarchy (for example, team leader, supervisor roles). This means that front- line managers only manage employees who have no supervisory responsibilities, and not other managers. The number of employees that a line manager is responsible for can vary from one or two in smaller organisations, up to as many as 30 in a larger business.
    [Show full text]
  • The Devsecops Product Line Management Playbook
    THE DEVSECOPS PRODUCT LINE MANAGEMENT PLAYBOOK Version 2.0 May 2021 Executive Summary and Approval The DevSecOps Product Line Management (PLM) Playbook details how the Office of Information and Technology (OIT), Development, Security, and Operations (DSO) leadership expects Product Lines to implement Lean-Agile and DevSecOps practices while moving from a project centric to a product centric focus. As the Department of Veterans Affairs (VA) continually strives to improve project and product management effectiveness and efficiency, VA welcomes any insight that users can provide. Users should send their comments and suggestions for improvements to the PLM Playbook to the Agile Center of Excellence (ACOE), [email protected] for review and consideration. The PLM Playbook applies to all IT products aligned to Product Lines in the Software Product Management, Infrastructure Operations, and Product Engineering groups within the DevSecOps organization. Others outside of DevSecOps may use the Playbook for situational awareness as needed. The DevSecOps PLM Playbook 2.0 is approved by: X Daniel McCune Executive Director, Software Product Manag... X Reginald Cummings Executive Director, Infrastructure Operations X Drew Myklegard Executive Director, Product Engineering i Revision History Version Date Description 1.0 July, 2020 First Issuance 2.0 May 2021 Added PLM Maturity Level 2 Table of Contents Product Line Management Playbook Overview ...................................................................... 1 Introduction ........................................................................................................................
    [Show full text]
  • The Effective HR Business Partner
    research CORPORATE RESEARCH FORUM November 2009 The Effective HR Business Partner Andrew Lambert “There’s not much difference between an HR BP and an HR generalist. The title isn’t important. What matters is their attitude and interest in the business – and being able to use HR expertise to shape advice for that business.” Celia Baxter, Group HR Director, Bunzl. “ ” CORPORATE RESEARCH FORUM All rights reserved. The Effective HR Business Partner No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means without prior permission in writing of the publisher. Corporate Research Forum One Heddon Street Mayfair London W1B 4BD United Kingdom ISBN: 978-0-9553273-8-4 research CORPORATE RESEARCH FORUM November 2009 The Effective HR Business Partner Andrew Lambert Report sponsored by AdviserPlus and Sheppard Moscow 1 research CORPORATE RESEARCH FORUM CONTENTS Contents Acknowledgements 4 Executive Summary 5 1 Changing context of business partnering 7 1.1 The struggle of business partnering 1.2 A different business context 1.3 The world and organisations are different places 1.4 Three imperatives – talent, performance and change 1.5 The core concern 2 Business partner issues 10 2.1 What customers want from HR BPs 2.2 Manager and HRD concerns 2.3 Underlying causes of problems 2.4 Business partner terminology 3 Roles and structure of HR BPs 14 3.1 The core purpose of BPs 3.2 BP structures and segmentation 3.3 To whom do HR BPs report? 3.4 How strategic or operational? 3.5 Effects of technology
    [Show full text]
  • Earned Value Management (EVM) System Description
    NASA/SP-2019-3704 Earned Value Management (EVM) System Description National Aeronautics and Space Administration November 1, 2019 Electronic copies are available from: NASA STI Program: https://wwww.sti.nasa.gov NASA STI Information Desk: [email protected]/ (757) 864-9658 Write to: NASA STI Information Desk Mail Stop 148 NASA Langley Research Center Hampton, VA 23681-2199 NASA Engineering Network (NEN) at https://nen.nasa.gov/web/pm/ (inside the NASA firewall only). OCFO-SID EVM Homepage at https://community.max.gov/dis- play/NASA/Earned+Value+Management+HOMEPAGE (inside the NASA firewall only) RECORD OF REVISIONS R E DESCRIPTION DATE V Basic Issue November 2013 1 Incorporate IPMR, ANSI/EIA-748 reference change March 2016 2 Added EVM reciprocity, scalability and new EVM $250M threshold January 2018 Added SMD Class-D EVMS Deviation, revised Intra-Agency Work Agree- ment EVM requirements, updated links, updated NASA EVMS requirements 3 September 2019 thresholds chart, deleted special publication numbers from references, cor- rected Data Requirements Description acronym, minor edits, etc. NASA EVM System Description ii ii TABLE OF CONTENTS P.1 Purpose ............................................................................................................ vi P.2 Applicability ..................................................................................................... vii P.3 Authority .......................................................................................................... vii P.4 References .....................................................................................................
    [Show full text]
  • The Influence of Line Managers and HR Department on Employees' Affective Commitment
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by Lirias Faculty of Business and Economics The influence of line managers and HR department on employees' affective commitment Caroline Gilbert, Sophie De Winne and Luc Sels DEPARTMENT OF MARKETING AND ORGANISATION STUDIES (MO) OR 1004 The influence of line managers and HR department on employees’ affective commitment Caroline Gilberta*, Sophie De Winnea,b and Luc Selsa aKatholieke Universiteit Leuven, Leuven, Belgium; bLessius, Antwerpen, Belgium Based on social exchange theory, we investigate the impact of HRM investments made by two important HR actors, i.e. line managers and the HR department, on employees’ affective commitment. More specifically, we examine the independent and joint impact of three different independent variables: the line manager’s enactment of HR practices, the line manager’s relations- oriented leadership behaviour and the HR department’s service quality. We contribute to existing literature in two ways. First, we pay attention to the HRM role of line managers, a topic largely neglected in SHRM research. Second, we focus on perceived HRM rather than intended HRM, because this is seen as the driver of employees’ attitudinal and behavioural reactions. Data for this study were collected among 1363 employees (response rate 72%), working in three different service organizations. The results of a moderated regression analysis indicate that line managers can enhance employee affective commitment by both the effective enactment of HR practices and good relations-oriented leadership behaviour. High service quality by the HR department has an additional positive effect on employees’ affective commitment.
    [Show full text]
  • Service-Line Management: an Overview
    Service-line management: an overview 114052_Monitor_Conf_briefing_sheet.indd4052_Monitor_Conf_briefing_sheet.indd SSec1:1ec1:1 221/4/091/4/09 111:18:371:18:37 Introduction What is service-line management? Service-line management (SLM) identifi es Service lines are the units from which the specialist areas and manages them as distinct trust’s services are delivered, each with operational units. It enables NHS foundation their own focus on particular medical trusts to understand their performance conditions or procedures and their own and organise their services in a way which specialist clinicians. Each unit also has benefi ts patients and delivers effi ciencies for clearly identifi ed resources, including the trust. It also provides a structure within support services, staffi ng and fi nances. which clinicians can take the lead on service development, resulting in better patient care. Many trusts have already implemented service-line reporting (SLR), which provides the fi nancial and SLM was developed by Monitor for NHS foundation operational picture for each service. SLM takes trusts, although its principles apply equally to other the service line concept to a higher level, providing NHS settings. It draws on evidence and best practice an organisation structure and management from UK pilot sites and the experience of healthcare framework within which clinicians and managers providers worldwide who use similar principles and can plan service activities, set objectives and approaches within their healthcare systems. It is a targets, monitor their service’s fi nancial and dynamic and constantly evolving programme which operational activity and manage performance. will continue to explore the issues and challenges faced by trusts and develop best practice solutions.
    [Show full text]
  • Organisational Structures in Emerging Markets
    2004:082 SHU MASTER’S THESIS Organisational Structures in Emerging Markets Cases from Multinational Telecommunication Firms in Russia THERESE DAHLÉN ANN-CHRISTIN FORSMAN Social Science and Business Administration Programmes INTERNATIONAL BUSINESS AND ECONOMICS PROGRAMME Department of Business Administration and Social Sciences Division of Industrial Marketing and e-Commerce Supervisor: Manucher Farhang 2004:082 SHU • ISSN: 1404 – 5508 • ISRN: LTU - SHU - EX - - 04/82 - - SE Acknowledgements It is great to have finally completed our Master’s thesis. We have gained much knowledge within the interesting area of organisational structures for emerging markets, and developed our skills in academic writing. During the process of writing the thesis, we have experienced both drawbacks and progress. However, we have always been able to motivate ourselves since the area of research was very interesting. We would like to thank our supervisor Manucher Farhang, Associate Professor at the Department for Industrial Marketing at Luleå University of Technology, who helped us through some of the difficulties we have encountered during the process. Furthermore, we would like to thank Saku Berg, project manager at TeliaSonera, and Catrin Düsing, vice president of people and culture in the market unit of Eastern Europe and Central Asia at Ericsson, for providing us with good valuable information in the interviews. We also want to thank our respondents for setting aside time for us and for answering our emails with follow-up questions. Finally, we want to give our deepest gratitude to our classmates for providing us with plenty of valuable and constructive criticism. We hope that this thesis will be interesting and useful reading material for other students, researchers, and people who are interested in the area of research.
    [Show full text]
  • Line Management and Mentoring
    Paper PM03 Line Management and Mentoring Tom Ward, PPD, Cambridge, UK ABSTRACT What makes a good mentor, and does this necessarily translate into what makes a good manager? In a technical industry, I would argue the two roles require different sets of skills and provide different benefits to employees. Both mentor and manager are key roles in the development of SAS programmers, but how do they differ to each other? This paper will suggest the skills required for each role and how to use each effectively to develop and retain staff. I will present examples from my own career from the perspective of employee, mentor and manager and link this to literature supporting the benefits of various approaches to both. INTRODUCTION The most valuable asset of a company in a services industry, such as a CRO, is not a physical item, it is their employees. The quality of their product has a direct correlation with the skills, experience and motivation of their staff. In order to maintain this talented and motivated workforce, staff retention must be at the core of the management structure and company ethos. Looking beyond quality, staff turnover is expensive; considerably more than just the direct cost of re-hire (recruiter fees, welcome bonuses etc.). Consider the hours spent to review CVs, interview, and follow up with references, extensive training to get even skilled recruits onboarded and even potential costs of loss of business due to staff shortage or reduced utilization. Increasing staff retention will result in increased quality, productivity and morale. Research shows the majority of employees in this sector rate ongoing education and a clear career path as important factors when making career decisions.
    [Show full text]
  • Managerialism: an Ideal Type
    Kent Academic Repository Full text document (pdf) Citation for published version Shepherd, Sue (2018) Managerialism: an ideal type. Studies in Higher Education, 43 (9). pp. 1668-1678. ISSN 0307-5079. DOI https://doi.org/10.1080/03075079.2017.1281239 Link to record in KAR http://kar.kent.ac.uk/60484/ Document Version Publisher pdf Copyright & reuse Content in the Kent Academic Repository is made available for research purposes. Unless otherwise stated all content is protected by copyright and in the absence of an open licence (eg Creative Commons), permissions for further reuse of content should be sought from the publisher, author or other copyright holder. Versions of research The version in the Kent Academic Repository may differ from the final published version. Users are advised to check http://kar.kent.ac.uk for the status of the paper. Users should always cite the published version of record. Enquiries For any further enquiries regarding the licence status of this document, please contact: [email protected] If you believe this document infringes copyright then please contact the KAR admin team with the take-down information provided at http://kar.kent.ac.uk/contact.html Studies in Higher Education ISSN: 0307-5079 (Print) 1470-174X (Online) Journal homepage: http://www.tandfonline.com/loi/cshe20 Managerialism: an ideal type Sue Shepherd To cite this article: Sue Shepherd (2017): Managerialism: an ideal type, Studies in Higher Education, DOI: 10.1080/03075079.2017.1281239 To link to this article: http://dx.doi.org/10.1080/03075079.2017.1281239
    [Show full text]
  • Managerialism As a Professionalising Catalyst for the Front-Line Practitioner Community of New Zealand’S Department of Conservation
    MANAGERIALISM AS A PROFESSIONALISING CATALYST FOR THE FRONT-LINE PRACTITIONER COMMUNITY OF NEW ZEALAND’S DEPARTMENT OF CONSERVATION _________________________________________ A thesis submitted in partial fulfilment of the requirements for the Degree of Master of Applied Science at Lincoln University by Euan S Kennedy __________________________________________ Lincoln University 2003 Abstract of a thesis submitted in partial fulfilment of the requirements for the Degree of Master in Applied Science, Lincoln University, New Zealand. MANAGERIALISM AS A PROFESSIONALISING CATALYST FOR THE FRONT-LINE PRACTITIONER COMMUNITY OF NEW ZEALAND’S DEPARTMENT OF CONSERVATION Euan S Kennedy ABSTRACT Since 1984, public service occupations in New Zealand have been subordinated to the over-determined bureaucratic structures of contemporary managerialism. The reac- tions of front-line public servants to New Management’s unfamiliar ‘market-place’ im- peratives and the concomitant loss of occupational autonomy have received very little rigorous qualitative analysis. This study addresses that shortfall, taking as its cue a key question in the sociology of ‘profession’—what arouses or subdues the inclination of bureaucratised occupations to professionalise as a means of reclaiming autonomy? It explains the nature and meaning of strategies adopted by front-line practitioners in New Zealand’s Department of Conservation (DOC) to defend their marginalised work conventions and collegial culture. Symbolic interactionist analysis shows that pro- foundly personal values and beliefs connect vocationally motivated practitioners with their ‘mission’ (to conserve natural and cultural heritage). These powerful intuitive connections play a crucial role in subduing interest in resistance and organised stra- tegic action, principally by converting conservation labour into the pursuit of personal fulfilment.
    [Show full text]
  • Hypothesis Testing of Edge Organizations: Specifying Computational C2 Models for Experimentation
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by Calhoun, Institutional Archive of the Naval Postgraduate School Calhoun: The NPS Institutional Archive Faculty and Researcher Publications Faculty and Researcher Publications 2005-06 Hypothesis Testing of Edge Organizations: Specifying Computational C2 Models for Experimentation Nissen, Mark E. Proceedings International Command and Control Research Symposium, McLean, VA (June 2005) http://hdl.handle.net/10945/31252 10th International Command and Control Research and Technology Symposium The Future of C2 Paper title: “Hypothesis Testing of Edge Organizations: Specifying Computational C2 Models for Experimentation” Paper #064 Track: “Edge Organizations” Mark E. Nissen Naval Postgraduate School 555 Dyer Road, Code GB/Ni Monterey, CA 93943-5000 831-656-3570(w) 831-656-3407 (f) [email protected] Acknowledgement: This research is sponsored in part by the Office of the Assistant Secretary of Defense for Networks and Information Integration (OASD/NII), through its Command & Control Research Program (CCRP). The several complementary parts of this research project are being coordinated through the Center for Edge Power at the Naval Postgraduate School. Form Approved Report Documentation Page OMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302.
    [Show full text]
  • Capacity Planning • Waiting Line Management • Sequencing Definition of Operations
    Operations Management Wendell Gilland Aviation Industrial Readiness Program January, 2020 Key Operations Issues That We Will Discuss • Definition of Operations • Capacity Analysis • Capacity Planning • Waiting Line Management • Sequencing Definition of Operations Inputs Human Resources Facilities and Processes Technology, Materials, Land, Energy, and Information Transformation Process Outputs Physical Goods Auxiliary Services Services Performance Measurement (Quality, Cost, Time, Productivity) Three Strategies for Production Build To Assemble Build To Order To Order Stock BTO: Begin production ATO: Build modules BTS: Manufacture entire only after receiving a prior to receiving order; product prior to receiving customer order. assemble product after customer order. receiving customer order. Slower Response Time Faster Raw Finished Materials Inventory Goods High Labor Skill Level Low Key Differences Between Service and Manufacturing Operations • High Customer Contact • Customer Participation in the Service Process • Perishability of Services • Site Selection Dictated by Customer Location • Labor Intensiveness • Variable, Non-Standard Outputs • Difficulty of Measuring Service Productivity Key Operations Issues That We Will Discuss • Definition of Operations • Capacity Analysis • Capacity Planning • Waiting Line Management • Sequencing Capacity - basic definition • Capacity: the productive capability of a facility, usually measured as a quantity of output per unit time. • Why is capacity important? Meet demand in the short term Strategically – Better service (internet, telecommunications) – Demand in the long term (opportunities) What is a Bottleneck? The step in the production/service delivery process: Bottleneck a) that has the lowest capacity when measured Definition using a comparable unit of measure and, therefore, b) that limits the overall output of the system. a) On paper: Determine the capacity - using a How Do You comparable measure - of each step in the process.
    [Show full text]