ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986)

(2015-2016)

FOR CLUSTER NO. – 11 (GROUP OF MINES) Area and Bankola Area Limited

Prepared at Regional Institute – I Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal Ltd.) G. T. Road (West End) - 713 304

CMPDI ISO 9001:2008 Company

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

ENVIRONMENTAL STATEMENT FOR CLUSTER NO. – 11 (GROUP OF MINES)

FOR THE YEAR: 2015-2016

CONTENTS

SL NO. CHAPTER PARTICULARS PAGE NO. 1 CHAPTER-I INTRODUCTION 2-6 2 CHAPTER-II ENVIRONMENTAL STATEMENT FORM-V (PART A TO I) 7-18

LIST OF ANNEXURES

ANNEXURE NO. PARTICULARS PAGE NO. I AMBIENT AIR QUALITY 19-21 II NOISE LEVEL 22-25 III MINE AND GROUND WATER QUALITY REPORT 26-32 IV GROUNDWATER LEVEL 33

PLATES

I LOCATION PLAN II PLAN SHOWING LOCATION OF MONITORING STATIONS

1

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

CHAPTER – I

INTRODUCTION

1.1 GENESIS: The Gazette Notification vide G.S.R No. 329 (E) dated 13th March, 1992 and subsequently renamed to ‘Environmental Statement’ vide Ministry of Environment & Forests (MOEF), Govt. of India gazette notification No. G.S.R No. 386 (E) Dtd.22nd April’93 reads as follows. “Every person carrying on an industry, operation or process requiring consent under section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued under the Environmental Protection Act, 1986 shall submit an Environmental Audit Report for the year ending 31st March in Form V to the concerned State Pollution Control Board on or before the 30th day of September every year.” In compliance with the above, the work of Environmental Statement for Cluster No. 11 was entrusted to CMPDI by GM (Environment), Eastern Coalfields Limited.

1.2 PROJECT DESCRIPTION:

Overview of Cluster No. 11: The cluster consists of 11 (eleven) underground mines, 3 (three) of which already have EC. 5 (five) opencast patches/mines have been identified within their leaseholds. The mines are administratively under Kenda and Bankola Areas of ECL. The mines of Cluster-11 are located in the east central part of Coalfields and north of the in the Burdwan District of and are having lease boundaries adjacent to one another. The Cluster is located within Latitudes 230 38’ N & 230 41’ N and Longitudes 860 46’ E & 860 51’ E lying 100m to 140m above MSL. The cluster was awarded EC vide letter no. J-11015/245/2011-IA-II.(M) dated 21st July, 2015 with following cluster mine details: S. Name of Mine Mine UG/OC ML Area Normative/ Peak Life No (Ha) Capacity (MTY) (Years) 1 Krishnanagar 1 UG 772 0.24 0.30 >25 2 Haripur Group of Mines UG+OC 1.99 2.27 >25 A Haripur 2 UG 0.60 0.78 >25 B Chora Block Incline 3 UG 4 0.99 0.99 >25 C Chora 7,9 & 10 Pit UG 853

D Bonbahal OC Patch (25 Ha) 5 OC 0.40 0.50 3 Shankarpur / CL Jambad OC Patch/ Exhausted and being E 6 OC mine (52 Ha) backfilled 3 Group of Mines 7 UG+OC 3.71 4.79 >25 A New Kenda UG 0.11 0.14 >25 742 B W Kenda OC Patch / Mine ( 49 Ha) OC 0.60 0.75 2 C New Kenda OC Mine (240 Ha) OC 3.00 3.90 8 4 Group of Mines 8 0.42 0.55 >25 A Lower Kenda UG 0.13 0.17 >25 676 B Bahula UG 0.24 0.31 >25 C CL Jambad UG 0.05 0.07 >25

2

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

S. Name of Mine Mine UG/OC ML Area Normative/ Peak Life No (Ha) Capacity (MTY) (Years) 5 9 UG 335 0.30 0.30 >25 6 10 UG 388 0.39 0.39 >25 7 Shankarpur Project 11 2.00# 2.30# A Shankarpur UG 452 1.16 1.33 >25 B Shankarpur OC Patch/ mine (42 Ha) OC 2.00 2.30 4 4218 9.05 10.90 # Mining will be done in phased manner

1. Krishnanagar UG Production in the mine has been discontinued since 1989-90 due to adverse geo-mining conditions – mainly waterlogging and high concentration of gases. However, it is being planned to exploit the virgin Koithee (R-III) seam. Considering the unexploited reserve still remaining in R-III, it is being planned that dewatering and degasification of the mine and subsequent mining will yield coal of C-D grade in substantial quantity. The project has the capacity to yield a normative capacity of 0.24 (MTY) and a peak capacity of 0.30 (MTY) by exploiting the lower virgin horizons. It is proposed to exploit the same accordingly.

2. Haripur UG At present, production from the mine has been temporarily suspended. Haripur Colliery is working in Dobrana seam only. The total mineable reserve is 16.40 MT out of which 10.64 MT is virgin and 5.76 MT is standing on pillar. The gradient of the seam is 1 in 10 and the degree of gassiness of the mine is Degree- II. It is expected that by introducing additional CM and additional SDL, production will be increased.

3. New Kenda UG & OC Patches At present, Dobrana and Kenda seams are being worked in this mine. Two districts are running in the mine – one manual depillaring district with hydraulic sand stowing in Dobrana seam and another also manual depillaring district with hydraulic sand stowing in Kenda seam. Two OC patches have been identified for opencast mining, details of which, are given as under – Sl Name of Mine Area(Ha) Mineable Peak Volume of Life N Reserves Capacity OB to be in (MT) (MTY) generated years (Million M3) 1 W Kenda OC Patch 49 1.18 0.75 7.65 2 2 New Kenda OC Patch 240 22 3.90 211 8

4. Lower Kenda UG At present, Dodrana seam is being worked in this mine through No. 4, 6 and 7 Pit. Depillaring district alongwith hydraulic sand stowing is going on at No. 4 Pit. Manual development by Bord & Pillar Method is going on at No. 7 Pit and development with SDL is in progress at No. 6 Pit.

3

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

5. Chora 7, 9 & 10 pits UG At present, Chora seam is being worked in this mine. Two districts are running in the mine – one development district (S2, top section) with SDL over standing bottom section and another depillaring district (S3, bottom section) with sand stowing in the bottom section working with LHD.

6. Chora Block Incline UG & OC Patches At present, Chora seam is being worked in this mine. The seam is already developed by Bord & Pillar Method upto a height of 3 m along floor almost upto the mine boundary. The pillars in this section are going to be extracted upto a height of 3.60 m along floor by splitting and sand stowing. The remaining top section will be developed upto 3 m over sand and will be splitted upto a height of 3.60 m over sand and will be filled up with sand stowing. At present, two districts are running in the mine – one development district with two SDLs over sand and another manual depillaring district with sand stowing. Water spraying is going on in both the district. Two OC patches have been identified for opencast mining, details of which, are given as under – Sl Name of Mine Area Mineable Peak capacity Volume of OB to Life in No (Ha) Reserves (MTY) be generated years (MT) (Million M3) 1 Bonbahal OC Patch (25ha) 25 1.1 0.50 6.27 3 2 Shankarpur/CL Jambad OC Patch Exhausted and being backfilled

7. Bahula UG At present, Kenda seam and Bonbahal seam are being worked in this mine. In Bonbahal seam at RJ Unit one SDL district through No. 1 Pit is being depillared by splitting as final operation method with hydraulic sand stowing. In Kenda seam at PJ Unit one manual district through No. 6 Pit is being depillared by splitting as final operation method with hydraulic sand stowing. In Kenda seam at NJ Unit two SDL districts through No. 3 Pit is being depillared by splitting in bottom section and slicing in top section with hydraulic sand stowing.

8. C L Jambad UG At present, Jambad seam is being worked in this mine. The seam is already developed by Bord & Pillar Method and now one manual district is being depillared by splitting with hydraulic sand stowing.

9. Siduli UG The mine block has been taken within the faults F3-F3, F4-F4, F10-F10 and Chora block on the North-Western side. The existing constituent within the above block are Siduli colliery comprising J.K.unit and Siduli unit, Nags unit of Khandra mine. R-IX seam has been worked in Nags Kajora unit where the seam has incropped and has been abandoned. R-VIII seam has been extensively worked in the J.K.unit (R-VIII seam exhausted) and Siduli unit of Siduli colliery and Nags Kajora unit of Khandra colliery (R-VIII seam near exhaustion). R- VIII seam is exhausted in Pure Seetalpur unit, Khas jambad unit and Seetalpur unit.

4

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

10. Khandra UG It is proposed to drive 4 parallel headings with necessary inter connections to act as main trunk roadways of average size of 4.50m (width) x 2.70 m (height) mainly supported by roof bolts. Holes in the roofs will be done by ordinary coal-drills. The galleries will be supported, wherever necessary, by a combination of steel-supports and rope-dowels. Solid blasting will be done at faces and blasted coal will be loaded on to coal tubs by SDLs, and then, coal will be transported to pit bottom by series of rope haulages. Upper Kajora seam (R-IX) at Nag’s Kajora Colliery (NKJ) has been exhausted. To deploy surplus manpower and utilize existing infrastructure facilities available at NKJ Colliery, it is essential to exploit virgin RVII seam to obtain replacement production for R-IX Seam. It is also envisaged to increase production in R-VIII Seam by adding a district with a view to utilizing full capacity of winding system to meet the demand of superior grade coal.

11. Shankarpur UG & OC Shankarpur Colliery comprises of two units- Shankarpur unit (5 & 6 pits) and Sheetalpur Unit (3 & 4 pits). All the pits are sunk upto R-VIII seam. Two inclines have also been driven upto R-VII seam. Reserve of R-VIII seam is exhausted. 3 & 4 Pit Unit- Production is envisaged from one manual depillaring with stowing district in R-VII seam. Incline unit- Production is envisaged from one SDL development district in R-VII seam. Inclines 1 & 2 are proposed to be extended to access R-VIIA seam. Pit No. 5 will be deepened by 95m upto R-VIIA seam to act as the main return airway of the mine. Production is envisaged from R-VII seam by working two B & P development districts with SDLs and one manual development district. R-VIIA seam will be developed after development of R-VII seam. A OC patch measuring 42 Ha has been identified for opencast mining, details of which, are given as under – Sl Name of Mine Area Mineable Volume of OB to Life in No (Ha) Reserves be generated years (MT) (Million M3) 1 Shankarpur OC 42 7.85 34 4 Patch/mine

1.3 ENVIRONMENTAL SCENARIO: The Environmental monitoring was carried out fortnightly as per guidelines of Ministry of Environment and Forests (MOEF) by CMPDI, RI-I starting from 2nd fortnight of May, 2015. Accordingly, ambient air quality was monitored at 8 locations (2 permanent locations, 3 pre-monsoon and 3 post-monsoon locations). Effluent quality was monitored at 11 locations. Noise level was monitored at 9 locations. Groundwater level is measured at 6 locations in each quarter. Location of the monitoring stations of air, noise & water are shown in Plate- II.

5

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

The environmental monitoring results for 21 fortnights ending March’2016 are appended as Annexure- I, II, III and IV. The environmental monitoring results for the year 2015- 16 can be concluded as given below:

AMBIENT AIR QUALITY 3 The PM10 concentration was found in the range of 62.4 to 194 µg/m . It has exceeded limit on 19 occasions as per NAAQS, 2009 while the concentration values are within the limit as per GSR 742 (E) dated 25.09.2000. The PM2.5 concentration was found in the range of 16.5 to 81.8 µg/m3. It has exceeded limits on 10 occasions as per NAAQS, 3 2009.The SO2 concentration remained below 10.0 µg/m and NOX concentration was in the range of 9.2 to 23.0 µg/m3.

WATER QUALITY The analysis results reveal that most of the parameters of effluent water are below permissible limits prescribed by Ministry of Environment & Forests (MOEF) as General Standards for Class-‘A’ effluent (Effluent discharged into inland surface water) and below permissible limits prescribed in IS:10500-2012 standards for groundwater quality.

NOISE LEVEL The noise level was found in the range of 54.0 to 71.2 dB (A). The noise level recorded is below permissible limit prescribed by Ministry of Environment and Forest (MOEF).

ENVIRONMENTAL STANDARDS: (I) Environmental standard for Raniganj Coalfield vide MOEF, Govt. of India, Gazette Notification No.GSR 742 (E) dated 25.09.2000 for 24 hourly samples at 500 meters from dust generating point: Station Pollutant Concentration (µg/m3) Category TSPM PM10 SO2 NOx Industrial 700.0 300.0 120.0 120.0 Residential 200.0 100.0 80.0 80.0

Limits for noise (Leq) dB(A) Station Day Time Night Time Category (6am-10pm) (10pm-6am) Industrial 75.0 70.0 Residential 55.0 45.0

(II) National Ambient Air Quality Standards (NAAQS) for residential, industrial and rural areas for 24 hourly samples:

Pollutant PM10 PM2.5 SO2 NOX Concentration (µg/m3) 100.0 60.0 80.0 80.0

Limits for noise Day Time (6am-9pm) Night Time (9pm-6am) (Leq) dB(A) 55.0 45.0

6

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

CHAPTER - II ENVIRONMENTAL STATEMENT FORM– V Environmental statement for the financial year ending March, 2016

PART – A

SL. NO. HEADING PARTICULARS (I) NAME AND ADDRESS OF THE PROJECT i Krishnanagar UG Agent, Haripur Colliery, Post-Haripur, Burdwan, W.B. ii Haripur UG iii New Kenda UG & OC Patches Agent, New Kenda Colliery, Post-Kenda, Burdwan, W.B. iv Lower Kenda UG Agent, Lower Kenda Colliery, Post-Bahula, Burdwan, W.B. v Chora 7, 9 & 10 pits UG Agent, Chora OCP, Post-Bahula, Burdwan, W.B. vi Chora Block Incline UG & OC Patches vii Bahula UG Agent, Lower Kenda Colliery, Post-Bahula, Burdwan, W.B. viii C L Jambad UG Agent, Siduli UG, Post-Bahula, Burdwan, W.B. ix Siduli UG x Khandra UG Agent, Khandra Colliery, Post-, Burdwan, W.B. xi Shankarpur UG & OC Office of the Agent, Shankarpur Colliery, Post-Ukhra, Burdwan, W.B. (II) INDUSTRY CATEGORY All mines in the cluster falls in red category (III) PRODUCTION CAPACITY 10.90 MTY (IV) YEAR OF ESTABLISHMENT All the mines within the cluster are taken over mines from pre- nationalisation period. (V) DATE OF THE LAST The Environment Statement is being submitted for the first ENVIRONMENTAL STATEMENT time for the financial year 2015 – 16 after the grant of EC on SUBMITTED 21st July, 2015.

PART – B WATER AND RAW MATERIAL CONSUMPTION (I) WATER CONSUMPTION (Cu.m/day)

WATER CONSUMPTION (m3/day) 1. Krishnanagar UG Sl. Particulars 2014-15 2015-16 No. A. MINING i Dust suppression ii Fire fighting iii Others (service building etc.) B. COOLING Nil Nil (in radiators of trucks/HEMM) C. DOMESTIC i Colony TOTAL

7

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

2. Haripur UG Sl. Particulars 2014-15 2015-16 No. A. MINING i Dust suppression ii Fire fighting iii Others (service building etc.) B. COOLING Nil Nil (in radiators of trucks/HEMM) C. DOMESTIC i Colony TOTAL

3. New Kenda UG & OC Patches Sl. Particulars 2014-15 2015-16 No. A. MINING i Dust suppression* ii Fire fighting - - iii Others (service building etc.) 20 20 B. COOLING 0 0 (in radiators of trucks/HEMM) C. DOMESTIC i Colony 1740 1740 TOTAL 1760 1760

4. Lower Kenda UG and Bahula UG Sl. Particulars 2014-15 2015-16 No. A. MINING i Dust suppression* ii Fire fighting - - iii Others (service building etc.) 15 15 B. COOLING 0 0 (in radiators of trucks/HEMM) C. DOMESTIC i Colony 1071 1071 TOTAL 1086 1086

5. Chora 7, 9 & 10 pits UG Sl. Particulars 2014-15 2015-16 No. A. MINING i Dust suppression* ii Fire fighting - - iii Others (service building etc.) 12 12 B. COOLING 0 0 (in radiators of trucks/HEMM) C. DOMESTIC i Colony 1008 1008 TOTAL 1020 1020

8

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

6. Chora Block Incline UG & Bonbahal OC Patch Sl. Particulars 2014-15 2015-16 No. A. MINING i Dust suppression* ii Fire fighting - - iii Others (service building etc.) 15 15 B. COOLING 0 0 (in radiators of trucks/HEMM) C. DOMESTIC i Colony 2430 2430 TOTAL 2445 2445

7. C L Jambad UG and Siduli UG Sl. Particulars 2014-15 2015-16 No. A. MINING i Dust suppression* ii Fire fighting - - iii Others (service building etc.) 20 20 B. COOLING 0 0 (in radiators of trucks/HEMM) C. DOMESTIC i Colony 1371 1371 TOTAL 1391 1391 *Note: 3 nos. of mobile sprinklers having capacity 12 KL cater to the need of dust suppression in whole .

8. Khandra UG Sl. Particulars 2014-15 2015-16 No. A. MINING i Dust suppression 381 400 ii Fire fighting 0 0 iii Others (service building etc.) 0 3 B. COOLING 0 0 (in radiators of trucks/HEMM) C. DOMESTIC i Colony 821 860 TOTAL 1202 1263

9. Shankarpur UG & OC Sl. Particulars 2014-15 2015-16 No. A. MINING i Dust suppression 144 147 ii Fire fighting 0 0 iii Others (service building etc.) 308 314 B. COOLING 0 0 (in radiators of trucks/HEMM) C. DOMESTIC i Colony 302 307 TOTAL 754 768

9

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

(II) RAW MATERIAL CONSUMPTION : 1. Krishnanagar UG Name of raw Name of Consumption of raw material per material products unit of product During previous During current financial year financial year (2014-15) (2015-16) 1. Explosive Coal 2. Diesel Nil Nil 3. Lubricants

2. Haripur UG Name of raw Name of Consumption of raw material per material products unit of product During previous During current financial year financial year (2014-15) (2015-16) 1. Explosive Coal 2. Diesel Nil Nil 3. Lubricants

3. New Kenda UG & OC Patches Name of raw Name of Consumption of raw material per material products unit of product During previous During current financial year financial year (2014-15) (2015-16) 1. Explosive Coal and OB - 0.296 Kg/te 2. Diesel - - 3. Lubricants - 0.112 l/te

4. Lower Kenda UG and Bahula UG Name of raw Name of Consumption of raw material per material products unit of output During previous During current financial year financial year (2014-15) (2015-16) 1. Explosive Coal - 0.270 kg/te 2. Diesel - - 3. Lubricants - 0.074 l/te

5. Chora 7, 9 & 10 pits UG Name of raw Name of Consumption of raw material per material products unit of output During previous During current financial year financial year (2014-15) (2015-16) 1. Explosive Coal - 0.341 kg/te 2. Diesel - - 3. Lubricants - 0.087 l/te

10

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

6. Chora Block Incline UG &Bonbahal OC Patch Name of raw Name of Consumption of raw material per material products unit of output During previous During current financial year financial year (2014-15) (2015-16) 1. Explosive Coal and OB - 0.701kg/te 2. Diesel - 0.240 l/te 3. Lubricants - 0.116 l/te

7. C L Jambad UG and Siduli UG Name of raw Name of Consumption of raw material per material products unit of output During previous During current financial year financial year (2014-15) (2015-16) 1. Explosive Coal - 0.436kg/te 2. Diesel - - 3. Lubricants - 0.140 l/te

8. Khandra UG Name of raw Name of Consumption of raw material per material products unit of output During previous During current financial year financial year (2014-15) (2015-16) 1. Explosive Coal 0.400kg/te 0.426kg/te 2. Diesel 0.046 l/te 0.044 l/te 3. Lubricants* 80 litres 60 litres *Consumption figure for the whole year

9. Shankarpur UG & OC Name of raw Name of Consumption of raw material per material products unit of output During previous During current financial year financial year (2014-15) (2015-16) 1. Explosive Coal 0.675kg/te 0.616kg/te 2. Diesel 0.088 l/te 0.096 l/te 3. Lubricants 0.094 litres 0.114 litres

11

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

PART – C POLLUTION GENERATED Pollution Quantity of pollution generated Percentage variation from prescribed standards with reasons WATER Mine water discharged Analysis results The analysis results reveal that most of the parameters are given in Annexure-III. are below permissible limits prescribed by MOEF as General Standards for class ‘A’ effluent (Effluent discharged into inland surface water). AIR The main air pollutant are PM10 and PM2.5 Ambient air quality results show that the values of SO2 and The air quality results are appended as NOx are well within the prescribed standards. The values Annexure-I. of PM10 have exceeded the limit on 19 occasions and the values of PM2.5 have exceeded the limit on 10 occasions as per NAAQS, 2009.

PART – D HAZARDOUS WASTE (As specified under Hazardous Waste (Management and Handling) Rules, 1989) 1. Krishnanagar UG Hazardous waste Total quantity During Previous During current Disposal financial year financial year method (2014-15) (2015-16) A) From process i)Used oil ii)Lead-Acid Batteries a. Automobile batteries Nil Nil b. Cap-lamp batteries iii) Used Cotton waste iv) Metal Scrap

2. Haripur UG Hazardous waste Total quantity During Previous During current Disposal financial year financial year method (2014-15) (2015-16) A) From process i)Used oil ii)Lead-Acid Batteries a. Automobile batteries Nil Nil b. Cap-lamp batteries iii) Used Cotton waste iv) Metal Scrap

12

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

3. New Kenda UG & OC Patches Hazardous waste Total quantity During Previous During current Disposal financial year financial year method (2014-15) (2015-16) A) From process i)Used oil - ii)Lead-Acid Batteries a. Automobile batteries - Nil b. Cap-lamp batteries Nil iii) Used Cotton waste - iv) Metal Scrap -

4. Lower Kenda UG and Bahula UG Hazardous waste Total quantity During Previous During current Disposal financial year financial year method (2014-15) (2015-16) A) From process i)Used oil - ii)Lead-Acid Batteries a. Automobile batteries - Nil Nos b. Cap-lamp batteries Nil Nos iii) Used Cotton waste Nil Kg iv) Metal Scrap Nil Kg

5. Chora 7, 9 & 10 pits UG Hazardous waste Total quantity During Previous During current Disposal financial year financial year method (2014-15) (2015-16) A) From process i)Used oil - ii)Lead-Acid Batteries a. Automobile batteries - 7Nos b. Cap-lamp batteries 425Nos iii) Used Cotton waste Nil Kg iv) Metal Scrap Nil Kg

6. Chora Block Incline UG & Bonbahal OC Patch Hazardous waste Total quantity During Previous During current Disposal financial year financial year method (2014-15) (2015-16) A) From process i)Used oil - ii)Lead-Acid Batteries a. Automobile batteries - NilNos b. Cap-lamp batteries 325 Nos iii) Used Cotton waste Nil Kg iv) Metal Scrap Nil Kg

13

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

7. C L Jambad UG and Siduli UG Hazardous waste Total quantity During Previous During current Disposal financial year financial year method (2014-15) (2015-16) A) From process i)Used oil - ii)Lead-Acid Batteries a. Automobile batteries - 1Nos b. Cap-lamp batteries 573Nos iii) Used Cotton waste Nil Kg iv) Metal Scrap Nil Kg

8. Khandra UG Hazardous waste Total quantity During Previous During current Disposal financial year financial year method (2014-15) (2015-16) A) From process i)Used oil 4830 litres 5540 litres ii)Lead-Acid Batteries a. Automobile batteries Nil Nos Nil Nos b. Cap-lamp batteries 275 Nos 270 Nos iii) Used Cotton waste 83Kg 85Kg iv) Metal Scrap NilKg NilKg

9. Shankarpur UG & OC Hazardous waste Total quantity During Previous During current Disposal financial year financial year method (2014-15) (2015-16) A) From process i)Used oil 4602litres 6280litres ii)Lead-Acid Batteries a. Automobile batteries Nil Nos 2Nos b. Cap-lamp batteries 245 Nos 300Nos iii) Used Cotton waste 3Kg 10Kg iv) Metal Scrap NilKg NilKg Approximate values may be given where actual values are not available. Note: a) The detail of used oil is to be given to concerned Pollution Control Board in Form-13 as per time mentioned in HW (M & H), Amendment Rules, 2003. b) The detail of disposal of Lead Acid batteries is to be given to concerned State Pollution Control Board in Form-VIII as per time mentioned in Batteries (M&H) Rules, 2001.

14

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

PART – E SOLID WASTE

Particulars Name of Mine Total quantity (In Million Cu.m) During previous During current financial year financial year (2014-15) (2015-16) New Kenda OC - - a) From West Kenda OC - - process Bonbahal OC - 0.38 (Mining) Shankarpur OC - - b) From New Kenda OC - - pollution West Kenda OC - - control Bonbahal OC - - facilities Shankarpur OC - - c) Quantity New Kenda OC - - recycled or West Kenda OC - - reutilized Bonbahal OC - - back filled Shankarpur OC - -

PART – F PLEASE SPECIFY THE CHARACTERISTICS (IN TERMS OF CONCENTRATION AND QUANTUM) OF HAZARDOUS AS WELL AS SOLID WASTE AND INDICATE THE DISPOSAL PRACTICE ADOPTED FOR BOTH THESE CATEGORIES OF WASTE.

Hazardous waste generated is given in the table PART-D which has been deposited at area store disposal stock yard. Used oil is reused as lubricant. Cap lamp batteries, HEMM batteries and metal scrap are stored at area store and auctioned to authorized recyclers.

15

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

PART – G IMPACT OF POLLUTION CONTROL MEASURES ON CONSERVATION OF NATURAL RESOURCES AND CONSEQUENTLY ON COST OF PRODUCTION. In order to carry out mining in an eco-friendly manner following pollution control measures have been implemented. 1. AIR POLLUTION CONTROL MEASURES: a) Total plantation carried out since start of the project till date with area planted, year of plantation, species planted and survival rate.  During 2014-15 Name of Mine Area No of Species selected Survival Cost* planted saplings rate planted Krishnanagar UG - - - - - Haripur UG - - - - - New Kenda UG & OC - - - - - Patches Lower Kenda UG and - - - - - Bahula UG Chora 7, 9 & 10 pits UG - - - - - Chora Block Incline UG - - - - - &Bonbahal OC Patch C L Jambad UG and Siduli - - - - - UG Khandra UG - - - - - Shankarpur UG & OC - - - - - *Please provide cost if available

 During 2015-16 Name of Mine Area planted No of saplings Species selected Survival Cost* (INR) (Ha) planted rate Krishnanagar UG - - - - - Haripur UG - - - - - New Kenda UG & OC - - - - - Patches Lower Kenda UG and 5 12500 Kadam, peepal, 85 % - Bahula UG jamun, amla etc. Chora 7, 9 & 10 pits UG - - - - - Chora Block Incline UG - - - - - &Bonbahal OC Patch C L Jambad UG and Siduli - - - - - UG Khandra UG - - - - - Shankarpur UG & OC 10 25000 Local species 50 % 20.00 Lakh *Please provide cost if available b) 3 nos. of water tankers of 12 KL capacity are used for dust suppression in and around coal transport route in Kenda Area. Apart from this, fixed water sprinklers are installed at Bahula Railway Siding. c) Wet coal transport, road maintenance is being done. d) Trucks carrying coal to the railway sidings are covered with tarpaulin to avoid spillage.

16

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

e) Regular sprinkling of water at coal loading & discharge points with the help of stand post at Railway siding. f) 2 nos. of fixed sprinklers have been provided near tippler for dust suppression. Mine water is used for this purpose. g) 1 no. of mobile water sprinkler having capacity 50 KL has been provided in the Shankarpur Colliery. Mine water is used for this purpose.

2. WATER POLLUTION CONTROL MEASURES: (for Mine/CHP/Workshop/Colony discharge water) a) Settling tank has been provided at filtration unit in New Kenda UG. Around 570 m3/day of water is being filtered for domestic use in mine colonies. b) Settling tank has been provided at filtration unit in Lower Kenda UG and Bahula UG. Around 545 m3/day of water is being filtered for domestic use in mine colonies. c) Settling tank has been provided at filtration unit in Chora 7, 9 and 10 pits UG. Around 545 m3/day of water is being filtered for domestic use in mine colonies. d) Soak pit is provided for discharging the domestic effluent water from the colonies in CBI UG. e) Settling tank has been provided at filtration unit in CL Jambad UG and Siduli UG. Around 550 m3/day of water is being filtered for domestic use in mine colonies. f) Slow sand filter is provided for water filtration in Khandra UG. Septic tank is provided for domestic effluent.

3. NOISE POLLUTION CONTROL MEASURES: a) Regular maintenance of machines and other equipment at Bunker and workshop including mine fan. b) Providing green belt around core activity area, along road side in colony and in other vacant space. c) Non-electric delay detonators are used in place of detonating fuse to eliminate noise pollution during blasting. d) All HEMM &light vehicle are provided with silencers. e) Noise monitoring is being carried out regularly.

4. LAND RESOURCE MANAGEMENT: a) Quantity of OB & backfilled area reclaimed (in ha) in year 2014-15 & 2015-16 Name of Mine Quantity of OB Backfilled area reclaimed (Mm3) (Ha) 2014-15 2015-16 2014-15 2015-16 New Kenda OC Patch - - - - West Kenda OC Patch - - - - Bonbahal OC Patch - 0.38 - - Shankarpur OC - - - -

17

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

PART – H ADDITIONAL INVESTMENT PROPOSAL FOR ENVIRONMENTAL PROTECTION INCLUDING ABATEMENT OF POLLUTION. a) Proposed plantation to be carried out in next five years (Total no of saplings, Area to be planted, estimated cost) i. Krishnanagar UG Plantation will be carried out as per proposed plan in future. ii. Haripur UG Plantation will be carried out as per proposed plan in future. iii. New Kenda UG & OC Patches Plantation will be carried out as per proposed plan in future over subsided lands and OB dump. iv. Lower Kenda UG and Bahula UG Plantation will be carried out as per proposed plan in future over subsided lands. v. Chora 7, 9 & 10 pits UG Plantation will be carried out as per proposed plan in future over subsided lands. vi. Chora Block Incline UG &Bonbahal OC Patch Plantation will be carried out as per proposed plan in future over subsided lands and OB dump. vii. C L Jambad UG and Siduli UG Plantation will be carried out as per proposed plan in future over subsided lands. viii. Khandra UG Plantation will be carried out as per proposed plan in future over subsided lands. ix. Shankarpur UG & OC For the year 2016 – 17, an area of 18.40 Ha has been earmarked for plantation over subsided lands and OB dump. b) The Environmental monitoring of the cluster will be continued fortnightly as per the guidelines of Ministry of Environment, Forests & Climate Change (MoEF& CC).

PART – I ANY OTHER PARTICULAR IN RESPECTOF ENVIRONMENTAL PROTECTION AND ABATMENT OF POLLUTION. The Environmental Monitoring is carried out fortnightly for the project by CMPDI, RI-I as per the guideline of Ministry of Environment and Forest (MOEF) and based on the result thereof; colliery takes necessary action if needed.

18

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

Annexure – I AMBIENT AIR QUALITY

Station Station Name Month Fortnight Date of PM10 PM2.5 SO2 NOx Remarks No Sampling 11A1 In Haripur village May Second 25-May-15 116.9 24.2 <10.0 16.8 Proximity to Chora 10 pit 11A1 In Haripur village June First 08-Jun-15 118.4 24.4 <10.0 14.7 - 11A1 In Haripur village June Second 23-Jun-15 106.4 24.3 <10.0 16.3 - 11A1 In Haripur village July Second 29-Jul-15 86.9 22.4 <10.0 19.3 - 11A1 In Haripur village August First 12-Aug-15 80.3 22.6 <10.0 19.3 - 11A1 In Haripur village August Second 26-Aug-15 84.7 20.9 <10.0 18.8 - 11A1 In Haripur village September First 11-Sep-15 82.4 24.2 <10.0 17.5 - 11A1 In Haripur village September Second 22-Sep-15 79.6 26.3 <10.0 17.5 - 11A1 In Haripur village October First 05-Oct-15 80.9 25.4 <10.0 19.3 - 11A1 In Haripur village October Second 30-Oct-15 82.1 26.4 <10.0 20.1 - 11A1 In Haripur village November First 02-Nov-15 88.4 30.4 <10.0 19.5 - 11A1 In Haripur village November Second 19-Nov-15 87.4 29.1 <10.0 18.3 - 11A1 In Haripur village December First 09-Dec-15 83.1 29.1 <10.0 16.2 - 11A1 In Haripur village December Second 16-Dec-15 82.7 30.4 <10.0 17.4 - 11A1 In Haripur village January First 05-Jan-16 80.1 26.9 <10.0 16.2 - 11A1 In Haripur village January Second 21-Jan-16 79.6 25.3 <10.0 16.7 - 11A1 In Haripur village February First 09-Feb-16 119.5 69.7 <10.0 17.4 - 11A1 In Haripur village February Second 19-Feb-16 124.7 36.9 <10.0 19.6 - 11A1 In Haripur village March First 05-Mar-16 126.3 42.3 <10.0 16.3 - 11A1 In Haripur village March Second 18-Mar-16 128.1 46.7 <10.0 14.2 - 11A2 In Shankarpur village May Second 25-May-15 96.4 22.7 <10.0 14.7 - 11A2 In Shankarpur village June First 08-Jun-15 94.3 22.9 <10.0 16.2 - 11A2 In Shankarpur village June Second 23-Jun-15 90.7 22.8 <10.0 14.9 - 11A2 In Shankarpur village July Second 24-Jul-15 84.1 20.9 <10.0 15.6 - 11A2 In Shankarpur village August First 12-Aug-15 79.2 20.9 <10.0 14.2 - 11A2 In Shankarpur village August Second 17-Aug-15 82.6 22.1 <10.0 14.9 - 11A2 In Shankarpur village September First 15-Sep-15 78.9 22.4 <10.0 16.0 - 11A2 In Shankarpur village September Second 18-Sep-15 80.7 24.6 <10.0 14.1 - 11A2 In Shankarpur village October First 13-Oct-15 82.6 26.8 <10.0 16.5 - 11A2 In Shankarpur village October Second 29-Oct-15 86.3 28.3 <10.0 17.5 - 11A2 In Shankarpur village November First 12-Nov-15 84.6 28.1 <10.0 16.2 - 11A2 In Shankarpur village November Second 30-Nov-15 86.8 28.7 <10.0 17.4 - 11A2 In Shankarpur village December First 07-Dec-15 81.2 28.4 <10.0 19.7 - 11A2 In Shankarpur village December Second 23-Dec-15 84.1 26.9 <10.0 18.0 - 11A2 In Shankarpur village January First 12-Jan-16 94.3 32.1 <10.0 19.4 - 11A2 In Shankarpur village January Second 27-Jan-16 92.3 30.6 <10.0 18.1 - 11A2 In Shankarpur village February First 15-Feb-16 190.6 81.2 <10.0 17.3 - 11A2 In Shankarpur village February Second 29-Feb-16 191.6 80.2 <10.0 18.2 - 11A2 In Shankarpur village March First 10-Mar-16 190.6 79.2 <10.0 16.4 - 11A2 In Shankarpur village March Second 28-Mar-16 92.2 32.4 <10.0 17.9 - 11A3 In Belbaid village October First 06-Oct-15 78.9 24.3 <10.0 12.1 - 11A3 In Belbaid village October Second 23-Oct-15 80.4 26.7 <10.0 14.0 - 11A3 In Belbaid village November First 03-Nov-15 78.3 24. <10.0 12.5 - 11A3 In Belbaid village November Second 16-Nov-15 77.4 23.2 <10.0 14.1 -

19

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

Station Station Name Month Fortnight Date of PM10 PM2.5 SO2 NOx Remarks No Sampling 11A3 In Belbaid village December First 14-Dec-15 80.2 28.1 <10.0 17.2 - 11A3 In Belbaid village December Second 21-Dec-15 79.6 26.2 <10.0 16.3 - 11A3 In Belbaid village January First 13-Jan-16 96.7 34.6 <10.0 20.1 - 11A3 In Belbaid village January Second 28-Jan-16 94.4 32.4 <10.0 19.6 - 11A3 In Belbaid village February First 02-Feb-16 192.8 80.4 <10.0 18.6 - 11A3 In Belbaid village February Second 16-Feb-16 194.1 79.7 <10.0 20.1 - 11A3 In Belbaid village March First 01-Mar-16 192.7 78.4 <10.0 18.5 - 11A3 In Belbaid village March Second 22-Mar-16 94.7 31.9 <10.0 17.4 - 11A4 In Jambad village October First 14-Oct-15 72.4 20.2 <10.0 18.3 - 11A4 In Jambad village October Second 27-Oct-15 74.2 22.4 <10.0 16.9 - 11A4 In Jambad village November First 06-Nov-15 90.7 29.4 <10.0 18.6 - 11A4 In Jambad village November Second 27-Nov-15 89.7 28.4 <10.0 17.6 - 11A4 In Jambad village December First 03-Dec-15 84.7 29.4 <10.0 15.0 - 11A4 In Jambad village December Second 17-Dec-15 82.3 30.6 <10.0 16.2 - 11A4 In Jambad village January First 15-Jan-16 92.3 32.2 <10.0 19.7 - 11A4 In Jambad village January Second 29-Jan-16 94.1 30.6 <10.0 18.2 - 11A4 In Jambad village February First 05-Feb-16 182.7 81.8 <10.0 19.7 - 11A4 In Jambad village February Second 23-Feb-16 190.4 80.1 <10.0 20.4 - 11A4 In Jambad village March First 15-Mar-16 188.4 79.9 <10.0 22.6 - 11A4 In Jambad village March Second 29-Mar-16 90.1 30.3 <10.0 20.6 - 11A5 In Damariband village October First 12-Oct-15 90.4 29.3 <10.0 15.6 - 11A5 In Damariband village October Second 30-Oct-15 89.6 28.4 <10.0 16.2 - 11A5 In Damariband village November First 04-Nov-15 88.3 28.2 <10.0 14.5 - 11A5 In Damariband village November Second 20-Nov-15 86.2 26.7 <10.0 15.1 - 11A5 In Damariband village December First 01-Dec-15 82.5 29.1 <10.0 18.9 - 11A5 In Damariband village December Second 29-Dec-15 84.4 28.2 <10.0 17.9 - 11A5 In Damariband village January First 13-Jan-16 80.1 28.4 <10.0 16. - 11A5 In Damariband village January Second 20-Jan-16 82.7 27.1 <10.0 16.4 - 11A5 In Damariband village February First 08-Feb-16 87.2 29.1 <10.0 17.5 - 11A5 In Damariband village February Second 29-Feb-16 88.9 38.6 <10.0 18.7 - 11A5 In Damariband village March First 09-Mar-16 98.3 38.1 <10.0 19.3 - 11A5 In Damariband village March Second 28-Mar-16 80.4 30.1 <10.0 21.3 - 11A6 In Bahadurpur village May Second 28-May-15 89.2 24.2 <10.0 12.3 - 11A6 In Bahadurpur village June First 11-Jun-15 86.3 20.6 <10.0 10.4 - 11A6 In Bahadurpur village June Second 26-Jun-15 80.3 20.9 <10.0 12.7 - 11A6 In Bahadurpur village July Second 29-Jul-15 74.6 18.8 <10.0 12.6 - 11A6 In Bahadurpur village August First 03-Aug-15 68.6 18.1 <10.0 14.6 - 11A6 In Bahadurpur village August Second 28-Aug-15 70.7 19.2 <10.0 15.2 - 11A6 In Bahadurpur village September First 09-Sep-15 67.3 18.7 <10.0 13.4 - 11A6 In Bahadurpur village September Second 17-Sep-15 72.4 22.4 <10.0 11.5 - 11A7 In Chichuria village May Second 28-May-15 92.4 23.1 <10.0 10.1 - 11A7 In Chichuria village June First 11-Jun-15 78.4 19.2 <10.0 9.2 - 11A7 In Chichuria village June Second 26-Jun-15 72.3 17.5 <10.0 10.4 - 11A7 In Chichuria village July Second 27-Jul-15 64.2 17.7 <10.0 18.2 - 11A7 In Chichuria village August First 13-Aug-15 64.7 17.4 <10.0 10.8 - 11A7 In Chichuria village August Second 21-Aug-15 66.4 18.5 <10.0 9.3 - 11A7 In Chichuria village September First 03-Sep-15 62.4 16.5 <10.0 12.0 - 11A7 In Chichuria village September Second 21-Sep-15 68.4 18.9 <10.0 16.2 - 11A8 In Basabdanga village May Second 26-May-15 130.2 32.7 <10.0 16.7 Proximity

20

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

Station Station Name Month Fortnight Date of PM10 PM2.5 SO2 NOx Remarks No Sampling to Sonepur Bazari OCP 11A8 In Basabdanga village June First 09-Jun-15 124.9 30.5 <10.0 14.8 - 11A8 In Basabdanga village June Second 24-Jun-15 116.2 24.6 <10.0 18.5 - 11A8 In Basabdanga village July Second 22-Jul-15 92.1 22.3 <10.0 18.5 - 11A8 In Basabdanga village August First 10-Aug-15 90.6 22.4 <10.0 18.5 - 11A8 In Basabdanga village August Second 24-Aug-15 94.6 24.8 <10.0 19.4 - 11A8 In Basabdanga village September First 14-Sep-15 93.7 20.9 <10.0 17.2 - 11A8 In Basabdanga village September Second 16-Sep-15 88.7 22.9 <10.0 14.1 -

AIR QUALITY METAL ANALYSIS Stati Station Name Month Fortnig Date of Arsenic Cadmi Chromi Mercury Nicke Lead on ht Sampling um um l No 11A1 In Haripur village September First 1-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.03 11A1 In Haripur village March First 5-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005 11A2 In Shankarpur September First 15-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.04 village 11A2 In Shankarpur March First 10-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005 village 11A3 In Belbaid village March First 1-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005 11A4 In Jambad village March First 15-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005 11A5 In Damariband March First 9-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005 village 11A6 In Bahadurpur September First 9-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.02 village 11A7 In Chichuria September First 3-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.07 village 11A8 In Basabdanga September First 14-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.06 village

21

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

Annexure – II NOISE LEVEL Station Station Name Month Fortnight Date of Noise Level No Sampling dB(A) 11N1 Pit-top Haripur UG June Second 23-Jun-15 63.9 11N1 Pit-top Haripur UG May Second 28-May-15 64.2 11N1 Pit-top Haripur UG June First 08-Jun-15 62.8 11N1 Pit-top Haripur UG July First 09-Jul-15 61.4 11N1 Pit-top Haripur UG August First 12-Aug-15 67.5 11N1 Pit-top Haripur UG August Second 21-Aug-15 62.3 11N1 Pit-top Haripur UG September First 09-Sep-15 64.5 11N1 Pit-top Haripur UG September Second 23-Sep-15 65.1 11N1 Pit-top Haripur UG October First 13-Oct-15 64.2 11N1 Pit-top Haripur UG October Second 27-Oct-15 70.3 11N1 Pit-top Haripur UG November First 03-Nov-15 67.2 11N1 Pit-top Haripur UG November Second 27-Nov-15 70.0 11N1 Pit-top Haripur UG December First 01-Dec-15 61 11N1 Pit-top Haripur UG December Second 31-Dec-15 67 11N1 Pit-top Haripur UG January First 06-Jan-16 68 11N1 Pit-top Haripur UG January Second 20-Jan-16 62 11N1 Pit-top Haripur UG February First 09-Feb-16 54 11N1 Pit-top Haripur UG February Second 20-Feb-16 69 11N1 Pit-top Haripur UG March First 09-Mar-16 62 11N1 Pit-top Haripur UG March Second 22-Mar-16 67 11N2 Pit-top Lower Kenda UG June Second 23-Jun-15 59.1 11N2 Pit-top Lower Kenda UG May Second 28-May-15 58.7 11N2 Pit-top Lower Kenda UG June First 08-Jun-15 57.2 11N2 Pit-top Lower Kenda UG July First 09-Jul-15 57.4 11N2 Pit-top Lower Kenda UG August First 12-Aug-15 69.3 11N2 Pit-top Lower Kenda UG August Second 21-Aug-15 69.7 11N2 Pit-top Lower Kenda UG September First 09-Sep-15 66.7 11N2 Pit-top Lower Kenda UG September Second 18-Sep-15 67.9 11N2 Pit-top Lower Kenda UG October First 01-Oct-15 66.7 11N2 Pit-top Lower Kenda UG October Second 27-Oct-15 68.5 11N2 Pit-top Lower Kenda UG November First 03-Nov-15 66.5 11N2 Pit-top Lower Kenda UG November Second 27-Nov-15 64.3 11N2 Pit-top Lower Kenda UG December First 01-Dec-15 60 11N2 Pit-top Lower Kenda UG December Second 31-Dec-15 64 11N2 Pit-top Lower Kenda UG January First 11-Jan-16 67 11N2 Pit-top Lower Kenda UG January Second 20-Jan-16 66 11N2 Pit-top Lower Kenda UG February First 09-Feb-16 61 11N2 Pit-top Lower Kenda UG February Second 20-Feb-16 62 11N2 Pit-top Lower Kenda UG March First 09-Mar-16 64 11N2 Pit-top Lower Kenda UG March Second 22-Mar-16 64 11N3 Pit-top Chora Block Incline UG June Second 24-Jun-15 59.8 11N3 Pit-top Chora Block Incline UG May Second 26-May-15 60.2 11N3 Pit-top Chora Block Incline UG June First 10-Jun-15 62.4 11N3 Pit-top Chora Block Incline UG July First 14-Jul-15 58.7 11N3 Pit-top Chora Block Incline UG August First 12-Aug-15 65.5 11N3 Pit-top Chora Block Incline UG August Second 21-Aug-15 65.1

22

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

Station Station Name Month Fortnight Date of Noise Level No Sampling dB(A) 11N3 Pit-top Chora Block Incline UG September First 01-Sep-15 61.3 11N3 Pit-top Chora Block Incline UG September Second 23-Sep-15 62.4 11N3 Pit-top Chora Block Incline UG October First 12-Oct-15 64.9 11N3 Pit-top Chora Block Incline UG October Second 27-Oct-15 66.4 11N3 Pit-top Chora Block Incline UG November First 03-Nov-15 66.8 11N3 Pit-top Chora Block Incline UG November Second 27-Nov-15 67.1 11N3 Pit-top Chora Block Incline UG December First 01-Dec-15 66 11N3 Pit-top Chora Block Incline UG December Second 31-Dec-15 67 11N3 Pit-top Chora Block Incline UG January First 11-Jan-16 64 11N3 Pit-top Chora Block Incline UG January Second 20-Jan-16 61 11N3 Pit-top Chora Block Incline UG February First 15-Feb-16 69 11N3 Pit-top Chora Block Incline UG February Second 20-Feb-16 63 11N3 Pit-top Chora Block Incline UG March First 09-Mar-16 69 11N3 Pit-top Chora Block Incline UG March Second 22-Mar-16 54 11N4 Pit-top Chora 7, 9 & 10 Pits June Second 26-Jun-15 62.1 UG 11N4 Pit-top Chora 7, 9 & 10 Pits May Second 25-May-15 66.2 UG 11N4 Pit-top Chora 7, 9 & 10 Pits June First 10-Jun-15 64.7 11N4 Pit-top Chora 7, 9 & 10 Pits July First 14-Jul-15 59.3 11N4 Pit-top Chora 7, 9 & 10 Pits August First 12-Aug-15 58.4 11N4 Pit-top Chora 7, 9 & 10 Pits August Second 24-Aug-15 60.8 11N4 Pit-top Chora 7, 9 & 10 Pits September First 01-Sep-15 65.2 11N4 Pit-top Chora 7, 9 & 10 Pits September Second 29-Sep-15 64.3 11N4 Pit-top Chora 7, 9 & 10 Pits October First 15-Oct-15 66.3 11N4 Pit-top Chora 7, 9 & 10 Pits October Second 27-Oct-15 67.1 11N4 Pit-top Chora 7, 9 & 10 Pits November First 03-Nov-15 67.6 11N4 Pit-top Chora 7, 9 & 10 Pits November Second 27-Nov-15 69.7 11N4 Pit-top Chora 7, 9 & 10 Pits December First 01-Dec-15 68 11N4 Pit-top Chora 7, 9 & 10 Pits December Second 31-Dec-15 66 11N4 Pit-top Chora 7, 9 & 10 Pits January First 11-Jan-16 62 11N4 Pit-top Chora 7, 9 & 10 Pits January Second 20-Jan-16 60 11N4 Pit-top Chora 7, 9 & 10 Pits February First 15-Feb-16 62 11N4 Pit-top Chora 7, 9 & 10 Pits February Second 16-Feb-16 59 11N4 Pit-top Chora 7, 9 & 10 Pits March First 09-Mar-16 58 11N4 Pit-top Chora 7, 9 & 10 Pits March Second 22-Mar-16 58 11N5 Pit-top Bahula UG June Second 24-Jun-15 58.2 11N5 Pit-top Bahula UG May Second 25-May-15 60.7 11N5 Pit-top Bahula UG June First 12-Jun-15 62.4 11N5 Pit-top Bahula UG August First 10-Aug-15 63.5 11N5 Pit-top Bahula UG July First 08-Jul-15 59.8 11N5 Pit-top Bahula UG August Second 21-Aug-15 65.7 11N5 Pit-top Bahula UG September First 14-Sep-15 63.1 11N5 Pit-top Bahula UG September Second 25-Sep-15 64.7 11N5 Pit-top Bahula UG October First 06-Oct-15 66.1 11N5 Pit-top Bahula UG October Second 29-Oct-15 68.7 11N5 Pit-top Bahula UG November First 06-Nov-15 70.5 11N5 Pit-top Bahula UG November Second 20-Nov-15 68.4 11N5 Pit-top Bahula UG December First 09-Dec-15 62

23

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

Station Station Name Month Fortnight Date of Noise Level No Sampling dB(A) 11N5 Pit-top Bahula UG December Second 31-Dec-15 62 11N5 Pit-top Bahula UG January First 11-Jan-16 65 11N5 Pit-top Bahula UG January Second 20-Jan-16 66 11N5 Pit-top Bahula UG February First 15-Feb-16 70 11N5 Pit-top Bahula UG February Second 16-Feb-16 54 11N5 Pit-top Bahula UG March First 01-Mar-16 67 11N5 Pit-top Bahula UG March Second 28-Mar-16 69 11N6 Pit-top C L Jambad UG June Second 26-Jun-15 59.8 11N6 Pit-top C L Jambad UG May Second 26-May-15 62.2 11N6 Pit-top C L Jambad UG June First 12-Jun-15 60.1 11N6 Pit-top C L Jambad UG August First 10-Aug-15 64.9 11N6 Pit-top C L Jambad UG July First 09-Jul-15 63.5 11N6 Pit-top C L Jambad UG August Second 21-Aug-15 59.3 11N6 Pit-top C L Jambad UG September First 14-Sep-15 62.5 11N6 Pit-top C L Jambad UG September Second 29-Sep-15 60.3 11N6 Pit-top C L Jambad UG October First 15-Oct-15 60.9 11N6 Pit-top C L Jambad UG October Second 29-Oct-15 64.6 11N6 Pit-top C L Jambad UG November First 06-Nov-15 68.2 11N6 Pit-top C L Jambad UG November Second 20-Nov-15 65.8 11N6 Pit-top C L Jambad UG December First 09-Dec-15 66 11N6 Pit-top C L Jambad UG December Second 30-Dec-15 64 11N6 Pit-top C L Jambad UG January First 11-Jan-16 63 11N6 Pit-top C L Jambad UG January Second 21-Jan-16 67 11N6 Pit-top C L Jambad UG February First 08-Feb-16 58 11N6 Pit-top C L Jambad UG February Second 16-Feb-16 67 11N6 Pit-top C L Jambad UG March First 01-Mar-16 62 11N6 Pit-top C L Jambad UG March Second 28-Mar-16 70 11N7 Pit-top Siduli UG June Second 23-Jun-15 60.9 11N7 Pit-top Siduli UG May Second 28-May-15 62.1 11N7 Pit-top Siduli UG June First 11-Jun-15 64.2 11N7 Pit-top Siduli UG August First 10-Aug-15 68.4 11N7 Pit-top Siduli UG July First 09-Jul-15 59.8 11N7 Pit-top Siduli UG August Second 24-Aug-15 64.1 11N7 Pit-top Siduli UG September First 01-Sep-15 63.8 11N7 Pit-top Siduli UG September Second 28-Sep-15 64.7 11N7 Pit-top Siduli UG October First 05-Oct-15 62.7 11N7 Pit-top Siduli UG October Second 29-Oct-15 65.2 11N7 Pit-top Siduli UG November First 06-Nov-15 66.1 11N7 Pit-top Siduli UG November Second 20-Nov-15 67.2 11N7 Pit-top Siduli UG December First 09-Dec-15 67 11N7 Pit-top Siduli UG December Second 30-Dec-15 63 11N7 Pit-top Siduli UG January First 12-Jan-16 66 11N7 Pit-top Siduli UG January Second 21-Jan-16 69 11N7 Pit-top Siduli UG February First 02-Feb-16 57 11N7 Pit-top Siduli UG February Second 29-Feb-16 64 11N7 Pit-top Siduli UG March First 01-Mar-16 68 11N7 Pit-top Siduli UG March Second 28-Mar-16 62 11N8 Pit-top Khandra UG June Second 24-Jun-15 58.9 11N8 Pit-top Khandra UG May Second 28-May-15 64.6

24

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

Station Station Name Month Fortnight Date of Noise Level No Sampling dB(A) 11N8 Pit-top Khandra UG June First 11-Jun-15 62.7 11N8 Pit-top Khandra UG August First 10-Aug-15 64.5 11N8 Pit-top Khandra UG July First 14-Jul-15 60.3 11N8 Pit-top Khandra UG August Second 24-Aug-15 58.9 11N8 Pit-top Khandra UG September First 01-Sep-15 60.7 11N8 Pit-top Khandra UG September Second 29-Sep-15 62.6 11N8 Pit-top Khandra UG October First 14-Oct-15 64.3 11N8 Pit-top Khandra UG October Second 29-Oct-15 63.9 11N8 Pit-top Khandra UG November First 06-Nov-15 65.4 11N8 Pit-top Khandra UG November Second 20-Nov-15 64.1 11N8 Pit-top Khandra UG December First 09-Dec-15 64 11N8 Pit-top Khandra UG December Second 30-Dec-15 69 11N8 Pit-top Khandra UG January First 12-Jan-16 69 11N8 Pit-top Khandra UG January Second 21-Jan-16 61 11N8 Pit-top Khandra UG February First 06-Feb-16 63 11N8 Pit-top Khandra UG February Second 29-Feb-16 63 11N8 Pit-top Khandra UG March First 05-Mar-16 61 11N8 Pit-top Khandra UG March Second 18-Mar-16 54 11N9 Pit-top Shankarpur UG June Second 26-Jun-15 62.1 11N9 Pit-top Shankarpur UG May Second 26-May-15 58.7 11N9 Pit-top Shankarpur UG June First 09-Jun-15 59.2 11N9 Pit-top Shankarpur UG August First 10-Aug-15 63.0 11N9 Pit-top Shankarpur UG July First 09-Jun-15 60.0 11N9 Pit-top Shankarpur UG August Second 24-Aug-15 63.8 11N9 Pit-top Shankarpur UG September First 01-Sep-15 64.3 11N9 Pit-top Shankarpur UG September Second 16-Sep-15 66.2 11N9 Pit-top Shankarpur UG October First 13-Oct-15 67.9 11N9 Pit-top Shankarpur UG October Second 29-Oct-15 70.6 11N9 Pit-top Shankarpur UG November First 04-Nov-15 69.8 11N9 Pit-top Shankarpur UG November Second 20-Nov-15 71.2 11N9 Pit-top Shankarpur UG December First 09-Dec-15 70 11N9 Pit-top Shankarpur UG December Second 30-Dec-15 70 11N9 Pit-top Shankarpur UG January First 12-Jan-16 70 11N9 Pit-top Shankarpur UG January Second 21-Jan-16 70 11N9 Pit-top Shankarpur UG February First 08-Feb-16 69 11N9 Pit-top Shankarpur UG February Second 29-Feb-16 67 11N9 Pit-top Shankarpur UG March First 05-Mar-16 59 11N9 Pit-top Shankarpur UG March Second 18-Mar-16 59

25

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

Annexure – III EFFLUENT WATER QUALITY (5 PARAMETERS) Station Station Name Month Fortnight Date of pH TSS TDS O&G COD No Sampling 11MW1 Haripur May Second 30-May-15 7.88 32 531 <2.0 28 11MW1 Haripur July First 09-Jul-15 7.93 <25.0 526 <2.0 16 11MW1 Haripur July Second 29-Jul-15 7.98 28 543 <2.0 36 11MW1 Haripur August First 12-Aug-15 8.04 <25.0 576 <2.0 20 11MW1 Haripur August Second 26-Aug-15 8.06 <25.0 584 <2.0 32 11MW1 Haripur June Second 23-Jun-15 7.96 <25.0 530 <2.0 16 11MW1 Haripur June First 08-Jun-15 7.91 28 536 <2.0 24 11MW1 Haripur September First 09-Sep-15 8.02 <25.0 567 <2.0 30 11MW1 Haripur September Second 22-Sep-15 8.02 7 484 <2.0 12 11MW1 Haripur October First 13-Oct-15 7.86 6 478 <2.0 24 11MW1 Haripur October Second 23-Oct-15 8.32 7 492 <2.0 16 11MW1 Haripur November First 03-Nov-15 7.88 5 506 <2.0 12 11MW1 Haripur November Second 28-Nov-15 7.64 10 486 <2.0 16 11MW1 Haripur December Second 21-Dec-15 7.55 16 620 <2.0 24 11MW1 Haripur January First 15-Jan-16 7.65 9 627 <2.0 16 11MW1 Haripur January Second 21-Jan-16 7.65 7 631 <2.0 24 11MW1 Haripur February First 02-Feb-16 7.72 10 657 <2.0 24 11MW1 Haripur February Second 16-Feb-16 7.82 14 650 <2.0 32 11MW1 Haripur March First 10-Mar-16 7.89 12 650 <2.0 36 11MW1 Haripur March Second 28-Mar-16 8.00 18 639 <2.0 24 11MW10 Khandra UG July First 14-Jul-15 7.65 <25.0 572 <2.0 16 11MW10 Khandra UG July Second 29-Jul-15 7.98 <25.0 562 <2.0 24 11MW10 Khandra UG August First 10-Aug-15 8.02 <25.0 574 <2.0 14 11MW10 Khandra UG August Second 25-Aug-15 8.00 32 588 <2.0 10 11MW10 Khandra UG June Second 24-Jun-15 8.05 <25.0 576 <2.0 12 11MW10 Khandra UG May Second 28-May-15 7.84 28 572 <2.0 24 11MW10 Khandra UG June First 05-Jun-15 7.86 <25.0 581 <2.0 8 11MW10 Khandra UG September First 14-Sep-15 8.00 32 581 <2.0 08 11MW10 Khandra UG September Second 17-Sep-15 8.07 6 498 <2.0 24 11MW10 Khandra UG October First 14-Oct-15 7.58 5 478 <2.0 16 11MW10 Khandra UG October Second 30-Oct-15 8.18 8 484 <2.0 24 11MW10 Khandra UG November First 03-Nov-15 8.42 10 472 <2.0 16 11MW10 Khandra UG November Second 27-Nov-15 8.12 10 488 <2.0 16 11MW10 Khandra UG December Second 29-Dec-15 7.96 10 433 <2.0 40 11MW10 Khandra UG January First 13-Jan-16 7.99 7 442 <2.0 16 11MW10 Khandra UG January Second 27-Jan-16 8.06 7 460 <2.0 8 11MW10 Khandra UG February First 09-Feb-16 8.21 10 741 <2.0 24 11MW10 Khandra UG February Second 23-Feb-16 8.15 12 725 <2.0 20 11MW10 Khandra UG March First 15-Mar-16 8.40 7 747 <2.0 32 11MW10 Khandra UG March Second 22-Mar-16 8.49 6 749 <2.0 20 11MW11 Shankarpur UG July First 14-Jul-15 7.78 <25.0 474 <2.0 16 11MW11 Shankarpur UG July Second 29-Jul-15 8.70 <25.0 449 <2.0 40 11MW11 Shankarpur UG August First 10-Aug-15 8.83 <25.0 467 <2.0 20 11MW11 Shankarpur UG August Second 25-Aug-15 8.78 26 471 <2.0 20 11MW11 Shankarpur UG June Second 24-Jun-15 8.09 26 478 <2.0 20 11MW11 Shankarpur UG May Second 27-May-15 7.22 <25.0 484 <2.0 22

26

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

Station Station Name Month Fortnight Date of pH TSS TDS O&G COD No Sampling 11MW11 Shankarpur UG June First 09-Jun-15 7.26 30 480 <2.0 28 11MW11 Shankarpur UG September First 14-Sep-15 8.80 30 493 <2.0 20 11MW11 Shankarpur UG September Second 17-Sep-15 8.58 7 484 <2.0 08 11MW11 Shankarpur UG October First 14-Oct-15 7.94 6 484 <2.0 16 11MW11 Shankarpur UG October Second 30-Oct-15 8.48 9 478 <2.0 24 11MW11 Shankarpur UG November First 03-Nov-15 8.48 8 506 <2.0 24 11MW11 Shankarpur UG November Second 27-Nov-15 8.38 12 494 <2.0 24 11MW11 Shankarpur UG December Second 29-Dec-15 8.29 12 445 <2.0 48 11MW11 Shankarpur UG January First 12-Jan-16 8.32 9 461 <2.0 24 11MW11 Shankarpur UG January Second 29-Jan-16 8.29 10 451 <2.0 16 11MW11 Shankarpur UG February First 09-Feb-16 8.32 12 431 <2.0 32 11MW11 Shankarpur UG February Second 23-Feb-16 8.26 14 444 <2.0 32 11MW11 Shankarpur UG March First 15-Mar-16 8.25 6 440 <2.0 48 11MW11 Shankarpur UG March Second 22-Mar-16 8.25 9 459 <2.0 36 11MW2 West Kenda OC Patch May Second 30-May-15 7.99 <25.0 478 <2.0 8 11MW2 West Kenda OC Patch July First 09-Jul-15 7.98 26 486 <2.0 20 11MW2 West Kenda OC Patch July Second 29-Jul-15 8.03 30 521 <2.0 48 11MW2 West Kenda OC Patch August First 13-Aug-15 8.05 <25.0 571 <2.0 14 11MW2 West Kenda OC Patch August Second 26-Aug-15 8.02 26 592 <2.0 18 11MW2 West Kenda OC Patch June Second 23-Jun-15 8.05 <25.0 480 <2.0 12 11MW2 West Kenda OC Patch June First 08-Jun-15 7.89 26 484 <2.0 16 11MW2 West Kenda OC Patch September First 09-Sep-15 8.06 <25.0 579 <2.0 14 11MW2 West Kenda OC Patch September Second 22-Sep-15 7.98 10 492 <2.0 24 11MW2 West Kenda OC Patch October First 13-Oct-15 7.97 8 474 <2.0 16 11MW2 West Kenda OC Patch October Second 23-Oct-15 8.34 10 484 <2.0 28 11MW2 West Kenda OC Patch November First 12-Nov-15 7.82 7 514 <2.0 16 11MW2 West Kenda OC Patch November Second 28-Nov-15 8.36 12 508 <2.0 24 11MW2 West Kenda OC Patch December Second 21-Dec-15 8.20 8 625 <2.0 32 11MW2 West Kenda OC Patch January First 15-Jan-16 8.23 8 633 <2.0 16 11MW2 West Kenda OC Patch January Second 21-Jan-16 8.20 5 630 <2.0 16 11MW2 West Kenda OC Patch February First 02-Feb-16 8.31 16 647 <2.0 40 11MW2 West Kenda OC Patch February Second 16-Feb-16 8.35 12 641 <2.0 56 11MW2 West Kenda OC Patch March First 10-Mar-16 8.32 14 668 <2.0 64 11MW2 West Kenda OC Patch March Second 28-Mar-16 8.21 12 688 <2.0 48 11MW3 New Kenda OC Patch May Second 30-May-15 7.70 30 276 <2.0 24 11MW3 New Kenda OC Patch July First 09-Jul-15 7.89 <25.0 276 <2.0 24 11MW3 New Kenda OC Patch July Second 29-Jul-15 8.69 <25.0 266 <2.0 40 11MW3 New Kenda OC Patch August First 10-Aug-15 8.66 <25.0 274 <2.0 20 11MW3 New Kenda OC Patch August Second 26-Aug-15 8.72 30 312 <2.0 24 11MW3 New Kenda OC Patch June Second 23-Jun-15 7.94 26 272 <2.0 24 11MW3 New Kenda OC Patch June First 11-Jun-15 7.72 28 280 <2.0 24 11MW3 New Kenda OC Patch September First 09-Sep-15 8.54 28 294 <2.0 24 11MW3 New Kenda OC Patch September Second 17-Sep-15 8.54 12 368 <2.0 32 11MW3 New Kenda OC Patch October First 13-Oct-15 8.32 10 484 <2.0 28 11MW3 New Kenda OC Patch October Second 23-Oct-15 8.12 12 490 <2.0 32 11MW3 New Kenda OC Patch November First 12-Nov-15 8.35 8 494 <2.0 24 11MW3 New Kenda OC Patch November Second 28-Nov-15 8.32 12 502 <2.0 24 11MW3 New Kenda OC Patch December Second 21-Dec-15 8.11 6 529 <2.0 24 11MW3 New Kenda OC Patch January First 15-Jan-16 8.19 11 537 <2.0 24

27

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

Station Station Name Month Fortnight Date of pH TSS TDS O&G COD No Sampling 11MW3 New Kenda OC Patch January Second 21-Jan-16 8.12 10 525 <2.0 24 11MW3 New Kenda OC Patch February First 02-Feb-16 8.12 14 551 <2.0 48 11MW3 New Kenda OC Patch February Second 16-Feb-16 8.11 13 525 <2.0 40 11MW3 New Kenda OC Patch March First 10-Mar-16 8.26 8 550 <2.0 40 11MW3 New Kenda OC Patch March Second 28-Mar-16 8.40 14 530 <2.0 48 11MW4 Lower Kenda May Second 28-May-15 7.43 28 414 <2.0 32 11MW4 Lower Kenda July First 09-Jul-15 7.52 26 416 <2.0 16 11MW4 Lower Kenda July Second 27-Jul-15 8.74 <25.0 388 <2.0 24 11MW4 Lower Kenda August First 03-Aug-15 8.77 <25.0 380 <2.0 30 11MW4 Lower Kenda August Second 26-Aug-15 8.84 <25.0 364 <2.0 34 11MW4 Lower Kenda June Second 24-Jun-15 8.03 30 410 <2.0 28 11MW4 Lower Kenda June First 11-Jun-15 7.48 32 418 <2.0 28 11MW4 Lower Kenda September First 09-Sep-15 8.72 30 372 <2.0 30 11MW4 Lower Kenda September Second 17-Sep-15 8.68 9 412 <2.0 20 11MW4 Lower Kenda October First 06-Oct-15 8.46 12 510 <2.0 24 11MW4 Lower Kenda October Second 23-Oct-15 8.34 11 498 <2.0 24 11MW4 Lower Kenda November First 03-Nov-15 7.86 6 478 <2.0 16 11MW4 Lower Kenda November Second 28-Nov-15 8.48 8 516 <2.0 16 11MW4 Lower Kenda December Second 23-Dec-15 8.38 7 471 <2.0 32 11MW4 Lower Kenda January First 15-Jan-16 8.41 7 479 <2.0 16 11MW4 Lower Kenda January Second 21-Jan-16 8.49 8 495 <2.0 16 11MW4 Lower Kenda February First 02-Feb-16 8.36 16 480 <2.0 24 11MW4 Lower Kenda February Second 16-Feb-16 8.32 8 452 <2.0 28 11MW4 Lower Kenda March First 10-Mar-16 8.50 9 500 <2.0 28 11MW4 Lower Kenda March Second 29-Mar-16 8.59 16 523 <2.0 24 11MW5 Chora Block Incline July First 09-Jul-15 7.64 <25.0 448 <2.0 16 11MW5 Chora Block Incline July Second 27-Jul-15 8.82 <25.0 422 <2.0 32 11MW5 Chora Block Incline August First 10-Aug-15 8.85 26 449 <2.0 22 11MW5 Chora Block Incline August Second 26-Aug-15 8.92 28 462 <2.0 20 11MW5 Chora Block Incline June Second 24-Jun-15 7.98 28 444 <2.0 24 11MW5 Chora Block Incline May Second 30-May-15 7.40 <25.0 448 <2.0 24 11MW5 Chora Block Incline June First 11-Jun-15 7.54 26 456 <2.0 24 11MW5 Chora Block Incline September First 09-Sep-15 8.78 32 470 <2.0 28 11MW5 Chora Block Incline September Second 17-Sep-15 8.62 10 438 <2.0 28 11MW5 Chora Block Incline October First 06-Oct-15 8.62 14 512 <2.0 32 11MW5 Chora Block Incline October Second 29-Oct-15 8.52 8 482 <2.0 20 11MW5 Chora Block Incline November First 06-Nov-15 7.84 8 512 <2.0 16 11MW5 Chora Block Incline November Second 26-Nov-15 7.48 10 478 <2.0 20 11MW5 Chora Block Incline December Second 23-Dec-15 7.38 9 507 <2.0 16 11MW5 Chora Block Incline January First 15-Jan-16 7.35 13 519 <2.0 32 11MW5 Chora Block Incline January Second 27-Jan-16 7.36 11 512 <2.0 16 11MW5 Chora Block Incline February First 08-Feb-16 7.48 8 592 <2.0 24 11MW5 Chora Block Incline February Second 16-Feb-16 7.48 7 559 <2.0 32 11MW5 Chora Block Incline March First 09-Mar-16 7.71 7 620 <2.0 24 11MW5 Chora Block Incline March Second 29-Mar-16 7.91 18 635 <2.0 40 11MW6 Chora 7, 9 & 10 Pits July First 14-Jul-15 7.86 <25.0 452 <2.0 24 11MW6 Chora 7, 9 & 10 Pits July Second 24-Jun-15 7.87 <25.0 430 <2.0 16 11MW6 Chora 7, 9 & 10 Pits August First 10-Aug-15 7.94 28 472 <2.0 16 11MW6 Chora 7, 9 & 10 Pits August Second 26-Aug-15 8.00 26 466 <2.0 20

28

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

Station Station Name Month Fortnight Date of pH TSS TDS O&G COD No Sampling 11MW6 Chora 7, 9 & 10 Pits June Second 24-Jun-15 8.09 <25.0 446 <2.0 16 11MW6 Chora 7, 9 & 10 Pits May Second 29-May-15 7.58 <25.0 447 <2.0 22 11MW6 Chora 7, 9 & 10 Pits June First 11-Jun-15 7.46 <25.0 438 <2.0 8 11MW6 Chora 7, 9 & 10 Pits September First 09-Sep-15 7.92 34 477 <2.0 20 11MW6 Chora 7, 9 & 10 Pits September Second 18-Sep-15 8.09 10 484 <2.0 32 11MW6 Chora 7, 9 & 10 Pits October First 06-Oct-15 8.52 16 488 <2.0 40 11MW6 Chora 7, 9 & 10 Pits October Second 29-Oct-15 8.48 9 520 <2.0 36 11MW6 Chora 7, 9 & 10 Pits November First 03-Nov-15 7.78 9 538 <2.0 32 11MW6 Chora 7, 9 & 10 Pits November Second 26-Nov-15 7.96 14 482 <2.0 28 11MW6 Chora 7, 9 & 10 Pits December Second 23-Dec-15 7.89 7 528 <2.0 16 11MW6 Chora 7, 9 & 10 Pits January First 15-Jan-16 7.90 8 534 <2.0 16 11MW6 Chora 7, 9 & 10 Pits January Second 27-Jan-16 7.92 9 531 <2.0 24 11MW6 Chora 7, 9 & 10 Pits February First 08-Feb-16 7.99 9 650 <2.0 32 11MW6 Chora 7, 9 & 10 Pits February Second 23-Feb-16 7.83 6 660 <2.0 32 11MW6 Chora 7, 9 & 10 Pits March First 09-Mar-16 8.21 6 667 <2.0 32 11MW6 Chora 7, 9 & 10 Pits March Second 29-Mar-16 8.35 14 666 <2.0 24 11MW7 Bahula UG July First 14-Jul-15 7.75 28 482 <2.0 16 11MW7 Bahula UG July Second 24-Jun-15 8.56 <25.0 471 <2.0 32 11MW7 Bahula UG August First 10-Aug-15 8.47 30 492 <2.0 24 11MW7 Bahula UG August Second 25-Aug-15 8.56 <25.0 470 <2.0 24 11MW7 Bahula UG June Second 24-Jun-15 7.93 26 478 <2.0 24 11MW7 Bahula UG May Second 29-May-15 7.32 30 492 <2.0 24 11MW7 Bahula UG June First 11-Jun-15 7.39 28 486 <2.0 24 11MW7 Bahula UG September First 14-Sep-15 8.52 36 482 <2.0 24 11MW7 Bahula UG September Second 18-Sep-15 8.32 12 482 <2.0 32 11MW7 Bahula UG October First 06-Oct-15 8.12 9 508 <2.0 20 11MW7 Bahula UG October Second 30-Oct-15 8.42 7 478 <2.0 28 11MW7 Bahula UG November First 04-Nov-15 7.64 7 482 <2.0 24 11MW7 Bahula UG November Second 26-Nov-15 8.42 12 488 <2.0 24 11MW7 Bahula UG December Second 23-Dec-15 8.40 6 468 <2.0 08 11MW7 Bahula UG January First 15-Jan-16 8.41 7 477 <2.0 32 11MW7 Bahula UG January Second 27-Jan-16 8.41 7 475 <2.0 8 11MW7 Bahula UG February First 08-Feb-16 8.09 7 468 <2.0 24 11MW7 Bahula UG February Second 23-Feb-16 8.00 <5 468 <2.0 16 11MW7 Bahula UG March First 09-Mar-16 8.32 8 492 <2.0 48 11MW7 Bahula UG March Second 29-Mar-16 8.48 12 509 <2.0 24 11MW8 C L Jambad UG July First 14-Jul-15 7.79 30 556 <2.0 32 11MW8 C L Jambad UG July Second 27-Jul-15 7.69 <25.0 538 <2.0 24 11MW8 C L Jambad UG August First 13-Aug-15 8.26 32 557 <2.0 34 11MW8 C L Jambad UG August Second 25-Aug-15 8.30 <25.0 539 <2.0 28 11MW8 C L Jambad UG June Second 24-Jun-15 7.92 32 552 <2.0 32 11MW8 C L Jambad UG May Second 28-May-15 7.47 32 547 <2.0 32 11MW8 C L Jambad UG June First 11-Jun-15 7.37 30 540 <2.0 28 11MW8 C L Jambad UG September First 14-Sep-15 8.32 <25.0 530 <2.0 22 11MW8 C L Jambad UG September Second 18-Sep-15 8.17 9 498 <2.0 20 11MW8 C L Jambad UG October First 14-Oct-15 8.36 8 492 <2.0 24 11MW8 C L Jambad UG October Second 30-Oct-15 8.38 6 522 <2.0 16 11MW8 C L Jambad UG November First 02-Nov-15 7.92 10 478 <2.0 24 11MW8 C L Jambad UG November Second 26-Nov-15 8.52 10 502 <2.0 16

29

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

Station Station Name Month Fortnight Date of pH TSS TDS O&G COD No Sampling 11MW8 C L Jambad UG December Second 23-Dec-15 8.52 9 636 <2.0 24 11MW8 C L Jambad UG January First 15-Jan-16 8.53 6 648 <2.0 24 11MW8 C L Jambad UG January Second 27-Jan-16 8.53 6 652 <2.0 8 11MW8 C L Jambad UG February First 09-Feb-16 8.12 <5.0 721 <2.0 16 11MW8 C L Jambad UG February Second 23-Feb-16 8.16 16 722 <2.0 28 11MW8 C L Jambad UG March First 09-Mar-16 8.01 9 728 <2.0 36 11MW8 C L Jambad UG March Second 22-Mar-16 8.19 8 750 <2.0 16 11MW9 Siduli UG July First 14-Jul-15 7.68 32 372 <2.0 24 11MW9 Siduli UG July Second 29-Jul-15 8.20 <25.0 355 <2.0 08 11MW9 Siduli UG August First 13-Aug-15 8.24 <25.0 354 <2.0 24 11MW9 Siduli UG August Second 25-Aug-15 8.36 <25.0 350 <2.0 20 11MW9 Siduli UG June Second 24-Jun-15 8.12 34 374 <2.0 24 11MW9 Siduli UG May Second 27-May-15 7.02 34 370 <2.0 16 11MW9 Siduli UG June First 11-Jun-15 7.03 36 366 <2.0 20 11MW9 Siduli UG September First 14-Sep-15 8.26 28 364 <2.0 24 11MW9 Siduli UG September Second 18-Sep-15 8.12 8 432 <2.0 16 11MW9 Siduli UG October First 14-Oct-15 7.98 10 482 <2.0 32 11MW9 Siduli UG October Second 30-Oct-15 8.36 <5 494 <2.0 16 11MW9 Siduli UG November First 02-Nov-15 8.36 11 488 <2.0 28 11MW9 Siduli UG November Second 27-Nov-15 8.54 6 518 <2.0 08 11MW9 Siduli UG December Second 29-Dec-15 8.50 8 448 <2.0 24 11MW9 Siduli UG January First 13-Jan-16 8.47 7 455 <2.0 08 11MW9 Siduli UG January Second 27-Jan-16 8.55 6 469 <2.0 16 11MW9 Siduli UG February First 09-Feb-16 8.24 8 739 <2.0 16 11MW9 Siduli UG February Second 23-Feb-16 8.16 18 726 <2.0 24 11MW9 Siduli UG March First 15-Mar-16 8.24 8 739 <2.0 24 11MW9 Siduli UG March Second 22-Mar-16 8.29 7 767 <2.0 12

Effluent Water Quality Standards (MoEF Schedule – VI Standards) Parameters pH TSS TDS Oil & Grease COD Limit 5.5-9.0 100 Not Specified 10 250

30

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

Annexure – III EFFLUENT QUALITY (29 PARAMETERS) Cluster 11 11 11 11 11 11 11 11 11 11 11 Effluent Station No 11MW1 11MW2 11MW3 11MW4 11MW5 11MW6 11MW7 11MW8 11MW9 11MW10 11MW11 Water Station Haripur West New Lower Chora Chora Bahula C L Siduli Khandra Shankarpu (MOEF Name Kenda Kenda Kenda Block 7, 9 & UG Jambad UG UG r UG Schedule-VI OC OC Incline 10 Pits UG Standard) Patch Patch Month Decem Decem Decem Decem Decem Decem Decem Decem Decem Decembe December ber ber ber ber ber ber ber ber ber r Fortnight First First First First First First First First First First First Date of 14-Dec- 14-Dec- 07-Dec- 07-Dec- 14-Dec- 14-Dec- 09-Dec- 09-Dec- 14-Dec- 14-Dec- 03-Dec-15 Sampling 15 15 15 15 15 15 15 15 15 15 Colour 3 4 5 3 3 3 3 3 4 3 3 Unobjectiona ble Odour Unobje Unobje Unobje Unobje Unobje Unobje Unobje Unobje Unobje Unobjecti Unobjectio Unobjectiona ctionabl ctionabl ctionabl ctionabl ctionabl ctionabl ctionabl ctionabl ctionabl onable nable ble e e e e e e e e e TSS 7 10 12 10 14 7 16 5 12 8 10 100.0 pH 8.12 8.04 8.00 8.13 8.09 8.11 8.24 8.09 8.17 8.0 8.21 5.5-9.0 Temperatu 21.78 22.00 22.03 21.94 21.88 21.72 21.91 22.0 22.4 22.1 21.98 Shall not re(Deg C) exceed 50C above the receiving water temp Oil & <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 10.0 Grease Total 0.03 0.03 <0.02 <0.02 0.03 0.03 <0.02 <0.02 <0.02 <0.02 0.02 Residual 1.0 Chlorine Ammonical 0.45 0.47 0.42 0.58 0.48 0.62 0.56 0.54 0.48 0.59 0.47 50.0 Nitrogen Total 1.64 1.52 1.26 1.32 1.38 1.42 1.58 1.72 1.67 1.53 1.42 Kjeldahi 100.0 Nitrogen Free <0.4 <0.4 <0.4 <0.4 <0.4 <0.4 <0.4 <0.4 <0.4 <0.4 <0.4 5.0 Amonia BOD 3 5 4 4 5 5 4 4 5 3 5 30.0 COD 16 24 32 24 24 16 24 16 16 24 32 250.0 Arsenic <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.2 Lead <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.1 Hexavalent 0.04 0.03 0.02 0.03 0.04 0.03 0.02 0.03 0.02 0.02 0.03 0.1 Chromium Total 0.06 0.04 0.04 0.05 0.06 0.04 0.03 0.05 0.04 0.04 0.04 2.0 Chromium Copper 0.04 0.03 0.03 0.03 0.04 0.03 0.03 0.04 0.03 0.03 0.03 3.0 Zinc 0.03 0.05 0.04 0.05 0.03 0.05 0.04 0.03 0.06 0.06 0.05 5.0 Selenium <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.05 Nickel <0.10 <0.10 <0.10 <0.10 <0.10 <0.10 <0.10 <0.10 <0.10 <0.10 <0.10 3.0 Fluoride 0.59 0.71 0.67 0.78 0.55 0.72 0.80 0.63 0.54 0.75 0.46 2.0 Dissolved 1.72 1.64 1.72 1.58 1.52 1.64 1.69 1.79 1.32 1.28 1.24 5.0 Phosphate Sulphide 0.006 0.005 0.006 0.005 0.008 0.007 0.009 0.007 0.005 <0.005 0.008 2.0 Phenolics <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 1.0 Manganese 0.24 0.22 0.24 0.26 0.22 0.24 0.20 0.22 0.26 0.24 0.20 2.0 Iron 0.16 0.14 0.12 0.10 0.12 0.10 0.14 0.16 0.16 0.14 0.12 3.0 Nitrate 2.9 2.7 3.6 3.4 3.2 3.9 3.7 2.9 2.9 2.8 3.1 10.0 Nitrogen Cadmium <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 0.003 Total 598 615 521 469 500 528 408 636 448 433 438 Dissolved Not Specified Solids

31

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

Annexure – III GROUNDWATER QUALITY Cluster No 11 11 11 11 11 11 Indian Station No 11GW1 11GW2 11GW3 11GW4 11GW5 11GW6 Drinking Station Dugwell at Dugwell at Dugwell at Dugwell at Dugwell at Dugwell at Water Standard Name Moira Bahadurpur Singaran Chichuria Shankarpur Ananda (IS- Kalimandir & Panchayet village of Dangal village Ashram at 10500) backside of office Belbad OCP Colony of Khandra Manager's S.B.Project village office Month May'15 May'15 May'15 May'15 May'15 May'15 Fortnight Second Second Second Second Second Second Date of 27-May-15 30-May-15 30-May-15 28-May-15 29-May-15 27-May-15 sampling Colour,Haz 4 3 2 4 5 3 5 en unit Max Odour Unobjection Unobjection Unobjection Unobjection Unobjection Unobjection Unobjection able able able able able able able Taste Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Turbidity, 3.1 2.9 3.2 4.0 3.9 4.0 5 NTU Max pH 7.66 7.61 8.14 6.55 7.65 7.50 6.5-8.5 Total 132 196 148 52 380 140 300.0 Hardness Iron <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 0.30 Chlorides 146 43 28 25 92 40 250.0 Res Free <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 0.20 chlorine Dissolved 708 260 241 104.4 533 198 500.0 Solids Calcium 30.4 62.4 38.40 14.7 115.2 41.6 75.0 Copper <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 0.05 Manganes <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 0.10 e Sulphate 68 74 69 58 47 57 200.0 Nitrate 9.30 8.86 10.19 12.40 9.75 11.52 45.0 Fluoride 0.62 0.48 0.38 0.57 0.78 0.54 1.0 Selenium <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 Arsenic <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.05 Lead <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.05 Zinc <0.01 <0.01 <0.01 <0.01 0.06 <0.01 5.00 Hex <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 0.05 Chromium Boron <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 1.00 Coliforms Nil Nil Nil Nil Nil Nil Nil (MPN) Phenolics <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 0.001 Alkalinity 236 208 288 112 172 208 200.0

32

Environmental Statement (Form-V) for Cluster No. – 11 (Group of Mines) 2015-16

Annexure – IV GROUNDWATER LEVEL Station Station Name Month Fortnight Date of Ground No Sampling Water Level BGL (mtr) 11GWL1 Dugwell at Moira Kalimandir & backside of November Second 19-Nov-15 2.00 Manager's office 11GWL1 Dugwell at Moira Kalimandir & backside of January First 11-Jan-16 1.80 Manager's office 11GWL1 Dugwell at Moira Kalimandir & backside of May Second 29-May-15 1.85 Manager's office 11GWL1 Dugwell at Moira Kalimandir & backside of August First 04-Aug-15 0.65 Manager's office 11GWL2 Dugwell at Bahadurpur Panchayet office November Second 18-Nov-15 6.55 11GWL2 Dugwell at Bahadurpur Panchayet office January Second 30-Jan-16 8.20 11GWL2 Dugwell at Bahadurpur Panchayet office May Second 29-May-15 9.30 11GWL2 Dugwell at Bahadurpur Panchayet office August First 11-Aug-15 4.40 11GWL3 Dugwell at Singaran village of Belbad OCP November Second 18-Nov-15 6.35 11GWL3 Dugwell at Singaran village of Belbad OCP January First 14-Jan-16 7.40 11GWL3 Dugwell at Singaran village of Belbad OCP May Second 29-May-15 8.75 11GWL3 Dugwell at Singaran village of Belbad OCP August First 11-Aug-15 2.80 11GWL4 Dugwell at Chichuria Dangal Colony of S.B. November Second 21-Nov-15 6.40 Project 11GWL4 Dugwell at Chichuria Dangal Colony of S.B. January Second 30-Jan-16 3.35 Project 11GWL4 Dugwell at Chichuria Dangal Colony of S.B. May Second 20-May-15 5.15 Project 11GWL4 Dugwell at Chichuria Dangal Colony of S.B. August Second 24-Aug-15 4.15 Project 11GWL5 Dugwell at Shankarpur village November Second 19-Nov-15 5.80 11GWL5 Dugwell at Shankarpur village January First 11-Jan-16 6.40 11GWL5 Dugwell at Shankarpur village May Second 20-May-15 10.40 11GWL5 Dugwell at Shankarpur village August First 05-Aug-15 2.05 11GWL6 Dugwell at Ananda Ashram at Khandra village November Second 19-Nov-15 7.15 11GWL6 Dugwell at Ananda Ashram at Khandra village January Second 18-Jan-16 7.16 11GWL6 Dugwell at Ananda Ashram at Khandra village May Second 20-May-15 8.25 11GWL6 Dugwell at Ananda Ashram at Khandra village August First 04-Aug-15 0.45

33

Plate – 1 Map Showing Location of Cluster -11 West Bengal

Burdwan District ƒ during October - March (Post Monsoon) Predominant Wind Direction N Narandhaura River/Nalah Road (ECL/NH) Kachcha Road Protected Forest Kumardiha Reserved Forest SAND (River, Nala, Dam) Built Up Water Bodies Kashinathpur Shivdanga 9 Chalbalpur Tirat

Sripur EASTERN RAILWAY Main Main RAILWAY EASTERN Saora Chanda

E.Rly.Toposi-Baraboni Chord

Baijantipur Line (Electrified) Line TO KOLKATA TO Joba Bogra Jaykaynagar Shyamsunderpur Kaithi Harabhanga Jhiladanga Shibpur Kendulia Belebathan East Nimcha

Joba Nunia Khal Nunia Jamari Layekdanga RS ƒ Berala Station Code Damalia Mondalpur Amritnagar Banali Taltore Nimcha Sattore 11A8 11A7 11A6 11A5 11A4 11A3 11A2 11A1 Satgram Mithapur Damodarpur Akhalpur

Kankardanga AIR QUALITY MONITORING STATIONS Nandi Jambad Pre monsoon Air Station Pre monsoon Air Station Pre monsoon Air Station Post monsoon Air Station Post monsoon Air Station Post monsoon Air Station Permanent Air Station Permanent Air Station Narainkuri Prembazar Permanent Air Station Post - monsoon Pre - monsoon Balanpur Bijpur Ranisayer Hormadanga Sekpur Egara Type of Station Jirdanga Damoda

Ikra NH-2 Mahabir R A N I G J Katagoria Searsol Birkulti Raniganj Sarthakpur RS Sankhari Ikra RS Chak Parui Kumardiha Toposi Amrasota Fatakduar Dhasal Raja Bandh Kumarbazar RS Hijalgora Bijaynagar Toposi In Basabdanga Village In Chichuria Village In Bahadurpur Village In Damariband Village In Jambad Village In Belbaid Village In Shankarpur Village In Haripur Village Kunustoria Name of Station Jhatidanga Banshra Patharchur Jot Janki Sonachora Dhasal Jamsol Napur Bil RS 11A3 Mangalpur Nutan Madanpur Lalbazar Belbaid Bahadurpur 11A6 11GWL3 Kuldanga Kumar Jamsol 11GWL2 Krishnanagar 11MW2 Shaldanga New Konda Madanpur Brajdihi Chak Tulsi Samuldihi Chakdola 11MW3 ƒ

Jamalpur Dhandardihi E.R.Andal Loop E.R.Andal Palasban Bagdiha

Beniadidanga D A M O D A R R I V E R E V I R R A D O M A D Babuisol Dobrana 11N2 11MW4 Khaskenda Ramchandrapur Nabasan Gajadar Kajora Chichuria Konda Pabra 11A4 11 North Jambad Baska Lachipur Andal Andal RS 11A1 Kajora Bhuri Kajora Debogram Pure Kajora RS 11N5 11A7 11MW7 Ramprasadpur

11GWL4

Haripur Chora TO KOLKATA TO Chichuria Sira Parashkol Dahuka Shymla Kankartala 11N1 11MW1 Haripur Khas Kajora Binodepur 11N6 Pure Jambad

11MW8 Singaran Nala Singaran Siduli Jawdanga Bahula Chora Rasa Bhadur 11N4 11N3 Kumarkhela Mukundapur 11MW6 Chattrishganda Madhujore 11MW5 Madhusudanpur Siduli RS Andal Khottadih Damariband Bhabaniganj Siduli 11N7 11MW9 Palpain 11A5 Sonpur 11GWL1 11A2 Dakshinkhanda 11GWL6 11N9 Khandra 11MW10 11MW11 11N8 Bazari Hansdiha Waria Ukhra Gopalmath RS Kendra Barajora 11GWL5 Basabdanga D U R G A P Suka Bandh Station Code Shankarpur 11A8 Lauberia Hazaratpur ƒ Ukhra Bhaluka Angargodia 11N3 11N3 11N3 11N3 11N3 11N3 11N3 11N2 11N1 RS Mayabazar Waria Bharati NOISE SAMPLING STATIONS Amlauka Mamudpur (Pre - Monsoon & Period) Pursha Market during April - September Predominant Wind Direction Banguri Krishnapur Name of Station (Workplace)

Amrai Andal Saithia Line Chanchani Patsaora Shankarpur UG Khandra UG Siduli UG C.L.Jambad UG Bahula UG Chora 7, 9 & 10 Pits Chora Block Incline Lower Kenda UG Haripur UG Kurunia Dhandabad Kansara Sarpi Ramnagar

Ichhapur

Baidyanathpur To Howrah To Shyamsundarpur Kumardihi Benachiti Joalbhanga Kajora Goenka- Kurladanga Bhiringi Bhimgara Beledanga Pandaveswar Faridpur Banshgora Bhimgara RS Gobindapur D U R G A P Mahal Nakrakonda Isgara

Ratanpur

Tilaboni A J A Y R I V E R E V I R Y A J A Sannabandhi Open Mixed jungle Danya Sirsa Station Code Konda UKHARA PF Kamalpur Rasidpur Palasbon 11GWL6 11GWL5 11GWL4 11GWL3 11GWL2 11GWL1 Suryapur Bansia Gogla Kalikapur Balijuri Open Mixed jungle Khorkedanga Jamgora ƒ GROUND WATER LEVEL Dugwell at Ananda Ashram of Khandra Village Dugwell at Shankarpur village Dugwell at Chichuriadangal colony of S.B.Project Dugwell at Singaran Village of Belbaid OCP Dugwell at Bahadurpur Panchayat Office Dugwell at Moira Kalimandir & backside of Manager's office Gogla Location of Dug Well Station Code Nutandanga Banagram MINE/ EFFLUENT WATER STATIONS Pansiuli Parulbona 11MW11 11MW10 11MW9 11MW8 11MW7 11MW6 11MW5 11MW4 11MW3 11MW2 11MW1

UKHARA PF TUMNI NALA TUMNI Benebandi Madhaiganj LOCATION OF SAMPLING Laskarbandh Pratappur 2 KMS Mine/Effluent Water Station Rangamatia Shankarpur UG Khandra UG Siduli UG C.L.Jaqmbad UG Bahula UG Chora 7, 9 & 10 Pits Chora Block Incline Lower Kenda UG New Kenda OC Patch West Kenda OC Patch Haripur UG ENVIRONMENT STATEMENT Chandardanga STATIONS EASTERN COALFIELDS LIMITED Madhabpur Haderdanga CMPDI ISO 9001 Company PLATE NO - 2 Srikrishnapur Shyamsundarpur R Palashdanga I E N V Babupur X X X X 1 2 111438 JOB NO 1 OF ƒ 0