WELCOME

Thank you for attending the Open House for US 95 Northwest (US 95 NW) Corridor Improvements Project Phase 2B/5 presented by the Department of Transportation (NDOT), in partnership with the City of Las Vegas, Regional Transportation Commission of Southern Nevada (RTCSNV), Clark County Regional Flood Control District, Las Vegas Paving and in cooperation with the Federal Highway Administration (FHWA). This freeway project will construct the following improvements:

• Widen US 95 from Durango Drive to Kyle Canyon Road o Add one general purpose lane and one auxiliary lane in each direction • Add HOV direct access ramps on US 95 at Elkhorn Road • Construct a new service interchange (Diverging Diamond Interchange (DDI)) • Construct storm drain facility from Centennial Bowl to Grand Teton Drive • Improve landscape and aesthetics

Tonight’s public meeting will be held from 4 – 7 p.m. with a brief presentation by project representatives at 5:30 p.m. Audience members will have the opportunity to publicly comment after the presentation. Before and after the presentation, the meeting will be conducted as an open house to provide you with the opportunity to view the displays, receive answers from project staff and submit comments.

Ways to Comment

During this meeting and through March 23, 2018, your comments are welcome concerning the proposed construction project.

You may submit your comments and any supporting exhibits for the public record in the following ways:

• Make an audience comment following tonight’s presentation. Comments will be recorded. • Record a comment with the court reporter or fill out a comment form during tonight’s meeting and leave it with a project representative or drop it in the comment box. • Email your comments to [email protected]. Please reference the project in the subject line (US 95 Phase 2B/5). • Write a letter or mail in your completed comment form and any associated exhibits to: Nevada Department of Transportation C/O Jenica Keller, PE, Senior Project Manager 1263 S. Stewart St., Carson City, NV 89712

All comments must be received by Friday, March 23, 2018, at 5 p.m. Thank you for attending this public information meeting and for your interest in improving regional connectivity in the region.

Sincerely,

Jenica Keller, PE, Senior Project Manager Nevada Department of Transportation

Durango Drive to Kyle Canyon Road

US 95 NORTHWEST CORRIDOR IMPROVEMENTS PROJECT 95

IMPROVEMENTS PROJECT TIMELINE OVERALL COST US 95 Widening HOV Access Ramps Early 2018 2+ Project begins, M groundbreaking $78 +AUX +GP GP GP Direct access 1 new General Purpose at Elkhorn Rd and 1 Auxillary lane in each direction Enhanced Estimated Kyle Canyon Technology Completion Interchange Mid-2019 TRAFFIC Ramp metering, tra c cams radar detection, emergency 52,000 vehicles/day New Interchange vehicle detectors, travel through the corridor dynamic message sign Aesthetics Stormwater System

Rock Walls, plants, image panels, monuments Stormwater work starts (metal & concrete) at Centennial Bowl by 2038, this could grow to 112,000 vehicles/day MATERIALS CAVATIO NCRET STEEL EX N CO E 100 2,000+ ShermanTanks Driveways 304 Swimming Pools 6 9 ds 3 s 5 yar 4, rd ,000 cubic 292 cubic ya 3,361 tons

www.us95nw.com US 95 Phase 2B/5 Public Open House Presentation

February 21, 2018 Welcome

Open House US 95 Northwest Corridor Improvements Project Phase 2B/5

Ways to Comment Tonight: Jenica Keller, P.E. • Comment during open house NDOT Senior Project Manager • Comment form • Court reporter 1263 S. Stewart St. Carson City, NV 89712

Comments Due: [email protected] Friday, March 23, 2018 (Subject: US 95 Phase 2B/5) 5:00 p.m.

All information presented is preliminary and subject to revision. February 21, 2018

2 What to Expect Tonight

. Update on US 95 NW Corridor Improvements Project, including Phase 2B/5 . Update on project timelines . Opportunity to submit comments . Receive answers from project staff

All information presented is preliminary and subject to revision. February 21, 2018

3 US 95 NW Corridor Improvements Project

Multi-phase project to construct improvements on US 95 from Washington Avenue to Kyle Canyon Road

. Add general purpose, HOV and auxiliary lanes on US 95 . Construct Skye Canyon Park Drive interchange (formerly Horse Drive) . Construct Kyle Canyon Road interchange . Add a system-to-system interchange at US 95/CC 215 Centennial Bowl . Add ramp metering and landscape and aesthetic improvements

All information presented is preliminary and subject to revision. February 21, 2018

4 Overview of US 95 NW Phases & Schedule

5 All information presented is preliminary and subject to revision. February 21, 2018 Phase 2B/5 | About the Project

. Widen US 95 from Durango Drive to Kyle Canyon Road  Add one general purpose lane and one auxiliary lane in each direction . Add HOV direct access ramps on US 95 at Elkhorn Road . Construct new service interchange  Diverging Diamond Interchange (DDI) . Construct storm drain facility from Centennial Bowl to Grand Teton Drive . Improve landscape and aesthetics

All information presented is preliminary and subject to revision. February 21, 2018

6 Phase 2B/5 | Improvements & Benefits

. Improve efficiency . Relieve congestion . Time savings . Enhance safety . Construct regional flood control facilities . Provide capacity for future growth and development

All information presented is preliminary and subject to revision. February 21, 2018

7 Phase 2B/5 | Project Timeline

Advertisement and Award Anticipated Construction Duration: 16-20 months

Fall January Mid 2017 2018 2019

. Estimated costs will be approximately $78 million . The project is funded through federal, state and local funding

All information presented is preliminary and subject to revision. February 21, 2018

8 Phase 2B/5 | Elkhorn HOV Direct Access Ramps

All information presented is preliminary and subject to revision. February 21, 2018

9 Phase 2B/5 | Kyle Canyon Interchange

All information presented is preliminary and subject to revision. February 21, 2018

10 Phase 2B/5 | Landscape & Aesthetics

Perspective | View of New US 95 Bridge at Kyle Canyon Underpass

Bird’s Eye Perspective | View Northwest Kyle Canyon Drive

All information presented is preliminary and subject to revision. February 21, 2018

11 Phase 2B/5 | Landscape & Aesthetics

Perspective | View of New US 95 Bridge at Kyle Canyon Underpass

Bird’s Eye Perspective | View Northwest Kyle Canyon Drive

All information presented is preliminary and subject to revision. February 21, 2018

12 Phase 2B/5 | Landscape & Aesthetics

Perspective | View of New US 95 Bridge at Kyle Canyon Underpass

Bird’s Eye Perspective | View West Kyle Canyon Drive

All information presented is preliminary and subject to revision. February 21, 2018

13 Phase 2B/5 | Durango Drive Project Impacts

SB US 95 to Durango Dr

WB Durango Dr to SB US 95

EB Durango Dr to SB US 95

All information presented is preliminary and subject to revision. February 21, 2018

All information presented is preliminary and subject to revision. 15 February 21, 2018 Phase 2B/5 | Oso Blanca Project Impacts

GrandImpacts Teton & Dr. Closures | Oso Blanca Rd. For Storm Drain Project including Farm Rd. and Gilcrease Ave.

Gillcrease Ave

Farm Road

Storm Drain project from Centennial Bowl Interchange to Grand Teton Drive

All information presented is preliminary and subject to revision. Centennial Bowl 16 All information presented is preliminary and subject to revision. February 21, 2018 Stay Informed on US 95 NW

www.us95nw.com Sign-up and stay up-to-date with the latest news and traffic information

All information presented is preliminary and subject to revision. February 21, 2018

17 Open Comment Period

. Please state your full name and address prior to your question or statement . Three-minute verbal comment per individual . A court reporter has recorded the presentation and is available to take comments

All information presented is preliminary and subject to revision. February 21, 2018

18 Thank you

www.nevadadot.com | www.us95nw.com

This is preliminary information; all content subject to change COMMENT FORM US 95 Northwest Corridor Improvements Phase 2B/5 February 21, 2018

Please print clearly.

Name: Date:

Street Address:

City: State: ZIP code:

Phone (daytime): Phone (evening):

Email address:

COMMENTS

Jenica Keller, NDOT Senior Project Manager Comments will be accepted until 5 p.m., Friday, March 23, 2018. Nevada Department of Transportation 1263 S. Stewart St. Carson City, NV 89712 Thank you! Phone: 775-888-7592 E-mail: [email protected]