Operating Instructions MOVITRAC® LTP-B, 21270996

Total Page:16

File Type:pdf, Size:1020Kb

Operating Instructions MOVITRAC® LTP-B, 21270996 Drive Technology \ Drive Automation \ System Integration \ Services *21270996_0115* Operating Instructions MOVITRAC® LTP-B Edition 01/2015 21270996/EN SEW-EURODRIVE—Driving the world Contents Contents 1 General information .................................................................................................................. 7 1.1 About this documentation ............................................................................................... 7 1.2 Structure of the safety notes .......................................................................................... 7 1.2.1 Meaning of signal words ................................................................................. 7 1.2.2 Structure of section-related safety notes ........................................................ 7 1.2.3 Structure of embedded safety notes............................................................... 7 1.3 Rights to claim under limited warranty ........................................................................... 8 1.4 Content of the documentation ........................................................................................ 8 1.5 Exclusion of liability ........................................................................................................ 8 1.6 Product names and trademarks ..................................................................................... 8 1.7 Copyright notice ............................................................................................................. 8 2 Safety notes ............................................................................................................................... 9 2.1 Preliminary information .................................................................................................. 9 2.2 General information ........................................................................................................ 9 2.3 Target group ................................................................................................................. 10 2.4 Designated use ............................................................................................................ 10 2.4.1 Safety functions ............................................................................................ 10 2.5 Other applicable documentation .................................................................................. 11 2.6 Transportation and storage .......................................................................................... 11 2.7 Installation/assembly .................................................................................................... 11 2.7.1 Housing installation guidelines for IP20 units ............................................... 11 2.7.2 Housing installation guidelines for IP55 units ............................................... 11 2.8 Electrical connection .................................................................................................... 12 2.9 Safe disconnection ....................................................................................................... 12 2.10 Startup/operation .......................................................................................................... 12 2.11 Inspection/maintenance ............................................................................................... 13 3 General specification .............................................................................................................. 14 3.1 Input voltage ranges ..................................................................................................... 14 3.2 Nameplate .................................................................................................................... 14 3.3 Type designation .......................................................................................................... 15 3.4 Overload capacity ........................................................................................................ 15 3.5 Protection function ....................................................................................................... 16 4 Safe Torque Off (STO)............................................................................................................. 17 4.1 Integrated safety technology ........................................................................................ 17 4.1.1 Safe condition ............................................................................................... 17 4.1.2 Safety concept .............................................................................................. 17 4.1.3 Restrictions ................................................................................................... 20 4.2 Safety conditions .......................................................................................................... 21 4.2.1 Storage requirements ................................................................................... 21 4.2.2 Installation requirements............................................................................... 21 4.2.3 Requirements on the external safety controller ............................................ 23 4.2.4 Requirements for safety relays ..................................................................... 24 21270996/EN – 01/2015 4.2.5 Requirements on startup............................................................................... 24 Operating Instructions – MOVITRAC® LTP-B 3 Contents 4.2.6 Requirements on operation........................................................................... 24 4.3 Connection variants ..................................................................................................... 26 4.3.1 General information ...................................................................................... 26 4.3.2 Disconnection of a single drive ..................................................................... 26 4.4 Safety characteristics ................................................................................................... 30 4.5 Signal terminal block for STO safety contact ............................................................... 30 5 Installation................................................................................................................................ 31 5.1 General information ...................................................................................................... 31 5.2 Mechanical installation ................................................................................................. 32 5.2.1 Housing variants and dimensions................................................................. 32 5.2.2 IP20 housing: Installation and installation space .......................................... 36 5.2.3 IP55 housing: Installation and control cabinet dimensions ........................... 37 5.3 Electrical installation ..................................................................................................... 38 5.3.1 Before installation ......................................................................................... 38 5.3.2 Installation..................................................................................................... 42 5.3.3 Overview of signal terminals ......................................................................... 49 5.3.4 Communication socket RJ45 ........................................................................ 51 5.3.5 UL-compliant installation............................................................................... 52 5.3.6 Electromagnetic compatibility (EMC) ............................................................ 55 5.3.7 Cable gland plate.......................................................................................... 62 6 Startup...................................................................................................................................... 63 6.1 User interface ............................................................................................................... 63 6.1.1 Operator terminal .......................................................................................... 63 6.1.2 Reset parameters to default settings ............................................................ 64 6.1.3 Factory setting .............................................................................................. 64 6.1.4 Further key combinations.............................................................................. 64 6.1.5 Software LT Shell.......................................................................................... 64 6.1.6 MOVITOOLS® MotionStudio software .......................................................... 65 6.2 Auto tune ...................................................................................................................... 66 6.3 Startup for motors ........................................................................................................ 66 6.3.1 Startup for asynchronous motors with V/f control ......................................... 66 6.3.2 Startup for asynchronous motors with VFC speed control............................ 66 6.3.3 Startup for asynchronous motors with VFC torque control ........................... 67 6.3.4 Startup for synchronous motors with PM speed control ............................... 68 6.3.5 Startup for LSPM motors
Recommended publications
  • Part 1: Study on Eco-Innovation Putting the EU on the Path to a Resource and Energy Efficient Economy
    Policy Department Economic and Scientific Policy Eco-innovation - putting the EU on the path to a resource and energy efficient economy Study and briefing notes IP/A/ITRE/ST/2008-06 & 14 JANUARY 2004 PE 416.218 This study was requested by the European Parliament's committee on Industry, Research and Energy (ITRE). Only published in English. Authors: Part 1: Study on Eco-innovation putting the EU on the path to a resource and energy efficient economy Wuppertal Institute for Climate, Environment, Energy Prof. Dr. Raimund Bleischwitz (Coordination and lead chapter 4), Bettina Bahn-Walkowiak, Dr. Wolfgang Irrek, Dr. Phillip Schepelmann Factor 10 Institute Prof. Dr. Friedrich Schmidt-Bleek (Lead Chapter 5) SERI Nachhaltigkeitsforschung und Kommunikations GmbH Dr. Stefan Giljum (Lead Chapter 2), Stephan Lutter, Lisa Bohunovski, Dr. Friedrich Hinterberger UNEP/Wuppertal Institute Collaborating Centre on Sustainable Consumption and Production gGmbH (CSCP) Elizabeth Hawkins, Michael Kuhndt (Lead Chapter 3), Dr. Nadine Pratt Part 2: Briefing notes of the Eco-Innovation Workshop of 12 November 2008 Arnold Black - Resource Efficiency Knowledge Transfer Network, UK Challenges, Drivers and Barriers to Eco-Innovation a UK context Geert van der Veen - Technopolis, the Netherland Public policies for Eco-innovation: focus on The Netherlands Birgit Eggl - Forseo, Germany Funding Eco-Innovation Administrator: Ms. Camilla Bursi Policy Department Economy and Science DG Internal Policies European Parliament Rue Wiertz 60 - ATR 00L008 B-1047 Brussels Tel: +32-2-283 22 33 Fax: +32-2-284 69 29 E-mail: [email protected] Manuscript completed in March 2009. The opinions expressed in this document do not necessarily represent the official position of the European Parliament.
    [Show full text]
  • An Adaptive Control Scheme for Variable Speed Wind Turbines Providing Frequency Regulation in Isolated Power Systems with Thermal Generation
    energies Article An Adaptive Control Scheme for Variable Speed Wind Turbines Providing Frequency Regulation in Isolated Power Systems with Thermal Generation Ana Fernández-Guillamón 1,† , Guillermo Martínez-Lucas 2,*,† and Ángel Molina-García 1,† and Jose Ignacio Sarasua 2,† 1 Department of Automatics, Electrical Engineering and Electronic Technology, Universidad Politécnica de Cartagena, 30202 Cartagena, Spain; [email protected] (A.F.-G.); [email protected] (Á.M.-G.) 2 Department of Hydraulic, Energy and Environmental Engineering, Universidad Politécnica de Madrid, 28040 Madrid, Spain; [email protected] * Correspondence: [email protected]; Tel.: +34-91-067-43-33 † These authors contributed equally to this work. Received: 27 May 2020; Accepted: 28 June 2020; Published: 1 July 2020 Abstract: The lack of synchronous inertia, associated with the relevant penetration of variable speed wind turbines (VSWTs) into isolated power systems, has increased their vulnerability to strong frequency deviations. In fact, the activation of load shedding schemes is a common practice when an incident occurs, i.e., the outage of a conventional unit. Under this framework, wind power plants should actively contribute to frequency stability and grid reliability. However, the contribution of VSWTs to frequency regulation involves several drawbacks related to their efficiency and equipment wear due to electrical power requirements, rotational speed changes, and subsequently, shaft torque oscillations. As a result, wind energy producers are not usually willing to offer such frequency regulation. In this paper, a new control technique is proposed to optimize the frequency response of wind power plants after a power imbalanced situation. The proposed frequency controller depends on different power system parameters through a linear regression to determine the contribution of wind power plants for each imbalance condition.
    [Show full text]
  • 24Th OCC Meeting Agenda
    MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: www.sldcmpindia.com Fax 0761-2664343 No.07-05/SG-9B-II/ Jabalpur, dated 22-06-2011 To As per distribution list Sub: Agenda of 24th meeting of Operation and Coordination Committee of MP. Please find enclosed herewith the Agenda of 24th meeting of the Operation and Coordination Committee of MP scheduled on 25th June 2011 at 11.00 AM at Banquet Hall, Board Room, Shakti Bhawan Jabalpur. The agenda of the meeting is also available on the website of SLDC ‘www.sldcmpindia.com’. It is also requested to please forward the information required for the meeting and the additional agenda points for inclusion, if any, to SLDC Jabalpur, so that the same could be included in the agenda for discussion in the meeting. ( P.A.R. Bende) Member Secretary, OCC S.E.(LD-OPN), SLDC MPPTCL, Jabalpur Encl : As above. \ Distibution List The Chief Engineer (T&C), The Superintending Engineer (DCC-WZ), MP Power Transmission Co. Limited, DISCOM Control Centre, MP Paschim Jabalpur. Kshetra Vidyut Vitaran Co. Limited, Near Polo Ground, Jail Road, Indore. The Executive Director (T&P), The Executive Engineer (DCC-EZ), MP Power Transmission Co. Limited, DISCOM Control Centre, MP Poorva Jabalpur. Kshetra Vidyut Vitaran Co. Limited, Jabalpur. The Executive Director (Plg & PS), The General Manger (LM), MP Power Transmission Co. Limited, DISCOM Control Centre, MP Madhya Jabalpur Kshetra Vidyut Vitaran Co. Limited, Bhopal. The Executive Director (O&M:Gen.), The Chief Engineer (PM&C), MP Power Generating Co.
    [Show full text]
  • 505HT for Francis/Kaplan Turbines 8200-1402, 8200-1403
    Released Product Manual 35117 (Revision -, 11/2019) Original Instructions 505HT for Francis/Kaplan Turbines 8200-1402, 8200-1403 Installation and Operation Manual Released Read this entire manual and all other publications pertaining to the work to be performed before installing, operating, or servicing this equipment. Practice all plant and safety instructions and precautions. General Failure to follow instructions can cause personal injury and/or property damage. Precautions This publication may have been revised or updated since this copy was produced. To verify that you have the latest revision, check manual 26455 , Customer Publication Cross Reference and Revision Status & Distribution Restrictions , on the publications page of the Woodward website: Revisions http://www.woodward.com/ The latest version of most publications is available on the publications page . If your publication is not there, please contact your customer service representative to get the latest copy. Any unauthorized modifications to or use of this equipment outside its specified mechanical, electrical, or other operating limits may cause personal injury and/or property damage, including damage to the equipment. Any such unauthorized modifications: (i) constitute "misuse" and/or "negligence" within the meaning of Proper Use the product warranty thereby excluding warranty coverage for any resulting damage, and (ii) invalidate product certifications or listings. If the cover of this publication states "Translation of the Original Instructions" please note: The original source of this publication may have been updated since this Translated translation was made. Be sure to check manual 26455 , Customer Publication Publications Cross Reference and Revision Status & Distribution Restrictions , to verify whether this translation is up to date.
    [Show full text]
  • Policy and Regulatory Environment for Utility-Scale Energy Storage: India Amy Rose, Claire Wayner, Sam Koebrich, David Palchak, and Mohit Joshi
    Policy and Regulatory Environment for Utility-Scale Energy Storage: India Amy Rose, Claire Wayner, Sam Koebrich, David Palchak, and Mohit Joshi National Renewable Energy Laboratory NREL is a national laboratory of the U.S. Department of Energy Technical Report Office of Energy Efficiency & Renewable Energy NREL/TP-6A20-78101 Operated by the Alliance for Sustainable Energy, LLC December 2020 This report is available at no cost from the National Renewable Energy Laboratory (NREL) at www.nrel.gov/publications. Contract No. DE-AC36-08GO28308 Policy and Regulatory Environment for Utility-Scale Energy Storage: India Amy Rose, Claire Wayner, Sam Koebrich, David Palchak, and Mohit Joshi National Renewable Energy Laboratory Suggested Citation Rose, Amy, Claire Wayner, Sam Koebrich, David Palchak, and Mohit Joshi. 2020. Policy and Regulatory Environment for Utility-Scale Energy Storage: India. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20-78101. https://www.nrel.gov/docs/fy21osti/78101.pdf. NREL is a national laboratory of the U.S. Department of Energy Technical Report Office of Energy Efficiency & Renewable Energy NREL/TP-6A20-78101 Operated by the Alliance for Sustainable Energy, LLC December 2020 This report is available at no cost from the National Renewable Energy National Renewable Energy Laboratory Laboratory (NREL) at www.nrel.gov/publications. 15013 Denver West Parkway Golden, CO 80401 Contract No. DE-AC36-08GO28308 303-275-3000 • www.nrel.gov NOTICE This work was authored by the National Renewable Energy Laboratory, operated by Alliance for Sustainable Energy, LLC, for the U.S. Department of Energy (DOE) under Contract No. DE-AC36-08GO28308. Funding provided by U.S.
    [Show full text]
  • Simulation Methods Development for a Plant Unit Master Control Logic Using Simulink in MATLAB
    Journal of the Korea Academia-Industrial https://doi.org/10.5762/KAIS.2017.18.2.324 cooperation Society ISSN 1975-4701 / eISSN 2288-4688 Vol. 18, No. 2 pp. 324-334, 2017 Simulation Methods Development for a Plant Unit Master Control Logic Using Simulink in MATLAB Changsun Yoon1, Yeon-Chan Hong2* 1Electrical Instrumentation & Control Engineering Department, KEPCO-E&C 2Department of Electronics Engineering, Incheon National University 매트랩 시뮬링크를 이용한 플랜트 유닛마스터 제어로직 시뮬레이션 기법 개발 윤창선1, 홍연찬2* 1한국전력기술(주) 전기계측기술그룹 2인천대학교 전자공학과 Abstract The simulators for a plant unit master control (UMC) developed by domestic or overseas researchers have been developed for operator-training purposes. UMC simulators normally constructed at the end of the plant construction, despite the UMC logics, should be simulated to pre-check many signal interfaces within the power generation systems. Because of the differences in construction schedule, it is difficult for logic designers or commissioning engineers to simulate the UMC logic during the design or commissioning stage. In this background, this paper proposes a simulation method that can be used easily by plant logic designers or operators in the MATLAB Simulink programming environment. The core of the UMC is realized with a unique simulation algorithm based on mathematical analysis and functional blocks combination. In addition, an integer-based configuration was proposed to realize the plant target value control for the equipment in the logic. With these simulation methods, functions, e.g., load distribution, high-low limitations, frequency compensation, etc. were simulated. The results showed that the plant UMC logic can be simulated in Simulink without a plant simulator.
    [Show full text]
  • Ancillary Services Definitions and Capability Study
    Ancillary Services Definitions and Capability Study Prepared for the U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Under Cooperative Agreement No. DE-EE0003507 Hawai‘i Energy Sustainability Program Task 2: Energy Modeling and Scenario Analysis Prepared by GE Energy Consulting Submitted by Hawai‘i Natural Energy Institute School of Ocean and Earth Science and Technology University of Hawai‘i December 2012 Acknowledgement: This material is based upon work supported by the United States Department of Energy under Cooperative Agreement Number DE-EE0003507. Disclaimer: This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference here in to any specific commercial product, process, or service by tradename, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. GE Energy Management Ancillary Services Definitions and Capability Study Part 1, Tasks 1-2, Final Report For Hawaii Natural Energy Institute Principal Contributors: Harjeet Johal Rameet Kohli Beth LaRose Michael O’Connor Sundar Venkataraman Revision 1 Date: 12/19/2012 Ancillary Services Definitions and Capability Study Table of Contents Table of Contents 1 Study Background and Objectives ..............................................................................
    [Show full text]
  • Review on Industrial Generators Load Sharing System Along Withgrid Momentry Synchronization and Setup a Backup Unit for Auxiliary Power for Generators
    International Journal For Technological Research In Engineering Volume 5, Issue 8, April-2018 ISSN (Online): 2347 - 4718 REVIEW ON INDUSTRIAL GENERATORS LOAD SHARING SYSTEM ALONG WITHGRID MOMENTRY SYNCHRONIZATION AND SETUP A BACKUP UNIT FOR AUXILIARY POWER FOR GENERATORS Verma Kunal Subhash1, Asst. Prof. Ashish Aboti2 1PG Scholar, Electrical Department, HJD, Kera, Kutch, Gujarat, India 2Internal Guide, Assistant Professor, Electrical Department, HJD, Kera, Kutch, Gujarat, India ABSTRACT: In this Industrial Define Project we are going variousmanufacturers, and many of theseoptions are to solve the load sharing problems of an industry by sharing not compatible witheach other. So, when electrical power for different type of loads in industry consideringthe paralleling of dissimilar through parallel generating sources by “load sharing generatorsets, or adding generator sets to anexisting control system”. To overcome the overloading and stability paralleling system, it iscritical to understand how problems on system generating sets and so increase the loadsharing can be accomplished. capability of system. There are many different methods for When a generator set is in a paralleled arrangement, load sharing between parallel generators. In the report we the voltage and frequency outputs of the generator had discussed all, but we take the best one for paralleling sets are forced to exactly the same values when they the generators.Connecting different communication areconnected to the same bus. Consequently, systems is possible on the prime-mover side through a generator set control systems cannotsimply monitor converter. According to the information gathered in this bus voltage and speed as a reference for maintaining thesis it is recommended that a PLCs are used for load equaloutput levels, as they do when operated in sharing between the existing power plants.We will also isolation from one another.
    [Show full text]
  • SMART GRIDS and RENEWABLES: a Guide for Effective Deployment TABLE of CONTENTS
    IRENA International Renewable Energy Agency SMART GRIDS AND RENEWABLES A Guide for Effective Deployment Working Paper Working November 2013 Copyright © IRENA 2013 Unless otherwise indicated, material in this publication may be used freely, shared or reprinted, so long as IRENA is acknowledged as the source. About IRENA The International Renewable Energy Agency (IRENA) is an intergovernmental organisation that supports countries in their transition to a sustainable energy future, and serves as the principal platform for international cooperation, a centre of excel- lence, and a repository of policy, technology, resource and financial knowledge on renewable energy. IRENA promotes the widespread adoption and sustainable use of all forms of renewable energy, including bioenergy, geothermal, hydropower, ocean, solar and wind energy in the pursuit of sustainable development, energy access, energy security and low-carbon eco- nomic growth and prosperity. www.irena.org Acknowledgements The work for the preparation of this paper was led by Paul Komor and Anderson Hoke, University of Colorado, Boulder, Colo- rado, USA. The paper benefitted from very valuable comments from Rainer Bacher (Bacher Energie, Switzerland), Melissa Chan (Navigant Consulting, USA), Kazuyuki Takada (New Energy and Industrial Technology Development Organization, Japan), Matt Wakefield (EPRI, USA). Authors: Ruud Kempener (IRENA), Paul Komor and Anderson Hoke (University of Colorado) For further information or to provide feedback, please contact: Ruud Kempener, IRENA Innovation and Technology Centre. E-mail: [email protected] or [email protected]. Disclaimer The designations employed and the presentation of materials herein do not imply the e xpression of any opinion whatsoever on the part of the International Renewable Energy Agency concerning the legal status of any country, territory, city or area, or concerning their authorities or the delimitation of their frontiers or boundaries.
    [Show full text]
  • Download Brochure (PDF)
    smallhydro PRIME ENGINEERING LIMITED IS AN ELECTRICAL ENGINEERING AND SERVICES FIRM THAT SPECIALIZES IN HYDROELECTRIC POWER AND CONTROL SYSTEM DESIGN, IMPLEMENTATION AND MAINTENANCE. OUR TEAM OF PROFESSIONALS HAVE WORKED TOGETHER ON AN EXTENSIVE NUMBER OF PROJECTS AND HAVE OBTAINED A PROVEN TRACK RECORD IN THE SMALL HYDRO INDUSTRY. WE OFFER OUR CLIENTS A WIDE RANGE OF SERVICES INCLUDING DESIGN-BUILD, ELECTRICAL BALANCE OF PLANT (EBOP) SUPPLY, AND ASSISTANCE WITH TURBINE / GENERATOR WATER TO WIRE PACKAGES AS WELL AS TESTING AND COMMISSIONING SERVICES. CONTROL PANELS STATION SERVICES E-HOUSES INTAKE CONTROL SYSTEMS REMOTE HV SUBSTATIONS UNIT PANELS MV SWITCHGEAR UNIT SUBSTATIONS MCC’s ENGINEERING SERVICES & INTEGRATION • Overall Electrical Design; Water to Wire, Balance of Plant, & Utility Interconnections • Power System Modeling for Arc Flash Analysis, Coordination & Fault Studies, Load Flow Analysis, & Ground Grid Studies • PLC Control & Automation System Designs (incl. Digital Speed Governor) & HMI Systems • Protective Relaying Systems Design & Programming • Communications: Including Ethernet Network Architecture, Plant Firewall/ Security, Protocol/ Medium Conversions & RTUs & SCADA System Design • Emergency & DC Systems Design PROTECTION & CONTROL SYSTEMS • PLC Based Turbine / Generator Protection & Control System for Isochronous (Isolated/Islanded) & Grid Connected Generation Systems • HMI / SCADA • Integrated Turbine / Generator & Auxiliary Equipment Protective Relaying systems • Integrated Interconnection Substation Protection, Transmission
    [Show full text]
  • Unlike the Conventional Generators That We Use on Land, a Ship's Generator Requires a Special Procedure for Starting and Stopp
    Unlike the conventional generators that we use on land, a ship’s generator requires a special procedure for starting and stopping it. Though not a very complex one, the process demands a step-by-step system to be followed. Missing even a single step might lead to failure in starting or stopping the generator and can even lead to “black-out”, a situation which everyone on ship tries their best to stay away from. In this article, we bring to you an accurate, step by step procedure for starting and stopping a generator on a ship. Generator starting procedure Automatic Start 1. Ÿ This method is only possible if sufficient amount of starting air is available. The air valves and interlocks are operated like in the turning gear operation. 2. Ÿ In this method the operator has nothing to do, for the generator starts itself depending on the load requirement. 3. Ÿ However during the Maneuvering process and in restricted areas, the operator has to start by going into the computer based Power Management System (pms). Once inside the system, the operator needs to go to the generator page and click start. 4. Ÿ In PMS system, the automation follows sequence of starting, matching voltage and frequency of the incoming generator and the generator comes on load automatically. 5. Ÿ In case of a blackout condition or a dead ship condition, the operator might have to start the generator manually. Manual start The manual process is totally different from the automatic start system. The following steps need to be followed: 1.
    [Show full text]
  • Copyrighted Material
    Index acid rain 206 bias voltage 122, 123 active (real) power 116, 269 bid-price auction 223 active governor 62 bilateral contracts 222 active networks 245 bilateral trading 221 active stall control 33 biodiesel 243 aggregation 34 bioethanol 243 aggregation effects 57, 58, 73; for wind 30 biofuels 8, 9, 14, 15 air density 31 biomass 2, 9, 11, 12, 15, 16, 50 air gap 99 anaerobic digestion 51 alternating current (AC) 112, 255, 256 combustion 51 alternator 98 gasifi cation 51 annual charge rate 197 pyrolysis 51 anthropogenic warming 5 BJT 123 apparent power 268 black start 236 asynchronous generator 98, 112 blackout 56, 67 asynchronous link 142 blade feathering 32 automatic voltage regulator (AVR) 160, block tripping 190 161, 162 boiler 17 auto-reclose circuit breakers 189 boost converter 134 auxiliaries (in power stations) 56, 64 boundary layer 27, 28 availability of power 58, 70, 71 bridge circuit 124, 125 automatic voltage controller (AVC) 161 British Electricity Transmission and average penetration 19 Trading Arrangements (BETTA) 223 buck converter 134 back-up 70, 71, 78 building integrated wind turbines 238, 239, balancing impact 72 240 balancing market COPYRIGHTED226, 227 bus MATERIAL164 balancing reserve 70 base load 22, 23, 64, 71 cadmium telluride PV cells 241 base load plant 201 cage 112, 113 batteries 57, 92 capacitance 259 Betz limit 32 capacity credit 71, 72, 74, 75, 204, 213 Renewable Energy in Power Systems Leon Freris and David Infi eld © 2008 John Wiley & Sons, Ltd 278 Index capacity factor (for wind turbine) 32 credible contingency
    [Show full text]