UPDATE EXTENDED PHASE 1 HABITAT SURVEY RELATING TO WILNECOTE BRICKWORKS FOR A WATER MANAGEMENT SYSTEM For HANSON BUILDING PRODUCTS PREPARED BY PLEYDELL SMITHYMAN LIMITED JULY 2015 20a The Wharfage, Ironbridge, Telford, Shropshire, TF8 7NH T: 01952 433211 F: 01952 433323
[email protected] UPDATE EXTENDED PHASE 1 HABITAT SURVEY AT WILNECOTE BRICKWORKS, TAMWORTH Wilnecote Brickworks, Hedging Lane, Report Prepared for Wilnecote, Hanson UK, Tamworth, The Ridge, B77 5EU Chipping, Sodbury, Bristol, BS37 6AY UPDATE EXTENDED PHASE 1 HABITAT SURVEY ON LAND AT WILNECOTE BRICKWORKS, HEDGING LANE, WILNECOTE, TAMWORTH, B77 5EU By: Pleydell Smithyman Limited Main Contributors July 2015 Kelly Downward Issued By ……………………………………………….. Kelly Downward BSc (Hons) Grad CIEEM Report Checked By ……………………………………………….. Robin Smithyman BSc (Hons) PG DipLA CMLI PG DipTP PG DipUD MIQ Pleydell Smithyman Limited 20a The Wharfage Ironbridge Telford Shropshire TF8 7NH Tel: 01952 433211 Fax: 01952 433323 E-mail:
[email protected] S:\M14.142(b) Wilnecote Brickworks - Ecological Services\Reports\M141.142(b).R.001 Wilnecote Brickworks - Update Extended Phase 1 Habitat Survey\M14.142(b)R.001 Update Extended Phase 1 Habitat Survey.doc Pleydell Smithyman Limited Printed copies of this document may be out of date July 2015 UPDATE EXTENDED PHASE 1 HABITAT SURVEY AT WILNECOTE BRICKWORKS, TAMWORTH Reference Contents Page Number 1.0 Introduction 1 2.0 Survey Methodology 4 3.0 Results 7 4.0 Conclusions and Recommendations 18 5.0 References 22 Drawings M14.142(b).D.001