Moef EIA Notification 14.09.2006
Total Page:16
File Type:pdf, Size:1020Kb
Application form for Environmental Clearance Project Name: Proposed “Residential & Commercial project” of Xrbia Developers Ltd. At balewadi, Pune APPENDIX – II (See paragraph 6) FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed environmental management plan & monitoring programme) 1. LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity) 1.1 Will the existing landuse get The existing land use will not get altered from the project. As per the significantly altered from the project zoning structure the area comes under residential area. that is not consistent with the Proposed development is in line with D.P. of Following documents are surroundings? (Proposed landuse must attached as supporting documents. conform to the approved Master Plan / 1. Tenement statement and building configuration details and Development Plan of the area. Change Master plan layout and are attached as Annexure II and of landuse if any and the statutory Annexure III approval from the competent authority are submitted). Attach Maps of (i) site location, (ii) surrounding features of the proposed site (within 500 meters) and (iii) the site (indicating levels & contours) to appropriate scales. If not available attach only conceptual plans. 1.2 List out all the major project Area details requirements in terms of the land area, Sr. Details Proposed Unit built up area, water consumption, 1. Total plot area 48,737 m2 power requirement, connectivity, 2. Total Deduction 14,295 m2 community facilities, parking needs, 3. Net Plot area 34,441 m2 etc. 4. Permissible FSI area 1,03,325 m2 5. FSI area 74,604 m2 6. Non FSI area 52,315 m2 7. Total construction area 1,26,919 m2 Tenement details Sr. Occupants Number Unit 1. Residential 2,243 No. 2. Commercial (Shops, Offices) 5 showrooms, 13 No. shops, 26 offices Population details Sr. Occupants Number Unit 1. Residential 8,449 No. 2. Commercial 996 No. Water consumption Sr. Description Quantity Unit 1. Total Water Requirement 1,185 m3/day 2. Fresh water requirement 785 m3/day 3. Flushing water requirement 400 m3/day 4. Landscaping water requirement 39 m3/day 5. Waste water generation 1,008 m3/day 6. Wastewater to municipal drain 468 m3/day Solid waste generation details Sr. Details Quantity Unit 1. Total Solid waste generation 4,051 Kg/day 2. Bio-degradable waste 2,736 Kg/day 3. Non-Biodegradable waste 1,315 Kg/day Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 8 Application form for Environmental Clearance Project Name: Proposed “Residential & Commercial project” of Xrbia Developers Ltd. At balewadi, Pune Energy requirement Description Power Unit During Construction Phase 150 kW During Operation Phase i) Max. Demand Load 4,573 kVA ii) Connected Load 5,625 kVA Parking details Proposed Sr. Details Proposed Unit 1. Cars 1,403 No. 2. Scooters 5,060 No. 3. Cycles 4,611 No. Connectivity Railway: Shivajinagar Railway Station at 10 km away from the proposed project site. Airway: Pune Airport is 14 km from the proposed project site. Roadway: Wakad road at 0.4 km away from the proposed project site. Location Plan attached as Annexure IV 1.3 What are the likely impacts of the The project being a well-planned activity will result in organized open proposed activity on the existing spaces and green areas. The biodiversity in the area will increase due to facilities adjacent to the proposed site? proposed green areas. (Such as open spaces, community Community cum recreational facilities will be developed hence no stress on facilities, details of the existing the existing facility is anticipated. landuse, disturbance to the local ecology). 1.4. Will there be any significant land The main reasons for erosion are overexploitation of groundwater, instable disturbance resulting in erosion, slopes, landslides etc. The proposed construction will involve cutting and subsidence & instability? (Details of soil filling operations. The project will involve construction of roads and type, slope analysis, vulnerability to development of green areas, which would reduce the chances of erosion subsidence, seismicity etc may be and subsidence. given). Subsidence is not anticipated, as ground water would not be used as a source of water supply. As per seismic-zoning map of India, the project site falls under zone III. Structural design requirements will be as per zone III. 1.5 Will the proposal involve alteration of The proposed development is planned in such a manner that it will not natural drainage systems? (Give details alter the existing drainage pattern of the area. on a contour map showing the natural drainage near the proposed project site) 1.6 What are the quantities of earthwork The project area will require minor cutting and filling work. Excavation for involved in the construction activity- foundation and road construction work is prominent activity. The debris cutting, filling, reclamation etc. (Give and excavated soil removed would be used as filling material for levelling details of the quantities of earthwork and for road construction. involved, transport of fill materials from outside the site, etc.) 1.7 Give details regarding water supply, Supply Source: Water supply during construction phase will be from waste handling etc during the water tanker. construction period. Storage: Water for construction will be stored in a tank constructed temporarily at site. Waste handling: Sanitation facilities like toilet blocks and bathrooms will be provide for the construction workers and site staff and the sewage generated will be collected and treated in a septic tank. It will be then disposed off into existing sewer line through closed pipeline. 1.8 Will the low lying areas & wetlands get No wet lands and low-lying areas on the site. altered? (Provide details of how low lying and wetlands are getting modified from the proposed activity) 1.9 Whether construction debris & waste No health hazards. Minor quantity of construction debris will be generated during construction cause health which will be sent out side. hazard? (Give quantities of various Construction waste will be used for road and as fill material for levelling types of wastes generated during and road, pathway construction. construction including the construction labour and the means of disposal) Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 9 Application form for Environmental Clearance Project Name: Proposed “Residential & Commercial project” of Xrbia Developers Ltd. At balewadi, Pune 2. WATER ENVIRONMENT 2.1 Give the total quantity of water Detailed water utilization chart Enclosed as Annexure V requirement for the proposed project with the break up of requirements for various uses. How will the water requirement met? State the sources & quantities and furnish a water balance statement. 2.2 What is the capacity (dependable flow or The proposed water demand will be met from Pune Municipal yield) of the proposed source of water? Corporation. 2.3 What is the quality of water required, in Not Applicable. The proposed water demand will be met from Pune case, the supply is not from a municipal Municipal Corporation. source? (Provide physical, chemical, biological characteristics with class of water quality) 2.4 How much of the water requirement can Treated water from Sewage treatment plant will be used for flushing be met from the recycling of treated in toilet and gardening purpose. wastewater? (Give the details of Sr. Details Quantity Unit quantities, sources and usage) 1. Total sewage generated 1,008 m3/day 2. Total STP capacity 1,058 m3/day 3. Treated water recycled for flushing 400 m3/day 4. Treated water for gardening 39 m3/day 5. Sludge generation 67 Kg/day 6. Excess treated water 468 m3/day 2.5 Will there be diversion of water from No diversion is anticipated. other users? (Please assess the impacts of the project on other existing uses and quantities of consumption) 2.6 What is the incremental pollution load The total sewage is about 1,008 m3/day will be generated from the from wastewater generated from the residential & commercial building. The composition of waste water is proposed activity? (Give details of the given in the table indicating the quality of raw waste water before quantities and composition of wastewater treatment. STP details attached as annexure VI generated from the proposed activity) Parameters Values Units pH 7-8 BOD 250-300 mg/l COD 450-600 mg/l O & G/ ABS 10-20 mg/l TSS 100-200 mg/l Mitigation measures: Domestic Effluent will be treated in the Sewage Treatment plant of capacity 1,058 m3/day. The treated sewage water will be reused for flushing and gardening. 2.7 Give details of the water requirements 10 Nos. of recharge pits will be provided for rainwater harvesting met from water harvesting? Furnish within project area. details of the facilities created. 2.8. What would be the impact of the land The project will have proper storm water drainage facility as per use changes occurring due to the Strom Water Drain Remarks by concerned authority. So, there will be proposed project on the runoff no problem of water logging due to this project. characteristics (quantitative as well as qualitative) of the area in the post construction phase on a long term basis? Would it aggravate the problems of flooding or water logging in any way? 2.9 What are the impacts of the proposal on In the proposed development, there will be no tapping of the ground water? (Will there be tapping groundwater. Water demand for the construction shall be met from of ground water; give the details of Tanker water whereas during operational phase will be met from Pune ground water table, recharging capacity, Municipal Corporation.