Publication of Award of Contract for Works Information Notice
Total Page:16
File Type:pdf, Size:1020Kb
PUBLICATION OF AWARD OF CONTRACT FOR WORKS INFORMATION NOTICE Publication date: Country: THE FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA Executing Agency: Ethiopian Roads Authority Name of Project: Ethiopia Integrated Transport Program Phase I: Jimma – Chida and Sodo – Sawla Roads Upgrading Project, Lot 3: Dinke – Sawla Loan/Grant Number: - Name of Tender: Ethiopian Integrated Transport Program Phase 1: Jimma – Chida and Sodo – Sawla Road Project: Lot 3: Dinke – Sawla Lot Number & Name (If different from Tender):N/A Procurement mode: ICB Domestic preference (Yes or No): No Regional preference (Yes or No): No Date of approval by the Bank of the PQ Document: PQ invitation date: January 06 & 07, 2017 December 29, 2017 Date of receipt by the Bank of the PQ Evaluation Date of approval by the Bank of the PQ Report: March 03, 2017 Evaluation: May 04, 2017 Borrower’s Tender Number: P-ET-D00-007 Date of receipt by the Bank of the draft Tender document: June 07, 2017 Date of approval by the Bank of the Tender Tender issuing date: August 16, 2017 Document: July 31, 2017 Closing date of the Tender: November 09, 2017 Date of Tender opening: November 09, 2017 Date of receipt by the Bank of the Tender Date of approval by the Bank of the Tender evaluation report: December 29, 2017 evaluation: March 29, 2018 Name of the winning Bidder: Beijing Urban Construction Group Co., Ltd Nationality: China Tel: (+86)-10-62-09-15-60 Mobile: 09-29-10-65-62 Fax: (+86)-10-62-09-15-59 Website: www.bucg.com Contract Award Price: ETB 1,020,177,271.11 Contract Start date 2018 Contract Duration: 4 Years / 48 Months Summary of Scope of Contract Awarded: Total Number of Bidders: Eleven (11) AL ASAB GENERAL TRANSPORT and CONTRACTING CGCOC GROUP Co. Ltd. ESTABLISHMENT Tel: +86-10-843-73-600 Abu Dhabi, United Arab Emirates (UAE) Mobile: 0912-00-31-50 / 0912-61-59-29 Tel: 02 - 02 555 0163 Fax: +86-10-843-73-601 Fax: 02 - 02 553 8809 Addis Ababa, Ethiopia Bid Price as Read-out: ETB 1,649,871,522.99 Bid Price as Read-out: ETB 1,378,807,894.64 Evaluated Price: ETB 1,649,871,419.69 Evaluated Price: ETB 1,770,443,951.59 Bid Accepted / Rejected: Rejected Bid Accepted / Rejected: Rejected Reason for Rejection: Higher Offer Reason for Rejection: Higher Offer Beijing Urban Construction Group Co., Ltd. CHINA RAILWAY No. 2 ENGINEERING GROUP No. 18, Beiitaipingzhuang Road, Haidian District, Beijing, CO., LTD. China Tel: +26 28 864 432 38 Email: [email protected] Email: [email protected] Tel: +251 944 110 0558 No. 16, Tongjin Road, Chengdu, P. R. China / Fax: +86 139 118 73203 Addis Ababa, Ethiopia Page 1 of 3 Bid Price as Read-out: ETB 1,029,219,190.45 Bid Price as Read-out: ETB 1,863,183,503.75 Evaluated Price: ETB 1,020,177,271.11 Evaluated Price: ETB 1,842,512,690.57 Bid Accepted / Rejected: Accepted Bid Accepted / Rejected: Rejected Reason for Rejection: N/A Reason for Rejection: Higher Offer China Civil Engineering Construction Corporation (CCECC) China Gezhoba Group Company Limited 4, Beifengwo, Haidian District, Beijing, China No. 558, Jiefang Road, Wuhan City, Hubei Tel: +251 912 50 07 88 Province, China Fax: +251 11 618 18 06 +251-11-3691168/3691121 Bid Price as Read-out: ETB 1,188,731,012.79 Bid Price as Read-out: ETB 2,129,657,220.18 Evaluated Price: ETB 1,188,730,883.68 Evaluated Price: ETB 2,129,657,222.62 Bid Accepted / Rejected: Rejected Bid Accepted / Rejected: Rejected Reason for Rejection: Higher Offer Reason for Rejection: Higher Offer Shandong Highway Engineering Construction Group Co. Sinohydro Corporation Limited Ltd No. 2, Building 2, No. 22 Yard, Chegongzhuang No.3366 Jingshi Road ( Linjiazhuang), Jinan City, West Road, Haidian District, Beijing, China Shandong, P.R. China Bole Sub city, Kebele 17, House No. 128 Addis Tel: +86 531 82316521/+251929003498 Ababa, Ethiopia Fax: +86 531 82316521/+251 116478985 Email: [email protected] Bid Price as Read-out: ETB 1,549,449,032.34 Tel: +251 920 244 238/4 Evaluated Price: ETB 1,550,588,404.35 Bid Price as Read-out: ETB 1,639,778,831.91 Bid Accepted / Rejected: Rejected Evaluated Price: ETB 1,651,382,492.51 Reason for Rejection: Higher Offer Bid Accepted / Rejected: Rejected Reason for Rejection: Higher Offer Sur Construction P.L.C. China Wu Yi. Ltd Tel: +251-11-466-83-51 01 Store, 4th Floor, the Landmark, 89 WUSI Fax: +251-11-466-83-50 Road, Hot Spring Street, Gulou District, Fuzhou, P.O. Box: 34360 Fujian, China Addis Ababa, Ethiopia Tel: +251 924954788 Bid Price as Read-out: ETB 1,916,411,832.11 Email: [email protected] Evaluated Price: ETB 1,942,664,038.11 Bid Accepted / Rejected: Rejected Bid Accepted / Rejected: Rejected Reason for Rejection: Unacceptable Bid Security Reason for Rejection: Higher Offer ZHONGMEI ENGINEERING GROUP LIMITED No. 76, Nanlian Road, Nanchang, Jiangxi, China (Headquarter) House No. 486, Woreda 09, Kirkos Sub city Addis Ababa Ethiopia Tel: +251 939 044 202 Tel: +251 114 706 524 Bid Price as Read-out: ETB 1,443,810,126.44 Evaluated Price: ETB 1,451,071,220.85 Bid Accepted / Rejected: Rejected Reason for Rejection: Higher Offer Scope of Contract: The Works to be carried out under this contract comprises of the upgrading of the Ethiopian Integrated Transport Program Phase 1: Jimma – Chida and Sodo – Sawla Road Project: Lot 3: Dinke – Sawla. The Project will be financed by a fund received from the African Development Bank, in term of a Grant and Loan. The Project starts from Dinke town which is located 394.5 km from Addis-Ababa on the main Addis- Butajera – Hosaena - Sodo road. The Project road then ends at Shifte town. The Project road has a total length of 75.97 km. The project is found in the South Nations Nationalities and Peoples Region (SNNPR). The project will be the secondt part of the Sodo – Sawla Road Upgrading Project which connects Wolayta Sodo and Gamo Goffa Zones and it will upgrade the existing gravel road to an all-weather climate – resilient road transport infrastructure to the rich agricultural area of southern Ethiopia. Page 2 of 3 The project will upgrade the existing gravel road as per ERA-2002 Design Manual standard of Asphalt Concrete surface. The Project road is designed according to ERA’s Design Manual 2002, and specification is prepared based on ERA’S Standard Specifications, 2002. The road when completed will have the following widths in Rural and Town Sections. The road will have a 7m carriage way with 1.5m shoulder width on each side in rural section. While in town sections, the road additional lanes / parking lanes and walkways will be provided as per the standard design manual. The project involves provision and maintenance of site laboratory and accommodation, office, transport, equipment as per Bills of Quantities; site clearance and setting out; earthworks; construction new bridges; replacement or repair of existing minor drainage structures and construction of additional new culverts; construction of drainage facilities such as ditches, outfalls, linings for drains and outfalls and scour check; construction of retaining wall structures; construction of sub-grade, sub-base and base course layers and shoulders; construction of shoulders (outside town sections); construction of asphalt concrete surfacing on carriageway and shoulders; removal of expansive clay layer to the designated depth on expansive soil sub-grade locations, construction of free draining layer and side filling of slopes adjacent to pavement layers; provision and erection of road furniture; accommodation of traffic throughout the construction period; ancillary operations to complete the execution of the works; taking care of the works prior to the issue of a taking-over certificate and rectification of defects during the Defects Liability Period and construction of reinstatement of the construction environment during and after construction completed. The Contractor is required to carry out geotechnical investigation on the bridge sites and carry out foundations need to be revised accordingly. The test results, the analysis and the design need to be approved by the Engineer. It also includes the development of General Management Plan (GMP) for the Maze National Park and provide training on the same to the relevant stakeholders, to be undertaken by the Contractor by assigning a specialized Sub-Contractor who can carry out the service. Moreover, construction of Sawla General Hospital Obstetrics, Gynecology Ward and Operation Unit Building and provision of Ambulance Vehicle will be made by the project. Ethiopian Roads Authority Page 3 of 3 .