City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Resurfacing and repair of street pavement, and restoration of flowlines of associated The Pavement Management program that is funded in FY 18-19 is spread throughout the City of Road Maintenance & Alameda Alameda Pavement Management curb and gutter, in order to extend the life of the street and improve its ridability for Alameda. Streets identified for resurfacing include sections of Alameda Avenue, Fernside Boulevard, 05/2018 11/2018 30 40 18 9 Rehabilitation cyclists and motorists. Harbor Bay Parkway, Park Street and Versailles Avenue. Throughout the City of Alameda - the backlog of repairs includes about 5,000 locations, of which Road Maintenance & Street tree root pruning and sidewalk repair to maintain pedestrian circulation and Alameda Alameda Sidewalks several clusters will be chosen that address the oldest requests, and maximize economy by 07/2018 06/2019 10 70 18 9 Rehabilitation safety, and minimize future damage to the street and sidewalk. aggregating sites in close location to each other.

This project consists of asphalt overlay of Evelyn Street from Garfield Avenue to Road Maintenance & Albany Alameda 17/18 Carryover Portland Avenue, for a distance of approximately 600 feet. It will also include base Evelyn Street from Garfield Avenue to Portland Avenue, in the City of Albany 05/2018 09/2018 20 30 15 9 Rehabilitation repair, traffic striping and upgrade of existing curb ramp to meet ADA requirements.

The 2019 Annual Street Rehabilitation Project includes the repair and rehabilitation of local streets and roads within the City of Albany. Street Saver software and a pavement Road Maintenance & 2019 Annual Street Rehabilitation condition index provided through a Pavement Management Technical Assistance Albany Alameda Various streets including portions of Pierce Street, Garfield, and Jackson Street in the City of Albany. 06/2018 05/2019 20 30 15 9 Rehabilitation Project Program provided priority streets for rehabilitation. Jackson Street, Pierce Street, and Garfield Avenue along with other priority streets were identified treatment based on function, pavement condition, and coordination with other projects.

FY 2019 Street Rehabilitation Project to overlay and reconstruct up to 1.01 miles of Berkeley streets. Planned segments for SB1 funds include: 6th Street from Allston Way to Dwight Way, Catalina Avenue from Colusa Avenue to 6th Street from Allston Way to Dwight Way, Catalina Avenue from Colusa Avenue to The Alameda, Road Maintenance & The Alameda, Derby Street from San Pablo Avenue to Mabel Street, Dwight Crescent Derby Street from San Pablo Avenue to Mabel Street, Dwight Crescent from 6th Street to 7th Street, Berkeley Alameda FY 2019 Street Rehabilitation 05/2019 10/2019 10 30 15 9 Rehabilitation from 6th Street to 7th Street, Highland Place from Ridge Road to Hearst Avenue, Ridge Highland Place from Ridge Road to Hearst Avenue, Ridge Road from La Loma Avenue to Highland Road from La Loma Avenue to Highland Place, Station Place from Catalina Avenue to Place, Station Place from Catalina Avenue to the south end of Station Place the south end of Station Place

Reconfiguration of a three-block segment of Shattuck Avenue from Allston Way to Complete Streets Berkeley Alameda Shattuck Avenue Reconfiguration University Avenue to improve pedestrian and bicycle safety, northbound circulation for Shattuck Avenue from Allston Way to University Avenue 09/2018 03/2020 20 30 15 9 Components motorists and transit vehicles, and the quality of public spaces in the Downtown core.

The FY 2018 Street Rehabilitation Project to reconstruct up to 0.81 miles of Berkeley Streets is continuing from its original FY 2018 submission due to construction timing Segments planned for pavement reconstruction funded from SB1 include: Road Maintenance & that will occur in FY 2019. Segments planned for pavement reconstruction funded from *Prospect Street - Pavement Reconstruction of 0.13 miles of Prospect Street from the UC Berkeley Berkeley Alameda FY 2018 Street Rehabilitation 08/2018 04/2019 20 30 15 9 Rehabilitation SB1 include: *Prospect Street - Pavement Reconstruction of 0.13 miles of Prospect Campus to Hillside Avenue Street from the UC Berkeley Campus to Hillside Avenue; *Panoramic Way - Pavement *Panoramic Way - Pavement Reconstruction of 0.68 miles of Canyon Road to east city limit Reconstruction of 0.68 miles of Canyon Road to east city limit

Design and construction of a 1.5-mile extension of Dublin Boulevard from Fallon Road to North Canyons Parkway in Livermore. Dublin Alameda Other Dublin Boulevard Extension Between Fallon Road in the City of Dublin and North Canyons Parkway in City of Livermore 07/2023 12/2025 30 50 16 7

This is a new proposed project for FY 18/19 report. Planning, design, and construction of Tassajara Road from North Dublin Ranch Drive Tassajara Road Realignment and to city limit. Dublin Alameda Other Between North Dublin Ranch Drive and the City Limit along Tassajara Road. 01/2016 06/2020 30 50 16 7 Widening The funding from FY 17/18 was carried forward as planned to FY 18/19 report. Pavement surface treatments and repairs to existing City streets. The City is proposing Road Maintenance & to resurface three streets this summer. These streets include; San Ramon Road, Dublin Dublin Alameda Annual Street Resurfacing These streets include; San Ramon Road, Dublin Blvd and Amador Valley Blvd. 07/2018 03/2019 7 25 16 7 Rehabilitation Blvd and Amador Valley Blvd. FY 17/18 SB1 funding was carried over to the FY 18/19 funding. Dublin Boulevard Improvements - Design and construction of Dublin Boulevard from Sierra Court to Dublin Court. Dublin Alameda Other Between Sierra Court and Dublin Court on Dublin Blvd. 07/2018 06/2019 30 50 16 7 Sierra Court to Dublin Court This is a new proposed project for FY 18/19 report. Design and environmental review of an Iron Horse Trail bridge for bicycles and Iron Horse Trail Bridge at Dublin pedestrians over Dublin Boulevard. Dublin Alameda Safety At Scarlet Drive on Dublin Blvd 07/2018 06/2019 30 50 16 7 Boulevard Funding from FY 17/18 was carried forward as planned to FY 18/19 report.

The Public Works Committee and BPAC have identified a new potential project in the City of Emeryville to install a mid-block crosswalk on San Pablo Avenue between 40th San Pablo Avenue Mid-Block Cross Emeryville Alameda Safety Street and Adeline Street in Caltrans State right-of-way. The work will include the new San Pablo Avenue between 40th Street and MacArthur Boulevard 09/2018 04/2019 10 20 15 9 Walk (17/18 Carryover) construction of ADA pedestrian ramps, large pedestrian refuge area in the median, and highly-visible pedestrian/vehicular traffic control devices.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

1. Central Ave: Blacow Rd to Fremont Blvd 2. Mowry Ave (East Bound): I-880 to Farwell Ave 3. South Grimmer Blvd (South Bound): Auto Mall Pkwy to Technology Dr 4. Washington Blvd: Palm Ave to Mission Blvd 5. Paseo Padre Parkway (South Bound): Mission Blvd to Curtner Rd 6. East Warren Ave: Curtner Rd to Yakima Dr. 7. Lake Oneida St 8. Lake Pyramid St 9. Chaucer Dr 10. Cornwallis Pl & Ct 11. Torrington Ct & Pl 12. Atteridge Pl & Ct 13. Barnfield Pl 14. Milton St 15. Ardo St 16. Gustavo Ct 17. Aquado Ct 18. Cano Ct Road Maintenance & Fremont Alameda Pavement Rehabilitation Project Pavement rehabilitation of asphalt roadways. 19. Tampico Rd 06/2018 11/2018 10 15 10 25 Rehabilitation 20. Cadiz Dr & Ct 21. Lexington St 22. Argonaut Way: Garland Dr to Mowry Ave 23. Blacow Rd Frtg (West Side): Eggers Dr to Brophy Dr 24. Blacow Rd Frtg (East Side): Eggers Dr to South End 25. Wheeler Dr: Sundale Dr to Logan Dr 26. Margery Dr: Davis St to Fremont Blvd 27. Baylis St 28. Coco Palm Dr: Whitecap St to Royal Palm Dr 29. Curtis St: Omar St to Peony Court 30. Fremont Blvd Frtg (West Side): Delaware Dr to Doane St 31. Montrose Ave: Fremont Blvd to Jamestown Rd 32. Duarte Ave 33. Mission Creek Dr 34. Anza St: Ellsworth St to Mission Blvd 35. Mohican Ct 36. Sentinel Pl: Raindance Rd to Owhanee Ct 37. Lippert Ave: to Hoyt St

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts 1. Abaca Way 2. Agnes Ct 3. Alder Ave: 625' E/O Fremont Blvd To Fremont Blvd 4. Alder Ave: 625' E/O Fremont Blvd To Hereford St 5. Alder Ave: Hereford St To Nicolet Ave 6. Alvaniece Ct 7. Ambar Pl North End 8. Ambar Pl South End 9. Andrews Ct 10. Arkwood St: Doane St To Cedarwood St 11. Athy Ct 12. Audubon Park Ct 13. Barry Way: Tyson Ln To Athy Ct 14. Benavente Ave: Canyon Heights Dr To Almeria Ave 15. Benavente Pl 16. Blacow Rd: Roberts Ave To East End 17. Blair Pl 18. Bogalusa Ct 19. Bruce Dr: Meredith Dr To Middlefield Ave Road Maintenance & Pavement maintenance project to apply cape and slurry seals to existing asphalt 20. Cadencia St: Mission Blvd To Morada Ct Fremont Alameda Cape and Slurry Seal Project 06/2018 11/2018 5 10 10 25 Rehabilitation roadways 21. Canto Pl 22. Carnation Way: Niles Blvd To N/O Ilima Ct 23. Casals Way 24. Cassio Cir: Othello Dr To Othello Dr 25. Castillejo Ct 26. Castillejo Way: Castillejo Rd To East End 27. Castillejo Way: Castillejo Rd To West End 28. Chapman Ct 29. Chateau Park Ct 30. Chatterton Ct 31. Claremont Park Ct 32. Clarendon Park Ct 33. Collin Ct 34. Covina Way: Cholla St To Towhee St 35. Curtis St: 110' E/O Farina Ln To Butano Park Dr 36. Dortha Ct 37. Durillo Ct 38. Eden Ct 39. El Portal Av: Niles Blvd To Plumeria Way 40. Emerson Ct I-880 Bicycle and Pedestrian Bridge Bridge project to provide safe crossing over an existing freeway for pedestrians and Fremont Alameda Road Grade Separation and Trail Project (East Bay Over Interstate 880 near Mission Boulevard 10/2020 12/2022 40 60 10 25 cyclists. Greenway Trail Reach 6)

Complete Streets Multi-Modal Improvements-BART Roadways improvements to improve safety and accessibility. Includes installation of Fremont Alameda BART Way and Gateway Plaza 06/2018 11/2018 20 30 10 20 Components Way and Gateway Plaza raised bike lanes, intersection modifications, and guide signs for pedestrian navigation.

Traffic Signal at Grimmer Blvd. and Fremont Alameda Traffic Control Devices Installation of new traffic signals Intersection of Grimmer Boulevard and Seneca Park Avenue 06/2018 11/2018 20 30 10 25 Seneca Park Ave. Traffic Signal at Blacow Rd. and Fremont Alameda Traffic Control Devices Installation of new traffic signal Intersection of Blacow Road and Gatewood Street 06/2018 11/2018 20 30 10 25 Gatewood St. Fremont Boulevard and Norris Road: Installation of HAWK beacon signal, Driscoll Road and Chiltern Pedestrian Crossing Enhancement Drive: Installation of RRFB, Fremont Boulevard and Margery Drive: Installation of RRFB, Paseo Padre Fremont Alameda Traffic Control Devices Installation of HAWK beacon signal and RRFB 05/2018 12/2018 20 30 10 25 Phase 2 Parkway and Surry Place: Installation of RRFB, Driscoll Road (mid block) between Amapola Drive and Chiltern Drive: Installation of RRFB

1. Mowry Avenue and Waterside Circle/Vancouver Common: Installation of High Intensity Activated Pedestrian Crossing Enhancement Installation of High Intensity Activated Crosswalk (HAWK) beacon signal and Fremont Alameda Traffic Control Devices Crosswalk (HAWK) beacon signal. 06/2018 11/2018 20 30 10 25 Phase 1 Installation of Rapid Rectangular Flashing Beacon (RRFB) 2. East Warren Avenue at Bradley Street: Installation of Rapid Rectangular Flashing Beacon (RRFB)

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Intersections of: 1. Alder and Coronado 2. Alder and Laredo 3. Altura and Tothero 4. Alvarado and Lake Arrowhead 5. Alvarado and Merganser 6. Ambar and Casa Marcia 7. Ambar and Quintana 8. Athy and Barry 9. Benavente and Canyon Heights 10. Benavente and Platero 11. Benavente and Benavente Pl 12. Benavente and Estrella 13. Benavente and Orden 14. Benavente and Obispo 15. Benavente and Almeria 16. Blanchard and Hawkins 17. Cadencia and Charlita 18. Cadencia and Danzon Complete Streets 19. Calaveras and Mariposa Fremont Alameda Intersection Ramps Installation of curb ramps at street intersections to improve accessibility 06/2018 03/2019 20 30 10 25 Components 20. Calaveras and Drake 21. Calaveras and Sutter 22. Camero and Canto 23. Canyon Heights and Fisalia 24. Canyon Heights and Hidalgo 25. Carnation and Niles 26. Carnation and Ilima 27. Cassio and Cassio Ct 28. Cassio and Othello (South Intersection) 29. Castillejo Way and Castillejo Ct. 30. Castillejo Way and Castillejo Rd. 31. Castillejo Way and Caldas 32. Chiltern and Casals 33. Chiltern and Kensington 34. Covina and Mantis 35. Dauphine and Blue Ridge 36. Deep Creek and Amberwood 37. Durillo and Durillo Ct 38. Essanay and Essanay Pl. 39. Everglades Park and Clarendon Park Breakwater Av: from Breakwater Ct to Whitesell St, Fairway St: from Mission Blvd to Faircliff St, Lester Av: from Hesperian Blvd to Thelma St, Miami Av: from Melbourne Av to Calaroga Av, Mohr Dr: from FY 2019 Pavement Rehabilitation Road Maintenance & The project consists of pavement rehabilitation treatment including overlay, cold-in- West St to Occidental Rd, Oakes Dr: from Chatham Ct to Durham Wy, Pontiac St: from Dale St to Hayward Alameda and Preventative Maintenance 11/2018 07/2019 10 15 20 10 Rehabilitation place recycling, and full depth reclamation. Jackson St, San Antonio St: from San Luis Obispo Av to Zephyr Av, San Luis Obispo Av: from Project Medallion Dr to San Antonio St, San Luis Obispo Av: from Huntwood Av to Medallion Dr, Vanderbilt St: from Briergate Wy to Garin Av

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

P ST (PINE ST to CHESTNUT ST) SCENIC AV (ARROWHEAD AV to 125' E/O MT DIABLO WY) SEVENTH ST (S I ST to S LIVERMORE AV) SILVER OAKS WY (FOURTH ST to SCHOOL ST) WISTERIA WY (BLUEBELL DR to 125' E/O ARROWHEAD AVE) AIRWAY BLVD (220' S/O KITTYHAWK RD to 880' W/O ISABEL) CONCANNON BLVD (WB LANES) (MURDELL LN to ALTAIR AV) (3) EAST AV (XAVIER WY to 160' E/O MADISON AV) HILLCREST AV (EAST AV to YALE WY) POMONA WY (HILLCREST AV to END) JACKSON AV (POMONA WY to LOYOLA WY) SCHOOL ST (MADERIA WY to END) HOLMES ST (MURRIETA BLVD to 200' S/O AARON ST) Asphalt resurfacing and base repairs of various residential, collector and arterial FOURTH ST (P STREET to 550' W/O Q ST) roadways including repairing curb and gutter, sidewalk, video detection at traffic signals, Road Maintenance & Street Resurfacing 2018 (17/18 LAS POSITAS RD (PULLMAN ST to 585' E/O PRESTON AV) Livermore Alameda signing and striping and handicap ramp installation. The priorities for selecting streets 05/2018 12/2018 20 30 16 7 Rehabilitation Carryover) N CANYONS PKWY (INDEPENDENCE RD to COLLIER CANYON RD) to be resurfaced are established by the Pavement Managment System (PMS) and a risk (2) S. GREENVILLE RD (265' S/O NATIONAL DRIVE to 450' S/O LAS POSITAS RD) level analysis, traffic volumes and staff field inspections. PORTOLA AV (N L ST to N LIVERMORE AV) ENOS WY (JUNCTION AV to PORTOLA AV) E STANLEY BLVD (MURRIETA BLVD to FENTON ST) N. VASCO RD (SCENIC AV to CRESTMONT AV) S VASCO RD (NB LANES) (EMILY WY to PATTERSON PASS RD) S VASCO RD (BRISA ST to 60' N/O NAYLOR AVE) WALL ST (EL CAMINITO to E STANLEY BLVD) LEAHY WAY (JENSEN ST to END) GARNET DR (RUBY RD to 310' W/O ZIRCON WY) PEARL DR (MURDELL LN to AMBER WY) QUARTZ CIRCLE (MURDELL LN to END) (2) S. Greenville Rd. Bid Alternate #2 (3) East Ave. Bid Alternate #3

E JACK LONDON BLVD (CURLEW RD to N MURRIETA BLVD) BARBER STREET (DUKE WY to FORDHAM WY) CLARKE AV (CALLAGHAN ST to KENNEDY ST) COVELLITE LN (PEARL DR to END) DUKE WY (MADEIRA WY to FORDHAM WY) EAST AV (CHARLOTTE WY to 1025 FT E/O CHARLOTTE WY) FLINT ST (COVELLITE LN to PEARL DR) FORDHAM WY (DUKE WY to HILLCREST AV) FOURTH ST (60 FT W/O S P ST to S N ST) GARDELLA PLAZA (RR CROSSING to SCOTT ST) HILLCREST AV (YALE WY to FORDHAM WY) JEFFERSON AV (EAST AV to POMONA WY) JUNCTION AV (N LIVERMORE AV to OLD FIRST ST) KELLY ST (ENOS WY to LEE AV) Slurry seal treatment and microsurfacing of residential, collector and arterial roadways, KENNEDY ST (KELLY ST to MARTIN AV) Road Maintenance & including base repairs, installation of ramps, and signing and striping. The priorities for Livermore Alameda Slurry Seal 2018 (17/18 Carryover) LADD AV (JUNCTION AV to LEE AV) 05/2018 09/2018 7 10 16 7 Rehabilitation selecting streets to be slurried are established by the Pavement Management System LEE AV (LADD AV to PORTOLA AV) (PMS) and a risk level analysis, traffic volumes and staff field inspections. MADEIRA WY (SCHOOL ST to JENSEN ST) MICHELL CT (MICHELL ST to END) MURPHY ST (SCOTT ST to END) OLD FIRST ST (JUNCTION AV to END) OREGON WY (ROSE ST to JENSEN ST) PORTOLA AV (100 FT W/O WOODHAVEN COMM to N L ST) S VASCO RD (PATTERSON PASS RD to RR OVERPASS) S VASCO RD (RR OVERPASS to BRISA ST) SCHERMAN WY (MURDELL LN to ALBERT WY) SCOTT ST (MICHELL ST to FIRST ST) STANFORD CT (STANFORD WY to END) STANFORD WY (E/O JENSEN ST to W/O ESTATES ST) VERN AV (KELLY ST to KENNEDY ST) VISTA ST (PESTANA WY to MADEIRA WY)

The following list of preliminary street locations are subject to change and will be selected based on Asphalt resurfacing and base repairs of various residential, collector and arterial priority need and resources throughout the year. roadways including repairing curb and gutter, sidewalk, video detection at traffic signals, Fourth Street (South Livermore Avenue to Maple Street), Las Positas Road (South Vasco Road to Road Maintenance & Livermore Alameda Street Resurfacing 2019 signing and striping and handicap ramp installation. The priorities for selecting streets Pullman Street), First Street (South Q Street to South M Street), First Street (South M Street to South L 05/2019 12/2019 20 30 16 7 Rehabilitation to be resurfaced are established by the Pavement Managment System (PMS) and a risk Street), East Avenue (South Livermore Avenue to Sixth Street), East Avenue (Sixth Street to Jensen level analysis, traffic volumes and staff field inspections. Street)

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

All preliminary street locations are subject to change and will be selected based on priority need and resources throughout the year. E Stanley Blvd (Murdell And El Caminito) El Caminito (Wall Street And El Padro Street) Farnsworth Dr (Harewood Dr And Lambeth Rd) Felicia Av (Jessica Dr And Nina Wy) Rhododendron Dr (Daffodil Wy And Springtown Blvd) College Av (Cross Creek Pl And S L St) Tamalpais Av (Logan St And Hagemann Dr) Catalina Dr (Orchard Wy And Wagoner Dr) Ventura Av (Rincon Av And Western Av) Sixth St (S N St And S L St) First St (Las Positas Rd And 956' N/O Las Positas Rd) Findlay Wy (Madison Av And Hillcrest Av) Capriconus Av (Bluebell Dr And Aquarius St) Slurry seal treatment and microsurfacing of residential, collector and arterial roadways, Murrieta Blvd (Fenton St And Holmes St) Road Maintenance & including base repairs, installation of ramps, and signing and striping. The priorities for Livermore Alameda Slurry Seal Project 2019 Industrial Wy (Vasco Rd And Preston Av) 05/2019 08/2019 7 10 16 7 Rehabilitation selecting streets to be slurried are established by the Pavement Management System Florida Ct (Linclon Av And End) (PMS) and a risk level analysis, traffic volumes and staff field inspections. Joyce St (Patterson Pass Rd And Theresa Wy) Skylinks Wy (Pasatiempo St And Spyglass Hills Rd) Portola Av (Rincon Av And Alviso Pl) Covington Wy (Wilton Rd And Hanover St) Yosemite Dr (Cascade Av And Yellowstone Wy) Fifth St (Mc Leod St And Maple St) Sunflower Ct (E/O Bluebell Dr And 830' S/O Bluebell Dr) Mc Leod St (First St And Fourth St) Lincoln Av (Stanford Wy And Pomona Wy) Bianca Wy (Shelley St And Felicia Av) Bristlecone Wy (Monterey Dr And End) Farnsworth Dr (Lambeth Rd And Wellingham Dr) Southfront Rd (Mc Graw Av And Franklin Ln (Pave Chg)) N Murrieta Blvd (Del Norte Dr And Portola Av)

The City of Newark is bounded to the north by State Route 84, to the east by Interstate 880, to the south by Stevenson Blvd and to the west by the SF Bay. In total, the City is responsible for Newark Alameda Traffic Control Devices Citywide Street Signs Installation or replacement of street signs at various locations throughout the City maintaining 106 centerline miles of roadways. Specific street signs on those roadways will be 08/2019 12/2019 15 25 25 10 prioritized and selected for maintenance during development of construction plans based on identified needs. The City of Newark is bounded to the north by State Route 84, to the east by Interstate 880, to the south by Stevenson Blvd and to the west by the SF Bay. In total, the City is responsible for Installation or replacement of traffic striping and pavement markings at various Newark Alameda Traffic Control Devices Thermoplastic Street Striping maintaining 106 centerline miles of roadways. Specific locations and limits of thermoplastic pavement 08/2019 09/2019 5 10 25 10 locations throughout the City striping on those roadways will be prioritized and selected for maintenance during development of construction plans based on identified needs. The City of Newark is bounded to the north by State Route 84, to the east by Interstate 880, to the Roadway pavement preventative maintenance on various streets located throughout south by Stevenson Blvd and to the west by the SF Bay. In total, the City is responsible for Road Maintenance & Newark Alameda 2019 Street Slurry Seal Program the City. Preventative maintenance typically involves application of a slurry seal to the maintaining 106 centerline miles of roadways. Specific sections and limits of roadways on which slurry 05/2019 07/2019 5 7 25 10 Rehabilitation existing roadway pavement seal will be applied will be prioritized and selected during development of construction plans based on identified needs.

The City of Newark is bounded to the north by State Route 84, to the east by Interstate 880, to the Complete Streets Citywide Accessible Pedestrian Installation, repair or replacement of accessible pedestrian ramps at various locations south by Stevenson Blvd and to the west by the SF Bay. In total, the City is responsible for Newark Alameda 02/2019 04/2019 20 30 25 10 Components Ramps throughout the City maintaining 106 centerline miles of roadways. Specific curb ramp locations on those roadways will be prioritized and selected during development of construction plans based on identified needs.

The City of Newark is bounded to the north by State Route 84, to the east by Interstate 880, to the south by Stevenson Blvd and to the west by the SF Bay. In total, the City is responsible for Complete Streets 2019 Sidewalk, Curb and Gutter Repair of damaged concrete curb, gutter and sidewalk at various locations throughout Newark Alameda maintaining 106 centerline miles of roadways. Specific locations and limits of curb, gutter and 02/2019 04/2019 15 30 25 10 Components Replacement the City. sidewalk replacement on those roadways will be prioritized and selected for maintenance during development of construction plans based on identified needs. The City of Newark is bounded to the north by State Route 84, to the east by Interstate 880, to the south by Stevenson Blvd and to the west by the SF Bay. In total, the City is responsible for Road Maintenance & Removal and replacement of failed roadway pavement sections on various streets Newark Alameda 2019 Street Patch Paving Program maintaining 106 centerline miles of roadways. Specific locations and limits of patch paving on those 04/2019 06/2019 15 20 25 10 Rehabilitation located throughout the City roadways will be prioritized and selected during development of construction plans based on identified needs. The City of Newark is bounded to the north by State Route 84, to the east by Interstate 880, to the Roadway pavement rehabilitation on various streets located throughout the City. south by Stevenson Blvd and to the west by the SF Bay. In total, the City is responsible for Road Maintenance & 2019 Asphalt Concrete Overlay Newark Alameda Pavement rehabilitation typically involves removal of 2" of existing pavement and maintaining 106 centerline miles of roadways. Specific sections and limits of roadways on which 04/2019 06/2019 15 20 25 10 Rehabilitation Program replacement with an asphalt concrete pavement overlay. asphalt concrete overlay will be performed will be prioritized and selected during development of construction plans based on identified needs.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts The City of Newark is bounded to the north by State Route 84, to the east by Interstate 880, to the south by Stevenson Blvd and to the west by the SF Bay. In total, the City is responsible for Complete Streets Installation of traffic calming measures such as speed bumps on various streets located Newark Alameda Traffic Calming Measures maintaining 106 centerline miles of roadways. Specific roadways and locations on which traffic 04/2019 06/2019 15 20 25 10 Components throughout the City. calming measures will be installed will be prioritized and selected for maintenance during development of construction plans based on identified needs. Road Maintenance & Dwight Way Resurfacing (17/18 Oakland Alameda Repave .28 miles of roadway City Limit to Dwight Place 08/2018 01/2019 10 20 18 9 Rehabilitation Carryover) Road Maintenance & Panoramic Place Resurfacing Oakland Alameda Repave .92 miles of roadway Panoramic Way to West End, and Dwight Way to City Limit (two sections) 08/2018 01/2019 10 20 18 9 Rehabilitation (17/18 Carryover) Road Maintenance & Chatham Road Resurfacing (17/18 Oakland Alameda Repave .65 miles of roadway Beaumont Ave to Park Blvd. South End to 29th Ave (2 segments) 08/2018 01/2019 10 20 18 9 Rehabilitation Carryover) Road Maintenance & Bridge Ave Resurfacing (17/18 Oakland Alameda Repave .2 miles of roadway Foothill Boulevard to E. 16th Street 08/2018 01/2019 10 20 18 9 Rehabilitation Carryover) Road Maintenance & E. 16th Street Resurfacing (17/18 Oakland Alameda Repave .29 miles of roadway 34th Ave to 37th Ave 08/2018 01/2019 10 20 18 9 Rehabilitation Carryover) Road Maintenance & Mason Street Resurfacing (17/18 Oakland Alameda Repave .08 miles of roadway Foothill Boulevard to Walnut Street 08/2018 01/2019 10 20 18 9 Rehabilitation Carryover) Road Maintenance & Shone Ave Resurfacing(17/18 Oakland Alameda Repave .23 miles of roadway Sterling Drive to Fontaine Street 08/2018 01/2019 10 20 18 9 Rehabilitation carryover) Road Maintenance & Old Redwood Road Resurfacing Oakland Alameda Repave .28 miles of roadway Redwoood Road to North End 08/2018 01/2019 10 20 18 9 Rehabilitation (17/18 Carryover) Road Maintenance & Lowell Street Resurfacing (17/18 Oakland Alameda Repave .67 miles of roadway Adeline Street to Market Street 08/2018 01/2019 10 20 18 9 Rehabilitation Carryover) Road Maintenance & Oakland Alameda 14th Street Resurfacing Repave 0.40 miles of roadway Wood Street to Mandela Pkwy 09/2018 04/2019 10 20 18 9 Rehabilitation Road Maintenance & Oakland Alameda 29th Avenue Resurfacing Repave 0.22 miles of roadway East 17th St to International Blvd 09/2018 04/2019 10 20 18 9 Rehabilitation Road Maintenance & Oakland Alameda 4th Avenue Resurfacing Repave 0.34 miles of roadway East 12th Street to E 18th Street 09/2018 04/2019 10 20 18 9 Rehabilitation Road Maintenance & Oakland Alameda 82nd Avenue Resurfacing Repave 0.26 miles of Roadway Utah Street to MacArthur Blvd 09/2018 04/2019 10 20 18 9 Rehabilitation Road Maintenance & Oakland Alameda Brush Street Resurfacing Repave 0.16 feet of Roadway 3rd Street to 6th Street 09/2018 04/2019 10 20 18 9 Rehabilitation Road Maintenance & Oakland Alameda Carson Street Resurfacing No. 1 Repave 0.05 miles of roadway Tompkins Avenue to Fair Avenue 09/2018 04/2019 10 20 18 9 Rehabilitation Road Maintenance & Oakland Alameda Carson Street Resurfacing No. 2 Repave 0.19 miles of roadway Reinhardt Drive to Mountain Blvd 09/2018 04/2019 10 20 18 9 Rehabilitation Road Maintenance & Oakland Alameda Claremont Avenue Resurfacing Repave 1.05 miles of roadway Alvarado road to Grizzly Peak Blvd 09/2018 04/2019 10 20 18 9 Rehabilitation Road Maintenance & Oakland Alameda Enterprise Way Repave 0.24 miles of roadway 85th Avenue to Edes Avenue 09/2018 04/2019 10 20 18 9 Rehabilitation Road Maintenance & Oakland Alameda Hillmont Drive Resurfacing Repave 0.10 miles of roadway Sunkist Drive to Edgemoor Pl 09/2018 04/2019 10 20 18 9 Rehabilitation Road Maintenance & Oakland Alameda Kingland Avenue Resurfacing Repave 0.15 miles of roadway Birdsall Avenue to Redding Street 09/2018 04/2019 10 20 18 9 Rehabilitation Road Maintenance & Oakland Alameda Peterson Street Resurfacing Repave 0.17 miles of roadway East End to Glasscock Street 09/2018 04/2019 10 20 18 9 Rehabilitation Road Maintenance & Oakland Alameda Tompkins Avenue Resurfacing Repave 0.13 miles of roadway Carson St to High St 09/2018 04/2019 10 20 18 9 Rehabilitation Road Maintenance & Oakland Alameda Webster Street Resurfaing Repave 0.21 miles of roadway Broadway to Grand Avenue 09/2018 04/2019 10 20 18 9 Rehabilitation Road Maintenance & Oakland Alameda Yerba Buena Avenue Resurfacing Repave 0.13 miles of roadway 40th Street to City Limits 09/2018 04/2019 10 20 15 9 Rehabilitation

Citywide - Bancroft Avenue, 98th Avenue, Telegraph Avenue, and Foothill Boulevard. Oakland’s street inventory consists of 806 miles of arterial, collector and residential streets. Minor street repair Road Maintenance & Citywide Street maintenance activities including potholing and spot repairs to city Oakland Alameda Local Road Maintenance activity is determined by the location of problems, as reported by the general public and noted by city 09/2018 04/2019 5 10 15, 18 9 Rehabilitation streets and sidewalks with city asphalt and concrete crews. crews. All locations have yet to be finalized and are subject to change throughout the year. Each location will be selected based on priority need and resources.

Road Maintenance & Piedmont Alameda 2018 Pavement Restoration Project Pavement restoration of Magnolia Avenue Magnolia Avenue between Hillside Avenue and Nova Drive 11/2018 06/2019 20 30 15 9 Rehabilitation The project will resurface various streets throughout Hacienda Business Park in the The project will resurface various streets throughout Hacienda Business Park in the summer of 2019, Road Maintenance & summer of 2019, including but not limited to: Stoneridge Drive between Gibraltar and Pleasanton Alameda One Bay Area Grant Cycle II including but not limited to: Stoneridge Drive between Gibraltar and Owens, Chabot Drive between 10/2018 04/2019 10 15 16 7 Rehabilitation Owens, Chabot Drive between Owens and Inglewood and Hacienda Drive between Owens and Inglewood and Hacienda Drive between Gibraltar and I-580. Gibraltar and I-580.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

The project will resurface various streets throughout the City in the summer of 2019, The project will resurface various streets throughout the City in the summer of 2019, including but not including but not limited to: various streets in County Fair Estates off of Paseo Santa limited to: various streets in County Fair Estates off of Paseo Santa Cruz (north); various streets in Road Maintenance & Annual Resurfacing and Pleasanton Alameda Cruz (north); various streets in Rheem tract, Santa Rita road frontage; and various Rheem tract, Santa Rita road frontage; and various streets in Val Vista, off of Single Tree, Payne, 02/2019 06/2019 10 15 16 7 Rehabilitation Reconstruction of Various Streets streets in Val Vista, off of Single Tree, Payne, Alvord, and Inglewood. The resurfacing Alvord, and Inglewood. The resurfacing treatments will extend the useful life of the roadway an treatments will extend the useful life of the roadway an additional 10 to 15 years. additional 10 to 15 years.

Road Maintenance & San Leandro Alameda Adason Drive Placement of thin overlay of travel lane and crack-seal surface. Adason Drive, between Halcyon Dr. to Hesperian Blvd. 07/2018 08/2018 4 5 18 9 Rehabilitation Road Maintenance & San Leandro Alameda Coburn Court Remove and replace all distressed pavement and crack seal surface Coburn Court, between parking lot to end of cul-de-sac 08/2018 08/2018 15 20 18 9 Rehabilitation Road Maintenance & San Leandro Alameda Sherry Court Remove and replace all distressed pavement and crack seal surface Sherry Court between Benedict Dr. to end of cul-de-sac 08/2018 08/2018 15 20 18 9 Rehabilitation Road Maintenance & San Leandro Alameda Hillside Drive Remove and replace all distressed pavement and crack seal surface Hillside Drive between Daily Drive to Montrose Drive 09/2018 09/2018 15 20 18 9 Rehabilitation Road Maintenance & San Leandro Alameda Sylvia Way Crack seal surface from end to end. Sylvia Way between Diletta Ave. to Sidney Ave. 09/2018 09/2018 4 5 18 9 Rehabilitation Road Maintenance & San Leandro Alameda Fairway Drive Crack seal surface from end to end. Fairway Drive between Doolittle Drive to 880 Overpass 10/2018 10/2018 4 5 18 9 Rehabilitation Road Maintenance & San Leandro Alameda Andover Street Crack seal surface from end to end. Andover Street between Lewelling Blvd. to Burkhart Ave. 10/2018 10/2018 4 5 18 9 Rehabilitation Road Maintenance & San Leandro Alameda Duzmal Avenue Crack seal surface from end to end. Duzmal Avenue from Faris Street to cul-de-sac of Kramer Street 04/2019 04/2019 4 5 18 9 Rehabilitation Road Maintenance & San Leandro Alameda Foothill Blvd. Crack seal surface from end to end. Foothill Blvd. between Durant Avenue to Macarthur Blvd. 04/2019 04/2019 4 5 18 9 Rehabilitation Road Maintenance & San Leandro Alameda Bigge Street Crack seal surface from end to end. Bigge Street between Adams Ave. to end of cul-de-sac 05/2019 05/2019 4 5 18 9 Rehabilitation

Road maintenance of 1) Decoto Road from Union Square to south City Limits Road Maintenance & (Fremont); 2) Alvarado-Niles Road from I-880 interchange to Fredi Street; 3) Union City Decoto Road, Alvarado-Niles Road, Union City Boulevard, Tamarack Drive, and other various streets Union City Alameda Pavement Repair Project 05/2019 06/2019 10 15 20 10 Rehabilitation Boulevard from north City Limit (Hayward) to Smith Street and 4)Tamarack Drive from in Union City, CA. Mission Boulevard to Ithaca Street 5) and various streets.

Road Maintenance & Amador City Amador Road Maintenance New pavement striping on all City roadways. Main Street; Old Highway 49; O'Neil Alley; God's Hill; Church St.; Keystone Alley 09/2018 12/2018 10 20 5 8 Rehabilitation Road Maintenance & Amador City Amador Road Maintenance Repainting Crosswalks (17/18 Carryover) Old Highway 49; Water St.; Keystone Alley 12/2018 03/2019 10 10 5 8 Rehabilitation BIRCHWOOD COURT, GLENBROOK DRIVE, GLENBROOK DRIVE, QUAIL HOLLOW, RAYMOND Road Maintenance & 2018/19 Pavement Rehabilitation Placement of micro-paving on various streets within the City as identified in the City's Ione Amador CIRCLE, RAYMOND DRIVE, CASTLE OAKS DRIVE, CASTLE OLKS DRIVE, BRIERWOOD, 12/2018 06/2019 10 20 5 14 Rehabilitation project Pavement Management Programe EDGEBROOK, EDGEBROOK, COTTONWOOD COURT Road Maintenance & Jackson Amador Citywide Street Drainage Repair Repair and/or replacement of street drainage improvements. China Graveyard Road, Broadway, Jackson Gate/North Main Street 04/2019 05/2019 15 75 5 8 Rehabilitation Complete Streets Plymouth ATP (Safe Routes to Plymouth Amador Shared Path and Bike Lanes Plymouth Elementary School to Shenandoah School Main Street/Shenandoah Rd Plymouth, CA 06/2018 10/2018 20 40 5 8 Components School Project) Road Maintenance & Sutter Creek Amador Main St. Bridge (17/18 Ongoing) Reconstruction and Rehab Main St. 10/2017 10/2018 10 20 5 8 Rehabilitation Road Maintenance & Biggs Butte Aleut Street 2" grind and overlay with Road Fabric. About 4695 square yards in Area. Between 3rd Street and 7th street. Does not include intersection of crossing streets. 07/2018 12/2018 5 10 3 4 Rehabilitation Road Maintenance & Biggs Butte F Street 2" grind and overlay with Road Fabric. About 2108 square yards in Area. Between 2nd street to 4th street. Does not include intersections at 3rd street. 07/2018 12/2018 5 10 3 4 Rehabilitation Road Maintenance & Biggs Butte C Street 2" grind and overlay with Road Fabric. About 2191 square yards in Area. From 2nd street to 4th street. Includes 5th and 6th street intersection. 07/2019 08/2019 5 10 3 4 Rehabilitation Road Maintenance & Biggs Butte C Street 2" grind and overlay with Road Fabric. About 2463 square yards in Area. From 4th street to 7th street. Includes 5th and 5th street intersections. 07/2019 08/2019 5 10 3 4 Rehabilitation Road Maintenance & Biggs Butte West Biggs-Gridley Road 2" grind and overlay with Road Fabric. About 1216 square yards in Area. From Bannock Street south to City Limits. 07/2019 08/2019 5 10 3 4 Rehabilitation Road Maintenance & Biggs Butte H street 2" grind and overlay with Road Fabric. From 4th to 7th street. 07/2020 08/2021 5 10 3 4 Rehabilitation Road Maintenance & Biggs Butte 6th Street 2" grind and overlay with Road Fabric. From Hamiltion Slough to Chatfield. 07/2020 08/2021 5 10 3 4 Rehabilitation Road Maintenance & Biggs Butte 10th Street 2" grind and overlay with Road Fabric. From B treet to Bannock. 07/2021 08/2022 5 10 3 4 Rehabilitation Road Maintenance & Biggs Butte 3rd Street 2" grind and overlay with Road Fabric. From Trent to F street. 07/2021 08/2022 5 10 3 4 Rehabilitation Road Maintenance & Biggs Butte 7th Street 2" grind and overlay with Road Fabric. From H to C street. 07/2022 08/2023 5 10 3 4 Rehabilitation Road Maintenance & Biggs Butte 2nd Street 2" grind and overlay with Road Fabric. From B to F street. 07/2022 08/2023 5 10 3 4 Rehabilitation Road Maintenance & Biggs Butte D street 2" grind and overlay with Road Fabric. From 2nd to 7th Street. 07/2022 08/2023 5 10 3 4 Rehabilitation

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

The project involves reconstruction of Cohasset Road between East Avenue and Eaton Road. Roadway rehabilitation will include a 4-inch grind and inlay of approximately Street Improvements and Road Maintenance & 5,207 linear feet (LF) of the existing roadway. Construction of new sidewalks and Chico Butte Maintenance (2018) Cohasset Road On Cohasset Road, from approximately 500' north of East Avenue to just south of Eaton Road. 04/2018 07/2018 18 25 3 4 Rehabilitation upgrading existing curb ramps to be ADA compliant will occur along the corridor. Class (Carryover Project FY17/18) 2 bike lanes will be included in the new striping plan to promote safe bike travel through the corridor and continue the city’s efforts to expand Chico’s bike lane infrastructure.

Street Improvements and Preform a Cold in-Place Recycle (CIR) of approximately 0.70 miles of existing Road Maintenance & Chico Butte Maintenance (2019) Esplanade from pavement surface, including upgrades to ADA curb ramps (19), installation of Class II On Esplanade, from the Lindo Channel bridge to East Ave 03/2019 06/2019 18 30 3 4 Rehabilitation Lindo Channel to East Ave bike lanes, and restriping. Road Maintenance & Gridley Butte Spruce Street Rehab Repair structural failures and Grind and Overlay, 5284 L.F. full Width. Oregon Street to Virginia Street 06/2019 12/2019 5 10 3 4 Rehabilitation Road Maintenance & Gridley Butte Magnolia Street Rehab Repair structural failures and Grind and Overlay, 2575 L.F. full Width. Oregon Street to Virginia Street 06/2019 12/2019 5 10 3 4 Rehabilitation Road Maintenance & Gridley Butte Nevada Street Rehab Repair structural failures and Grind and Overlay, 400 L.F. full Width. Cedar Street to Laurel Street 06/2020 12/2020 5 10 3 4 Rehabilitation Road Maintenance & Gridley Butte Indiana Street Rehab Repair structural failures and Grind and Overlay, 450 L.F. full Width. Peach Street to Pecan Street 06/2020 12/2020 5 10 3 4 Rehabilitation Road Maintenance & Gridley Butte Peach Street Rehab Repair structural failures and Grind and Overlay, 330 L.F. full Width. Indiana Street to Vermont Street 06/2021 12/2021 5 10 3 4 Rehabilitation Road Maintenance & Gridley Butte Bridgeford Street Rehab Repair structural failures and Grind and Overlay, 427 L.F. full Width. Ohio Street to Virginia Street 06/2021 12/2021 5 10 3 4 Rehabilitation Road Maintenance & Gridley Butte Ohio Street Rehab Repair structural failures and Grind and Overlay, 800 L.F. full Width. Spruce Street to Sycamore Street 06/2022 12/2022 5 10 3 4 Rehabilitation Road Maintenance & Gridley Butte Kentucky Street Rehab Repair structural failures and Grind and Overlay, 800 L.F. full Width. Spruce Street to Sycamore Street 06/2022 12/2022 5 10 3 4 Rehabilitation Road Maintenance & Oroville Butte Orange Avenue Repave/Resurface Along Montgomery Street to Long Bar Rd 01/2020 06/2020 10 20 3 4 Rehabilitation Road Maintenance & Oroville Butte FEATHER RIVER BL Repave/Resurface ORO DAM BLVD. E TO SAFFORD ST. 01/2020 06/2020 10 20 3 4 Rehabilitation Road Maintenance & Oroville Butte NELSON AV Repave/Resurface 4TH ST TO END OF SCHOOL 01/2020 06/2020 10 20 3 4 Rehabilitation Road Maintenance & Oroville Butte 6TH STREET Repave/Resurface NELSON AVE TO END OF SCHOOL 01/2020 06/2020 10 20 3 4 Rehabilitation Road Maintenance & Oroville Butte ORO BANGOR HWY Repave/Resurface LINCOLN ST TO BURLINGTON AVE 01/2019 06/2019 10 20 3 4 Rehabilitation Road Maintenance & Oroville Butte GREENVILLE ST Repave/Resurface LINCOLN ST TO BURLINGTON AVE 01/2019 06/2019 10 20 3 4 Rehabilitation Road Maintenance & Oroville Butte MYERS ST Repave/Resurface LINCOLN ST TO WYANDOTTE AVE 01/2019 06/2019 10 20 3 4 Rehabilitation Project exemplifies the meaning of 'complete streets' effort as work will include road Complete Streets Almond Street (Pearson to Elliott), Birch Street ( to Black Olive), Fir Street (Skyway to Black Paradise Butte Paradise Gap Closure Complex rehabilitation, installation of new sidewalks, bike lanes, bike paths, lighting, and 08/2018 08/2020 10 50 3 4 Components Olive), Elliott Road (Skyway to Almond), Black Olive (Pearson to Fir), Foster Road (Pearson to Birch) drainage. Road Maintenance & Angels Camp Calaveras 2018 Road Improvment Project Repave or Reconstruct Acorn Drive Acorn Drive 07/2018 08/2018 30 40 5 8 Rehabilitation Road Maintenance & Colusa Colusa 5th Street Reconstruction 5th Street Structural Reconstruction: Levee Rd - Market; Oak - Webster; Lafayette - South City Limits 05/2019 06/2019 20 30 3 4 Rehabilitation Road Maintenance & Colusa Colusa 3rd Street Reconstruction 3rd Street Structural Reconstruction Jay Street - Webster 05/2019 06/2019 20 30 3 4 Rehabilitation Road Maintenance & Alley Between Carson and Sioc; 7th - 5th, 10th - 9th., Alley Between Fremont and Carson; 13th - 12th, Colusa Colusa Alley Ways (Various) Structural Reconstruction of Various Alley Ways 05/2019 06/2019 20 30 3 4 Rehabilitation Alley Between Market and Jay; 12th - 10th Clay Street Between 12th - 11th, Main Street Between 8th - 6th, Fremont Street Between 5th - 3rd; Road Maintenance & Colusa Colusa City Wide Cape Seal Cape Seal of Various City Streets 10th - 9th, and B st. - Bridge St. , 11th Street Between Oak and Parkhill, Lafayette Street Between 7th - 05/2019 06/2019 5 10 3 4 Rehabilitation 6th. Road Maintenance & Husted Rd South Pavement Rehab Williams Colusa Husted Road (South) Pavement Repair & Overlay Husted Road (South) from I-5 to Abel Road 06/2019 12/2019 7 10 4 4 Rehabilitation Project (17/18 carryover) Road Maintenance & Williams Colusa 7th Street Rehab Project Pavement Repair & Overlay 7th Street/ Frontage Road from Theater Road to Husted Road 06/2020 12/2020 7 10 4 4 Rehabilitation Road Maintenance & Husted Rd North Pavement Rehab Williams Colusa Pavement Repair & Overlay Husted Road (North), from E street to State Route 20 06/2021 12/2021 7 10 4 4 Rehabilitation Project Road Maintenance & Williams Colusa E Street Rehab Project Pavement Repair & Overlay E street from Husted Road to 6th Street 06/2022 12/2022 7 10 4 4 Rehabilitation

Pavement overlay on E Street from the Vann Street intersection east to approximately 400 feet. Road Maintenance & Pavement repairs, sidewalk improvements, and traffic control devices at various Street Williams Colusa Intersection Improvements Sidewalk repairs & ADA ramps on E Street at I-5 Off-ramp intersection and at 8th Street intersection. 06/2018 11/2018 7 10 4 4 Rehabilitation Intersection Locations Traffic control improvements on E Street at Vann Street intersection and at 8th Street intersection.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

various locations: (109 locations) Acorn Road, Milner Road, Matssqui Road, Longview Court, Kalama Road, Langley Court, Chrisse Court, Nanimo Court, Shasta Court, Terranova Drive, Clearbrook Drive, Echo Cir, Clayburn Road, Road Maintenance & Antioch Contra Costa 2019 Ruberized Cape Seal Project Leveling Course (where needed) and rubberized cape seal Fairside Way, Primrose Court, Morning Vale Court, Pembroke Court, Sandrose Court, Washington 02/2019 09/2019 10 15 11 7 Rehabilitation Way, Jefferson Way, Garfield Place, Regan Ct, Johnson Drive, Hayes Way, Carter Way, Harding Way, Harding Court, Van Buren Drive, S. Apple Court, Cherry Street

This project will consist of pavement condition surveying of roadways every two years and then reconstructing, overlaying, surface sealing and crack sealing various roads The City of Brentwood currently maintains: each year as needed. The City's pavement management software selects those streets Road Maintenance & Pavement Management Program - 192 Miles of Streets, 5,957 Street Lights, 65 Traffic Signals, 9,416 Traffic Signs, 150 acres of weed Brentwood Contra Costa on which it is the most cost effective to perform preventative maintenance with field 05/2019 08/2019 7 15 11 7 Rehabilitation 2019 abatement verification by staff. Constructing roadways is a significant investment for the City. Preventative maintenance is the best means for keeping this large investment in good, operable condition and avoids costly reconstruction.

This project will consist of pavement condition surveying of roadways every two years and then reconstructing, overlaying, surface sealing and crack sealing various roads each year as needed. The City's pavement management software selects those streets Road Maintenance & Pavement Management Program - Armstrong Road, Elkins Way, Sycamore Avenue, and the residential neighborhood south of Balfour Brentwood Contra Costa on which it is the most cost effective to perform preventative maintenance with field 05/2018 08/2018 7 15 11 7 Rehabilitation 2018 (17/18 Ongoing) Road between Fairview Avenue and Walnut Avenue. verification by staff. Constructing roadways is a significant investment for the City. Preventative maintenance is the best means for keeping this large investment in good, operable condition and avoids costly reconstruction.

This project will construct a grade separation underpass consisting of four travel lanes crossing under the Union Pacific Railroad. This project entails: constructing a bridge Lone Tree Way - Union Pacific structure; relocation of numerous existing wet and dry utilities; high pressure gas lines; Brentwood Contra Costa Road Grade Separation Lone Tree Way and Union Pacific Railroad at-grade crossing 07/2021 07/2023 25 30 11 7 Undercrossing storm water pump station; retaining walls and landscaped parkway. This project will increase public safety by creating a grade separation crossing of the Union Pacific Railroad, instead of the present at-grade crossing.

This project will continue the widening of Brentwood Boulevard with two lanes in each direction and will include: two bike lanes; curbs; gutters; medians; sidewalk on east side; street lights and landscaping on each side of the roadway. This project will also Complete Streets Brentwood Boulevard Widening Brentwood Contra Costa include a new parallel bridge over Marsh Creek, traffic signal modification at Brentwood Brentwood Boulevard from Havenwood Avenue to Homecoming Way 07/2020 07/2021 25 30 11 7 Components North - Phase I Boulevard and Grant Street and moving the overhead power lines, telephone lines and cable lines underground. This project will improve safety, traffic flow and facilitate adjacent development. Construct approximately 1,600' of road including a 16' median; two 12' lanes; 12" water John Muir Parkway Extension - main; median landscaping; street lights; 24" storm drain and 8" non-potable water main. John Muir Parkway from the future Foothill Drive intersection with Concord Avenue to Briones Valley Brentwood Contra Costa Safety 05/2019 11/2019 25 30 11 7 Phase II (17/18 Carryover) This section of roadway will replace existing Concord Avenue to ensure continued traffic Road circulation in the area.

This project will provide pavement rehabilitation and preventative maintenance on arterial roadway segments in the City. Treatments will include grind and overlay, spot Balfour Road from Minnesota Avenue to Fairview Avenue and from East Country Club Drive to the Road Maintenance & Brentwood Various Streets and repairs, and slurry seals/crack seals. These pavement rehabilitation activities will Brentwood Contra Costa Western City Limits; Lone Tree Way from Brentwood Boulevard to Medallion Drive, excluding portion 05/2021 09/2021 15 20 11 7 Rehabilitation Road Preservation require removal and replacement of ADA ramps to ensure compliance with current located in unincorporated Contra Costa County accessibility requirements. New traffic signal detection and striping will also be required where the existing assets are removed.

This project includes the installation of new water and sewer facilities, the rehabilitation of existing facilities, including streetlights and either the removal or replacement of Road Maintenance & Downtown Alley Rehabilitation existing infrastructure, to correct existing operations and maintenance constraints due Diablo Way and Midway Alleys, bounded by Brentwood Boulevard, Pine Street, Second Street, and Brentwood Contra Costa 06/2019 07/2022 25 30 11 7 Rehabilitation (17/18 Carryover) to the age of the facilities. This project will allow the City to accommodate the Chestnut Avenue anticipated development of the Downtown area and, where feasible, bring the aging facilities up to current standards.

Road Maintenance & Pine Hollow Road Improvement Street rehabilitation and complete streets components for Pine Hollow Road between Mt Clayton Contra Costa Pine Hollow Road, Clayton, CA 04/2019 04/2020 7 50 14 11 Rehabilitation Project Zion/Tiffin Drives and the Western City Limit line opposite from Quiet Circle.

City of Clayton: Frank Place - Yolanda Circle to Cul-de-Sac, Bettencourt Drive - Yolanda Circle East to Yolanda Circle West, Southbrook Drive - 250' west of Marquette Ct. to 100' east of Eastwood Ct, Road Maintenance & 2018 Neighborhood Streets Project Clayton Contra Costa Annual Street maintenace of various local neighborhood streets within Clayton, CA Westbrook Ct. - Southbrook Dr. to Cul-de-Sac, El Camino Dr. - Clayton Rd. to Pine Hollow Rd, 06/2018 12/2018 7 10 14 7 Rehabilitation (2017-18 Ongoing) Coronado Ct. - El Camino Dr. to Cul-de-Sac, Yosemite Ct. - El Camino Dr. to Cul-de-Sac, Yosemite Cir. - El Camino Dr. South to El Camino Dr. North.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts This project will extend the recently completed pavement rehabilitation work on Oak Grove Road from Whitman Road to Treat Boulevard, likely using cold-in-place recycling, similar to the previous phase, whereby a portion of the existing roadway Road Maintenance & Oak Grove Road Pavement asphalt is removed, treated with an asphalt recycling agent, compacted in place and Concord Contra Costa Oak Grove Road from Whitman Road to Treat Boulevard 01/2019 12/2019 15 20 14 7 Rehabilitation Rehabilitation then covered with a new asphalt surface layer. Work will also include the installation/upgrade of curb ramps at intersections, minor concrete repairs, replacement of traffic signal loops, adjustment of pedestrian push buttons to meet accessibility standards, and restriping the roadway.

This project will include base repairs and resurfacing of Diamond Boulevard from Willow Diamond Boulevard Pavement Road Maintenance & Pass Road to the bridge over Walnut Creek and include the upgrade/replacement of Concord Contra Costa Rehabilitation (17/18 Carryover) Diamond Boulevard from Willow Pass Road to the bridge over Walnut Creek 01/2019 12/2019 10 12 14 7 Rehabilitation accessible ramps on the north side of the intersection and at driveways, minor curb and (17/18 Ongoing) gutter repairs, traffic signal loop replacement, and restriping the roadway.

The work generally includes, but is not limited to, preparatory tree trimming, removal and replacement of existing Portland Cement Concrete curb, sidewalk, curb ramp, and valley gutter, installing PCC swale, subdrain installation, removal and replacement of existing asphalt concrete pavement (dig-outs), pavement cold planning, installation of Road Maintenance & paving mat, installation of asphalt concrete overlay, removal and replacement of Various streets in Danville including El Capitan Drive, El Cerro Boulevard, Brookside Drive, Freitas Danville Contra Costa Pavement Management Program 06/2018 09/2018 20 25 16 7 Rehabilitation asphalt concrete speed lumps/bumps, removal and replacement of new traffic signal Road. loop detectors, adjusting to grade of survey monument castings, water valve castings, storm drain and sanitary sewer manhole covers, and other utility lids, removal and replacement of existing pavement striping and markers, traffic control, and other items as required.

Citywide on arterial and collector streets. These include Principal Arterials: Carlson Blvd, Central Ave, Fairmount Ave, San Pablo Ave; Minor Arterials: Ashbury Ave, Arlington Blvd, Barrett Ave, Colusa Ave, Cutting Blvd, Elm Street, Hill St, Key Blvd, Street Light, Traffic Signal & Street Replacement, repair and upgrades of street light equipment, traffic signal equipment Moeser Ln, Potrero Ave, Richmond St; and Major Collectors: Alta Punta, Ashbury Ave, Avis Dr, El Cerrito Contra Costa Traffic Control Devices 10/2018 09/2019 10 25 15 9 Sign Replacement and Upgrades and street signs Buckingham Dr, Colusa Ave, Edwards Ave, Eureka Ave, Fairview Dr, Ganges Ave, Jordan Ave, King Dr, Macdonald Ave, Ave, Navellier St, San Mateo St, Sea View Dr, Shevlin Dr, South 55th St, Terrace Dr, and Tulare Ave. All locations have yet to be finalized and will be selected based on safety need, condition of existing asset, and traffic volumes.

Central Ave & San Diego St Pedestrian Crossing Improvements including flashing beacons and median El Cerrito Contra Costa Safety Carlson Boulevard at San Diego St 12/2018 12/2019 10 25 15 9 Pedestrian Crossing Improvements modifications

Central Ave & Carlson Blvd Street Pedestrian Crossing Improvements including high-visibility crosswalk pavement El Cerrito Contra Costa Safety Carlson Boulevard at El Dorado St 09/2018 09/2020 7 25 15 9 Improvements markings and signs and median modification

Locations are on major Pedestrian and Bicycle Routes as identified in the City's Active Transportation Plan (available for review at www.el-cerrito.org/ATP) including San Pablo Avenue, BART to Bay Trail Implement the Active Transportation Plan, adopted by the City Council in April 2016, Complete Streets Active Transportation Program connection along Fairmount Avenue-Carlson Blvd-Cerrito Creek path-Lassen St-San Diego Street- El Cerrito Contra Costa includes access, safety and other enhancements to pedestrian and bicycle 12/2020 12/2030 7 25 15 9 Components (17/18 Ongoing) Belmont Ave-Central Ave, Richmond St, Fairmount Ave, Key Blvd and Arlington Blvd. Locations have infrastructure. yet to be finalized and will be selected based on leveraging of other funding opportunities and grant prioritization criteria and prioritization criteria in the Active Transportation Plan.

Korematsu Safe Routes to School Bicycle boulevard striping and speed humps on Norvell St and Schmidt Ln between Potrero Ave and Complete Streets Implement enhanced crosswalk signing & striping and portions of the East Side Bicycle El Cerrito Contra Costa Improvements, Phase 1 (17/18 Richmond St and enhanced crosswalks on Richmond St, Norvell St and Lawrence St at Gladys and 07/2018 12/2018 7 10 15 9 Components Boulevard per the City's Active Transportation Plan in the vicinity of the school Carryover) Donal Aves, on Navellier St at Gladys Ave, on Potrero Ave at Navellier St Locations on Richmond St, San Pablo Ave, Arlington Blvd and Moeser Ln for signs and other Sidewalk & Street Sign Maintenance prioritized locations throughout the City to address citizen requests for sidewalk repairs including Elm El Cerrito Contra Costa Safety Sidewalk repair and sign replacement 06/2018 12/2018 10 25 15 9 (17/18 Ongoing) St, Douglas Dr, Kearney St, Edith St, Cutting Blvd, Potrero Ave, Roberta Dr, Richmond St, Fairmount Ave, Coronado St, Moeser Lane, and San Pablo Ave .

Locations are on major Pedestrian Routes including: San Pablo Ave., Richmond St., Central Ave., Potrero Ave., and Cutting Blvd. Locations have yet to be finalized and will be selected based on a Repair sidewalk areas uplifted by street tree roots, including tree root pruning or tree El Cerrito Contra Costa Safety Sidewalk Infrastructure Maintenance methodology that prioritizes locations on major Pedestrian Routes (designated in the City’s Active 12/2018 06/2019 20 25 15 9 removal. Transportation Plan), and based on their proximity to schools, the severity of the sidewalk damage and repair method, and other factors (e.g. number of requests received).

Street Light & Traffic Signal Citywide for on-going maintenance of 12 traffic signalized intersections, 1728 City-owned street light El Cerrito Contra Costa Traffic Control Devices Street light and traffic signal on-going maintenance 08/2018 06/2019 10 20 15 9 Maintenance locations, and 17 flashing beacons/ in-roadway lights/ radar speed feedback signs locations.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Locations are on major Pedestrian Routes and serving City facilities, which include: Moeser Lane and Pomona Ave adjacent to the Civic Theater and connecting to Community Center/Swim Center. Additional locations are on other major Pedestrian Routes including Arlington Blvd, Ashbury Ave, Barrett Ave, Central Ave, Colusa Ave, Cutting Blvd, Fairmount Ave, Hill St, Navellier St, Moeser Ln, Implement the City's American with Disabilities Act (ADA) Transition Plan, adopted by Potrero Ave, Richmond St, San Pablo Ave, Schmidt Ln, Stockton Ave. Locations have yet to be Access Modifications - Streets & El Cerrito Contra Costa Safety City Council in 2009 to remove physical barriers along the street right-of-way including finalized and will be selected based on methodology contained in the City's ADA Transition Plan 12/2018 06/2019 10 25 15 9 Sidewalks mid-block sections of sidewalks, intersections and pedestrian signals (available for review at http://www.el-cerrito.org/522/ADA-Transition-Plan). These are locations along Pedestrian Routes (designated in the City’s Active Transportation Plan), locations requested by a person with disabilities, locations serving state and local government office and facilities, locations serving important transportation including pathways to schools, and locations serving commercial zones and other Title III entities.

Coronado Street ( Refugio Valley Road to Carson Street), Carson Street (Refugio Valley Road to Coronado Street), Falcon Way (Sparrow Drive to Wren Court), Bobolink Way (Partridge Drive to Road Maintenance & 2018 Pavement Maintenance Hercules Contra Costa Work includes pavement dig-outs, crack filling, slurry seal and reinstall striping. Sparrow Drive), Brighton Street (Dartford Way to Edinburgh Court), Canterbury (Newbury Court to 08/2018 09/2018 7 10 15 9 Rehabilitation Project Dartford Way), Village Parkway (Hercules Avenue to Hercules Avenue), Goldenrod Drive (Violet Road to Columbine Drive) Fully reconstruct six residential streets. Existing streets will be pulverized in-place to a Barrot Road - Stanley Boulevard to the end depth of approximately 16 inches to create a new road base and reclaim existing Clover Court - Stanley Boulevard to the end of court Road Maintenance & asphalt concrete, base rock, and sub-base materials. New base may be cement-treated Grondine Road - South Silver Springs to the end of road Lafayette Contra Costa 2019 Road Reconstruction Project 04/2019 10/2019 25 30 16 7 Rehabilitation based on actual field and testing conditions. following re-grading, the new base will Linda Vista Lane - Old Tunnel road to the end of lane receive two layers of hot mix asphalt concrete to provide a strong and smooth road Rohrer Drive - Silvrado Drive to Dead Horse Canyon surface. Rossi Street - Reliez Valley Road to the end of the street Reconstruct failed pavement by rebuilding the roadway structural section. Replace Road Maintenance & 2018 Road & Drain Rehabilitation Lafayette Contra Costa failed storm drain crossing coincident with road reconstruction. Crescent Dr, Del Arroyo Ct, Hillview Ln, Moon Ct, Via Baja, Via Media 04/2018 10/2018 25 30 16 7 Rehabilitation Project This is a carryover project that Lafayette submitted last year. Road Maintenance & 2019 Downtown Arterial Paving Martinez Contra Costa Base failure repair and AC overlay, ADA ramps Alhambra Ave from Jones St to Marina Vista; Pine/Court Street from Susana St to Marina Vista 06/2019 06/2020 12 25 14 3 Rehabilitation Project

The type of rehabilitation chosen for this year’s pavement rehabilitation project will be On April 11th, 2018, The Moraga Town Council approved Resolution 19-2018, appropriating $278,728 Full Depth Reclamation (FDR), a technique that pulverizes the existing asphalt of RMRA funds to the Town’s annual Pavement Management Program for this summer’s pavement pavement and underlying base material and blends it with cement to create a rehabilitation project. This total is in addition to the $93,300 appropriated in October 2017 for the same reconstructed roadway base with superior strength. This eco-friendly method efficiently project, which will span two fiscal years (2017/2018 and 2018/2019), with the specific portions of the Road Maintenance & 2018 Joint Moraga-Orinda Full utilizes existing materials, with lessened needs for virgin materials and off haul/delivery Moraga Contra Costa project funded, by year, as follows: 04/2018 10/2018 20 20 16 7 Rehabilitation Depth Reclamation trucking. The roadway will receive a top overlay of Rubberized Hot Mix Asphalt (RHMA) Tharp Drive (Redfield Place to Springfield Place), 430 linear feet / 14,190 Square feet, FY 2018/19 as a wearing surface, a product that incorporates recycled rubber from tires, and Tharp Drive (Springfield Place to Deerfield Drive), 635 linear feet / 20,955 Square feet, FY 2018/19 thereby provides the environmental benefit of diverting tires from landfills. The streets Tharp Drive (Deerfield Drive to Butterfield Place), 355 linear feet / 11,715 Square feet, FY 2017/18 selected --with the length and area to be rehabilitated -- are listed under “Project Location”.

The scope of CIP 196 is to complete the roadway and median improvements on Laurel Complete Streets Laurel Road Widening Project Road between Rose Avenue and Mellowood Drive. This work includes design and Oakley Contra Costa Laurel Road between Rose Avenue and Mellowood Drive 07/2018 01/2019 20 25 11 7 Components (Rose Avenue to Mellowood Drive) construction of pavement widening, bike lanes, new curbs, gutters, sidewalks, medians, street, landscaping with new street trees and lights. The project streets all have different degrees of failures due to their age and varying The Repair and Resurfacing Project consists of the following streets: Walnut Meadows Drive, Merlot pavement condition. The project will repair identified streets and place a Thin Lane, Merlot Court, Chappalet Place, Walnut Meadows Court, Fetzer Court, Fetzer Lane, Jordan Lane, Road Maintenance & FY 2018-19 Street Repair and Maintenance Overlay (TMO) over those streets. The TMO provides a minor structural Oakley Contra Costa Forbes Court, Jomanet Court, Soda Rock Place, Deerpark Road, Deerpark Way, Deerpark Court, 08/2018 10/2018 5 10 11 7 Rehabilitation Resurfacing Project benefit that will have a longer useful life. Other streets identified in the project and are Northgate Place, Lakespring Drive, Cotati Court, Beaulieu Lane, Lakespring Place, Lakespring Court, not as severely worn will get slurry seal treatment that will extend the life of the W. Summerfield Ct., E. Summerfield Ct., Fairhaven Way, Fairhaven Ct. roadways. Miner Road Pavement Road Maintenance & Rehabilitate existing pavement and include width to selective should pavement areas Orinda Contra Costa Rehabilitation & Shoulder Widening A portion of Miner Road from Camino Pablo to Lombardy Lane. 05/2018 07/2018 10 15 16 7 Rehabilitation where feasible. Project Valley Ave, San Pablo Avenue to Charles Avenue;Lopes Lane, All; Clark Court, All; Danny Court, All; Road Maintenance & Annual Residential Slurry Seal Collins Ave, All; Clark Court, All, Flamingo Court, All;, Blue Jay Circle, All; Whippoorwill Court, All, Pinole Contra Costa Crack seal, repair isolated base failures, slurry seal, and reinstall existing striping 07/2018 07/2019 3 5 15 9 Rehabilitation Project RO1807-SB1 (P1) Park Street, Quinan to Tennant; Rafaela Street, Pinole Valley Road to John Street; Sunnyview Drive, San Pablo Avenue to Woy Circle; Wilde Court, All Road Maintenance & Annual Residential Rehabilitation Pinole Contra Costa Thin AC Overlay Delores Court 01/2019 07/2019 6 10 15 9 Rehabilitation Project RO1807-SB1 (P2) Road Maintenance & Annual Residential Rehabilitation Pinole Contra Costa Localized patch paving to correct base failures Tennent Avenue, from Pinole Valley Road to WPCP 07/2018 07/2019 6 10 15 9 Rehabilitation Project RO1807-SB1 (P3)

Road Maintenance & Annual Residential Slurry Seal Crestview Dr (all), Major Vista Ct (all), Nob Hill Ave (Meadow Ave to Sunnyview Dr), Fifth Ave (San Pinole Contra Costa Crack seal, repair isolated base failures, slurry seal, and reinstall existing striping 01/2018 09/2018 3 5 15 9 Rehabilitation Project RO1701-A (17/18 Ongoing) Pablo Avenue to Nob Hill Ave), O’Conner Dr. (City Limits to Bantry Rd).

Pittsburg Contra Costa Traffic Control Devices Traffic Signal Modification Modifications to traffic signal timing and modernization of traffic control equipment Loveridge Road and West Leland Road 07/2018 08/2018 1 10 14 7

Road Maintenance & Pittsburg Contra Costa Citywide Pavement Striping Installation or replacement of striping on streets as determined by Staff Loveridge Road from Pittsburg-Antioch Highway to Buchanan Road 07/2018 08/2018 1 5 14 7 Rehabilitation Road Maintenance & W. Leland Road Pavement Pittsburg Contra Costa Pavement rehabilitation of W. Leland Road W. Leland Road from Railroad Avenue to Woodhill Drive 06/2018 07/2019 10 20 14 7 Rehabilitation Management

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts 2018 Traffic Signal Modification Pittsburg Contra Costa Traffic Control Devices Modifications to traffic signal timing and modernization of traffic control equipment Citywide, with emphasis on the Leland Road corridor 07/2017 08/2018 1 10 14 7 (17/18 Ongoing) Pleasant Hill Road Improvement Project elements include new street lighting, intersection geometry modification, lane Complete Streets Pleasant Hill Contra Costa Project (Taylor Boulevard to reconfiguration, new signals at PHR/Westover Drive and PHR/Gregory Lane Pleasant Hill Road, Between Gregory Lane and Taylor Boulevard, Pleasant Hill, CA 07/2019 08/2019 12 22 14 3 Components Gregory Lane) intersections, pavement rehabilitation, new bike lanes, and landscaping. Concrete sidewalk, curb and gutter repairs, ADA curb ramps; localized asphalt base repairs, asphalt milling and hot mix asphalt/rubberized hot mix asphalt overlay; Road Maintenance & Portions of 7th Street, Castro Ranch Road, Cutting Boulevard, Giant Highway, Marina Way, and South Richmond Contra Costa Pavement Rehabilitation Project pavement striping and markings; traffic calming elements and regulatory signs; 12/2018 12/2019 15 20 15 9 Rehabilitation 55th Street. installation of bicycle facilities; and traffic signal modifications for vehicular, pedestrian, and bicycle safety.

The Market Street Resurfacing Project includes annual pavement rehabilitation and preventative maintenance. The Pavement Condition Index (PCI) for this arterial section of pavement is 51. Pavement in this area is significantly distressed due to high traffic Road Maintenance & Market Street Pavement volumes and transit use. The work to be performed will include, but is not limited to, San Pablo Contra Costa The project section is located between Church Lane and 23rd Street along Market Street. 09/2018 01/2019 15 20 15 9 Rehabilitation Rehabilitation Project base failure repairs, slurry sealing, crack sealing, cold planing of existing asphalt concrete, overlaying or reconstructing the existing asphalt concrete pavement with conventional asphalt concrete, constructing concrete curb ramps, placement of striping and installing valley gutters.

ADELAIDE HILLS CT(ARROWFIELD WAY to END),ALBION RD(HARCOURT WAY to WATERMILL This project provides street rehabilitation work in accordance with the City Pavement RD),ALKANTE CT(ASTERBELL DR to END),ALLANMERE CT(ALLANMERE DR to Road Maintenance & 2019 Pavement Management Management Program. Based on long-range projections, each street is programmed for END),ALLANMERE DR(ARROWFIELD WAY to ANDREAS WAY),ANDREAS CT(ANDREAS WAY to San Ramon Contra Costa 05/2019 12/2019 3 20 16 7 Rehabilitation Project necessary rehabilitation. Street rehabilitation work will include slurry seal, END),ANDREAS WAY(ARROWFIELD WAY to END),ANGSLEY CT(N BELLINGHAM WAY to microsurfacing , asphalt overlays, street reconstruction, etc. END),ANGSLEY LN(ARROWFIELD WAY to N BELLINGHAM WAY),APPLEWOOD DR(S MONARCH RD to GOLDENBAY AVE) - Not Limited To These Locations TBD This project will provide pavement repair on Crow Canyon Road, including slurry Road Maintenance & Crow Canyon Road Pavement San Ramon Contra Costa seal/microsurfacing, localized repairs, reconstruction and striping on the entire project Along Crow Canyon Road, from St. George Road to Dougherty Road. 03/2019 11/2019 7 15 16 7 Rehabilitation Rehabilitation limits. "The 2018 Oak Grove Rehabilitation project will repave Oak Grove Road from Ygancio Valley Road to Cedro Lane, and Oak Grove Road from Mitchell Drive to the City Limits. These sections were last repaved between 1982 and 1990 and has a PCI average Road Maintenance & The 2018 Oak Grove Rehabilitation project will repave Oak Grove Road from Cedro Lane to Ygnacio Walnut Creek Contra Costa Oak Grove Road Rehabilitation rating of 59. The project will perform required ADA upgrades and traffic signal 04/2018 05/2018 10 20 14 7 Rehabilitation Valley Road, and Oak Grove Road from Ygnacio Valley Road to the City Limits. upgrades as needed. The roadway area to be repaved is estimated to be 275,000 S.F. This project will be funded by Measure J/ Gas Tax Funding."

The 2019 OBAG North Main Street project will repave North Main Street from Interstate 680 to California Boulevard. This section of North Main Street was last Road Maintenance & repaved in 1982 and has a PCI rating of 69. The project will perform required ADA Walnut Creek Contra Costa North Main Street Rehabilitation North Main Street between Interstate 680 & California Blvd 01/2019 08/2019 10 20 14 7 Rehabilitation upgrades and traffic signal upgrades as needed. The roadway area to be repaved is estimated to be 127,000 S.F. for a project cost of $900,000.

Ygnacio Valley Road Rehabilitation Project will repave Ygnacio Valley Road from Civic Drive to San Carlos Drive. This section of Ygnacio Valley Road was last repaved in Road Maintenance & 1989 and has a PCI rating of 70. The project will perform required ADA Walnut Creek Contra Costa Ygnacio Valley Road Rehabilitation Ygnacio Valley Road between Civic Drive and San Carlos Drive 01/2020 08/2020 10 20 14 7 Rehabilitation upgrades and traffic signal upgrades as needed. The roadway area to be repaved on Ygnacio Valley Road is estimated to be 630,000 S.F.

The 2020 Roadway Rehabilitation project will repave Broadway from Parkside Drive to Ygnacio Valley Road and Parkside Drive from Civic Drive to San Juan Avenue. Road Maintenance & Broadway and Parkside Drive Broadway and Parkside Drive were last repaved between 1986 and 1993 and has a Broadway between Parkside to Ygnacio Valley Road Walnut Creek Contra Costa 01/2020 08/2020 10 20 14 7 Rehabilitation Rehabilitation PCI average rating of 71. The project will perform required ADA upgrades and traffic Parkside Drive between San Juan to Civic Dr signal upgrades as needed. The roadway area to be repaved is estimated to be 191,000 S.F. K Street Drainage Improvement and Road Maintenance & Install new drainage improvements, repave/resurface a minimum of 300 LF of Crescent City Del Norte Roadway Rehabilitation Project K Street between Front Street and 2nd Street 03/2020 06/2020 20 30 2 2 Rehabilitation Roadway, install new ADA compliant access ramps and pedestrian improvements (17/18 Ongoing) Crescent City Storm Drainage Road Maintenance & Improvement and Roadway Install new drainage improvements, repave/resurface a minimum of 1200 LF of Crescent City Del Norte Front Street between F Street and B Street, C Street between Howe Drive and 5th Street 06/2018 06/2019 20 30 2 2 Rehabilitation Rehabilitation Project (17/18 Roadway, install new ADA compliant access ramps and pedestrian improvements Ongoing) Street signs and Stop signs throughout the city. All locations subject to change and will be selected based on priority need and resources throughout Replace old traffic signs and street signs with new standard safety retro-reflective signs the year. Placerville El Dorado Safety Safety Retro-Reflective Signage 03/2019 04/2019 15 20 5 1 throughout the city Barrett, Dr. Bartlett Ave., Bedford Ct., Benson Ct, Chapel St. Cottage St., Corker St. Cresent St. Debra Ct. Deena Ct, Dimity Lane, Garden Loop, Gerle Ave, Hazzard St., Letitita Ave.

Road Maintenance & Country Dr. Crack Sealing - 2017 / Crack sealing the road section as described in the project locations using hot crack Placerville El Dorado Country Club Dr. from top of Country Club Dr. near Airport at city county line to Cedar Ravine Road. 02/2019 05/2019 5 10 5 1 Rehabilitation 2018 Carry Over sealing machine.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Road Maintenance & Perform crack sealing on various streets throughout the city using hot pour crack filling Sections of lower Main Street, Upper Main Street, Lower Broadway, Cedar Ravine Road, Washington Placerville El Dorado Crack Sealing 09/2018 06/2019 5 10 5 1 Rehabilitation process Street, Pacific Street, Benham Street, Armory Street and other streets throughout the City.

There are 23 locations identified throughout the city. All locations subject to change and will be selected based on priority needs and resources throughout Utility patch pavement repairs throughout the city - Remove temporary patch and the year. Road Maintenance & Placerville El Dorado Utility Patch Paving replace with permanent Asphalt Concrete (AC). These location are all from the repair of 2 on Main Street, 2 on Broadway, 2 on Country Club, Bedford, Bee Street, Washington Street, Pine 09/2018 06/2019 5 10 5 1 Rehabilitation water and sewer repairs. Street, Bartlet Street, Chappel Street, Manor Drive, Baker Road, David Cir, Goldner, Goyan, Fowler, Accia, Duden, Sean, Darlinton

All locations subject to change and will be selected based on priority needs and resources throughout the year. Road Maintenance & Patch and/or slurry various streets throughout the city using the cities Dura-Patch Placerville El Dorado Patch Paving and or Slurry Sealing The scope includes small areas of work on over 15 streets in the city. 02/2019 06/2019 5 10 5 1 Rehabilitation machine and or slurry pot. Big Cut Road, Benham St, Fowler Way, Bedford, Lewis Ave, Stout Ct, Goyan Ave, Fiske St, Clark St, Coon Hollow Rd, Bear Rock, Armory Dr., Spanish Ravine, Elm St, Washington St.

Country Dr. Remove and Replace Road Maintenance & Remove large cracks in pavement and replace with AC as described in the project Placerville El Dorado Asphalt Cracks - 2017 / 2018 On- Country Club Dr. from top of Country Club Dr. near Airport at city county line to Cedar Ravine Road. 12/2017 06/2019 5 10 5 1 Rehabilitation location. Going Road Maintenance & Placerville Dr. Crack Sealing - 2017 Crack seal road section as described in the project location using a hot crack sealing Placerville El Dorado On Placerville Dr. from near US Hwy 50 Bridge to lower Main Street. 02/2019 06/2019 5 10 5 1 Rehabilitation / 2018 Carry Over machine.

The City proposes to rehabilitate approximately 2,000 l.f. of collector class roadway serving access to the City's hospital corridor. The project proposes to dig out and Road Maintenance & 3rd Street SB-1 Pavement repair several failing structural sections, cold mill existing asphalt, re-use millings for South Lake Tahoe El Dorado 3rd Street - South Lake Tahoe, Ca. Limits of US Hwy 50 to the limits of South Avenue 06/2019 10/2019 15 20 5 1 Rehabilitation Rehabilitation Project base structure in failed sections (eliminates 30% of off-haul), re-pave using PG64-28 Polymer Modified asphalt with recycled asphalt product. Strip and paint all lines and crosswalks with water based paint.

Road Maintenance & Fowler Street Improvements - Grind and overlay existing pavement, some reconstruction. Traffic loop replacement. Clovis Fresno Fowler Avenue from Barstow Avenue to Shaw Avenue 05/2020 10/2020 7 20 23 8 Rehabilitation Barstow to Shaw Minor concrete work. Stripping.

Road Maintenance & Minnewawa Street Improvements - Grind and overlay existing pavement, some reconstruction. Traffic loop replacement. Clovis Fresno Minnewawa Avenue from Shepherd Avenue to Teague Avenue 05/2020 10/2020 7 20 23 8 Rehabilitation Shepherd to Teague Minor concrete work. Stripping.

Road Maintenance & Villa Street Improvements - Barstow Grind and overlay existing pavement, some reconstruction. Traffic loop replacement. Clovis Fresno Villa Avenue from Barstow Avenue to Shaw Avenue 05/2020 10/2020 7 20 23 8 Rehabilitation to Shaw Minor concrete work. Stripping.

Installation of curb and gutter, sidewalks, curb ramps to comply with Americans with Disabilities Act requirements, driveway approaches, alley approaches, valley gutters, Road Maintenance & Sunset Street Rehabilitation Project A.C. pavement, aggregate base, storm drain laterals, storm drain inlets, LED street Coalinga Fresno Sunset Street from Polk Street to Washington Street 08/2018 05/2019 15 25 31 12 Rehabilitation (Phase 1) lights, electrical conduit, electrical wire, pull boxes, crosswalks, traffic striping and markings, traffic signage, bike lane striping, existing utility lid adjustment, street tree removal or trimming and construction surveying

Road Maintenance & Helm Canal Road Rehabilitation Firebaugh Fresno Roadway rehabilitation In the City of Firebaugh between Poplar and Birch Drive 07/2018 07/2019 10 20 31 12 Rehabilitation (north side)

At various locations in the City of Firebaugh: Birch Dr from Helm Canal to cul-de-sac, Dogwood Wy from Maple to cul-de-sac, Cypress Wy from Helm Canal to Maple, Alder Wy from Elm St to cul-de-sac, Road Maintenance & Firebaugh Fresno Roadway Sealing Project Roadway crack sealing and slurry sealing Poplar Wy from Helm Canal to Elm St, Willow Wy from Spruce to Elm St, Spruce St from Willow Wy to 07/2018 07/2019 5 10 31 12 Rehabilitation cul-de-sac, Maple Ct from Poplar to Dogwood Wy, Elm Street from Willow to Birch Drive, Ash Street from Alder to Dogwood Wy, Oak Street from Alder to Dogwood Wy

Road Maintenance & Fowler Fresno Main St. / 9th St. Slurry Seals Apply crack and slurry seals on city streets. Main Street between 10th St. and 8th St. & 9th St. from Fresno St. to Merced St. 09/2018 12/2018 5 7 31 12 Rehabilitation Road Maintenance & Adams Avenue Reconstruction Fowler Fresno Reconstruction pavement, curb, gutter and sidewalks. Adams Avenue - Golden State to 5th Street 02/2018 07/2018 15 20 31 12 Rehabilitation (17/18 Carryover) BPMP Bride Deck Rehab Phase 2 Also Senate District 14 - State Assembly District 31 - Multiple bridge deck repairs throughout the City Fresno Fresno Other Bridge Deck Rehabilitation 11/2018 01/2019 20 40 23 8 (17/18 Carryover) of Fresno Road Maintenance & Fresno Fresno Emerson, West to Marks (S) Pavement slurry seal Emerson - West to Marks 07/2018 10/2018 7 10 23 8 Rehabilitation Road Maintenance & Fresno Fresno Hughes, Shields to Dakota (S) Pavement slurry seal Hughes - Shields to Dakota 07/2018 10/2018 7 10 23 8 Rehabilitation Road Maintenance & Fresno Fresno Barstow, First to Millbrook (S) Pavement slurry seal Barstow - First to Millbrook 07/2018 10/2018 7 10 23 8 Rehabilitation Road Maintenance & Fresno Fresno Olive, Fresno to Clovis (S) Pavement slurry seal Olive - Fresno to Clovis 07/2018 10/2018 7 10 31 14 Rehabilitation Road Maintenance & Cedar-Jackson-Jensen-Church Fresno Fresno Pavement slurry seal Cedar-Jackson-Jensen-Church Neighborhood 07/2018 10/2018 7 10 31 14 Rehabilitation Neighborhood (S) Harrison and Shields Traffic Signal Fresno Fresno Traffic Control Devices New Traffic Signal Harrison Ave & Shields Ave 09/2019 11/2019 15 30 23 8 (D) Barstow and Palm Traffic Signal Left Fresno Fresno Traffic Control Devices Traffic Signal Modification Barstow Ave & Palm Ave 06/2019 08/2019 15 30 23 8 Turn Phasing

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Fresno Fresno Traffic Control Devices California and Walnut Traffic Signal New Traffic Signal California Ave & Walnut Ave 06/2019 08/2019 15 30 31 14

Armstrong and Lane Traffic Signal Fresno Fresno Traffic Control Devices New Traffic Signal Armstrong Ave & Lane Ave 09/2019 11/2019 15 30 23 8 (D) Clinton and Fresno Traffic Signal Fresno Fresno Traffic Control Devices Traffic Signal Modification Clinton Ave & Fresno Street 09/2019 11/2019 15 30 31 8 Left Turn Phasing (D) Road Maintenance & Marks Ave Overlay, Ashlan to Fresno Fresno Pavement overlay Marks Ave - Ashlan to Dakota 08/2019 09/2019 10 15 23 8 Rehabilitation Dakota (D) Road Maintenance & Sierra Overlay, Blackstone to Maroa Fresno Fresno Pavement overlay Sierra Ave - Blackstone to Maroa 08/2019 09/2019 10 15 23 8 Rehabilitation (partial County) (D) Road Maintenance & Nees Overlay, Fresno to Millbrook Fresno Fresno Pavement overlay Nees Ave - Fresno to Millbrook 08/2019 09/2019 10 15 23 8 Rehabilitation (D) Road Maintenance & Chestnut Overlay, Bullard to Fresno Fresno Pavement overlay Chestnut Ave - Bullard to Herndon 08/2019 09/2019 10 15 23 8 Rehabilitation Herndon (D)

Road Maintenance & North & Fig Pavement Reconstruction of North Avenue from Fig to Walnut; and Fig Avenue from North to 0.25 Fresno Fresno North Avenue and Fig Avenue 06/2019 06/2020 15 20 31 14 Rehabilitation Reconstruction (17/18 Carryover) miles south, including pavement reconstruction and drainage facilities.

Road Maintenance & North Ave Overlay Elm to Fig (17/18 Fresno Fresno Asphalt overlay on North Avenue from Elm Avenue to Fig Avenue North Avenue from Elm Avenue to Fig Avenue 08/2018 12/2018 15 25 31 14 Rehabilitation Carryover) Road Maintenance & Blackstone Overlay, Shaw to Ashlan Curb ramp replacement, traffic signal loop replacement, curb and gutter repair, signing Fresno Fresno Blackstone Avenue from Shaw Avenue to Ashlan Avenue 08/2018 10/2018 10 20 23 8 Rehabilitation (17/18 Carryover) and pavement markings. Rehabilitiation of Clinton Avenue consisting of an asphalt concrete overlay, replacing Road Maintenance & Clinton Overlay, Blackstone to Fresno Fresno damaged traffic detector loops, restriping and upgrading non-standard curb ramps to Clinton Avenue from Blackstone Avenue to Maroa Avenue 08/2018 10/2018 20 25 31 8 Rehabilitation Maroa (17/18 Carryover) meet ADA standards Rehabilitiation of Shields Avenue consisting of an asphalt concrete overlay, replacing Road Maintenance & Shields Overlay, Sunnyside to Fresno Fresno damaged traffic detector loops, restriping and upgrading non-standard curb ramps to Shields Avenue from Sunnyside Avenue to Fowler Avenue 10/2018 12/2018 20 25 23 8 Rehabilitation Folwer (17/18 Carryover) meet ADA standards Road Maintenance & Marks Ave Overlay, Barstow to Fresno Fresno Pavement overlay Marks Avenue from Barstow Ave to BNSF railroad crossing 03/2019 04/2019 10 15 23 8 Rehabilitation BNSF (17/18 Carryover)

Lane-Kings Canyon-Maple Neighborhood concrete and slurry; West Ave (east side) south of Clinton concrete repair; West Ave (west side) Ashlan to Griffith concrete repair; Shields Ave east of Valentine concrete repair; Bullard/Brawley/Calimyrna/Marty Neighborhood concrete repair; Bullard/Sierra/Millbrook/Cedar Neighborhood concrete repair; Helm, Belmont to Harvey (partial Road Maintenance & FY18-19 Annual Street Maintenance Operational program to replace damaged concrete and street repaving. Located in County) paving; Hughes Ave Overlay, Ashlan to Emerson; Bluff Overlay, Van Ness to easterly limit; Fresno Fresno 08/2018 05/2019 7 20 31 14 Rehabilitation Program State Senate Districts 8 and 14; State Assembly Districts 23 and 31. Second St./Jensen Ave Frontage Rd/Fourth St/Date paving; Channing Overlay, West Ave to Kearney; Hazelwood Overlay, Ventura to Butler; Dakota/Hampton/Millbrook/Ninth Neighborhood paving; Clay Overlay, Peach Ave to City/County limit; Winery Overlay, Butler to Hamilton; Hamilton Overlay, Winery to Chestnut; El Paso-Angus Overlay, Fresno to Nees connector; Maroa Overlay, Dakota to Ashlan (partial County); Maple Ave Overlay, Olive to Belmont.

Road Maintenance & Cedar Ave Overlay, Barstow to Fresno Fresno Pavement overlay Cedar Ave - Barstow to Bullard 05/2019 06/2019 10 15 23 8 Rehabilitation Bullard Road Maintenance & Bullard, First to Cedar (partial grant Fresno Fresno Pavement overlay Bullard Ave - First to Cedar 05/2019 06/2019 10 15 23 8 Rehabilitation match)

Complete Streets Palmer Ave Class II Bike Lane From Huron Fresno Install 0.9 mi of Class II bike lane Palmer Ave from Lassen Ave to Siskiyou Ave 09/2018 10/2019 10 20 31 12 Components Lassen Ave to Siskiyou Ave

Complete Streets M St Class II Bike Lanes From 4th Huron Fresno Install two (2) 900 ft Class II bike lanes M St from 4th St to 7th St 10/2018 12/2019 10 20 31 12 Components St to 7th St Complete Streets M St Class IV Bike Lanes from 7th Huron Fresno Install two (2) 0.63 Class IV bike lanes M St from 7th St to Palmer Ave 03/2019 09/2020 10 20 31 12 Components St to Palmer Ave Complete Streets Lassen Ave Sidewalks from Placita Huron Fresno Improve sidewalks and install landscaping to improve pedestrian experience Lassen Ave from Placita (9th St) to 12th St 12/2018 12/2020 25 35 31 12 Components to 12th St

Complete Streets Lassen Ave Sidewalks & Greening Huron Fresno Improve sidewalks and install landscaping to improve pedestrian experience Lassen Ave from 12th St to US Post Office 06/2019 06/2021 25 35 31 12 Components from 12th St to Post Office

Complete Streets Complete reconstruction including removal and replacement of full depth pavement Kerman Fresno Del Norte Avenue Reconstruction On Del Norte 200' South of C Street to Kearney Blvd in Kerman, CA 07/2018 09/2018 20 35 31 12 Components section. Road Maintenance & Kingsburg Fresno 21st Avenue Reconstruction Pavement, curb, gutter, sidewalk, and curb ramp reconstruction. 21st Avenue between Sierra Street and Mariposa Street 05/2018 12/2018 15 20 31 12 Rehabilitation

In general, the project consists of reconstruction of 5th Street from Oller Street (State Route 180) to Derrick Avenue (State Route 33) and Quince Street from 5th Street to 6th Road Maintenance & 5th Street and Quince Street Street, including demolition of existing asphalt and concrete pavements, Full Depth 5th Street from Oller Street (SR 180) to Derrick Avenue (SR 33), and Quince Street from 5th Street to Mendota Fresno 03/2019 08/2019 15 30 31 12 Rehabilitation Reconstruction Reclamation soil-cement treatment, new HMA pavement, curbs, gutters, ramps, 6th Street driveway and alley approaches, and traffic striping and markings to add two way left turn lanes, parking/bike lanes and high visibility school zone cross walks.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

In general, the project consists of reconstruction of the three streets between Rowe Avenue and Sorensen Avenue, including demolition of existing asphalt and concrete Road Maintenance & Black, Fleming, McCabe Avenue Black Avenue from Rowe Avenue to Sorensen Avenue, Flemming Avenue from Rowe Avenue to Mendota Fresno pavements, Full Depth Reclamation soil-cement treatment, new HMA pavement, curbs, 03/2020 11/2020 15 30 31 12 Rehabilitation Reconstruction Sorensen Avenue, and McCabe Avenue from Rowe Avenue to Sorensen Avenue gutters, ramps, driveway approaches, and traffic striping and markings to add center lane lines, parking/bike lanes and high visibility school zone cross walks.

In general, the project consists of reconstruction of North Kate Street between Divisadero Street and I Street, including demolition of existing asphalt and concrete Road Maintenance & Mendota Fresno Kate Street Reconstruction pavements, Full Depth Reclamation soil-cement treatment, new HMA pavement, curbs, North Kate Street between Divisadero Street and I Street 03/2020 11/2020 15 30 31 12 Rehabilitation gutters, ramps, and traffic striping and markings to add center lane line and parking/bike lanes.

In general, the project consists of reconstruction of Rio Frio Street between 7th Street Road Maintenance & and 8th Street, including demolition of existing asphalt and concrete pavements, Full Mendota Fresno Rio Frio Street Reconstruction Rio Frio Street from 7th Street to 8th Street 03/2021 09/2021 15 30 31 12 Rehabilitation Depth Reclamation soil-cement treatment, new HMA pavement, curbs, gutters, ramps, and traffic striping and markings to add two way left turn lanes and parking/bike lanes.

In general, the project consists of reconstruction of Stamoules Street between 7th Street and 9th Street, including demolition of existing asphalt and concrete pavements, Road Maintenance & Mendota Fresno Stamoules Street Reconstruction Full Depth Reclamation soil-cement treatment, new HMA pavement, curbs, gutters, Stamoules Street from 7th Street to 9th Street 03/2021 09/2021 15 30 31 12 Rehabilitation ramps, and traffic striping and markings to add two way left turn lanes and parking/bike lanes.

In general, the project consists of reconstruction of Marie Street between Divisadero Street and 5th Street and 5th Street betwee Marie Street and Lolita Street, including Road Maintenance & Marie Street & 5th Street Mendota Fresno demolition of existing asphalt and concrete pavements, Full Depth Reclamation soil- Marie Street from Divisadero Street to 5th Street, and 5th Street from Marie Street to Lolita Street 03/2021 09/2021 15 30 31 12 Rehabilitation Reconstruction cement treatment, new HMA pavement, curbs, gutters, ramps, and traffic striping and markings to add center lane line and parking/bike lanes.

In general, the project consists of reconstruction of Naples Street between 2nd Street and 9th Street, including demolition of existing asphalt and concrete pavements, storm Road Maintenance & Mendota Fresno Naples Street Reconstruction drain inlets, manholes and pipes, Full Depth Reclamation soil-cement treatment, new Naples Street from 2nd Street to 9th Street 03/2022 10/2022 15 30 31 12 Rehabilitation HMA pavement, curbs, gutters, ramps, and traffic striping and markings to add two way left turn lanes and parking/bike lanes. Complete Streets Orange Cove Fresno Park & Anchor Street Project Construct curb, gutters, sidewalks, street lights and asphalt paving. Northwest corner of Park Blvd. & Anchor Ave. 08/2018 04/2019 25 50 31 14 Components Complete Streets Park Boulevard Sidewalks (17/18 Repair of Sidewalks to remove trip and fall hazards and improve accessibility for Orange Cove Fresno The North side of Park Blvd. between Center St. and Sixth Street 03/2019 05/2019 20 50 31 14 Components Carryover) disabled persons. Complete Streets 5th Street Construction (2017/18 Parlier Fresno Construction of 160 feet of new street, curb and gutter and sidewalk 5th Street between Academy Avenue and Sierra Avenue 10/2020 06/2021 15 30 31 14 Components Carryover) Road Maintenance & Reconstruction of asphalt pavement and base rock, construction of compliant curb Parlier Fresno Cypress/Rodriguez Reconstruction Cypress Avenue and Rodriguez Avenue between Mendocino Avenue and Mulberry Lane. 03/2019 06/2019 25 30 31 14 Rehabilitation ramps and associated infrastructure.

Project will employ heavy roadway maintenance strategies in the form of digouts of Road Maintenance & Manning Avenue Phase 2 Heavy Reedley Fresno distressed areas and cape seal within the limits of the project. Same project as the 18- City of Reedley - Manning Ave between Frankwood and Columbia Avenues 04/2018 08/2018 6 8 31 14 Rehabilitation Maintenance (17/18 Ongoing) 19 Fiscal Year. SB-1 Funds from 17/18 & 18/19 required to complete the project.

Road Maintenance & Idaho Avenue Reconstruction - San Joaquin Fresno Roadway reconstruction In the City of San Joaquin between 9th Street and Main Street 08/2020 08/2021 10 20 31 12 Rehabilitation 17/18 Carryover Road Maintenance & Nevada Avenue Overlay - 17/18 San Joaquin Fresno Roadway overlay In the City of San Joaquin between 5th Street and Main Street 08/2019 08/2020 10 20 31 12 Rehabilitation Carryover Various locations in the City of San Joaquin: First St from Colorado to Annabella, Annabella from Road Maintenance & Roadway Sealing Project - 17/18 Helm to 4th Street, Helm from Colorado to California, 2nd St from Annabella to Helm, 3rd St from San Joaquin Fresno Roadway crack sealing and slurry sealing 08/2020 08/2021 5 10 31 12 Rehabilitation Carryover Annabella to Helm, 1st St Court, 2nd St Court, 4th St from Annabella to West Nevada, West Nevada from 3rd St to 5th St, White St from 3rd St to 5th St Road Maintenance & 6th Street Repairs Project - 17/18 San Joaquin Fresno Roadway reconstruction In the City of San Joaquin between Colorado Avenue and Nevada Avenue 08/2019 08/2020 10 20 31 12 Rehabilitation Carryover Road Maintenance & 11th Street Reconstruction - 17/18 San Joaquin Fresno Roadway reconstruction In the City of San Joaquin between Colorado Avenue and Nevada Avenue 08/2022 08/2023 10 20 31 12 Rehabilitation Carryover Road Maintenance & 9th Street Reconstruction - 17/18 San Joaquin Fresno Roadway reconstruction In the City of San Joaquin between Colorado Avenue and Nevada Avenue 08/2023 08/2024 10 20 31 12 Rehabilitation Carryover Road Maintenance & Oregon Avenue Reconstruction - San Joaquin Fresno Roadway reconstruction In the City of San Joaquin between 9th Street and Pine Street 08/2024 08/2025 10 20 31 12 Rehabilitation 17/18 Carryover Road Maintenance & Rawson Ave. Reconstruction - 14th Reconstruction of asphalt pavement, construction of compliant curb ramps and Sanger Fresno Rawson Ave. Reconstruction - 14th Street to Hoag Ave. 07/2018 12/2018 25 30 31 8 Rehabilitation Street to Hoag Ave. associated infrastructure Road Maintenance & Dewitt Ave Reconstruction - Hoag Reconstruction of asphalt pavement, construction of compliant curb ramps and Sanger Fresno Dewitt Ave Reconstruction - Hoag Avenue to 14th Street 07/2018 12/2018 25 30 31 8 Rehabilitation Avenue to 14th Street associated infrastructure sealing project will be within the boundaries of the streets S. Newmark, North Ave, Church Ave and Del Ray Ave. Arterial roads within the boundaries include N. Bethel, Greenwood Ave, Jensen and Road Maintenance & Biennial preventative maintenance project including crack seal, slurry seal and/or Sanger Fresno 2018/19 Street Sealing Project Academy Ave. 07/2018 06/2019 10 15 31 8 Rehabilitation rubberized cape seal *All locations have yet to be finalized and are subject to change. Each location will be selected based on the assessed priority need and resources throughout the year.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Road Maintenance & Alphabet Streets (A & B) Reconstruct and rehabilitate A & B street from Floral Avenue to Rose Avenue. Upgrade Selma Fresno Alphabet Streets (A through E) Floral Avenue to Rose Avenue in Selma, CA 01/2019 08/2019 20 25 31 14 Rehabilitation Reconstruction Project ramps to current ADA standards, replace/add sidewalk where missing

Located in Selma on Nebraska Avenue from Highway 43 to Mitchell Avenue, Complete Streets reconstruct the existing 2-lane rural roadway including widening the westbound roadway Selma Fresno Nebraska Avenue (17/18 Carryover) Nebraska Avenue from Hwy 43 to Mitchell Avenue 10/2019 10/2020 20 25 31 14 Components to the ultimate width, providing enhanced access in and out of downtown Selma and congestion relief at the Thompson/Highland intersection.

Patch longitudinal cracking with Hot Mix Asphalt (HMA) in 4’ strips along Arterials and Road Maintenance & McCall from Floral to Dinuba, Orange from Floral to Nelson, Nelson from Highland to Thompson, Rose Selma Fresno Arterial Street Rehabilitation Major Collectors using a 4’ wide paving machine (see attached photos). Crack seal all 01/2019 05/2019 20 25 31 14 Rehabilitation from McCall to Country Rose, Second from E Front to High joints and cracks, place Caltrans type II slurry seal over entire road width and restripe

As part of the Tehama Street Improvement Project, Tehama Street from Woodward Road Maintenance & Orland Glenn Tehama Street Improvements Avenue to East Street will be rehabilitated for roadway repairs and ADA compliance to Tehama Street from Woodward Avenue to East Street. 07/2018 06/2019 15 20 3 4 Rehabilitation curbs, gutters, sidewalks and pedestrian ramps. Complete Streets Supplement STIP funds for Sycamore Street repair/replace sidewalk, curb and gutters Willows Glenn Sycamore Street Rehabilitation Sycamore St. from Lassen St. to Tehama St. 04/2018 10/2018 20 50 3 4 Components where needed. Replace ramps to meet State ADA requirements. Remove and replace broken and uneven sidewalks that are trip and fall hazards or Birch Street/Tehama Street force pedestrian traffic to leave the sidewalk and travel in the street. Repair or replace South side of Birch St. from Butte St. to Tehama St. West side of Tehama St. from Birch ST. to Cedar Willows Glenn Safety 07/2018 04/2019 20 50 3 4 Sidewalk renovation curb and gutter where needed. Connect sections to encourage pedestrian travel and St. bring sidewalk system into ADA compliance. Remove and replace broken and uneven sidewalks that are trip and fall hazards or Walnut Street/Butte Street Sidewalk force pedestrian traffic to leave the sidewalk and travel in the street. Repair or replace South side of Walnut St. from Shasta St. to Butte St. West side of Butte St. from Walnut St. to Willows Glenn Safety 08/2018 05/2019 20 50 3 4 renovation curb and gutter where needed. Connect sections to encourage pedestrian travel and Sycamore St. bring sidewalk system into ADA compliance. Arcata Humboldt Safety Road Safety Improvement Installing two radar feedback signs within city limits for traffic/speed control 11th Street 07/2018 01/2019 8 10 2 2 Road Maintenance & Crescent Way between Old Arcata Road and Bayside Road Arcata Humboldt Road Paving Project Overlaying Crescent Way and Bayside Road with a thin AC layer 02/2019 11/2019 18 20 2 2 Rehabilitation Bayside Road between Union Street and Buttermilk Lane

Road Maintenance & Street Maintenance (Fixing Potholes Arcata Humboldt Annual Maintenance Project Westwood Court 07/2018 10/2018 15 20 2 2 Rehabilitation and AC Overlay) '17/18 Carry Over

Road Maintenance & Street Maintenance (Fixing Potholes Arcata Humboldt Annual Maintenance Project 13th Street, Bayside Road to Union Street 07/2018 10/2018 15 20 2 2 Rehabilitation and AC Overlay) '17/18 Carry Over

Road Maintenance & Blue Lake Humboldt City of Blue Lake SB 1-2018-2019 Pothole repair Acacia Drive, South Railroad, Railroad Avenue 08/2018 09/2018 2 5 2 2 Rehabilitation

Blue Lake Humboldt Traffic Control Devices City of Blue Lake SB 1-2018-2019 Traffic Calming Railroad Avenue, Raymar Avenue 08/2018 10/2018 2 5 2 2

Portions of H Street between 16th and Henderson Streets. Road Maintenance & Remove and replace sections of Asphalt Pavement, install new bicycle sensitive traffic Eureka Humboldt Maintenance Paving 2018 Portions of 6th Street between Myrtle Ave. and Commercial Street 07/2018 09/2018 15 20 2 2 Rehabilitation signal detectors and install new thermoplastic striping and markings. Portions of 7th Street between Pine Street and E Street Road Maintenance & Washington Street paving Ferndale Humboldt Street surface is severely cracked. 325 feet of re-pavement. Washington Street 08/2018 09/2018 20 30 2 2 Rehabilitation improvement (17/18 Carryover) Road Maintenance & Ferndale Humboldt Shaw Street Street surface is severely cracked. 200 feet of re-pavement. Shaw Street 08/2018 09/2018 20 30 2 2 Rehabilitation Road Maintenance & Annual Paving Project - Asphalt Concrete and replacement and leveling course to repair failing asphalt, and Kenmar & Fortuna Blvd Intersection, Main & 12th St. Intersection, Newburg and Fortuna Boulevard Fortuna Humboldt 07/2018 06/2019 10 20 2 2 Rehabilitation Intersections striping Intersection Road Maintenance & Kenmar Road Reconstruction Asphalt Concrete and replacement and leveling course to repair failing asphalt. This is Fortuna Humboldt Kenmar Road between Church Street and Lee Court, and Renee Ct. to Crestview Drive 07/2018 06/2019 10 15 2 2 Rehabilitation Project a carryover project from FY17/18. Road Maintenance & General streets maintenance and repairs including but not limited to potholes, Eeloa Ave. between Spring St. and Fern St.; 1st, 2nd, 3rd, and 4th Avenues including side streets of Rio Dell Humboldt General Maintenance and Repairs 07/2018 06/2019 1 5 2 2 Rehabilitation sweeping, storm drain maintenance, etc. Dixie, Columbus, and Elko; Ogle St.

Road Maintenance & Westhaven Drive Pavement Trinidad Humboldt Resurface and restripe approximately 0.25 miles of roadway. Westhaven Drive From Main St. to City Limits 11/2018 06/2019 5 10 2 2 Rehabilitation Rehabilitation (2017-18 Carryover)

Road Maintenance & Edwards Street Pavement Trinidad Humboldt Resurface and restripe approximately 0.35 miles of roadway. From Trinity Street to the pier parking lot. 01/2018 06/2019 5 10 2 2 Rehabilitation Rehabilitation (17/18 Carryover) Town Hall Pedestrian and Complete Streets Construct curb ramp, accessible driveway and accessible on-street parking stall, Trinidad Humboldt Accessible Parking Improvements Trinity Street in front of Town Hall 01/2019 06/2019 5 10 2 2 Components including striping and signage. (17-18 Carryover) Road Maintenance & Streets Rehabilitation Phase 11, Brawley Imperial Resurface approximately 0.5 miles of road utilizing recycled materials. 16th, 17th, 18th Streets between K St. and Malan St. 08/2018 03/2019 10 15 56 40 Rehabilitation (17/18 Ongoing)

Road Maintenance & Rehabilitation of Legion Street from Rehabilitation of 0.3 miles of Asphalt Concrete with recycled material, remove and Legion Street between Highway 86 and Evelyn Avenue in the City of Brawley, County of Imperial, Brawley Imperial 03/2019 06/2019 10 15 56 40 Rehabilitation Highway 86 to Evelyn Street replace accessible ramps, installation of striping. California

The project will consist of widening and improving Cesar Chavez Blvd. to four (4) lanes Road Maintenance & Calexico Imperial Cesar Chavez Blvd. Improvement from 2nd Street to Highway 98 and include surface rehab, turn lanes, traffic signal, Cesar Chavez Blvd. from 2nd Street to Highway 98 06/2018 07/2018 10 20 56 40 Rehabilitation lighting and sidewalks Road Maintenance & The project will consist of paving dirt road De Las Flores Street between Eady Avenue Calexico Imperial De Las Flores Street Improvemet De Las Flores Street between Eady Avenue and Kloke Avenue 09/2018 10/2018 10 20 56 40 Rehabilitation and Kloke Avenue to include installation of curb, gutter and sidewalk.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Road Maintenance & Calexico Imperial Second Street Bridge The project will consist of widening and improving Second Street bridge Second Street Bridge 11/2018 12/2018 10 20 56 40 Rehabilitation Freeman Street Rehabilitation Road Maintenance & The City will rehabilitate at least 500 lineal feet of full width improvements on Freeman Calipatria Imperial Between Brown and Commerical Freeman Street Rehabilitation between Brown and Commercial Avenues. 02/2019 05/2019 10 20 56 40 Rehabilitation Avenue. Avenues Road Maintenance & 2018 Streets Overlay and Street asphalt overlay and chip seal. Project will eliminate rough riding conditions and La Brucherie Avenue between Adams Avenue and Villa Avenue El Centro Imperial 06/2018 12/2018 15 20 56 40 Rehabilitation Rehabilitation Project potholes by rehabilitating the street segments Ross Avenue between Dogwood Avenue and Alder Canal (East city limit)

This project will "touch" virtually every street in the City, not rehabilitated within the past 3 years. It will refurbish a portion of them with crack sealing followed by a slurry sealcoat. Other street sections in poorer condition are to be crack sealed followed by the placement of an asphalt rubber aggregate membrane chip over the pavement Road Maintenance & Citywide Pavement Rehabilitation surface followed by a slurry sealcoat. It would be necessary to remove and replace City of Holtville citywide (Chestnut, Olive & Webb Avenues, etc.). All locations have yet to be finalized Holtville Imperial 09/2018 12/2018 15 25 56 40 Rehabilitation Project pavement failure areas in the existing street system by saw cutting and removing the and will be selected based on priority need and resources throughout the year. A.C. failed pavement and re-installing new hot mix A.C. pavement prior to either of the aforementioned pavement refurbishment methods. Other minor street improvement work associated with the street refurbishment includes covering and cleaning slurry from water valves, gas valves and manhole covers and applying striping to the streets

Project list is as follows: Continue with the installation of non previously existing storm Storm Drain Installation - Northwest drain system on the Northwest quadrant of the City. Much of this area gets inundated Barioni Blvd. north to 15th Street, between SR 86 and La Brucherie Road. This area is the northwest Imperial Imperial Other Quadrant of City - Continuing (17/18 with rain water causing the asphalt to accelerate oxidation. This situation has been 06/2019 11/2019 25 30 56 40 quadrant of the City where there are no storm drains. Carryover) causing severe damage to the roadway including multiple cracks thus creating sinkholes.

City of Westmorland is proceeding with a project for the design and installation of conventional asphalt with an asphaltic rubberized aggregate membrane. The selected Road Maintenance & Streets Rehabilitation Program C Street from Main Street to 7th Street, D Street from 5th Street to 6th Street and J Street from 7th Westmorland Imperial streets have been in conjunction with the Pavement Management Study. 09/2018 12/2018 12 15 56 40 Rehabilitation Phase 2 (17/18 Carry-Over) Street to 8th Street (Design phase completed as of June 2018, and construction will begin in September 2018)

Pave existing roadway without adding capacity. Excavate to place Cl.2 A.B. with A.C.; CMAQ Project to install new street Road Maintenance & install curb, gutter, cross gutter, ADA ramps, sidewalk, and driveway entrances; raise Westmorland Imperial and curb and sidewalks (17/18 Carry- North H Street (from 7th to 8th St) and 8th Street (from H St. to I St.) [950'] 09/2018 12/2018 30 50 56 40 Rehabilitation manhole covers and water valve covers; striping and signage. Over) (Design phase was completed in June 2018)

Road Maintenance & Bishop Inyo Spruce Fiber Seal Place fiber seal Spruce Street between Yaney and Wye 08/2018 10/2018 10 25 26 8 Rehabilitation Road Maintenance & Bishop Inyo Home Street Fog Seal Place fog seal Home Street 08/2018 10/2018 5 15 26 8 Rehabilitation Road Maintenance & Bishop Inyo Mac Iver Street Fog Seal Place fog seal Mac Iver Street 08/2018 10/2018 5 15 26 8 Rehabilitation Road Maintenance & Bishop Inyo South Second Fog Seal Place fog seal South Second Street 08/2018 10/2018 5 15 26 8 Rehabilitation Road Maintenance & Bishop Inyo Third and South Digouts Replace failed pavement At and near the intersection of South and Third streets. 07/2018 11/2018 25 75 26 8 Rehabilitation West Elm, Schley; West Elm, Hammond; West Elm, Warren; East Elm, Central; East Elm, Howard; Road Maintenance & West Pine, Schley; Academy, Hammod; South, Sneden; Clarke, Third; Clarke, Sneden; Willow, Bishop Inyo 2018-2019 Cross Gutters Construct concrete cross gutters 12/2018 06/2019 75 100 26 8 Rehabilitation Whitney; Willow, Rose; Willow, High; Willow, Second; May, Second; May, Third; May, Bush; May, High; May, Rose Road Maintenance & Bishop Inyo 2018-2019 Sidewalks Construct and reconstruct sidewalks. Park Street 12/2018 06/2019 75 100 26 8 Rehabilitation Road Maintenance & Arvin Kern Purchase Equipment-Hot Mix Purchase a hot mix trailer and a roller compactor for road maintenance of pot holes The City maintains Arvin approximately 4.8 square miles 12/2018 12/2018 5 20 32 21 Rehabilitation Road Maintenance & Arvin Kern Pothole Filling throughout the City Road Maintenance of potholes The City maintains Arvin approximately 4.8 square miles 06/2018 12/2019 5 20 32 21 Rehabilitation Road Maintenance & Microsurfacing various streets Franklin Avenue-between A and Butte, S Hill Street-between SR 223 and Haven, Arvin Kern Microsurfacing various streets throughout the City- Grouped Project 01/2019 04/2019 5 10 32 21 Rehabilitation throughout the City Walnut Drive-between Franklin and 223 Widen Varsity Road in front of the high school to fully originally planned 60-foot width by Road Maintenance & Arvin Kern Varsity ORad Widening installing an additional 10 feet of pavement atop of the current shoulder, and install new Varsity Road between Campus Drive and Mahin Drive. 01/2019 04/2019 5 10 32 21 Rehabilitation curb, gutter, sidewalk Local match requirement for FHWA funding. Existing pavement along this roadway is Pavement Rehabilitation on Wible Road Maintenance & in disrepair. Rehabilitation of this pavement will improve the overall rideability of the Bakersfield Kern Road from White Lane to Planz Wible Road from White Lane to Planz Road 03/2019 09/2019 20 25 34 14 Rehabilitation road for both passenger cars and commercial trucks. This project is 88.53% federally Road funded with a 11.47% local match requirement. Local match requirement for FHWA funding. Existing pavement along this roadway is Pavement Rehabilitation on District Road Maintenance & in disrepair. Rehabilitation of this pavement will improve the overall rideability of the Bakersfield Kern Blvd from Gosford Road to Stine District Blvd from Gosford Road to Stine Road 03/2019 09/2019 20 25 34 16 Rehabilitation road for both passenger cars and commercial trucks. This project is 88.53% federally Road funded with a 11.47% local match requirement.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Local match requirement for FHWA funding. This project will resurface the existing 11 locations (South Monterey Street; 0.1 mile east Coffee Road; 0.2 mile south Truxtun Avenue - bridge decks using methacrylate treatment, cleaning and replacing joint seals, repairing Gosford Road SB; 0.2 mile south Truxtun Avenue - Gosford Road NB; 0.3 mile south Truxtun Avenue - unsound concrete with rapid setting concrete patches, cleaning bridge decks, cleaning Bakersfield Kern Other Bridge Improvements Gosford Road SB; 0.3 mile south Truxtun Avenue - Gosford Road NB; 0.3 mile north Truxtun Avenue - 03/2019 09/2019 20 25 32, 34 14, 16 rebars and apply epoxy coating, repairing curbs and median curb, sealing deck cracks, Coffee Road NB; 0.1 mile north Brundage Lane; South of Terrace Way; East of H Street; South and remove and replace striping. This project is 88.53% federally funded with a 11.47% Monterey Street local match requirement. City Staff will perform section repairs, as needed, along with doing a complete .35 feet Pavement Resurfacing - Jewetta Road Maintenance & overlay on the entire steet. This will be done by utilizing various annual contracts from Bakersfield Kern Avenue from Hageman Road to Jewetta Avnue from Hageman Road to South of Lonon Avenue 08/2018 09/2018 20 25 34 16 Rehabilitation material suppliers, trucking, and asphalt grinding contractors with City Streets staff South of Lonon Avenue doing the paving. City Staff will perform section repairs, as needed, along with doing a complete .35 feet Road Maintenance & Pavement Resurfacing - Pin Oak overlay on the entire steet. This will be done by utilizing various annual contracts from Bakersfield Kern Pin Oak Blvd from White Lane to Bear Creek 08/2018 09/2018 20 25 34 16 Rehabilitation Blvd from White Lane to Bear Creek material suppliers, trucking, and asphalt grinding contractors with City Streets staff doing the paving. City Staff will perform section repairs, as needed, along with doing a complete .35 feet Pavement Resurfacing - Clay Road Maintenance & overlay on the entire steet. This will be done by utilizing various annual contracts from Bakersfield Kern Patrick Farr from Granite Falls to Clay Patrick Farr from Granite Falls to Hageman Road 08/2018 09/2018 20 25 34 16 Rehabilitation material suppliers, trucking, and asphalt grinding contractors with City Streets staff Hageman Road doing the paving. Existing pavement along this roadway is in disrepair. Rehabilitation of this pavement will Road Maintenance & Pavement Rehabilitation on H Street Bakersfield Kern improve the overall rideability of the road for both passenger cars and commercial H Street from 4th Street to Truxtun Avenue 12/2018 05/2019 20 25 34 16 Rehabilitation from 4th Street to Truxtun Avenue trucks. Pavement Rehabilitation on Haley Existing pavement along this roadway is in disrepair. Rehabilitation of this pavement will Road Maintenance & Bakersfield Kern Street from Columbus Avenue to improve the overall rideability of the road for both passenger cars and commercial Haley Street from Columbus Avenue to University Avenue 12/2018 05/2019 20 25 34 16 Rehabilitation University Avenue trucks. City Staff will perform section repairs, as needed, along with doing a complete .35 feet Road Maintenance & Pavement Resurfacing - Park View overlay on the entire steet. This will be done by utilizing various annual contracts from Bakersfield Kern Park View from White Lane to Campus Park 04/2019 05/2019 20 25 34 16 Rehabilitation from White Lane to Campus Park material suppliers, trucking, and asphalt grinding contractors with City Streets staff doing the paving. City Staff will perform section repairs, as needed, along with doing a complete .35 feet Pavement Resurfacing - Berkshire Road Maintenance & overlay on the entire steet. This will be done by utilizing various annual contracts from Bakersfield Kern Rd from Wible Road to Santana Sun Bershire Rd from Wible Road to Santana Sun Dr. 04/2019 05/2019 20 25 34 16 Rehabilitation material suppliers, trucking, and asphalt grinding contractors with City Streets staff Dr. doing the paving. City Staff will perform section repairs, as needed, along with doing a complete .35 feet Road Maintenance & Pavement Rehabilitation on H Street overlay on the entire steet. This will be done by utilizing various annual contracts from Bakersfield Kern H Street from Brundage Lane to 4th Street 04/2019 05/2019 20 25 34 16 Rehabilitation from Brundage Lane to 4th Street material suppliers, trucking, and asphalt grinding contractors with City Streets staff doing the paving. Road Maintenance & Holly & Grapewood ave Grind +/- 2" of Existing Asphalt Surface and Repave with 3" of Hot Mix Asphalt an Holly ave between Eucaliptus ave and Corwin st and California City Kern 01/2019 02/2019 8 10 36 16 Rehabilitation Rehabilitation Estimated 0.60 Miles of Local Street. Grapewood ave between Fir ave and Corwin st. Road Maintenance & Grind +/- 2" of Existing Asphalt Surface and Repave with 3" of Hot Mix Asphalt an Bay av. between Catalpa ave and 94th st. and California City Kern Bay & Catalpa Ave Rehabilitation 10/2018 11/2018 8 10 36 16 Rehabilitation Estimated 0.74 Miles of Local Street. Catalpa ave. between Lask st. and 94th st. Road Maintenance & Grind +/- 2" of Existing Asphalt Surface and Repave with 3" of Hot Mix Asphalt an Eucalyptus ave between S. Loop Blvd and Corwin st. and California City Kern Eucalyptus/Fir Ave Rehabilitation 11/2018 12/2018 8 10 36 16 Rehabilitation Estimated 0.65 Miles of Local Street. Fir ave between Holly ave and Corwin st.

Albany Street between 11th Avenue and Garces Highway; Austin St between 1st Ave and Garces Repave/Resurface 5.32 miles of road pavements with average width of 42 FT and Hwy; Belmonth St between Diaz Stand Garces Hwy; Dover Pl between Diaz St and 1st Ave; Dover St 2019 Pavement Resurfacing and Road Maintenance & restripe 8,000 LF of double left turn lanes, 4,000 LF of center lines and 3.0 miles of Bike between 1st Ave and Garces Hwy; Oleander St bet. 20th Ave and End of Rd; Oxford St bet. 20th Ave Delano Kern Rehabilitation at Various Streets in 02/2019 09/2019 7 10 32 14 Rehabilitation Lanes and repaint pavement markings and crosswalks and replace raised pavement and Co. Ln. Rd; Patton St bet. 21st Ave and Co. Ln. Rd.; Quincy St bet. 18th Ave and Cecil Ave.; Delan markers. Randolph St bet. Co. Ln. Rd and Cecil Ave.; Rounds St bet 20th Ave and End of Rd.; Thomas Way bet Co. Ln. Rd and End of Rd.; 21st Ave bet Princeton St and Oxford St.

Lexington St. between Woollomes Ave and Schuster Road; Kensington St. between Cecil Avenue and 6th Avenue; Dover Place between Garces Highway and 9th Avenue; Dover Place between 10th Avenue and 12th Avenue; Dover Place between Garces Highway and 12th Avenue; Belmont St. Road Maintenance & Pavement Resurfacing and Repave/Resurface 4.9 miles of of road pavements and restripe 2,950 LF of turn lane, Delano Kern between 11th Avenue and 13th Avenue; Belmont St. between Garces Highway and 8th Avenue; 03/2018 06/2018 5 10 32 14 Rehabilitation Rehabilitation (17/18 Carryover) 1,155 LF of Left turn pockets and repaint pavement markings and crosswalk. Belmont St. between Cecil Avenue and 20th Avenue; Asti Street between 1st Avenue and Garces Highway; Austin St. between Garces Highway and 8th Avenue; Clinton St. between Cecil Avenue and 20th Avenue; 22nd Avenue between Girard Street and Oxford Street

Road Maintenance & Street Improvement Project FY 2018-Crack Fill and Slurry Sear 8800 +/- square yards of residential streets within the city of Maricopa Kern Union Street; Adeline St; Mary St; Broadway St; Helen St 03/2019 08/2019 5 10 34 16 Rehabilitation 2019 Maricopa City of McFarland_ATP Kern Ave Complete Streets Complete Street Components new sidewalks, curb, gutter, class 3 bike lanes and high Various locations- three city blocks bounded by 5th Street from W. Kern to W. Sherwood; 4th Street McFarland Kern Elementary SR2S Connectivity 05/2018 09/2018 10 20 32 14 Components visibility crosswalks. from W. Harlow Ave to California Ave; 3rd and 4th Place from W. Sherwood to California Ave Project (17/18 Ongoing) Road Maintenance & McFarland Kern Ave SB1 Road Repave/resurface, re-stripping of crosswalk and road on West Kern Ave from 5th McFarland Kern W. Kern Ave from 5th Street to 6th Street: 02/2019 05/2019 10 20 32 18 Rehabilitation Maintenance Street to 6th Street.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Locations TBD- Sample California Ave. (Sunland Dr. - Gateway Blvd.), California Ave. (China Lake Blvd. - Sunland Dr.), California Ave. (Alley - China Lake , vd.), Church Ave. (Gateway Blvd. - Richmond Rd.), Haloid Ave. (Warner St. - China Lake Blvd.), Lincoln St. (Upjohn Ave. - Church Ave.), Robertson Ave. (Warner St. - China Lake Blvd.), Valley St. (Church Ave. - Ridgecrest Blvd.), Valley St. (Upjohn Ave. - Church Ave.), Wilson Ave. (Warner St. - China Lake Blvd.), Gemstone St. (California Blvd. - Ridgecrest Blvd.), Gemstone St. (Church Ave. - California Ave.), American St. (Church Ave. - Commercial Ave.), Road Maintenance & Work is divided between four preventive maintenance fixes: Double Fiber, Single Fiber, Ridgecrest Kern 2018 Road Projects American St. (Commercial St. - Ridgecrest Blvd.), Beth Ln. (Henry St. - Cul-de-Sac), Broadway St. 09/2018 11/2018 6 15 34 16 Rehabilitation Flex and a Rubberized Double Chip (Commercial - Church Ave.), Broadway St. (Beth Lane - Church Ave.), Church Ave. (China Lake Blvd. - Gold Canyon Dr.), Church Ave. (Gold Canyon Dr. - Sunland St.), Debra Ln. (Holly Canyon Dr. - Sunland Dr.), Desert Candles St. (Haloid Ave. - Upjohn Ave.), Desert Candles St. (Haloid Ave. - Church Ave.), Emily St. (Yellow Astor Ave. - Wilson Ave.), Fire Opal Dr. (Church Ave. - Ridgecrest Blvd.), Forest Knoll St. (Upjohn Ave. - North to end pavement), Garnet St. (Grande Way - Gemstone St.)

Road Maintenance & Residential Road and Sidewalk Grind, Repair, & Seal - Munzer St. from Shafter Ave. to Shafter Kern Munzer St. - Road Rehabilitation Munzer St. from Shafter Ave. to N. Wall St. 12/2018 06/2019 10 15 32 14 Rehabilitation N. Wall St. Road Maintenance & Residential Road and Sidewalk Grind, Repair, & Seal - Pine St. From State Ave to Shafter Kern Pine St. - Road Rehabilitation Pine St. From State Ave to Blake Ave. 12/2018 06/2019 10 15 32 14 Rehabilitation Blake Ave. Road Maintenance & Residential Road and Sidewalk Grind, Repair, & Seal - Polo St. from Shafter Ave to N. Shafter Kern Polo St. - Road Rehabilitation Polo St. from Shafter Ave to N. Wall St. 12/2018 06/2019 10 15 32 14 Rehabilitation Wall St. Complete Streets Sidewalk Rehabilitation - 345 Shafter Kern Sidewalk Repair and Installation at 345 Calloway St. 345 Calloway St., Shafter , CA 93263 12/2018 06/2019 10 15 32 14 Components Calloway

Various pedestrian improvements Repair or replace broken sidewalks, curbs/ gutter, and install pedestrian ramps at Taft Kern Safety 10th Street Between Kern Street 10th Street between Kern Street and Front Street 02/2018 02/2019 15 25 34 16 various locations and Front Street

Road Maintenance & Valley Boulevard Rehabilitation Tehachapi Kern Repave Valley Boulevard from Tucker Road to Curry Street. Valley Boulevard from Tucker Road to Curry Street. 06/2019 06/2020 15 20 34 16 Rehabilitation Project 3 different areas in City limits: Boundaries are Pinon Street south to Highline and Curry Street east to Ponderosa: 10 streets, Road Maintenance & Tehachapi Kern Surface Treatment of Local Street Various surface treatments Boundaries are Georgia Street south to E. Abajo Ave and Dennison Road east to city limit: 10 streets, 07/2019 01/2020 3 5 34 16 Rehabilitation Valley Blvd north to Fir Street and Curry Street east to Clearview: 10 streets

Road Maintenance & Tehachapi Boulevard Rehabilitation Tehachapi Kern Repave Tehachapi Boulevard from Curry Street to Hayes Street. Tehachapi Boulevard from Curry Street to Hayes Street. 12/2018 06/2019 15 20 34 16 Rehabilitation Project The Projects funded by SB 1 will consist of asphalt rehabilitation, ADA curb ramps and Road Maintenance & Streets Rehabilitation (Sunset, other Street improvements on Sunset St. between Palm Ave. and Griffith Ave., Maple Sunset St. between Palm Ave. and Griffith Ave., Maple Ave. between 9th Place and Poso Ave. and Wasco Kern 01/2019 04/2019 10 15 32 14 Rehabilitation Maple, & Jubilee) Ave. between 9th Place and Poso Ave. and Jubilee Dr. between Palm Ave. and Maple Jubilee Dr. between Palm Ave. and Maple Ave. Ave. Remove and replace 4,390 square yards of road. Remove and replace 400 linear feet Complete Streets Seventh Avenue Road Project of concrete curb and gutter. Remove and replace 1,500 square feet of concrete Avenal Kings Seventh Avenue from San Joaquin St south to SR 269 (Skyline Blvd.) 10/2018 03/2019 10 20 32 14 Components (17/18 Carryover) sidewalk. Remove and replace 200 square feet of concrete driveway. Remove and replace 8 wheelchair ramps. Remove and replace 7,480 square yards of road. Remove and replace 600 linear feet Complete Streets Monterey Street Road Project (17/18 of concrete curb and gutter. Remove and replace 2,000 square feet of concrete Avenal Kings Monterey St. from 1st Ave east to 5th Ave. 08/2019 04/2020 10 20 32 14 Components Carryover) sidewalk. Remove and replace 400 square feet of concrete driveway. Remove and replace 8 wheelchair ramps. Remove and replace 7,470 square yards of road. Remove and replace 600 linear feet Complete Streets Mariposa Street Road Project (17/18 of concrete curb and gutter. Remove and replace 2,000 square feet of concrete Avenal Kings Mariposa St. from First Ave. east to Fifth Ave. 08/2020 04/2021 10 20 32 14 Components Carryover) sidewalk. Remove and replace 400 square feet of concrete driveway. Remove and replace 8 wheelchair ramps. Grind, remove and install 45,000 square yards of 2 1/2" Asphaltic Concrete. Install Complete Streets 60,000 square yards of 2 1/2" Asphaltic Concrete. Haul, place and compact 45,000 Avenal Kings Avenal Cutoff Road Project Avenal Cutoff Road from SR 269 east to the California Aqueduct overcrossing. (17/18 Carryover) 03/2022 03/2023 15 25 32 14 Components square yards of Asphaltic Concrete Grindings on the shoulder of the road. Install roadway striping. Furnish Traffic Controls

Whitey Avenue: Dairy Avenue to Van Dorsten Avenue, Type II Slurry Seal, update striping and signing Letts Avenue: Sherman Avenue to Oregon Avenue, Chip Seal, update striping and Whitey Avenue: Dairy Avenue to Van Dorsten Avenue signing Letts Avenue: Sherman Avenue to Oregon Avenue 2018/2019 City of Corcoran SB1 Road Maintenance & Otis Avenue: Niles Avenue to Orange Avenue, Chip Seal, update striping and signing Otis Avenue: Niles Avenue to Orange Avenue Corcoran Kings Road Maintenance Projecst (17/18 07/2018 06/2019 5 10 32 14 Rehabilitation Niles Avenue: Dairy Avenue to Otis Avenue, Chip Seal, update striping and signing Niles Avenue: Dairy Avenue to Otis Avenue Ongoing) Dairy Avenue: Niles Avenue to Business Park, Chip Seal, update striping and signing Dairy Avenue: Niles Avenue to Business Park (ongoing)Dairy Avenue: Bainum Avenue to Orange Avenue, Type II/Fiber Seal, update (ongoing)Dairy Avenue: Bainum Avenue to Orange Avenue striping and signing

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Installation of a traffic signal at the intersection of 13th Avenue and Grangeville Boulevard, and the widening / resurfacing of 13th Avenue from Grangeville Boulevard Traffic signal installation at to a point approximately 1500 feet south of Grangeville (north end of Hanford Learning Hanford Kings Traffic Control Devices intersection of 13th Ave. / Center Development). Intersection of 13th Avenue / Grangeville Boulevard. 04/2019 08/2019 30 50 14 32 Grangeville Blvd. The project will increase traffic flow efficiency and reduce intersection congestion by allowing more free flow traffic movements through the intersection. The project will also provide air quality benefits by reducing vehicle idling times.

Grangeville / BNSF - Grade Preliminary engineering study report to determine feasibility of providing a grade Hanford Kings Road Grade Separation Grangeville Boulevard / BN&SF Railroad Intersection 07/2018 12/2018 50 100 32 14 Separation Feasibility Study separation structure between the BN&SF Railroad and Grangeville Boulevard. Road Maintenance & Hanford Kings 12th Avenue Pavement Resurfacing Resurface 0.4 miles of street. 12th Avenue, between Hanford-Armona Road and Springcrest Street. 01/2019 04/2019 15 30 32 14 Rehabilitation

Project will resurface Tenth Avenue, from Grangeville Boulevard to Third Street, with a Tenth Avenue Resurfacing, double coat fiber seal treatment. The pavement preservation treatment consists of an Road Maintenance & Hanford Kings Grangeville Boulevard to Third asphalt emulsion coating with fibers added to provide structural integrity. Tenth Avenue, from Grangeville Boulevard to Third Street. 03/2019 06/2019 7 10 14 32 Rehabilitation Street Resurfacing of Tenth Avenue will extend the useful life of the asphalt concrete pavement surface thereby prolonging the need for more expensive roadway repairs.

Project will resurface Grangeville Boulevard from 11th Avenue to 12th Avenue, with a double coat fiber seal treatment. The pavement preservation treatment consists of an Road Maintenance & Grangeville Boulevard Resurfacing, Hanford Kings asphalt emulsion coating with fibers added to provide structural integrity. Grangeville Boulevard, from 11th Avenue to 12th Avenue. 03/2019 06/2019 7 10 14 32 Rehabilitation 11th Avenue to 12th Avenue. Resurfacing of Grangeville Boulevard will extend the useful life of the asphalt concrete pavement surface thereby prolonging the need for more expensive roadway repairs.

Road Maintenance & Multiple Locations - Cinnamon Drive from 19 1/2 Avenue to Holly Avenue Lemoore Kings 2019 Slurry Seal Type II Slurry seal, update striping and signing 04/2019 10/2019 8 10 32 14 Rehabilitation 19 1/2 Avenue from Castle Way to Cinnamon Drive Multiple Locations - Hanford-Armona Road from Hwy 41 to Fox Street; Hanford-Armona Road from Road Maintenance & Lemoore Kings 2020 Slurry Seal Type II Slurry seal, update striping and signing Belinda Drive to the Canal; Silverado Drive from 19 1/2 Avenue to 19th Avenue; 19 1/2 Avenue from 04/2020 10/2020 8 10 32 14 Rehabilitation Silverado Drive to Bush Avenue Road Maintenance & Multiple Locations - Cedar Lane from 19th Avenue to Vine Street Lemoore Kings 2021 Slurry Seal Type II Slurry seal, update striping and signing 04/2021 10/2021 8 10 32 14 Rehabilitation Cinnamon Drive from Balboa to Hanford-Armona Road Dam Road/Dam Road Extension Installation of a roundabout with multi-lane entries at all intersection approaches with a Clearlake Lake Safety Roundabout Project (17/18 Dam Road at Dam Road Extension at the intersection near Walmart. 04/2020 11/2020 20 25 4 2 10-foot shared use pathway and crosswalk. Carryover) Burns Valley/Civic Center Complete Streets Olympic Drive from Pine Street to Lakeshore Drive. Lakeshore Drive from Olympic Drive to Division Clearlake Lake Enhancement Project (17/18 Approximately 2,600 lineal feet of curb, gutter and sidewalk improvements. 01/2020 06/2020 20 25 4 2 Components Avenue. Carryover) Dam Road Extension Project (17/18 Extension of Dam Road Extension South Center Drive to 18th Avenue, approximately Clearlake Lake Safety Dam Road Extension Drive from Dam Road to 18th Avenue. 04/2019 07/2019 20 25 4 2 Carryover) 1,000 lineal feet. Complete Streets Highlands Park Frontage Frontage improvements, parking lot and pedestrian improvements totaling Clearlake Lake 14335 Lakeshore Drive, Highlands Park 08/2018 11/2018 20 25 4 2 Components Improvements (17/18 Carryover) approximately 515 lineal feet. Complete Streets Clearlake Lake Airport Road Improvements Regional shopping center connector road from 18th Avenue east to west. 18th Avenue at State Road 53 09/2019 11/2020 20 25 4 2 Components Road Maintenance & Reconstruct existing roadway and replace curb, gutter & sidewalk to meet current ADA Lakeport Lake Second Street Reconstruction Second Street between Main Street and Park Street 07/2018 08/2018 8 15 4 2 Rehabilitation standards Road Maintenance & Miscelleneous roadway Project boundaries will be Lakeport Blvd. to 20th Street. This area has approximately 52 City Lakeport Lake Mill and Fill, dig-outs, pot-hole repairs and thin lift overlays 10/2018 04/2019 4 8 4 2 Rehabilitation maintenance activities maintained Streets within it. Road Maintenance & APPLY FOG SEAL AND/OR TYPE II SLURRY w/CRACK SEALING TO NEWER Susanville Lassen 2018-2019 SEAL COATS VARIOUS STREETS I.E. RIVERSIDE, JOHNSTONVILLE, NUMA, BUNYAN & GRAND 02/2019 05/2019 3 7 1 1 Rehabilitation PAVED STREETS WITHIN THE CITY Resurfacing 11 streets of pavement using rubberized asphalt concrete (RAC). The Road Maintenance & FY 2018/19 Annual Street Capehorn Dr, Captains Pl, Dunegal Ct, Eaglebrook Dr, Forestridge Dr, Goodspring Dr, Janlor Dr, Kiva Agoura Hills Los Angeles project also includes removing and replacing curb ramps in order to comply with current 07/2018 09/2018 10 20 50 27 Rehabilitation Resurfacing Project Ct, Lake Crest Dr, Passageway Pl, and Rigger Rd American with Disabilities (ADA) standards. Installation of traffic signal at the intersection of Thousand Oaks Blvd and Argos St. Thousand Oaks Boulevard/Argos Agoura Hills Los Angeles Traffic Control Devices Includes new crosswalks and new curb ramps in order to comply with current ADA Intersection of Thousand Oaks Boulevard and Argos Street. 07/2018 10/2018 50 60 50 27 Street Traffic Signal standards. Road Maintenance & FY18/19 RMRA SB1 Street The southeast portion of the City. North of the San Bernardino freeway, east of Garfield (excluding Alhambra Los Angeles Street grind and overlay with rubberized asphalt. 09/2018 03/2019 15 20 49 22 Rehabilitation Rehabilition Project Garfield), south of Valley Blvd (excluding Valley Blvd), and west of New Avenue. The project is located in the north end of the City. Bounded by Pine Street on the north; Alhambra Road Maintenance & FY 17/18 RMRA SB1 Street Road on the south; Electric Avenue on the west; and Olive Avenue to the east. Two other street Alhambra Los Angeles Grind and overlay 07/2018 12/2018 15 20 49 22 Rehabilitation Rehabilitation Project segments are: Almansor Street from Main Street to Huntington Drive and Marengo Avenue from Main Street to Valley Blvd.

This project will resurface approximately 2.5 miles of City roadways with rubberized asphalt. Work includes pavement rehabilitation/reconstruction to extend the roadway Fallen Leaf Road (From Hampton Road to Glencoe Drive), Rodeo Road (From Hacienda Drive to Road Maintenance & FY 2018-19 Pavement Arcadia Los Angeles service life. Other repair items to be included in the scope of work are localized AC dig- Foothill Boulevard), Camino Real Avenue (From Santa Anita Avenue to Sixth Avenue), Las Flores 03/2019 04/2019 15 20 49 22 Rehabilitation Rehabilitation Program out repairs and minor repairs to concrete curb and gutter, sidewalk, and cross gutters. Avenue (From Holly Avenue to Santa Anita Avenue) All striping and pavement markers will be reinstalled upon completion of the paving.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts This project will include construction of new sidewalk and retaining wall along the north side of the Colorado Boulevard from San Antonio Road to Colorado Boulevard Gold Complete Streets Colorado Blvd Sidewalk Gap Line Bridge. The project will consist of abandoning an existing sewer main, removing North side of Colorado Boulevard from San Antonio Road to the Colorado Boulevard Gold Line Arcadia Los Angeles 02/2019 04/2019 20 20 49 22 Components Closure (17/18 Ongoing) several mature trees, regarding and landscaping the adjacent frontage of Newcastle Bridge. Park, and placing a new retaining wall where needed to construct an new 5ft wide sidewalk per City Standards.

The project is the final phase that closes the gap in the City's master plan to provide safe bike and pedestrian paths for the City's lowest-income residents. The project will The project will span the entire length of Norwalk Boulevard within the City limits, from the intersection Artesia Los Angeles Safety Norwalk Boulevard (17/18 Ongoing) 01/2018 08/2018 25 30 58 32 provide 26,400 linear feet of Class 2 bike lanes, 835 linear feet of sidewalk of the Metro right-of-way to Artesia Boulevard. improvements, 3,000 linear feet of traffic-calming safety medians, and 5 ADA ramps.

Road Maintenance & Residential Street Resurfacing Resurfacing pavement, and/or removal and replacement of asphalt, and/or cape sealing Artesia Los Angeles Hibbing St., Meadow Dr., 181st St., and 188th St. 08/2018 10/2018 25 30 58 32 Rehabilitation (17/18 Carryover) and striping Reconstruct a 5-way intersection utilizing complete streets concepts by installing two Complete Streets Avalon Los Angeles Five Corner Complete Street Project mini roundabouts, new sidewalks, lighting, improved transit facilities and shared bicycle Intersection of Tremont, Avalon Canyon, Country Club and Sumner roadways 09/2019 06/2021 20 30 70 26 Components facilities. Road Maintenance & Gladstone Street Pavement This project will rehabilitate the pavement on Gladstone Street from Azusa Avenue to Azusa Los Angeles Gladstone Street from Azusa Avenue to Heathdale Avenue and Citrus Avenue to Galanto Avenue 06/2019 12/2019 15 25 48 22 Rehabilitation Rehabilitation Heathdale Avenue and Citrus Avenue to Galanto Avenue.

Vernon Avenue Pavement Road Maintenance & Rehabilitate Pavement on Vernon Avenue from Gladstone Street to 6th Street (17/18 Azusa Los Angeles Rehabilitation from Gladstone Street Vernon Avenue from Gladstone Street to 6th Street 09/2018 12/2018 10 15 48 22 Rehabilitation Carryover) to 6th Street (17/18 Carryover)

This project is ongoing from FY 2017-18. Design phase has commenced and is scheduled to be completed by 8/2017. Construction will begin in 10/2018. Project will consist of reconstruction of portions of the street structural section including removal of Road Maintenance & Brooks Drive and Spring Street Brooks Drive between Rivergrade and Road and End of Street. Baldwin Park Los Angeles 22-inches of the existing roadway and constructing new roadway section including sub- 10/2018 02/2019 20 25 48 22 Rehabilitation Reconstruction (FY17/18 Ongoing) Spring Street between Littlejohn and End of Street. surface preparation, sub grade and constructing aggregate base and asphalt concrete (AC) pavement sections. The project also includes upgrade/replacement of accessible ramps and major curb and gutter repairs.

Design and construction of eight (8) entry monument signs to be placed at major entry Proposed locations: Road Maintenance & points to the city. The project includes street improvements necessary to accommodate Baldwin Park Los Angeles Entry Street Monument Signs Badillo St. (WB), Puente Ave. (NB), Ramona Blvd. (WB), Baldwin Park Blvd. (WB), Pacific Ave (NB), 02/2018 06/2018 20 30 48 22 Rehabilitation the installation including sub-surface preparation, subgrade and AC overlay, and Los Angeles St. (WB), Francisquito Ave (NWB), Root St. (WB) concrete improvements. Leorita St - Dalewood St to Bess Avenue, Vineland Ave – City Limit to end of street, Valona Dr - Work includes 2-inch cold-mill of the roadway and placing new asphalt layer. The Walnut Creek Pkwy to end of street, Gardenview Ln- Siesta Ave to Dalewood St, Dundry A ve- Corak Road Maintenance & Residential Street Rehabilitation Baldwin Park Los Angeles project also includes upgrade/replacement of accessible ramps, minor curb and gutter A ve to end of street, Athol St. Bess Ave to Fairgrove St, Stichman Ave- I-10 Freeway to end of street, 09/2018 12/2018 15 25 48 22 Rehabilitation Project repairs, traffic signal loop replacement, and re-striping. Baldwin Park Blvd- SCL to Bess Ave

This project is being carried over from FY2017-18. The project consist of 2-inch cold- Road Maintenance & Street Rehabilitaion Project (FY17- mill of existing roadway and constructing new asphalt layer. The project also includes Fraizer Street - Judith and End of Street, Amar Road - Fraizer to End of Street, Phelan Avenue - Los Baldwin Park Los Angeles 09/2018 12/2018 10 15 48 22 Rehabilitation 18 Carryover) upgrade/replacement of accessible ramps, minor curb and gutter repairs, and re- Angeles St to Olive Street, Nolina St - Ledford St to Dalewood St, Ledford St - Fraizer St to Nolina St striping. This project will consist of reconstruction of portions of the street structural section including sub-surface preparation, subgrade and constructing aggregate base and Road Maintenance & Maine Avenue Supplemental Paving Baldwin Park Los Angeles asphalt concrete (AC) pavement sections. The project also includes Maine Avenue - Between Los Angeles Street and Arrow Highway 11/2018 06/2019 15 25 48 22 Rehabilitation and Street Improvements upgrade/replacement of accessible ramps, relocation of water main and major curb and gutter repairs. Flora Avenue - Walnut St. to 350’ s/o of Walnut St., Florence Ave. Frontage Road - Florence Ave. to Cold mill existing AC pavement, ARHM overlay, remove and replace damaged driveway East End, Walnut St. - Otis Ave. to East End, Vinevale Ave. - Gage Ave. to Randolph St., Chanslor Road Maintenance & Pavemement Repaving Project Fy Bell Los Angeles approaches, sidewalks, curb and gutter, curb ramps, AC pavement, replace signing and Ave. - Gage Ave. to Florence Ave., Heliotrope Ave. - Gage Ave. to Florence Ave., Fishburn Ave. - 06/2018 09/2018 15 20 63 33 Rehabilitation 18-19 striping, water quality improvements, and install ADA compliant ramps as needed. Bell Ave. to Gage Ave., Pine Ave. - Bell Ave. to Florence Ave. (Carry Over), Weik Ave. - Heliotrope Ave. to Vinevale Ave. (Carry Over) Citywide Maintenance Zones; Zone 1 bounded by NCL, WCL, Lubec St and Jaboneria; Zone 2 Road Maintenance & Sidewalks, Curb and Gutter bounded by WCL, Lubec St, Jaboneria and Clara St; Zone 3 bounded by WCL, SCL, Clara St and Bell Gardens Los Angeles Remove and replace damage concrete improvements, Citywide 10/2017 06/2019 20 30 58 33 Rehabilitation Replacement, Citywide Garfield; Zone 4 bounded by NCL, Jaboneria, Clara St, and Perry Rd; Zone 5 is bounded by NCL, ECL, Park Ln and Perry Rd. Citywide Maintenance Zones. Zone 1 bounded by NCL, WCL, Lubec St and Jaboneria Rd; Zone 2 Road Maintenance & Street Signage Replacement, bounded by WCL, Lubec St, Jaboneria Rd, and Clara St; Zone 3 bounded by WCL, SCL, Clara St and Bell Gardens Los Angeles Remove and replace damaged or non-compliant street signs, Citywide 10/2017 06/2019 20 30 58 33 Rehabilitation Citywide Garfield; Zone 4 bounded by NCL, Jaboneria, Clara St and Perry Rd; Zone 5 bounded by NCL, ECL, Park Ln and Perry Rd Citywide Maintenance Zones. Zone 1 bounded by NCL, WCL, Lubec and Jaboneria; Zone 2 bounded Road Maintenance & Annual Pavment Striping and by WCL, Lubec, Jaboneria and Clara St; Zone 3 bounded by WCL, SCL, Clara St and Garfield; Zone 4 Bell Gardens Los Angeles Re-stripe all pavement striping, markings, legends, and curb painting, Citywide 10/2017 06/2019 10 15 58 33 Rehabilitation Markings Project, Citywide bounded by NCL, Jaboneria, Clara St and Perry Rd; Zone 5 bounded by NCL, ECL, Park Ln and Perry Rd Citywide Maintenance Zones. Zone 1 bounded by NCL, WCL, Lubec St and Jaboneria; Zone 2 Road Maintenance & Pothole Repairs and AC Overlay bounded by WCL, Lubec St, Jaboneria and Clara St; Zone 3 bounded by WCL, SCL, Clara St and Bell Gardens Los Angeles Repair potholes and AC Overlay maintenance project on streets and alleys, Citywide 10/2017 06/2019 10 15 58 33 Rehabilitation Maintenance Project, Citywide Garfield; Zone 4 bounded by NCL, Jaboneria, Clara St and Perry Rd; Zone 5 bounded by NCL, ECL, Park Ln and Perry Rd.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Annual Local Road Maintenance Rehabilitation 1.5 - 2 grind and overlay on the Annual Local Road Maintenance Rehabilitation 1.5 - 2 grind and overlay on the following roadway following roadway segments Agra from Specht to End; Hannon St from Emil to Perry; segments Agra from Specht to End; Hannon St from Emil to Perry; Toler Ave from Loveland to End; Road Maintenance & Annual Local Road Maintenance Toler Ave from Loveland to End; Loveland from Darwell to Toler; Chalet from Hannon to Bell Gardens Los Angeles Loveland from Darwell to Toler; Chalet from Hannon to Foster Bridge; Adams fro Ludell to Lubec; 06/2018 06/2019 10 15 58 33 Rehabilitation Rehabilitation - 17/18 Carry Over Foster Bridge; Adams fro Ludell to Lubec; Ludell from Jaboneria to El Selinda; Ira from Ludell from Jaboneria to El Selinda; Ira from Florence to Perry; Ira from Priory to Clara; Florence Ave Florence to Perry; Ira from Priory to Clara; Florence Ave from Scout to Flood Control; from Scout to Flood Control; Clara from Emil to Scout; Gotham fro Jaboneria to Gephart; Clara from Emil to Scout; Gotham fro Jaboneria to Gephart;

Annual Arterial Road Maintenance Rehabilitation - 1.5 - 2 inch grind and overlay on the Annual Arterial Road Maintenance Rehabilitation - 1.5 - 2 inch grind and overlay on the following Road Maintenance & Annual Arterial Road Maintenance Bell Gardens Los Angeles following arterial roadway segments; Garfield Ave from Shull to Eastern; Gage from arterial roadway segments; Garfield Ave from Shull to Eastern; Gage from Garfield to Perry; Gage 06/2018 06/2019 10 15 58 33 Rehabilitation Rehabilitation - 17/18 Carry Over Garfield to Perry; Gage from Emil to Chalet; Gage from Darwell to Garfield. from Emil to Chalet; Gage from Darwell to Garfield.

Remove and replace damaged sidewalk, install pedestrian lighting, install chokers mid- SR2SL-5348 (027) Eucalyptus Bellflower Los Angeles Safety block, remove and replace non ADA compliant drive aprons, and install curb bulb-outs, Eucalyptus Avenue between Flora Vista Street and Somerset Boulevard. 06/2018 07/2018 10 15 58 32 Avenue modify traffic signal, and install high visibility crosswalk. Road Maintenance & STPLH-5348 (031) Bellflower and Cold mill and resurface with ARHM, remove and replace sidewalk, curb ramps, curb, Bellflower Boulevard between Flora Vista and Somerset Boulevard and Alondra Boulevard between Bellflower Los Angeles 07/2018 11/2018 10 15 58 32 Rehabilitation Alondra gutter, drive aprons, and adjusting utilities to grade. Bellflower Boulevard and East City Limit.

All locations are an estimate and are subject to change throughout the year based on priority need and resources available to the City. - To include the design and construction related rehabilitation of roadway paving for – Burton Way (North Side) between North Rexford Drive and Oakhurst Drive, Burton Way (South Side) multiple locations throughout the City that will include the use of recycled rubberized Road Maintenance & Beverly Hills - Road Repair between North Rexford Drive and North Robertson Boulevard, Rexford Drive between Olympic Beverly Hills Los Angeles asphalt, whenever feasible. 02/2019 06/2020 15 20 50 26 Rehabilitation Improvements (17/18 Carryover) Boulevard and Pico Boulevard, Crescent Drive between Sunset Boulevard and Lexington Road, All project details are an estimate and are subject to change throughout the year based Copley Place near Copley Drive and Sunset Boulevard, Linden Drive between S. Santa Monica on priority need and resources available to the City. Boulevard and Charleville Boulevard, Rexford Dr. between Olympic Boulevard and Wilshire Boulevard, and Almont Dr. between Charleville Boulevard and Olympic Boulevard.

Road Maintenance & Bradbury Los Angeles Royal Oaks North Curb Extension Installation of new curb and gutter along the north side of Royal Oaks Drive. Royal Oaks Drive in the City of Bradbury. 07/2018 06/2019 75 100 48 25 Rehabilitation

Local Streets (Public) (35’-40’): Bradbury Rd. (Lemon Ave to Wildrose Ave.), Braewood Dr. (Royal Oaks Drive to Col De Sac), Elda Street ( Moutn Olive Drive to Col De Sac), Fairlee Ave (Gardi Street to Col De Sac), Freeborn Dr. (Moutn Olive Drive to Col De Sac), Gardi Street (Spring Point Drive to Col De Sac – West), Gardi Street (Spring Point Drive to Mount Olive Drive), Gardi Street (Mount Olive Drive to Col De Sac – East), Mount Olive Lane (Mount Olive Drive to Col De Sac), Oak Shade Road (Spring Point Drive to Road Maintenance & Design of Citywide Slurry Seal Col De Sac), Spring Point Dr. (Gardi Street to Oak Shade Road), Winston Street (Royal Oaks Drive to Bradbury Los Angeles The total cost of design will be $15,000 so this funds the start of the design. 12/2018 06/2019 5 7 48 25 Rehabilitation Project - 17/18 Carryover Lemon Avenue), Woodlyn Lane (250 W. Mt Olive Dr to Mount Olive Drive) Collector Streets (35’-40’): Lemon Avenue (Winston Street to Bradbury Ave), Mount Olive Dr (Royal Oaks Drive to Bradbury City Line to the North), Royal Oaks Dr (Public Trail on Tract 18507 to Parcel 10 on 17 Acre lot in TIN R 10 Wpor SEC 30), All locations have yet to be finalized and are subject to change. Each location will be selected based on priority need and resources throughout the year.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts AVON ST from WARNER BL to RIVERSIDE DR AVON ST from ALAMEDA AV to VERDUGO AV BOB HOPE DR from END to PARKSIDE AV BRIGHTON ST from EDISON BL to VERDUGO AV CALIFORNIA ST from VALLEY HEART DR to RIVERSIDE DR CALIFORNIA ST from ALAMEDA AV to VERDUGO AV CATALINA ST from OLIVE AV to VERDUGO AV CLYBOURN AV from SARAH ST to VERDUGO AV CORDOVA ST from WARNER BL to OLIVE AV CORDOVA ST from ALAMEDA AV to OAK ST EDISON BL from ALAMEDA AV to BUENA VISTA ST EVERGREEN ST from NATIONAL AV to RIVERSIDE DR EVERGREEN ST from ALAMEDA AV to END FAIRVIEW ST from VALLEY HEART DR to END FAIRVIEW ST from OLIVE AV to OAK ST FLORENCE ST from OLIVE AV to VERDUGO AV FLORENCE ST from ALAMEDA AV to WILLOW ST FRANKLIN AV from END to ROSE ST To resurface/reconstruct deteriorated streets, alleys, and concrete (sidewalk, driveway FRANKLIN AV from ROSE to END apron, curb, gutter, and pedestrian ramps). Sidewalk improvements include new Road Maintenance & FREDERIC ST from ALAMEDA AV to OLIVE AV Burbank Los Angeles Street Restoration Zones 1, 2, & 19 pedestrian ramps for improved disabled access. Resurfacing/reconstructing 12/2018 07/2019 20 20 43 25 Rehabilitation FREDERIC ST from OLIVE AV to VERDUGO AV deteriorated streets, alleys, and sidewalks reduces on-going maintenance and improves GAYLORD DR from VALLEY HEART DR to RIVERSIDE DR ride quality. HEFFRON DR from PASS AV to SCREENLAND DR HOLLYWOOD WY from VALHALLA DR to 212' N/O VALHALLA DR HOLLYWOOD WY from PACIFIC AV to VALHALLA DR HOOD AV from END to ROSE ST JACARANDA AV from CLYBOURN AV to TOLUCA PAR DR JACARANDA AV from END to CALIFORNIA ST KENWOOD ST from OLIVE AV to ALAMEDA AV KEYSTONE ST from OLIVE AV to VERDUGO AV LIMA ST from OLIVE AV to OAK ST LINCOLN ST from ALAMEDA AV to VERDUGO AV MAPLE ST from MONTEREY AV to PACIFIC AV MAPLE ST from OLIVE AV to ALAMEDA AV MAPLE ST from ALAMEDA AV to END MAPLE ST from END to HEFFRON DR MYERS ST from ALAMEDA AV to VERDUGO AV NAOMI ST from OLIVE AV to VERDUGO AV NAOMI ST from ALAMEDA AV to WILLOW ST NATIONAL AV from CLYBOURN AV to ROSE ST The program is to overlay the street pavement based on the Pavement Management Road Maintenance & Index ratings. Las Virgenes Rd between Thousand Oaks Bl and Parkmor Rd is one of Calabasas Los Angeles Annual Street Resurfacing Program Las Virgenes Rd between Thousand Oaks Bl and Parkmor Rd 03/2019 06/2019 8 15 45 27 Rehabilitation the segment that the City will use SB 1 funding for resurfacing. This segment is on the National Highway System

The improvements on Mulholland Hwy adjacent to the Calabasas High School include sidewalk connecting between the eastern high school driveway on Mulholland Highway and an access road to the high school on Old Topanga Canyon Road. It will also include extending the existing Class II bike facility to Old Topanga Canyon Road. The pedestrian and bicycle facilities will end on Mulholland Highway, in front of Calabasas Mulholland Hwy and 1000 feet east of Mulholland Hwy and Old Topanga Cyn Rd and 875 ft north of Calabasas Los Angeles Other Mulholland Gap Closure Project High School, approximately 770 feet east of the intersection. On Old Topanga Canyon 02/2019 06/2019 15 25 45 27 Topanga Cyn Rd Road, the improvements will include reconstructing the existing dirt path on the east side of the roadway to a fully improved sidewalk and connects it to the existing sidewalk adjacent to the school service road. Additional improvements include providing Class II bicycle facilities on both sides of the roadway that will extend to Mulholland Hwy. The pedestrian and bicycle facilities currently end north of Old Topanga Canyon Road.

$1.6 million project will repair and resurface 557,930 sq. ft. of the roadway surface; including A.C. grinding as required to allow for the new layer of asphalt. This Project ALBERTONI STREET also includes removal and replacement of pavement sections recommended for ALBERTONI ST. FROM FIGUEROA ST. to AVALON BLVD.an East -West Collector street (approx. Complete Streets Carson Los Angeles REHABILITATION FROM reconstruction. Then, it will be overlaid with 2.0" to 2.5" thick of asphalt to provide a lengh 9,815 L.F.) within Maintenance Zone #1 S/O 91 FWY at the Eastern/Northern section of the 02/2019 09/2019 15 20 64 35 Components FIGUEROA ST. to AVALON BLVD. - good ridabillity roadway surface. Also, the project will include repair broken and City of Carson damaged concrete improvements including Curb & Gutter, Cross Gutters, Sidewalks, Driveway Approaches, Access Ramps to comply with ADA requirements.

$1.6 million project will repair and resurface 185,875 sq. ft. of the roadway surface; including A.C. grinding as required to allow for the new layer of asphalt. This Project TURMONT ST. FROM AVALON also includes removal and replacement of pavement sections recommended for Complete Streets TURMONT ST. FROM AVALON BLVD. to CENTRAL AVE. - an East -West Collector street (approx. Carson Los Angeles BLVD. to CENTRAL AVE.(17/18 reconstruction. Then, it will be overlaid with 2.0" to 2.5" thick of asphalt to provide a 04/2018 08/2018 15 20 64 35 Components lengh 5,521 L.F.) within Maintenance Zone #3 at the Central/Northern section of the City of Carson Carryover) good ridabillity roadway surface. Also, the project will include repair broken and damaged concrete improvements including Curb & Gutter, Cross Gutters, Sidewalks, Driveway Approaches, Access Ramps to comply with ADA requirements.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Resurface the top 3 inches of asphalt on Carmenita Road from 183rd Street to South Road Maintenance & Carmenita Road Rehabilitation Street. The Project will also include the replacement of deficient sidewalks, curbs, Cerritos Los Angeles Carmenita Road from South Street to 183rd Street. 07/2018 09/2018 10 12 58 32 Rehabilitation Project gutters and disabled accessible ramps, replacement of traffic loops, adjustment of manholes and water valves to grade, and thermoplastic striping.

Construct asphalt removals and replacements as needed, and apply an Bituminous The following streets will be affected: 176th Street, Ashworth Place, Bryce Circle, Carnaby Street, Road Maintenance & Residential Street Rehabilitation Slurry Coat over residential streets. Project and will also include the replacement of Carolyn Street, Casandra Avenue, Chaparral Way, Cortner Avenue, Corto Avenue, Destino Street, Cerritos Los Angeles 03/2019 05/2019 5 7 58 32 Rehabilitation Project deficient sidewalks, curbs, gutters and disabled accessible ramps, and thermoplastic Elgers Street, Felson Place, Felson Street, Niagara Avenue, Reva Street, Rose Street, Semora Place, striping. Semora Street, Stark Avenue, Sybrandy Avenue, Yosemite Street.

The Project consists of a grind & pave of the existing roadway surface with 2 inches of Rubberized Asphalt Concrete (RAC). Areas that are lifted, or sunken, will be removed Towne Avenue from to Foothill Boulevard, Andrews Drive from Claremont Boulevard Road Maintenance & Citywide Annual Roadway Claremont Los Angeles and replaced with a deeper section to restore the surface to acceptable standards. North to Claremont Boulevard South, Mt. Baldy Road from Mills Avenue to Grand Avenue, and Indian 07/2018 02/2019 10 20 41 25 Rehabilitation Improvements Curb and gutter, sidewalk, street striping, and ADA ramps will be replaced as necessary Hill Boulevard from Base Line Road to Armstrong Drive. to pave the roadways. The Project will provide for the pavement rehabilitation of selected streets throughout Road Maintenance & FY 18/19 Pavement Rehabilitation Garfield Avenue - Telegraph Road to South City Limit; Slauson Avenue - West of Gage Avenue to Commerce Los Angeles the City. The selected streets were based on the recommendations identified within the 12/2018 02/2019 20 25 58 32 Rehabilitation Project Telegraph Road; and Gage Avenue - Slauson Avenue to Zindell Avenue City's Pavement Management System (PMS). Installation of raised medians and Class II bicycle lanes. Remove and replace locations Complete Streets Compton Los Angeles Compton Boulevar for ADA ramps, curb gutters, sidewalk; grind/overlay asphalt; replace all traffic Compton Boulevard from Willowbrook Avenue to eastern city limits 07/2018 03/2019 10 20 64 35 Components markings, linework, traffic loops

Install bike lanes and lighting along the corridor; enhance pedestrian crossing at 15 Complete Streets Compton Los Angeles Compton Boulevard West intersections. Remove and replace locations for ADA ramps, curb, gutter, sidewalk; Compton Boulevard from Willowbrook Avenue to western city limits 07/2018 04/2019 10 20 64 35 Components grind/overlay asphalt; replace all traffic markings, linework traffic detectors loops.

Tajauta Ave. from Rosecrans Ave. to Compton Blvd.; Elva. from to 138th St. to Parmelee Ave.; Slater Ave. from 133rd St to Wilmington Ave.; Grandee Ave. from City Limit North to 138th St.; Parmelee from City limit North to 138th St.; Oris St. from Grandee Ave. to City limit East; 135th St. from Parmelee to Elva Ave.; Compton Ave. from 130th St to 134th Pl.; Tucker St. from Crane Ave. to Van Ness Ave.; Rosecrans Ave. from City limit East to Alameda St.; Palmer St. from Alameda St. to Bowen Ave.; Bullis Rd. from City limit North to Compton Blvd.; Myrrh St. from City limit East to Oleander Ave.; Complete Streets crack sealing, micro surfacing, remove and replace ADA ramps , curb, gutter, sidewalk; Walnut St. from City limit to City limit; Walnut Park Dr. from City limit to City limit; Walnut Pkwy from Compton Los Angeles Residential Street Resurfacing 07/2018 09/2019 10 15 64 35 Components replace all traffic markings and other minor associated work. City limit to City limit; Greenleaf Blvd. from Central Ave. to Center St.; Greenleaf Blvd. from Harris Ave. to City limit East; Alondra Blvd. from City limit East to City limit West; Bulllis Rd. from Compton Blvd. to City limit South; Greenleaf Blvd. from City limit East to Alameda St.; Central Ave. Pkwy & center median imp. (landscaping) from City limit North to Greenleaf Blvd.; Alondra Blvd., from City limit East to Lime Ave.; Santa Fe Ave. from City limit North to City limit South; Alameda St. West from City limit North to City limit South; Alameda St. East from City limit North to City limit South; Santa Fe Ave. from City limit North to City limit South.

Salinas Ave. from 134th St. to 132nd St.; Dern Ave from 134th St. to 132nd St.; Riddle Ave from 134th St. to 132nd St; Grandee Ave. from 127th St. to El Segundo Blvd.; 151 St, from Tajauta Ave to Dwight Ave; 152nd St, from Tajauta Ave. to Dwight Ave; Wilmington Ave. from Stockwell Ave. to 131 St.; Nord St. from Wilmington Ave. to Paulsen Ave.; Stockwell Ave. from Wilmington Ave. to Paulsen Complete Streets Remove and replace locations of ADA ramps, curb, gutter, sidewalk; grind/overlay Ave.; Carlin Ave. from Alameda St. to Santa Fe Ave.; Euclid Ave. from Alameda St. to Santa Fe Ave.; Compton Los Angeles Residential Street Rehabilitation 07/2018 09/2019 10 15 64 35 Components asphalt; replace all traffic markings, and linework Saunders St. from Essey Ave. to East end; Pixley St. from Essey Ave. to Thorson Ave.; Thorson Ave. from Bales St. to Sauders St.; Bales St. from Bradfield Ave. to Holly Ave.; Holly Ave. from San Vicente St. to Bales St.; San Mateo St. from West end to Harris Ave.; San Marcus St. form West end to Harris Ave.; San Luis St. from West end to Harris Ave.; Locust Ave. from Compton Blvd. to San Vicente St.; San Vicente St. from Holly Ave. to Harris Ave.

Traffic Signal Modifications - Badillo Upgrades to traffic signal poles, controller cabinet, signal heads, and signage with the Covina Los Angeles Traffic Control Devices St & Hollenbeck Ave (17/18 Badillo Street and Hollenbeck Avenue 12/2018 12/2018 15 20 48 22 consideration for the addition of protected left-turn phasing to be considered. Carryover)

Zones 1,2,3,4,5,6,7,8,9 and 10 identified in the 2016 PMS Report. Project Locations include: Zone 1 Cypress St (limits Homerest to Leaf); Zone 2 Covina Blvd (Azusa to Citrus); Zone 3 San Bernardino Rd (Citrus to Hollenbeck); Zone 4 Hollenbeck (Badillo to Rowland); Zone 5 Barranca Ave (Cienega to Arterial Street Slurry Seal Program provides application of 11.36 miles of arterial and Covina), Citrus Ave (Cypress to Arrow), and Covina Blvd (Citrus to Barranca); Zone 6 Badillo (Citrus to collector streets that were identified in 2016 PMS Report that are at a point of Barranca), Citrus Ave (San Bernardino to Cypress), San Bernardino Rd (Second to Grand), Second Road Maintenance & Covina Los Angeles Arterial Streets Slurry Seal Program deterioration and the application of slurry seal would assist in preserving the condition Ave (Badillo to San Bernardino); Zone 7 Puente St. (Barranca to Grand), Rowland Ave (Citrus to First), 03/2019 06/2019 7 7 48 22 Rehabilitation of the pavement surface and extend the overall life of the pavement. Projected will be Rowland Ave (Barranca to E’ly City Limit), Workman Street (Citrus to Barranca); Zone 8 Cienga Ave conducted in two phases (FY 2019 and FY 2020) (Grand to Bender), Cypress St (Glendora to Bonnie Cove), Glendora Ave (Covina to Cienga), Glendora (Cypress to Covina); Zone 9 Badillo St. (Glendora to Lyman), Glendora (Badilo to Cypress), Reeder Ave (Badillo to Cypress); Zone 10 Covina Hills Rd (Oak Canyon to E’ly City Limit), Glendora Ave (Badillo to Puente), Puente St (W’ly City Limit to Glendora).

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Project consists of the Citywide maintenance and rehabilitation of the City's Road & Sidewalk infrastructure. It may include Grind & Cap/AC Overlay (Full Street Reclamation); Asphalt Concrete (AC) restoration (grind and cap) at identified areas; Crack sealing at existing AC and/or PCC roads; slurry seal application; repair of Citywide Project. Includes one or more of the following potential/eligible streets: Atlantic Ave., Patata Road Maintenance & Cudahy Citywide Street damaged sidewalks, driveways & curb & gutters; ADA improvements, traffic striping & St., Ardine St., Clara St., Cecilia St., Otis Ave., River Road, Salt Lake Ave., Park Ave., Elizabeth St., Cudahy Los Angeles 03/2019 12/2019 10 20 63 33 Rehabilitation Improvement Project signage. The City plans to rehabilitate approx. 10-15% of its road/sidewalk infrastructure Hartle Ave., Walnut St., Santa Ana St., Bear Ave., Flower St., Flora St; Wilcox Ave., Live Oak St., this FY under SB1 Program Funds available as described above and per the 2016 Olive St. Cudahy Area: 1.2 sq. mi. City's PMS & latest CPI. Note: This is a carry-over project from FY2017/18 with an available total funding equal to the City's SB1 allocations/revenues for FY2017/18 & FY 2018/19. Overland Avenue paving from Road Maintenance & Culver City Los Angeles Ballona Creek to Washington 3 inch grind and overlay utilizing Hot mix rubberized asphalt. Culver City, Overland Avenue, from Ballona Creek to Washington Boulevard 01/2019 02/2019 25 30 54 30 Rehabilitation Boulevard

As a result of the widening of the Grand Ave./Golden Springs Drive intersection being Grand Ave./Golden Springs Drive performed as part of the SR57/60 Confluence Project (Phase IIA), pedestrian Diamond Bar Los Angeles Other Intersection Enhancement (17/18 hardscape and landscape enhancements associated with crosswalks, sidewalks, and Intersection of Grand Ave. and Golden Springs Drive 10/2017 12/2019 10 20 55 29 Ongoing) parkways are being implemented. This project consists of 0.2 centerline miles along Golden Springs Drive and 0.25 centerline miles along Grand Ave.

Arterial Street Rehabilitation As part of the City's ongoing pavement rehabilitation program, the entire width of the Road Maintenance & Diamond Bar Los Angeles (Diamond Bar Blvd. from Mountain major arterial roadway, Diamond Bar Blvd., will be rehabilitated. This project consists of Diamond Bar Blvd. between Mountain Laurel Way and Clear Creek Canyon 02/2019 06/2019 10 20 55 29 Rehabilitation Laurel to Clear Creek Canyon) 0.88 centerline miles.

Multijurisdictional complete street study of the Lakewood Blvd.-Rosemead Blvd. corridor Lakewood Blvd./Rosemead Blvd. Downey Los Angeles Other within the Gateway Cities sub-region. Study will analyze multiple travel modes (transit, Lakewood Blvd. (Telegraph Rd. – Gardendale St.) 12/2018 06/2020 99 99 58 32 Corridor Study cycling, walking, vehicles, etc.) and enhancing connectivity among said modes.

FY 17-18 Pedestrian Road Maintenance & Construction of new and repair of existing pedestrian facilities (i.e. sidewalk, curb Downey Los Angeles Improvements/New Sidewalk/Ramp Southeast and northwest quadrants of the city 07/2018 06/2019 30 50 58 32 Rehabilitation ramps) to enhance pedestrian circulation and to comply with ADA requirements Construction & ADA Improvements

Road Maintenance & Paramount Blvd. Median Island Downey Los Angeles Construction of raised concrete median islands Paramount Blvd. (Imperial Hwy. - Florence Ave.) 07/2018 06/2019 25 30 58 32 Rehabilitation Project Construction of new sidewalk and curb ramps, signage, replacement of striping and South Downey Safe Routes to Blodgett Ave., Adoree St., Airpoint Ave., Blodgett Ave., Lankin St., Quoit St., Nada St., Julius St., Downey Los Angeles Safety pavement markings, installation of vehicle speed feedback signs and safety education 12/2018 06/2019 25 50 58 32 School Project Pomering Rd. & Laura St. program

FY 18-19 Pedestrian Improvements/ Southwest quadrant (District 2): Burns Ave., Brookshire Ave., Gardendale St., Milta Ave., Stewart & Road Maintenance & Construction of new and repair of existing pedestrian facilities (i.e. sidewalk, curb Downey Los Angeles New Sidewalk/Ramp Construction & Gray Rd. & Old River School Rd. All locations are subject to change and will be selected based on 10/2018 06/2019 30 50 58 32 Rehabilitation ramps) to enhance pedestrian circulation and to comply with ADA requirements ADA Improvements priority need and resources throughout the year.

Northwest quadrant (District 3): Telegraph Rd., Stoakes Ave., I-5 Fwy., Orizaba Ave., Gallatin Rd., Road Maintenance & FY 18-19 Annual Slurry Seal Slurry seal residential streets in order to help preserve the condition of the asphalt Downey Ave., Burns Ave., Old River School Rd., Stewart & Gray Rd., Milta Ave., Rio Hondo Dr., Downey Los Angeles 10/2018 06/2019 5 10 58 32 Rehabilitation Program pavement on said streets for approximately 10 more years. Sherry Ave., Guatemala Ave. & Rivergrove Dr. All locations are subject to change and will be selected based on priority need and resources throughout the year.

Century Blvd (City Limit - Downey Av), Cole St (Brookshire Av - Patton Rd), Dalen St (Bellflower Blvd – Ardis Ave), Donovan St (Birchdale Ave - Brookshire Ave), Imperial Blvd (Frontage Rd N Imperial Hwy - Imperial Hwy), Imperial Bl (Frontage Rd S Imperial Hwy - Imperial Hwy), Patton Rd (Stewart & Gray Rd - Fontana St), Patton Rd (Fontana St - Cleta St), Seaaca St (Pangborn Av - Cul-De-Sac), Washburn Rd (Woodruff Ave - Regentview Ave), Washburn Rd (Bellflower Blvd. - Woodruff Ave), Alameda St (Downey Ave - Brookshire Ave), Cole St (Paramount Bl - Downey Ave), Comolette St (Paramount Bl - Downey Ave), De Palma St (Horton Ave - Rives Ave.), Horley Ave (Yankey St - Loop End), Bellder Dr (Suva St - Cul-De-Sac), Brookshire Ave (Gallatin Rd - Vista Del Rio Ave), Casanes Road Maintenance & FY 18-19 Residential Street Construct rubberized asphalt overlay on residential streets to extend the useful life of Downey Los Angeles Ave (Casanes Ave - Cul-De-Sac), Chaney Ave (Appleby St - Vista Del Rio Ave), Clancey Ave 10/2018 06/2019 10 20 58 32 Rehabilitation Pavement Rehabilitation said streets for approximately 20 more years. (Gotham St - Baysinger St), Cleta St (Brookshire Ave - Patton Rd), Dacosta St (Brookshire Ave - Cul- De-Sac), Dolan Ave (Charloma Dr - Cul-De-Sac), Iowa St (Downey Ave - Dolan Ave), Manzanar Ave (Suva St - Lubec St), Margaret St (Lakewood Bl - Cul-De-Sac), Raviller Dr (Mattock Ave - Lesterford Ave), Santa Gertrudes (Downey Ave - Brock Ave), Suva St (Stamps Ave - Manzanar Ave), Vista Del Rio Ave (Brookshire Ave - Stoakes Ave) All locations are subject to change and will be selected based on priority need and resources throughout the year.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Locations are all within the City of Duarte's City Limits Street Overlay – Estimated useful Life 20-25 years Highland Avenue from Duarte Road to Central Avenue, Mountain Avenue (half of street) from Meridian to Joella Street, Santo Domingo Avenue from Central Avenue to Huntington Drive, Fairlee Avenue The 2018 Street Rehabilitation Project will consist of sections of roadways to be cold from Central Avenue to Maynard Drive, Bloomdale Street from Mount Olive Drive to Crestfield Drive, milled and resurfaced along with section of roadways that will be slurry sealed. The Francita Avenue from Royal Oaks Drive to end of cul-de-sac preliminary Engineer’s estimate for this work is $512,000. This project is partially funded Road Maintenance & Duarte Los Angeles 2018 Street Rehabilitation Project with SB 1 funds while the primary funding source is local funds. The City of Duarte, will 11/2018 05/2019 15 25 48 25 Rehabilitation Slurry Seal – Estimated useful life 15-20 years receive and estimated $365,881 in SB 1 funding in Fiscal Year 2018-19 from SB 1 but Calle Martos from Calle Andra to Las Lomas Road, Calle Adra from Huntington Drive to Calle Martos, will only allocate $125,700 to this project. Construction is estimated to begin in January Calle Linares from Calle Martos to end of street, Calle Malaga from Calle Martos to end of street, Calle 2019 and be completed in May of 2019. Villada Circle from Calla Arda to Calla Arda, Bashor Street from Sino Avenue to Las Lomas Road, Bashor Street from Vineyard Avenue to Sino Avenue, Brinsey Avenue from Royal Oaks Drive to end of street, Vineyard Avenue from Royal Oaks Drive to end of street

Slurry Seal/Overlay Project Phase II Road Maintenance & - Montain View Rd, Magnolia St, El Monte Los Angeles Roadway/street slurry seal, overlay and resurfacing project Area encompassing Montain View Rd, Magnolia St, Parkway Dr and Fineview St 03/2019 08/2019 10 20 48, 49 22 Rehabilitation Parkway Dr and Fineview St (17-18 carryover)

Merced Ave - Garvey Ave to Rio Complete Streets El Monte Los Angeles Hondo Parkway Road Diet (Traffic traffic calming and road diet Merced Ave from Garvey Ave to Rio Hondo Parkway 10/2018 06/2019 5 15 48, 49 22 Components Calming) (17-18 carryover)

2" Grind and overlay in the following streets: Sheldon St. – between Grand Ave. and El Segundo Blvd.; Kansas St. – between El Segundo Blvd. 2" Grind and overlay in the more severely damaged areas and and Holly Ave.; Kansas St. – between Holly Ave. and Mariposa Ave.; Holly Ave. – between Kansas St. Slurry Seal in others. and Illinois St.; Pine Ave. – between Kansas St. and Washington St.; Washington St. – between Holly Road Maintenance & PW 18-18, FY17/18 Pavement El Segundo Los Angeles The construction is expected to take place from August to September 2018, with Ave. and Mariposa Ave.; Illinois St – between El Segundo Blvd. and Franklin Ave.; Illinois St – 03/2018 06/2018 5 15 62 26 Rehabilitation Rehabilitation (17/18 Carryover) $94,000 of the SB 1 fund expenditure (combined with other funds for a total of $1.3 between Grand Ave. and Mariposa Ave.; Mariposa Ave. EB – between Nash St. and Douglas St.; Million project budget). Mariposa Ave. WB – between Nash St and Douglas St.; Nash St. – between Rosecrans Ave. and Park Pl.; Park Pl. – between Continental Way and Douglas St.; Douglas St. – between Rosecrans Ave. and Park Pl.; Douglas St. – between Coral Cir. and El Segundo Blvd.

Road Maintenance & Gardena Los Angeles Local Road Maintenance 2018-2019 Coldmill and Overlay and spot pavement repair of 20 to 25 streets From Crenshaw Blvd. to Vermont Ave. and from El Segundo Blvd. to 182nd Street 04/2019 05/2019 5 20 62, 66 35 Rehabilitation

Selective removal and construction of deteriorated pavement; surface grinding and placement of ARHM, Asphalt Concrete Pavement (Leveling Course); selective Road Maintenance & San Fernando Road Rehabilitation reconstruction of concrete curb and gutters, cross gutters, driveway aprons, and Glendale Los Angeles San Fernando Road between Pacific Avenue and Elk Avenue 05/2019 11/2019 15 20 43 25 Rehabilitation Project Phase 3 sidewalks; construction of Portland Cement Concrete ADA curb ramps; adjustment of existing manholes and water meters to finished grade; installation of striping and other pavement markings; and modification of existing traffic signal systems.

Selective removal and construction of deteriorated pavement; surface grinding and placement of ARHM, Asphalt Concrete Pavement (Leveling Course); selective Road Maintenance & Highland Avenue Rehabilitation reconstruction of concrete curb and gutters, cross gutters, driveway aprons, and Glendale Los Angeles Highland Avenue between San Fernando Road and Kenneth Road 05/2019 11/2019 15 20 43 25 Rehabilitation Project sidewalks; construction of Portland Cement Concrete ADA curb ramps; adjustment of existing manholes and water meters to finished grade; installation of striping and other pavement markings; and modification of existing traffic signal systems.

Rehabilitation of Doran Street which includes grinding and resurfacing of the pavement Road Maintenance & Doran Street Rehabilitation Project Project is Located in the County of Los Angeles, City of Glendale, on Doran Street between Brand Glendale Los Angeles using rubberized asphalt, reconstruction of damaged sidewalks, curbs, gutters and 04/2018 08/2018 15 20 43 25 Rehabilitation (17/18 Ongoing) Boulevard and Adams Street. reconstruction/upgrade of ADA Accessible Curb Ramps where required.

The work includes asphalt concrete resurfacing, removal and replacement of curb ramps, sidewalks, curb and gutter, driveway approaches,adjusting manholes, striping, and some local repair. The project limits are from Glendora Avenue to Cullen Avenue. On the City's Pavement Management System, Ada Avenue has an average pavement Ada Avenue from Glendora Avenue to Cullen Avenue Road Maintenance & Laurel and Ada Avenue Street condition index (PCI) of 20 out of 100. The work includes cold mill and replacement of Glendora Los Angeles Laurel Avenue Street Improvement from Grand Avenue to Pennsylvania Avenue. 07/2018 06/2019 20 30 48 25 Rehabilitation Reconstruction asphalt concrete, removal and replacement of curb ramps, repair of sidewalks, curb and Laurel Avenue from Grand Avenue to Pennsylvania Avenue. gutter, driveway approaches and adjusting manholes, striping, and some local repair. The project limits are from Grand Avenue to Pennsylvania Avenue. On the City's Pavement Management System, Laurel Avenue has an average pavement condition index (PCI) of 22 out of 100.

The work includes thin layer of asphalt concrete removal and resurfacing, removal and replacement of some curb ramps,adjusting manholes, striping, and some local repair. Road Maintenance & Leadora Avenue Street The project limits are from Grand Avenue to Pennsylvania Ave. and from Glendora Ave. Glendora Los Angeles Leadora Avenue from Grand Ave. to Pennsylvania Ave. and Glendora Ave. to Cullen Ave. 07/2018 06/2019 20 30 48 25 Rehabilitation Rehabilitation to Cullen Avenue. On the City's Pavement Management System, Leadora Avenue has an average pavement condition index (PCI) of 57 out of 100.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Cold mill existing AC pavement, ARHM overlay, remove & replace damaged driveway Road Maintenance & Hawaiian Gardens Los Angeles Street Overlay Project FY 18/19 approaches, sidewalks, curb & gutter, install ADA compliant ramps, replace signing & 2 street segments: 211th and 213th Streets 04/2019 05/2019 15 20 63 32 Rehabilitation striping. Road Maintenance & Hawthorne Blvd. Improvement Repaving of asphalt, traffic signal upgrades, installation of new traffic signal, bike lane, Hawthorne Los Angeles Hawthorne Blvd. between 111th Street and 126th Street. 10/2018 09/2021 10 15 62 35 Rehabilitation Project Phase 1 ADA ramp improvements, sewer relocation, adjustment of utilities.

117th Street from Prairie Avenue to East end; 130th Street from Roselle Avenue to Cordary Avenue; Galli Street from Chadron Avenue to West End; Doty Avenue from Imperial Highway to 118th Street; Kornblum Avenue from 115th Street to 117th Street; Kornblum Avenue from 119th Street to 120th Street; 144th Place from Doty Avenue to West end; 146th Street & 147th Place from Prairie Avenue to Doty Avenue; Cordary Avenue from 144th Street to Prairie Avenue; Lemoli Avenue, Doty Avenue & Cerise Avenue from Rosecrans Avenue to 147th Street; Washington Avenue from City Limit to El Segundo Boulevard; 118th Place from Tahoe Avenue to Felton Avenue; 134th Street, 138th Place & 139th Street from Glasgow Place to Isis Avenue; 131st Street from Chadron Avenue to Crenshaw Boulevard; 132nd Street from Prairie Avenue to Yukon Avenue; Crenshaw Boulevard, Doty Avenue & Kornblum Avenue from 135th Street to Rosecrans Avenue; Bodger Avenue from Marine Avenue to Road Maintenance & Street & Pothole Repair, Sidewalk Grinding, Traffic Marking / Signage, Related North End; Fonthill Avenue from Rosecrans Avenue to North end; Lisso Avenue from Kornblum Hawthorne Los Angeles Local Streets & Roads Maintenance 07/2018 06/2020 1 3 62 35 Rehabilitation Equipment Maintenance Avenue to West end; Slayton Avenue from Cerise Avenue to West end; Freeman Avenue, Menlo Avenue, Oxford Avenue & Cedar Avenue from Imperial Highway to El Segundo Boulevard; Broadway & 118th Street from Hawthorne Boulevard to Inglewood Avenue; Dalerose Avenue (Gale) from Imperial Highway to North end; 145th Street from Doty Avenue to Yukon Avenue.; Ruthbar Avenue from 148th Street to Fonthill Avenue; Kornblum Avenue from Marine Avenue to 147th Street; Sundale Avenue from 118th Street to 115th Street; 134th Place from Isis Avenue to Judah Avenue; Isis Avenue from 135th Street to Wiseburn Street; Wiseburn Street from Judah Avenue to Glasgow Place; Atkinson Avenue, Tarron Avenue & Chanera Avenue from 119th Street to 115th Street; Grevillea Avenue from Imperial Highway to Broadway; 134th Street from Hawthorne Blvd to Prairie Avenue; Chadron Avenue Simms Avenue & Yukon Avenue from El Segundo Blvd to 131st Street; Florwood Avenue from 130th Street to 132nd Street; Doty Avenue from Ruthbar Avenue to 147th Street.

Road Maintenance & El Segundo Boulevard Improvement Intersections widening, ADA improvements, pavement reconstruction and AHRM Hawthorne Los Angeles El Segundo Boulevard from Hawthorne Boulevard to Crenshaw Boulevard. 09/2019 07/2022 10 15 62 35 Rehabilitation Project overlay, traffic signals upgrade and reconstruction, storm drain improvement.

The project consists of improvements that will improve walkability and provide safe pedestrian access on 8th Street from Valley Drive to Hermosa Avenue. Improvements include continuous sidewalk; ADA curb access ramps on 8th Street; drainage Hermosa Beach Los Angeles Safety 8th Street Improvements On 8th Street between Valley Drive and Hermosa Avenue, Hermosa Beach, CA. 09/2018 09/2019 15 30 66 26 improvements; installing crosswalks on both sides of 8th Street at intersections of: Manhattan Avenue, Monterey Blvd, Loma Drive, Cypress Avenue, Bard Street and Valley Drive.

Various Locations based on Pavement Management System developed and adopted October 2017. Streets planned as part of the project at this time are: 18th St, Prospect to Pacific Coast Highway; 19th St, Harper to Prospect Ave; 20th St, Harper to Prospect Ave; 20th Pl, Harper to Prospect Ave; 21 St, Harper to Pacific Coast Highway; 24 St, Valley Dr. to Park Ave; 24th Pl, Valley Dr. to Park Ave; 28th Ct, Morningside to Manhattan Ave; 29 St., This project proposes pavement rehabilitation of streets at various locations. The Road Maintenance & Street Improvements - Various Ingleside to Highland Ave; 29 Ct., Ingleside to Highland Ave.; 31 St, Ingleside to Manhattan Ave; 32 Hermosa Beach Los Angeles project will also address limited quantities of deteriorated concrete sidewalk, curb and 11/2018 06/2019 10 20 66 26 Rehabilitation Locations (FY1718 Carryover) Pl., Ingleside to Manhattan Ave.; 33 St, Highland Ave to Manhattan Ave; 33 Pl., Highland Ave to gutter, curb ramps and drainage deficiencies. Manhattan Ave; 34th Pl., Highland Ave to Palm Dr; 34th St., Highland Ave to Manhattan Ave; Francisco St., Morningside Dr to Valley Dr; Hillcrest Dr., 21st St. to 18th St.; Park Ave., 24th Pl to Loma Dr.; Prospect Ave., Artesia to 18th St.; Rhodes Ave., 21st St to 18th St; Harper Ave., Artesia to Carnegie Ln; Longfellow, Ingleside to Manhattan Ave

To improve traffic congestion and pedestrian access on the Long Valley Rd on-ramp, the City of Hidden Hills proposes to install sidewalk and remove traffic that currently contributes to congestion. This would be accomplished by constructing a right turnout Complete Streets Long Valley Rd/Valley Circle/US- lane on Long Valley Rd at the Long Valley Road intersection with the stop-controlled NB Long Valley Road at the City of Hidden Hills, the Long Valley Road corridor/US-101 on-ramp in the Hidden Hills Los Angeles 04/2016 10/2019 40 50 45 27 Components 101 On-Ramp Improvements U.S. 101 on-ramp, modifications to the City's security gate house, the purchase of land City Los Angeles, and Valley Circle Blvd in the City of Los Angeles. and construction of a parking lot and staging area for vehicles waiting to enter Hidden Hills, and the construction of sidewalk on the Long Valley Rd corridor/on-ramp and on Valley Circle Blvd.

Pavement reconstruction: removal and replacement of the original pavement structural 53rd St - Pacific Blvd to East City Limits; 54th St - Pacific Blvd to East City Limits; 55th St - Pacific capacity by the placement of the equivalent or increased pavement structure (3" to 6"). Blvd to East City Limits; 56th St - Pacific Blvd to East City Limits; 57th St - Pacific Blvd to Soto St; Road Maintenance & Reconstruction may include recycled materials (tires) for the reconstruction of the Huntington Park Los Angeles Street Rehabilitation Project Seville Ave - 58th St to Slauson Ave; Benson St - Gage Ave to End of Cul-de-Sac; California Ave - 12/2018 05/2019 10 15 53 33 Rehabilitation complete pavement structure. Preventative maintenance shall include overlay; removal Gage Ave to Randolph Pl; Arbutus Ave - Belgrave Ave to Randolph St; Carmelita Ave - Slauson Ave and replacement of top 2" of A.C. Enhancements also include the application of slurry to Randolph St; Fishburn Ave - Slauson Ave to Randolph St; Middleton St - Gage Ave to Saturn Ave seal to the existing asphalt pavement surface.

Road Maintenance & Arenth Avenue Reconstruction Cold Mill Overlay, driveway approaches, improved hydrology pattern, ADA Industry Los Angeles Fullerton Road to Nogales Street 07/2020 10/2020 15 25 48, 55, 57 22, 29 Rehabilitation (17/18 Carryover) improvements, striping

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Road Maintenance & Centinela Avenue Improvements ( Design 1.5 miles of street resurfacing, curb, gutter and sidewalk repairs, ADA ramp Inglewood Los Angeles Centinela from La Cienega to Florence 02/2018 03/2019 10 20 62 35 Rehabilitation 17/18 Ongoing) upgrades and related activites Construction of 1.5 Miles of street resurfacing and associated improvements including Road Maintenance & Imperial Highway Improvement Inglewood Los Angeles curb, gutter and sidewalk repairs and curb ramp construction as well as traffic and Imperial Hwy from Van Ness to Prairie Ave 07/2018 03/2019 10 20 62 35 Rehabilitation Project (17/18 Ongoing) pedestrian safety improvements Road Maintenance & N. La Brea Avenue Improvements Construction of 1.15 Miles of Street reconstruction, curb, gutter and sidewalk repairs, Inglewood Los Angeles N. La Brea from Florence Blvd to 64 St 09/2018 02/2020 10 20 62 35 Rehabilitation (17/18 Carryover) ADA ramp upgrades and related activities Road Maintenance & South Prairie Improvement Project Design 1 Mile of street resurfacing and associated improvements including curb, Inglewood Los Angeles S. Prairie Ave from Century Blvd to I-105 fwy 03/2019 02/2020 10 20 62 35 Rehabilitation (17/18 Carryover) gutter and sidewalk repairs and curb ramp construction Road Maintenance & Irwindale Los Angeles 2017/2018 Resurfacing Program 2" grind and overlay of AC pavement, re-striping Irwindale Ave, between Arrow Hwy and Cypress St 02/2018 07/2018 10 15 48 22 Rehabilitation Road Maintenance & Resurfacing: 2" grind and overlay of AC pavement, re-striping, structural repairs where Rivergrade Road, Stewart Avenue, Longden Avenue, Irwindale Road, and Adelante Street; City of Irwindale Los Angeles 2018/2019 Resurfacing Program 03/2019 05/2019 10 15 48 22 Rehabilitation needed Irwindale

Location 1 Alta Canyada Rd from Fairmount Ave to the North City Limit, Location 2 Alta Park Ln from Alta Canyada Rd to East Cul-de-sac, Location 3 Caroli Ln from Green Ln to North Cul-de-sac, Location 4 Cypress Dr from Foothill Blvd to Cul-de-sac, Location 5 El Camino Corto St Foothill Blvd to The work to be done consists of furnishing all labor, materials, equipment, tools, and Cul-de-sac, Location 6 Encinas Dr from Salisbury Rd to Flanders Rd, Location 7 Fairview Dr from incidentals. The general items of work include variable depth cold milling of existing Encinas Dr to Cul-de-sac, Location 8 Flanders Rd from Alta Canyada Rd to East Cul-de-sac, Location pavement; paving with asphalt rubber hot mix (ARHM) and conventional asphalt 9 Flintridge Ave from Hampstead Rd to Chevy Chase Dr, Location 10 Green Ln from 1252 Green Ln to Road Maintenance & 2019 Street Resurfacing Program La Canada Flintridge Los Angeles concrete; miscellaneous curb and gutter removal and replacement; adjustment to grade North Cul-de-sac, Location 11 Groveland Ln from Salisbury Rd to Parkman Dr, Location 12 Indiana 07/2018 12/2018 15 20 43 25 Rehabilitation 18/19-1 of manhole and valve cover; installation of traffic striping, marking, raised pavement Ave from Foothill Blvd to Cul-de-sac, Location 13 Jarvis Ave from Earlmont Ave to Fairmount Ave, marker, and curb address (house number) painting; and miscellaneous appurtenant Location 14 La Porte Dr from Commonwealth Ave to Oakwood Ave., Location 15 Lasheart Dr Green work. Clean up and leave in an operable and acceptable condition all of the work. Ln to North Cul-de-sac, Location 16 Leata Ln from Foothill Blvd. to Cul-de-sac, Location 17 Parkman Dr from Groveland Ln to Commonwealth Ave, Location 18 Pembury Pl from Hampstead Rd to Cul-de- sac, Location 19 Salisbury Rd from Commonwealth Ave to Groveland Ln, Location 20 Salisbury Rd from Lasheart Ln to Encinas

Chota Rd. from Fullerton Rd. to 1635’ w/o Fullerton Rd., Chota Rd. from 1635’ w/o Fullerton Rd. Carrie Repair deteriorated pavement areas and resurface streets identified as priorities in the Hills Ln., Chota Rd. from Carrie Hills Ln. to Kashlan Rd., Fullerton Rd. from Corral Mtwy. to North City Road Maintenance & FY 18/19 Street Improvement Pavement Management Program. Repair may include crack fill, slurry seal, cape seal, Limit, Sapota Dr. from End to Sharpless Dr., Sharpless Dr. from Skyline Vista Dr. to Skyline Dr., La Habra Heights Los Angeles 03/2016 07/2019 10 20 57 32 Rehabilitation Project chip seal, asphalt concrete overlay, or remove and replace, as well as restriping and Coban Rd. from Dorothea Rd. to East Rd., Coban Rd. from Kashlan Rd. to End, Skyline Dr. from 1250 drainage facility repair and improvements. n/o Sharpless Dr. to Sharpless Dr., Skyline Dr. from Sharpless Dr. to Airoso Rd., Kanola Rd. from Fullerton Rd. to West End REPOSADO DR (AHUACATE RD TO END); PAPAYA DR (944' N/O EAST RD TO PINTO DR); REPOSADO DR (GREENVIEW DR TO CITRON RD); AHUACATE RD (1185' N/O CHURCHHILL DR Repair deteriorated pavement areas and resurface streets identified as proprieties in TO REPOSADO DR); REPOSADO DR (CITRON RD TO HILLSIDE CT); PAPAYA DR (EAST RD TO Road Maintenance & CARRYOVER - FY 17/18 Street the Pavement Management Plan. Repair may include crack fill, slurry seal, cape seal, 944' N/O EAST RD); REPOSADO DR (HACIENDA RD TO CHANDOS LN); VALLE DR (1065' N/O La Habra Heights Los Angeles 07/2018 08/2018 10 20 57 32 Rehabilitation Improvement Project chip seal, AC overlay, and R&R, as well as restriping and drainage facility repair and EAST RD TO AIROSO DR); AIROSO DR (SKYLINE DR TO VALLE RD); REPOSADO DR (CHANDOS improvements. LN TO GREENVIEW RD); AHUACATE RD (CHURCHILL RD TO 1185' N/O CHURCHILL RD); REPOSADO DR (HILLSIDE CT TO AHUACATE RD); CHURCHILL RD (AHUACATE RD TO EAST RD); VALLE DR (EAST RD TO 1065' N/O EAST RD) Street rehabilitation on local, public streets bounded by Imperial Highway, Biola Avenue, Stage Road, Valley View Avenue and Milan Creek. Project includes pavement Road Maintenance & Measure I Residential Street Phase Street rehabilitation on local, public streets bounded by Imperial Highway, Biola Avenue, Stage Road, La Mirada Los Angeles rehabilitation, replacement of damaged curb, gutter and sidewalk, upgrades to existing 12/2018 06/2019 20 25 57 32 Rehabilitation V Valley View Avenue and Milan Creek. and placement of new handicap curb access ramps, removal and replacement of slotted cross gutters, storm drain pipe repairs, etc. Tamar Dr. - Prichard St. to End, Prichard St. - Tamar Dr. to Sunkist Ave., Glenshaw Dr. - Prichard St. Road Maintenance & Repaving of Various Local Streets to Temple Ave., Shadydale Ave. - Prichard St. to Temple Ave., Lasselette St. - Tonopah Ave. to East La Puente Los Angeles Grind and overlay of local residential streets 09/2018 06/2019 20 25 57 22 Rehabilitation Fy 18-19 End, Beckner St. - Orange Ave. to East End,Moccasin St. - Mayland Ave. to End, Homeward Ave. - Ardilla Ave. to Sunkist Ave., Resurfacing of Various Local Road Maintenance & La Puente Los Angeles Streets FY 17-18 (CARRY OVER Grind and overlay of local residential streets Radway Ave. - Prichard St. to Temple Ave., Broadmoor Ave. - Prichard St. to Temple Ave., 09/2018 06/2019 20 25 57 22 Rehabilitation PROJECT) Various locations - Old Wheeler Road from Wheeler Avenue to Wheeler Avenue, Sherwood Drive Road Maintenance & 2018/19 Pavement Rehabilitation from Wheeler Avenue to Wheeler Avenue, Bowdoin Street from Fruit Street to Emerald Avenue et al La Verne Los Angeles The proposed project will include the rehabilitation of 2.4 miles of existing pavement. 09/2018 10/2018 12 20 41 25 Rehabilitation Projetc and the rehabilitation of Roosevelt et al which includes Madison Avenue, Brandt Street and Fillmore Court. Road Maintenance & Alley West of Lakewood Blvd Remove existing asphalt and base. Reconstruct with new base and Portland Cement Lakewood Los Angeles Alley west of Lakewood Blvd between Candlewood St and Hardwick Ave 08/2018 08/2019 25 30 63 32, 33 Rehabilitation Reconstruction Concrete (PCC) Road Maintenance & Candlewood St between Fidler Ave and 400 feet west of Lakewood Blvd Lakewood Los Angeles Pavement Rehab Phase I Overlay with ARMH 08/2018 06/2019 12 15 63 32, 33 Rehabilitation Harvey Way between Bellflower and Woodruff Road Maintenance & Del Amo Blvd between Paramount Blvd and Cherry Ave Lakewood Los Angeles Del Amo Blvd Rehab Overlay with ARHM 08/2018 06/2019 12 15 63 32, 33 Rehabilitation Del Amo Blvd between Paramount Blvd and Downey Ave Complete Streets Paramount Blvd Drainage and Modify existing curb and gutter and side panels (medians) to receive and retain Lakewood Los Angeles Paramount Blvd between Del Amo Blvd and Carson St 08/2018 06/2019 20 30 63 32, 33 Components Landscape stormwater and nuisance water runoff. (Funding by SB 1 and other sources) Road Maintenance & Downey Ave Pavement Rehab Lakewood Los Angeles Overlay with ARHM Downey Ave between Del Amo Blvd and Country Club Rd 08/2018 06/2019 15 25 63 32, 33 Rehabilitation (17/18 Carryover)

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

(1) 10th Street West, between Avenue L & Avenue M (17/18 Ongoing) The 2018 PMP-Revive 25 is one of a series of projects to "revive" every lane mile within (2) Neighborhood: Avenue K-4 to Avenue K-8; 25th Street West to 30th Street West; (3) City limits by the year 2025. Revive 25 will maximize the life of all Lancaster roads by Road Maintenance & Neighborhood: Lancaster Boulevard to Avenue J; 10th Street West to 15th Street West; (3) Lancaster Los Angeles Revive 25 preventing road issues before they occur. This project includes street resurfacing, traffic 06/2017 09/2018 15 30 36 21 Rehabilitation Neighborhood: Glenhaven to Avenue J-8; Division Street to Raysack Street; (4) Neighborhood: calming measures, and right sizing roadway. Some of the projects will also incorporate Lancaster Boulevard to Avenue J; 2nd Street East to 3rd Street East; (5) Neighborhood: Avenue J-8 to recycled asphalt (RAP). Avenue K; 15th Street West to Rembrandt Street; (6) 4th Street East; Avenue L to Avenue M.

Road Maintenance & Repave/Resurface a total of 0.41 miles of road. Project also includes removal and 149th Street (Hawthorne Blvd to Larch Avenue); 160th Street (Hawthorne Blvd to Freeman Ave); and Lawndale Los Angeles Various Streets Resurfacing Project 12/2018 03/2019 20 28 62 35 Rehabilitation replacement of PCC curb/gutter, sidewalk, curb ramps, and other appurtenance work. 167th Street (Hawthorne Blvd to Freeman Ave).

Road Maintenance & Alley Resurfacing Project (17/18 Repave/Resurface a total of 0.21 miles of alleyways. Project also includes removal and Lawndale Los Angeles Alleys east of Hawthorne from 163rd to 166th Streets and from 167th to 168th Streets 12/2018 03/2019 20 28 62 35 Rehabilitation Carryover) reconstruction of concrete gutters. 250th Street (Pennsylvania Avenue Road Maintenance & Lomita Los Angeles to Eshelman Avenue) Rehabilitation Street Resurfacing/Rehabilitation 250th Street between Pennsylvania Avenue and Eshelman Avenue 06/2018 10/2019 10 20 66 26 Rehabilitation Project

Streets throughout the City’s street maintenance Zone F (NW corner of the City) including portions of Road Maintenance & Zone F Street Improvement and Street improvements, including AC Reconstruction, AC Overlay, Cape Seal, and Slurry the following streets: 240th Street, 242nd Street, 243rd Street, 245th Street, Adona Drive, Allbrook Lomita Los Angeles 01/2019 06/2019 5 20 66 26 Rehabilitation Slurry Seal Project Seal per the City’s 2017 Pavement Management Program update. Street, Alliene Avenue, Benhill Avenue, Cadiz Drive, Carlene Lane, Dawn Street, Hendricks Avenue, Lomita Drive, Lomita Park Place, Lucille Avenue, G654Olson Lane, and Pennsylvania Avenue.

Road Maintenance & FY19 Residential Street Repair, Long Beach Los Angeles Maintenance/Rehabilitation of 0.2 mile of road E 15th Street between Lewis Ave and Alamitos 05/2019 07/2019 10 15 70 33 Rehabilitation CD6 Road Maintenance & Long Beach Los Angeles Major & Secondary Streets Maintenance/Rehabilitation of 0.5 mile of road Anaheim Street between Pacific Ave and Atlantic Ave 08/2019 10/2019 10 15 70 33 Rehabilitation Road Maintenance & Long Beach Los Angeles Major & Secondary Streets Maintenance/Rehabilitation of 0.3 mile of road Temple Avenue between 4th St and 7th St 08/2019 10/2019 10 15 70 33 Rehabilitation Road Maintenance & Long Beach Los Angeles Major & Secondary Streets Maintenance/Rehabilitation of 0.5 mile of road Ximeno Avenue between Broadway and 4th St 08/2019 10/2019 7 10 70 34 Rehabilitation Road Maintenance & Long Beach Los Angeles Major & Secondary Streets Maintenance/Rehabilitation of 0.5 miles of road Anaheim Street between Gardenia Ave and Temple Ave 08/2019 10/2019 7 10 70 33 Rehabilitation Road Maintenance & Long Beach Los Angeles Major & Secondary Streets Maintenance/Rehabilitation of 0.5 mile of road Carson Street between Clark Ave and Bellflower Blvd 08/2019 10/2019 7 10 70 33 Rehabilitation Road Maintenance & Long Beach Los Angeles Major & Secondary Streets Maintenance/Rehabilitation of 0.5 mile of road Anaheim Street between Alamitos Ave to Gardenia Ave 08/2019 10/2019 7 10 70 33 Rehabilitation Road Maintenance & Long Beach Los Angeles Major & Secondary Streets Maintenance/Rehabilitation of 0.4 mile of road Long Beach Blvd between 31st St and Wardlow Rd 08/2019 10/2019 7 10 70 33 Rehabilitation Road Maintenance & Long Beach Los Angeles Major & Secondary Streets Maintenance/Rehabilitation of 0.5 mile of road Del Amo Blvd between Atlantic Ave and Orange Ave 08/2019 10/2019 7 10 70 33 Rehabilitation Road Maintenance & Long Beach Los Angeles Major & Secondary Streets Maintenance/Rehabilitation of 0.5 mile of road Artesia Blvd between Cherry Ave to Paramount Blvd 08/2019 10/2019 10 15 63 33 Rehabilitation Road Maintenance & FY19 Residential Street Repair, Long Beach Los Angeles Maintenance/Rehabilitation of 1.2 mile of road 15th Street between Orange Ave and Obispo Ave 08/2019 10/2019 10 15 70 33 Rehabilitation CD4 & CD6 The project will install a wire mesh net to keep material from a failed slope from Glendale Blvd/Silverlake Blvd continuing to impact the public right of way. Sandstone debris up to four feet in diameter Los Angeles Los Angeles Safety Glendale Bl. And Silverlake Bl. 08/2018 01/2019 20 30 43 24 Rockfall Mitigation (17-18 Ongoing) previously dosed the sidewalk and two lanes of traffic on the street. Funding is provided from: SB1 ($34,546) and Gas Tax ($531,000) The project will construct a bulkhead type retaining wall with new steel piles and precast concrete lagging to restore lateral support to the roadway. The roadway has settled one Verde Oak Drive (2252 N) Bulkhead Los Angeles Los Angeles Safety to two feet over an 80 linear foot area. 2252 N. Verde Oak Drive 10/2018 04/2019 20 30 43 25 (17-18 Ongoing) Funding is provided from: SB1 ($140,000); Gas Tax ($330,104) and the Public Works Trust Fund ($427,896)

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Construction of six Complete Streets projects begun in 2017-18: Avalon: Complete Street Project involving 3.9 lane miles of street reconstruction, 5.3 lane miles of resurfacing, and safety improvements. The project will include a street reconfiguration to one lane each way with a center lane for turning, fully protected bike lanes from 56th to Manchester, speed feedback signs, leading pedestrian intervals, rectangular rapid flash beacons (RRFB), protected left turns, curb extensions, signal timing upgrades, intersection tightening, new crosswalks with RRFB, new traffic signals, and bus stop relocation. Main: Complete Street Project involving 3.1 lane miles of asphalt street reconstruction, 2.3 lane miles of concrete street reconstruction, 4.9 lane miles of asphalt resurfacing, and safety improvements. The project will include speed feedback signs, leading pedestrian intervals, adding RRFBs to crosswalks, protected left turns, signal timing upgrades, new crosswalks with RRFB, new traffic signals, and bus stop relocation. Reseda: Complete Street Project Involving 6.2 lane miles of street reconstruction, 6.2 Avalon from San Pedro to 120th (Council Districts 8, 9, 15) lane miles of resurfacing and safety improvements. The project will include crosswalk Main(south) from MLK to Imperial (Council Districts 8, 9) Street Reconstruction/Vision Zero Complete Streets installation or upgrades, striping modifications, curb extensions, signal phasing and Reseda from Parthenia to Victory (Council District 3,12) Los Angeles Los Angeles Project Construction (17-18 06/2018 06/2020 20 25 45, 46, 53, 54, 59 18, 24, 30 Components timing changes, and proposals for closing a gap in the existing bike lanes, between Roscoe from the 405 Freeway to Woodman (Council Districts 6) Ongoing) Valerio and Vanowen. Venice (east) from Arlington to Figueroa (Council Districts 1, 9, 10) Roscoe: Complete Street Project involving 3.4 lane miles of street reconstruction, and Temple from Beverly to Beaudry (Council Districts 1, 13) safety Improvements. The project will include speed feedback signs, leading pedestrian intervals, protected left turns, traffic signals and crosswalk upgrades. Temple: Complete Street Project involving 2.9 lane miles of street reconstruction, 1.3 lane miles of resurfacing, and safety improvements. The project will include speed feedback signs, leading pedestrian intervals, protected left turns, signal timing upgrades, new crosswalks with RRFB, new traffic signals, and bus stop relocation. Venice: Complete Street Project involving 6.8 lane miles of street reconstruction, 1.6 lane miles of resurfacing, and safety Improvements. The project will include leading pedestrian intervals, adding RRFB to crosswalks, protected left turns, and new traffic signals. These projects total $80 million in estimated costs. However, funding will be provided from multiple sources (including SB1) over multiple years (including 2017-18, 2018-19 and 2019-20). SB1 provides $6 million in 2017-18 and $23,561,000 in 2018-19.

18/19 Complete Street Projects in the Valley, West LA, South LA, East LA and the Complete Streets Street Reconstruction/Vision Zero Citywide - in the Valley, West LA, South LA, East LA and the Central City. Specific locations have yet Los Angeles Los Angeles Central City. Specific locations have yet to be finalized. Locations will be selected 01/2019 01/2020 20 25 59 30 Components Design to be finalized. Locations will be selected based upon priority need and resources throughout the year. based upon priority need and resources throughout the year. 39, 43, 45, 46, 50, Sidewalk Repair Access Request Citywide - in the Valley, West LA, South LA, East LA and the Central City. Specific locations have yet 18, 24, 25, 26, 27, Los Angeles Los Angeles Safety Repair of sidewalks adjacent to streets to safely separate vehicle and pedestrian traffic 01/2019 01/2020 20 25 51, 53, 54, 59, 62, Acceleration to be finalized. Locations will be selected based upon priority need and resources throughout the year. 30 64

Road Maintenance & Citywide - in the Valley, West LA, South LA, East LA and the Central City. Specific locations have yet Los Angeles Los Angeles Concrete Streets (17-18 Ongoing) Repair of failed concrete streets 01/2019 01/2020 35 40 59 30 Rehabilitation to be finalized. Locations will be selected based upon priority need and resources throughout the year.

Silverlake Blvd Underpass Arch Sidewalk and road repair: Separate motor vehicle and pedestrian traffic for public Los Angeles Los Angeles Safety Silver Lake. Council District 13: Sunset Blvd and Silver Lake St. 01/2019 07/2019 20 25 51 24 Project safety.

Separation of pedestrian and vehicle traffic for safety: To complete sidewalk improvements around Sheldon Arleta Park. Remove and reconstruct street pavement, Sheldon Arleta Sidewalk Los Angeles Los Angeles Safety curb, gutter, trees, utilities poles, new concrete sidewalk, re-strip street, construct street Sheldon Arleta Park . Council District 6, Sheldon St and Sharp Ave 01/2019 01/2020 20 25 39 18 Improvement - Sharp Ave lights, relocate fence, new fence wrought iron(tubular). Funding sources include SB1 $2,843,734 and Public Works Trust Fund $289,782.

Repair of roadway: Re-mediate the transition structure at the culvert outlet by correcting Road Maintenance & Cochran Ave (2520) Culvert at Cul- the grade to drain to the south and replace the deficient curb and gutter along with the Los Angeles Los Angeles South LA. Council District 10, 2520 Cochron Ave 01/2019 01/2020 20 25 54 30 Rehabilitation De-Sac sidewalk that will be impacted in order to re-establish the original drainage pattern. Project funding sources include SB1 $245,000 and Public Works Trust Fund $100,000.

Road Maintenance & Dudley Drive Pavement Los Angeles Los Angeles Reconstruction of street to correct drainage due to long-term subsidence. Council District 14, Dudley Dr and Cato St 01/2019 01/2020 20 25 51 24 Rehabilitation Reconstruction Roadway reconstruction: This project will replace damaged pavement, concrete curb, and sidewalk along Via Marisol approximately 700 feet east of Monterey Road. Road Maintenance & Anticipated repair includes excavation of existing soil, installation of replacement soil, Los Angeles Los Angeles Via Marisol Street Repair Council District 14: Via Marisol and Monterey Rd 01/2019 01/2020 20 25 51 24 Rehabilitation removal and replacement of damaged existing pavement, curb, and sidewalk, and re striping of the street. Project funding sources include SB1 $2,146,224 and Public Works Trust Fund $226,464.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Road Maintenance & Kinney Street Improvement - Street improvement, retaining wall: Retaining walls and street improvement, including Los Angeles Los Angeles Council District 1, Kinney Street between Crestmoore Pl and Lavell Dr 01/2019 01/2020 20 25 51 24 Rehabilitation Crestmoore to Lavell regrading street, new curb and gutter for drainage control.

Repair roadway to reduce flooding and promote safety: This project consists of constructing 600’ of 36”storm drain in Branford Street from the outlet at the Pacoima Branford Street - Arleta Ave to Wash Diversion Channel, northeasterly to Arleta Avenue. Branford Street is a heavily Los Angeles Los Angeles Safety San Fernando Valley. Council District 6: Branford Street - Arleta Ave to Pacoima Wash 01/2019 01/2020 20 25 39 18 Pacoima Wash traveled secondary highway. The intersection of Arleta and Branford becomes flooded during even minor rainfall events, seriously impeding vehicular and pedestrian traffic. This can contribute to traffic accidents, increasing the City’s liability.

Road Maintenance & Vista Del Mar 2,200 and 3,000 feet This safety related project constructs 2 steel beam and precast concrete lagging Los Angeles Los Angeles West LA. Council District 11: Vista Del Mar / Imperial Hwy 01/2019 01/2020 20 25 62 26 Rehabilitation n/o Imperial Hwy Bulkheads bulkheads along Vista Del Mar to restore lateral support to the street.

This $90 million project will create a safety separation between motorists, bicyclists and pedestrians and provide linkages with two rail lines. This project will be in construction Active Transportation River to Rail Los Angeles Los Angeles Other in the spring of 2018 and will be completed before the opening of the Crenshaw line in South LA. Council District 8 and Council District 9. 01/2019 01/2020 20 25 54 30 Corridor late 2019. $3 million of SB1 is to install cool pavement, plant trees and fund one of two bike hubs. The remaining funding is provided from other sources.

Road repair and sidewalk and bicycle improvements: Improve pedestrian safety by installing curb extensions, widening sidewalks, improving pedestrian lighting, enhancing crosswalks, and provide pedestrian amenities including benches, street trees, Complete Streets landscaped buffers from traffic and bike racks. Los Angeles Los Angeles 7th Street Streetscape Downtown LA. Council District 14: 7th Street between Olive and San Pedro. 01/2019 01/2020 20 25 53 30 Components Estimated total cost of project is $10,699,534. Project funding sources include: Wilshire Grand Development $7,970,689, Housing and Community Investment Department grant $2,115,000, Affordable Housing Sustainable Communities grant $13,845 and SB1 $600,000 Street Lighting Improvement: Replace existing high voltage series street lighting system Main Street Lighting Improvement Los Angeles Los Angeles Safety with a low voltage system (install new poles, foundations, conduit, wires, and energy Council District 9: Main St. from 42nd Pl. to 57th St. and San Pedro Pl. between Main St. and 80th. 01/2019 01/2020 15 20 59 30 Unit 2 efficient LED lighting. 2nd Street Tunnel - Hill to Figueroa Street Lighting improvement: Replacement of tunnel lights, including conduit, wires, Los Angeles Los Angeles Safety Downtown LA. Council District 14 01/2019 04/2020 15 20 53 24 STM/STP poles, luminaries, and lamps. Part of the Security Lighting at Bus Stops Program. This project installs modern Street lighting at bus stops in the Valley, West LA, South LA, East LA and the Central City. Specific Los Angeles Los Angeles Safety Security Lighting Unit 20 pedestrian lighting systems at select bus stop locations to meet lighting standards for locations have yet to be finalized. Locations will be selected based upon priority need and resources 01/2019 08/2019 15 20 59 30 pedestrian traffic. throughout the year. Complete Street Project Involving 0.9 lane miles of resurfacing, and safety Complete Streets 6th Street from Rampart to Beaudry Los Angeles Los Angeles improvements. Input from the public and affected Council Office(s) will be used to Council District 1: 6th Street from Rampart to Beaudry 01/2019 06/2020 20 30 53 24 Components (17-18 Carryover) determine specific safety improvements. Complete Street Project involving 0.9 lane miles of resurfacing, and safety Complete Streets Adams from Fairfax to Crenshaw Adams from Fairfax to Crenshaw Los Angeles Los Angeles Improvements. Input from the public and affected Council Office(s) will be used to 01/2019 06/2020 20 30 54 30 Components (17-18 Carryover) (Council District 10) determine specific safety improvements. Complete Street Project involving safety improvements. Input from the public and Complete Streets Alvarado from 6th to 7th (17-18 affected Council Office(s) will be used to determine specific safety improvements. Input Alvarado from 6th to 7th Los Angeles Los Angeles 01/2019 06/2020 20 30 53 24 Components Carryover) from the public and affected Council Office(s) will be used to determine specific safety (Council District 1) Improvements.

Complete Street Project involving 3.7 lane miles of street reconstruction, 3.4 lane miles Complete Streets Broadway from Century to MLK (17- Broadway from Century to MLK Los Angeles Los Angeles of resurfacing, and safety improvements. Input from the public and affected Council 01/2019 06/2020 20 30 59, 64 30 Components 18 Carryover) (Council Districts 8, 9) Office(s) will be used to determine specific safety improvements.

Complete Street Project involving 9.5 lane miles of street reconstruction, 3.6 lane miles Complete Streets Figueroa from MLK to Imperial (17- Figueroa from MLK to Imperial Los Angeles Los Angeles of resurfacing, and safety improvements. Input from the public and affected Council 01/2019 06/2020 20 30 59, 64 30 Components 18 Carryover) (Council Districts 8, 9) Office(s) will be used to determine specific safety Improvements.

Complete Street Project involving 1.3 lane miles of street reconstruction, 3.7 lane miles Complete Streets Hoover from Vernon to Manchester Hoover from Vernon to Manchester Los Angeles Los Angeles of resurfacing, and safety improvements. Input from the public and affected Council 01/2019 06/2020 20 30 59, 64 30 Components (17-18 Carryover) (Council Districts 8, 9) Office(s) will be used to determine specific safety improvements.

Complete Street Project involving 1.6 lane miles of street reconstruction, 3.3 lane miles Complete Streets N Broadway from Ave 18 to Mission N. Broadway from Ave 18 to Mission Los Angeles Los Angeles of resurfacing and safety improvements. Input from the public and affected Council 01/2019 06/2020 20 30 51 24 Components (17-18 Carryover) (Council District 1) Office(s) will be used to determine specific safety improvements.

Complete Street Project involving 0.9 lane miles of street reconstruction, 0.6 lane miles Complete Streets Pico (east) from Western to Union Pico (east) from Western to Union Los Angeles Los Angeles of resurfacing, and safety improvements. Input from the public and affected Council 01/2019 06/2020 20 30 53 24 Components (17-18 Carryover) (Council Districts 1, 10) Office(s) will be used to determine specific safety improvements.

Complete Street Project involving 12.4 lane miles of street reconstruction, 4.9 lane Complete Streets Sepulveda from Nordhoff to Rinaldi Sepulveda from Nordhoff to Rinaldi Los Angeles Los Angeles miles of resurfacing, and safety improvements. Input from the public and affected 01/2019 06/2020 20 30 39, 46 18 Components (17-18 Carryover) (Council District 7) Council Office(s) will be used to determine specific safety improvements.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Complete Street Project involving 1.0 lane mile of street reconstruction, 0.4 lane miles Complete Streets 7th from Figueroa to Alameda (17- 7th from Figueroa to Alameda Los Angeles Los Angeles of resurfacing, and safety improvements. Input from the public and affected Council 01/2019 06/2020 20 30 53 24, 30 Components 18 Carryover) (Council District 14) Office(s) will be used to determine specific safety improvements.

Complete Street Project involving 3.5 lane miles of street reconstruction, 4.6 lane miles Complete Streets Western from Century to Western from Century to Washington Los Angeles Los Angeles of resurfacing, and safety improvements. Input from the public and affected Council 01/2019 06/2020 20 30 53, 59, 62 24, 30 Components Washington (17-18 Carryover) (Council Districts 8, 10) Office(s) will be used to determine specific safety improvements.

The project will construct a bulkhead type retaining wall with new steel piles and precast Davies Way (2044) Bulkhead (17-18 concrete lagging to restore lateral support to the roadway and provide for pedestrian Los Angeles Los Angeles Safety 2044 Davies Way 02/2018 08/2018 20 30 50 26 Ongoing) safety. SB1 will provide $200,000, Measure M will provide $516,250 and the City General Fund will provide $42,000 This project will repair the roadway bed and sidewalks along Tujunga, Strathern and Fair Tujunga/Strathern/Fair Streets. Los Angeles Los Angeles Safety Street/Sidewalk Project (17-18 Tujunga Ave. , Strathern St. and Fair St. 01/2020 06/2021 20 30 39 18, 25 $300,000 from SB1 is provided to start the project. The actual costs of the project and Ongoing) remaining funding have yet to be identified.

This project will implement streetscape improvements along Ventura Boulevard Re-lmagine Ventura Blvd between Royer and Sale Avenue. Improvements to parking, roadway capacity, Complete Streets Los Angeles Los Angeles Streetscape Improvements (17-18 walkability, bicycle infrastructure, driveway accessibility (turn restrictions), and Ventura Bl, between Royer and Sale Ave. 01/2020 01/2021 20 30 45 27 Components Ongoing) aesthetics are being considered. $500,000 is provided from SB1 to begin the project. Actual costs of the project and remaining funding have yet to be identified.

This project will restore lateral support to public street by extending a bulkhead approximately 120 linear feet, adjacent to a 70 foot wide landslide. Construction includes street repair, extension of metal-beam guardrail and curb. The beam size for Castellammare (17434) (17-18 Los Angeles Los Angeles Safety the bulkhead is W36x193 and 60-ft deep. $771,000 is provided by Measure M. West LA, Council District 11 04/2018 12/2018 20 30 62 26 Ongoing) $800,000 is provided by SB1.

To design and construct pedestrian and safety enhancements intended to increase the use of public transportation and create a link to the Metro Expo LRT Station at Western Ave and Exposition Blvd. This project includes: 64 street trees, 5 bus shelters, 21 bus safety lighting, 22 ADA curb rams, 8 crosswalk enhancements, replacing all parkways Complete Streets Western Avenue Expo Line Station with full with sidewalks and bringing 45,952 sf of sidewalks and 7,477 sf of driveways Los Angeles Los Angeles Council District 8, Western Ave between Exposition Blvd and MLK Jr. Blvd. 08/2018 12/2019 20 30 59 30 Components Linkage Project (17-18 Ongoing) up to code. Western Ave is a priority corridor in Council District 8's economic development strategy. $181,000 is provided by SB1, $751,900 is provided by Measure M, $858,071 is provided by Metro, and $1,100 is provided by the Public Works Trust Fund. 39, 43, 45, 46, 50, Citywide - in the Valley, West LA, South LA, East LA and the Central City. Specific locations have yet 18, 24, 25, 26, 27, Los Angeles Los Angeles Safety Vision Zero - Phase 3 Road Safety Improvements 07/2018 06/2019 10 15 51, 53, 54, 59, 62, to be finalized. Locations will be selected based upon priority need and resources throughout the year. 30 64 39, 43, 45, 46, 50, Vision Zero Traffic Signals (17-18 Citywide - in the Valley, West LA, South LA, East LA and the Central City. Specific locations have yet 18, 24, 25, 26, 27, Los Angeles Los Angeles Traffic Control Devices Traffic Signals to Promote Roadway Safety 07/2018 06/2019 15 20 51, 53, 54, 59, 62, Ongoing) to be finalized. Locations will be selected based upon priority need and resources throughout the year. 30 64

Tunnel and Roadway Safety: Scope of work includes ventilation fan system, Sepulveda Blvd Tunnel Cleaning West LA, Council District 11, Sepulveda Blvd beneath and adjacent to runways at LAX between 105 Los Angeles Los Angeles Safety uninterrupted power supply system, carbon monoxide sensor calibration, remote 01/2019 06/2019 1 2 62 26 and Maintenance Freeway and Century Blvd monitoring system, sump pump maintenance, and fire life alarm system training.

Tunnel and Roadway Safety: Perform cleaning of the existing tunnel walls quarterly (remove graffiti and accumulated grime) using existing contractual services. Scope of Sherman Way Tunnel Cleaning and Los Angeles Los Angeles Safety work includes the existing water sump pumping system, ventilation system and San Fernando Valley, Council District 6, Sherman Way between Valjean Ave & Hayvenhurst Ave 01/2019 06/2019 1 2 46 18 Maintenance electrical switchgear maintenance, carbon monoxide sensor calibration, and remote monitoring system maintenance. Tunnel and Roadway Safety: Perform cleaning of the existing tunnel walls quarterly 2nd Street Tunnel Cleaning and (remove graffiti and accumulated grime) using existing contractual services. Additional Los Angeles Los Angeles Safety Downtown LA, Council District 1, 2nd Street between Figueroa St & Beaudry Ave 01/2019 06/2019 1 2 53 24 Maintenance maintenance work to complement recent replacement of four ventilation fans and installation of Carbon Monoxide sensors. Tunnel and Roadway Safety: Perform cleaning of the existing tunnel walls quarterly (remove graffiti and accumulated grime) using existing contractual services. Additional 3rd Street Tunnel Cleaning and Los Angeles Los Angeles Safety work to complement recent upgrades to ventilation system by providing regular Downtown LA, Council District 1, 3rd Street between Figueroa St & Beaudry Ave 01/2019 06/2019 1 2 53 24 Maintenance maintenance and service to Carbon Monoxide sensors, the ventilation system, and other electrical components.

Tunnel and Underpass lighting This project will convert existing high intensity discharge lamps to LED's at Existing tunnels and underpasses in the Valley, West LA, South LA, East LA and the Central City. 39, 43, 45, 46, 50, 18, 24, 25, 26, 27, Los Angeles Los Angeles Safety Improvement Program (TULIP) (17- approximately 100 tunnels and underpasses within the City. The new lighting will Specific locations have yet to be finalized. Locations will be selected based upon priority need and 10/2017 06/2019 15 15 51, 53, 54, 59, 62, 30 18 Ongoing) improve visibility and safety for motorists and pedestrians while reducing energy use. resources throughout the year. 64

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts This project repairs an unstable cut slope by constructing approximately 200 Road Maintenance & Sunset Bl. Phase 1, Class 3 linear feet of shotcrete wall with soil-nail anchors. Los Angeles Los Angeles Council District 13: Sunset Blvd, Coronado Ter to Waterloo St 01/2018 06/2019 20 30 51 24 Rehabilitation Remedial Slope (17-18 Ongoing) $410,000 is funded by SB1, $785,489 is funded by Measure M Local Return Fund, and $1,223,349 is funded by Gas Tax. Replace existing high voltage series street lighting system with a low voltage system Lower Grand Tunnel Lighting Approximately 170 fixtures will be replaced with new LED fixtures. This project will Los Angeles Los Angeles Safety Council District 14: Grand Ave, 4th St. to General Thaddeus Kosciuzkow Way 01/2018 06/2019 15 20 53 30 Improvement (17-18 Ongoing) result in a more reliable system that will raise lighting levels to increase visibility and reduce energy use and to improve safety. Rehabilitation of street pavement. Removal and reconstruction of PCC concrete Road Maintenance & Lynwood Los Angeles Wright Road driveway, PCC sidewalk, PCC curb ramp, and 6" PCC curb and gutter. Includes traffic Wright Road from Fernwood Avenue to Duncan Avenue 09/2018 02/2019 20 30 63 33 Rehabilitation striping and markings, adjustment of manhole cover to grade, etc.

Major maintenance to be performed on the following streets: Paseo Portola Street, Rambla Orienta Road Maintenance & This project consists of the reconstruction and maintenance of approximately 686,106 Malibu Los Angeles 17/18 Annual Street Maintenance Street, Paseo Hidalgo Street, Calle Del Barco, and Seaboard Road. Minor maintenance to be 07/2018 10/2018 10 20 50 27 Rehabilitation square feet of City Streets. performed in the Carbon Canyon, Las Flores and Big Rock neighborhoods.

Major maintenance to be performed on Morning View Drive, Boniface Drive, and Portshead Road. Road Maintenance & This project consists of the reconstruction and maintenance of approximately 374,854 Malibu Los Angeles 18/19 Annual Street Maintenance Minor maintenance to be performed on Cliffside Drive, Greenwater Road, Selfridge Drive, and Bison 03/2019 06/2019 10 20 50 27 Rehabilitation square feet of City streets. Court. Marine Avenue from Sepulveda Road Maintenance & Resurfacing asphalt pavement utilizing cold-in-place recycling, capping roadway with Manhattan Beach Los Angeles Boulevard to Aviation Blvd Street Marine Avenue between Sepulveda Boulevard and Aviation Boulevard in Manhattan Beach 11/2018 04/2019 20 25 66 26 Rehabilitation hot mix rubberized asphalt and curb ramp upgrades at street intersections. Resurfacing Road Maintenance & Maywood Los Angeles Slauson Avenue Improvement Grind and Overlay. Slauson Avenue from Atlantic Boulevard to the east City border. 06/2018 07/2018 10 20 63 33 Rehabilitation

This project involves developing an inventory of current Traffic Signal Devices and 39 Signalized Intersections that are owned and maintained by the City of Monrovia. A complete list is Monrovia Los Angeles Traffic Control Devices Traffic Signal Master Plan determining the condition of the assets with recommended repairs and necessary attached and they are primarily located along the major thoroughfares including: Duarte Road, Foothill 07/2018 03/2019 5 5 41 25 upgrades. Boulevard, Huntington Drive, Mountain Avenue, Myrtle Avenue, and Royal Oaks Drive.

S/E Section: 26 Streets bound by: Colorado Blvd to the North, I-210 to the South, Myrtle Ave to the This project involves the replacement of Traffic Markings throughout the City as West and the Easterly City Limit. N/W Section: 24 Streets bound by: Colorado Blvd to the South, Monrovia Los Angeles Safety Roadway Striping Improvements 07/2018 09/2018 1 2 41 25 needed. Hillcrest Blvd to the North, Myrtle Ave to the East, and the Westerly City Limit. Crosswalk and Legend Striping at +/- 50 Crosswalks throuhgout the City. Foothill Blvd Traffic Sign Monrovia Los Angeles Safety This project involves upgrades/replacement of all traffic signs along Foothill Blvd. The project is located along Foothill Blvd., from the west City limit (5th Ave.) to Mountain Ave. 07/2017 07/2018 15 15 41 25 Replacement Road Maintenance & The project involves maintenance activities to the bridges within the City, including There are three bridges within this program and they include: Duarte Road over Sawpit Wash, E. Monrovia Los Angeles National Bridge Repairs 07/2018 06/2019 3 5 41 25 Rehabilitation resurfacing and deck treating improvements. Evergreen Avenue over Sawpit Wash, and Duarte Road over Santa Anita Wash Huntington Drive Traffic Sign Monrovia Los Angeles Traffic Control Devices This project involves upgrades/replacement of all traffic signs along Huntington Drive. Along Huntington Drive from the west City limit (5th Ave) to Mountain Avenue. 03/2019 06/2019 5 15 41 25 Replacement This project involves the removal of trash from storm water catch basins that invert Road Maintenance & Cleaning of Storm Drain Trash Approximately 500 catch basins that are owned either by the City of Monrovia or the County of Los Monrovia Los Angeles along City roadways. There are approximately 500 catch basins that would be cleaned 07/2018 06/2019 1 1 41 25 Rehabilitation Screens Angeles and are located throughout the City. A complete map has been provided for review. as part of this project.

Huntington Drive Phase II is a pavement rehabilitation and traffic signal improvement Road Maintenance & Monrovia Los Angeles Huntington Drive Phase II Project project funded through STPL Funds. This specific expense is for the City's share of The project location is Huntington Drive between Magnolia Ave. and Shamrock Ave. 02/2019 06/2019 5 15 41 25 Rehabilitation inspection and project management costs. Total Project Estimate is $2,000,000

The Highway Safety Improvement Program (HSIP) is a project that aims at adding additional traffic signals, roadway striping, and traffic signage to enhance pedestrian The project impacts three identified intersections within the City: (1) Monrovia Los Angeles Safety HSIP Project 01/2019 06/2019 5 25 41 25 safety. This specific expense is for the City's share of inspection and project Foothill/California; (2) Foothill/Sunset; and (3) Huntington/5th. management costs. Project estimate is $750,000.

Road Maintenance & Beach Street (Street Improvement Preliminary engineering/design, construction management, inspection services related Montebello Los Angeles Beach Street from 3rd Street to Vail Avenue (City of Montebello) 09/2018 11/2018 15 20 58 32 Rehabilitation #1 - Pre-Construction) to this street improvement project (street pavement, sidewalks, etc).

The City will conduct the preliminary engineering, design, construction management and inspection services for Montebello Blvd ATP Project (Lincoln to Paramount) which Complete Streets Montebello Blvd ATP Project - will include dedicated bike lanes and pedestrian improvements (sidewalks, crosswalks Montebello Los Angeles Montebello Blvd ATP Project (Lincoln to Paramount) 07/2018 12/2018 15 20 58 32 Components Design (17/18 Ongoing) and lighting), pavement repairs, new drought-tolerant landscaped median and trees that will allow for storm water capturing, bus stop improvements, and many other complete and green street features.

Construction and repairs of deteriorated asphalt pavement, damaged concrete Road Maintenance & Beach Street (Street Improvement Beach Street from 3rd Street to Vail Montebello Los Angeles (sidewalks, driveways, ADA ramps, curb & gutter, pavement markings, signage, traffic 02/2019 05/2019 15 20 58 32 Rehabilitation #2 - Construction) Avenue (City of Montebello) signal improvements, parkway trees, etc.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Chandler Ave - Newmark Ave to Graves Ave, Crest Vista Dr - Wandering St to Crest Way (17/18 Carryover), De la Fuente St - Cadiz St to Harding Ave (17/18 Carryover), Fulton Ave - Kempton Ave (N) to Kempton Ave (S) (17/18 Carryover), Keller St - Kempton Ave to Fulton Ave (17/18 Carryover), Cold mill asphalt concrete pavement and construct Mabel Ave - Marguerita Ave to Atlantic Ave (17/18 Carryover), Marguerita Ave - Garvey Ave to Road Maintenance & rubberized asphalt concrete overlay on various local Monterey Park Los Angeles Various Street Resurfacing Newmark Ave (17/18 Carryover), McPherrin Ave - Hellman Ave to Emerson Ave (17/18 Carryover), 12/2018 06/2019 15 20 49 22 Rehabilitation streets. Work includes but is not limited to grind, McPherrin Ave - Newmark Ave to Graves Ave, Mooney Dr - Orange Ave to East City Limit (17/18 overlay, and replacement of curb ramps. Carryover), Moore Ave - Newmark Ave to Harding Ave (17/18 Carryover), Schoolside Ave - Cesar Chavez Ave to 1st St, Vancouver Ave - Floral Dr to Cesar Chavez Ave, Wilcox Ave - El Repetto Dr to Keller St (17/18 Carryover), Wilcox Ave - Pomona Dr to Aldergate St (17/18 Carryover)

400 miles of sidewalks and curb & gutter; 187 miles of asphalt patching and pothole repair; Road Maintenance & Norwalk Los Angeles Local Streets Cycle 2 Local Street Pavement Rehabilitation maintenance of alleys, City owned lots, commercial sidewalks, cul-de-sacs, culverts, drain and 01/2019 09/2019 10 15 57, 58 32 Rehabilitation drainage channels, dead-ends, hillsides, parkways, and slot flows 400 miles of sidewalks and curb & gutter; 187 miles of asphalt patching and pothole repair; Road Maintenance & Norwalk Los Angeles Local Streets Cycle 2 rehab local streets maintenance of alleys, City owned lots, commercial sidewalks, cul-de-sacs, culverts, drain and 01/2019 09/2019 10 15 57, 58 32 Rehabilitation drainage channels, dead-ends, hillsides, parkways, and slot flows

Road Maintenance & Avenue R Reconstruction and Design and construction of Avenue R from 5th East to Tierra Subida, approximately Palmdale Los Angeles Avenue R from 5th Street East to Tierra Subida Avenue 08/2018 08/2019 10 20 36 21 Rehabilitation Overlay (5th East to Tierra Subida 420,000 square feet of roadway

Road Maintenance & Avenue R-8 Reconstruction and Design and construction of Avenue R-8 from 30th East to 40th East to provide Palmdale Los Angeles Avenue R-8 from 30th East to 40th East 09/2018 09/2019 10 20 36 21 Rehabilitation Overlay (30th East to 40th East) reconstruction and overlay, approximately, 316,000 square feet

Road Maintenance & 30th Street West Overlay (Rancho Overlay of 30th Street West from Rancho Vista Blvd to Avenue P-8/Highland Avenue to Palmdale Los Angeles 30th Street West from Rancho Vista Blvd to 25th West 06/2019 09/2019 10 20 36 21 Rehabilitation Vista Blvd to P-8/Highland Avenue) 25th Street West approximately 316,000 square feet

Division Street & Rancho Vista Palmdale Los Angeles Safety Design and construction of a traffic signal at Division Street and Rancho Vista Blvd. Intersection of Division Street and Rancho Vista Blvd. 01/2019 12/2019 15 30 36 21 Blvd. Traffic Signal

Neighborhood 1 - Rancho Vista Blvd to the southwest, Towncenter Dr to the northwest, and the tract boundary to the east Neighborhood 2 - bounded by tract boundaries to the west, Avenue R-4 to the north, Avenue R-8 to the south, and 25th St East to the east Neighborhood 3 - bounded by tract boundaries to the west, Avenue R-4 to the north, Avenue R-8 to the south, and 25th St East to the east Neighborhood 4 - bounded by Division St to the east, tract boundary to the north, south, and west Road Maintenance & 2018-19 Cape Seal/Slurry 2018-19 Cape Seal/Slurry Seal Resurfacing Program. A total of 2,180,000 square feet Neighborhood 5 - bounded by Division St to the west & south, tract boundary n/o East Avenue R-2 to Palmdale Los Angeles 04/2019 10/2019 5 8 36 31 Rehabilitation Resurfacing Program split into 8 different neighborhoods. the north, 3rd St East and Kimberly Ln to the east Neighborhood 6 - Bounded by a tract boundary n/o East Avenue R-4 to the north, 5th St East to the east, 3rd St East / Kimberly Ln to the west, and East Avenue R-8 to the south Neighborhood 7 - bound by 20th St East to the west, Avenue R-4 to the north, Avenue R-8 to the south, and tract boundary to the east(possibly include Avenue R-4 cape seal from 20th St East to 25th St East Neighborhood 8 - bounded by Avenue R to the north, 45th St East to the west, 47th St East to the east, and a tract boundary s/o Avenue R-8 to the south

25th St East, from Avenue S to Palmdale Blvd Road Maintenance & 2018-19 Overlay Resurfacing 35th St East, from Avenue S south to Desert Oak Dr (rr trax) Palmdale Los Angeles 2018-19 Overlay Resurfacing Program 06/2019 10/2019 10 20 36 21 Rehabilitation Program East Avenue Q-8, from 5th St West to Wakefield Pl Bolz Ranch Rd, from Avenue N-8 to Towncenter

Neighborhood 1 - bounded by Peonza Lane to Towncenter/ Concina Lane to Portola Drive., Neighborhood 2 - bounded by TownCenter to Avenue O-8/Heathrow Drive to Vicker Way, Road Maintenance & 2017/18 Cape Seal & Slurry Seal 2017/18 Cape Seal & Slurry Seal project throughout the City of Palmdale. 3,626,000 Palmdale Los Angeles Neighborhood 3 - bounded by Kimberly Lan to Larchwood Drive/Ave R-8 to Ave R-12, Neighborhood 4 04/2018 09/2018 5 8 36 21 Rehabilitation (Ongoing) square feet of cape seal and 900,000 square feet of slurry. - bounded by 20th East to 25th East/Ave R-8 to Ave S, Neighborhood 5 - bounded by Ave R to Ave R- 8/47th East to 55th East, Neighborhood 6 - Palmdale Blvd to Monaco Lane/50th East to 55th East

FY 2017-2018 ROAD REPAIR AND Road Maintenance & This project consists of resurfacing a portion of Palos Verdes Drive West and will Palos Verdes Estates Los Angeles ACCOUNTABILITY ACT OF 2017 Both sides of Palos Verdes Drive West (between Via Coronel/Cloyden to the South City Limit). 08/2018 09/2018 10 20 66 26 Rehabilitation include the replacement of damaged or curb, gutter, sidewalks and curb ramps. (SB1)

San Juan St. - Orange Ave. to El Camino Ave. (carryover 2017-18, est. completion 9/18), San Miguel St. - (carryover 2017-18, est. completion 9/18), El Camino Ave. - San Carlos St. to Somerset Blvd. (carryover 2017-18, est. completion 9/18), San Juan St. - El Camino Ave. to Dills Pk., San Miguel St. - Road Maintenance & Neighborhood Street Resurfacing El Camino Ave. to Dills Pk., San Vicente St. - Orange Ave. to Dills Pk., San Mateo Ave. - San Marino Paramount Los Angeles Grind and resurface with Rubberizes Asphalt 02/2019 06/2019 20 25 63 33 Rehabilitation FY19 St. to Dills Pk., San Marcus St. - San Marino St. to Dills Pk., San Luis St. - San Marino St. to San Vicente St. , San Antonio Ave. - San Luis St. to San Vicente St., San Jose St. - San Luis St. to San Vicente St. , Marcelle St. - Ansmith Ave. to Gundry Ave., Motz St. - Hunsaker Ave. to Gundry Ave., Ansmith Ave. - 72nd St. to Motz St., Gundry Ave. - Jackson St. to Alondra Blvd.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

This project will resurface 1.7 miles of City of Pasadena streets utilizing rubberized Cypress Avenue from Cypress Way to Blake Street; Elizabeth Street from El Molino Avenue to asphalt. This method is a noise reducing pavement material that consists of regular Catalina Avenue; Gordon Terrace from Waverly Street to Bellevue Avenue; Grandview Street from asphalt concrete mixed with crumb rubber made from recycled tires. This sustainable Road Maintenance & Resurfacing and Slurry Seal FY Raymond Avenue to Garfield Avenue; Las Lunas Street from Palo Verde Avenue to Sinaloa Avenue; Pasadena Los Angeles paving practice diverts tires from the waste stream. The project has the capacity to 06/2018 03/2019 15 15 41 25 Rehabilitation 2017 - 2019 Pine Bluff Drive from Riviera Circle to Riviera Drive; Sierra Bonita Lane from Sierra Bonita lane to divert over 5,800 tires from landfills, while also reducing noise, resisting cracking, East End; Sunnyslope Avenue from Paloma Street to Hermanos Street; Verde Street from Oak lasting longer, providing better skid resistance, retaining a dark color longer, and Avenue to Craig Avenue. providing contrast to pavement markings.

Traffic Signal at Garfield Avenue This project provides for the installation of a traffic signal at the intersection of Garfield Pasadena Los Angeles Traffic Control Devices Intersection of Garfield Avenue and Washington Boulevard 12/2018 05/2019 30 30 41 25 and Washington Boulevard Avenue and Washington Boulevard.

This project will resurface 3.4 miles of City of Pasadena streets utilizing rubberized Adler Lane from Riviera Drive to Hastings Ranch Drive; Arroyo Boulevard from California Boulevard to asphalt. This method is a noise reducing pavement material that consists of regular Grand Avenue; Brigden Road from Allen Avenue to Altadena Drive; Claremont Street from Raymond asphalt concrete mixed with crumb rubber made from recycled tires. This sustainable Road Maintenance & Annual Citywide Street and ADA Avenue to Garfield Avenue; Cliff Drive from Greenhill Road to Rim Road; Greenhill Road from Pasadena Los Angeles paving practice diverts tires from the waste 03/2019 08/2019 15 15 41 25 Rehabilitation Improvement Program Hastings Ranch Drive to Michillinda Avenue; Oakland Avenue from Del Mar Avenue to California stream. The project has the capacity to divert over 11,600 tires from landfills, while also Boulevard; Paloma Street from Hill Avenue to Allen Avenue; and Paloma Street from Craig Avenue to reducing noise, resisting cracking, lasting longer, providing better skid Canyon Wash Drive. resistance, retaining a dark color longer, and providing contrast to pavement markings.

Telegraph Road Traffic Througthput Road Maintenance & Telegraph Road from Passons Boulevard to East City Limit and Telegraph Road from Manzanar Pico Rivera Los Angeles and Safety Enhancement Project - Grind and Overlay Project 06/2018 06/2019 10 20 58 32 Rehabilitation Avenue to West City Limit Phase II (17/18 Carryover)

Arroyo Avenue (Fairplex Drive to Dudley Street), Twelfth Street (Hamilton Blvd to Park Ave), Franklin Ave (Palomares St to Towne Ave), Columbia Avenue (Washington Ave to Sheridan Ave), Alvarado Road Maintenance & Street Preservation - Local Citywide Street preservation of local streets Citywide , according to pavement management Street (Loranne Ave to Sheridan Ave), Grand Avenue (Butterfield Rd to Dudley St), Palmer Street Pomona Los Angeles 04/2019 12/2019 2 20 52 20 Rehabilitation (FY18-19) program, focused primarily on slurry seals, cape seals, and thin overlays. (Butterfield Rd to Dudley St), Mc Comas Street (Butterfield Rd to Dudley St), Canyon Way ( Hillcrest Dr to El Paraiso Dr), Canyon Way (Hillcrest Dr to Hillcrest Dr), La Verne Avenue (Los Flores St to Mountain Ave) Citywide- All Streets: Citywide - All City Streets:Abbey Lane, Abbot Street, Acacia Street, Academy Avenue, Adobe Lane, Adams Street, Airshire Lane, Alameda Street, Albert Avenue, Albona Place, Alcott Avenue, Alldama Avenue, Alder Street, Alderberry Lane, Aldis Street, Alicante Street, Alicia Court, Aliso Street, Alpline Street, Alta Drive, Alta Mira Place, AltaVista Drive, Altura Court, Alvarado Street,Amer Oaks Court, Amberson Street, American Avenue, Anderwood Court, Angela Street, Ann Arbor Avenue, Annandale Way, Anne Place, Appian Way, Appleton Way, Aralia Drive, Arboleda Way, Arbor Way, Arcana Court, Archwood Drive, Armour Street, Arrow Highway, Arroyo Avenue, Arroyo Drive, Arroyo Park Drive, Artesia Street, Arthur Avenue, Aruba Court, Asbury Avenue, Ashbrook Lane, Ashfield Avenue, Ashport Street, Aspen Lane, Aston Avenue. Atlantic AStreet, Augusta Street, Auto Center Drive, Avalon Avenue, Avenidas Rancheros, Azalea Drive, Bainbridge Street, Balboa Street, Baldwin Avenue, Baldy View, Ballerina Place, Balsam Drive, Bangor Street, Barbara Lane, Barclay Court, Bardley Court, Barjud Avenue, Barhill Avenue, Barry Avenue, Battram Street, Baudin Street, Bayport Court, Baywood Avenue, Bear Valley Road, Beaver Court, Beckford Way, Beechnut Place, Belfort Avenue, Belinda Avenue, Bella Vista Way, Bellevue Avenue, Benedict Way, Berkeley Avenue, Berkshire Way, Berrian Street, Biarritz, Biscay Way, Blackbird Lane, Blacksmith Court, Black Oak Drive, Blakely Court, Bluegrass Place, Blueridge Lane, Blueridge Drive, Bluff Point Court, Bobolink Way, Bolivar Street, Bonanza Court, Bonita Avenue, Bonnie Brae Street, Boston Place, Bougainvilla Avenue, Boyd Place, Bradford Street, Brea Place, Brea Canyon Road, Brentwood Street, Breon Street, Brewster Drive, Briarwood Lane, Brookmont Lane, Brookside Lane, Brookwin Drive, Brownfield Road Maintenance & Contracted Asphalt and Concrete On-call as-needed asphalt, and concrete repairs for streets, sidewalks, curb and Lane, Browning Avenue, Buchanan Drive, Buena Vista Avenue, Buffington Street, Burdick Drive, Pomona Los Angeles 07/2018 07/2018 2 10 52 20 Rehabilitation Repair Services gutters) Burlington Place, Burma Court, Butterfield Road, Byron Court, Cadillac Drive, Catalina Drive, California Place, Calle De Cabos, Calle De Oro, Calle De Rodeo, Calle Del Mar, Calle Del Rey, CAlle Del Sol, Calle Las Palmas, Calpine Court, Cambrin Road, Camellia Court, Cameo Court, Cameron Avenue, Camerota Avenue, Camino Del Milagro, Camphor Place, Canfield Avenue, South Campus Drive, Canoga Place, Canyon Oak Circle, Canyon Rim Road, Canyon Way, Cantara Street, Canterbury Avenue, Capper Avenue, Caprino Way, Cardiff Court, Carlton Avenue, Carmanita Avenue, Carmel Court, Carnegie Avenue, Carrione Court, Carol Drive, Carrotwood Lane, Carolann Street, Carriage Way, Carruthers Court, Carson Lane, Cary Lane, Casa Hermosa Drive, Casa Vista Drive, Caslon Court, Castera Place, Castle Place, Caswell Avenue, Caswell Street Catalpa Place Catalina Drive, Cathedral Way, Cathy Avenue, Cedarwood Drive, Celia Street, Center Street, Chadwick Court, Chanslor Street, Chaparral Drive, Charles Way, Chelsa Drive, Cherry Way, Chester Place, Chestnut place, Christina Court, Cimarron Place, Cinderella Way, Cindy Court, Citron Place, Citrus Place, Claire Place, Claremont Place, Clark Avenue, Cleveland Street, Cleveland Place, Cloverdale Drive, Clovis Court, Club Drive, Cobre Court, Colfax Court, Cobblestone Lane, College Avenue, Collingwood Drive, Colmar Street, Colony Drive, Columbia Avenue, Comanche Circle, Commercial Street, Como Drive, Concord Avenue, Copper Canyon Circle, Cordova Street, Corinthian Way, Cornelia Street, Corporate Center Drive, Cottontail Drive, Cottonwood Place, Country Mile Road, Country Ridge Road, Country Wood Drive, County Road, Cove Crest Way, Crabapple Drive, Crest Way, Cresthaven Lane, Cresthaven Way, Crest View Place, Crimson Way, Cromwell Street, Crystal Place, Culver Court, Curran Place, Currier Street, Curtis Court, Cynthia Street, Cypress Street, Dalton Court, Darby

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

1. Albona Place 2. Alvarado Park Avenue (small median in the center of the street, 3. Arrow Highway (between Fulton Road and eastern Pomona City limits), 4. Arrow Highway (between Orange Grove Avenue and Mountain Avenue, 5. Berkshire Street (Garey Avenue/Queen Anne and Berkshire), 6. Burdick Street and White Avenue (northwest corner by the off-ramp), 7. Dudley Hansen Edison (between Ninth Street and Phillips Drive), 8. Fairplex Drive and Holt Avenue (northwest section), 9. Fourth Street (between Park Avenue and Main Street), 10. Garey Avenue (between Harrison Street and Bonita Avenue), 11. Garey Avenue (between SR71 and Ninth Street), 12. Holt Avenue (between Mission Blvd and Pomona Blvd.), 13. Huntington Boulevard (between Holt Avenue and Burdick Drive), Routine maintenance including mowing, weed control, pest control, irrigation, debris, 14. Mission Boulevard (between East End Ave and Pomona City Limits), 15. Mission Boulevard trash removal, maintenance and trimming of trees, shrubs and ground covers within the (between Human Way and Dudley Street), 16. Mission Boulevard (Mission Boulevard and Curran Road Maintenance & Annual Roadway Landscape Safety Pomona Los Angeles right-of-way. This maintenance as is defined as the preservation and upkeep of a Place), 17. Mission Boulevard (Temple Avenue to Humane Way), 18. Mission 71 (Butterfield Street to 07/2018 07/2018 1 2 52 20 Rehabilitation Maintenance street or road construction condition, and the operation of a street or road facility and its Brea Canyon Road), 19. Murchison Street (Dudley Street to dead end -westbound), 20. Producer Way, integral services to provide safe, convenient and economical highway transportation. 21. San Bernardino Avenue (between Bonnie Brae Street and Baldy View Avenue), 22. Temple Avenue (between Mission Blvd. and Valley Blvd.), 23. Towne Avenue (between County Road and Riverside Drive), 24. Towne Avenue/San Antonio Street Median, 25. University Corporate Center (between 57/71 Freeway sand South Campus Drive), 26, Fairplex Drive (between Holt Ave. and McKinley), 27. Holt Avenue (between Indian Hill Blvd. and Pomona City Limits), 28. Holt Avenue Median (east and west of Fairplex Drive), 29. Rio Rancho Road/Auto Center Drive Rancho Valley Drive/Access Road/Lexington Ave, 30. Rio Rancho Road )Garey Avenue to SR71, 31. Towne Avenue(between San Bernardino Freeway and Foothill Boulevard), 32. White Avenue (between San Bernardino Freeway and La Verne City Limits, 33. Garey Avenue (Aliso to Foothill Blvd)

Citywide- All Streets: Citywide - All City Streets:Abbey Lane, Abbot Street, Acacia Street, Academy Avenue, Adobe Lane, Adams Street, Airshire Lane, Alameda Street, Albert Avenue, Albona Place, Alcott Avenue, Alldama Avenue, Alder Street, Alderberry Lane, Aldis Street, Alicante Street, Alicia Court, Aliso Street, Alpline Street, Alta Drive, Alta Mira Place, AltaVista Drive, Altura Court, Alvarado Street,Amer Oaks Court, Amberson Street, American Avenue, Anderwood Court, Angela Street, Ann Arbor Avenue, Annandale Way, Anne Place, Appian Way, Appleton Way, Aralia Drive, Arboleda Way, Arbor Way, Arcana Court, Archwood Drive, Armour Street, Arrow Highway, Arroyo Avenue, Arroyo Drive, Arroyo Park Drive, Artesia Street, Arthur Avenue, Aruba Court, Asbury Avenue, Ashbrook Lane, Ashfield Avenue, Ashport Street, Aspen Lane, Aston Avenue. Atlantic AStreet, Augusta Street, Auto Center Drive, Avalon Avenue, Avenidas Rancheros, Azalea Drive, Bainbridge Street, Balboa Street, Baldwin Avenue, Baldy View, Ballerina Place, Balsam Drive, Bangor Street, Barbara Lane, Barclay Court, Bardley Court, Barjud Avenue, Barhill Avenue, Barry Avenue, Battram Street, Baudin Street, Bayport Court, Baywood Avenue, Bear Valley Road, Beaver Court, Beckford Way, Beechnut Place, Belfort Avenue, Belinda Avenue, Bella Vista Way, Bellevue Avenue, Benedict Way, Berkeley Avenue, Berkshire Way, Berrian Street, Biarritz, Biscay Way, Blackbird Lane, Blacksmith Court, Black Oak Drive, Blakely Court, Bluegrass Place, Blueridge Lane, Blueridge Drive, Bluff Point Court, Bobolink Way, Bolivar Street, Bonanza Court, Bonita Avenue, Bonnie Brae Street, Boston Place, Bougainvilla Avenue, Boyd Place, Bradford Street, Brea Place, Brea Canyon Road, Brentwood Street, Breon Street, Brewster Drive, Briarwood Lane, Brookmont Lane, Brookside Lane, Brookwin Drive, Brownfield Traffic Signal and Street Light - Inventory compilation of all city-owned lights, traffic signals, street signs and posts to Lane, Browning Avenue, Buchanan Drive, Buena Vista Avenue, Buffington Street, Burdick Drive, Pomona Los Angeles Traffic Control Devices 07/2018 07/2018 1 10 52 20 Asset Managment System integrate into a Geographic Information System to feed into a new work-order system. Burlington Place, Burma Court, Butterfield Road, Byron Court, Cadillac Drive, Catalina Drive, California Place, Calle De Cabos, Calle De Oro, Calle De Rodeo, Calle Del Mar, Calle Del Rey, CAlle Del Sol, Calle Las Palmas, Calpine Court, Cambrin Road, Camellia Court, Cameo Court, Cameron Avenue, Camerota Avenue, Camino Del Milagro, Camphor Place, Canfield Avenue, South Campus Drive, Canoga Place, Canyon Oak Circle, Canyon Rim Road, Canyon Way, Cantara Street, Canterbury Avenue, Capper Avenue, Caprino Way, Cardiff Court, Carlton Avenue, Carmanita Avenue, Carmel Court, Carnegie Avenue, Carrione Court, Carol Drive, Carrotwood Lane, Carolann Street, Carriage Way, Carruthers Court, Carson Lane, Cary Lane, Casa Hermosa Drive, Casa Vista Drive, Caslon Court, Castera Place, Castle Place, Caswell Avenue, Caswell Street Catalpa Place Catalina Drive, Cathedral Way, Cathy Avenue, Cedarwood Drive, Celia Street, Center Street, Chadwick Court, Chanslor Street, Chaparral Drive, Charles Way, Chelsa Drive, Cherry Way, Chester Place, Chestnut place, Christina Court, Cimarron Place, Cinderella Way, Cindy Court, Citron Place, Citrus Place, Claire Place, Claremont Place, Clark Avenue, Cleveland Street, Cleveland Place, Cloverdale Drive, Clovis Court, Club Drive, Cobre Court, Colfax Court, Cobblestone Lane, College Avenue, Collingwood Drive, Colmar Street, Colony Drive, Columbia Avenue, Comanche Circle, Commercial Street, Como Drive, Concord Avenue, Copper Canyon Circle, Cordova Street, Corinthian Way, Cornelia Street, Corporate Center Drive, Cottontail Drive, Cottonwood Place, Country Mile Road, Country Ridge Road, Country Wood Drive, County Road, Cove Crest Way, Crabapple Drive, Crest Way, Cresthaven Lane, Cresthaven Way, Crest View Place, Crimson Way, Cromwell Street, Crystal Place, Culver Court, Curran Place, Currier Street, Curtis Court, Cynthia Street, Cypress Street, Dalton Court, Darby

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Citywide- All Streets: Citywide - All City Streets:Abbey Lane, Abbot Street, Acacia Street, Academy Avenue, Adobe Lane, Adams Street, Airshire Lane, Alameda Street, Albert Avenue, Albona Place, Alcott Avenue, Alldama Avenue, Alder Street, Alderberry Lane, Aldis Street, Alicante Street, Alicia Court, Aliso Street, Alpline Street, Alta Drive, Alta Mira Place, AltaVista Drive, Altura Court, Alvarado Street,Amer Oaks Court, Amberson Street, American Avenue, Anderwood Court, Angela Street, Ann Arbor Avenue, Annandale Way, Anne Place, Appian Way, Appleton Way, Aralia Drive, Arboleda Way, Arbor Way, Arcana Court, Archwood Drive, Armour Street, Arrow Highway, Arroyo Avenue, Arroyo Drive, Arroyo Park Drive, Artesia Street, Arthur Avenue, Aruba Court, Asbury Avenue, Ashbrook Lane, Ashfield Avenue, Ashport Street, Aspen Lane, Aston Avenue. Atlantic AStreet, Augusta Street, Auto Center Drive, Avalon Avenue, Avenidas Rancheros, Azalea Drive, Bainbridge Street, Balboa Street, Baldwin Avenue, Baldy View, Ballerina Place, Balsam Drive, Bangor Street, Barbara Lane, Barclay Court, Bardley Court, Barjud Avenue, Barhill Avenue, Barry Avenue, Battram Street, Baudin Street, Bayport Court, Baywood Avenue, Bear Valley Road, Beaver Court, Beckford Way, Beechnut Place, Belfort Avenue, Belinda Avenue, Bella Vista Way, Bellevue Avenue, Benedict Way, Berkeley Avenue, Berkshire Way, Berrian Street, Biarritz, Biscay Way, Blackbird Lane, Blacksmith Court, Black Oak Drive, Blakely Court, Bluegrass Place, Blueridge Lane, Blueridge Drive, Bluff Point Court, Bobolink Way, Bolivar Street, Bonanza Court, Bonita Avenue, Bonnie Brae Street, Boston Place, Bougainvilla Avenue, Boyd Place, Bradford Street, Brea Place, Brea Canyon Road, Brentwood Street, Breon Partial salaries to be used towards the increase of staff dedicated to perform work on Street, Brewster Drive, Briarwood Lane, Brookmont Lane, Brookside Lane, Brookwin Drive, Brownfield the advancement of and compliance with RMRA SB-1 relation projects. Work to be Complete Streets SB1 Program Compliance and Lane, Browning Avenue, Buchanan Drive, Buena Vista Avenue, Buffington Street, Burdick Drive, Pomona Los Angeles performed in the following areas for RMRA SB-1 Program Funds: Engineering, Public 07/2018 07/2018 1 10 52 20 Components Project Advancement Workforce Burlington Place, Burma Court, Butterfield Road, Byron Court, Cadillac Drive, Catalina Drive, Works Onsite Inspection, Construction Management, Project Delivery and RMRA SB-1 California Place, Calle De Cabos, Calle De Oro, Calle De Rodeo, Calle Del Mar, Calle Del Rey, CAlle Program Compliance. Del Sol, Calle Las Palmas, Calpine Court, Cambrin Road, Camellia Court, Cameo Court, Cameron Avenue, Camerota Avenue, Camino Del Milagro, Camphor Place, Canfield Avenue, South Campus Drive, Canoga Place, Canyon Oak Circle, Canyon Rim Road, Canyon Way, Cantara Street, Canterbury Avenue, Capper Avenue, Caprino Way, Cardiff Court, Carlton Avenue, Carmanita Avenue, Carmel Court, Carnegie Avenue, Carrione Court, Carol Drive, Carrotwood Lane, Carolann Street, Carriage Way, Carruthers Court, Carson Lane, Cary Lane, Casa Hermosa Drive, Casa Vista Drive, Caslon Court, Castera Place, Castle Place, Caswell Avenue, Caswell Street Catalpa Place Catalina Drive, Cathedral Way, Cathy Avenue, Cedarwood Drive, Celia Street, Center Street, Chadwick Court, Chanslor Street, Chaparral Drive, Charles Way, Chelsa Drive, Cherry Way, Chester Place, Chestnut place, Christina Court, Cimarron Place, Cinderella Way, Cindy Court, Citron Place, Citrus Place, Claire Place, Claremont Place, Clark Avenue, Cleveland Street, Cleveland Place, Cloverdale Drive, Clovis Court, Club Drive, Cobre Court, Colfax Court, Cobblestone Lane, College Avenue, Collingwood Drive, Colmar Street, Colony Drive, Columbia Avenue, Comanche Circle, Commercial Street, Como Drive, Concord Avenue, Copper Canyon Circle, Cordova Street, Corinthian Way, Cornelia Street, Corporate Center Drive, Cottontail Drive, Cottonwood Place, Country Mile Road, Country Ridge Road, Country Wood Drive, County Road, Cove Crest Way, Crabapple Drive, Crest Way, Cresthaven Lane, Cresthaven Way, Crest View Place, Crimson Way, Cromwell Street, Crystal Place, Culver Court, Curran Place, Currier Street, Curtis Court, Cynthia Street, Cypress Street, Dalton Court, Darby 12th Street (Garey Ave to S. Town Ave), 12th Street (Garey Ave to S. Park), 7th Street (S. Hamilton Blvd to S. Buena Vista Ave), Brookwin Drive (End to N. Currier St.), Buena Vista Ave (W. Grand Ave Street Preservation-Local Citywide Street Preservation of local streets Citywide, according to pavement management to W. Phillips Blvd), Butterfield Rd (End to W. Phillips Blvd), Cameron Avenue (Mariposa St to Road Maintenance & Pomona Los Angeles (FY17-18) Project No. 428-68558 program, focused primary on slurry seals, cape seals, and thin overlays. Carry Over Neptune St), Canfield Ave (Mariposa St. to Neptune St.) Neptune St (Canfield Ave -Cul-De-Sac), 10/2018 10/2019 2 12 52 20 Rehabilitation (17/18 Ongoing) from FY 17/18. Dalton Court (Ross St. to End), Densmore Street (Lincoln Ave to Edgehill Drive), Deveron Place (Densmore St to Caprino Way), Caprino Way (Lincoln Ave to Deveron Pl), Surrey Lane ( Glen Ave to End), and Blakely Court (Lorrane Ave to End)

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Citywide- All Streets: Citywide - All City Streets:Abbey Lane, Abbot Street, Acacia Street, Academy Avenue, Adobe Lane, Adams Street, Airshire Lane, Alameda Street, Albert Avenue, Albona Place, Alcott Avenue, Alldama Avenue, Alder Street, Alderberry Lane, Aldis Street, Alicante Street, Alicia Court, Aliso Street, Alpline Street, Alta Drive, Alta Mira Place, AltaVista Drive, Altura Court, Alvarado Street,Amer Oaks Court, Amberson Street, American Avenue, Anderwood Court, Angela Street, Ann Arbor Avenue, Annandale Way, Anne Place, Appian Way, Appleton Way, Aralia Drive, Arboleda Way, Arbor Way, Arcana Court, Archwood Drive, Armour Street, Arrow Highway, Arroyo Avenue, Arroyo Drive, Arroyo Park Drive, Artesia Street, Arthur Avenue, Aruba Court, Asbury Avenue, Ashbrook Lane, Ashfield Avenue, Ashport Street, Aspen Lane, Aston Avenue. Atlantic AStreet, Augusta Street, Auto Center Drive, Avalon Avenue, Avenidas Rancheros, Azalea Drive, Bainbridge Street, Balboa Street, Baldwin Avenue, Baldy View, Ballerina Place, Balsam Drive, Bangor Street, Barbara Lane, Barclay Court, Bardley Court, Barjud Avenue, Barhill Avenue, Barry Avenue, Battram Street, Baudin Street, Bayport Court, Baywood Avenue, Bear Valley Road, Beaver Court, Beckford Way, Beechnut Place, Belfort Avenue, Belinda Avenue, Bella Vista Way, Bellevue Avenue, Benedict Way, Berkeley Avenue, Berkshire Way, Berrian Street, Biarritz, Biscay Way, Blackbird Lane, Blacksmith Court, Black Oak Drive, Blakely Court, Bluegrass Place, Blueridge Lane, Blueridge Drive, Bluff Point Court, Bobolink Way, Bolivar Street, Bonanza Court, Bonita Avenue, Bonnie Brae Street, Boston Place, Bougainvilla Purchase and implementation of a centralized work order tracking system for Avenue, Boyd Place, Bradford Street, Brea Place, Brea Canyon Road, Brentwood Street, Breon maintenance and repair requests, and completion of said work for road, lighting, traffic Street, Brewster Drive, Briarwood Lane, Brookmont Lane, Brookside Lane, Brookwin Drive, Brownfield Centralized Public Works signals and signage, and storm drain system; provide for an overall centralized Lane, Browning Avenue, Buchanan Drive, Buena Vista Avenue, Buffington Street, Burdick Drive, Pomona Los Angeles Other Maintenance Tracking Database 06/2018 07/2019 10 15 52 20 database for efficient tracking of work orders, staff time, materials,etc. (Carry Over from Burlington Place, Burma Court, Butterfield Road, Byron Court, Cadillac Drive, Catalina Drive, (17/18 Carryover) FY 17/18) Request for Proposals to be sent out June/July 2018 - Implementation by California Place, Calle De Cabos, Calle De Oro, Calle De Rodeo, Calle Del Mar, Calle Del Rey, CAlle July 2019. Del Sol, Calle Las Palmas, Calpine Court, Cambrin Road, Camellia Court, Cameo Court, Cameron Avenue, Camerota Avenue, Camino Del Milagro, Camphor Place, Canfield Avenue, South Campus Drive, Canoga Place, Canyon Oak Circle, Canyon Rim Road, Canyon Way, Cantara Street, Canterbury Avenue, Capper Avenue, Caprino Way, Cardiff Court, Carlton Avenue, Carmanita Avenue, Carmel Court, Carnegie Avenue, Carrione Court, Carol Drive, Carrotwood Lane, Carolann Street, Carriage Way, Carruthers Court, Carson Lane, Cary Lane, Casa Hermosa Drive, Casa Vista Drive, Caslon Court, Castera Place, Castle Place, Caswell Avenue, Caswell Street Catalpa Place Catalina Drive, Cathedral Way, Cathy Avenue, Cedarwood Drive, Celia Street, Center Street, Chadwick Court, Chanslor Street, Chaparral Drive, Charles Way, Chelsa Drive, Cherry Way, Chester Place, Chestnut place, Christina Court, Cimarron Place, Cinderella Way, Cindy Court, Citron Place, Citrus Place, Claire Place, Claremont Place, Clark Avenue, Cleveland Street, Cleveland Place, Cloverdale Drive, Clovis Court, Club Drive, Cobre Court, Colfax Court, Cobblestone Lane, College Avenue, Collingwood Drive, Colmar Street, Colony Drive, Columbia Avenue, Comanche Circle, Commercial Street, Como Drive, Concord Avenue, Copper Canyon Circle, Cordova Street, Corinthian Way, Cornelia Street, Corporate Center Drive, Cottontail Drive, Cottonwood Place, Country Mile Road, Country Ridge Road, Country Wood Drive, County Road, Cove Crest Way, Crabapple Drive, Crest Way, Cresthaven Lane, Cresthaven Way, Crest View Place, Crimson Way, Cromwell Street, Crystal Place, Culver Court, Curran Place, Currier Street, Curtis Court, Cynthia Street, Cypress Street, Dalton Court, Darby Complete Streets Hawthorne Boulevard Median The project will remove colored asphalt and replace median with drought-tolerant Rancho Palos Verdes Los Angeles Hawthorne Boulevard - From Crest Road to Crestmont Lane 11/2018 04/2019 18 22 66 26 Components Beautification Project landscaping, with curb and gutter repairs Road Maintenance & Residential Street Rehabilitation The Residential Street Rehabilitation Project will resurface residential streets in The project is citywide but these funds will be used to resurface the residential streets north of 190th Redondo Beach Los Angeles 04/2019 07/2019 15 25 66 26 Rehabilitation Project Redondo Beach. Street in the City. The project will resurface the commercial streets in north Redondo Beach including The project will resurface the commercial streets in north Redondo Beach including Santa Fe, Space Road Maintenance & North Redondo Beach Commercial Redondo Beach Los Angeles Santa Fe, Space Park Drive, and Doolittle. Curbs and gutters will be repaired and Park Drive, and Doolittle. Curbs and gutters will be repaired and replaced as necessary. (Adopted 06/2018 12/2018 20 30 66 26 Rehabilitation Streets replaced as necessary. (Adopted CIP, pg. 22) CIP, pg. 22) This section of Manhattan Beach Boulevard is approximately 1 mile long with a roadway Manhattan Beach Boulevard Road Maintenance & width of 100 feet. This section is classified as a major arterial, carries approximately Manhattan Beach Boulevard runs east-west and is located in north Redondo Beach. The project limits Redondo Beach Los Angeles Resurfacing - Aviation Boulevard to 12/2018 06/2019 20 30 66 26 Rehabilitation 38,000 vehicles daily, and includes a transit route between Aviation Boulevard and are Aviation Boulevard on the west and Inglewood Avenue on the east. Inglewood Avenue Redondo Beach Avenue. Street resurfacing on various city streets, including: Bluemound Road between Willow Wood Road to Dunwood Road, Elmdale Drive between Silver Eagle Road to Kingspine Road, Kingspine Road between Silver Eagle to Bluemound Road between Willow Wood Road to Dunwood Road, Elmdale Drive between Silver Eagle Road Maintenance & 2018-19 Resurfacing Project on E. Silver Spur; Latigo Lane between Palos Verdes Drive North to Terminus, Road to Kingspine Road, Kingspine Road between Silver Eagle to E. Silver Spur , Latigo Lane Rolling Hills Estates Los Angeles 07/2018 10/2018 15 25 66 26 Rehabilitation Various City Streets Rollingwood Drive between Silver Eagle Road to Kingspine Road, Palos Verdes Drive between Palos Verdes Drive North to Terminus, Rollingwood Drive between Silver Eagle Road to North Street Depression Near Lazy Creek , Hawthorne Boulevard between Palos Kingspine Road Verdes Drive North and the south city limit

Road Maintenance & Walnut Grove Resurfacing Project The project consists in ARHM pavement overlay, sidewalk replacement, striping, curb Rosemead Los Angeles From Northerly City Limit to Marshall Avenues 01/2019 05/2019 10 15 49 22 Rehabilitation (17/18 Carryover) ramp installation, tree planting, and appurtenances. Road Maintenance & Colored Crosswalk Installation The project will install colored concreted crosswalk at four intersections. This will Rosemead Los Angeles Mission Drive, Valley Boulevard, Marshall and Wells Street along Walnut Grove Avenue 01/2019 05/2019 10 15 49 22 Rehabilitation Project provide more safety to pedestrians. Rehabilitation, resurfacing, and restoration of speed bumps. The repair work will also Road Maintenance & San Dimas Los Angeles Rennel Ave Et Al - 17/18 Carryover include upgrade/replacement of the ADA accessible ramps, minor curb, gutter, and Rennell Avenue from Arrow Hwy to Juanita including adjacent short sul-de-sac. 04/2018 05/2018 15 20 41 25 Rehabilitation sidewalk panels, and striping. Project will use Full Depth Reclamation technology up to 15" deep and overlay asphalt Road Maintenance & concrete . Repair and reconstruction of work will include upgrade/replacement of ADA San Dimas Los Angeles Covina Blvd Rehabilitation Covina Blvd (Arrow Hwy to 57 Fwy) 04/2020 06/2020 15 20 41 25 Rehabilitation accessible ramps, minor curb, gutter, and sidewalk panels, and striping. Project will require State and Railroad permits.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Project will use Full Depth Reclamation technology up to 15" deep and overlay asphalt Road Maintenance & Lone Hill Ave (Cienega to Covina San Dimas Los Angeles concrete . Repair and reconstruction of work will include upgrade/replacement of ADA Lone Hill Ave (Cienega to Covina Blvd) 04/2021 06/2021 15 20 41 25 Rehabilitation Blvd) accessible ramps, minor curb, gutter, and sidewalk panels, and striping.

Rehabilitation, resurfacing, and restoration of existing street. Repair and reconstruction Road Maintenance & San Dimas Los Angeles Eaton Road Et Al will include upgrade/replacement of ADA accessible ramps, minor curb, gutter, and Southwest corner of Arrow Hwy and Lone Hill Ave 04/2022 06/2022 15 20 41 25 Rehabilitation sidewalk panels, and striping.

Rehabilitate existing street by use of Full Depth Reclamation technology up to 15" deep Road Maintenance & and overlay asphalt concrete base and cap. Will also include upgrade/replacement of San Dimas Los Angeles Bonita Avenue Corridor Bonita Avenue from San Dimas Avenue to eastern City Limits 04/2023 06/2023 15 20 41 25 Rehabilitation ADA accessible ramps, minor curb, gutter, and sidewalk panels, and striping. Project will also include grind and overlay of short adjacent cul-de-sac.

Rehabilitation, resurfacing, and restoration of existing street. The repair work will also Road Maintenance & San Dimas Los Angeles Arrow Highway Rehabilitation include upgrade/replacement of ADA accessible ramps, minor curb, gutter, and Arrow Highway Western City Limits to Eastern City Limits 04/2024 06/2024 15 20 41 25 Rehabilitation sidewalk panels, and striping. Rehabilitation, resurfacing, and restoration of existing street. The repair work will also Road Maintenance & San Dimas Los Angeles Gladstone Street (East of Amelia) include upgrade/replacement of ADA accessible ramps, minor curb, gutter, and Gladstone Street (East of Amelia) 04/2025 06/2025 15 20 41 25 Rehabilitation sidewalk panels, and striping. Rehabilitate existing street by using Full Depth Reclamation Technology up to 15" deep and overlay asphalt concrete base and cap. Project will also include Road Maintenance & San Dimas Los Angeles Avenida Entrada Rehab upgrade/replacement of ADA accessible ramps, minor curb, gutter, and sidewalk Avenida Entrada (Via Verde to Avenida Ladera) 04/2019 06/2019 15 20 41 25 Rehabilitation panels, and striping. Project will also include grind and overlay of short adjacent cul-de- sacs. City of San Fernando: A total of four (4)streets encompass the project. The project consists of street repaving, Alexander Street between Library Street and Lucas Street, N Workman Street between Glenoaks Road Maintenance & repairs to sidewalks, drive approaches and curb and gutter, installation of access ramps San Fernando Los Angeles Annual Street Resurfacing Project Boulevard and Seventh Street, Lazard St between Fourth Street and Glenoaks Boulevard, Lucas 10/2018 04/2019 15 20 29 17 Rehabilitation and striping and pavement markings. In addition to the street improvements, water and Street between N Workman Street and Orange Grove Avenue sewer upgrades/repairs will be conducted on the aforementioned streets.

The scope of work includes of resurfacing local street pavement, including removing San Marino Ave. (Longden to Las Tunas Dr.), Warner Lane (San Marino to west terminus), Oak Lane and replacing existing curb ramps in order to comply with ADA standards. Road Maintenance & 2018 Great Street Project (17/18 (San Marino to west terminus), Broadway (Mission Dr. to Junipero Serra), Alanmay (Broadway to Live San Gabriel Los Angeles Project originally listed in the 2017-18 FY Project List, with adoption of 2018-19 FY 05/2018 06/2018 10 15 49 22 Rehabilitation Ongoing) Oak), Cresta Avenue (Las Tunas to Hermosa), Earle Street (Las Tunas to Elm), and Mission Dr. (Las Project List the original project scope and location(s) were expanded to maximize SB1 Tunas to Sycamore) funding.

Road Maintenance & Del Mar Ave Pavement San Marino Los Angeles Resurface major arterial street Del Mar Ave. from city limits to Huntington Drive 01/2020 06/2020 20 20 49 25 Rehabilitation Rehabilitation (17/18 Carryover) Road Maintenance & Huntington Drive Pavement San Marino Los Angeles Resurface major arterial street Huntington Drive WB Virginia Road to city limits 01/2021 06/2021 20 20 49 25 Rehabilitation Rehabilitation (17/18 Carryover) Road Maintenance & Huntington Drive Street San Marino Los Angeles Huntington Drive Street Rehabilitation; Deep mill & fill with spot reconstruction Huntington Drive, San Marino, CA 91108 01/2019 06/2019 20 20 49 25 Rehabilitation Rehabilitation Road Maintenance & Local Street Reconstruction: Roanoke Road, Sierra Vista Avenue, Shenandoah Road, San Marino Los Angeles Local Street Reconstruction Roanoke Road, Sierra Vista Avenue, Shenandoah Road, Canon Drive 01/2019 06/2019 20 20 49 25 Rehabilitation Canon Drive Below is a sampling of possibl locations to be improved: Soledad Canyon Road Sierra Hwy to Sand Canyon Rd; Gary Dr Megan Dr to Cop '875 S/O Megan Dr; Gary Dr Cop 875' S/O Megan Dr to Carrousel Dr; Bougainvillia Wy Rosehaven Ln to North End; Carla Ct Lillyglen Dr to East End; Flowerpark Dr Soledad Canyon Rd to Gardenia Park Dr; Flowerpark Dr Gardenia Park Dr to Lotusgarden Dr; Gladiolus Dr Nasturtium Dr to Lotus Garden Dr; Lillyglen Dr Road Maintenance & The annual Overlay & Slurry Seal Program reflects the City's commitment to roadway Gladiolus Dr to Poppy Meadow St; Lotusgarden Dr Nasturtium Dr to Gardenia Lane; Gina Ct End to Santa Clarita Los Angeles 2017-2018 Overlay and Slurry Seal 07/2018 04/2019 3 15 38 21, 27 Rehabilitation infrastructure by resurfacing streets in need of attention. Via Joyce Dr; Jerry Pl End to Via Joyce Dr; Leong Ct End to Santa Catarina Rd; Nicholas Cir Rodgers Dr (N) to Rodgers Dr (S); Patricia Pl End to Rodgers Dr; Ricki Ct End to Via Joyce Dr; Rhona Pl Santa Catarina Rd to end; Rodgers Dr Adriene Wy to Santa Catarina; Santa Catarina Rd Rodgers Dr to Plum Canyon; Tamara Pl End to Nicholas Cir; Werren Pl Via Joyce Rd to end; Sassoon Pl Santa catarina to end

Copper Hill Drive from Newhall Ranch Road to Smyth Drive, McBean Parkway from 5 fwy to Singing Road Maintenance & 2018-2019 Overlay & Slurry Seal The annual Overlay & Slurry Seal Program reflects the City's commitment to roadway Santa Clarita Los Angeles Hills Drive, Rye Canyon Road from 5 fwy to Newhall Ranch Road, and Valencia Blvd from Magic 06/2019 04/2020 3 15 38 21, 27 Rehabilitation Program infrastructure by resurfacing streets in need of attention. Mountain Pkwy to Citrus Street

Industrial street project will consist of removal of existing asphalt concrete pavement Road Maintenance & Santa Fe Springs Road Street surface, reworking the underlying aggregate base and in situ soil material to provide a Santa Fe Springs Los Angeles Between Los Nietos Road and rail road tracks (City boundary) 12/2018 06/2019 15 20 57 32 Rehabilitation Rehabilitation firm and stable platform for placing new asphalt concrete pavement. The removal and replacement of curb and gutter along with removal of sidewalk and driveways.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Design and construction of school access and safety improvements near Edison Language Academy, SMASH, John Muir, McKinley Elementary, Grant Elementary and Franklin Elementary that were identified during Walk Audits conducted in the spring of Edison Language Academy-2402 Virginia Ave; SMASH-2525 5th St; John Muir-2526 6th St.; McKinley Safe Routes to School at Six 2017. The crossing improvements include, bulb-outs, high-visibility beacons, curb ramp Santa Monica Los Angeles Safety Elementary-2401 Santa Monica Blvd.; Grant Elementary-2368 Pearl St; Franklin Elementary-2400 12/2018 12/2020 25 25 50 26 Schools improvements, signage and striping, and operational changes to these schools. The Montana Ave improvements also remove crossing barriers and provide improved visibility and legibility for students and parents, making active transportation more comfortable for students and their families.

07th St, 23rd St, 26th St, Broadway, Cloverfield Bl, San Vicente Bl, 17th St, Lincoln Bl, Stanford St, Road Maintenance & Citywide Annual Paving Project - Improvements made through the Annual Paving and Sidewalk Repair Project to Dewey St, Neilson Wy, Ocean Av, Pico Bl, Ashland Av, Pearl St. Please see attached spreadsheet Santa Monica Los Angeles 10/2018 10/2019 7 25 50 26 Rehabilitation Carryover FY 2017-2018 maintain the City's streets. for locations. All locations have yet to be finalized and are subject to change. Each location will be selected based on priority need and resources throughout the year

San Gabriel Ct. Sierra Place to Mt Trail Ave.; San Gabriel Ct. Mt Trail Ave. to Holdman Ave.; Sierra Road Maintenance & Place Sierra Madre Blvd. to Lowell Ave.; East Highland Ave. Mt. Trail Ave. to Baldwin Ave.; Merrill Sierra Madre Los Angeles 2018-19 Street Improvement project Grind and cap, Slurry Seal, Chip Seal, Sidewalk infill and Handicap Ramps. 12/2018 02/2019 7 20 41 25 Rehabilitation Ave. Laurel Ave. to Highland Ave.; Auburn Ave. Alley Montecito Ct. to end; South Mt Trail Ave. Orange Grove to Sierra Madre Blvd.; North Baldwin Ave. Sierra Madre Blvd. to end

Myrtle Avenue (1/2 Street) 33RD TO N. CITY LIMITS, LEWIS AVENUE 32ND TO N. CITY LIMITS, LEMON AVENUE S. CITY LIMITS TO NEVADA ST., CERRITOS S. CITY LIMITS TO BURNETT ST., LEMON AVENUE 32ND TO N. CITY LIMITS, BRAYTON AVENUE (1/2 STREET) 33RD TO N. CITY LIMITS, GUNDRY AVENUE 33RD TO N. CITY LIMITS, FALCON AVENUE 33RD TO N. CITY LIMITS, WALNUT AVENUE 32ND (CITY LIMIT) TO N. CITY LIMITS, 33RD ST. CALIFRONIA AVENUE TO WALNUT AVENUE, 32ND ST. CALIFORNIA AVENUE TO ORANGE AVENUE, 29TH ST. W. CITY LIMITS TO OLIVE AVENUE, COLUMBIA ST. W. CITY LIMITS TO E. LIMIT, PATERSON W. CITY Road Maintenance & Signal Hill Los Angeles SB-1 RMRA 2018/19 Repair City Streets LIMITS TO E. LIMIT, WALTON ST. LIME AVE TO MYRTLE ST., VERNON ST. W. CITY LIMITS TO 01/2019 09/2019 8 12 70 33 Rehabilitation CALIFORNIA AVENUE, 25TH ST. W. CITY LIMITS TO CALIFORNIA AVENUE, LEWIS AVENUE S. CITY LIMITS TO BURNETT ST., 23RD ST. LEMON AVENUE TO CERRITOS, DAWSON AVENUE WILLOW TO 28TH ST., 21ST ST. CHERRY TO TEMPLE, ALLIANCE ST. ALLEY TO ORANGE, BURNETT ST. ORANGE TO WALNUT, BURNETT ST. ROSE AVENUE TO CHERRY, CRESTON AVENUE WALNUT TO TERMINES, JESSE NELSON CIRCLE HILL ST. TO TERMINES, GAVIOTA AVENUE ALAMITOS AVENUE TO HILL ST. , CRESCENT ST. ROSE TO GARDENA, 20TH ST. FREEMAN TO OBISPO

Road Maintenance & Restore paved road surfaces to add structural capacity, riding comfort and skid Signal Hill Los Angeles Spring Street Overlay Carryover Spring Street 07/2017 06/2020 25 30 70 33 Rehabilitation resistance which add to the road's safety. Road Maintenance & This project includes grinding of 2” existing asphalt, install 2” A.C. overlay and install South El Monte Los Angeles Alesia Street (17/18 Carryover) Alesia St. from e/s Adelia Ave. to w/s Potrero Ave. 07/2018 10/2018 10 15 57 22 Rehabilitation new striping Road Maintenance & This project includes grinding of 2” existing asphalt, install 2” A.C. overlay and install South El Monte Los Angeles Chico Ave. (17/18 Carryover) Chico Ave. - from n/s Rush St. to s/s Fern Ave.; 03/2019 06/2019 10 15 57 22 Rehabilitation new striping Road Maintenance & This project includes grinding of 2” existing asphalt, install 2” A.C. overlay and install South El Monte Los Angeles Elliot Ave (17/18 Carryover) Elliott Ave. – s/s from Santa Anita Ave. e/s to 460’ east. 03/2019 06/2019 10 15 57 22 Rehabilitation new striping Road Maintenance & This project includes grinding of 2” existing asphalt, install 2” A.C. overlay and install South El Monte Los Angeles Floradale Ave. (17/18 Carryover) Floradale Ave. – 1800 blk. n/o Thienes Ave. 03/2019 06/2019 10 15 57 22 Rehabilitation new striping Road Maintenance & This project includes street seal coating over existing AC Pavement, crack sealing, and South El Monte Los Angeles Granada Ave. (17/18 Carryover) Granada Ave. – from n/s Weaver Ave. to s/s Klingerman Ave. 03/2019 06/2019 5 7 57 22 Rehabilitation new striping Road Maintenance & This project includes grinding of 2” existing asphalt, install 2” A.C. overlay and install South El Monte Los Angeles Lashbrook Ave. (17/18 Carryover) Lashbrook Ave. – from 600ft. s/o Garvey Ave. to s/s Garvey 03/2019 06/2019 10 15 57 22 Rehabilitation new striping Road Maintenance & This project includes grinding of 2” existing asphalt, install 2” A.C. overlay and install South El Monte Los Angeles Klingerman Ave. (17/18 Carryover) Klingerman Ave. – from 650’ w/o Potrero Ave. to w/s Potrero 03/2019 06/2019 10 15 57 22 Rehabilitation new striping

Pothole repairs on the following streets: Chico between Garvey Avenue/Rust Street, Lashbrook Avenue s/o Garvey Avenue, Fawcett Avenue s/o Santa Anita Avenue, Farndon Street s/o Lidcombe Avenue, Lerma Road from Central Avenue to This project seeks to repair potholes at the sites listed in the Project Location area. Strozier Avenue, Strozier Avenue to Lerma Road to Remer Street, Elliot Avenue east of Santa Anita Road Maintenance & Annual Pothole Repairs (17/18 Avenue, Santa Anita Avenue/Merced Avenue Intersection, Durfee Avenue/Thienes Intersection, South El Monte Los Angeles 07/2018 06/2019 10 15 57 22 Rehabilitation Ongoing) all locations are subject to change and will be selected based on priority need and Weaver Street/Mountain View Road Intersection, 2439 Loma Avenue, Farndon Street/Durfee Avenue resources throughout the year Intersection, Klingerman Street west of Potrero Avenue all locations are subject to change and will be selected based on priority need and resources throughout the year

Ongoing from FY 2017/18: The Sidewalk Improvement Project will maintain pedestrian Within the City limits: Santa Ana Street (North-side Boundary), Alameda Street (West-side Boundary), Complete Streets Citywide Sidewalk Improvement safety a priority. Under this project, over 650 locations of damaged sidewalk, curb, California Avenue (East-side Boundary), and Century/Martin Luther King Jr. Boulevard (South-side South Gate Los Angeles 06/2018 05/2019 30 50 63 33 Components Phase V (17/18 Ongoing) gutters and access ramp around the City will be repaired to remove any potential Boundary); approximately 40 Streets. tripping hazards. Note: Exclude ROW from the City of Lynwood and City of Huntington Park

Complete Streets Garfield Avenue and Imperial Rehabilitation of pavement, reconstruction of damaged curb and gutter, drive South Gate Los Angeles Garfield Avenue from Jefferson Avenue to South City Limits. 11/2018 10/2019 30 30 63 33 Components Highway Street Rehabilitaition approaches, sidewalks, on Garfield Avenue from Jefferson Avenue to South City Limits.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Ongoing from FY 2017/18: The Firestone Boulevard Project Boulevard contains a wide range of infrastructure improvements which includes the following: increasing the number of travel lanes from four to six, raised landscape medians, pavement Firestone Boulevard Regional Complete Streets rehabilitation, traffic signal and Street light modifications, traffic signal synchronization, South Gate Los Angeles Corridor Capacity Enhancement On Firestone Boulevard from Alameda Street to California Avenue 07/2017 06/2019 30 30 63 33 Components traffic signing and striping, concrete repairs and ADA ramp improvements, storm water Project (17/18 Ongoing) quality mitigation measures, pedestrian lights, bus shelters and furniture enhancements, and a signature gateway design at five major intersections. Gateway design includes public art pieces, pedestrian lighting, street furniture, and landscaping.

Within the City limits: Imperial Highway (North-side Boundary), Los Angeles River (West-side The sidewalk Improvement Project will maintain pedestrian safety a priority. Under this Complete Streets Citywide Sidewalk Improvement Boundary), Paramount Boulevard (East-side Boundary), and I-105 (South-side Boundary); South Gate Los Angeles project, over 600 locations of damaged sidewalk, curb, gutters and access ramp around 09/2018 06/2019 30 50 63 33 Components Project Phase VI approximately 60 Streets. the City will be repaired to remove any potential tripping hazards. Note: Exclude ROW from the City of Downey.

The project scope of work consists of street and highway pavement maintenance; rehabilitation, installation, construction, and reconstruction of necessary associated Road Maintenance & facilities such as drainage and traffic control devices; maintenance, rehabilitation, South Pasadena Los Angeles Monterey Rd - Phase3 Orange Grove Ave to Pasadena Ave 09/2018 06/2019 15 17 41 25 Rehabilitation installation, construction, and reconstruction of facilities that expand ridership on transit systems; safety projects to reduce fatalities; or as a local match to obtain state or federal transportation funds for similar purposes.

The project scope of work consists of street and highway pavement maintenance; rehabilitation, installation, construction, and reconstruction of necessary associated Road Maintenance & South Pasadena Roadway facilities such as drainage and traffic control devices; maintenance, rehabilitation, Alpha Avenue, Alta Vista, Camino Del Sol, Pine Street, Monterey Rd (at City Limits), Orange Grove South Pasadena Los Angeles 09/2018 06/2019 15 17 41 25 Rehabilitation Rehabilitation Project installation, construction, and reconstruction of facilities that expand ridership on transit Avenue, Sterling Place systems; safety projects to reduce fatalities; or as a local match to obtain state or federal transportation funds for similar purposes.

The project scope of work consists of street and highway pavement maintenance; rehabilitation, installation, construction, and reconstruction of necessary associated Road Maintenance & South Pasadena Streets facilities such as drainage and traffic control devices; maintenance, rehabilitation, La France Ave, Wayne Ave, Fletcher Ave, Stratford Ave, Camden Avenue, Camden Parkway, Courte South Pasadena Los Angeles 09/2018 06/2019 15 17 41 25 Rehabilitation Preventative Maintenance Program installation, construction, and reconstruction of facilities that expand ridership on transit Avenue, Stratford Avenue, Hardison Lane systems; safety projects to reduce fatalities; or as a local match to obtain state or federal transportation funds for similar purposes.

Road Maintenance & Rosemead Boulevard Resurfacing Rosemead Boulevard from northern city limit (just north of Calita Street) to southern city limit (railroad Temple City Los Angeles Resurfacing of about two miles of Rosemead Boulevard, a major arterial street 06/2018 10/2018 5 10 49 22 Rehabilitation (17/18 Carryover) grade separation south of Pentland Street)

Alessandro Ave. from Las Tunas Dr. to Garibaldi Ave.; Golden West Ave. from Las Tunas Dr. to Longden Ave.; Kauffman Ave. from Garibaldi Ave. to Longden Ave.; Lemon Ave. (N/S) from Longden Ave. to Northern City Limit; Lemon Ave. (E/W) from Temple City Blvd. to Eastern City Limit; Livia Ave. Road Maintenance & Resurfacing of about three miles of collector and local streets with methods appropriate Temple City Los Angeles Street Resurfacing Phase 5A from Longden Ave. to Woolley St.; Longden Ave. from Oak Ave. to Eastern City Limit; Noel Dr. from 08/2018 12/2018 5 20 49 22 Rehabilitation for the pavement condition Broadway to North End; Primrose Ave. from Garibaldi Ave. to Flaherty St.; Rowland Ave. from Flaherty St. to Wendon Ave.; Trelawny Ave. from South End to Lemon Ave.; Workman Ave. from Alley E/O TC Blvd. to Camellia Ave.; Workman Ave. from Oak Ave. to Cloverly Ave.

Road Maintenance & Sidewalk Repair for Handicap Localized repairs of damaged sidewalks and handicap ramps, along with associated Torrance Los Angeles Old Torrance 06/2018 04/2019 25 50 66 26, 35 Rehabilitation Accessibility - 17/18 Carryover curb and gutter repairs, driveway repairs, and tree removal and replanting.

Tentative areas of proposed sidewalk replacement include: (1) The area bounded by Sepulveda Blvd, Road Maintenance & Sidewalk Repair for Handicap Localized repairs of damaged sidewalks and handicap ramps, along with associated Western Ave, south City limit and Cabrillo Ave; and (2) The area bounded by Sepulveda Blvd, Torrance Los Angeles 09/2018 06/2019 25 50 66 26 Rehabilitation Accessibility curb and gutter repairs, driveway repairs, and tree removal and replanting. Hawthorne Blvd, Lomita Blvd and Anza Ave. Specific areas and locations have yet to be finalized, but will be selected based on priority need, resources and available funding throughout the year.

To comply with Section 2A.08 Maintaining Minimum Retroreflectivity standards required by the 2014 Edition of the California Manual on Uniform Traffic Control Devices Section 5 of the Sign Replacement Program. Northern boundary line between Soto Street and Downey Sign Replacement Program (FY (CAMUTCD), the City of Vernon has adopted a sign replacement program. The city has Road to north side of Leonis Boulevard. West side of Downey Road to east side of Soto Street Vernon Los Angeles Traffic Control Devices 07/2018 06/2019 10 15 53 33 2018-2019) chosen to use a blanket replacement method to maintain regulatory and warning sign including all streets within Section 5 - 26th Street, Bandini Boulevard, Vernon Avenue, 44th Street, retroreflectivity at or above the minimum levels as directed by Table 2A-3 of the 45th Street, Boyle Avenue, Sierra Pine Avenue, and Alcoa Avenue. CAMUTCD. Road Maintenance & Provides for the engineering, contract administration and slurry seal of various streets Walnut Los Angeles Slurry Seal Area 4 Westerly half of Creekside Drive 07/2018 06/2019 5 7 55 29 Rehabilitation in area 4 (Westerly half of Creekside Drive).

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Alicia Street from Audrey Lane to Arline Street Andrea Court from Arline Street to End of Cul-De-Sac Angela Street from Adrienne Drive to End of Cul-De-Sac Arline Street from Audrey Lane to Alicia Street Audrey Lane from Adrienne Drive to Alicia Street Betsy Street from Carmen Street to End of Cul-De-Sac Carmen Street from Cecelia Street to Cindy Street Cecelia Street from Carmen Street to Cindy Street Chance Street from Gehrig Street to Shakespeare Drive Christie Lane from Woodgate Drive to Carmen Street Cynthia Court from Amanda Street to End of Cul-De-Sac Cindy Street from Carmen Street to Cecelia Street Dee Lane from Woodgate Drive to End of Cul-De-Sac Delores Street from Elena Avenue to Dee Lane Ferntower Avenue from Hollingsworth Street to Morganfield Avenue Road Maintenance & Rehabilitation of pavement, replacement of damaged curb, gutter and sidewalks, Francesca Drive from Woodgate Drive to Nogales Street West Covina Los Angeles Residential Street Rehabilitation 07/2018 08/2018 10 20 48, 55 22, 29 Rehabilitation installation of catch basin insert, signing and striping. Frieda Court from Gloria Street to End of Cul-De-Sac Gabriella Street from Gloria Street to End of Cul-De-Sac Gail Court from Gabriella Street to End of Cul-De-Sac Gehrig Street from Tinker Street to Chance Street Gina Lane from Gabriella Street to Nogales Street Ginger Court from Gabriella Street to End of Cul-De-Sac Gloria Street from Gabriella Street to Beginning of Cul-De-Sac Gloria Street from Frieda Street to End of Cul-De-Sac Lindsey Court from Shakespeare Drive to End of Cul-De-Sac Maranville Court from Gehrig Street to End of Cul-De-Sac Peggy Court from Pauline Street to End of Cul-De-Sac Penny Street from Priscilla Drive to End of Cul-De-Sac Petra Court from Priscilla Drive to End of Cul-De-Sac Priscilla Drive from Shakespeare Drive to Pauline Street Tinker Street from Gehrig Street to Shakespeare Drive Thomas Place from Woodgate Drive to End of Cul-De-Sac

City of West Hollywood. See attached list for locations. Greenacre Ave. cul-de-sac to SMB, Spaulding between Fountain and SMB, Formosa Ave between Lexington and SMB, Vista St. between Fountain and SMB, Genesee between Fountain and SMB, Road Maintenance & Grind and overlay 2 inches of rubberized hot mix A.C. on 11 residential streets. West Hollywood Los Angeles Annual Paving Project Genesee between SMB and Romaine, Genesee between Romaine and Willoughby, Orange Grove 06/2018 07/2018 10 20 50 26 Rehabilitation Miscellaneous work includes: Restriping, raising valve covers, ADA curb ramps, etc. between Fountain an Santa Monica, Ogden Dr between Fountain an Santa Monica, Flores St between Fountain an Santa Monica, Kings Rd. between Fountain and SMB

Road Maintenance & Citywide Industrial Streets. RMRA funds will be used on Russel Ranch Road for full depth grind and Westlake Village Los Angeles Annual Street Improvement Project Overlay or Slurry of several roadways within the industrial areas of Westlake Village. 07/2018 01/2019 10 25 44 27 Rehabilitation overlay. Resurfacing of Pioneer Boulevard from Beverly Boulevard to Orange Drive. Includes sidewalk repairs and installation of ADA wheelchair access ramps to provide safe path of travel. Includes re-striping of Class II Bike Lanes and Share the Road Sharrow Legends. Road Maintenance & Pioneer Boulevard & Vicinity Several of our projects encompass several streets in the vicinity of the named street Whittier Los Angeles Pioneer Boulevard from Beverly Boulevard to Orange Drive. 03/2019 05/2019 15 20 57 32 Rehabilitation Resurfacing limits. We may combine some of the projects listed under one contract in order to obtain more reasonable bid prices. We are trying to provide general areas were work is to be performed utilizing SB1 funds. The City of Whittier has over 220 miles of streets that it maintains and to list each and everyone that is to be worked on separately would be vary cumbersome.

Joint project with the County of Los Angeles County to resurface Scott Avenue from Mulberry Drive to Leffingwell Road and adjacent streets. Includes installation of ADA wheelchair access ramps and sidewalk repairs to provide safe ADA path of travel. Scott Avenue is signed as a Class III Bike Route. Road Maintenance & Scott Avenue and Vicinity Several of our projects encompass several streets in the vicinity of the named street Scott Avenue from Mulberry Drive to Leffingwell Road in both the City of Whittier and unincorporated Whittier Los Angeles 08/2018 10/2018 15 20 57 32 Rehabilitation Resurfacing limits. We may combine some of the projects listed under one contract in order to obtain Los Angeles County. more reasonable bid prices. We are trying to provide general areas were work is to be performed utilizing SB1 funds. The City of Whittier has over 220 miles of streets that it maintains and to list each and everyone that is to be worked on separately would be vary cumbersome.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Resurfacing of Valley Home Avenue from Whittier Boulevard to Janine Drive and adjacent nearby streets. This is a joint project between the City of Whittier and the City of La Habra. Project includes installation of ADA wheelchair access ramps. Several of our projects encompass several streets in the vicinity of the named street limits. We Road Maintenance & Valley Home Avenue & Vicinity Valley Home Avenue from Whittier Boulevard to Janine Drive in both the City of Whittier and the City Whittier Los Angeles may combine some of the projects listed under one contract in order to obtain more 08/2018 10/2018 15 20 57 32 Rehabilitation Resurfacing of La Habra reasonable bid prices. We are trying to provide general areas were work is to be performed utilizing SB1 funds. The City of Whittier has over 220 miles of streets that it maintains and to list each and everyone that is to be worked on separately would be vary cumbersome.

Resurfacing of Santa Fe Springs Road from Mulberry Drive to Los Netos Road. Includes the installation of new Class II Bike Lanes. Joint project between the City of Whittier and the City of Santa Fe Springs. Several of our projects encompass several Road Maintenance & Santa Fe Springs Road Resurfacing streets in the vicinity of the named street limits. We may combine some of the projects Whittier Los Angeles Santa Fe Springs Road in the City of Whittier and the City of Santa Fe Springs. 08/2018 10/2018 15 20 57 32 Rehabilitation and Vicinity listed under one contract in order to obtain more reasonable bid prices. We are trying to provide general areas were work is to be performed utilizing SB1 funds. The City of Whittier has over 220 miles of streets that it maintains and to list each and everyone that is to be worked on separately would be vary cumbersome.

Resurfacing of College Avenue from Penn Street to the end at the Whittier College Campus. Includes installation of ADA access ramps. Several of our projects encompass several streets in the vicinity of the named street limits. We may combine Road Maintenance & College Avenue and Vicinity Whittier Los Angeles some of the projects listed under one contract in order to obtain more reasonable bid College Avenue from Penn Street north to the end of the street at the Whittier College Campus. 04/2019 06/2019 15 20 57 32 Rehabilitation Resurfacing prices. We are trying to provide general areas were work is to be performed utilizing SB1 funds. The City of Whittier has over 220 miles of streets that it maintains and to list each and everyone that is to be worked on separately would be vary cumbersome.

Resurfacing of asphalt roadway. Carryover of project to FY 2018-19. Several of our projects encompass several streets in the vicinity of the named street limits. We may combine some of the projects listed under one contract in order to obtain more Road Maintenance & Newcomb Avenue and Vicinity Whittier Los Angeles reasonable bid prices. We are trying to provide general areas were work is to be Newcomb Avenue from Citrustree Road to Leffingwell Road. 03/2019 06/2019 15 20 57 32 Rehabilitation Resurfacing (17/18 Carryover) performed utilizing SB1 funds. The City of Whittier has over 220 miles of streets that it maintains and to list each and everyone that is to be worked on separately would be vary cumbersome. Resurfacing of asphalt roadway. Carryover of project to FY 2018-19. Several of our projects encompass several streets in the vicinity of the named street limits. We may combine some of the projects listed under one contract in order to obtain more Road Maintenance & Lashburn Street and Vicinity Whittier Los Angeles reasonable bid prices. We are trying to provide general areas were work is to be Lashburn Street from First Avenue to Maybrook Avenue. 03/2019 06/2019 15 20 57 32 Rehabilitation Resurfacing (17/18 Carryover) performed utilizing SB1 funds. The City of Whittier has over 220 miles of streets that it maintains and to list each and everyone that is to be worked on separately would be vary cumbersome. Resurfacing of asphalt roadway. Carryover of project to FY 2018-19. Several of our projects encompass several streets in the vicinity of the named street limits. We may combine some of the projects listed under one contract in order to obtain more Road Maintenance & Pounds Avenue & Vicinity Whittier Los Angeles reasonable bid prices. We are trying to provide general areas were work is to be Pounds Avenue from north of Lashburn Street to south of Lashburn Street. 03/2019 06/2019 15 20 57 32 Rehabilitation Resurfacing (17/18 Carryover) performed utilizing SB1 funds. The City of Whittier has over 220 miles of streets that it maintains and to list each and everyone that is to be worked on separately would be vary cumbersome.

Road Maintenance & Specific improvements related to this project include the rehabilitation of pavement on 5th Street Curve from Mariposa Ave to the Chowchilla Fairground Parking Lot on Road 16. Length of Chowchilla Madera 5th Street to Road 16 Project 07/2018 04/2019 20 30 5 12 Rehabilitation 5th Street and installation of traffic striping, marking and signage to Road 16. project is 631 feet.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Falcon From 817 ft N of Aviation To Yeager N. Golden State Blvd. From 329' N of Ave. 17 To City Limts (N) Berry Dr From Plumas To Maple Dessert Ranch Way From Makenna To Toschi Dessert Ranch Way From Toschi To Granada Eagle Way From Mekiana To St Tropez Maple From Berrry Dr To Toschi Maple From Mekenna To St Tropez Mekenna From Eagle Way To Oak Mekenna From Howard Rd To Eagle Way Mekenna From Maple To Dessert Ranch Way Mekenna From Plumas To Maple Oak From Mekenna To Tropez Dr Plumas From Berrry Dr To Granada Plumas From Mekenna To Tropez Dr Plumas From Tropez Dr To Berry Dr Toschi From Dessert Ranch Way To Maple Tropez Dr From Howard Rd To Eagle way Tropez Dr From Oak To Plumas Road Maintenance & 2018 Chip Seal Project (17/18 Application of a chip seal (AKA Bituminous Surface Treatment) to local streets located Tropez Dr From Plumas To Maple Madera Madera 06/2018 07/2018 5 8 5 12 Rehabilitation Ongoing) throughout Madera. Shannon Ave. From Sunset To Venturi Shannon Ave. From Venturi To Lighthouse Dr. Foster From Bruce To N. Park Dr. Foster From Sunset To Ula Foster From Ula To Bruce Pine From De Cesari To Roberts Pine From N Park To De Cesari Pine From Roberts To Roberts Crystal From Strauss To Gary Ln. Diamond Way From Strauss To Gary Lane Gary Ln. From Crystal Way To Emily Way Gary Ln. From Diamond Way To Majestic Ct. Gary Ln. From Emily Way To End Gary Ln. From Hwy 145 To Diamond Way Gary Ln. From Majestic Ct. To Crystal Way Majestic Ct. From end To Gary Ln. Maple From Santa Clara To Santa Cruz Maple From Stadium To Sata Clara Strauss From Crystal Way To end Strauss From Diamond Way To Crystal Way

Sample locations of possible work, exact locations TBD - Aviation Drive From Condor To Falcon Condor From Kennedy (16) To Aviation Falcon Drive From Aviation To Yeager (1/2) Granada Drive From Foxglove To Kennedy Apple Tree Ct From Peach Tree Dr To end Apple Tree Dr From Berry Dr To Toschi Dr Apple Tree Dr From Toschi Dr To S Granada Dr Berry Dr. From Pear Tree Dr To Peanut Dr Berry Dr. From Peanut Dr To Apple Tree Dr Berry Dr. From Apple Tree Dr To Orange Tree Dr Berry Dr. From Orange Tree Dr To Cherry Tree Dr Cherry Tree Dr From Berry Dr To Toschi Dr Road Maintenance & 2018 Asphalt Rejuvenation Application of an asphalt rejuvenation treatment material (AKA Reclamite) to local Cherry Tree Dr From Toschi Dr To S Granada Dr Madera Madera 05/2018 08/2018 3 5 5 12 Rehabilitation Treatment Project (17/18 Ongoing) streets located throughout Madera. Toschi Dr. From Orange Tree Dr To Cherry Tree Dr Wolftrap St. From Chianti To 78' N of Merlot Bernardi Ave From Stadium Rd To Munras Ave El Monte From Fair Oak To Stadium Fair Oak From Gamay To El Monte Lighthouse Dr. From Mainberry To Harbor Dr. Lighthouse Dr. From Harbor Dr. To Shannon Mainberry Dr. From Sunset Ave. To Bay View Dr. Mainberry Dr. From Bay View Dr. To Venturi Ct. Mainberry Dr. From Venturi Ct. To Lighthouse Ct. Mainberry Dr. From Lighthouse Ct. To Lighthouse Dr. Sand Dollar Ct. From Bay View Dr. To End Venturi Ct From Mainberry To End

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Cleveland Avenue from Raymond to Malta Street Cleveland Avenue from Malta Street to Calimyrna Avenue Cleveland Avenue from Calimyrna Avenue to Tulare Street Cleveland Avenue from Schnoor Street to Granada Drive Country Club Drive from Adell Street to Clark Street Country Club Drive from Sherwood to Cleveland Avenue Country Club Drive from Clark to Sherwood D Street North from 4th Street to 5th Street D Street North from 5th Street to Yosemite Avenue D Street South from Yosemite Avenue to 6th Street D Street South from 6th Street to 7th Street D Street South from 7th Street to Clinton D Street South from Clinton to 9th Street Gateway Drive from Cleveland to Central Pecan Avenue from Pine Street to Stadium Road Road Maintenance & Pine Street from Almond to North end of MHS Madera Madera RMRA Seals/Overlays 2018-19 Road maintenance by application of surface seals and overlays 01/2019 06/2019 5 15 5 12 Rehabilitation Raymond Road from Cleveland to Laguna Way Raymond Road from Laguna Way to City Limits Tozer Street from Almond to Cedar Tozer Street from Trail Way to A Street Tozer Street from Sunrise to 15th Street Tozer Street a ~220' section btwn 15th Street & Clinton Yosemite Avenue from Q Street to P Street Yosemite Avenue from P Street to O Street Yosemite Avenue from O Street to N Street Yosemite Avenue from N Street to M Street Yosemite Avenue from M Street to L Street Yosemite Avenue from L Street to K Street Yosemite Avenue from K Street to J Street Yosemite Avenue from J Street to I Street Yosemite Avenue from I Street to H Street Yosemite Avenue from H Street to Gateway Drive

Road Maintenance & Corinthian Parking/Overlook and portions of Belvedere Ave, Belvedere Ave, Blanding Lane, Byaview Belvedere Marin 2018 Pavement Rehab Project Trench Restoration and pavement resurfacing. 08/2018 10/2018 15 25 10 2 Rehabilitation Ave, San Rafael Ave, and Acacia Ave.

Stetson Avenue (From Buida Court to Chapman Drive), Chapman Drive (From Stetson Avenue to Road Maintenance & 2017/18 Pavement Rehabilitation Grind and Overlay of Local Streets identified to be in poor condition per the 2017 Corte Madera Marin Tamalpais Drive), Oakdale Avenue (From Chapman Drive to Eastman Avenue), Buena Vista Avenue 10/2017 06/2018 15 20 10 2 Rehabilitation Project (17/18 Ongoing) Pavement Management Report and field observation (From Sausalito Street to Oakdale Avenue), Council Crest Drive, Ash Avenue

Widen Casa Buena Drive to add bicycle lanes and new sidewalk to provide pedestrian Complete Streets Casa Buena Complete Streets Corte Madera Marin access from neighboring multifamily housing. Pavement rehabilitation will also be a Casa Buena Drive from Sanford Street to Meadow Valley Road 07/2017 10/2019 15 20 10 2 Components Project (17/18 Ongoing) component of this project Assess existing conditions and multiple sidewalk widening, crosswalk enhancements, Complete Streets Paradise Drive Multimodal Corte Madera Marin and bike lane (class I and II) improvements and construct the improvements corridor Tamalpais Avenue/San Clemente intersection out Paradise Drive to Town limits at Robin Drive 08/2018 08/2019 15 20 10 2 Components Enhancements wide

Assess existing conditions including traffic counts, right of way constraints, roadway Traffic Control Device Maderal/Tamal Vista, Nellen/Wornum, And along Paradise Drive where it intersects with San Corte Madera Marin Traffic Control Devices geometry, etc. Begin with Madera/Tamal Vista intersection and then build between 3-4 09/2018 10/2019 20 30 10 2 Enhancements Clemente, Harbor Drive and Sea Wolf Passage more roundabouts at Nellen/Wornum and along Paradise Drive

Road Maintenance & Grind and Overlay of Tamal Vista Bl and improve/consolidate pedestrian crossings, add Corte Madera Marin Tamal Vista Complete Streets Tamal Vista Bl between Madera and Fifer Avenues 03/2019 07/2019 15 20 10 2 Rehabilitation bike lanes, create ADA bus stops, sidewalks, curb cuts/ramps Road Maintenance & Scenic Rd Repavement (17/18 Fairfax Marin repave approximately 1,700 linear ft of Scenic Rd Scenic Rd between Shapiro Lane and Bay Rd; Scenic Rd. between Tamalpais to Upper Scenic 07/2018 12/2018 10 15 10 2 Rehabilitation Carryover) Road Maintenance & Canyon Rd Stablization and Fairfax Marin Road stabilization project including repavement portion of road at appox. 145 Canyon 09/2018 10/2019 20 30 10 2 Rehabilitation Reconstruction

Fairfax Marin Safety Sidewalk replacement in downtown reconstruct sidewalks to improve pedestrian safety and ADA accessibility in downtown various locations on Bolinas Rd and Broadway in downtown 07/2018 12/2018 20 30 10 2

Fairfax Marin Safety Parkade Pedestrian Improvements Provide matching funds for ADA improvements in Parkade parking lot in downtown. Parkade parking lot between Sir Francis Drake Blvd. and Broadway in downtown 07/2018 12/2019 15 25 10 2

on select streets, dig out and replace sections of failed roadway with 8" of new asphalt; Locust Avenue from King Street to Ward Street Road Maintenance & local streets pavement rehabilitation remove existing pavement to 2" below existing gutter and place new 2" lift of asphalt King Street from Magnolia Avenue to Hawthorne Avenue Larkspur Marin 07/2018 12/2018 20 20 10 2 Rehabilitation 2017-18 over entire street width. install new ADA compliant curb ramps where required at Ward Street from Magnolia Avenue to Hawthorne Avenue crosswalks Rice Lane from Cane Street to King Street

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Janes Street (Molino Avenue to Montford Avenue) Cascade Drive (Throckmorton Avenue to Cornwall Street) Summit Avenue (Tamalpais Avenue to Fern Canyon Road) Buena Vista Avenue (Oakdale Avenue to Country Club Road) Montford Avenue (Janes Street to Miller Avenue) Country Club Drive (Buena Vista Drive to End) Coach Drive (Underhill Road to Benson Circle) West Blithedale (Throckmorton Avenue to Hillside Avenue) 2018 Slurry Seal Project and 2018 Road Maintenance & Elm Avenue (Locust Avenue to Sidney Street) Mill Valley Marin Street and Sewer Rehabilitation Slurry Seal or street and sewer rehabilitation of existing streets in City of Mill Valley 07/2018 05/2019 7 30 10 13 Rehabilitation LaGoma Street (Miller Avenue to Locke Lane) Project Valley Circle (Plymouth Avenue to east end of Sycamore Avenue) Cascade Drive (Marion Avenue to Laurel Street) Catalpa Avenue (E. Blithedale Avenue to Fern Avenue) Elma Street (Lovell Street toThrockmorton Avenue) Manor Terrace (Elm Avenue to North End) Park Avenue (Walnut Avenue to Miller Avenue) Recreation Center Parking Lot City Hall Parking Lot

Inventory accessibility of city right-of-way, identify & document access barriers per ADA Complete Streets Novato Marin ADA RoW Transition Plan Title II, document barriers in MTC StreetSaver Program to facilitate future upgrades in All public paths of travel within the city right-of-way. 04/2019 04/2019 10 30 10 2 Components conjunction with the citywide Pavement Management Program.

ALAMEDA DEL PRADO: IGNACIO-ALAMEDA DE LA LOMA; ATHERTON: US 101-CITY LIMITS; BALRA DRIVE@SHEVELIN RD; CENTER ROAD: WILSON AVE-RICA VISTA; COURT ROAD@BRUNO ST; DAVIDSON STREET; EAST COURT: COURT RD-BRUNO ST; Road Maintenance & MTC Pavement Management Phase Citywide pavement condition assessment, rehabilitation project determination, and Novato Marin ENFRENTE ROAD: US 101 OFF RAMP-ENTRADA DR; ENTRADA DRIVE: EAST END- 07/2017 06/2021 4 4 10 2 Rehabilitation IV (17/18 Ongoing) reporting (Design Phase) ENFRENTE RD; ENTRADA DRIVE: EAST END-1000 FT WEST; GOLDEN GATE PLACE; IGNACIO BOULEVARD: ENFRENTE DR-ENTRADA DR; INDIAN VALLEY ROAD: CHAMBERLAIN AVE-CITY LIMITS; LA NOCHE COURT. Road Maintenance & Sherman Ave. & Cain Lane Novato Marin Pavement maintenance and rehabilitation Sherman Ave. & Cain Ln. between Sherman & Reichert 08/2020 12/2021 15 30 10 2 Rehabilitation Improvements Road Maintenance & 2019 Annual Pavement Exact locations TBD pending pavement condition assessment. Likely candidate streets for Novato Marin Pavement preservation, maintenance and rehabilitation. 40/2019 06/2020 15 30 10 2 Rehabilitation Rehabilitation Project resurfacing work include Center Rd., Novato Blvd., Wilson Ave., and N. Redwood Blvd. Road Maintenance & S. Novato Blvd to US101 Novato Marin Pavement preservation, maintenance and rehabilitation. S. Novato between Diablo Ave. and US101 12/2021 12/2023 10 30 10 2 Rehabilitation Preventative Mtce Road Maintenance & Olive Phase III (Redwood to Enhance safety of the RR crossing, pavement rehabilitation, replace failing drainage Novato Marin Olive Ave. between Redwood Blvd. and Railroad Ave. 12/2018 12/2022 15 30 10 2 Rehabilitation Railroad) facilities Redwood & San Marin Novato Marin Safety Enhance safety, reduce traffic congestion, modify the interchange (including widening) San Marin Dr. at Redwood Blvd. and southbound US101 I/C 12/2021 12/2024 20 30 10 2 Improvements (AGP-5 & NP-1) Complete Streets Novato Blvd Improvements 7th/Tam- Enhance safety, reduce traffic congestion, widen roadway, and add bike/pedestrian Novato Marin Novato Blvd. between Diablo Ave. and Tamalpais Ave. 06/2022 12/2023 20 30 10 2 Components Diablo facilities Address deficiencies in the public right-of-way (pedestrian/bike focus) near SMART Novato Marin Safety SMART Access Improvements In the vicinity of the SMART San Marin, Hamilton, and future Downtown train stations. 12/2018 12/2019 10 20 10 2 stations Traffic, Bicycle, & Ped Complete Streets Redwood Blvd. from San Marin Dr. to Wood Hollow Dr; Novato Blvd. from Diablo to Grant; Hill Novato Marin Improvements FY 14/15-18/19 Enhance safety, provide equal access, and reduce congestion as issues are identified 12/2018 12/2019 10 20 10 2 Components Rd@Indian Valley; Oak Grove Dr.-Entrada Dr.; Sutro Ave from Novato Blvd to Center Rd. (17/18 Ongoing) Complete Streets Novato Marin North Redwood Blvd Corridor Study Develop comprehensive streetscape plan with public input, determine constraints. Redwood Blvd. between Diablo Ave. and Wood Hollow Dr. 12/2020 12/2022 10 30 10 2 Components

Complete Streets Add Class 2 bike lanes to Lamont Ave., sliver widening and drainage improvements to Novato Marin Lamont Avenue Bicycle Lanes Lamont Ave. between Reichert Ave. and Franklin Ave. 12/2019 12/2020 10 30 10 2 Components accommodate new bicycle facility, pavement rehab., and new striping.

Evaluate improvements to bike/ped access to Stafford Lake Park as a partnership with Complete Streets Marin County Parks. Project may rehabilitate existing asphalt pathway and/or construct Novato Marin Novato Blvd. Multiuse Path Novato Blvd. between Sutro Ave. and Stafford Lake 12/2020 12/2022 10 30 10 2 Components new pathway on potential public access easement from O'Hare Park west to Stafford Lake Park Complete Streets Pedestrian Access to Transit & Novato@McClay, Redwood@Rush Cr., DeLong@Sherman, Diablo@George, Alameda Del Novato Marin Enhance multiple crosswalks identified as being potential barriers to transit use. 12/2017 12/2018 10 20 10 2 Components Crosswalk Improvements Prado@Posada Del Sol. Redwood Blvd. Improvements North Enhance safety, reduce traffic congestion, widen roadway, rehabilitate existing Novato Marin Safety Redwood Blvd. between San Marin Dr. and Wood Hollow Dr. 12/2022 12/2024 20 30 10 2 of San Marin (NP-2) pavement. Road Maintenance & Bridge widening/rehabilitation, construct bicycle lanes, enhance crosswalks, and Novato Marin Grant Ave. Bridge Rehabilitation Grant Ave. between 8th St. and Virginia Ave. 06/2019 12/2020 20 30 10 2 Rehabilitation pavement maintenance/rehabilitation. Complete Streets Novato Marin Downtown SMART Station Phase III Plan and construct improvements to unimproved downtown depot site Grant Ave. between Scott Ct. and Railroad Ave. 12/2019 10/2021 10 30 10 2 Components Road Maintenance & Retaining Wall Assessment Group 1 Assess condition of city retaining walls, establish inventory, implement repairs as Novato Marin Simmons Lane, Sunset Parkway, and Marin Valley above Clubview Drive 11/2017 11/2018 10 20 10 2 Rehabilitation Repairs necessary.

Road Maintenance & Citywide Bridge Novato Marin Assess condition of city bridges, establish inventory, implement repairs as necessary. All city-owned/maintained bridges at various locations within the city limits 12/2019 12/2022 10 30 10 2 Rehabilitation Assessment/Improvement (Group 1)

San Marin/Simmons Intersection Enhance safety, reduce traffic congestion, eliminate porkchop islands to enhance Novato Marin Safety Intersection of San Marin Dr. and Simmons Ln. 12/2021 12/2023 20 30 10 2 Signalization or Roundabout crosswalks, rehabilitate existing pavement.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Nave@Bolling; Nave@S. Hamilton; Redwood@Diablo-DeLong; Redwood@Lamont; Novato Traffic Signal Upgrade Program Traffic signal equipment replacement and timing/phasing modifications to improve Novato Marin Traffic Control Devices Blvd@Grant; Novato Blvd@Tamalpais-7th; Ignacio@Palmer; Ignacio@Alameda Del Prado; 12/2018 12/2020 5 20 10 2 (17/18 Carryover) efficiency and enhance safety for bicyclists and pedestrians. Rowland@Redwood; Rowland@ Rowland Way; Rowland@Vintage Road Maintenance & Pavement maintenance and rehabilitation, close sidewalk gap, enhance crosswalks, Novato Marin Vineyard Road Pavement Rehab Vineyard Rd. between Wilson Ave. and Sutro Ave. 05/2018 06/2019 15 30 10 2 Rehabilitation and add Class II bike lanes where existing width allows. Pavement preservation, maintenance and rehabilitation. Restriping work to include Road Maintenance & Nave Dr. from Alameda Del Prado to Bel Marin Keys Blvd. and Bel Marin Keys Blvd. from Nave Dr. to Novato Marin Measure A Group 10 bicycle lane enhancements and intersection reconfiguration at Roblar Dr. to improve 07/2018 06/2019 15 30 10 2 Rehabilitation Digital Dr. access. Road Maintenance & Town of Ross FY 18/19 Pavement Ross Marin 2" grind and overlay, with minor curb and gutter repair within local residential streets. Olive Ave and Walnut Ave in the Town of Ross, CA. 04/2019 11/2019 10 15 10 3 Rehabilitation Rehabilitation Project Road Maintenance & pavement rehabilitation and curb/gutter repair on Fallen Leaf and portions of Wellington Ross Marin 17/18 Carryover Winship Park in the Town of Ross, CA 07/2018 08/2018 15 25 10 2 Rehabilitation Ave. San Francisco Boulevard from Sir Francis Drake Boulevard to end; Merced Ave from Fern Lane to Street repaving, which consists of removal of the existing pavement section and San Anselmo Ave; Plumas Ave from Scenic Ave to Morton Lane,; Morton Lane from Plumas Ave to Road Maintenance & 2018/2019 FY Street Rehabilitation San Anselmo Marin replacement with new asphalt concrete. Complete Streets elements will be analyzed Elm Ave; Kensington Road from Bolinas Ave to Ross Ave; Brookside Dr from Broadmoor Ave to 07/2018 11/2018 20 30 10 2 Rehabilitation Project and included if appropriate. Cordone Dr; Meadowcroft Dr from Butterfield Rd to Morningside Dr; and Brookside Court from Brookside Dr to end.

This project includes the construction of a multi-use path, parking, and other road improvements along one side of the roadway from Las Gallinas Avenue to the Civic Center SMART station.

The FY 2017-18 amount listed ($100,000) is to contract with an outside firm for the Merrydale Pathway - North preliminary engineering and design of the pathway. Complete Streets San Rafael Marin Connector (Northgate Promenade) Las Gallinas Avenue to Civic Center SMART station 07/2018 01/2019 10 15 10 2 Components (17/18 Carryover) FY 2017-18 Year End Update (6/4/2018): - RMRA funds being used for the design as well as construction of these projects - Design contracted out. Will be designed and constructed same year, no need to separate out from construction - Design estimated to be completed late fall 2019 - WIll go out for bid January 2019

Removing and replacing the top 4" of asphalt, installing new roadway striping and minor electrical work at traffic signals on Lucas Valley/Smith Ranch Roads from Los Gamos Drive on the west to Redwood Highway on the east, including the area underneath the freeway. New wheelchair ramps will be installed where necessary to comply with federal law. This project is a high priority due to the existing asphalt having exceeded its useful lifespan. While the roadway directly under Highway 101 is Caltrans jurisdiction, per the Road Maintenance & Smith Ranch and Lucas Valley agreement in place, the City is responsible for the maintenance of Smith Ranch Road. Lucas Valley/Smith Ranch Road: from Los Gamos Drive on the west to Redwood Highway on the east, San Rafael Marin 03/2019 05/2019 15 20 10 2 Rehabilitation Road Resurfacing (17/18 Carryover) and includes the roadway under Highway 101. FY 2017-18 Year End Update (6/4/2018): - RMRA funds being used for the design as well as construction of these projects - Design contracted out. Will be designed and constructed same year, no need to separate out from construction - Design estimated to be completed late fall 2019 - WIll go out for bid January 2019

San Rafael Sanitation District (SRSD) has performed a larger sewer replacement on Lincoln Avenue. Before SRSD resurfaces the roadway, Public Works will install new wheelchair ramps to comply with federal law. As a standard practice, all curb ramps are replaced and updated with performed street resurfacing. Minor traffic signal upgrades will also be necessary at the intersection of Lincoln Avenue and Paloma Avenue. Complete Streets Lincoln Avenue Curb Ramps (17/18 The project will install wheelchair ramps on Lincoln Avenue from the north side of Mission Avenue to San Rafael Marin 08/2019 01/2020 30 40 10 2 Components Carryover) FY 2017-18 Year End Update (6/4/2018): Prospect Drive. - RMRA funds being used for the design as well as construction of these projects - Design contracted out. Will be designed and constructed same year, no need to separate out from construction - Design estimated to be completed late fall 2019 - WIll go out for bid January 2019

Remove existing concrete pavement and replace with AC pavement. Up to five new Road Maintenance & Bee St. and Bonita St. Bee St. between Bonita St. and Caledonia St. Sausalito Marin curb ramps, sanitary sewer main and lateral and storm drain improvements and 07/2018 10/2018 20 30 10 2 Rehabilitation Improvements Bonita St. Between Litho St. and Bee St. sidewalk improvements as required . Remove exiting concrete surfacing and replace with new asphalt surface. AC overlay Excelsior Ln, between Bulkley Ave. and Steps to Bridgeway with attendant grinding and base repair. Elimination of exposed road base material Road Maintenance & 2019 Streets Resurfacing Project Easterby St. between Bridgeway/Filbert and Pearl St. Sausalito Marin material from entering the bay during wet weather. Six new curb ramps. Elimination of 10/2018 06/2019 10 30 10 2 Rehabilitation (17/18 Carryover) Locust St. between Bridgeway and the bay potential trip hazards, drainage improvements and repair of sanitary sewer main and Girard Ave. between Johnson St. and Turney St. laterals as may be required.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Road Maintenance & 2018 Various Streets Overlay Las Tiburon Marin Pavement overlay of Las Lomas Lane from Mar West to end Las Lomas Lane, Tiburon 01/2018 06/2018 15 30 10 2 Rehabilitation Lomas Lane Town of Tiburon, CA, Road Maintenance & Hawthorne Undergrounding Road Hawthorne Drive from East End to Rock Hill, Hawthorne Drive from Wend End to Rock Hill, Rock Hill Tiburon Marin Restoration of streets following the undergrounding of overhead utilities. 01/2019 06/2019 15 25 10 2 Rehabilitation Resurfacing from Tiburon Blvd to Del Mar, Rock Hill from Del Mar to Cul De Sac

When small localized areas of pavement are found to be in poor condition they are treated with small scale pavement repair. Small scale pavement repair must be done in a timely fashion; as potholes grow and allow water intrusion which leads to more large scale deterioration of the pavement. Surface patching and crack sealing are the two primary intermediary actions taken to conserve the existing conditions of pavement. Road Maintenance & Street and Alley Pavement Azalea Circle, Espey Way, Myrtle Street, Noyo Heights Drive, Olsen Lane, West Street, Willow Street, Fort Bragg Mendocino Pothole patching is the most common local technique, done by milling a portion of the 07/2018 06/2019 2 10 2 2 Rehabilitation Maintenance Woodward Street, and Stewart Street pavement to a depth that removes all deteriorated material and then the pothole is filled with asphalt and compacted. The goal of this project is to prevent the local/residential streets and alleys with low PCI’s from deteriorating into an un-usable state as these street categories often go unselected for full treatment due to the algorithm used to by the Pavement Management Program.

Centerline, fog line, bicycle lane, and crosswalk markings provide cost-effective roadway guidance that helps reduce crashes and supplement other traffic control devices such as sign and signals. The city’s existing pavement markings need replacing in many locations; these will be replaced by thermoplastic and raised pavement markers. This year nine streets have been identified for such work. The street Chestnut Street, East Oak Street, East Pine Street, Redwood Avenue, Manzanita Street, North Fort Bragg Mendocino Traffic Control Devices Crosswalk and Street Marking striping project will replace all white and yellow line markings, decals, raised markers, 07/2018 06/2019 3 4 2 2 Franklin Street, South Harold Street, South Lincoln Street, and Willow Street and word pavement markings on approximately 3.5 miles of streets. The selected streets include arterials, collectors, and safe routes to school. The standards for the application of markings and delineation are set forth in the California Manual on Uniform Traffic Control Devices (MUTCD). The unfunded balance for this project will be covered with local street sales tax dollars.

A full length condition and engineering assessment of Riverside Drive (.63 miles) and Road Maintenance & Mill Street & Riverside Drive Mill Street (.2 miles) to prepare construction documents, specifications and bidding Point Arena Mendocino In Point Arena, all of the City Portion of Riverside Drive and all of Mill Street 10/2018 05/2019 15 25 2 2 Rehabilitation Engineering Assessment documents for the completion of Riverside Road and Mill Street reconstruction in budget years 2019-2020 and 2020-2021.

Port Road Rehab & Slurry Seal ‐ O Numerous base failures require 10,000 + sq. ft. of dig outs and 5” of reconstruction and then 42,000 sq. ft. of slurry seal. We expect a life Road Maintenance & In Point Arena, on Port Road , extending easterly from the western terminus at the Point Arena Pier Point Arena Mendocino Port Road Rehab & Slurry Seal of the slurry seal to be 8 -10 years thus preserving the underlaying asphalt while we 03/2018 07/2018 10 15 2 2 Rehabilitation ramp for 0.6 miles, ending approximately at the eastern terminus near the Iversen Road junction. work on repairs to streets that require larger investments per square foot. We expect the Port Rd. project to be completed before the end of summer 2018.

Road Maintenance & This project will construct a 2-inch AC overlay on North State Street from 240 feet north Ukiah Mendocino North State Street AC Overlay North State Street from 240 feet north of Low Gap Road to the northern City limits in Ukiah, California 07/2018 10/2018 20 25 2 2 Rehabilitation of Low Gap Road to the northern City limits. Road Maintenance & South Orchard Avenue AC Overlay This project will construct a 2-inch AC overlay on South Orchard Avenue from Gobbi Ukiah Mendocino South Orchard Avenue from Gobbi Street to Marlene Street 07/2018 10/2018 20 25 2 2 Rehabilitation (17/18 Carryover) Street to Marlene Street. Replacement of approximately 5 miles of deteriorated traffic markings, including: pedestrian crosswalks, center lines, bike lanes, etc. This is part of a program to replace Various locations throughout the City. Most streets in our city of 2.8 square miles are on a four-year Annual Striping Program FY a quarter of the City's traffic markings per year. The annual striping program re-stripes Willits Mendocino Safety rotation, with approximately 20-22 miles of paved roadway total. All project locations are within 1.5 04/2019 06/2019 2 4 2 2 2018/19 and refreshes traffic markings on approximately one quarter of the City's streets each miles of Lat 39.400528, Lon -123.349698 year. Certain high traffic locations and most school zones are stripped each year or every other year as needed. Road Maintenance & Creekside Road Stabilization This project will repair drainage structures, regrade the roadway, replace approximately Willits Mendocino Creekside Street, between Boscabell and South Lenore Streets 04/2019 06/2019 10 25 2 2 Rehabilitation Project 80' of curb, gutter, and asphalt. Traffic Light Installation @ Atwater The City of Atwater will install a traffic light at Atwater Boulevard and First Street to Atwater Merced Traffic Control Devices Boulevard/First Street (17/18 Atwater Boulevard and First Street 07/2018 01/2019 15 30 21 12 provide safe controls for drivers and pedestrians. Carryover) The City of Atwater will retrofit a traffic light from a camera control to an induction coil Traffic Retrofit @ Winton Way and Atwater Merced Traffic Control Devices control for better performance in inclement weather, ensuring safety and ease of Winton Way and Juniper Avenue 07/2018 01/2019 15 30 21 12 Juniper Avenue (17/18 Carryover) commute for drivers/pedestrians. Complete Streets Winton Way Road Improvement Winton Way will undergo a long-term pavement upgrade to address future needs of the Atwater Merced Winton Way between Broadway and Bellevue Road 07/2018 12/2028 20 30 21 12 Components (17/18 Carryover) City

Complete Streets Fruitland Avenue Road Fruitland Avenue will undergo a long-term pavement upgrade with new traffic circles to Atwater Merced Fruitland Avenue between Orchard Park and Shaffer Road 10/2018 12/2028 20 30 21 12 Components Improvements (17/18 Carryover) encourage the flow of traffic while reducing emissions and increasing pedestrian safety.

Atwater Station, in conjunction with the Altamont Corridor Express, will provide an ACE Merced Extension: Atwater Atwater Merced Other environmentally-friendly travel alternative to the Bay Area while revitalizing Atwater Atwater Boulevard, between Winton Way to east of First Street 12/2020 12/2022 20 30 21 12 Station (17/18 Carryover) Boulevard with new sidewalks and improved parking.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Its for development of the Active Transportation Plan for the City. The City currently does not have an The Active Transportation Plan will slowly adapt current transportation infrastructure to active transportation plan. Locations include Bell Dr., Olive Ave., Applegate Rd., N Winton Way., Active Transportation Plan (17/18 encourage the use of public transportation, bicycle paths and walking through the Bellevue Rd., East Bellevue Rd., Atwater Merced Other 12/2019 12/2025 20 30 21 12 Carryover) development of new mass transit options, protected bicycle lanes, and improved Juniper Ave., East Juniper Ave., First St., Shaffer Rd., Ave One, Ave Two, sidewalks. All locations have yet to be finalized and are subject to change N Buhach Rd., Santa Fe Dr., Green Sands Ave. and Gertrude Ave. All locations have yet to be finalized and are subject to change.

Broadway from Winton Way to Shaffer Rd. Third St. from Atwater Blvd. to Juniper Ave. Linden St. All City roads require extensive painting maintenance for safety. from First St. to Bellevue Rd. All locations have yet to be finalized and are subject to change Road Maintenance & 18/19 Annual City - Wide Roadway Center Striping Broadway from Winton Way to Shaffer Rd. Center Striping Third St. Atwater Boulevard from Winton Way West to the Freeway on ramp Atwater Merced 08/2018 06/2019 10 20 21 12 Rehabilitation Painting from Atwater Blvd. to Juniper Avenue. Center Striping Linden from First Street to Current listed locations are based on an estimate and may change based on priority need and Bellevue Rd. All locations have yet to be finalized and are subject to change resources. All locations have yet to be finalized and will be selected based on priority need and resources throughout the year.

Atwater's current pedestrian infrastructure is aging rapidly. In addition to cracks and Curb, Gutter and sidewalk Third St. from north of Palm Ave. to Mulberry Ave; Mulberry from Third St. to Fourth St; Fourth St. from Atwater Merced Safety unsafe ledges, sidewalks are not compliant with the Americans with Disabilities Act 07/2018 06/2019 15 30 21 12 replacement (17/18 Carryover) Quince Ave. to Mulberry. Approximately 1,200 LF total. (ADA).

The complete reconstruction and replacement of storm drainage systems, streets, Road Maintenance & Center Avenue North Project - 17/18 sidewalks, curb, and gutter, including any environmental and engineering work ad Center Avenue from Marguerite Street to Loraine Street, and Loraine Street from Center Avenue to Dos Palos Merced 12/2018 06/2019 40 50 21 12 Rehabilitation Carryover deemed necessary located on Center Avenue from Marguerite Street to Lorain Street, Dos Palos Avenue and Loraine Street from Center Avenue to Dos Palos Avenue

Complete Streets Sidewalks and public street near the entrance of mobile-home located in the 1400 block of Meredith Gustine Merced Greenacres Project (Ongoing) Eliminate high curbs and install ADA-compliant ramps. 06/2018 01/2019 15 20 21 12 Components Avenue.

Ramp, sidewalk and gutter rehabilitation to improve safety and walkability of the area. Complete Streets The project will replace uneven concrete that contains tripping hazards, as well as Block on the southwest corner of 5th Street and North avenues and Northwest corner of 5th Street and Gustine Merced Hillview Sidewalk (Ongoing) 12/2017 07/2018 15 20 21 12 Components replace ramps for handicap access for all pedestrians, including citizens attempting to First Avenue adjacent to the public high school and funeral home. access both the public High School and the sole funeral home in the City.

Ramp, sidewalk and gutter rehabilitation to improve safety and walk-ability of the area. Complete Streets The project will replace uneven concrete that contains tripping hazards, as well as Block on the northwest corner of 5th Street and 3rd Avenue, in the heart of the City business district Gustine Merced Main Street/GPS Project (Carryover) 03/2019 12/2019 15 20 21 12 Components replace ramps for handicap access for all pedestrians, including all traffic in the and utilized extensively by the public. downtown corridor. Gustine Merced Traffic Control Devices Hwy 33/140 Roundabout Eliminate stop sign on State Highway 33, replacing with a Roundabout. Junction of State Highways 33 and 140. 11/2018 11/2019 10 20 21 12 Replace two-way stop with Roundabout to correct site obscurement and ADA Gustine Merced Traffic Control Devices Downtown Roundabout Intersection of 5th Street and 4th Avenue. 11/2021 11/2022 10 20 21 12 compliance issues. Road Maintenance & Gustine Merced Carnation Road Rehabilitate/reconstruct dilapidated roadway Carnation Road between East Avenue and Waste Water Treatment Plant 01/2019 11/2019 10 20 21 12 Rehabilitation CMAQ - Construct Roundabout at Livingston Merced Other Construct a Roundabout at Main Street & B Street In the City of Livingston at the intersection of Main Street and B Street 08/2018 08/2019 10 20 21 12 Main St & B St Road Maintenance & Livingston Merced Stefani Avenue Rehabilitation Reconstruction of the roadway structural section In the City of Livingston between Davis Street and Campbell Boulevard 08/2018 09/2019 10 20 21 12 Rehabilitation

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts West I Street from Pacheco Blvd to 7th St Colorado Ave from H St to J St J St from Colorado Ave to Pacheco Blvd Maryland Ave from J St to Pacheco Blvd West K St from West I St to Iowa Ave Linda Vista from West J St to West I St H St from Texas Ave to Arizona Ave H St from 2nd St to 4th St H St from 7th St to Pacheco Blvd 3rd St from H St to K St Johnson Rd from Overland Ave to H St Ortigalita Rd from Pioneer Rd to Cardoza Rd K St from 3rd St to 7th St L St from Center Ave to 5th St 5th St from M St to H St 6th St from Page Ave to H St 10th St from I St to H St 7th St from H St to Willmott Rd C St from 7th St to North St Road Maintenance & North St from D St to Willmott Rd Los Banos Merced Fog Seal A sprayed on application of SS1H liquid asphalt emulsion with a light coating of sand 07/2018 09/2018 5 7 21 12 Rehabilitation D St from North St to 3rd St 3rd St from D St to G St E St from 2nd St to 3rd St E St from 5th St to 7th St F St from 2nd St to 7th St G St from 2nd St to 5th St 4th St from H St to F St 6th St from F St to E St M St from 4th St to 6th St North Santa Anna St from East B St to Overland Ave North Santa Rita St from East B St to Santa Cruz Way Santa Maria Rd from Santa Anna St to East End Santa Inez from Santa Maria Rd to Overland Ave Santa Paula St from Santa Maria Rd to Overland Ave North Santa Rosa from East B St to Santa Cruz Way Quail St from Mercey Springs Rd to Woodbury Dr Chukar St from Skylark Ave to Meadowlark Ave Dove St from Mercey Springs to Fairmont Dr Eagle St from Skylark Ave to Meadowlark Ave Robin St form Skylark Ave to Meadowlark Ave Road Maintenance & Los Banos Merced Fog Seal (17/18 Ongoing) A sprayed on application of SS1H liquid asphalt emulsion with a light coating of sand Iowa Ave from Pacheco Blvd to Madrone St 07/2018 09/2018 5 7 21 12 Rehabilitation

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts West I Street from Pacheco Blvd to 7th St Colorado Ave from H St to J St J St from Colorado Ave to Pacheco Blvd Maryland Ave from J St to Pacheco Blvd West K St from West I St to Iowa Ave Linda Vista from West J St to West I St H St from Texas Ave to Arizona Ave H St from 2nd St to 4th St H St from 7th St to Pacheco Blvd 3rd St from H St to K St Johnson Rd from Overland Ave to H St Ortigalita Rd from Pioneer Rd to Cardoza Rd K St from 3rd St to 7th St L St from Center Ave to 5th St 5th St from M St to H St 6th St from Page Ave to H St 10th St from I St to H St 7th St from H St to Willmott Rd C St from 7th St to North St Road Maintenance & A hot liquid rubberized asphalt application material, applied to the cracks on the North St from D St to Willmott Rd Los Banos Merced Crack Seal 10/2018 06/2019 5 7 21 12 Rehabilitation roadway D St from North St to 3rd St 3rd St from D St to G St E St from 2nd St to 3rd St E St from 5th St to 7th St F St from 2nd St to 7th St G St from 2nd St to 5th St 4th St from H St to F St 6th St from F St to E St M St from 4th St to 6th St North Santa Anna St from East B St to Overland Ave North Santa Rita St from East B St to Santa Cruz Way Santa Maria Rd from Santa Anna St to East End Santa Inez from Santa Maria Rd to Overland Ave Santa Paula St from Santa Maria Rd to Overland Ave North Santa Rosa from East B St to Santa Cruz Way Quail St from Mercey Springs Rd to Woodbury Dr Chuckar St from Skylark Ave to Meadowlark Ave Dove St from Mercey Springs to Fairmont Dr Eagle St from Skylark Ave to Meadowlark Ave Robin St form Skylark Ave to Meadowlark Ave Road Maintenance & Center Ave from Cardoza Rd to City Limits South Los Banos Merced Cold Mix Overlay A thin layer of cold mix spread out over entire roadway section 06/2019 06/2019 10 20 21 12 Rehabilitation Willmott Rd from Johnson Rd to 1st St

West I Street from Pacheco Blvd to south end Cardoza Road from Badger Flat to West I Street Bellflower Way from Woodbrush Ave to Wildrye Ave Bluegrass Ct from Woodbrush Ave to west end Woodbrush Ave from Bellflower Way to Badger Flat Rd Dewberry Ct from Woodbrush Ave to west end Oatgrass Way from Woodbrush Ave to Ortigalita Rd Cattail Ct from Oatgrass Way to south end Road Maintenance & A hot liquid rubberized asphalt application material, applied to the cracks on the Los Banos Merced Crack Seal (17/18 Carryover) Reed Ct from Bellflower Way to north end 10/2018 06/2019 5 7 21 12 Rehabilitation roadway Watercress Ct from Bellflower Way to north end Landing Way from Bellflower Way to Cardoza Rd Wildrye Ave from Bellflower Way to Oatgrass Way Ortigalita Rd from Pacheco Blvd to Cardoza Rd Birch Ave from Ortigalita Rd to Magnolia Way Birch Ave from West I St to Eucalyptus Dr Greenwood Way from Birch Ave to Alberta St Hawthorne Dr from Birch Ave to West I Street

Road Maintenance & Los Banos Merced Cold Mix Overlay (17/18 Carryover) A thin layer of cold mix spread out over entire roadway section Overland Avenue from Nantes Ave to Johnson Rd 06/2019 06/2019 10 20 21 12 Rehabilitation Road Maintenance & A hot liquid rubberized asphalt application material, applied to the cracks on the Los Banos Merced Crack Seal (17/18 Ongoing) Iowa Avenue from Pacheco to Madrone St 10/2018 06/2019 5 7 21 12 Rehabilitation roadway Road Maintenance & Roadway Scrub Seal (17/18 Canal Street (Childs Ave to 16th St); East El Portal Avenue (G St to Joerg Ave); West 26th Street (G Merced Merced Scrub Seal Roadway Rehabilitation Project. 05/2018 09/2018 7 10 21 12 Rehabilitation Ongoing) St to M St); and Merced Avenue (Parsons Ave to Motel Drive) Various locations throughout the City of Merced - see Location Map. Sidewalk Replacement Project Merced Merced Safety Sidewalk Replacement Project. (K, Canal, & 8th Streets; Seville Way; East Donna Drive; Q & 4th Streets; Q & 10th Streets; R & 10th 05/2018 09/2018 10 20 21 12 (17/18 Ongoing) Streets; Evelyn & Julie Drive; East 22nd St & Cherry Ave) Curb and Gutter Replacement Various locations throughout the City of Merced - see Location Map. Merced Merced Safety Curb and Gutter Replacement Project. 05/2018 09/2018 10 20 21 12 Project (17/18 Ongoing) (K St; Q & 10th St; R & 10th/11th St; Evelyn Ct; East 22nd St & Cherry Ave; V & 8th St) Merced Merced Other Road Improvement Project (1) Road widening and traffic signal improvements. Yosemite Avenue (St. Augustine to SR 59) 04/2019 07/2019 20 20 21 12 Merced Merced Other Road Improvement Project (2) Road widening, sidewalk, curb and gutter. Childs Avenue (Parsons Avenue to Campus Parkway) 06/2019 10/2019 20 20 21 12

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Various locations throughout the City of Merced. Area 1 generally bounded by south of Santa Fe Road Maintenance and Road Maintenance & Avenue, north of Highway 99, east of Highway 59, and west of Yosemite Parkway. Area 2 generally Merced Merced Rehabilitation Programs and Road Maintenance and Rehabilitation Programs and Material Purchase. 07/2018 06/2019 5 7 21 12 Rehabilitation bounded by south of Highway 99, north of Dickenson Ferry Road, east of Thornton Road, and west of Material Purchase Highway 59. See "Maintenance Area" attachment for detailed information.

Road Maintenance & These funds will be used to perform minor repair work on a deteriorating section of road Alturas Modoc East 8th Street road way repair 8th and Main street 06/2019 07/2019 7 12 1 1 Rehabilitation way. This will give this road way some additional life. Meridian Blvd Curb and Gutter replacement project Phase 2. Located along Meridian Blvd west of Minaret Rd the project will remove and replace curb and gutter that is Road Maintenance & Meridian Blvd Curb and Gutter Mammoth Lakes Mono currently failing to convey stormwater, undermining pavement and is a hazard to Meridian Blvd, Mammoth Lakes CA 05/2019 07/2019 10 20 25 1 Rehabilitation Phase 2 pedestrians. The project is expected to last at least 20 years and would be completed during the summer of 2018. Provide funding to remedy any multi -modal infrastructure deficiencies or complete any necessary safety improvements identified during the planning and/ or construction Complete Streets Main Street Infrastructure Mammoth Lakes Mono process that are not directly funded by the current STIP sidewalk projects. Main Street (SR203) Mammoth Lakes CA 05/2019 07/2019 10 20 25 1 Components Improvements Improvements of this nature typically last 20 years and would be completed during the summers of 2018 or 2019.

Type II Slurry Seal 1. 2nd Avenue from Santa Fe to Lobos Street 2. 3rd Avenue from Junipero Avenue to Santa Fe Street 3. 3rd Avenue from Santa Rita Street to Guadalupe Street 4. 4th Avenue from Santa Fe Street to Santa Rita Street 5. 5th Avenue from Dolores Street to San Carlos Street 6. 6th Avenue from Mission Street to Torres Street 7. 6th Avenue from Monte Verde to Lincoln Street 8. 7th Avenue from San Carlos Street to Junipero Avenue 9. 7th Avenue from Guadalupe Street to Forest Street 10. 10th Avenue from Junipero Avenue to Torres Street 11. 11th Avenue from Junipero to East End 12. 13th Avenue from San Carlos Street to Junipero Avenue 13. Camino Del Monte from City Limits to 2nd Street 14. Del Mar from Ocean Avenue to Turn Around 15. Dolores Street from Vista to 2nd Avenue 16. Dolores Street from 4th Avenue to 5th Avenue 17. Dolores Street from Franciscan Way to City Limits Road Maintenance & Carmel-by-the-Sea Monterey Road Project (FY 18/19) Type II Slurry Seal on 26 Possible Segments and 2 inch overlay 18. Escolle Way from Perry Newberry Way to Turn Around 03/2019 04/2019 10 15 29 17 Rehabilitation 19. Junipero Avenue from Ocean Avenue to 8th Avenue 20. Lasuen Drive from Rio Road to City Limit 21. Lincoln Street from 5th Avenue to Ocean Avenue 22. Lobos Street from 2nd Avenue to 4th Avenue 23. Mission Street from 3rd Avenue to 4th Avenue 24. Ocean Avenue from Del Mar to San Antonio Avenue 25. Santa Lucia Avenue from Camino Real to Dolores Street 26. Torres Street from City Limits to 2nd Avenue

2 Inch overlay 1. 1st Avenue from Carpenter Street to Lobos Street 2. 8th Avenue from Casanova Street to Monte Verde Street 3. 8th Avenue from San Carlos to Junipero Avenue 4. Camino Del Monte from 3rd Avenue to Junipero Avenue 5. Forest Road from Mountain View to 7th Avenue 6. Junipero Avenue from 8th Avenue to 10th Avenue 7. Junipero Avenue from Camino Del Monte to 2nd Avenue 8. Santa Fe Street from Ocean Avenue to 8th Avenue

Design and construct street reconstruction and overlay package, Del Rey Oaks Road Maintenance & Street Reconstruction and Overlay Del Rey Oaks Monterey residential streets, estimated useful life 15-20 years. Estimated completion October Carlton Drive and cul du sacs north of Portola and Quendale Streets. 02/2019 06/2019 15 20 29 17 Rehabilitation Package 2019. Road Maintenance & Alta Street Pavement Rehabilitation Reconstruct major arterial through the City of Gonzales. 10,000 LF of roadway will be Gonzales Monterey Alta Street from 10th Street (northern City limits) to on-ramp to SB101 (southern City limits) 12/2017 08/2018 12 20 28 12 Rehabilitation (17/18 Ongoing) improved. Improvements to public alley servicing commercial properties fronting El Camino Real and residential properties fronting 8th Street. Project includes asphalt and concrete repairs, reconstruction of alley paving, construction of concrete ribbon gutters for Road Maintenance & Commercial and Residential Alley Alley between El Camino Real and 8th Street, from Apple Avenue to Elm Avenue, Greenfield, CA Greenfield Monterey drainage and stormwater control, construction of ADA pedestrian crossings at affected 04/2018 11/2018 15 20 30 12 Rehabilitation Improvement Project 93927 street intersections, construction of a subterranean stormwater retention basin, and associated design, construction management, and inspection services provided by City Engineer and City staff. Road Maintenance & Related costs of Public Works employees assigned to the Streets Division and Greenfield Monterey Administrative Costs City of Greenfield 01/2018 06/2019 1 1 30 12 Rehabilitation providing local street and road maintenance and repair services.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Crack seal and Slurry Seal - Royal City of King City - Amherst Dr, Bedford Ave, Bedford Circle, Bluff Avenue, Brighton Ave, Cambridge Road Maintenance & King City Monterey Coach and N Vanderhurst St/Queen Project consist of Slurry Seal treatment to the following Street. Ave, Keats Ave, Leeds Ave, Nantucket Way, Ocford Ave, Sussex Circle, Sussex Way, Wellington 07/2018 09/2018 10 15 30 12 Rehabilitation St Neighborhoods Ave, Orchard St, Copley St, N Vanderhurst Ave (North of King St) and Queen St.

Road Maintenance & Bitterwater Rd - East of Industrial Dr Design, Grind and Overlay - Total cost with other revenues is $330,000. SB1 funds King City Monterey Bitterwater Road - East of Industrial Drive to East of Airport Drive 07/2018 09/2018 25 30 30 12 Rehabilitation to East of Airport Dr expected to be used is $86,917.00. Road Maintenance & ANNUAL STREET RESURFACING, Marina Monterey CRACH SEALING, DIGOUTS, 2IN OVERLAY DEL MONTE BLVD - RESERVATION RD TO SR1, RIGHT LANE 03/2019 06/2019 4 29 29 17 Rehabilitation OVERLAY CRESTVIEW CT - RESERVATION RD TO END; JOHNSON PL - TALLMON ST TO END; LELIA PL - CRIVELLO RD TO END; OTTO DR - HILLCREST AVE TO END; SNELL PL - MESSINGER DR TO Road Maintenance & ANNUAL STREET RESURFACING, Marina Monterey CRACH SEALING, DIGOUTS, RUBBER CAPE SEAL END; VISTA DEL CAMINO - SUSAN AVE TO MELANIE RD; YOUNG CIR - VILLA CIR TO END; 04/2019 06/2019 10 29 29 17 Rehabilitation RUBBER CAPE JORDON CT - BROSTROM DR TO END; KENNEDY CT - REINDOLLAR AVE TO SOUTH END; SHOEMAKER PL - MESSINGER DR TO END Road Maintenance & ANNUAL STREET RESURFACING, Marina Monterey CHIP SEAL & SLURRY SEAL CARMEL AVE - CALIFORNIA AVE TO SALINAS AVE; FIRST AVE - DIVERTY ST TO EIGHTH ST 04/2019 06/2019 10 14 29 17 Rehabilitation CAPE

ALBERT WAY - LYNSCOTT DR TO END; ARNOLD CT - LANDRUM CT TO END; BAILEY CT - WITTENMYER CT TO END; BAYER DR - RIDGEVIEW AVE TO MELVILLE RD; CALIFORNIA AVE - TAMARA CT TO CARMEL AVE; CALIFORNIA AVE - REINDOLLAR AVE TO TAMARA CT; CLARKE PL - MESSINGER DR TO END; EDNA CT - LYNSCOTT DR TO END; FERRIS CIR - SUNRISE CIR TO END; HILLCREST AVE - ZANETTA DR TO VAUGHAN AVE; HORN CT - PRESTON DR TO END; Road Maintenance & ANNUAL STREET RESURFACING, Marina Monterey SLURRY SEAL JEAN ST - FERRIS AVE TO JEAN CIR; MARINA GREENS DR - PAUL DAVIS DR TO DEL MONTE 05/2019 06/2019 24 29 29 17 Rehabilitation SLURRY BLVD; OAK CIR - DE FOREST RD TO END; REDWOOD DR - HILLCREST AVE TO CARMEL AVE; SAND DOLLAR CT - STARFISH CT TO END; STARFISH CT - MARINA DR TO END; SUNRISE AVE - KELLI CT TO BOSTICK AVE; TALCOTT AVE - GRANT ST TO REINDOLLAR AVE; TWELFTH ST - SECOND AVE TO ELEVENTH ST; VISTA DEL CAMINO - MELANIE RD TO GEORGE WAY; BEACH RD - DEL MONTE BLVD TO DE FOREST RD

CONCORD CT - EDDY ST TO END COVE WAY - DOLPHIN CIR TO END CRESCENT ST - PATTON PARKWAY TO REINDOLLAR AVE DIANA PL - LYNSCOTT DR TO END ECHO ST - NEESON RD TO DELTA ST ELLIS CT - SALINAS AVE TO END FIFTH AVE - THIRD ST TO EIGHTTH ST FITZGERALD CIR - BEACH RD TO END FOREST CIR - BAYER ST TO END HEALY AVE - ABDY WAY TO MARINA DR JUNIPER CT - DOLPHIN CIR TO END KAREN CT - CALIFORNIA AVE TO END LAKE CT - SR 1 TO END Road Maintenance & ANNUAL STREET RESURFACING, LAKEWOOD DR - DREW ST TO ABDY WAY Marina Monterey SEAL CRACKS 05/2019 06/2019 16 18 29 17 Rehabilitation CRACK SEAL MAX CIR - REINDOLLAR AVE TO END MICHAEL DR - MICHELLE CT TO NORTH END QUEBRADA DEL MAR RD - COSTA DEL MAR RD TO SIRENA DEL MAR RD REDONDO CT - CARDOZA AVE TO END RESERVATON RD - SEASIDE CT. TO DEL MONTE BLVD RESERVATON RD - EB - DEL MONTE BLVD TO SEACREST AVE RESERVATON RD - WB - DEL MONTE BLVD TO SEACREST AVE RESERVATON RD - WB - BLANCO RD (WEST BOUND) TO IMJIN PARKWAY SANDPIPER WAY - DOLPHIN CIR TO END SUSAN AVE - VISTA DEL CAMINO TO MELANIE RD TAMARA CT - CALIFORNIA AVE TO END VISTA DEL CAMINO CIR - GEORGE WAY TO SOUTH END VISTA DEL SUR - SUSAN AVE TO END WILSON CT - ABRAMS DR TO SOUTH END

Construction of concrete curbs, gutters, sidewalks, sidewalk crossings (driveway Road Maintenance & Reconstruction of Via Gayuba approach) and curb ramps, storm drainage, signage and striping, isolated street and Monterey Monterey Via Gayuba (between Via Del Pinar and Mar Vista) 11/2018 08/2019 20 25 29 17 Rehabilitation (Carryover from FY 17/18) driveway surface repairs, pavement grinding, street reconstruction and hot mix asphalt pavement. Construction of concrete curbs, gutters, sidewalks, sidewalk crossings (driveway Road Maintenance & Reconstruction of Mar Vista and approach) and curb ramps, storm drainage, signage and striping, isolated street and Monterey Monterey Mar Vista, from Skyline Drive to Monte Vista, and Skyline Drive, from Veterans Drive to Mar Vista 01/2019 06/2019 20 20 29 17 Rehabilitation Skyline Drive driveway surface repairs, pavement grinding, street reconstruction and hot mix asphalt pavement.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

This will include necessary road rehabilitation on Congress Avenue between Sunset Drive and David Avenue. The project will include reconstruction of approximately 52,000 SF of roadway and concrete overlay on approximately 67,00 SF of roadway. Road Maintenance & Congress Avenue Street This project will also include construction of a continuous pedestrian walkway and Pacific Grove Monterey Congress Avenue, from David Avenue to Sunset Drive. 03/2019 06/2019 15 20 29 17 Rehabilitation Rehabilitation installation of ADA ramps. The City plans to use the entire SB1 FY18/19 allocation of $257,361 towards the road rehabilitation and maintenance portion of the Congress Avenue Road Rehabilitation Project.

Upgrade faded lane lines, crosswalks (various locations) and bike lanes (various Salinas Monterey Safety Striping and Signing locations). Bike lanes include Alisal Street (Work St. to Bardin Rd.); Abbot Street 06/2018 03/2019 5 7 30 12 (Carryover from 17/18) Pavement repairs and asphalt concrete overlay on collector street Circle Drive, Road Maintenance & Salinas Monterey Circle Drive Improvements including striping. Circle Dr., between Sanborn Rd. and St. Edwards Dr. 09/2018 03/2019 25 50 30 12 Rehabilitation (Carryover from 17/18) Road Maintenance & San Juan Grade Road Pavement repairs and asphalt concrete overlay on major arterial San Juan Grade Road, Salinas Monterey San Juan Grade Road, between Boronda Road and Russell Road. 09/2018 03/2019 25 50 30 12 Rehabilitation Improvements including striping. Constitution Blvd (E Laurel Dr to Boronda Rd); Natividad Rd (E Alvin Dr to E Boronda Rd); John St Road Maintenance & Pavement Slurry Seal Citywide pavement maintenance (slurry seal) and striping on major & minor arterials (Wood St to Alisal Rd); Freedom Pkwy (Constitution Blvd to Williams Rd); North Sanborn Rd (Del Salinas Monterey 09/2018 03/2019 5 7 30 12 Rehabilitation Improvements and local residential roads. Monte Ave to Boronda Rd); East Laurel Dr (Natividad Rd to N Sanborn Rd); and residential streets citywide. Salinas Monterey Traffic Control Devices Priority Traffic Signals 1-2 New traffic signals on City Priority List (1&2) (17/18 Ongoing) East Alvin Dr at Linwood Dr; Boronda Rd at Sanborn Rd 01/2018 12/2018 25 50 30 12 Road Maintenance & Contra Costa Street and Sidewalk Curb, gutter, and sidewalk improvements; and adjacent street rehabilitation with new Sand City Monterey Contra Costa Street between Elder Avenue and Shasta Avenue 04/2022 09/2022 10 20 29 17 Rehabilitation Improvement Project crosswalks. Road Maintenance & Fremont Boulevard Rehab (17/18 Seaside Monterey Remove & Replace failed storm drains & road sections South city limit to north city limit 05/2018 11/2018 1 5 29 17 Rehabilitation Ongoing) West Street, between Front and Market Road Maintenance & Repair of failed roadway sections (dig-out and replace with new asphalt concrete), Soledad Monterey 2018 Streets Maintenance Project Front Street, between San Vicente Rd and Oak Street 08/2018 10/2018 10 20 30 12 Rehabilitation slurry/Cape Seal and re-striping of various roadways throughout City. Benito Street, Between North Installation of accessible concrete bulb-outs at two intersections and one mid block crossing to create safe crossing locations for nearby elementary schools. Upgraded Complete Streets Metz Road Traffic Calming Project Soledad Monterey roadway striping will include left hand turn lanes, bike lanes, and upgraded high visibility Metz Road between Walker and Third 04/2018 08/2018 20 30 30 12 Components (17/18 Ongoing) crosswalks. The roadway will also have repairs made and an asphalt slurry seal applied for maintenance. Road Maintenance & 2019 Annual Pavement Arden Court, Kensington Way (E end to Chaucer), Knightsbridge Way (Elliott to Danrose), Lansford American Canyon Napa Mill and overlay 06/2019 07/2019 10 20 4 3 Rehabilitation Management Project Court, Linwood Lane, Park Lane, Regent Court and Strand Court 2018 Annual Pavement Road Maintenance & Ascot Court, Bedford Lane, Brookshire Way, Capra Drive, Chaucer Court, Kent Way, Kingsly Lane, American Canyon Napa Management Project (17/18 Mill and Overlay 07/2018 08/2018 10 20 5 3 Rehabilitation Knightsbridge Court, Knightsbridge Way (Danrose to Banbury) and Patricia Drive. Carryover8

Calistoga Napa Other Design FY 19/20 Proejcts Hire consultants to design next years SB1 projects so they are shelf ready to bid Design of projects will include assessment of all City roadways and necessary improvements. 72/2018 06/2019 10 20 7 2

Complete Streets North Half Sector A Sidewalk Calistoga Napa Replace damaged sidewalks in North Half of Sector A North of Washington between Lincoln Ave and Berry Street 07/2018 06/2019 10 20 7 2 Components Replacement

The project generally includes the application of various preventative maintenance Project locations include (but are not limited to) maintenance areas and individual streets within the techniques on City streets. The treatments will include, but are not limited to: crack City of Napa: Browns Valley West, Central, Alta Heights, Westwood, Springwood Estates, Von Uhlit Road Maintenance & SB 1 - Road Maintenance Project sealing, scrub sealing, rejuvenating seals and microsurfacing. Each technique is Napa Napa Ranch, Valle Verde Dr., Salvador Ave., Foster Rd. and Kaiser Rd. Area maps showing said locations 07/2018 06/2019 2 7 4 3 Rehabilitation FY2018/19 considered cost effective and will extend the life of pavements approximately 2 to 7 are attached with the Council Resolution. All project locations listed are preliminary and may be years by protecting the surface from the effects of aging, cracking, deterioration, and subject to change. water infiltration while also enhancing the safety and appearance.

The project generally includes (but is not limited to) the application of an asphalt Project locations include (but are not limited to) various neighborhoods within the City of Napa Road Maintenance & SB 1 - Street Rejuvenation Project rejuvenation sealant on more than 100 roadway segments (approximately 16 centerline identified as: Young Ave. Area, Mac Tract, West Twin Oaks Area, Robinson Lane Area, River Park, Napa Napa 05/2018 06/2019 2 5 4 3 Rehabilitation FY17/18 (FY17/18 Carryover) miles). This process reverses the effects of aging due to environmental damage from Napa Valley Corporate Park, and ABC Streets. Area maps are attached. All project locations listed sunlight and water. It is cost-effective and extends the life of the roadway 2-5 years. are preliminary and may be subject to change.

Road Maintenance & St. Helena Napa 2017/18 Pavement Restoration Overlay 0.41 miles of roadway, upgrade curb ramps and striping Kennedy Court, El Bonita, and La Quinta 05/2018 08/2018 7 15 7 2 Rehabilitation

Road Maintenance & 2018/19 Pavement Restoration Andrea Ave frm Kearney to Oak, Grove Ct frm Hunt to End, Kearney St frm Hillview to Pine, Spring St St. Helena Napa Overlay 0.89 miles of roadway, upgrade curb ramps and striping 05/2019 08/2019 7 15 7 2 Rehabilitation Project frm Valleyview to Sylvaner, Spring St frm City limits to west of Sylvaner, Monte Vista frm Hunt to End

Design downtown sidewalk and pedestrian improvements: sidewalk, curb ramps, bulb Complete Streets Downtown Sidewalk and Pedestrian St. Helena Napa outs, landscape, furnishing, utilities. OBAG II Grant (2 year design with construction in Main Street (Highway 29) from Mitchell Drive to Pine Street 02/2020 10/2022 15 30 7 2 Components Project FY20/21 Complete Streets St. Helena Napa Sidewalk Gap Closure Project Complete a sidewalk gap closure project Hunt Avenue from Monte Vista Avenue to June Lane 05/2019 07/2019 15 30 7 2 Components Road Maintenance & Annual Paving Maintenanc and Remove and replace - tree abatement and replace curbs, gutters, ADA Ramps, Yountville Napa Yount Street (from Finnell to Mount St) 01/2019 04/2019 25 40 3 4 Rehabilitation Paving Program sidewalks.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Road Maintenance and Rehabilitation Account (RMRA) projects will resurface or repave several streets throughout the City of Grass Valley. Streets are selected and prioritized Road Maintenance & 2018 Annual Street Rehabilitation Bennett St, Brighton St, East Main St, Freeman Ln, McCourtney Rd, Mill St, and S Auburn St, Grass Grass Valley Nevada based on the City’s Pavement Management System in order to most effectively address 06/2018 10/2018 15 20 1 1 Rehabilitation Project Valley, CA deferred maintenance on the local street system and prioritize the delivery of basic street maintenance and rehabilitation projects

This project consists of roadway rehabiliation. Sidewalk will be widened and enhanced at intersections to provide safe, convenient and efficient pedestrian access within the Downtown Historic District. Pavement improvements include replacement of Road Maintenance & Broad Street from Commerical Street to (and including) the intersection of West Broad Street and East Nevada City Nevada Broad Street Y deteriorated pavement and improvements to cross-slope for drainage. This project will 04/2019 11/2019 10 25 1 1 Rehabilitation Broad Street. help reduce traffic congestion and improve pedestrian safety which reduces vehicle emissions helping the State achieve its air quality and greenhouse gas emissions reductions goals. This project consists of roadway rehabiliation. Sidewalk will be widened and enhanced at intersections to provide safe, convenient and efficient pedestrian access within the Downtown Historic District. Pavement improvements include replacement of Complete Streets Commercial Street Improvements Nevada City Nevada deteriorated pavement and improvements to cross-slope for drainage. This project will Commercial Street from Union Street to York Street 08/2018 06/2019 10 25 1 1 Components (17/18 Carryover) help reduce traffic congestion and improve pedestrian safety which reduces vehicle emissions helping the State achieve its air quality and greenhouse gas emissions reductions goals.

The 2018 Slurry Seal Project would apply slurry seal to approximately 33 miles of local road, representing 78 roadway segments. A slurry seal is a cold-mix combination of Road Maintenance & asphalt emulsion, fine well-graded aggregate, and water. This is a versatile treatment Various roads in the Town of Truckee including portions of the Tahoe Donner and Glenshire Truckee Nevada 2018 Slurry Seal Project C1801 05/2018 06/2018 5 15 1 1 Rehabilitation which results in a smooth surface with adequate friction with moderate costs. Slurry neighborhoods. seals have been used by the Town for several years and have proven to be a cost- effective preventive treatment that is well accepted by the community.

Road Maintenance & The 2019 Slurry Seal Project would apply slurry seal to approximately 29 miles of local Roads anticipated to be slurry sealed include residential roads in Tahoe Donner, Glenshire, Donner Truckee Nevada 2019 Slurry Seal Project 05/2019 10/2019 5 15 1 1 Rehabilitation road, representing 124 roadway segments. Lake, and Gray's Crossing. A map of the roads is included in the attached project description.

Road Maintenance & Glenwood Terrace Association Curb ramp upgrades; patching pavement cracks; grinding existing asphalt surface; Glenwood Association Public Streets - Briarglen, Amber, Birchmont, Coralwind, Parkwood, Aliso Viejo Orange 08/2018 12/2018 10 20 73 36 Rehabilitation Public Streets Rehabilitation installing new, fiber reinforced, asphalt rubber surface. Windflower, Spicewood, Lynoak, Eastwind Sidewalk and curb ramp repairs/upgrades; patching failed pavement areas; grinding Road Maintenance & Aliso Viejo Orange Alicia Parkway Rehabilitation existing asphalt surface; installing new, fiber reinforced, asphalt rubber surface. Design Alicia Parkway - Pacific Park Drive to City Limits 06/2019 10/2019 10 20 73 36 Rehabilitation work only in FY 18-19. Road Maintenance & Association areas: Laguna Audubon II; Moulton Parkway 1, 2 and 3; California Renaissance, Altisse, Aliso Viejo Orange Slurry Seal Program FY 18-19 Repair of failed pavement areas; crack filling; installation of slurry seal. 01/2019 06/2019 5 7 73 36 Rehabilitation Seaway Collection The road rehabilitation work consists of cold planing and resurfacing the road with an Road Maintenance & Anaheim Orange Weir Canyon Road Rehabilitation asphalt concrete overlay, AC berms, and replacement of traffic striping, traffic signal (District 6) - Weir Canyon Road from Serrano Avenue to Parkglen Place 07/2018 01/2019 10 15 68 37 Rehabilitation loops, and pavement markings. The road rehabilitation work consists of cold planing and resurfacing the road with an Road Maintenance & La Palma Avenue & Magnolia asphalt concrete overlay, the removal and reconstruction of ADA access ramps, curb (District 1) - La Palma Avenue from the West City Limit to Mayflower Street & Anaheim Orange 08/2018 02/2019 10 15 65 29 Rehabilitation Avenue Rehabilitation and gutter, concrete sidewalk, and replacement of traffic striping, traffic signal loops, Magnolia Avenue from the I-5 Freeway to La Palma Avenue and pavement markings.

The road rehabilitation work consists of cold planing and resurfacing the road with an Road Maintenance & asphalt concrete overlay, the removal and reconstruction of ADA access ramps, curb Anaheim Orange Riverdale Avenue Rehabilitation (District 6) - Riverdale Avenue from the SR-91 Freeway to Lakeview Avenue 09/2018 02/2019 10 15 68 37 Rehabilitation and gutter, commercial driveway approaches, concrete sidewalk, and replacement of traffic striping, traffic signal loops, and pavement markings.

The road rehabilitation work consists of cold planing and resurfacing the road with an asphalt concrete overlay and by constructing Jointed Plain Concrete Pavement (JPCP) (District 5) - Blue Gum Street from La Palma Avenue to the North City Limits Road Maintenance & Blue Gum Street & Miraloma at the intersection approaches on Miraloma Avenue and Blue Gum Street. The work Anaheim Orange Miraloma Avenue from the SR-57 Freeway bridge to Blue Gum Street, and a 10/2018 03/2019 20 25 68 37 Rehabilitation Avenue Rehabilitation also includes the removal and reconstruction of ADA access ramps, cross gutters, and 527 foot segment of La Cresta Avenue starting at 264 feet east of Blue Gum Street going easterly the installation of new curb, gutter, sidewalk, and the replacement of traffic striping, traffic signal loops, and pavement markings.

The road rehabilitation work consists of cold planing and resurfacing the road with an Road Maintenance & asphalt concrete overlay, the removal and reconstruction of ADA access ramps, curb Anaheim Orange Orange Avenue Rehabilitation (District 2) - Orange Avenue from Magnolia Avenue to Gilbert Street 11/2018 05/2019 10 15 65 29 Rehabilitation and gutter, commercial driveway approaches, concrete sidewalk, and replacement of traffic striping, traffic signal loops, and pavement markings.

Project Partnering with APU-Electrical to cost share on the road rehabilitation of the Orangewood Avenue Rehabilitation impacted road segments due to the APU-Electrical underground conversion project Road Maintenance & Anaheim Orange from Harbor Boulevard to Lewis currently in construction. The road rehabilitation work consists of cold planing, (District 4) - Orangewood Avenue from Harbor Boulevard to Lewis Street 08/2017 11/2018 10 15 69 34 Rehabilitation Street [APUE UD #64] resurfacing the road with an asphalt concrete overlay, and the replacement of traffic striping, traffic signal loops, and pavement markings.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Project partnering with the City of Placentia and OCTA to cost share on the road rehabilitation of the impacted road segments due to the Kraemer Grade Separation Orangethorpe Avenue & Kraemer (District 5) - Orangethorpe Avenue from the Kraemer Boulevard Intersection easterly on Orangethorpe Road Maintenance & Project and Orangethorpe Grade Separation Project constructed by OCTA. The road Anaheim Orange Boulevard Rehabilitation [OCTA Avenue to the end of the Orangethorpe Grade Separation project limit and southerly on Kraemer 07/2018 09/2018 10 15 68 37 Rehabilitation rehabilitation work consists of cold planing, resurfacing the road with an asphalt Bridges] Boulevard to East La Jolla Street concrete overlay, slurry seal, the replacement of traffic striping, traffic signal loops, pavement markings, curb and gutter, sidewalk, and an ADA access ramp.

Arterial Slurry Seal Group 2 – Various Locations Ball Road from The road rehabilitation work consists of applying a crack sealant and slurry seal coat to Beach Boulevard to Dale Avenue; (Districts 1, 6) - Ball Road from Beach Boulevard to Dale Avenue Road Maintenance & the existing pavement. Some minor cold planing, resurfacing the road with an asphalt Anaheim Orange La Palma Avenue from Chrisden La Palma Avenue from Chrisden Street to Potomac Circle 07/2018 08/2018 5 7 65, 68 29, 37 Rehabilitation concrete overlay, and the replacement of traffic striping, traffic signal loops, and Street to Potomac Circle; Santa Santa Ana Canyon Road from Fairmont Boulevard to Mohler Drive pavement markings. Ana Canyon Road from Fairmont Boulevard to Mohler Drive;

The road rehabilitation work consists of cold planing and resurfacing the road with an Lincoln Avenue Rehabilitation from Road Maintenance & asphalt concrete overlay, the removal and reconstruction of ADA access ramps, curb Anaheim Orange State College Boulevard to Sunkist (District 5) - Lincoln Avenue from State College Boulevard to Sunkist Street 01/2018 07/2018 10 15 69 29, 34 Rehabilitation and gutter, concrete sidewalk, and replacement of traffic striping, traffic signal loops, Street and pavement markings. The road rehabilitation work consists of cold planing and resurfacing the road with an asphalt concrete overlay or applying a slurry seal, the removal and reconstruction of Road Maintenance & Anaheim Orange Orange Avenue Rehabilitation ADA access ramps, curb and gutter, commercial driveway approaches, concrete (District 1) - Orange Avenue from Western Avenue to Dale Avenue 01/2018 07/2018 10 15 65 29 Rehabilitation sidewalk, and replacement of traffic striping, traffic signal loops, and pavement markings. Project Partnering with APU-Electrical to cost share on the road rehabilitation of the impacted road segments due to the APU-Electrical underground conversion project Road Maintenance & Lincoln Avenue & Rio Vista Street (District 5) - Lincoln Avenue from Sunkist Street to Rio Vista Street and Anaheim Orange currently in construction. The road rehabilitation work consists of cold planing, 08/2016 10/2018 10 15 68, 69 29, 34, 37 Rehabilitation Rehabilitation [APUE UD #63] Rio Vista Street from Lincoln Avenue to La Palma Avenue resurfacing the road with an asphalt concrete overlay, and the replacement of traffic striping, traffic signal loops, and pavement markings. Project partnering with PW-Sewer Section to cost share on the road rehabilitation of the La Palma Avenue Rehabilitation impacted road segments due to the PW-Sewer improvement project currently in Road Maintenance & Anaheim Orange from East Street to N. Acacia Street construction. The road rehabilitation work consists of cold planing, resurfacing the road (District 5) - La Palma Avenue from East Street to N. Acacia Street 02/2018 09/2018 10 15 69 29 Rehabilitation [PW Sewer] with an asphalt concrete overlay, and the replacement of traffic striping, traffic signal loops, and pavement markings.

Project partnering with the County of Orange to cost share on the road rehabilitation of City streets. The road rehabilitation work consists of cold planing and resurfacing the (District 2) - Gilbert Street from Broadway to Orange Avenue; Road Maintenance & Central Anaheim Rehabilitation at Anaheim Orange road with an asphalt concrete overlay, the removal and reconstruction of ADA access Broadway from Greenwhich Street to Brookhust Street; 03/2018 07/2018 10 15 65 29 Rehabilitation County Limits ramps, curb and gutter, commercial driveway approaches, concrete sidewalk, and Ball Road from Gilbert Street to Perdido Street replacement of traffic striping, traffic signal loops, and pavement markings.

The work consists of removing and reconstructing the pavement in the roadway, Road Maintenance & (District 5) - Acacia Neighborhood bordered by Via Burton Street to the north, State College Boulevard Anaheim Orange Acacia Neighborhood Rehabilitation applying slurry seal, replacing damaged areas of concrete (sidewalk, curb and gutter, 10/2018 06/2019 7 20 69 29 Rehabilitation to the east, Lincoln Avenue to the south, and East Street to the west and access ramps), replacing pavement striping and pavement markings.

The work consists of removing and reconstructing the pavement in the roadway, Road Maintenance & Kings Court Neighborhood (District 2) - Kings Court Neighborhood bordered by Ball Road to the north, Euclid Street to the east, Anaheim Orange applying slurry seal, replacing damaged areas of concrete (sidewalk, curb and gutter, 05/2018 06/2019 7 20 65 29 Rehabilitation Rehabilitation Katella Avenue to the south, and Brookhurst Street to the west and access ramps), replacing pavement striping and pavement markings.

The project will address poor drainage areas throughout the community by constructing Northeast Anaheim Colony (Sabina) new concrete curb and gutter. The project improvements will also include cold planing Road Maintenance & (District 3) - Sabina Neighborhood (Project A) - bordered by La Palma Avenue to the north, Anaheim Anaheim Orange Neighborhood Rehabilitation and resurfacing the road with an asphalt concrete overlay, the replacement and 05/2018 06/2019 7 20 69 29 Rehabilitation Boulevard to the east, Sycamore Street to the south, and Harbor Boulevard to the west (Project - A) construction of new ADA access ramps, and the replacement of uneven and broken sidewalks. The project will address poor drainage areas throughout the community by constructing Northeast Anaheim Colony (Sabina) new concrete curb and gutter. The project improvements will also include cold planing Road Maintenance & (District 3) - Sabina Neighborhood (Project - C) - bordered by La Palma Avenue to the north, East Anaheim Orange Neighborhood Rehabilitation and resurfacing the road with an asphalt concrete overlay, the replacement and 01/2019 06/2019 7 20 69 29 Rehabilitation Street to the east, Sycamore Street to the south, and Pauline Street to the west (Project - C) construction of new ADA access ramps, and the replacement of uneven and broken sidewalks. The road rehabilitation work consists of cold planing and resurfacing the road with an Road Maintenance & Santa Ana Canyon Road Anaheim Orange asphalt concrete overlay, AC berms, and replacement of traffic striping, traffic signal (District 6) - Santa Ana Canyon Road from Riverview Drive to Gypsum Canyon Road 04/2019 06/2019 10 15 68 37 Rehabilitation Rehabilitation loops, and pavement markings. Project conisiting of strategic arterial sidewalk repair in phases. This will be Phase III of the program. The work includes removal and reconstruction of concrete sidewalk, curb (Districts 3, 4) - Phase III of the program will include all north, south, east, and west arterial streets Road Maintenance & Anaheim Orange Arterial Sidewalk Repairs - Phase III and gutter, driveway approaches and ADA access ramps. This project will improve from Euclid Street to Harbor Boulevard (excluding work on Harbor) and to the City limits north and 08/2018 06/2019 10 15 65, 69 29, 34 Rehabilitation pedestrian mobility. Scope of Phase III equates to approximately 15.12 miles of south. sidewalk rehabilitation. Cliffwood Industrial Park Pavement Road Maintenance & This project will rehabilitate the pavement on Cliffwood Street, Oak Place, Thor Place Brea Orange Rehabilitation Project FY 17/18 City of Brea, Ca within the Cliffwood Industrial Park Subdivision 08/2018 01/2019 10 20 55 29 Rehabilitation and Telstar Way. Carryover

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts his project will rehabilitate Puente Street from Imperial Highway to Lambert Road. Improvements consist of reconstructing existing asphalt pavement, replacing damaged Road Maintenance & The Project is located within the City of Brea on Puente Street from Lambert Road to Imperial Highway Brea Orange Puente Street Rehabiliation sidewalk, curb, gutter and upgrading existing curb access ramps to current Americans 02/2019 06/2019 10 20 55 29 Rehabilitation (SR 90) with Disabilities Act (ADA) requirements. Coordination with Caltrans is required for permit and construction. 1/3 mile Descanso Avenue roadway rehabilitation with AC. Includes removal and Road Maintenance & Buena Park Orange Descanso Avenue Rehabilitation replacement of curb & gutter, sidewalk, accessible ramps, driveway approaches, City of Buena Park - Descanso Avenue between Altura Boulevard and Caballero Boulevard 06/2018 12/2018 10 15 65 32 Rehabilitation signing & striping, utility adjustments, and other incidentals.

Road Maintenance & 3/4 mile AC arterial roadway rehabilitation and replacement of curb & gutter, sidewalk, Buena Park Orange La Palma Avenue Rehabilitation City of Buena Park - La Palma Avenue from Beach Boulevard to Knott Avenue 06/2018 06/2019 10 15 65 32 Rehabilitation accessible ramps, driveway approaches, signing & striping, and other incidentals.

This project will provide major rehabilitation to 1,900 miles of City streets which are in immediate need for improvement. The project is implemented in accordance with the Road Maintenance & Bear Street Improvements, from I- Costa Mesa Orange Pavement Management System to meet the City Council Goal to reach and maintain an Bear Street, from I-405 to Baker Street 12/2018 06/2019 10 10 74 37 Rehabilitation 405 to Baker Street average Citywide Pavement Condition Index (PCI) of 85. These RMRA funds will be used towards rehabilitation of Bear Street, from I-405 to Baker Street.

This project will provide major rehabilitation to 6,768 miles of City streets which are in immediate need for improvement. The project is implemented in accordance with the Road Maintenance & Fairview Road Improvements, from I- Costa Mesa Orange Pavement Management System to meet the City Council Goal to reach and maintain an Fairview Road, from I-405 to Adams Avenue 12/2018 06/2019 10 10 74 37 Rehabilitation 405 to Adams Avenue average Citywide Pavement Condition Index (PCI) of 85. These RMRA funds will be used towards rehabilitation of Fairview Road, from I-405 to Adams Avenue.

The scope of work consists of slurry sealing over 250,000 SF of arterial roadway and • Holder Street (Ball Road to Orange Avenue) Road Maintenance & FY 2018-19 Annual Street resurfacing approximately 250,000 SF of pavement using rubberized asphalt concrete Cypress Orange • Walker Street (Ball Road to Orange Avenue) 10/2018 01/2019 8 20 65 29 Rehabilitation Rehabilitation Project (RAC). The proposed project also includes incidental items of work, such as traffic • Katella Avenue (Walker Street to Valley View Street) striping, traffic loops, manhole adjustments, etc.

Road Maintenance & FY18-19 Annual Residential This resurfacing program is intended to rehabilitate non-arterial streets including, The project location includes Via California from Camino Capistrano to Via Lopez and Pequito Drive Dana Point Orange 09/2018 01/2019 20 25 73 36 Rehabilitation Resurfacing, Curb & Gutter Project residential, residential collector and collector streets. from La Cresta Drive to the cul-de-sac. Additional streets may be added.

Quadrant H2: Mt Marcey Ct, Evans Cir, Mt. Erebus Ct, Catskills St, Mt Tahat St, Mt Olancha St, Whitecap Cir, Diamond Ct, Amethyst Ct, Jade Ct, Carnation Ct, Shasta St, Suzette River Cir, Marigold Road Maintenance & Residential Roadway Rehabilitation Cir, Orchid Ave, Violet Cir, San Gabriel St, Mayflower Cir, Iris Ave, Everest Cir, Rosemary Ave, San Fountain Valley Orange Residential Roadway Rehabilitation and Resurfacing of Quadrant H2 05/2018 09/2018 10 15 72 34 Rehabilitation and Resurfacing Jacinto Cir, Sierra St, Mt Mennes Ct, Ruby Ct, Mt Ackerman Ct, Mt Musala Ct, Holly Ave, Mt Pico Ct, Richardson St, San Jacinto St, Mt Lister Ct, Poppy Ave, Mt Carmel Ct, Everest St, Lilac Ave, Turquoise Cir, Mt Kenya Ct, Zircon Ct, Foothill St, Azalea Ave, Mt Robert Ct

Euclid Street Rehabilitation and Road Maintenance & Fountain Valley Orange Resurfacing from Slater Avenue to Euclid Street Rehabilitation and Resurfacing from Slater Avenue to Warner Avenue Euclid Street from Slater Avenue to Warner Avenue 12/2017 06/2018 10 15 72 34 Rehabilitation Warner Avenue

The project street is functionally classified as arterial street and mostly consists of four (4) lanes with two (2) lanes on each direction on Commonwealth Avenue and additional median lane on Raymond Avenue. Total length of the street is approximately 1.25 miles with 60 feet wide pavement. The work includes reconstruction and grind & overlay of pavement to extend the roadway service life and to reconstruct; curb, and Road Maintenance & Commonwealth / Raymond Avenue Commonwealth Avenue from Balcom Avenue to Acacia Drive and Raymond Avenue from Fullerton Orange gutter, access ramp, cross gutter, manhole and valve adjustment to grade, traffic 04/2019 02/2020 10 20 65 29 Rehabilitation Rehabilitation Project Commonwealth Avenue to Chapman Avenue. striping, and replace traffic loop detectors all within the City right-of-way. In conjunction with the street improvements, the project will replace water and sewer mains paid by other funds. The identified estimated total project cost ($5,331,945) is including water and sewer improvements. The street improvements cost alone is estimated to be $3,270,000.

The project street is functionally classified as arterial street and mostly consists of five lanes with two (2) lanes on each direction with median lane. Total length of the street is Road Maintenance & Chapman Avenue Rehabilitation approximately 1.2 miles with 60-70 feet wide pavement. The work includes grind and Chapman Avenue between; Acacia Avenue to 57 Freeway/Caltrans right-of-way excluding Fullerton Orange 08/2018 12/2018 10 20 65 29 Rehabilitation Project (Carryover from FY 2017-18) overlay of asphalt concrete to extend the roadway service life and to reconstruct; curb, Commonwealth Avenue to Clarke Avenue and State College Blvd to Sycamore Avenue. and gutter, access ramp, cross gutter, manhole and valve adjustment to grade, traffic striping, and replace traffic loop detectors all within the City right-of-way.

For the Euclid segment of the project, the location will be on Euclid Street, from Patricia Drive to The Project will rehabilitate Euclid Street from Patricia Drive to Katella Avenue and Katella Avenue . For the Chapman segment of the project, the location will be on Chapman Avenue Road Maintenance & Euclid Street & Chapman Avenue Chapman Avenue from Brookhurst Street to Nelson Street. The Project also includes Garden Grove Orange from Brookhurst Street to Nelson Street. For the residential streets, the locations are: Sapphire Street 03/2019 04/2019 10 20 65, 69 34 Rehabilitation Rehabilitation Project rehabilitation of residential streets: Sapphire Street (Belgrave - Vanguard), Santa Rita (Belgrave - Vanguard), Santa Rita Avenue (Lamplighter to Vanguard to Wild Goose) and Healey at Avenue (Lamplighter to Vanguard to Wild Goose) and Healey at Lamplighter. Lamplighter.

The City of Santa Ana is the lead agency responsible for rehabilitating Euclid Street, Road Maintenance & Euclid Street Rehabilitation (Hazard Garden Grove Orange from Hazard Avenue to Westminster Street. The City of Garden Grove owns the On Euclid Street, from Hazard Avenue to Westminster Street. 07/2018 12/2018 10 20 65, 69 34 Rehabilitation Avenue - Westminster Street) westerly 12' of pavement and will contribute funding for their portion of the project.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts La Bonita Storm Drain Project The Project will install dual 30' RCPs to facilitate water service access on La Bonita Garden Grove Orange Other (Westminster Avenue - Anabel On La Bonita Street, from Westminster Avenue to Anabel Avenue in the City of Garden Grove. 07/2018 12/2018 10 20 65, 69 34 Street, from Westminster Avenue to Anabel Avenue. Avenue) Road Maintenance & Westminster Rehabilitation (Harbor- The project will rehabilitate Westminster Avenue, from Harbor to Roxey, including Garden Grove Orange On Westminster Avenue, from Harbor Blvd. to Roxey Drive, in the City of Garden Grove. 03/2018 07/2018 10 20 65, 69 34 Rehabilitation Roxey) miscellaneous concrete improvements.

Edinger Avenue (Graham-Bolsa Chica), Saybrook Street (Heil-Edinger), Algonquin Street (Warner- Road Maintenance & Project will utilize RMRA funding in addition to local funding to fully rehabilitate up to 8 Huntington Beach Orange Arterial Rehabilitation Project Heil), Slater Avenue (Beach-Gothard), Newland Street (Yorktown-Garfield), Graham Street (Warner- 10/2018 10/2019 15 25 74 37 Rehabilitation arterial street segments. Springdale), Delaware Street (Main-Ellis), Atlanta Avenue (Bushard-Brookhurst)

This is the FY 17/18 Project which is being rolled over since the project will not have been completed by June 30, 2018. Road Maintenance & Arterial Rehabilitation Project (FY The RMRA funding will be utilized to maintain and/or improve on the "Good" condition Huntington Beach Orange Heil Avenue (Bolsa Chica-Graham) and Indianapolis Avenue (Beach-Newland) 05/2018 09/2018 15 25 74 37 Rehabilitation 17/18 Project) of the City's street network, specifically concentrating on its arterial highway segments. The city utilizes HMRA asphalt, which contains crumb rubber from tires that would otherwise end up in landfills. Use of HRMA also extends the design life of the project.

Road Maintenance & Jamboree Pavement Rehabilitation - Rehabilitation and replacement of deteriorated asphalt pavement, concrete curbs, Irvine Orange Jamboree Road between Michelle Drive and the OCTA railroad overcrossing bridge. 03/2019 12/2019 20 20 68 37 Rehabilitation Michelle to Railroad Tracks gutters, access ramps, and sidewalks.

Road Maintenance & Alton Pavement Rehabilitation - I-5 Rehabilitation and replacement of deteriorated asphalt pavement, concrete curbs, Irvine Orange Alton Pavement Rehabilitation - I-5 Freeway to Technology Drive East 12/2018 09/2019 20 20 68 37 Rehabilitation Freeway to Technology Drive East gutters, access ramps, and sidewalks.

Road Maintenance & Idaho Street Pavement Project The Project consists of grind and overlay the full width of the street, reconstruction of La Habra Orange Idaho Street from La Habra Boulevard to Whittier Boulevard in the City of La Habra, CA 06/2018 09/2018 15 15 55 29 Rehabilitation (17/18 Ongoing) damaged curb ramps, sidewalk, and curb and gutter.

Road Maintenance & La Habra Boulevard Pavement from The project consists of grind and overlay the full width the street, reconstruction of La Habra Orange La Habra Boulevard from Beach Boulevard to Idaho Street in the City of La Habra, CA 04/2019 06/2019 15 15 55 29 Rehabilitation Beach Boulevard to Idaho Street damaged curb ramps, sidewalk, and curb and gutter.

Road Maintenance & La Palma Orange Valley View Street Rehabilitation Rehabilitation including crack sealing, dig-outs, and slurry seal (PW Contract). South City Limit to Thelma Avenue 07/2018 04/2019 7 10 65 29 Rehabilitation Road Maintenance & Orangethorpe Avenue Rehabilitation La Palma Orange Rehabilitation including grinding, paving, and thermal striping ( PW Contract). Moody Street to Walker Street 02/2018 08/2018 7 10 65 29 Rehabilitation (17/18 Carryover) Road Maintenance & La Palma Orange Orangethorpe Avenue Rehabilitation Rehabilitation including grinding, paving, and thermal striping (PW Contract). Walker Street to Valley View street 05/2018 10/2018 7 10 65 29 Rehabilitation Road Maintenance & La Palma Orange Walker Street Rehabilitation Rehabilitation including crack sealing, dig-outs, and slurry seal La Palma Avenue to 183rd Street 07/2018 06/2019 7 10 65 29 Rehabilitation Citywide Project - North, South, East, and West City Limits. All locations will be selected and Road Maintenance & Rehabilitation including curb repairs, tree and landscape removal, irrigation, hard and La Palma Orange Arterial Street Medians (Phase 1) addressed based on priority need and resources throughout the year, locations may be subject to 12/2018 06/2019 15 20 65 29 Rehabilitation soft scape installation change prior to work commencing. Road Maintenance & Zone 1 Street Slurry Seal and patch damaged pavement; seal cracks; apply Type 1 slurry seal; refresh pavement Laguna Beach Orange All City maintained streets between Montage Resort Drive and southerly City limits. 08/2019 12/2019 8 12 74 37 Rehabilitation Rehabilitation striping and markings

“All City maintained streets in the area bounded by Park Avenue, Wendt Terrace, and Thalia Street”. Road Maintenance & Zone 2 Street Concrete Remove and replace damaged concrete curbs, gutters, and sidewalks at various Laguna Beach Orange *All locations listed are an estimate and may be subject to change based on priority need and 04/2019 09/2019 25 35 74 37 Rehabilitation Rehabilitation locations Citywide. resources throughout the year.

Existing guard railing locations within the Diamond/Crestview neighborhood and along hillside collector roads including, but not limited to, Park Avenue, Alta Vista Way, Bluebird Canyon Drive, Road Maintenance & Laguna Beach Orange Citywide Guard Rail Repairs Replace or modify damaged guard railings at various locations Citywide. Summit Drive, Nyes Place 09/2019 12/2019 20 30 74 37 Rehabilitation *All locations listed are an estimate and may be subject to change based on priority need and resources throughout the year.

Laguna Beach Orange Other Bent Street Drainage Improvements Re-contour roadway to improve drainage and reduce flooding. Bent Street between 450 Bent Street and Park Avenue 06/2020 12/2020 20 30 74 37

Road Maintenance & 2080 Crestview Drive Road Edge Laguna Beach Orange Reconstruct, support and protect roadway edge adjacent to steep natural slope. West edge of roadway near 2080 Crestview Drive 06/2020 12/2020 20 30 74 37 Rehabilitation Support Fiscal Year 2017/2018 Street Slurry Road Maintenance & Repair damaged pavement and slurry seal the streets that were last rehabilitated in Laguna Canyon Frontage Road, Arroyo Drive, Woodland Drive, Canyon Acres Drive, and the area Laguna Beach Orange Seal and Rehabilitation (17/18 05/2018 11/2018 8 12 74 37 Rehabilitation 2008. between Thalia Street and Cress Street. Carryover)

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Multiple street segments in Zones C and E as follows: STREET NAME FROM - TO Alameda Av Aliso Hills Dr-La Paz Rd Alisal Av Linda Vista Dr-Paseo De Valencia Alisal Av Sarita Dr-Linda Vista Dr Aliso Hills Dr Alameda Av-Alicia Pw Aliso Hills Dr La Paz Rd-Alameda Av Alta Loma Ct Santa Rosa Av-East End Altamira Dr Alameda Av-Buena Vista Dr Amalia St Yolanda St-Carmel St Anacapa St San Pedro Av-El Prado St Andrea St Lupita St-North End Buena Vista Dr Los Gatos Dr-North End Calero Av La Mirada St-El Conejo Ln Carmel St South End-North End Creek Dr Linda Vista Dr-South End Creekview Dr West End-Christina Ct Del Monte St Alameda Av-La Cuesta Av El Capitan Ln Creek Dr-Largo Dr Road Maintenance & Citywide Street Maintenance, CIP Pavement repairs and resurfacing of various residential and collector streets within the El Conejo Ln Linda Vista Dr-Calero Av Laguna Hills Orange 09/2019 02/2020 7 15 73 36 Rehabilitation No. 101-K City's PMP zones of "C" and "E". El Prado St Alameda Av-San Pedro Av El Segundo St Aliso Hills Dr-North End Elena Dr Los Gatos Dr-Alameda Av Encanto Ct Luna Bonita Dr-South End Ernestine Ct Linda Flora St-North End Eva St Lupita St-Yolanda ST Gordon Rd Moulton Pw-Imperial Dr La Cienega St La Cienega St-Aliso Hills Dr La Cienega St Rio Grande Av-Sierra Bonita Dr La Cuesta Av Terra Bella Av-Sausalito St La Habra Ct Sarita Dr-East End La Mirada St Alisal Ln-Linda Vista Dr La Serra St Aliso Hills Dr-North End Las Alturas Av Mandeville Dr-Monte Royale St Las Alturas Ct Las Alturas St-East End Linda Flora St East End-El Segundo St Linda Vista Dr Largo Dr-Sarita Dr Los Alamitos Monte Royals St-Mandeville Dr Los Cerros St La Cienega St-South End Los Gatos Dr Buena Vista Dr-West End Roadway Maintenance and repair including the repair of isolated areas of pavement, Road Maintenance & Niguel Road Pavement pavement grinding and removal, asphalt pavement overlay, associated concrete Laguna Niguel Orange Niguel Road from Marina Hills Road to Highlands Avenue 01/2019 04/2019 12 15 73 36 Rehabilitation Rehabilitation Project improvements including bus pads and access ramps, adjustment of surface utilities to final pavement grade, and roadway marking and striping.

Roadway maintenance and repair including the repair of isolated areas of pavement, Alicia Parkway Pavement Road Maintenance & pavement grinding and removal, asphalt pavement overlay, associated concrete Laguna Niguel Orange Rehabilitation Project (17/18 Alicia Parkway from Highlands Avenue to Pacific Park Drive 06/2018 08/2018 12 15 73 36 Rehabilitation improvements including bus pads and access ramps, adjustment of surface facilities to Carryover) final pavement grade, and roadway marking and striping.

Pavement Management Plan This project involves the rehabilitation of approximately 1,000 linear feet of pavement Road Maintenance & Project (Eastbound El Toro Road on eastbound El Toro Road between Avenida Sevilla and Church Intersection, including Laguna Woods Orange Eastbound El Toro Road between Avenida Sevilla and Church Intersection 10/2018 06/2019 5 5 74 37 Rehabilitation between Avenida Sevilla and replacement of deteriorated pavement and a surface seal of crack sealant and Church Intersection) rubberized slurry. Road Maintenance & The non-arterial public streets generally between Ridge Route Drive to the southerly City limit and Lake Forest Orange Slurry Seal, Zone B Slurry Seal of Non-Arterial Streets within Zone B. 07/2018 10/2018 7 10 68 37 Rehabilitation Jeronimo Road to the westerly City limit. Road Maintenance & Dimension Road from Bake Lake Forest Orange Asphalt Reconstruction on Dimension Road from Bake Parkway to Lake Forest Drive. Dimension Road from Bake Parkway to Lake Forest Drive. 05/2019 08/2019 15 20 68 37 Rehabilitation Parkway to Lake Forest Drive Civic Center Drive from Road Maintenance & Commercentre Drive to dead-end Asphalt Reconstruction on Civic Center Drive from Commercentre Drive to dead-end Lake Forest Orange Civic Center Drive from Commercentre Drive to dead-end approximately 1,400 feet to the South. 05/2019 08/2019 15 20 68 37 Rehabilitation approximately 1,400 feet to the approximately 1,400 feet to the South. South Portion of Greenbrook Design and construction of grinding and overlay of part of the Greenbrook Road Maintenance & Humboldt St from Cerritos Ave to Myra Ave and San Mateo Ave from Humboldt St to end of cul-de- Los Alamitos Orange Neighborhood Street Rehabilitation Neighborhood on Humboldt St from Cerritos Ave to Myra Ave and San Mateo Ave from 08/2018 10/2018 20 30 72 34 Rehabilitation sac Project Humboldt St to end of cul-de-sac. Portion of Greenbrook Road Maintenance & This is a carryover from FY 2017-18 SB1 project. Approximately 100 feet of street grind Lassen Street from San Joaquin Ave to north end of cul de sac, San Joaquin Ave from Lassen St to Los Alamitos Orange Neighborhood Street Rehabilitation 05/2018 08/2018 20 30 72 34 Rehabilitation and overlay with rubberized asphalt concrete and 200 feet of slurry seal. eastern end of cul de sac and Sierra Circle from Cerritos Ave Project

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

The City of Mission Viejo has established seven, distinct geographic areas to conduct the resurfacing of public residential streets in the City. Each year, one of the seven areas is budgeted as a capital improvement project (CIP) for public residential streets resurfacing. The program operates on a rotating, seven-year cycle. In FY 2018-19, Residential Resurfacing Area 7 is scheduled for residential street resurfacing. This Public residential streets in Residential Resurfacing Area 7, which is bounded by Los Alisos Boulevard Road Maintenance & project will resurface, with overlay and slurry seal treatments, 62.63 lane miles of public Mission Viejo Orange Residential Resurfacing to the north, La Paz Road to the south, the City of Mission Viejo jurisdictional boundary to the east, 07/2018 11/2018 7 20 73 36 Rehabilitation residential streets in Area 7. There are 166 public residential streets in Area 7. The and Marguerite Parkway to the west, in the City of Mission Viejo. purpose of the City of Mission Viejo seven-year residential resurfacing program is to regularly maintain and improve the pavement condition of the City's residential public streets. The seven-year cycle achieves a maximum useful life of the pavement treatments, to prevent the streets from degrading into more expensive pavement conditions that would require more expensive resurfacing treatments.

In Fiscal Year 2018-19, the arterial streets of Felipe Road and Olympiad Road in the City of Mission Viejo will be resurfaced with overlay treatment. The resurfacing project Road Maintenance & Felipe Road/Olympiad Road Arterial will overlay 14.54 lane miles of arterial streets, and will tackle pavement conditions on On Olympiad Road, from Alicia Parkway south to Jeronimo Road; and, on Felipe Road, from La Paz Mission Viejo Orange 06/2019 10/2019 15 20 73 36 Rehabilitation Resurfacing roadway segments along Felipe Road and Olympiad Road which have been classified Road south to Marguerite Parkway, in the City of Mission Viejo. as "fair" and "good" in a preliminary 2018 Citywide Pavement Management Program Update. This project grinds and overlays sections of MacArthur Boulevard and University Drive Road Maintenance & MacArthur Blvd and University Dr MacArthur Boulevard from Bonita Canyon Road to SR 73 and University Drive from Jamboree Road to Newport Beach Orange with rubberized asphalt concrete. Reconstruction of deteriorated concrete 09/2018 02/2019 15 25 74 37 Rehabilitation Pavement Rehab (17/18 Carryover) State Route 73. improvements is also included. This project involves coldmilling and overlaying the existing asphalt concrete pavement with rubberized asphalt concrete. Deteriorated concrete improvements will also be Road Maintenance & San Joaquin Hills Road Pavement reconstructed. Impacted utilities will be adjusted to grade. The new pavement will also Newport Beach Orange This project is located on San Joaquin Hills Road from Jamboree Road to MacArthur Boulevard . 08/2019 12/2020 15 20 74 37 Rehabilitation Rehabilitation be restriped. Final design is scheduled to be completed by Summer of 2019 and construction will be completed by Winter 2020. The estimated useful life of this project is 15 years minimum.

1. Burton Avenue From West End To Chouteau Street 2. Chouteau Street From Emerson Avenue To Burton Avenue 3. Chouteau Street From Buckeyewood Avenue To South End 4. Cleveland Street From Meats Avenue To Del Mar Avenue 5. Del Mar Avenue From Cleveland Street To Chouteau Street 6. Del Mar Avenue From Chouteau Street To Cambridge Street 7. El Sereno Drive From Santiago Boulevard To Riding Way 8. Emerson Avenue From Pine Street To Chouteau Street 9. Gates Avenue From Cleveland Street To East End 10. Genesse Street From North End To Grove Avenue 11. Genesse Street From North End To Del Mar Avenue 12. Keokuk Street From North End To Grove Avenue 13. Namuria Street From North End To Grove Avenue The Pavement Rehabilitation Project will maintain and rehabilitate approximately 18 14. Pine Street From Meats Avenue To Emerson Avenue Streets for a total of 25,270 linear feet for a total of 1,385,335 square feet of pavement. 15. Ridgewood Street From Buckeyewood Avenue To South End Road Maintenance & The construction activities will consist of slurry seal, cold planning, and overlay Orange Orange Pavement Rehabilitation FY 18/19 16. Shaffer Street From Meats Avenue To Buckeyewood Avenue 05/2019 12/2019 10 15 68 37 Rehabilitation operations. In addition to the pavement rehabilitation the City will improve access ramps 17. Shaffer Street From Buckeyewood Avenue To within the project limits along with other construction activities related to pavement 18. Winlock Street From Buckeyewood Avenue To South End rehab such as, adjusting valve boxes, manhole rings, crack sealant, and striping. 19. Woodside Street From Buckeyewood Avenue To South End 20. Chapman Ave From Newport Boulevard To Trails End Lane 21. Chapman Ave From Trails End Lane To Jamboree Road 22. Meats Avenue From 280' W/0 Feather Hill To Summitridge Lane 23. Meats Avenue From Summitridge Lane To Marywood Drive 24. Meats Avenue From Marywood Drive To Via Escola 25. "Meats Avenue From Via Escola To 1065' N/O Via Escola (City Limit)" 26. Newport Boulevard From White Oak Ridge To Chapman Ave 27. Newport Boulevard From Chapman Avenue To Santiago Canyon Road 28. Taft Avenue From Tustin Avenue To Sacramento Street 29. Taft Avenue From Sacramento Street To Fern Street 30. Taft Avenue From Fern Street To Santiago Boulevard 31. Tustin Street From 400' S/O Lincoln Avenue To 150' N/O Heim Avenue

This project will rehabilitate 191,000 square feet of residential streets utilizing central plant recycling in lieu of a traditional reconstruction project. This method will allow the Road Maintenance & FY 2018-19 Street Resurfacing City to recycle the existing pavement and aggregate in order to reconstruct the roadway. See attached map. Residential neighborhood at Bastanchury Road and McCormack on our border Placentia Orange 10/2018 04/2019 15 20 55 29 Rehabilitation Project Phase 1 This methodology will save money as well as reduce greenhouse gas emissions. If with the City of Yorba Linda. successful, the City will employ pavement recycling projects in future road rehabilitation efforts. Preventative maintenance slurry seal project for approximately 400,000 square feet of Road Maintenance & FY 2017-18 Residential Slurry Seal residential streets. Residential neighborhood northwest of the Kraemer Boulevard/Golden Avenue intersection. This Placentia Orange 05/2018 06/2018 5 7 55 29 Rehabilitation Project NOTE: This project is replacing project LSR-2018-5269. Based on available funding, project is a scaled back version of project LSR-2018-5269 to fit within available SB 1 funding. slurry seal project LSR-2018-5269 is being scaled back

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Avenida de Las Flores is a heavily utilized corridor within the City that is in need of a slurry seal treatment. The segment spanning from Avenida de las Banderas at the Rancho Santa Road Maintenance & south end to Antonio Parkway to the north has a weighted PCI of 69. By applying a Avenida de las Flores, between Avenida de las Banderas and Antonio Parkway in the City of Rancho Orange Avenida de las Flores Slurry Seal 02/2019 03/2019 5 7 73 36 Margarita Rehabilitation slurry seal this year, the pavement life can be extended for this facility. Isolated areas of Santa Margarita. full depth removals will be identified and constructed prior to the slurry seal application, along with crack sealing of the existing cracks.

This project will slurry seal the northernmost segment of Antonio Parkway from Las Flores to Santa Margarita Parkway, with the potential to be combined with Project 7 Rancho Santa Road Maintenance & Antonio Parkway, between Santa Margarita Parkway and Avenida de las Flores in the City of Rancho Orange Antonio Parkway Slurry Seal Project above. This segment of Antonio Parkway has an average PCI of 68 and was identified 03/2019 04/2019 5 7 73 36 Margarita Rehabilitation Santa Margarita as a candidate for slurry seal. Isolated areas of full depth removal will be identified and construction, as well as crack sealing prior to the application of the slurry seal.

This project will rehabilitate the pavement along Avenida Empresa (a major arterial) from Avenida de las Banderas to Aventura. This is the second segment of a three phased improvement project along Avenida Empresa identified in the City’s PMP, as well as field verified. The roadway is in need of repair, based on the current PCI of 58 Rancho Santa Road Maintenance & Avenida Empresa Pavement Avenida Empresa, between Avenida de las Banderas and Aventura in the City of Rancho Santa Orange for this area. The project will consist of a 2" cold mill of the existing pavement and a 2" 07/2018 08/2018 10 15 73 36 Margarita Rehabilitation Rehabilitation Project Margarita ARHM cap. Isolated sections of the road will be identified for full depth removal and replacement. The first phase of the project, from Antonio Parkway to Avenida de las Banderas, was completed in FY 17-18. A future fiscal year phase will rehabilitate the remaining portion of Avenida Empresa to Santa Margarita Parkway.

Rehabilitate Avenida Vista Hermosa, a four lane divided arterial, from Via Turqueza to Road Maintenance & Avenida Vista Hermosa San Clemente Orange Camino Vera Cruz (a distance of about 1/3 mile). The project will also repair damaged Avenida Vista Hermosa, from Via Turqueza to Camino Vera Cruz, in the City of San Clemente. 09/2018 11/2018 20 25 73 36 Rehabilitation Rehabilitation curb, gutter and sidewalk, and upgrade curb ramps as required by ADA.

Rehabilitate pavement on Camino De Los Mares, a six-lane divided arterial street, from Road Maintenance & Camino De Los Mares the I-5 freeway east to Avenida Vaquero (a distance of about 0.75 miles). The project San Clemente Orange Camino De Los Mares, from the I-5 freeway to Avenida Vaquero, in the City of San Clemente. 04/2019 06/2019 20 25 73 36 Rehabilitation Rehabilitation will include repair of damaged curb, gutter and sidewalk, and upgrade of curb ramps as required by ADA. The Meredith Canyon Neighborhood Local Streets Project is a multi-year project that is currently in the design phase and will complete construction by December 2020. The Meredith Canyon Neighborhood The Meredith Canyon Neighborhood Local Streets Pavement Rehabilitation Project includes the Road Maintenance & project includes pavement rehabilitation by overlay or complete reconstruction of 3 San Juan Capistrano Orange Local Streets Pavement following streets within the City - Via De Agua, Avenida Calita, Avenida La Mirada, Calle Esparanza, 07/2018 12/2020 15 30 73 36 Rehabilitation miles of roadway, construction of 42 ADA compliant curb ramps, repair and Rehabilitation Project Calle Miramar, Avenida Pescador, Paseo De Este and Calle Don Carlo. reconstruction of damaged curbs and gutters, reconstruction of 12 speed humps and new roadway signing and striping. The project involves rehabilitation of approximately 2.2 miles of residential streets, The project area is in the northerly portion of the city, on the west side of the I-5 Freeway, and Capistrano Villas I, II, and III construction of 5 ADA ramps, replacement of 10 speed humps, and construction of a encompasses approximately 80 acres of medium density, low income Road Maintenance & San Juan Capistrano Orange Pavement Rehabilitation Project raised channelization island and an additional street light at one major intersection. housing with 799 condominium units. The neighborhood is known as the “Capistrano Villas.” The 01/2018 08/2018 15 30 73 36 Rehabilitation (17/18 Ongoing) The rehabilitation will involve completed pavement reconstruction in some areas and streets in the project are Avenida De La Vista, La Zanja Street, Los Rios Street, Calle Santa Barbara, pavement overlay in other areas. Calle San Luis, Calle San Antonio and Calle San Diego. City's Pavement Management System has identified Raitt Street from McFadden Avenue to Civic Center Drive as a priority for rehabilitation to prevent further Raitt Street Rehabilitation: deterioration of the pavement section due to weather, age and heavy usage. This Road Maintenance & Santa Ana Orange McFadden Avenue to Civic Center project will rehabilitate 1.18 miles of Raitt Street; replace damaged curbs, gutters, McFadden Avenue to Civic Center Drive 06/2019 03/2020 20 20 72 34 Rehabilitation Drive sidewalks, and driveway approaches; reconstruct approximately 31 curb ramps to conform to the latest ADA standards. The project will enhance the walkability and safety of motorists and pedestrians.

City's Pavement Management System has identified Edinger Avenue from Raitt Street to Bristol Street as a priority for rehabilitation to prevent further deterioration of the pavement section due to weather, age and heavy usage. This project will rehabilitate Road Maintenance & Edinger Avenue Rehabilitation: Raitt Santa Ana Orange 0.49 miles of Edinger Avenue; replace damaged curbs, gutters, sidewalks, and Raitt Street to Bristol Street 06/2019 03/2020 20 20 69 34 Rehabilitation Street to Bristol Street driveway approaches; reconstruct approximately 12 curb ramps to conform to the latest ADA standards; and incorporate bicycle lane elements. The project will enhance the walkability, rideability and safety of motorists, pedestrians and bicycle users.

City's Pavement Management System has identified Bristol Street from MacArthur Boulevard to Railroad as a priority for rehabilitation to prevent further deterioration of Bristol Street Rehabilitation: the pavement section due to weather, age and heavy usage. This project will Road Maintenance & Santa Ana Orange MacArthur Boulevard to Railroad rehabilitate 0.26 miles of Bristol Street; replace damaged curbs, gutters, sidewalks, and Bristol Street from MacArthur Boulevard to Railroad (N/O Alton) 06/2019 03/2020 20 20 69 34 Rehabilitation (N/O Alton) driveway approaches; reconstruct 4 curb ramps to conform to the latest ADA standards; and incorporate bicycle lane elements. The project will enhance the walkability, rideability and safety of motorists, pedestrians and bicycle users.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Preventative street maintenance is one of the planned strategies prolonging the useful life of streets and reducing the costly alternative of reconstructing streets. The proposed improvements include the benefit of improving the texture of the asphalt wearing Raitt Street Preventative Road Maintenance & surface an reducing water infiltration under the pavement to delay the pavement Santa Ana Orange Maintenance: Edinger Avenue to Raitt Street from Edinger Avenue to McFadden Avenue 04/2019 10/2019 10 10 69 34 Rehabilitation deterioration process. Additionally, 0.5 mile segment of Raitt Street between Edinger McFadden Avenue Avenue and McFadden Avenue has been identified as high priority in need of preventative maintenance before it deteriorates beyond good condition, which would require a significantly more expensive treatment if prolonged.

City's Pavement Management System has identified Main Street from Dyer Road to Warner Avenue as a priority for rehabilitation to prevent further deterioration of the pavement section due to weather, age and heavy usage. This project will rehabilitate Road Maintenance & Main Street Rehabilitation: Dyer 0.5 mile of Main Street; replace damaged curbs, gutters, sidewalks, and driveway Santa Ana Orange Main Street from Dyer Road to Warner Avenue 06/2019 03/2020 20 20 69 34 Rehabilitation Road to Warner Avenue approaches; and incorporate bicycle lane elements as incorporation to our Bike Lane Master Plan. All curb ramps will be conformed to the latest ADA standards. The project will enhance the walkability, rideability and safety of motorists, pedestrians and bicycle users.

City's Pavement Management System has identified Alton Avenue from Raitt Street to Bristol Street as a priority for rehabilitation to prevent further deterioration of the Road Maintenance & Alton Avenue Rehabilitation: Raitt pavement section due to weather, age and heavy usage. This project will rehabilitate Santa Ana Orange Alton Avenue from Raitt Street to Bristol Street 06/2019 03/2020 20 20 69 34 Rehabilitation Street to Bristol Street 0.66 miles of Alton Avenue; replace damaged curbs, gutters, sidewalks, and driveway approaches; and reconstruct 4 curb ramps to conform to the latest ADA standards. The project will enhance the walkability and safety of motorists and pedestrians.

City's Pavement Management System has identified McFadden Avenue from Fairview Street to Raitt Street as a priority for rehabilitation to prevent further deterioration of the Road Maintenance & McFadden Avenue Rehabilitation: pavement section due to weather, age and heavy usage. This project will rehabilitate Santa Ana Orange McFadden Avenue from Fairview Street to Raitt Street 07/2019 06/2020 20 20 69 34 Rehabilitation Fairview Street to Raitt Street 3,800 linear feet; pavement rehabilitation, replace damaged curbs, gutters, sidewalks, and driveway approaches. The project will enhance the walkability and safety of motorists and pedestrians.

Preventative street maintenance is one of the planned strategies prolonging the useful life of streets and reducing the costly alternative of reconstructing streets. The proposed improvements include the benefit of improving the texture of the asphalt wearing Main Street Preventative Road Maintenance & surface an reducing water infiltration under the pavement to delay the pavement Santa Ana Orange Maintenance: 1st Street to Civic Main Street from1st Street to Civic Center Drive 04/2019 10/2019 10 10 69 34 Rehabilitation deterioration process. Additionally, this 1800-feet segment of Main Street from 1st Center Drive Street to Civic Center Drive has been identified as high priority in need of preventative maintenance before it deteriorates beyond good condition, which would require a significantly more expensive treatment if prolonged.

Preventative street maintenance is one of the planned strategies prolonging the useful life of streets and reducing the costly alternative of reconstructing streets. The proposed improvements include the benefit of improving the texture of the asphalt wearing 1st Street Preventative Road Maintenance & surface an reducing water infiltration under the pavement to delay the pavement Santa Ana Orange Maintenance: City Limit to Newhope 1st Street from City Limit to Newhope Street 04/2019 10/2019 10 10 69 34 Rehabilitation deterioration process. Additionally, this 3,900 linear feet of pavement have been Street identified as high priority and in need of preventative maintenance before. Also, damaged curbs, gutters, sidewalks, and driveway approaches will be replaced. The project will enhance the walkability and safety of motorists and pedestrians.

City's Pavement Management System has identified Westminster Avenue from Harbor Boulevard to Fairview Street as a priority for rehabilitation to prevent further deterioration of the pavement section due to weather, age, and heavy usage. This Road Maintenance & Westminster Avenue Rehabilitation: Santa Ana Orange project will rehabilitate 5300 feet of Westminster Avenue; replace damaged curbs, Westminster Avenue Rehabilitation from Harbor Boulevard to Fairview Street. 06/2018 09/2018 20 20 72 34 Rehabilitation Construction 17/18 Ongoing gutters, sidewalks, and driveway approaches; and reconstruct 20 curb ramps to conform to the latest ADA standards. The project will increase the rideability and safety of motorists and pedestrians.

City's Pavement Management System has identified Euclid Street from Hazard Avenue to Westminster Avenue as a priority for rehabilitation to prevent further deterioration of the pavement section due to weather, age, and heavy usage. This project will Road Maintenance & Euclid Street Rehabilitation: Design Santa Ana Orange rehabilitate 2700 feet of Euclid Street; replace damaged curbs, gutters, sidewalks, and Euclid Street from Hazard Avenue to Westminster Avenue. 09/2018 12/2018 20 20 72 34 Rehabilitation 17/18 Ongoing driveway approaches; reconstruct 20 curb ramps to conform to the latest ADA standards; and restripe bike lanes. The project will increase the rideability and safety of motorists, pedestrians and bicycle users.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

City's Pavement Management System has identified Euclid Street from Hazard Avenue to Westminster Avenue as a priority for rehabilitation to prevent further deterioration of the pavement section due to weather, age, and heavy usage. This project will Road Maintenance & Euclid Street Rehabilitation: Santa Ana Orange rehabilitate 2700 feet of Euclid Street; replace damaged curbs, gutters, sidewalks, and Euclid Street from Hazard Avenue to Westminster Avenue. 09/2018 12/2018 20 20 72 34 Rehabilitation Construction 17/18 Carryover driveway approaches; reconstruct 20 curb ramps to conform to the latest ADA standards; and restripe bike lanes. The project will increase the rideability and safety of motorists, pedestrians and bicycle users.

Ongoing Construction for 17/18 projects per LSR PM. Preventative street maintenance is one of the planned strategies prolonging the useful life of streets and reducing the costly alternative of reconstructing streets. The proposed improvements include the Flower Street and MacArthur benefits of improving the texture of the asphalt wearing surface and reducing water Road Maintenance & Boulevard Preventative infiltration under the pavement to delay the pavement deterioration process. Flower Street from Sunflower Avenue to MacArthur Boulevard; and MacArthur Boulevard from Raitt Santa Ana Orange 05/2018 08/2018 10 10 72 34 Rehabilitation Maintenance: Construction 17/18 Additionally, this 3700-feet segment of MacArthur Boulevard from Raitt Street to Bristol Street to Bristol Street. Ongoing Street, and 2200-feet segment of Flower Street from Sunflower Avenue to MacArthur Boulevard have both been identified as high priority in need of preventative maintenance before it deteriorates beyond good condition, which would require a more expensive treatment.

1 on 10TH ST from OCEAN AV to ELECTRIC AV 2 on 11TH ST from SEAL WY to OCEAN AV 3 on 12TH ST from SEAL WY to OCEAN AV 4 on 13TH ST from SEAL WY to OCEAN AV 5 on 14TH ST from OCEAN AV to ELECTRIC AV 6 on 4TH ST from OCEAN AV to MARINA DR 7 on 5TH ST from OCEAN AV to MARINA DR 8 on 6TH ST from (S) ELECTRIC AV to MARINA DR 9 on OCEAN AV from 13TH ST to MAIN ST 10 on OCEAN AV from MAIN ST to 5TH ST 11 on OCEAN AV from ELECTRIC AV to 13TH ST 12 on OCEAN AV from 5TH ST to 1ST ST 13 on BANYAN AV from CAMELIA ST to COLUMBINE ST 14 on BIRCHWOOD AV from OLEANDER ST to DAISY ST 15 on BLUEBELL ST from ALMOND AV to BIRCHWOOD AV Road Maintenance & 16 on CAMELIA ST from ALMOND AV to BANYAN AV Seal Beach Orange Annual Slurry Seal Project ST1901 The work will consist of surface treatment and traffic pavement markings. 04/2019 06/2019 10 24 72 34 Rehabilitation 17 on CARNATION CR from ALMOND AV to Cul-de-sac 18 on COLUMBINE ST from ALMOND AV to BANYAN AV 19 on DAFFODIL CR from ALMOND AV to Cul-de-sac 20 on DAHLIA DR from ALMOND AV to Cul-de-sac 21 on FERN CR from ALMOND AV to Cul-de-sac 22 on GOLDENROD CR from ALMOND AV to Cul-de-sac 23 on IRIS CR from ALMOND AV to Cul-de-sac 24 on ROSSMOOR CENTER WY from SEAL BEACH BL to WEST RD 25 on ROSSMOOR CENTER WY from WEST RD to MONTECITO RD 26 on DAISY ST from CANDLEBERRY AV to DOGWOOD AV 27 on DOGWOOD AV from DAISY ST to IRONWOOD AV 28 on DOGWOOD AV from MARIGOLD ST to FUCHSIA ST 29on E LDER AVf romO LEANDER STto HE ATHER ST 30 on GOLDENROD ST from ELDER AV to Cul-de-sac 31 on HEATHER ST from HAZELNUT AV to LAMPSON AV 32 on MARIGOLD ST from CANDLEBERRY AV to DOGWOOD AV

Cerritos Avenue (Dale Ave e/s City Limit); Knott Avenue (City Limit - City Limit); Lampson Avenue Road Maintenance & FY 18/19 City Wide Street Stanton Orange Street Rehabilitation throughout the City. (City Limit - Beach Blvd w/s); Magnolia Avenue (City Limit n/o Cerritos City Limit n/o Syracuse); 08/2018 09/2018 5 10 65 29 Rehabilitation Rehabilitation Project Orangewood Avenue (Beach Blvd e/s City Limit)

Repave/resurface 1.43 miles of road, including localized removal and repair of asphalt Road Maintenance & concrete pavement failure areas, repair of sidewalk and curb & gutter, reconstruction of Tustin Orange Newport Avenue Rehabilitation Sycamore Avenue to Holt Avenue 06/2018 03/2019 20 30 68 37 Rehabilitation curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic signal detector loops, and traffic striping.

Repave/resurface 0.95 miles of road, including localized removal and repair of asphalt Road Maintenance & concrete pavement failure areas, repair of sidewalk and curb & gutter, reconstruction of Tustin Orange Browning Avenue Rehabilitation El Camino Real to Irvine Blvd. 09/2019 06/2020 20 30 68 37 Rehabilitation curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic signal detector loops, and traffic striping.

Repave/resurface 0.24 miles of road, including localized removal and repair of asphalt concrete pavement failure areas, repair of sidewalk and curb & gutter, reconstruction of Road Maintenance & Tustin Orange Red Hill Avenue Rehabilitation curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt San Juan St. to Bryan Ave. 06/2020 03/2021 20 30 68 37 Rehabilitation concrete overlay, traffic signal detector loops, traffic striping, and median reconstruction to lengthen the northbound left turn pocket at Bryan Ave.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Repave/resurface 0.47 miles of road, including localized removal and repair of asphalt Road Maintenance & concrete pavement failure areas, repair of sidewalk and curb & gutter, reconstruction of Tustin Orange Red Hill Avenue Rehabilitation Walnut Ave. to Interstate 5 Freeway 06/2020 03/2021 20 30 68 37 Rehabilitation curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic signal detector loops, and traffic striping.

Repave/resurface 0.23 miles of road, including localized removal and repair of asphalt Road Maintenance & concrete pavement failure areas, repair of sidewalk and curb & gutter, reconstruction of Tustin Orange Edinger Avenue Rehabilitation Jamboree Road to Harvard Ave. 09/2020 06/2021 20 30 68 37 Rehabilitation curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic signal detector loops, and traffic striping.

Repave/resurface 1.6 miles of road, including localized removal and repair of asphalt Road Maintenance & concrete pavement failure areas, repair of sidewalk and curb & gutter, reconstruction of Tustin Orange Jamboree Road Rehabilitation Barranca Parkway to SCRRA Railroad 09/2021 06/2022 20 30 68 37 Rehabilitation curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic signal detector loops, and traffic striping.

Parkcenter Lane and Bryan Avenue Tustin Orange Traffic Control Devices Installation of new traffic signals and equipment Parkcenter Lane / Bryan Avenue Intersection 03/2018 12/2018 15 25 68 37 Traffic Signal Installation Lansdowne Road and Valencia Tustin Orange Traffic Control Devices Installation of new traffic signals and equipment Lansdowne Road / Valencia Ave. Intersection 03/2018 12/2018 15 25 68 37 Avenue Traffic Signal Installation

the project location includes 19 street section within the City. The list is attached the approved resolution. Leigh Circle (Ridgeview Circle to Cul-de-sac); Ridgeview Circle (Cul-de-sac to Cul-de-sac); Daron The project improvements of the nineteen streets sections include: (Taft Avenue to Cul-de-sac); Loma Street (Cerro Villa Drive to Valley Drive); Valley Drive (Cerro Villa •Rem ove and replace deteriorated pavement sections. Drive to Loma Street); Aubrey Circle (Valley Drive to Cul-de-sac); Montana Circle (Vida Circle to Cul- Road Maintenance & Street Rehabilitation Project (17/18 Villa Park Orange • Crack seal as needed. de-sac); Francisco Drive (Vida Circle to Cul-de-sac); Fernando Circle (Roberto to Cul-de-sac); Vida 07/2018 12/2018 15 25 68 37 Rehabilitation Carryover) • Edge or full grinding of the street pavement. Circle (Francisco Drive to Fernando Circle); Roberto Street (Collins Avenue to Fernando Circle); Mesa • Overlay the full pavement section with a minimum 2 inches of rubberized asphalt. Drive (Mesa Drive to Villa Isle Drive); Mesa Drive (Villa Isle Drive to Cerro Villa Drive); Park Villa Ln /Pl (Villa Park Road to Cul-de-sac); Hidden Valley Dr (Canyon Drive to Cul-de-sac); Durfee Circle (Lemon to Cul-de-sac); James Circle (James Road to Cul-de-sac); James Road (Center Road to James Circle); Christine Circle (James Road to Cul-de-sac)

Remove deteriorated pavement and place new asphalt concrete overlay for the segment between Trask Avenue and Garden Grove Boulevard; apply type 2 slurry seal Road Maintenance & Westminster Orange Hoover Street Improvements for the segment between Bolsa Avenue and Trask Avenue; remove and replace Hoover Street from Bolsa Avenue to Garden Grove Boulevard 07/2018 04/2019 10 15 72 34 Rehabilitation damaged curb, gutter, cross gutter, spandrel, sidewalk, ADA ramps, driveway approach, adjust manholes and water valves to grade; and install signing and striping.

Remove existing pavement and place new asphalt concrete overlay; remove and Road Maintenance & replace damaged curb, gutter, cross gutter, spandrel, sidewalk, ADA ramps, driveway Westminster Orange Bolsa Avenue Improvements Bolsa Avenue from Brookhurst Street to Ward Street 10/2018 04/2019 15 20 72 34 Rehabilitation approach, bus pad; adjust manholes and water valves to grade; install signing and striping. On Going Street Maintenance Zone 2 is located on the north side of the City generally bounded by Valley View Avenue on the West, The project includes crack sealing, slurry sealing, asphalt overlays, and miscellaneous Road Maintenance & Program/Annual Pavement Yorba Linda Boulevard on the South, Village Center Drive on the East, and the City boundary on the Yorba Linda Orange asphalt repair along with restriping of pavement markings. The City is divided into 7 06/2019 09/2019 5 7 55 29 Rehabilitation Preservation Program (APPP) Zone North. The zone consists of 76 lane miles of pavement which include a combination of arterials, zones and the program provides for treatment of one zone per year. 2 collectors, and local streets.

Auburn Folsom Rd. from Indian Hill Rd. to Lincoln Way; Hale St. from High St. to Orange St.; Staff has identified the proposed FY18/19 projects based on the FY13/14 to FY22/23 Marguerite Mine Rd. from Auburn Ravine to Hwy 49/ City limits; Auburn Ravine Rd. from Palm Ave. to Road Maintenance & City of Auburn 2019 Street Overlay Road Overlay Report Management System. Auburn Placer Elm Ave.; Epperle Ln. from Auburn Ravine Rd. to End; Palm Ave. from Hwy 49 to Auburn Ravine Rd.; 04/2019 06/2019 20 30 5 1 Rehabilitation Project Construction is anticipated from March through June 2019. With the proposed 2-inch College Way from Knoll St. to High St.; Knoll St. from Pleasant Ave to College Way; Landis Cir. from overlays, the useful life is estimated at 20 years. end to End; Los Altos Ave. from end to end; Hoffman Ave. from High St. to Landis Cir.

Road Maintenance & Rising Sun Road Pavement Colfax Placer This project will resurface approximately 1400 feet of Rising Sun Road On Rising Sun Road between between Ben Taylor Road and West Grass Valley Road 06/2018 08/2018 20 20 1 1 Rehabilitation Resurfacing Project Road Maintenance & Colfax Placer Culver Street Reconstruction This project will reconstruct up to 600 feet of Culver Street On Culver Street from West Oak Street to Newman Street 06/2018 08/2018 20 20 1 1 Rehabilitation South Auburn Street & I-80 This project will replace, realign, and reconstruct the existing South Auburn Street and I- Colfax Placer Safety On South Auburn Street between Hwy 174 and Whitcomb Avenue at I-80 on and off ramps. 10/2018 06/2019 20 20 1 1 Roundabout 80 on and off ramp intersection with a roundabout. The project will maintain and preserve the local street and road system in good condition, reduce drive times and traffic congestion, improve bicycle safety and make the pedestrian experience safer with the following improvements: • Phase 2 - new curb, gutter, sidewalk, drainage facilities, bulbout curb returns, including Lincoln Blvd. from Sterling Parkway to McBean Park Drive for the Phase 1A work. Lincoln Placer Safety Lincoln Blvd Phase 2 & 1A compliant curb ramps, streetscape including new trees, landscaping and irrigation; 03/2018 11/2018 30 100 6 1 Lincoln Blvd from McBean Park Drive to 2nd Street for the Phase 2 work. and • Phase 1A - restriping, removal and replacement of loop detectors along Lincoln Blvd. from Sterling Parkway to 1st Street and the installation of new signals at 1st, 3rd and McBean Park Drive. Town Center Implementation Plan Phase 3 – Taylor Rd from HSB to King Road Maintenance & Town Center Implementation Plan Work consist of overlay and the addition of a bike/pedestrian path from Del Oro HS to Loomis Placer Taylor Road from Horseshoe Bar Rd to North Town Limits 05/2019 06/2019 10 20 6 1 Rehabilitation Phase 3 North Town Limits as well as placing and replacing bike lanes, curb, gutter and sidewalk on Taylor Road from Horseshoe Bar to King.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Reconstruct the portion Sierra College Blvd. that is failing and needs to be Road Maintenance & Sierra College Blvd. Reconstruction Rocklin Placer reconstructed. This will involve reconstruction of the travel way and will not include the Sierra College Blvd. Between Clover Valley and City Limits 12/2020 06/2021 17 20 4 1 Rehabilitation (Clover Valley to City Limits) shoulders. Reconstruct the portion Sierra College Blvd. that is failing and needs to be Road Maintenance & Sierra College Blvd. Reconstruction Rocklin Placer reconstructed. This will involve reconstruction of the travel way and will not include the Sierra College Blvd Between Rocklin Road and El Don Drive 12/2019 06/2020 17 20 4 1 Rehabilitation (Rocklin Road - El Don Drive shoulders.

Acquire consultant through RFP process to study Rocklin's gaps in transportation infrastructure, and identify technologies to enhance Rocklin's safety and drivability. As past and forecasted future performance of investments continue to influence project Road Maintenance & Rocklin Placer Traffic Signal ITS decisions, the ability for Rocklin to implement systems to collect the data that can be Rocklin and adjacent agencies 06/2018 06/2020 25 30 4 1 Rehabilitation used to generate measurable/comparable performance indicators will be critical. With an ITS Master Plan, Rocklin should have the ability to develop and evaluate mitigation measures for peak hour traffic congestion.

Granite Drive (Rocklin Road to Dominguez Road); Lonetree Blvd. (City Limit with Roseville to Sunset Blvd.); Blue Oaks Blvd. (City Limit with Roseville to Sunset Blvd.); Wildcat Blvd. (West Stanford Ranch The removing and replacing of degraded asphalt needs to be done as part of general Road to City Limit with Lincoln); Park Drive (City Limit with Roseville to Stanford Ranch Road); Park Road Maintenance & Rocklin Placer Citywide Dig Outs (17/18 Carryover) repairs and is necessary to preserve the roadways and prevent major rehabilitation in Drive (Stanford Ranch Road to Crest Drive); Sunset Blvd. (Stanford Ranch Road to Fairway Drive); 12/2018 06/2019 17 20 4 1 Rehabilitation the coming years. Sunset Blvd. (Stanford Ranch Road to HWY 65); Sierra College Blvd. (Rocklin Road to Southside Ranch Road); Sierra College Blvd. (City Limit with Loomis to City Limit with Placer County); West Oaks Blvd. (Sunset Blvd. to Stanford Ranch Road).

Argonaut Avenue from Midas to end, Mountain View Drive from Midas Avenue to Sweetwater Drive, Mission Way from Mountain View Drive to Argonaut Avenue, Capistrano Way from Mountain View Drive to Argonaut Avenue, Verano Way from Mountain View Drive to Argonaut Avenue, Roble Way from Verano Way to Argonaut Avenue, Mesa Court from Verano Way to end, Piedra Court from The removing and replacing of degraded asphalt needs to be done as part of general Argonaut Avenue to end, Rio Court from Argonaut Avenue to end, Antelope Court from La Paloma Road Maintenance & Rocklin Placer Mission Hills Reconstruction repairs and is necessary to preserve the roadways and prevent major rehabilitation in Lane to end, La Paloma Lane from Argonaut Avenue to Antelope Way, Antelope Way from La Paloma 12/2018 06/2019 17 20 4 1 Rehabilitation the coming years. Lane to Mountain View Drive, Sweetwater Drive from Antelope Way to Lemon Hill Drive, Sweetwater Court from Lemon Hill Drive to end, Hillside Drive from Sweetwater Drive to Pecan Court, Pecan Court from Hillside Drive to end, Baltic Circle from end to end, Chelsea Place from Sweetwater Drive to end, Chelsea Court from Chelsea Place to end, Lemon Hill Drive from Argonaut Avenue to end, David Court from Argonaut Avenue to end, Adam Court from Argonaut Avenue to end.

Replace existing signalized intersection with a multilane roundabout, new pavement, and street lighting system. Current LOS is unacceptable due to the addition of new Road Maintenance & developments, i.e. Rocklin Commons and other developments in the vicinity along Rocklin Placer Pacific Street Roundabout Pacific Street at Rocklin Road 12/2018 06/2019 17 20 4 1 Rehabilitation Granite Drive. Replacing the signals will lead to an acceptable LOS and reduced traffic conflicts. Rocklin Road pavement is deteriorated and has had no structural overlays in the last 10 years. Partial road reconstruction and resurfacing of the Rocklin Ranch Industrial Park. This is Road Maintenance & Partial Road Reconstruction of an industrial area and has a lot of regular and heavy vehicular traffic. The amount of Rocklin Placer Alvis Court, Del Mar Avenue, Monopoly Court, and Citrus Avenue 12/2018 06/2019 13 15 4 1 Rehabilitation Rocklin Ranch Industrial Park traffic has increased over time causing the streets to become fatigued and susceptible to water damage. Adjust Rocklin Road’s street alignment and construct sidewalk, center island, and Road Maintenance & Rocklin Road Sidewalk and Center Rocklin Placer intersection. This will improve Rocklin Road's traffic circulation and reduce traffic Rocklin Road between Granite Drive and I‐80 North West Exit 12/2018 06/2019 17 20 4 1 Rehabilitation Island impediments. Repair dips and undulations on the roadway. As a result of the natural road settling, Road Maintenance & along the creek crossing, undulations in the roadway and along the sidewalk have Rocklin Placer Sceptre and Camelot Drive Repair Along the creek crossing at Sceptre Drive and Camelot Drive 12/2018 06/2019 17 20 4 1 Rehabilitation occurred which have created drainage issues and is creating ADA barriers on the sidewalk. Reconstruct the portion Sierra College Blvd. that is failing and needs to be Road Maintenance & Sierra College Blvd. Reconstruction Rocklin Placer reconstructed. This will involve reconstruction of the travel way and will not include the Sierra College Blvd. Between Scarborough and Nighwatch 12/2018 06/2019 17 20 4 1 Rehabilitation (Scarborough - Nightwatch) shoulders.

Lane extension and gutter redesign and construction. Existing conditions cause delays for the left turn lane from Sunset Blvd. to 3rd Street. By extending the turn lane, it will free the straight movement through the intersection, and by removing the valley gutter Road Maintenance & Sunset Blvd. and Springview Rocklin Placer and constructing a smoother transition onto 3rd Street, traffic will not have to slow for Intersection of Sunset Blvd. and Springview Drive 12/2018 06/2019 17 20 4 1 Rehabilitation Intersection Upgrade the bump, and will proceed normally through the intersection. This will result in fewer delays for drivers using the traffic signal and will sustain a steady flow of traffic in a safe and secure manner.

The project includes the removal and replacement of failed asphalt concrete roadway Road Maintenance & 2019 Residential Resurfacing sections and the application of a preventative maintenance surface treatment. The The work will occur along various residential streets within the Woodcreek Oaks, Foothills Junction, Roseville Placer 05/2019 10/2019 7 10 6 1, 4 Rehabilitation Project maintenance surface treatment will provide a waterproof membrane to protect the Los Cerritos, Roseville Heights, South Cirby, and Maidu neighborhoods. existing asphalt surfaces and extend the life of the underlying pavement.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts The street segments identified for this project include: Washington Blvd. from Pleasant Grove Blvd. to The project includes the removal and replacement of failed asphalt concrete pavement Road Maintenance & 2018 Roller Compacted Concrete just south of Blue Oaks Blvd.; Atkinson Street from Church Street to the Foothills Blvd. overcrossing; Roseville Placer with roller compacted concrete pavement. The project also includes the reconstruction 05/2018 11/2018 20 40 6 1, 4 Rehabilitation Pavement Project Denio Loop from Atkinson Street to Foothills Blvd.; Hickory Street from Church Street to Oakland of the road base with cement treated base as well as curb ramp improvements. Avenue. Various pothole locations along Commercial Street., Various pothole locations along Utah Street., Road Maintenance & Grind out distressed areas along Commercial Street and pavement patch those grind- Portola Plumas 18/19 Street Patching Citywide Various pothole locations along Ridge Street., Various pothole locations along Third Ave., Various 06/2019 07/2019 2 4 3 1 Rehabilitation outs with hot mix asphalt. pothole locations along California Street. Various locations on West Street, Various locations on Joy Way, Various locations on Main Street, Road Maintenance & 17/18 Street Patching Citywide Portola Plumas Grind out distressed areas pavement patch those grind-outs with hot mix asphalt. Various locations on Pacific Street, Various locations on 2nd Avenue, Various locations on Taylor 06/2018 10/2018 2 4 3 1 Rehabilitation (17/18 Carryover) Avenue. Road Maintenance & Various Streets Improvements Grind and construct 2" asphalt concrete (AC) overlay and adjust water valves and sewer Banning Riverside First Street from Livington St to Williams St; Second Street from Hays St to Williams St. 08/2018 02/2019 10 15 42 23 Rehabilitation (17/18 Carryover) manhole covers go grade. Grind and construct 2" asphalt concrete; adjust water valve and sewer manhole covers; Road Maintenance & 2018-19 Various Streets AC Williams Street from 8th Street to 16th Street; 8th Street from Ramsey St to Nicolet St; Jacinto View Banning Riverside repair concrete curb and gutter, sidewalk, access ramps and cross gutter; and reinstall 05/2019 11/2019 10 15 42 23 Rehabilitation Overlay/Rehabilitation Road from Omar St to Winchester Dr; Indian School Lane from San Gorgonio Ave to Blanchard St. all existing striping and pavement markers.

Crack seal and slurry seal existing asphalt concrete pavement; remove and replace Road Maintenance & Banning Riverside Jacinto View Road Slurry Seal deteriorated ac pavement to subbase; repair concrete curb and gutter, sidewalk, access Jacinto View Road from Winchester Drive to Sunset Avenue 03/2019 09/2019 5 7 42 23 Rehabilitation ramps and cross gutter; and reinstall all existing striping and pavement markers.

Road Maintenance & Beaumont Avenue Reconstruction Beaumont Riverside Grind and overlay street reconstruction for Beaumont Ave Beaumont Ave from 6th to 11th Street 03/2019 05/2019 15 30 42 23 Rehabilitation Project Alexe St, Ana St, Cherry Valley Acres Ln, Citrus St. Jon Gilbert Ln, Lucille Ct, Monika Ct, Vasali Ln, Road Maintenance & Cherry Ave, Beaumont Ave, Palm Ave, Spruce Ct, Shasta Way, Roy Ct, Apple Canyon Rd, Cynthia St. Beaumont Riverside Annual Slurry Seal FY 18-19 Slurry Seal application on various streets in the City of Beaumont 09/2018 10/2018 5 7 42 23 Rehabilitation 6th St, California Ave, Elm Ave, Moonlight Dr., Oak Valley Parkway, Olive Ave, Radka Ave, Veile Ave, Myrl Dr, 1st, 2nd, 3rd, 7th, 8th, 10th, 11th, 12th, 13th St.

The project consists of installing 300 linear feet of underground stormwater storage system; installation of catch basins to capture stormwater from the street; piping to connect to the existing storm drain system, and street reconstruction. The estimated Complete Streets Barnard Street – Stormwater Blythe Riverside useful life of the project is 50 to 100 years according to industry standards, and the Barnard St. and Lovekin Blvd., City of Blythe, Riverside 09/2018 11/2018 50 99 56 28 Components System Improvement Project anticipated year of construction is 2018. The Engineer’s opinion of probable cost is 249,519.00 with the City furnishing 6 feet diameter corrugated pipe supplies for the construction of the underground stormwater retention.

Joint improvement project with the City of Yucaipa to construct improvements on Complete Streets County Line Road Corridor Calimesa Riverside County Line Road fom Calimesa Blvd. to Bryant St. including 4 intersections, sidewalk, County Line Road from Calimesa Rd. to Bryant St. 05/2018 06/2019 20 40 42 23 Components Improvement Project ADA Ramps, bike lanes, utility relocations and street widening. Install trash filters in existing storm drain catch basins. (This project has not yet Complete Streets Catch Basin Trash Filters (Carry Canyon Lake Riverside commenced due to other higher priority 17/18 projects. This project is moving forward Railroad Canyon Road - Western City Boundary to Eastern City boundary - 2 Miles 10/2018 12/2018 20 25 67 28 Components Over 17/18) and will be completed.) Phase II Wrought Iron Fence Canyon Lake Riverside Safety Remove and replace existing wrought iron safety fencing. Railroad Canyon Road - between Canyon Lake Drive South and Sky Link Drive - south side 07/2018 09/2018 10 15 67 28 Replacement

The pavement approaching and through the intersection is requiring restoration and will Road Maintenance & Date Palm Drive and Dinah Shore Cathedral City Riverside be reconstructed using Asphalt and Portland Cement Concrete (PCC). The stopping Intersection of Date Palm Drive and Dinah Shore Drive in Cathedral City. 03/2018 03/2018 20 30 56 28 Rehabilitation Intersection Reconstruction lanes of all four legs of the intersection will be reconstructed using PCC.

The existing pavement on Avenida Ximino neighborhood streets requires Road Maintenance & Avenida Ximino Neighborhood Avenida Ximino between 30th Avenue and Vega Road, Susan Drive, Walker Avenue and Vega Road Cathedral City Riverside reconstruction. The Project will reconstruct the streets and improve the respective street 03/2019 08/2019 15 20 56 28 Rehabilitation Street Reconstruction between Avenida Ximino and Avenida Juarez in Cathedral City. drainage. Landau Boulevard and McCallum This project will provide a signalized intersection near Mt. San Jacinto High School Cathedral City Riverside Safety Way Intersection Traffic Signal which gets significant pedestrian traffic from students. It was also the location of a The intersection of Landau Boulevard and McCallum Way in Cathedral City. 03/2020 08/2020 15 20 56 28 Construction pedestrian fatality in 2015. Peacock Palms Neighborhood Road Maintenance & The existing pavement throughout the neighborhood requires Calle Leon, Paseo Laredo, Via Durango, Via Hermosa, Vera Cruz, Calle De Vega, Avenida Cortez, Coachella Riverside Pavement Maintenance (17/18 09/2018 10/2018 20 20 56 28 Rehabilitation Maintenance/Reconstruction Pavon Palma Carryover) Road Maintenance & Harrison Street Coachella Riverside The existing pavement requires Maintenance/Reconstruction Harrison Street from Grapefruit Blvd. to Avenue 54 05/2018 09/2018 20 20 56 28 Rehabilitation Maintenance/Reconstruction Avenue 54 Street Road Maintenance & Coachella Riverside Maintenance/Rehabilitation (17/18 The existing pavement requires Maintenance/Reconstruction Avenue 54 From Harrison Street to Grapefruit Blvd. 09/2018 10/2018 20 20 56 28 Rehabilitation Carryover) Avenida Del Oro Neighborhood Road Maintenance & Pavement Coachella Riverside The existing pavement requires Maintenance/Reconstruction Avenida Del Oro, Avenida Del Parque, Corte Del Parque 09/2018 10/2018 20 20 56 28 Rehabilitation Maintenance/Reconstruction (17/18 Carryover) Road Maintenance & Rubberized Asphalt Concrete Foothill Pkwy from Skyline to I-15, Green River from City limit to SR-91, Crestridge from Green River Corona Riverside Rubberized Asphalt Concrete Rehabilitation Project 10/2018 04/2019 15 20 60 31 Rehabilitation Rehab Project 2017-22 to Prado Rd, Prado Rd from Crestridge to terminus Area 1 btwn Green River Rd, Palisades Dr. and Serfas Club Dr., Area 2 btwn Border Ave, Avenida Del Road Maintenance & 2018 Local Streets Rehab Project Corona Riverside Pavement Rehabilitation Vista Ave, Via Del Rio Ave and Ontario Ave, Area 3 btwn Rimpau Ave, Kellogg Ave, Ontario Ave and 10/2017 04/2019 15 20 60 31 Rehabilitation 2017-13 Ridgewood Dr.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts 2018-2019 City-wide Asphalt Grind Project will include grind and overlay of asphalt material, and crack seal and slurry seal. Road Maintenance & Various road segments City-wide(30.22 Square Miles) as recommended in the current Pavement Desert Hot Springs Riverside and Overlay, Slurry, and Road Replacement of striping and markings and addition of Bike lanes marking at various 11/2018 12/2018 5 10 56 28 Rehabilitation Management Plan with PCI Ratings between 65 and 75. Reconstruction Project segments.

Project will include the installation of new traffic signals, street lights, bike lanes, traffic Palm Drive Traffic Signal and Street Desert Hot Springs Riverside Safety signal synchronization facilities, grind and overlay of asphalt material, and striping and Palm Drive from Two Bunch Palms Trail to Pierson Blvd 08/2018 09/2018 5 10 56 28 Light Project markings and addition of bike lanes marking at various segments.

Complete Streets Project will include the installation of new curb and gutter, sidewalk, ADA ramps, grind Desert Hot Springs Riverside Desert View Sidewalk Project Desert View Ave from Palm Dr to Verbena Dr 10/2018 11/2018 5 10 56 28 Components and overlay of asphalt material, and striping and markings Project will include grind and overlay of asphalt material, and crack seal and slurry seal. Road Maintenance & Re-striping of Mission Lakes Blvd Desert Hot Springs Riverside Replacement of striping and markings and addition of Bike lanes marking at various Various road segments along Mission Lakes Blvd and Two Bunch Palms Trails 10/2018 11/2018 5 10 56 28 Rehabilitation and Two Bunch Palms Trail Project segments. Schleisman Rd between Whitewell Rd and Archibald Ave; Archibald Ave between 65th St and Corbin Road Maintenance & AC improvement operations including grind & overlay, micro-surfacing , reconstruction Dr; Citrus St between Harrison Ave and Hamner Ave; Limonite Ave between Archibald Ave and Eastvale Riverside 2018 Annual Overlay Project 09/2018 06/2019 10 20 60 31 Rehabilitation and traffic striping. Hamner Ave; Philadelphia Ave between Milliken Ave and I-15; Sumner Ave between Limonite Ave and Citrus St; Scholar Way between Limonite Ave and Citrus St Road Maintenance & Pavement Management Program Hemet Riverside Pavement Management Program Phase 2 - Slurry seal project Agate St. to Corte Cercado with 38 Total Streets 05/2019 12/2019 5 15 42 23 Rehabilitation Phase 2 - Slurry Seal Project Road Maintenance & Pavement Management Program Hemet Riverside Pavement Management Project Phase One - Slurry Seal Yale St. to Winthrop Dr. with 65 Total Streets 05/2018 12/2018 5 15 42 23 Rehabilitation Phase 1 Slurry Seal Florida Avenue Emergency Vehicle Preemption Hardware Project- a hardware purchase only project to solicit bids for EVP hardware compatible with the City system to be Road Maintenance & Florida Avenue EVP/Opticom Hemet Riverside installed on the Caltrans Median Project. Caltrans has already committed to installing Florida Avenue and Highway 74 08/2018 12/2018 5 8 42 23 Rehabilitation Hardware and wiring any City provided EVP hardware on the 23 signals within the project boundary.S

This project with support the City's Pavement Management Program (PMP). The City's Road Maintenance & Fred Waring Drive and Portola PMP identifies the street for scheduled slurry seal as a preventative maintenance to Fred Waring Drive from eastern city limits to western city limits Indian Wells Riverside 05/2018 09/2018 5 10 42 28 Rehabilitation Avenue Slurry Seal (17/18 Ongoing) extend its useful life. Crack sealing will be applied prior to application of rubberized Portola Avenue from Mockingbird Trail to city limits south slurry seal and then pavement striping lines and markings will be installed.

This project with support the City's Pavement Management Program (PMP). The City's Road Maintenance & PMP identifies the street for scheduled slurry seal as a preventative maintenance to Indian Wells Riverside Highway 111 Slurry Seal Highway 111 from eastern city limits to western city limits 07/2020 06/2021 5 10 42 28 Rehabilitation extend its useful life. Crack sealing will be applied prior to application of rubberized slurry seal and then pavement striping lines and markings will be installed.

This project with support the City's Pavement Management Program (PMP). The City's PMP identifies the street for scheduled slurry seal as a preventative maintenance to Road Maintenance & Fairway Drive Slurry Seal and Miles extend its useful life. Crack sealing will be applied prior to application of rubberized Indian Wells Riverside Fairway Drive from Cook Street to Indian Wells Lane 06/2018 06/2019 5 10 42 28 Rehabilitation Avenue Overlay (17/18 Ongoing) slurry seal and then pavement striping lines and markings will be installed. Overlay of Miles Avenue to include rubberized asphalt, road diet (through re-striping), and bike lanes The improvements will include widening Highway 111 from four to six lanes including Highway 111 Street Improvements pavement reconstruction, intersection improvements, and upgraded traffic signals at all Road Maintenance & Indio Riverside from Madison Street to Rubidoux intersections. Upgrade existing sidewalks and driveways to current ADA standards and Highway 111 from Madison Street to Rubidoux Street 08/2017 09/2018 10 20 56 28 Rehabilitation Street add sidewalks to the bus stops near the intersection of Madison Street and Highway 111.

Add pavement along Rancho Los Cerritos Drive, Primrose Lane, Galindo Court and Sabrina Court. The improvements include constructing new asphalt pavement and aggregate base to these streets. Rolled curbs and drywells will be installed as Road Maintenance & North Indio Pavement Indio Riverside necessary to mitigate drainage issues. The project limits include a 36ft street section for Rancho Los Cerritos Drive, Primrose Lane, Galindo Court and Sabrina Court 05/2018 05/2018 10 20 56 28 Rehabilitation Improvements two lanes of traffic along Rancho Los Cerritos between Avenue 38 and Avenue 39, as well as for Galindo Court and Sabrina Court. Due to Right-of-Way constraints, Primrose Lane will be constructed as a temporary 20ft section from Avenue 38 to Lindy Lane.

Reconstruct the pavement along Miles Avenue between Deglet Noor Street and Oasis Miles Avenue Pavement Road Maintenance & Street. The proposed improvements include removing the existing deteriorated asphalt Indio Riverside Reconstruction from Deglet Noor Miles Avenue between Deglet Noor Street and Oasis Street 03/2018 09/2018 10 20 56 28 Rehabilitation and replacing with a new asphalt layer. The proposed improvements also include Street to Oasis Street removing and replacing any deteriorated sub-base as necessary.

Road Maintenance & Rubidoux Blvd Pavement The rehabilitation of approximately .85 centerline miles (275,000 SF) of AC pavement Jurupa Valley Riverside Rubidoux Blvd - Mission Blvd to 29th St 09/2018 02/2019 15 20 60 31 Rehabilitation Rehabilitation by grind and overlay with isolated removal and reconstruction Road Maintenance & Van Buren Blvd Pavement The rehabilitation of approximately .85 centerline miles (300,000 SF) of AC pavement Jurupa Valley Riverside Van Buren Blvd - Jurupa Rd to Rutile St 07/2018 12/2018 15 20 60 31 Rehabilitation Rehabilitation - Ph. 2A by grind and overlay with isolated removal and reconstruction City of Jurupa Valley Limits - Bounded as follows: North of Santa Ana River, East of I-15, South of Citywide Pavement Need Completion of a pavement management program for the first time since the City's Jurupa Valley Riverside Other Philadelphia Avenue/ El Rivino Road, West of Brown Avenue and the Santa Ana River. Phasing for 05/2018 12/2018 3 5 60 31 Assessment 17/18 Ongoing incorporation. Includes assessment of approximately 300 miles (road centerline). improvements will be based on priority need throughout each year.

Complete Streets Jurupa Valley High School Safe Provides curb, gutter, sidewalk and dirt trails along with LED crosswalk flashers at the Jurupa Valley Riverside Martin St - 50th to Bellegrave, 48th St - Martin to Troth, Troth St - 48th to Bellegrave 05/2018 08/2018 10 20 60 31 Components Routes to School - 17/18 Ongoing Martin/Bellegrave intersection and curb bump outs at the Martin St intersections.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

The proposed improvements will convert the La Quinta Village into a bicycle and pedestrian friendly, Complete Street atmosphere. The three major streets in the Village; Calle Tampico from Eisenhower Drive to Washington Street, Eisenhower Drive from Complete Streets La Quinta Village Complete Streets - Calle Tampico from Eisenhower Drive to Washington Street, Eisenhower Drive from Calle Tampico to La Quinta Riverside Calle Tampico to Calle Sinaloa, and Calle Sinaloa/Avenue 52 from Eisenhower Drive to 04/2019 08/2020 20 30 42 28 Components A Road Diet Project Calle Sinaloa, and Calle Sinaloa/Avenue 52 from Eisenhower Drive to Washington Street Washington Street; will be reduced from four lanes down to two lanes and include bicycle facilities and on-street parking. In addition, five roundabouts will be constructed in order to link the road diet segments together.

Complete Streets Jefferson Street at Avenue 53 The proposed improvement will construct a modern roundabout at the intersection of La Quinta Riverside Jefferson Street at the intersection of Avenue 53. 12/2018 11/2019 20 30 42 28 Components Roundabout Jefferson Street and Avenue 53.

Carryover of $175,874 from the previous year allocation. The proposed improvements will convert the La Quinta Village into a bicycle and pedestrian friendly, Complete Street atmosphere. The three major streets in the Village; Calle Tampico from Eisenhower FY 2017/28 Carryover from La Complete Streets Drive to Washington Street, Eisenhower Drive from Calle Tampico to Calle Sinaloa, and Calle Tampico from Eisenhower Drive to Washington Street, Eisenhower Drive from Calle Tampico to La Quinta Riverside Quinta Village Complete Streets - A 04/2019 08/2020 20 30 42 28 Components Calle Sinaloa/Avenue 52 from Eisenhower Drive to Washington Street; will be reduced Calle Sinaloa, and Calle Sinaloa/Avenue 52 from Eisenhower Drive to Washington Street Road Diet Project from four lanes down to two lanes and include bicycle facilities and on-street parking. In addition, five roundabouts will be constructed in order to link the road diet segments together.

Pavement Rehabilitation of Lincoln Street from Road Maintenance & Lincoln Street Pavement Lake Elsinore Riverside Riverside Drive to north end of Lincoln Street. The project consists of Slurry Seal Type Lincoln Street 10/2018 04/2019 10 12 67 28 Rehabilitation Rehabilitation II treatment or 2" mill and overlay depending on PCI condition of road segment.

Graham Ave Pavement Road Maintenance & Lake Elsinore Riverside Rehabilitation between Lakeshore 2" Grind and overlay W. Graham Ave between Lakeshore and Langstaff 04/2018 07/2018 7 10 67 28 Rehabilitation and Langstaff (17/18 Carryover)

Graham Ave Pavement Road Maintenance & Lake Elsinore Riverside Rehabilitation between Langstaff 2" Grind and overlay Graham Ave between Langstaff and Main 04/2018 07/2018 7 10 67 28 Rehabilitation and Main (17/18 Carryover) Graham Ave Pavement Road Maintenance & Lake Elsinore Riverside Rehabilitation between Main and Slurry Seal II Graham Ave between Main and Heald 04/2018 07/2018 7 10 67 28 Rehabilitation Heald (17/18 Carryover) Road Maintenance & Rustler's Ranch Phase 2 (17/18 Menifee Riverside repave/resurface 2.4 miles of neighborhood streets in severe condition Rustler's Ranch Neighborhood. North of Newport Rd and East of Bradley Rd 03/2019 04/2019 8 10 67 23 Rehabilitation Carryover)

Road Maintenance & Murrieta Road Resurfacing (Newport repave/resurface 3.0 miles of local arterial road. Restripe bike/Neighborhood Electric Menifee Riverside Murrieta Road from Newport Road to Rouse Road 09/2018 10/2018 15 20 67 23 Rehabilitation to Ethanac) (17/18 Carryover) Vehicle (NEV) lanes. Install additional signs.

John F Kennedy Dr - Heacock St to Indian St; Iris Ave - Perris Blvd to Kitching St; Iris Ave - Kitching St to Lasselle St; Sunnymead Blvd - Frederick St to Heacock St; Pigeon Pass Rd - Sunnymead Blvd to Swan St; Moreno Beach Dr - Via Del Lago to John F Kennedy Dr; Hemlock Ave - Pigeon Pass Rd to Heacock St; Alessandro Blvd - Lasselle St to West of Darwin Dr; Road Maintenance & Citywide Pavement Rehabilitation Moreno Valley Riverside Surface Remove/Replace and Slurry Seal Alternative Streets: 10/2018 02/2019 5 10 61 31 Rehabilitation Program Moreno Beach Dr - Auto Mall Dr to Cottonwood Ave; Pigeon Pass Rd - Swan St to Western Ridge Dr; Moreno Beach Dr - Ironwood Ave to Locust Ave; Elder Ave - Morrison St to Foxhound Cir; Iris Ave - Indian St to Perris Blvd

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Abedul St - Buena Fortuna Ln to North End Ancladero Ct - Buena Fortuna Ln to North End Aslan Ct - Seafarer Wy to North End Avenida De Loring - Buena Fortuna Ln to North End Bayless St - Blooming Meadow Rd to Ironwood Av Betts Pl - Rockcrest Dr to Sylmar Dr Blooming Meadow Rd - Bayless St to Wild Flax Ln Bluntleaf Ct - Sweetleaf St to North End Bodega Ct - Napa Valley Ct to North End Briar Knoll Pl - Rhea Dr to Blooming Meadow Rd Broadleaf Ln - Bluntleaf Ct to Sunnymead Bl Brookstone Dr - Stonebridge Ct to Poppystone Dr Buena Fortuna Ln - Abedul St to Avenida De Loring Buena Village Ct - West End to Avenida De Loring Burd Ct - Plato Dr to South End Calabria Dr - Avenida De Loring to Abedul St Callita St - Abedul St to Avenida De Loring Camino Juanito - Buena Fortuna Ln to Kramera Av Candle Shoe Ct - End to Meadow Wood Wy Road Maintenance & Citywide Pavement Rehabilitation Canyonstone Dr - Gentian Av to Poppystone Dr Moreno Valley Riverside Slurry Seal 07/2018 09/2018 3 5 61 31 Rehabilitation Program Cascada Cr - Avenida De Loring to West End Caspian Wy - Dome St to Yee St Challis Ct - Pattilynn Dr to East End Chiante Ct - Pattilynn Dr to Yee St Cinnamon Creek Ct - West End to Meadow Wood Wy Cobra Dr - Wedow Dr to Santiago Dr Cockatiel Dr - Swan St to McCylly Ct Cope Ct - Plato Dr to South End Copper Cove Ln - Cypress Sands Ln to Lasselle St Crane Ct - Rhea Dr to North End Creekstone Dr - Fugate Ct to Heacock St Cushenbury Dr - Running Deer Rd to East End Cypress Sands Ln - Copper Cove Ln to South End Dome St - Yee St to Caspian Wy Dunhill Dr - Nagai Dr to Cottonwood Av Elyce Ct - Running Deer Rd to East End Flamingo Bay Ln - Copper Cove Ln to Brodiaea Av Frente Caliente - Abedul St to East End Fugate Ct - Puddingstone Dr to North End Gemstone Ct - Puddingstone Dr to North End The project proposes to resurface one mile of California Oaks Road from I-15 to Clinton Pavement Resurfacing - Asphalt Road Maintenance & Keith Road utilizing cold-in-place recycling paving method. This sustainable paving Murrieta Riverside Overlay California Oaks Road from I- California Oaks Road from I-15 to Clinton Keith Road 12/2018 05/2019 10 20 67 28 Rehabilitation practice removes more of the surface damage, and the rehabilitated road lasts longer 15 to Clinton Keith Road than roads resurfaced with conventional asphalt. Asphalt overlay of Jefferson Avenue from Date Street to Cherry Street and Murrieta Hot Road Maintenance & 17/18 Carryover Project - Asphalt Springs Road from Jefferson Avenue to Madison Avenue. This project will rehabilitate Jefferson Avenue from Date Street to Cherry Street and Murrieta Hot Springs Road from Jefferson Murrieta Riverside 06/2018 07/2018 10 20 67 28 Rehabilitation Overlay the existing asphaltic concrete roadways through isolated dig out repairs and hot mix Avenue to Madison Avenue. asphalt overlay. Street widening and improvement project on Second Street eastbound lane (between Road Maintenance & Norco Riverside Second Street Widening Project Hamner Avenue and 1-15 Freeway) to add a dedicated right turn lane onto the 1-15 Second Street eastbound lane between Hamner Avenue and I-15 Freeway. 07/2018 06/2019 15 25 60 31 Rehabilitation southbound Freeway. Street widening and improvement project on Sixth Street eastbound lane (between Road Maintenance & Norco Riverside Sixth Street Widening Project Hamner Avenue and 1-15 Freeway) to add a dedicated right turn lane onto the 1-15 Sixth Street between Hamner Avenue and I-15 Freeway 07/2018 06/2019 15 25 60 31 Rehabilitation southbound Freeway. Street rehabilitation (grind and overlay) project on River Road between Main Street and Road Maintenance & Corydon Avenue. Norco has half street maintenance requirements for River Road from Norco Riverside River Rd Rehabilitation Project River Rd between Second St and Corydon Avenue 07/2018 06/2019 15 25 60 31 Rehabilitation Second Street to Corydon Avenue and this project will be conducted jointly with the City of Corona as the Lead Agency. Monterey Avenue Repaving - Road Maintenance & Palm Desert Riverside Whitewater Channel to Hovely Lane Repave 3/4 mile of road using full depth reclamation street resurfacing Northbound Monterey Avenue from Whitewater Storm Channel to Hovley Lane West 07/2018 09/2018 20 25 42 28 Rehabilitation West Road Maintenance & Cook Street Resurfacing - Gerald Palm Desert Riverside Cold-in-place recycling with a warm mix cap Approximately 3,300 linear feet of Cook Street, from Gerald Ford Drive to Frank Sinatra Drive. 04/2019 06/2019 20 30 42 28 Rehabilitation Ford Drive to Frank Sinatra Drive

Pedestrian safety upgrades on the Indian Canyon Corridor through downtown Palm Palm Springs Riverside Safety Indian Canyon Traffic Safety Project Springs, including upgrading signals, pedestrian crossings, bulb-outs, safety lighting, Indian Canyon Road between Tachevah Drive and Camino Parocela 07/2018 03/2019 10 20 42 28 and reduction of pedestrian exposure time to traffic at ten intersections.

Road Maintenance & Perris Riverside Citywide Street Rehabilitation Grind & Overlay various City streets to provide smooth roadway surface. Total area of the city contains 31.5 square miles 01/2019 02/2019 5 10 61 31 Rehabilitation Road Maintenance & Perris Riverside A Street Rehabilitation Grind & Overlay existing pavement along A Street between 4th Street and Nuevo Road. A Street (between 4th Street and Nuevo Road) 01/2019 02/2019 5 10 61 31 Rehabilitation Road Maintenance & Asphalt to Concrete Transitions Grind & Overlay asphalt at locations where asphalt meets concrete to provide smooth Perris Riverside Total area of the city contains 31.5 square miles 08/2018 09/2018 5 10 61 31 Rehabilitation Rehabilitation surface

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Road Maintenance & Perris Riverside Perris Boulevard Pavement Rehab Grind & Overlay Perris Blvd between Ramona Expressway and Orange Avenue Perris Boulevard (between Ramona Exwy and Orange Ave) 07/2019 08/2019 5 10 61 31 Rehabilitation Road Maintenance & Ramona Expressway Pavement Perris Riverside Grind & Overlay Ramona Expressway between Webster Avenue and Rider Street Ramona Expressway (between Webster Ave and Rider St) 07/2019 08/2019 5 10 61 31 Rehabilitation Rehab Road Maintenance & Downtown Streets Pavement Perris Riverside Grind & Overlay various streets throughout the City's Downtown region Various streets throughout downtown 01/2020 02/2020 5 10 61 31 Rehabilitation Rehabilitation This project will include a full rehabilitation of existing pavement on the westbound #1 lane of a 3/4-mile half-street segment of Dinah Shore Drive that was recently annexed into the City of Rancho Mirage. The existing pavement has deteriorated over numerous Road Maintenance & Dinah Shore Drive Pavement Dinah Shore Drive, north side, from Los Alamos Road to 1,320’ west of Bob Hope Drive (Total Rancho Mirage Riverside years without the necessary maintenance, which has resulted in severe alligator 08/2018 09/2019 10 20 42 28 Rehabilitation Rehabilitation distance: 0.75 miles) cracking over the entire length and a Pavement Condition Index of 41 – the lowest in the City of Rancho Mirage. The City plans to utilize the cold in-place recycling method to reduce costs. This project will include a full rehabilitation of existing pavement for ¾ of a mile on the southbound lanes of Monterey Avenue between Hovley Lane and the north edge of the Road Maintenance & Monterey Avenue Street Pavement bridge at the Whitewater Channel. The existing pavement has deteriorated over Monterey Avenue, west side, from Hovley Lane to the north edge of the bridge at the Whitewater Rancho Mirage Riverside 04/2019 06/2019 10 20 42 28 Rehabilitation Rehabilitation numerous years and is in poor condition over the entire length of the subject area. The Channel (Total distance: 0.75 miles) City plans to utilize a cold in-place recycling method with a hot mix top course to reconstruct the ¾ mile stretch of roadway.

Cranford Avenue from Seventh St. (140' N'ly) to Everton Pl. (Maintenance) Presley Avenue from Linden St. to Seventh St. (Maintenance) Seventh Street from Chicago Ave. to End of Street (Maintenance) The Road Maintenance and Rehabilitation Project will consist of resurfacing 0.39 miles Seventh Street from Cranford Ave. to End of Street (Maintenance) of Arterial and 3.68 miles of Local roads to provide a safer and quieter street network Seventh Street from Presley Ave. to Cranford Ave. (Maintenance) system; existing concrete sidewalk, curb/gutter, and driveways will be rehabilitated to Box Springs Blvd. from Sycamore Canyon Blvd. to River Crest Dr. (Maintenance) eliminate tripping hazards; and pedestrian ramps will be improved to the current ADA Quail Valley Court from Box Springs Blvd. to End of Street (Maintenance) standards. Douglass Avenue from Linden St. to University Ave. (Maintenance)

Rossbo Avenue from Wolfe Ave. to Young St. (Maintenance) The Traffic Signal Installation project (Mission Inn Avenue at Pine Street) would Bingham Avenue from Hole Ave. to Mobley Ave. (Maintenance) Carryover: 2017-2018 SB-1 signalize the intersection of Mission Inn Avenue at Pine Street. As part of the project, Wolfe Avenue from Rossbo Ave. to Mobley Ave. (Maintenance) Riverside Riverside Other Maintenance and Traffic the intersection would include crosswalks and dedicated left-turn lane on Mission Inn 06/2018 09/2018 15 20 61 31 Young Street from Rossbo Ave. to Bingham Ave. (Maintenance) Improvements Avenue to improve safety and reduce delay to Pine Street. Pierce Street from Magnolia Ave. to Indiana St. (Maintenance)

Tenby Court from Weatherby Dr. to End of Street (Maintenance) The Pedestrian HAWK Signal Installation project (Arlington Avenue at Arlington Heathrow Drive from Wickham Dr. to Weatherby Dr. (Maintenance) Regional Learning Center, east of Murray St) would construct a pedestrian HAWK Keys Court from Weatherby Dr. to End of Street (Maintenance) signal directly in front of the Arlington Regional Learning Center so students can access Newmarket Drive from Wickham Dr. to Weatherby Dr. (Maintenance) the RTA bus stop on the southerly side of Arlington Avenue. The project will install a Weatherby Drive from Heathrow Dr. to Newmarket Dr. (Maintenance) crosswalk, pedestrian ramps, and pedestrian indications to safeguard pedestrian Hedrick Avenue from Wells Ave. to Hole Ave. (Maintenance) crossings. Mimosa Hill Court from Hedrick Ave. to End of Street (Maintenance) Mission Inn Avenue and Pine Street Intersection (Traffic Signal) Arlington Avenue and Murray Street (Pedestrian HAWK Signal)

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Business Way from Russell Street to End of Street (Maintenance) Spruce Street from La Cadena Drive to Chicago Avenue (Maintenance) Prospect Avenue from Sedgwick Avenue to End of Street (Maintenance) Sycamore Canyon Boulevard from Box Springs Boulevard, northerly to City Limits (Maintenance) The Road Maintenance and Rehabilitation Project will consist of resurfacing 4.19 miles Victoria Avenue from Central Avenue to Horace Street (Maintenance) of Arterial and 2.29 miles of Local roads to provide a safer and quieter street network Van Buren Boulevard from Wood Road to Orange Terrace Parkway (Maintenance) system; existing concrete sidewalk, curb/gutter, and driveways will be rehabilitated to Donald Avenue from California to Admiralty Avenue (Maintenance) eliminate tripping hazards; and pedestrian ramps will be improved to the current ADA Admiralty Avenue from Donald Avenue to Jackson Street (Maintenance) standards. Texas Avenue from Arlington Avenue to Colorado Avenue (Maintenance) Arizona Avenue from Fillmore Street to La Sierra Avenue (Maintenance) The Traffic Signal Installation projects will makes it easier for pedestrians, bicyclists, Gramercy Place from Tilden Street to La Sierra Avenue (Maintenance) motorists, and public transit to enter the intersection. Traffic signals reduce overall Adams Street and Lincoln Avenue Intersection (Traffic Signal Modifications) intersection delay and in general reduce emissions and congestion. Magnolia Avenue and Briscoe Street Intersection (Traffic Signal Modifications) Magnolia Avenue and Palm Avenue/Tibbets Street Instersection (Traffic Signal Modifications) 2018-2019 SB-1 Maintenance and Riverside Riverside Other Pedestrian Scramble Improvement projects will modify the traffic cycles and install new Magnolia Avenue and School Circle Intersection (Traffic Signal Modifications) 04/2019 08/2019 15 20 61 31 Traffic Improvements diagonal crosswalks to temporarily stop all vehicular traffic and allow pedestrian Brockton Avenue and Tenth Street Intersection (Traffic Signal Modifications) movements in all directions including diagonally. Pedestrian scrambles safeguard Chicago Avenue and Spruce Street Intersection (Traffic Signal Modifications) pedestrian crossings, encourage active transportation, and would better serve the Columbia Avenue and Mulberry Street/Primer Street Intersection (Traffic Signal Modifications) numerous special events held in the Downtown area. Mission Grove Parkway and Mission Village Drive Intersection (Traffic Signal Modifications) Mission Grove Parkway and Mission Village Place Intersection (Traffic Signal Modifications) The Pedestrian HAWK Signal Installation project will benefit John W. North High Olivewood Avenue and Ramona Drive/Panorama Road Intersection (Traffic Signal Modifications) School. The HAWK signal system would improve pedestrian crossings and would University Avenue and Pine Street Intersection (Traffic Signal Modifications) encourage parents to use Trade Center Drive as an alternate drop off and pickup University Avenue and Campus Drive Intersection (Traffic Signal Modifications) location. The HAWK signal is a pedestrian beacon designed to stop traffic flow to allow Mission Inn Avenue and Redwood Drive Intersection (Traffic Signal Modifications) pedestrians to cross safely. Cole Avenue and Krameria Avenue Intersection (New Traffic Signal) Arlington Avenue and Chadbourne Avenue Intersection (New Traffic Signal) Market Street and University Avenue Intersection (New Pedestrian Scramble) Market Street and Mission Inn Avenue Intersection (New Pedestrian Scramble) Third Street and Trade Center Drive (New Pedestrian HAWK Signal)

SE corner of Cottonwood Ave & Palm Ave.; Enterprise Ave & Investors Pl.; Grand Ave, Industrial Road Maintenance & Pavement Rehabilitation of Downtown San Jacinto including several locations Way, Bissell Pl. & Greco Ct.; Chase St. off of Ramona Exp.; Raintree Ln. ; Hewitt St. from Esplanade San Jacinto Riverside Downtown Pavement Rehabilitation 04/2018 06/2019 7 10 42 23 Rehabilitation throughout the city - construction scheduled to start in FY 2018/19. Ave to Shaver; Quandt Ranch Rd. ; Irwin St., El Monte, Evans & El Centro; Old Mountain Rd.; Porterfield Dr. ; and Wateka St. Road Maintenance & Mountain Road from Seventh to San Jacinto Riverside Pavement rehabilitation. Mountain Road from Seventh to Esplanade. 04/2018 06/2019 7 10 42 23 Rehabilitation Esplanade Pavement Rehabilitation Program - Road Maintenance & This project encompasses rehabilitating the pavement of the Meadowview Temecula Riverside Meadowview Loop (Via Norte/Del Entire lengths of Via Norte and Del Rey Road. 01/2019 06/2019 10 20 75 28 Rehabilitation neighborhood loop, which include the entire lengths of Via Norte and Del Rey Road. Rey)

Road Maintenance & Pavement Rehabilitation Program - This project include rehabilitating the pavement of the Business Park Drive Loop, which The entire loop of Business Park Drive including Single Oak Drive (From Diaz Road to Rancho Temecula Riverside 02/2019 06/2019 10 20 75 28 Rehabilitation Business Park Drive Loop include the entire lengths of Business Park Drive and Single Oak Drive. California Road/Ridge Park Drive)

Road Maintenance & Clinton Keith Road Rehabilitation Wildomar Riverside Road Rehabilitation and Repair Palomar to Renaissance Plaza 05/2018 07/2019 16 21 67 28 Rehabilitation and Repair Road Maintenance & Bundy Canyon Road Rehabilitation Wildomar Riverside Road Rehabilitation and Repair Oak Creek to The Farm 05/2018 07/2019 5 10 67 28 Rehabilitation and Repair Road Maintenance & Grand Avenue Rehabilitation and Wildomar Riverside Road Rehabilitation and Repair Leslie to 2000' se'ly of McVicar 05/2018 07/2019 19 24 67 28 Rehabilitation Repair Road Maintenance & Wildomar Riverside Lemon Street Road Rehabilitation and Repair 771' SW of Gafford to Gafford 05/2019 12/2019 20 25 67 28 Rehabilitation Road Maintenance & Wildomar Riverside Inland Valley Road Rehabilitation and Repair Clinton Keith Road to Prielipp 05/2018 07/2019 20 25 67 28 Rehabilitation Road Maintenance & Wildomar Riverside PCI Update Road Rehabilitation and Repair Pavement Management Assessment and Report Citywide 07/2018 12/2018 3 4 67 28 Rehabilitation Update Citywide Pavement Management System. Re-evaluate all streets and utilize Road Maintenance & Citywide Pavement Management Citrus Heights Sacramento new system/program to better tack conditions of roadway segments and coordinate data Citywide - 235 miles of maintained roadway 08/2018 01/2019 15 20 8 4 Rehabilitation System Update (Carryover) pertaining to city owned/maintained assets. Thirteen residential streets located in the City of Citrus Heights: Road Maintenance & 2018 Residential Street Resurfacing Citrus Heights Sacramento Project will resurface 13 residential streets, with existing PCI's around 25. 07/2018 08/2018 15 30 8 4 Rehabilitation Project Baranga Drive; Capricorn Drive; Cheval Court; Graham Circle; Halifax Street; Daly Avenue; Alma Mesa; Carrick Court; Coronet Court; Holm Oak Way; Longden Circle; Sunwood Way. Road Maintenance & 2017/2018 Residential Resurfacing Auburn Frontage; Catamaran; Knisley Court, Tareyton; (list revised based on updated estimates and Citrus Heights Sacramento Resurfacing of Residential Streets (6 planned) 08/2018 09/2018 20 25 8 4 Rehabilitation Project (Carryover) streets moved to 18/19 SB1 project)

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

The project will provide a two-inch overlay for the entire roadway from East Stockton Blvd. to the bridge at Laguna Creek (~4300 feet) including new striping, markings and Road Maintenance & Bond Road Median Improvements traffic loops. The project will also construct about 2100 feet of raised center median on Bond Road between East Stockton Blvd. & bridge at Laguna Creek. Raised Center Median; E. Elk Grove Sacramento 11/2018 08/2019 15 24 9 6 Rehabilitation and Resurfacing Bond Rd, between E. Stockton Blvd. and Egret Dr. And provide an EB left turn pocket Stockton Blvd to Egret Dr. to create a physical separation between eastbound and westbound traffic. into the shopping center’s eastern driveway. Carry-over project from FY17/18

Project would add about 3000 feet of green bike lane marking in the conflicted areas. Elk Grove Boulevard from the intersection of Auto Center Drive to E. Stockton Boulevard, & Laguna Elk Grove Sacramento Safety Green Bike Lane Pilot Project 06/2018 09/2018 5 10 9 6 Carry over project from FY17/18 Boulevard at the intersection with Neosho Drive. Slurry & Chip Seal Streets Laguna Crest Way; Laguna Blvd to Sage Glen Way LAGUNA QUAIL WAY; RED DOG CREEK DR to RED DOG CREEK DR SITKA CT; WEEPING FIG WY to CDS-EAST END MOLINERO CT; LAGUNA QUAIL WAY to CDS-SOUTH END TEGAN RD; FRANKLIN BL to 1271 FT W/OF FRANKLIN BL WHISKEY CREEK DR; LAGUNA QUAIL WY to LAGUNA PARK DR SICKLE CT; LAGUNA QUAIL WY to CDS-EAST END SAGE GLEN WAY; LAGUNA CREST WAY to EAST DEAD END CANADEO CIR; CHAMBERLIN CIR to BLOSSOM RIDGE DR LEEMANS WAY; WATERFIELD DR to VAN BROCKLIN WAY CHAMBERLIN CIR; WATERFIELD DR to TITTLE WAY CLEARY CIR; WATERFIELD DR (SOUTH) to WATERFIELD DR (NORTH) MILLNER WAY; CHAMBERLIN CIR to BLOSSOM RIDGE DR JURGENSON WAY; LUCKMAN WAY to WATERFIELD DR TRAFTON CT; CHAMBERLIN CIR to CDS KINARD WAY; WATERFIELD DR to BLOSSOM RIDGE DR LUCKMAN WAY; BLOSSOM RIDGE DR to VAN BROCKLIN WAY Approximately 752,800 square feet of asphalt overlay streets. All non compliant ramps VAN BROCKLIN WAY; JURGENSON WY to KINARD WAY Road Maintenance & 2019 Pavement Slurry Seal and will be corrected as part of the asphalt overlay project. WATERFIELD DR; WHITELOCK PKWY to KINARD WAY Elk Grove Sacramento 08/2018 06/2019 7 20 9 6 Rehabilitation Resurfacing Approximately 6.7 million square feet of slurry or chip seal streets. LAMBEAU CT; LEEMANS WAY to CDS All the above mentioned areas will receive new traffic striping. TITTLE WAY; JURGENSON WY to BLOSSOM RIDGE DR CONZELMAN WAY; WATERFIELD DR to TITTLE WAY SIMONICH WAY; HITE CIR to SHOECH WAY SHOECH CT; SIMONICH WAY to CDS BENGAL CT; GILLIAM DR to CDS MILLNER WAY; BLOSSOM RIDGE DR to CANADEO CIR SIMOES CT; STOECKER WY to CDS BATTLES CT; CANADEO CIR to CDS HITE CIR; SIMONICH WAY to SIMONICH WAY LOTUS POND CT; GOLDEN GLORY WAY to CDS QUICK CT; GILLIAM DR to CDS VAN STEYN CT; STOCKMEN WY to CDS WARMERDAM CT; HITE CIR to CDS CANADEO CIR; E BLOSSOM RIDGE DR to W BLOSSOM RIDGE DR KNEPPLE CT; CANADEO CIR to CDS MATINA DR; WILLARD PKWY to GILLIAM DR SHOECH WAY; SIMONICH WAY to GILLIAM DR STOECKER CT; LUTTIG WAY to CDS STOECKER WAY; LUTTIG WAY to SHOECH WY Folsom-Auburn Road (Oak Avenue to Folsom Dam Road) Folsom Lake Crossing (Folsom-Auburn to E. Natoma Street) Road Maintenance & Pavement Resurfacing Project FY Folsom Sacramento Microsurfacing treatment on various roadways. Blue Ravine Road (E. Natoma Street to Oak Avenue Parkway) 08/2018 06/2019 5 10 6 1 Rehabilitation 18-19 Iron Point Road (Oak Avenue Parkway to E. Bidwell Street) American River Canyon North neighborhood Road Maintenance & Plaza Drive Pavement Folsom Sacramento Asphalt overlay of roadway, ADA upgrades. Plaza Drive loop 10/2018 06/2019 15 25 6 1 Rehabilitation Rehabilitation Willow Creek Estates Storm Drain Folsom Sacramento Other Lining of deteriorated storm drain pipes Various locations within the Willow Creek Estates neighborhood 08/2018 06/2019 25 50 6 1 Lining

Project locations will be selected from the executed Resolution for SB1 2018/19 Project List as shown: 1ST ST (F ST KOST RD 64 $481,600); MEADOWVIEW DR (CINDY LN KOST RD 37 $163,200); CREEKSIDE WAY (MEADOWVIEW DR KOST RD 75 $102,900 ; CINDY LN (1ST ST TUDOR ST 74 $45,300); DOVER DR (MEADOWVIEW DR TUDOR ST 79 $32,100); DOWNING DR (1ST ST W END 68 $46,400); TUDOR ST ( KENT ST KOST RD 68 $29,000); KENT ST (TUDOR ST CINDY LN 74 Road Maintenance & 2018/19 Pavement Rehabilitation Roadway rehabilitation as identified by the 2018/19 SB1 project list. The work, in $12,600); KANDY ST (TUDOR ST CREEKSIDE WAY 74 $8,400); CARLO CT (1ST ST W END 79 Galt Sacramento 08/2018 09/2018 8 15 9 5 Rehabilitation Project general, will rehabilitate deteriorate roadways within the City of Galt city limits. $15,700); FAIRWAY DR (CAROLINE AVE GLENDALE AVE 52 $147,700); GLENDALE AVE (FAIRWAY DR MELADEE AVE 70 $39,500); CASADO DR (MELADEE AVE GLENDALE AVE 70 $27,700); MELADEE LN (CAROLINE AVE LINCOLN WY 77 $108,200); SOUTHDALE CT (MELADEE AVE LINCOLN WY 79 $30,900); HAPPY CT (CASADO DR S END 70 $9,200); B ST (4TH ST LINCOLN WY 36 $120,100); 6TH ST (A ST G ST 37 $155,100)

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts South Galt Safe Routes to School and Rehabilitation and SACOG Bicycle and Pedestrian Improvement Project CIP #518C, project description includes repairs of South Galt Safe Routes to School pavement, restriping existing bicycle lanes and bike lanes gaps, adding pedestrian and Rehabilitation and SACOG bulbouts and median refuge islands, adding signage and warning devices as well as Complete Streets Galt Sacramento Bicycle and Pedestrian adjusting utilities to grade. The project will also replace damaged sidewalk sections, The project is located in the City of Galt. The work is on A Street from the east to west City limits. 03/2018 07/2018 10 20 9 5 Components Improvement Project (17/18 upgrading to current ADA standards and adding sidewalks/walkways. The project Ongoing) location is bounded by SR99 to Pringle and South to Kost Road. The maximum useful life of the project is approximately 20 years. The anticipated year of construction is 2017-18. Road Maintenance & Union St. from F St. to H St. (2017- Isleton Sacramento Grind and Overlay - 534' x 30' - 3' x 534' 1-30" manhole Union St. from F St. to H St. 12/2018 01/2019 15 20 11 3 Rehabilitation 2018 Carryover) Road Maintenance & 3rd St from Jackson to C Street Isleton Sacramento Grind and Overlay - 680' x 25' Grind and Overlay and 10 Handicap upgrades 3rd St from Jackson to C Street 01/2020 06/2020 15 30 11 3 Rehabilitation (2017-2018 Carryover) Road Maintenance & 4th St from A St to B St (2017-2018 Grind and Overlay - 272' x 30' needs handicap ramps at B St. & gutter rehab (Cost Isleton Sacramento 4th St. from A St. to B Street 01/2020 06/2020 15 30 11 3 Rehabilitation Carryover) estimate does not include gutter rehab) Road Maintenance & B St. from 2nd to 5th Street (2017- Grind and Overlay - 588' x 18' Roughly half has 3' sidewalks ADA should be 4'. 1- Isleton Sacramento B St. from 2nd to 5th Street 01/2020 06/2020 15 20 11 3 Rehabilitation 2018 Carryover) 30"x30" stormgrate 2- 30"manholes, 1-monitoring well, 1 water service Road Maintenance & Everything West of Delta Avenue Isleton Sacramento Slurry Seal - This is a actual quote for a slurry seal coat Everything West of Delta Avenue 06/2019 07/2019 15 20 11 3 Rehabilitation (2017-2018 Carryover) Park & Ride Lot Parcel Grind and Overlay - Estimated 15,112 square feet pave for park & ride lot - stripe Isleton Sacramento Other 15700260020000 (2017-2018 2nd & D Street - Parcel 15700260020000 09/2018 12/2018 15 20 11 3 parking stalls - bicyle parking area, (3 handicap) Carryover) Road Maintenance & 2nd Street - C to E Street (2017- Isleton Sacramento Grind and Overlay - Estimated 11,915 square feet 2nd Street from C Street to E Street; curve to Hwy 160 01/2018 06/2019 15 20 11 3 Rehabilitation 2018 Carryover) This project will construct complete streets components on Folsom Boulevard from Complete Streets Folsom Boulevard Enhancement Horn Road to Bradshaw Road including road rehabilitation, landscaped medians, Rancho Cordova Sacramento Folsom Boulevard between Horn Road and Bradshaw Road. 10/2018 04/2019 15 20 8 4, 8 Components Phase V construction of sidewalks, and streetscape improvements at intersections. The project will also include storm drain upgrades as necessary. This project will rehabilitate Sunrise Boulevard from Folsom Boulevard to Citrus Road. Road Maintenance & Rancho Cordova Sacramento Sunrise Rehabilitation - Phase 1 The project will also include sidewalk upgrades/repairs and storm drain upgrades as Sunrise Boulevard from Folsom Boulevard to Citrus Road 02/2019 05/2019 15 20 8 4, 8 Rehabilitation necessary. Road Maintenance & Placement of Hot Mix Asphalt (HMA) over the existing pavement structure to extend the Sacramento Sacramento Natomas Boulevard From North Park Drive to Elkhorn Boulevard 05/2018 10/2018 15 30 7 6 Rehabilitation life of the street and avoid major street reconstruction in the future. Road Maintenance & Placement of Hot Mix Asphalt (HMA) over the existing pavement structure to extend the Sacramento Sacramento Grand Avenue Marysville Blvd to Rio LInda Blvd 05/2018 10/2018 15 30 7 6 Rehabilitation life of the street and avoid major street reconstruction in the future. Road Maintenance & Placement of Hot Mix Asphalt (HMA) over the existing pavement structure to extend the Sacramento Sacramento J Street 16th Street to 30th Street 05/2018 10/2018 15 30 7 6 Rehabilitation life of the street and avoid major street reconstruction in the future. Road Maintenance & Placement of Hot Mix Asphalt (HMA) over the existing pavement structure to extend the Sacramento Sacramento Mack Road Stockton Blvd to Morrison Creek bridge deck 05/2018 10/2018 15 30 9 6 Rehabilitation life of the street and avoid major street reconstruction in the future. This is the Design Phase for the Annual Road Rehabilitation Project for Fiscal Year Central Avenue--east of Graf Road to west of College Street 2018/2019, involving a number of specific locations throughout the City of Hollister Fifth Street--east of San Benito Street to west of Sally Street identified as needing improvement. Each of the specific areas listed have a current Seventh Street--west of Line Street to west of San Benito Street Pavement Condition Index (PCI) of 45-85, based upon the City's Pavement Ladd Lane--north of Talbot Drive to north of Southside Road Road Maintenance & Annual Road Rehabilitation FY Management System. This is the first phase of the Annual Road Rehabilitation Project Hollister San Benito Talbot Drive--west of Sunset Drive to east of Olga Drive 05/2018 06/2019 10 30 30 12 Rehabilitation 18/19--Design Phase for FY 18/19, with an estimated project cost of $200,000 in RMRA funds. The Nora Drive--south of Tina Drive to north of Irma Drive Construction Phase will follow with an estimated $657,083 in RMRA funding and Olga Drive--south of Talbot Drive to north of north of Majestic Drive $542,927 in other identified funding for a total construction cost of 1.2 million. Paul Drive--west of Ladd Lane to east of Nora Drive Together, the Design and Construction phases of the Annual Road Rehabilitation FY Hillock Drive--east of Ladd Lane to North of Sunset Drive 18/19 are estimated to total 1.4 million.

This is the Construction Phase of the Annual Road Rehabilitation Project for Fiscal Year Central Avenue--east of Graf Road to west of College Street 18/19, for a number of identified locations within the City of Hollister as having a current Fifth Street--east of San Benito Street to west of Sally Street Pavement Condition Index (PCI) of 45-85, based upon the City's Pavement Seventh Street--west of Line Street to west of San Benito Street Management System. The goal of this project is to improve the PCI of these streets and Ladd Lane--north of Talbot Drive to north of Southside Road Road Maintenance & Annual Road Rehabilitation FY Hollister San Benito extend the life expectancy of the pavement for these local roads. Total costs for the Talbot Drive--west of Sunset Drive to east of Olga Drive 05/2018 06/2019 10 30 30 12 Rehabilitation 18/19--Construction Phase Construction Phase is estimated to be 1.2 million, with an estimated $457,083 in RMRA Nora Drive--south of Tina Drive to north of Irma Drive funding and $742,927 in other identified funding. Together, the Design and Olga Drive--south of Talbot Drive to north of north of Majestic Drive Construction phases of the Annual Road Rehabilitation FY 18/19 are estimated to total Paul Drive--west of Ladd Lane to east of Nora Drive 1.4 million. Hillock Drive--east of Ladd Lane to North of Sunset Drive Road Maintenance & San Juan/Hollister Road Pavement San Juan Bautista San Benito Resurface this roadway San Juan/Hollister Road (The Alameda is the closest cross street) 01/2019 05/2019 15 20 30 12 Rehabilitation Project

•Muskrat Ave, Joshua St, Dennis St, Panther Ave. and Janine St. between Jay St. and Kay St. Road Maintenance & Pavement Repair and Rehabilitation Apply crack seal & type II slurry over 237,000 square feet of existing asphalt pavement. Adelanto San Bernardino •Jay St. between Racoon Ave. and Muskrat Ave. 07/2018 09/2018 3 5 33 21 Rehabilitation Project, Phase I Re-install all pavement markings. •Kay St. between Janine St. and Muskrat Ave.

•Stevens St. and Aster Rd. between Chamberlaine Way and Vintage Road. Road Maintenance & Pavement Repair and Rehabilitation Apply crack seal & type II slurry over 184,000 square feet of existing asphalt pavement. •Vintage Rd. and Chamberlaine Wy. Between Stevens St. and Aster Rd. Adelanto San Bernardino 07/2018 09/2018 3 5 33 21 Rehabilitation Project, Phase II Re-install all pavement markings. •The east half of Mendicino Rd. between Stevens St. and Aster Rd. •Sonoma Rd, Zinfadel Dr, Bouquet Ave. and Napa Rd. Road Maintenance & Apple Valley San Bernardino Bear Valley Road Resurfacing Resurface Bear Valley Road from the western town limit to Joshua Road (5 miles). Bear Valley Road from the western town limit to Joshua Road 07/2018 10/2018 7 10 33 21 Rehabilitation

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Road Maintenance & Apple Valley San Bernardino Yucca Loma Road Resurfacing Resurface Yucca Loma Road from Apple Valley Road to Navajo Road (3 miles). Yucca Loma Road from Apple Valley Road to Navajo Road 07/2018 10/2018 7 10 33 21 Rehabilitation Road Maintenance & Apple Valley San Bernardino Central Road Resurfacing Resurface Central Road from Bear Valley Road to Thunderbird Road (2 miles). Central Road from Bear Valley Road to Thunderbird Road 07/2018 10/2018 7 10 33 21 Rehabilitation Road Maintenance & Apple Valley San Bernardino Riverside Drive Resurfacing Resurface Riverside Drive from Shoshonee Road to Branding Iron (2.2 miles). Riverside Drive from Shoshonee Road to Branding Iron 07/2018 10/2018 7 10 33 21 Rehabilitation Road Maintenance & Apple Valley San Bernardino Rincon Road Resurfacing Resurface Rincon Road from Yucca Loma Road to Rancherias Road (1.4 miles). Rincon Road from Yucca Loma Road to Rancherias Road 07/2018 10/2018 7 10 33 21 Rehabilitation Road Maintenance & Apple Valley San Bernardino Shoshonee Road Resurfacing Resurface Shoshonee Road from Rincon Road to Tonawanda Road (.63 miles). Shoshonee Road from Rincon Road to Tonawanda Road 07/2018 10/2018 7 10 33 21 Rehabilitation Road Maintenance & Apple Valley San Bernardino Flathead Road Resurfacing Resurface Flathead Road from Tonawanda Road to Highway 18 (.6 miles). Flathead Road from Tonawanda Road to Highway 18 07/2018 10/2018 7 10 33 21 Rehabilitation Road Maintenance & West Section 7 Rehabilitation West Section 7 is defined north of Rimrock Road, east of Agarita Avenue, south of Interstate 15, and Barstow San Bernardino Reconstruct pavement approximately 23,401 center line feet of roadway. 04/2019 08/2019 15 20 33 16 Rehabilitation Project - (17/18 Carryover) West of Barstow Road (Route 247) Road Maintenance & Pavement Preservation Project The project location is defines as east of Muriel Drive, South of East Main Street, and north of Barstow San Bernardino Placement of pavement preservation techniques on existing roadway 04/2019 07/2019 3 7 33 16 Rehabilitation (17/18 Carryover) Interstate 15. Road Maintenance & General Program Categories - Annual program to overlay local streets as economies of scale opportunities present Big Bear Lake San Bernardino Locations based on the 90 miles of the roadway within the City limit 07/2019 07/2020 20 25 33 23 Rehabilitation Overlay mid-year Road Maintenance & General Program Categories - Annual program to overlay local streets as economies of scale opportunities present Big Bear Lake San Bernardino Locations based on the 90 miles of the roadway within the City limit 07/2020 07/2021 20 25 33 23 Rehabilitation Overlay mid-year Road Maintenance & Annual program to overlay local streets as economies of scale opportunities present Big Bear Lake San Bernardino General Program Categories Locations based on the 90 miles of the roadway within the City limit 07/2021 07/2022 20 25 33 23 Rehabilitation mid-year Road Maintenance & Annual program to overlay local streets as economies of scale opportunities present Big Bear Lake San Bernardino General Program Categories Locations based on the 90 miles of the roadway within the City limit 07/2022 07/2023 20 25 33 23 Rehabilitation mid-year Menlo Drive, Sheephorn Road, Villa Road Maintenance & Big Bear Lake San Bernardino Grove Avenue, Wolf Road Chip chip seal application of a local street Menlo Drive, Sheephorn Road, Villa Grove Avenue, Wolf Road Chip Seal - Entire Lengths 07/2018 07/2019 3 5 33 23 Rehabilitation Seal Road Maintenance & Lagunita Pavement and Drainage Big Bear Lake San Bernardino full depth reconstruction of a local street with drainage improvements Lakeview Drive To End 07/2019 07/2020 20 25 33 23 Rehabilitation Rehabilitation Road Maintenance & Lower Moonridge Pavement and Big Bear Lake San Bernardino full depth reconstruction of a local street with drainage improvements Elm Street To Big Bear Boulevard 07/2019 07/2020 20 25 33 23 Rehabilitation Sidewalk Rehabilitation ATP grant for street improvements Big Bear Boulevard: Edgemoor Road to Cienega Road & Mig Bear Bear Boulevard: Stanfield Cutoff to Big Bear Lake San Bernardino Safety sidewalk and bike lane matching construct missing link sidewalks and stripe additional bike lanes 07/2019 07/2020 15 20 33 23 Division Drive funds Road Maintenance & Talbot Drive - Pavement Big Bear Lake San Bernardino Pavement Reconstruction Big Bear Boulevard to North End 07/2020 07/2021 20 25 33 23 Rehabilitation Reconstruction Road Maintenance & Upper Moonridge Pavement and Big Bear Lake San Bernardino Pavement and Sidewalk Rehabilitation Elm Street To Clubview Drive 07/2020 07/2021 20 25 33 23 Rehabilitation Sidewalk Rehabilitation Road Maintenance & Summit Boulevard Pavement Big Bear Lake San Bernardino full depth reconstruction of a local street Big Bear Boulevard to Snow Summit Base Area 07/2021 07/2022 20 25 33 23 Rehabilitation Reconstruction Road Maintenance & Clubview Drive Pavement Big Bear Lake San Bernardino full depth reconstruction of a local street Moonridge Road to Bear Mountain Base Area 07/2022 07/2023 20 25 33 23 Rehabilitation Reconstruction Road Maintenance & Big Bear Lake San Bernardino Cliff Drive Pavement Reconstruction full depth reconstruction of a local street Talmadge Road to Spruce Road 07/2022 07/2023 20 25 33 23 Rehabilitation

Balboa Lane- Santa Clara Boulevard To End, Berkley Lane-Pennsylvania Avenue To Marin Drive, Boulder Bay Court- Willow Landing To End, Bow Canyon Court- Bow Canyon Road To End, Bow Canyon Lane-Bow Canyon Road To End, Chipmunk Lane-Chincapin Road To Willow Landing,Elgin Road and Knoll Road- North Of Forest Road,Homestead Lane and Red Oak Lane- East of Knight Road Maintenance & Big Bear Lake San Bernardino FY 18/19 Street Improvements Full depth reconstruction and/or overlay of a local street Avenue, Lakeview Court-North Of Lakeview Drive, Manzanita Court- Rueda Lane To End, Marin Road- 07/2018 07/2019 20 25 33 23 Rehabilitation Pennsylvania Avenue To Berkley Lane, Meadowhill Place- West of Stony Creek Road, Mendocino Drive-Yosemite Drive To End, Sand Canyon Court-Sand Canyon Road To End, Short Lane-East Of Bonita Lane, Siskiyou Drive- Shasta Road To Deer Canyon Road, Swan Drive- Oriole Drive To Wren Drive, Clubview Drive- Goldmine Drive To Clover Drive

Street Grind and Overlay of Riverside Drive which also includes construction of Road Maintenance & Street Rehabilitation and TSM Riverside Drive (Central Ave. to 200 LF w/o Oaks St.) and traffic signal modifications @ Riverside Chino San Bernardino approximately 40 ADA accessibility ramps and full depth reconstruction of some areas. 12/2019 06/2020 10 15 52 20 Rehabilitation FY2018-19 - Riverside Drive Dr/Benson Ave and Riverisde Dr./10th St. Project will also include traffic signal modifications for two signalized intersections.

Rehabilitation of Pipeline Avenue, Chino Avenue and East End Avenue utilizing Grind Road Maintenance & FY 2018-19 Street rehabilitation and Overlay. The project will also include the construction of approximately 37 ADA Pipeline Avenue (Chino Ave to Philadelphia Ave.) and East End Avenue (Riverside Ave. to Chino San Bernardino 12/2020 06/2021 10 15 52 20 Rehabilitation Project - County Co-Op accessibility ramps. This project is in cooperation with The Count of San Bernardino Philadelphia Ave.) and Chino Avenue (Pipeline Ave to SR71) Public Works Department. Reconstruction including but not limited to: grind and overlay of asphalt; selected Road Maintenance & El Prado Reconstruction Project Chino San Bernardino removal of replacement of asphalt; concrete curb; gutter; spandrel and cross gutter; El Prado Road (Central Avenue to Kimball Avenue) 06/2018 06/2019 10 15 52 20 Rehabilitation (17/18 Carryover) signing and striping and accessible ramps.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Construction of 53 pedestrian and transit ADA accesibility ramps along with approximately 4.3 miles of bicycle lanes which will include construction of sidewalk, Accessibility ramps along B Street and C Street between Monte Vista Avenue and 4th Street. Bicycle Complete Streets TDA Bycicle, Pedestrian and Transit Chino San Bernardino street, curb& gutter, cross-gutter and spandrels for proper drainage. Lanes within our City of Chino Bicycle and Pedestrian Master Plan with priority rank 1-5. These bike 12/2018 06/2019 20 25 52 20 Components Accessibility Improvements Installation/relocation of streetlight poles, vaults, valves, manholes and street signs to lanes are along 12th Street, B Street, 10th Street and C Street. Total of approximately 4.3 miles ensure safe, clear and compliant paths of travel for active transportation purposes.

The work will include the removal and reconstruction of damaged pavement, curbs and Road Maintenance & Chino Hills San Bernardino Rolling Ridge Drive Rehabilitation gutters, ADA access ramps, grind and overlay of existing pavement, adjustment of Rolling Ridge Drive from Chino Hills Parkway to Bayberry Drive, Chino Hills 12/2018 04/2019 10 15 55 29 Rehabilitation manholes and water valves, striping, and signing San Bernardino Ave. (Eucalyptus to Road Maintenance & Colton San Bernardino Indigo Ave.) Pament Rehabilitation Asphalt grinding and overlay with rubberized asphalt San Bernardino Ave. (West of Pepper Ave.), Colton, CA 92324 08/2018 01/2019 10 15 47 20 Rehabilitation Project La Cadena Drive (Barton Road. to Road Maintenance & Colton San Bernardino Iowa) Pavement Rehabilitation Asphalt grinding and rubberized asphalt overlay La Cadena Drive (South of Barton Road), Colton, CA 92324 08/2018 01/2019 10 15 47 20 Rehabilitation Project Mt. Vernon Ave (F St. to Colton Road Maintenance & Colton San Bernardino Ave.) Pavement Rehabilitation Asphalt grinding and rubberized asphalt overlay Mt. Vernon Ave. (north of F Street), Colton, CA, 92324 08/2018 01/2019 10 15 47 20 Rehabilitation Project Santo Antonio Drive (Mt. Vernon Road Maintenance & Colton San Bernardino Ave. to East End) Pavement Asphalt grinding and rubberized asphalt overlay Santo Antonio Drive (east of Mt. Vernon Ave), Colton, CA, 92324 08/2018 01/2019 10 15 47 20 Rehabilitation Rehabilitation Project Road Maintenance & Mill Street Paving Project (17/18 on- Colton San Bernardino 1-1/2" to 2" thick grinding and rubberized asphalt overlay. Mill Street between Rancho Ave. and Michigan Ave. 03/2018 07/2018 10 15 47 20 Rehabilitation going) Road Maintenance & Olive Street Paving Project (17/18 Colton San Bernardino 1-1/2" to 2" thick grinding and rubberized asphalt overlay Olive Street between La Cadena and 6th Street 03/2018 07/2018 10 15 47 20 Rehabilitation on-going) Road Maintenance & San Bernardino Ave. Paving Project Colton San Bernardino 1-1/2" to 2" thick grinding and rubberized asphalt overlay San Bernardino Ave. from Eucalyptus Avenue to Indigo Avenue 03/2018 12/2018 10 15 47 20 Rehabilitation (17/18 On going) Hemlock Avenue -Slover to Santa Ana Pavement Rehabilitation for the five streets as listed below and shall consist of cold Poplar Avenue -Slover to Santa Ana Road Maintenance & Pavement Rehabilitation SB-1 Fontana San Bernardino plane/overlay asphalt pavement, pavement markings, manholes, and utility Live Oak Avenue -Slover to Santa Ana 09/2018 06/2019 10 15 47 20 Rehabilitation RMRA Project adjustments. Beech Avenue -Slover to Jurupa Santa Ana Avenue -Cherry to Live Oak

Arliss Lane from Cul De Sac to Arliss Drive; Arliss Lane from Arliss Drive to Cul De Sac; McClarren Street from Vivienda Avenue to Canal Street; Orangewood Court from Observation Drive to End of Street; Mavis Street from Michigan Avenue to Vivienda Avenue; Vivienda Avenue from Cul De Sac to Van Buren Street; Dos Rios Avenue from Country Club Lane to De Berry Street; Franklin Street from Mirado Avenue to Mt. Vernon Avenue; Vista Grande Way from Grand Terrace Road to North of Dog Park; Minona Court from Minona Drive to Cul De Sac; Pascal Avenue from De Berry Street to Cul De Sac; Arliss Way from Cul De Sac to Arliss Drive; Eton Drive from Thames Street to Preston Street; Glendora Drive from Barton Road to End of Street; Palm Court from Palm Avenue to Cul De Sac; W. Litton Avenue from S. Rosedale Avenue to S. La Cadena Drive; Miriam Way from Arliss Drive to Road Maintenance & Pavement Rehabilitation Project Grind and overlay; pulverize, place pulverized miscellaneous base and pave; ADA Grand Terrace San Bernardino Kington Street; Robin Way from Warbler Avenue to Oriole Avenue; Vivienda Avenue from Terrace 07/2018 10/2018 10 15 47 20 Rehabilitation (2017-18 Carry Over) ramps, slurry seal, and curb and gutter repair Avenue to Maple Avenue; Honey Hill Drive from Westwood Street to Palm Avenue; Jensen Court from Cul De Sac W. End to Observation Drive; De Soto Street from Kingston Street to Dos Rios Avenue; Lark Street from Reed Avenue to Cul De Sac; Siskin Court from Paradise Street to Cul De Sac; Willet Avenue from Mavis Street to Van Buren Street; Dutch Street from Pico Street to Tanager Street; Dos Rios Avenue from Palm Avenue to Country Club Lane; Rosedale Avenue from Palm Avenue to City Limit (South); Arliss Drive from Preston Street to End of Street; Mirado Avenue from Pico Street to Ladera Street; Flamingo Street from Michigan Avenue to Cul De Sac; Nandina Street from Preston Street to Canary Court; Pascal Avenue from Victoria Street to Carhart Avenue; Royal Avenue from Pico Street to End of Street

Fremontia Avenue from Reed Avenue to W. Main Street; Terrace Avenue from Vivienda Avenue to Walnut Avenue; De Soto Street from Warbler Avenue to Oriole Avenue; Grand Terrace Court from Road Maintenance & Grind and Overlay 2.5" asphalt concrete, repair damaged curb and gutter, install ADA Grand Terrace Road to Cul De Sac; Carhart Avenue from Vivienda Court to Canal Street; Oriole Grand Terrace San Bernardino Pavement Rehabilitation Project 04/2019 06/2019 15 20 47 20 Rehabilitation ramps, and restore striping at various locations throughout the City of Grand Terrace. Avenue from La Paix Street to De Berry Street; Garden Avenue from Cul De Sac to Pico Street; Minona Drive from Eton Drive to Preston Street; Walnut Avenue from Terrace Avenue to Burns Avenue; Pico Street from Mount Vernon Avenue to Oriole Avenue

Road Maintenance & Road Maintenance via slurry seal over selected roads in disrepair to extend their useful Hesperia San Bernardino FY 2018-19 Slurry Seal Project 73.10 Square Miles Within the City limits 06/2018 08/2018 5 10 59 17 Rehabilitation life.

Road Maintenance & FY 2018-19 Street Improvement This project includes removal and replacement of asphalt as well as the remediation of Hesperia San Bernardino Main Street from La Junta Road to Pyrite Avenue 06/2018 08/2018 20 25 59 17 Rehabilitation Project severe drainage issues and a sag in the sewer line through this section of roadway.

Road Maintenance & Highland San Bernardino 4th Street Pavement Rehabilitation Rehabilitate pavement with localized reconstruction and overlay 4th Street from west end to east end 07/2018 12/2018 10 15 40 23 Rehabilitation Road Maintenance & Highland San Bernardino 6th Street Pavement Rehabilitation Rehabilitate pavement with localized reconstruction and overlay 6th Street from Tippecanoe Ave. to Del Rosa Dr. 07/2018 12/2018 10 15 40 23 Rehabilitation

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Road Maintenance & Highland San Bernardino 9th Street Pavement Rehabilitation Rehabilitate pavement with localized reconstruction and overlay 9th Street from 600 feet east of Tippecanoe Ave. to Fairfax Ln. 07/2018 12/2018 10 15 40 23 Rehabilitation Road Maintenance & Del Rosa Avenue Pavement Highland San Bernardino Rehabilitate pavement with localized reconstruction and overlay Del Rosa Ave. from 3rd Street to 4th Street 07/2018 12/2018 10 15 40 23 Rehabilitation Rehabilitation Road Maintenance & Del Rosa Avenue Pavement Highland San Bernardino Rehabilitate pavement with localized reconstruction and overlay Del Rosa Ave. from Base Line to Pacific St. 07/2018 12/2018 10 15 40 23 Rehabilitation Rehabilitation Road Maintenance & Ditmar Ave. Pavement Highland San Bernardino Rehabilitate pavement with localized reconstruction and overlay Ditmar Ave. from Union St. to Vine St. 07/2018 12/2018 10 15 40 23 Rehabilitation Rehabilitation Road Maintenance & Marilyn Ave. Pavement Highland San Bernardino Rehabilitate pavement with localized reconstruction and overlay Marilyn Ave. from 3rd Street to 4th Street 07/2018 12/2018 10 15 40 23 Rehabilitation Rehabilitation Road Maintenance & Highland San Bernardino Rogers Ln. Pavement Rehabilitation Rehabilitate pavement with localized reconstruction and overlay Rogers Ln. from Union St. to Vine St. 07/2018 12/2018 10 15 40 23 Rehabilitation Road Maintenance & Highland San Bernardino Vine St. Pavement Rehabilitation Rehabilitate pavement with localized reconstruction and overlay Vine St. from Sterling Ave. to East End 07/2018 12/2018 10 15 40 23 Rehabilitation Road Maintenance & Highland San Bernardino City-wide Minor Street Maintenance Repair potholes and perform minor pavement rehabilitation as necessary On 157.2 miles of arterials, collectors and local streets 07/2018 06/2019 2 5 40 23 Rehabilitation City-wide Pavement Striping and Highland San Bernardino Safety Maintain pavement striping and marking as necessary. On 157.2 miles of arterials, collectors and local streets 07/2018 06/2019 3 7 40 23 Marking

Highland San Bernardino Traffic Control Devices City-wide Traffic Signal Maintenance Maintain traffic signal systems as necessary Thirty nine (39) traffic signal systems located at arterial intersections 07/2018 06/2019 10 30 40 23

Road Maintenance & Sterling Avenue Pavement Rehabilitate pavement with localized reconstruction and overlay (carried over from FY Highland San Bernardino Sterling Avenue from 6th Street to Base Line 07/2018 06/2019 10 15 40 23 Rehabilitation Rehabilitation 2017-18) Oakwood Drive from Barton Road south to end; Khan Drive from Oakwood Drive to Vollmer Drive; Road Maintenance & Loma Linda San Bernardino Citywide Slurry seal 0.6 miles of roadway. Paulson Drive from Oakwood Drive to Vollmer Drive; Vollmer Drive from Khan Drive to Paulson Drive; 07/2018 08/2018 7 15 40 23 Rehabilitation Wareham Court from Vollmer Drive to end. Daisy Street from Poplar Street to Benton Street; Iris Street from to Tulip Street; Aster Road Maintenance & Street from Lawton Avenue to Tulip Street; Starr Street from Anderson Street to Hillcrest Street; Loma Linda San Bernardino Citywide Repave/resurface 1.4 miles of roadway 07/2018 08/2018 7 15 40 23 Rehabilitation Hillcrest Street from Prospect Avenue to Barton Road; Campus Street from Barton Road to Lawton Avenue; Richardson Street from Starr Street to Barton Road. Road Maintenance & Holt Boulevard Street Improvement The project will repair any uplifted curb, gutter and sidewalk; replace non-compliant Montclair San Bernardino 4000-4400 blk Holt Boulevard 11/2018 04/2019 15 20 52 20 Rehabilitation Project pedestrian ramps and resurface the asphalt pavement.

North Montclair Traffic Signal Design services for the installation of new conduit, fiber and traffic control hardware Montclair San Bernardino Traffic Control Devices Interconnect Improvement Project- associated with a new traffic signal interconnect system north of the Interstate 10. This Monte Vista Avenue, Moreno Street, Arrow Hwy and Central Avenue 02/2019 06/2020 15 20 52 20 Design Only project will ultimately make a complete interconnect system Citywide.

Road Maintenance & Monte Vista Avenue Street Design services only. The project will repair curb, gutter and sidewalk, upgrade traffic The project limits include both northbound and southbound lanes from Pacific Electric Bicycle Trail Montclair San Bernardino 01/2019 12/2019 10 20 52 20 Rehabilitation Rehabilitation (Design Only) signal equipment, resurface the pavement, and stripe the street. (north city limits) to Phillips Street (south city limits) Road Maintenance & Needles San Bernardino River Road Re-Construction Project Complete reconstruction of road section Jack Smith Park to North K Street 02/2019 03/2019 20 40 33 16 Rehabilitation Road Maintenance & 2018 Pavement Rehabilitation Grind & overlay asphalt street, repair fail asphalt areas, repair sidewalk, repair curb & Ontario San Bernardino Milliken Avenue - Jurupa Street to Airport Drive (17/18 Carryover) 06/2018 12/2018 15 25 52 20 Rehabilitation Project gutter, upgrade all ramps to current ADA standards, restripe roadway. Archibald Avenue - SR 60 and Riverside Drive (17/18 Carryover) Road Maintenance & 2019 Pavement Rehabilitation Grind & overlay asphalt street, repair fail asphalt areas, repair sidewalk, repair curb & Philadelphia Street - Archibald Avenue to Haven Avenue (17/18 carryover) Ontario San Bernardino 06/2019 12/2019 15 25 52 20 Rehabilitation Project gutter, upgrade all ramps to current ADA standards, restripe roadway. Concourse Avenue - Haven Avenue to Milliken Avenue Cedar Street - Campus Avenue to Euclid Avenue TCC Mission Boulevard Project design of 5 miles of bike lanes, street improvements, street lights, ADA ramps, Ontario San Bernardino Other Mission Boulevard between Benson Avenue & Bon View Avenue 06/2019 12/2019 15 25 52 20 Improvements sidewalks Grove Avenue and Francis Street Ontario San Bernardino Traffic Control Devices 2018 Traffic Signal Improvements Upgrade to video detection equipment, intersection improvements, ADA improvements. 06/2019 12/2019 15 25 52 20 Vineyard and Sixth Street

FY17/18 SB1 Non-Local Street The project involves storm drain, localized asphalt repair, cold planning, crack sealing, FY17/18 SB1 Non-Local Street Pavement Rehabilitation at Two Locations: Road Maintenance & Rancho Cucamonga San Bernardino Pavement Rehabilitation at Two asphalt rubber hot mix overlay, video detection signal upgrades, ADA ramp upgrades, 6th Street from Milliken Avenue to Charles Smith Avenue 07/2018 08/2018 20 30 40, 41 23 Rehabilitation Locations utility adjustments and pavement striping for approximately 2.55 miles of roadway. Jersey Boulevard from Haven Avenue to Rochester Avenue

FY18/19 SB1 Non-Local Street Pavement Rehabilitation at Three Locations: FY18/19 SB1 Non-Local Street The project includes cold planning, localized asphalt repair, crack sealing, asphalt Road Maintenance & Haven Avenue from Church Street to Base Line Road Rancho Cucamonga San Bernardino Pavement Rehabilitation at Three rubber hot mix overlay, video detection signal upgrades, ADA ramp upgrades, utility 05/2019 06/2019 20 30 40, 41 23 Rehabilitation Hermosa Avenue from Banyan Street to 300 feet N/O Wilson Avenue Locations adjustments and pavement striping for approximately 2.25 miles of roadway. Highland Avenue from Archibald Avenue to Haven Avenue

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

FY18/19 SB1 Local Street Pavement Rehabilitation at Various Locations: Alder Street from Lion Street to Candlewood Street Cabrini Court from North End to Delaware Street Calaveras Avenue from Arrow Route to 9th Street Concannon Street from Callaway Place to Barsac Place Creekbridge Street from Northgate Place to Brookside Road Deer Canyon Drive from Broken Arrow Road to Cobblestone Lane Fisher Drive from East Avenue to Mulberry Street Furman Court from West End to Chapman Place Galveston Place from Baltimore Drive to South End Highland Avenue from Sapphire Street to Sard Street FY18/19 SB1 Local Street The project includes cold planning, localized asphalt repair, crack sealing, asphalt Road Maintenance & Inspiration Drive from Crestview Place to Skyline Road Rancho Cucamonga San Bernardino Pavement Rehabilitation at Various concrete overlay, ADA ramp upgrades, utility adjustments and pavement striping for 05/2019 06/2019 10 20 40, 41 23 Rehabilitation Kalmia Street from North Victoria Windrows Loop to Santolina Place Locations approximately 2.90 miles of roadway. Kinlock Avenue from Church Street to Hemlock Street La Ronda Street from Avenida Leon to Lion Street Lomita Drive from Ramona Avenue to Teak Way Manzanita Drive from Hellman Avenue to Hillside Cove Matterhorn Court from North End to Chelsea Way Mt. Baldwin Court from West End to Hillview Loop Ridge Canyon Road from Valinda Avenue to Morning Star Drive Rockrose Avenue from Highland Avenue to Morning Glory Drive San Bernardino Road from Sauterne Drive to Spinel Avenue Silverberry Street from Carob Street to North Victoria Windrows Loop Spinel Avenue from North End to Estacia Street

Complete Streets Install bike boulevards, high-visibility crosswalks, pedestrian bulbouts, and ADA Redlands San Bernardino PIPP Implementation Various locations along Grant Avenue, Cajon Street, and Vine Avenue 06/2018 12/2018 30 30 40 23 Components accessibility features around the Redlands Library and Redlands Bowl. Programmed locations include the following street areas. Actual street segments may be adjusted during construction.

No. Street Name From Street To Street 1 6TH ST COLTON AVE SUN AVE 2 6TH ST SUN AVE UNION AVE 3 6TH ST UNION AVE BROCKTON AVE 4 ALABAMA ST INDUSTRIAL PARK AVE ORANGE TREE LN 5 ALABAMA ST ORANGE TREE LN LUGONIA AVE 6 ALESSANDRO RD CREEKSIDE DR SAN TIMOTEO CANYON RD 7 ALLISON WAY LA SOLANA DR Dead End 8 ALVARADO ST OLIVE AVE CLARK ST 9 ALVARADO ST CLARK ST FERN AVE 10 ALVARADO ST FERN AVE HOME PL 11 ALVARADO ST HOME PL CYPRESS AVE 12 ALVARADO ST CYPRESS AVE PALM AVE 13 ALVARADO ST PALM AVE CHESTNUT AVE 14ALVARADO STCHESTNUT AVEWALNUT AVE 15 ALVARADO ST WALNUT AVE HIGHLAND AVE Road Maintenance & During the first phase of PARIS (5 stage program launched in 2012 and completing in 16 ASH ST FERN AVE Dead End Redlands San Bernardino PARIS Paving Program 04/2019 06/2019 5 20 23 20 Rehabilitation 18/19) the City of Redlands will rehabilitate approximately 2/3 of city streets. 17 ASH ST CLARK ST FLETCHER AVE 18 BEAUMONT AVE NEVADA ST SAN TIMOTEO CANYON RD 19 BERKELEY DR LUGONIA AVE SHARON RD 20 BERKELEY DR SHARON RD DELAWARE AVE 21 BERKELEY DR DELAWARE AVE NICKOLAS AVE 22 BERKELEY DR NICKOLAS AVE THOMAS AVE 23 BERKELEY DR THOMAS AVE PENNSYLVANIA AVE 24 CABALLERO LN CEDAR AVE CRESCENT AVE 25 CAJON ST HIGHLAND AVE CRESCENT AVE 26 CAJON ST CRESCENT AVE SUMMIT AVE 27 CAJON ST SUMMIT AVE GARDEN ST 28 CAJON ST GARDEN ST HILTON AVE 29 CAJON ST HILTON AVE FOUNTAIN AVE 30 CALVARY CIR ALABAMA ST Dead End 31 CANYON RD GARDEN ST SARRITA DR 32 CEDAR AVE CENTER ST PACIFIC ST 33 CEDAR AVE PACIFIC ST CABALLERO LN 34 CEDAR AVE CABALLERO LN MONTEREY ST 35 CEDAR AVE MONTEREY ST SAN JACINTO ST 36 CEDAR AVE SAN JACINTO ST SAN MATEO ST

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Pavement rehabilitation of the indicated existing street segments using one or more of the following methods: (1) Cold Milling and Asphalt Concrete (AC) Surface Course; (2) Full Depth AC removal and re-construction; (3) Full Depth Reclamation including in- place pulverization and mixing of the existing pavement to create a stablized base, Linden Ave. from Foothill Blvd. to Rialto Ave.; Merrill Ave. from Maple Ave. to Riverside Ave.; Rialto Road Maintenance & followed by construction of AC Base and Surface Course; (4) Cold In-Place Recycling Rialto San Bernardino Annual Street Overlay Project Ave. from Riverside Ave. to Sycamore Ave.; Valley Blvd. from Spruce Ave. to 640' east of Lilac Ave.; 08/2018 01/2019 7 20 47 20 Rehabilitation of existing pavement, followed by construction of an AC Surface Course. Addition of and Valley Blvd. from Riverside Ave. to East City Limit. new and/or repair/upgrade of curbs and gutters, cross gutters, catch basins, and culverts. Addition of new and/or repair/upgrade of ADA curb ramps; and addition of new sidewalks and/or repair/replacement of damaged sidewalks. Replacing/Upgrading traffic striping and pavement markings.

Pavement rehabilitation of the indicated existing street segments using one or more of the following methods: (1) Cold Milling and Asphalt Concrete (AC) Surface Course; (2) Lilac Ave. from Tahoe St. to Walnut Ave. Full Depth AC removal and re-construction; (3) Full Depth Reclamation including in- Linden Ave. from Riverside Ave. to 155' south of Candlewood Ave. place pulverization and mixing of the existing pavement to create a stablized base, Linden Ave. from 374' south of Persimmon Ave. to Casmalia St. followed by construction of AC Base and Surface Course; (4) Cold In-Place Recycling Locust Ave. from Riverside Ave. to Casa Grande Dr. Road Maintenance & Rialto San Bernardino Annual Street Overlay Project of existing pavement, followed by construction of an AC Surface Course. Addition of Locust Ave. from Lowell St. to Casmalia St. 03/2019 09/2019 7 20 47 20 Rehabilitation new and/or repair/upgrade of curbs and gutters, cross gutters, catch basins, and Pepper Ave. from Baseline Rd. to Etiwanda Ave. culverts. Addition of new and/or repair/upgrade of ADA curb ramps; and addition of new Pepper Ave. from Foothill Blvd. to 2nd St. sidewalks and/or repair/replacement of damaged sidewalks. Replacing/Upgrading traffic Summit Ave. from Maple Ave. to Apple Ave. striping and pavement markings. Willow Ave. from Walnut Ave. to Chaparral St.

Sierra Way - 9th Street to Baseline Street; Arrowhead Avenue - 7th Street to 9th Street; "J" Street PAvenuement - 8th Street to 11th Street; Davidson Street - 16th Street to 19th Street; Garner Avenue - Road Maintenance & SS18-002 11 Street Segments1 Construction of asphalt pavement, replacement of Curb and Gutter, Sidewalk, Handicap Baseline Street to 14th Street; Evans Street - Western Avenue to Medical Center; Wilson Street - 9th San Bernardino San Bernardino 01/2019 03/2019 1 10 47 29 Rehabilitation (KOA) Ramps, and Stripping. Street to Baseline Street; 8th Street - Medical Center Drive to Mt Vernon Avenue; Union Street - Mt Vernon Avenue to Western Avenue; Western Avenue - Union Street to 9th Street; Little Mountain Drive - Kendall Drive to 30th Street

Waterman Avenue - Mill Street to Central Avenue; Commercial Road - Waterman Avenue to Steele Road; "H" Street - 48th Street to Northpark Blvd; Pumalo Street - Golden Avenue to Date Place; Hunts Ln - Harwick Drive to Commercial Dr; Arrowhead Avenue - 5th Street to 7th Street; Baseline Road Maintenance & SS18-003 14 Street Segments1 Construction of asphalt pavement, replacement of Curb and Gutter, Sidewalk, Handicap San Bernardino San Bernardino Street - "H" Street to "E" Street; Central Avenue - Pacific Street to SR210; Pacific Street - City Limits 01/2019 03/2019 1 10 47 23 Rehabilitation (Willdan) Ramps, and Stripping. (Olive) to Central Avenue; Central Avenue - SR210 to Highland Avenue.; Grand Avenue - College Avenue to Varsity Avenue; Western Avenue - Kendall Drive to 48th Street; California Street - 30th Street to Cajon Blvd; Inland Center Drive - G Street to Adell Street

Bridge and Railing Repairs at Various Locations in the City of San Bernardino. Coating Bridge and Railing Repairs at San Bernardino San Bernardino Safety with Methacrylate, Patching spalling concrete, repairing bridge seals, repairing Citywide within San Bernardino. 04/2018 06/2018 5 10 40, 47 20, 23 Various Locations (17/18 Carryover) damaged or vandalized bridge railing and related work. Pavement Rejuvenation at Various Crack filing and slurry sealing at various locations citywide. Consists of cleaning and Road Maintenance & San Bernardino San Bernardino Locations (Annual Slurry) (17/18 sealing cracks, grinding raised areas, and applying a slurry seal that protects the street Citywide with the City of San Bernardino 04/2018 06/2018 2 5 40, 47 20, 23 Rehabilitation Carryover) against moisture intrusion into the subgrade. Pavement Rehabilitation of Inland Center Drive Pavement Rehab - "E" St & Adel St in Inland Center Drive Pavement front of Inland Center mall to repair roadway, broken curb & gutter and sidewalk. also Road Maintenance & San Bernardino San Bernardino Rehab - "E" St & Adel St (17/18 retrofitting or installing ADA access ramps as required by State/federal Guidelines. This Inland Center Drive Pavement Rehab - "E" St & Adel St 08/2018 11/2018 5 10 47 20 Rehabilitation Carryover) project will grind 1-1/2 to 2 inches of existing asphalt ant overlay with new asphalt concrete pavement.

Pavement Rehabilitation of Little Mtn. Drive Pavement Rehab - Kendall Drive to 30th St Little Mtn. Drive Pavement Rehab - Road Maintenance & to repair roadway, broken curb & gutter and sidewalk. also retrofitting or installing ADA San Bernardino San Bernardino Kendall Dr to 30th St (17/18 Little Mtn. Drive Pavement Rehab - Kendall Dr to 30th St 08/2018 11/2018 5 10 40 23 Rehabilitation access ramps as required by State/federal Guidelines. This project will grind 1-1/2 to 2 Carryover) inches of existing asphalt ant overlay with new asphalt concrete pavement.

Street (Start to End) Repair Length,Width SUMMIT DR (HILL SIDE AVE to BULLION AVE OL) 242, 27; HILLSIDE AVE (SUMMIT DR to OLD DALE ROAD OL) 1068, 21; BULLION AVE (29 PALMS HWY to OLD DALE ROAD OL) 1222, 22; PINE AVE (29 PALMS HWY to OLD DALE ROAD OL) 1197, 32; OASIS AVE (29 PALMS HWY to OLD DALE ROAD OL) 1206, 28; SPLIT ROCK AVE Road Maintenance & (29 PALMS HWY to OLD DALE RD OL) 1222, 30; DESERT QUEEN AVE (Cactus Dr to Twentynine Palms San Bernardino Street Overlays 2018/2019 Downtown South in The City of Twentynine Palms 10/2018 03/2019 9 12 42 16 Rehabilitation OLD DALE RD OL) 550, 26; TAMARISK AVE (Cactus Dr to OLD DALE ROAD OL) 550, 27; YUCCA AVE (Cactus Dr to OLD DALE ROAD OL) 550, 21; SMOKE TREE AVE (Cactus Dr to OLD DALE ROAD OL) 550, 24; CHOLLA AVE (Cactus Dr to OLD DALE ROAD OL) 550, 31; CACTUS DR (ADOBE ROAD to HILLSIDE Ave OL) 2900, 29; DIDSBURY ROAD (ADOBE ROAD to END OL) 2000, 24

Arrow Highway Rehabilitation 1.13 miles of water main and service laterals replacement, asphalt pavement Road Maintenance & Upland San Bernardino (Originally Listed in FY 2017-18, rehabilitation, replacement of damaged curbs, gutters, sidewalks, handicap ramps, and Arrow Highway, from Benson Avenue to San Antonio Avenue. 01/2019 06/2020 15 20 41 25 Rehabilitation Forecasted Start in FY 2019-20) re-striping.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Mulberry Avenue Reconstruction 0.17 miles of water main and service laterals replacement, asphalt pavement Road Maintenance & Upland San Bernardino (Originally Listed in FY 2017-18, rehabilitation, replacement of damaged curbs, gutters, sidewalks, handicap ramps, and Mulberry Avenue, from Foothill Blvd. to Pine Street. 01/2019 06/2020 20 25 41 25 Rehabilitation Forecasted Start in FY 2019-20) re-striping. 14th Street Rehabilitation (Originally Road Maintenance & 0.70 miles of asphalt pavement rehabilitation, replacement of damaged curbs, gutters, Upland San Bernardino Listed in FY 2017-18, Forecasted 14th Street, from Campus Avenue to Grove Avenue. 01/2020 06/2021 15 20 41 25 Rehabilitation sidewalks, handicap ramps, and re-striping. Start in FY 2020-21) 3rd Avenue Rehabilitation 0.58 miles of water main and service laterals replacement, asphalt pavement Road Maintenance & Upland San Bernardino (Originally Listed in FY 2017-18, rehabilitation, replacement of damaged curbs, gutters, sidewalks, handicap ramps, and 3rd Avenue, from 'A' Street to 11th Street. 08/2018 06/2019 15 20 41 25 Rehabilitation Forecasted Start in FY 2018-19) re-striping. 9th Street Rehabilitation (Originally 0.38 miles of water main and service laterals replacement, asphalt pavement Road Maintenance & Upland San Bernardino Listed in FY 2017-18, Forecasted rehabilitation, replacement of damaged curbs, gutters, sidewalks, handicap ramps, and 9th Street, from 3rd Avenue to Campus Avenue. 08/2018 06/2019 15 20 41 25 Rehabilitation Start in FY 2018-19) re-striping. Road Maintenance & Arrowhead Drive / 7th Avenue Pavement reconstruction, asphalt overlays, widening at certain locations, restriping, and Arrowhead/7th Avenue from Green Tree Boulevard to Bear Valley Road, a distance of approximately Victorville San Bernardino 06/2018 10/2018 20 25 33 21 Rehabilitation Improvement Project reconstructing access ramps to meet ADA current standards. 2.1 miles. Village Drive is a 4-lane arterial road, 4.3 miles long. This project will reconstruct Road Maintenance & Victorville San Bernardino Village Drive existing pavement, add shoulders, install Class II bike lanes, upgrade access ramps Village Drive between Mojave Drive and Air Expressway, a length of 4.3 miles. 02/2018 06/2018 20 25 33 21 Rehabilitation and driveway approaches to meet ADA standards. Complete Streets County Line Road Improvements Rehabilitation of asphalt and curb/gutter. Construction of sidewalk, drainage Yucaipa San Bernardino County Line Road from Bryant Street o I-10 Freeway 05/2018 02/2019 25 25 42 23 Components (17/18 Carryover) improvements and associated street improvements. Complete Streets Yucaipa Boulevard Improvements Rehabilitation of asphalt and curb/gutter. Construction of sidewalk, drainage Yucaipa San Bernardino Yucaipa Blvd from 15th Street to I-10 Freeway 10/2017 03/2019 25 25 42 23 Components (17/18 Ongoing) improvements and associated street improvements. Complete Streets Avenue E Intersection Rehabilitation of asphalt and curb/gutter at intersections as part of the construction of Yucaipa San Bernardino Avenue E from Bryant Street to 5th Street 05/2019 05/2020 25 25 42 23 Components Improvements (17/18 Carryover) roundabouts. Buena Vista Pavement Road Maintenance & Yucca Valley San Bernardino Rehabilitation Project No. 7002 Pavement Rehabilitation Buena Vista Drive: SR-247 and Yucca Messa Road in the Town of Yucca Valley 05/2018 07/2018 10 15 42 16 Rehabilitation (17/18 Ongoing) The boundaries of the city's PMP are roughly from La Costa Ave to Interstate 78 and from the coast to The Pavement Management Program (PMP) annually resurfaces approximately 17 Road Maintenance & Vista and San Marcos to the east. Specific streets selected for resurfacing are based on modeling Carlsbad San Diego Pavement Management Program centerline miles of roadway with either slurry seal or rubberized asphalt concrete 09/2018 06/2019 5 25 76 36 Rehabilitation analysis, prioritization, and engineering judgement. Each year, approximately 17 centerline miles of overlay. pavement is resurfaced as part of this program.

This annual maintenance project replaces broken, cracked, and uplifted concrete The boundaries of the city's Concrete Repair Program are roughly from La Costa Ave to Interstate 78 Complete Streets Carlsbad San Diego Concrete Repair Program throughout the city to prevent trip hazards, increase safety, and to promote complete and from the coast to Vista and San Marcos to the east. Specific locations selected for concrete 09/2018 06/2019 40 60 76 36 Components streets and accessibility for all pedestrians. replacement are based on field review by staff, prioritization, budget, and engineering judgement.

E NAPLES ST (CRESCENT DR - MEDICAL CTR DR); THIRD AV (N FOURTH AV - D ST); NAPLES RMRA Major Pavement Project includes street overlays and street reconstruction on various streets in the City. ST (FOURTH AV - THIRD AV); OXFORD ST (TOBIAS DR - HILLTOP DR); THIRD AV (L ST - Road Maintenance & Chula Vista San Diego Rehabilitation - FY2018/19 The major rehabilitation treatments are based on the recommendations of the City's NAPLES ST); F ST (FOURTH AV - THIRD AV); THIRD AV (ORANGE AV - ANITA ST); L ST (THIRD 03/2019 09/2019 20 25 79, 80 40 Rehabilitation (STM396) Pavement Management System. AV - FIRST AV); FIRST AV (H ST- I ST); HILLTOP DR (TELEGRAPH CYN RD - E L ST); I ST (SECOND AV - HILLTOP DR); BONITA RD CITY LIMIT (@ WILLOW ST - ALLEN SCHOOL RD)

RMRA Major Pavement Project includes street overlays and street reconstruction on various streets in the City. Road Maintenance & E PALOMAR ST (HILLTOP DR - MELROSE AV); BAY BL (I-5 FREEWAY RAMP - PALOMAR ST); Chula Vista San Diego Rehabilitation – FY2017/18 The major rehabilitation treatments are based on the recommendations of the City’s 06/2018 12/2018 20 25 79, 80 40 Rehabilitation MOSS ST (FOURTH AV - THIRD AV); C ST (N GLOVER AV - SECOND AV) (STM395) Pavement Management System.

Removal and replacement of 2-3" of existing asphalt surface; replacement of base Road Maintenance & Street, Curb and Gutter Coronado San Diego material as necessary; replacement of damaged curb and gutter; and required Entire length of Adella Avenue; Jamaica Village Road; Spinnaker Way; and Flora Avenue 04/2019 05/2019 20 30 78 39 Rehabilitation Improvements FY18/19 replacement of adjacent pedestrian ramps that do not meet current ADA regulations.

Del Mar 6 (DM06) Sidewalk, Streets Complete Streets Sidewalk, roadway, pedestrian lighting and bike lane improvements, paving, and new Del Mar San Diego and Drainage Improvements along North and South bound Camino Del Mar from 9th to 15th Street 09/2018 05/2019 50 75 78 39 Components striping. Camino Del Mar

Various streets in the City of El Cajon to the limits as noted: Airport Dr. - Wing Ave. to Magnolia Ave., Madison Ave - Ballantyne St. to Mollison Ave., El Cajon Blvd. - Murray Dr. to I-8 EB On-ramp, Franklin Ave. - El Cajon Blvd. to Johnson Ave., Granite Hills Dr. - Melody Ln. to Madison Ave., Grossmont Ave. - Chase Ave. to Wilson Ave., Johnson Ave. - Bradley Ave. to Fletcher Pkwy., Johnson Ave. - Road Maintenance & El Cajon San Diego Overlay 2018 (17/18 Ongoing) Repave and restripe approximately 4 centerline miles of roads Washington Ave. to Chase Ave., Magnolia Ave. - Airport Dr. to north City Limit, Midway Dr. - Pine Dr. 09/2018 11/2018 13 20 71 38 Rehabilitation to Helix View Dr., Murray Dr. - Water St. to El Cajon Blvd., Nidrah St. - Chase Ave. to end, Nugent Ct. - Grossmont College Dr. to end, Avenida Cherylita - Horizon Hills Dr to End, Ballantyne St - Broadway to Hart Dr., Circo Del Cielo - Dewitt Dr to Cul-de-sac, Horizon Hills Dr - Circo Del Cielo to East City Limits,

Provides for the reconstruction and/or resurfacing of several collectors and Granite Hills Dr, Graves Ave, Rex Hall St, Lloyd St, Greenfield Dr, E. Bradley Ave, Benedict Ave, Road Maintenance & thoroughfares. The work involves grinding asphalt and replacing it with TRMAC, Jackman St, N Marshall Ave, Fesler St, Pine Dr, Helix ViewDr, Brookhurst Dr, Oakbrook Ct, W/E Main El Cajon San Diego Overlay 2019 03/2018 06/2019 12 15 71 38 Rehabilitation grinding and replacing pavement markers, as well as adjusting manholes and survey St, W. Bradley Ave, N Second St, Cedar St, Ann St, Walter Way, June Way, Ednabelle Ct, Foote Path monuments. The approximate length of work is 5.85 lane miles. Way, Midway Dr, Nadeen Dr, Mary St, McWay St, Willowbrook Ct

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Village Park Way from Encinitas Bl to Gatepost Rd; N. Vulcan St from Leucadia Bl to Union St; Highway 101 from Encinitas BL to D Street: Cole Ranch Rd from 7th St to 5th St: N. Rancho Santa FE Rd from Peppertree Ln to 7th St; N. Vulcan St from Orpheus Av to Sunset Dr; N. Vulcan St from Union St to Orpheus Av; N. Rancho Santa FE Rd from Encinitas Bl to Peppertree Ln: Springwood lane from Morning Sun Dr to N. Cul-de-sac: Glascow Av from Birmingham Dr to North End; Wotan Drive from Santa Fe Dr to Melba; Peppertree Ln from Rancho Santa Fe Rd to SE End: Somerset Av from Warwick Av to Brighton Av: Orkney Ln from Faith Av to MacKinnon Av; Via Andalusia from Via Cantebria to Via Montecito; Justin Rd from Munevar Rd to Ocean Crest Rd: Morning Sun Dr from Morning Sun Ct to Springwood Ln: Bumann Road from Fortuna Ranch Rd to Rim Rock Circle; Bumann Road from Rim Rock Circle to Wildflower Drive; Somerset Av from Caretta Wy to Warwick Av; Red Coach Ln from Glen Arbor Dr to W. Cul-de-sac: Barbara Ln from Caudor St to W End: Leafwood Pl from Glen Arbor Dr to W. Cul-de-sac; Puebla St from Passiflora Av to E End; N. Willowspring Dr from Glen Arbor Dr to Village Park Wy; N. Willowspring Dr from Gardendale Rd to Glen Arbor Dr: Leucadia Bl from Quail Gardens Dr to Garden View Rd: Meadow Wood Pl from Orchard Wood Rd to W. Cul-de-sac; Neptune Ave from Grandview St to N END; Leucadia Bl from Saxony Rd to Sidonia St: Countryhaven rd from parkdale Lane to Glen Arbor Dr: Leucadia Bl from Garden View Rd to Town Center Pl; Orchard Wood Rd from Amargosa Dr to Village View Rd; Neptune Ave from Jasper St to Jason St: Ocean Crest Rd from MacKinnon Av to Justin Rd: Neptune Ave from Jason St Road Maintenance & Annual Overlay Program FY 2018- Encinitas San Diego Overlay and Slurry Seal at various locations in the City of Encinitas to Avocado St; Cathy Ln from MacKinnon Av to Justin Rd; Eolus Ave from Hymettus Av to Hillcrest 08/2018 03/2019 5 25 76 36 Rehabilitation 19 Dr/Andrew Av: Leucadia Bl from Sidonia St to Quail Gardens Dr: Woodside Ln from Morning Sun Dr to S. Cul-de-sac; Eolus Ave from E Glaucus St to Hymettus Av; Orchard Glen Cir from Orchard Wood Rd E to Orchard Wood Rd W; Countryhaven Rd from Village Wood Rd to Parkdale Ln: Eugenie Av from N CDS to Sidonia St: Village View Rd from Orchard Wood Rd to 515' S/O Orchard Wood Rd; Misty Cir from Countrywood Ln to Cul-de-sac; Willowood Ln from Glen Arbor Dr to W. Cul-de-sac: Capri St from Burgundy Road to Gascony Road: Orchard Wood Rd from W CDS to Amargosa Dr; Morning Sun Dr from Springwood Ln to Woodside Ln; Caudor St from Plato Place to Noma Lane: Morning Sun Dr from Woodside Ln to S. Cul-de-sac: Shadytree Ln from Glen Arbor Dr to W. Cul-de-sac; Via Monecito from Via Cantebria to E. Cul-de-sac; Eugenie Av from Sidonia St to Puebla St; Countryhaven Rd from Glen Arobor Dr to Willowspring Dr: Leora Lane from Noma Lane to Cul-de-sac: Neptune Ave from Avocado St to Grandview St; Morning Sun Dr from Rancho Santa Fe Rd to Morning Sun Ct; Green Orchard Pl from Orchard Wood Road to S. Cul-de-sac; Countryhaven Ct from Countryhaven Rd to Cul-de-sac: Rossini Dr from Montgomery Ave to Manchester Av: Cathy Ln from Orkney Ln to MacKinnon Av; Shady Acres Cir from Countrywood Ln to Cul-de-sac; Caudor St from Noma Lane to Barbara Lane: Rossini Dr from Stafford Av to N END: Countrywood Ct from Countrywood Ln to Cul-de-sac; Morning Sun Ct from Morning Sun Dr to W Cul-de-sac; Meadowhaven Ct from W CDS to Village View Rd: Woodmoss Ct from W CDS to Willowspring Dr: Eolus Ave from Naiad St to E Glaucus St: Eolus Ave from Leucadia Bl to Naiad St

Maintenance Zone SO Bear Valley Parkway from Beethoven Drive to Las Palmas Avenue/Peet Lane Centre City Parkway from Felicita Road to S. Centre City Parkway entrance Citracado Parkway from Western City Limits to Centre City Parkway This project will remove and replace pavement in poor condition, and apply surface Del Lago Boulevard from I-15 to Via Rancho Parkway treatments to extend the life of our streets. The project remove/replaces curb and El Norte Parkway from Bourbon Road to Seven Oakes Road Road Maintenance & 2018 Street Rehabilitation & gutter, sidewalk, cross gutters, and loops that are in poor condition. The project El Norte Parkway from Rose Street to Lincoln Avenue Escondido San Diego 07/2018 11/2018 5 20 75 38 Rehabilitation Maintenance Project restripes affected roadways, some have bike lanes added in compliance with our Escondido Boulevard from Brotherton Road to S. Centre City Parkway entrance Bicycle Master Plan, and installs new video detection cameras at affected intersections Felicita Road from Brotherton Road to 520 s/o Monticello Drive to improve the efficiency of our traffic signal systems. Hamilton Lane from Bernardo Avenue to Felicita Road Pine Street from Valley Parkway to 15th Avenue Quince Street from Second Avenue to Thirteenth Avenue Rose Street from Lincoln Avenue to El Norte Parkway Via Rancho Parkway from Montesano Road to Beethoven Drive

Slurry Seal and Grind/Overlay over 20 streets city-wide that need attention based of the Boulevard Ave, Cypress Ave, Calla Ave, Donax Ave, Daisy Ave, Elkwood Ave, Ebony Ave, Imperial Road Maintenance & Imperial Beach San Diego RTIP FY 18-19 Street Improvements City's Pavement Management System. ADA compliant pedestrian ramps will also be Beach Blvd, 8th St, Grove Ave, Holly Ave, Arriba Ave, Hemlock Ave, Iris Ave, California St, 7th St, 09/2018 01/2019 5 25 78 40 Rehabilitation proposed, if necessary, on all of the streets that get rehabilitated. 10th St, Emory St, 11th St, Florida St, 15th St, Citrus Ave

Road Maintenance & La Mesa San Diego La Mesa Blvd Rehab Project 2A Asphalt Mill & Overlay La Mesa Blvd from Normal Ave to Acacia Ave 01/2019 06/2019 15 25 79 38 Rehabilitation Road Maintenance & La Mesa San Diego La Mesa Blvd Rehab Project 2B Asphalt Mill & Overlay La Mesa Blvd - From Randlett Dr. to Grossmont Blvd 01/2019 06/2019 15 25 79 38 Rehabilitation Road Maintenance & La Mesa San Diego La Mesa Blvd Rehab Project 2C Asphalt Mill & Overlay La Mesa Blvd - From Grossmont Blvd to I-8 01/2019 06/2019 15 25 79 38 Rehabilitation Road Maintenance & La Mesa San Diego Spring Street Rehab Project 2 Asphalt Mill & Overlay Spring St - From the Southern City Limit to I-8 01/2019 06/2019 15 25 79 38 Rehabilitation Road Maintenance & La Mesa San Diego University Ave Rehab Proj 2A West Asphalt Mill & Overlay University Ave - Western City Limit to Harbinson Ave 01/2019 06/2019 15 25 79 38 Rehabilitation Road Maintenance & La Mesa San Diego University Ave Rehab Proj 2B East Asphalt Mill & Overlay University Ave - From La Mesa Blvd to Baltimore Dr 01/2019 06/2019 15 25 79 38 Rehabilitation Road Maintenance & La Mesa San Diego 70th Street Rehab Project 1 Asphalt Mill and Overlay 70th Street from University Avenue to City Limits at Interstate 8 02/2019 06/2019 15 25 79 38 Rehabilitation

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Road Maintenance & La Mesa San Diego La Mesa Blvd. Rehab Project 1 Asphalt Mill and Overlay La Mesa Blvd from Lee Ave to University Ave and from Allison Ave to Randlett Dr 02/2019 06/2019 15 25 79 38 Rehabilitation Road Maintenance & La Mesa San Diego Palm Ave. Rehab Project 1 Asphalt Mill and Overlay Palm Ave from 4400 Palm Ave to Echo Drive 02/2019 06/2019 15 25 79 38 Rehabilitation The street list for FY 18/19 Street Rehab Project ($194,959) tentatively include: Adams Street, Alton Drive, Angelus Avenue, Baldwin Road, Bonita Street, Broadway, Buena Vista Avenue, Cameron Drive, Central Avenue, Citronella Street, College Avenue, Cuyamaca Avenue, Davison Street, Daytona Street, Dupont Drive, El Roy Street, Ensenada Street, Eppick Court, Fairfax Drive, Federal Blvd, Florine Road, La Puerta Place, Lansing Drive, Lawford Place, Lemon Grove Road Maintenance & FY 2018-19 Street Rehabilitation Lemon Grove San Diego Rehabilitate and Maintain City Streets and Roadways Avenue, Lemon Grove Way, Lincoln Street, Loma Drive, Massachusetts Avenue, Morose Street, Mt. 07/2018 12/2018 5 10 79 38 Rehabilitation Projects Vernon Street, North Avenue, Olive Street, Pacific Street, Palm Street, Roosevelt Avenue, Siegle Court, Washington Street The limits of the FY 18-19 streets are not confirmed at this time and will be further vetted after July 2018.

This project will create the City's first storm drain assessment, inventory, and The City maintains 70 Miles of roadway for roughly 450 plus streets within the City limits, this includes Lemon Grove San Diego Other Storm Drain Master Plan 07/2018 10/2018 5 10 79 38 prioritization for repairs. 47.5 miles of drainage to be assessed Anticipated streets included in the FY 17/18 Street Rehab Project ($150,000)which should be completed in June 2018 are: Road Maintenance & FY 2017-18 Street Rehabilitation Rehabilitate or maintenance city streets as a part of the City's annual paving Dayton Drive (Englewood Drive to Nichals Street), Barton Drive (Ensenada Street to Englewood Lemon Grove San Diego 04/2018 06/2018 5 10 79 38 Rehabilitation Project (17/18 Ongoing) rehabilitation project. Drive), Palm Street (Skyline Drive to Golden Avenue), Lemon Grove Avenue (Palm Street to Southern City Limits), Buena Vista Avenue ( to Broadway)

FY 2018 Safe Routes to School (SRTS) Pedestrian and Bicycle Enhancements – Harbison Avenue Construct traffic calming measures and bike sharrows on Harbison Avenue between National City San Diego Safety Harbison Avenue between Division Street and E. 4th Street 09/2018 12/2018 20 30 79, 80 40 Traffic Calming, Division Street to E. Division Street and E. 4th Street 4th Street (FY 2018 Carryover Project) FY 2018 SRTS Pedestrian and Provide street resurfacing and restriping to include a "road diet" for traffic calming Bicycle Enhancements – Division converting four travel lanes to two travel lanes with a two-way left-turn center lane, National City San Diego Safety Street Traffic Calming, Euclid Division Street between Euclid Avenue and Harbison Avenue 02/2018 06/2018 10 15 79, 80 40 Class II bike lanes, and new pedestrian curb ramps for ADA compliance on Division Avenue to Harbison Avenue (FY Street between Euclid Avenue and Harbison Avenue 2018 Carryover Project) Road Maintenance & Provide pavement rehabilitation, grind and overlay on Euclid Avenue between National City San Diego Euclid Avenue Street Resurfacing Euclid Avenue between Cervantes Avenue and E. 24th Street 11/2018 06/2019 10 15 79, 80 40 Rehabilitation Cervantes Avenue and E. 24th Street Road Maintenance & Provide pavement rehabilitation, grind and overlay on Palm Avenue between Division National City San Diego Palm Avenue Street Resurfacing Palm Avenue between Division Street and E. 18th Street 11/2018 06/2019 10 15 79, 80 40 Rehabilitation Street and E. 18th Street

Project 1- Slurry Sealing List 1 ADAMS STREET MADISON STREET HARRISON STREET 2 ARBOR COVE CIRCLE MYRTLE STREET SWEETSHADE STREET 3 ARISTA WAY WEST END SHARI WAY 4 ARISTA WAY SHARI WAY EAST END 193 VIA LAS ROSAS VIA SONORA GENEVA STREET 194 VIA LAS VILLAS SHADOW RIDGE ROAD VIA SEVILLE 195 VIA LAS VILLAS VIA SEVILLE SHADOW RIDGE ROAD 196 VIA PAUMA LUISENO AVENUE VIA YUHA 197 VIA RIO SE END VIA MARIA 198 VIA RIO VIA EMILY VIA MARIA Project 1- Slurry Sealing - Will assess and plan based on a potential of 212 streets 199 VIA RIO WEST END VIA EMILY Road Maintenance & Segments Oceanside San Diego Slurry Sealing 18/19 200 VILLAGE COURT VILLAGE DRIVE NW END 08/2018 06/2019 5 7 76 36 Rehabilitation 201 VOYAGER COURT SE END MAINSAIL ROAD 202 WALTON STREET KRAFT STREET LORETTA STREET 203 WEITZEL STREET CIVIC CENTER DRIVE SPORTFISHER DRIVE 204 WINDWARD WAY NORTH CLEVELAND STREET TREMONT STREET 205 WINDWARD WAY TREMONT STREET NORTH COAST HIGHWAY 206 WISCONSIN AVENUE SOUTH DITMAR STREET SOUTH NEVADA STREET 207 WISCONSIN AVENUE SOUTH CLEMENTINE STREET GRANT STREET 208 WISCONSIN AVENUE SOUTH FREEMAN STREET SOUTH DITMAR STREET 209 WISCONSIN AVENUE SOUTH DITMAR STREET SOUTH DITMAR STREET 210 WISCONSIN AVENUE SOUTH COAST HIGHWAY SOUTH FREEMAN STREET 211 WISCONSIN AVENUE SOUTH NEVADA STREET SOUTH CLEMENTINE ST 212 WOODBINE PLACE SOUTH END CASSIDY STREET

Preparatory work including patching, crack sealing. Asphalt overlaying to repair mainly Road Maintenance & Oceanside San Diego Asphalt Overlay arterial streets as they often carry truck traffic. Replace striping and pavement various streets (list attached) 08/2018 06/2019 15 20 76 36 Rehabilitation markings.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts GISID STREET FROM TO PCI CONDITION COND. WIDTH LENGTH AREA TYPE OF WORK A B RANK 319 AIRPORT ROAD SAN LUIS REY ROAD PRODUCTION AVENUE 77 Good Weak 37 462 17,109 Thin Overlay (1.5 - 2.0) 14.00 26,600 Local 499 AIRPORT ROAD PRODUCTION AVENUE ROYMAR ROAD 67 Good Moderate 46 612 28,173 Thin Overlay (1.5 - 2.0) 14.00 43,800 Local 501 AIRPORT ROAD ROYMAR ROAD HIGHWAY 76 EXPRESSWAY 47 Good Moderate 48 207 9,960 Thin Overlay (1.5 - 2.0) 14.00 15,500 Local 917 ARTHUR AVENUE GOLD DRIVE LENORE STREET 64 Very Good Weak 37 699 25,879 Surface Treatment 4.00 11,500 Local 936 ARTHUR AVENUE LENORE STREET EAST PARKER STREET 56 Fair Weak 37 587 21,705 Mod Overlay (2.0 - 3.0) 16.00 38,600 Local 956 ARTHUR AVENUE EAST PARKER STREET CHARLES AVENUE 50 Good Moderate 38 756 28,717 Thin Overlay (1.5 - 2.0) 14.00 44,700 Local 970 ARTHUR AVENUE CHARLES AVENUE FLORA DRIVE 49 Fair Moderate 35 262 9,181 Mod Overlay (2.0 - 3.0) 16.00 16,300 Local 1412 ASH STREET SOUTH MYERS STREET NE Road Maintenance & Slurry Sealing of various streets throughout the City. (Streets named in project location END 51 Good Moderate 27 105 2,835 Thin Overlay (1.5 - 2.0) 14.00 4,400 Local Oceanside San Diego Slurry Sealing 17/18 Carryover 07/2018 06/2019 5 7 76 36 Rehabilitation and attached list. Streets may be added and removed as project progresses). 1801 AUTUMN DRIVE SUNBURST DRIVE MAPLE DRIVE 83 Very Good Weak 38 404 15,369 Surface Treatment 4.00 6,800 Local 1837 AUTUMN DRIVE MAPLE DRIVE NORTH AVENUE 40 Marginal Moderate 37 181 6,697 Thick Olay (> 2.0 - 3.0) 19.50 14,500 Local 6121 AUTUMN DRIVE SPRINGTIME DRIVE SUNBURST DRIVE 75 Good Weak 37 733 27,123 Thin Overlay (1.5 - 2.0) 14.00 42,200 Local 1742 AVENIDA ANDANTE SW END AVENIDA OCEANO 34 Marginal Moderate 38 374 14,209 Thick Olay (> 2.0 - 3.0) 19.50 30,800 Local 1748 AVENIDA ANDANTE AVENIDA OCEANO CORTE VERANO 62 Good Moderate 36 805 28,971 Thin Overlay (1.5 - 2.0) 14.00 45,100 Local 1947 AVENIDA ANDANTE CORTE VERANO CORTE ANDANTE 61 Good Moderate 30 372 11,172 Thin Overlay (1.5 - 2.0) 14.00 17,400 Local 1973 AVENIDA ANDANTE CORTE ANDANTE AVENIDA OCEANO 59 Good Weak 34 520 17,688 Thin Overlay (1.5 - 2.0) 14.00 27,500 Local 3873 AVENIDA DE LA PLATA AVENIDA DEL ORO AVENIDA PLAZA REAL 74 Good Moderate 45 955 42,962 Thin Overlay (1.5 - The FY 18/19 Street Maintenance Project will provide deep patching, skin patching, slurry sealing, utility lid raise to grade, and restriping for all of the streets in City of This project includes all of the streets in street maintenance zone 1, which includes 86 streets and Poway street maintenance zone 1. This project includes 86 streets totaling approximately 20 center line miles. Zone 1 includes Espola Road from the west city limits to Sandhill Road Maintenance & FY 18/19 Street Maintenance Poway San Diego approximately 20 centerline miles and approximately 5 million square feet of road Road, and includes all public streets north and east of Espola Road within these limits. The project 07/2018 09/2018 15 20 77 38 Rehabilitation Project surface. The project will greatly extend the life of these streets, and will include also includes streets on the south and east sides of Espola Road in the Summerfield Estates and restriping with complete street striping features including continental crosswalk striping Bridlewood Neighborhoods. and the addition of bike lane buffers.

This project involves the application of a slurry seal on approximately 60 miles of roads throughout the city. Slurry seal is generally used on streets which are in good condition Balboa Park, City Heights, Eastern Area, Greater North Park, Kearny Mesa, Linda Road Maintenance & Slurry Seal Group 1804 ‐ Option to protect them from deterioration. The application of a slurry seal, which consists of Vista, Mira Mesa, Navajo, Otay Mesa, Otay Mesa‐Nestor, Pacific Beach, Peninsula, San Diego San Diego 10/2018 03/2019 3 7 77, 78, 79 38, 39, 40 Rehabilitation Renewal (1804B) sand, emulsion and water applied in a thin layer up to 3/8 of Rancho Encantada, San Ysidro, Skyline‐ Paradise Hills, Tierrasanta, Tijuana River an inch thick on a street surface, can protect and preserve the street pavement for Valley, University approximately 3‐7 years.

This project involves the application of a slurry seal on approximately 60 miles of roads Carmel Valley, City Heights, Clairemont Mesa, College Area, Kearny Mesa, Kensington‐Talmadge, throughout the city. Slurry seal is generally used on streets which are in good condition Linda Vista, Midway‐ Pacific Highway, Mira Mesa, Mission Valley, Navajo, Otay Mesa, Otay Road Maintenance & Slurry Seal Group 1803 ‐ Option to protect them from deterioration. The application of a slurry seal, which consists of San Diego San Diego Mesa‐Nestor, Peninsula, Rancho Bernardo, Rancho 08/2018 12/2018 3 7 77, 78, 79 38, 39, 40 Rehabilitation Renewal (1803B) sand, emulsion and water applied in a thin layer up to 3/8 of Encantada, Scripps Miramar Ranch, Skyline‐ Paradise Hills, Southeastern San Diego, Torrey Hills, an inch thick on a street surface, can protect and preserve the street pavement for Uptown approximately 3‐7 years.

This project involves the application of a slurry seal on approximately 60 miles of roads throughout the city. Slurry seal is generally used on streets which are in good condition Road Maintenance & to protect them from deterioration. The application of a slurry seal, which consists of Carmel Valley, Clairemont Mesa, La Jolla, Mira Mesa, Pacific Beach, Peninsula, San Diego San Diego Slurry Seal Group 1901 08/2018 12/2018 3 7 77, 78, 79 38, 39, 40 Rehabilitation sand, emulsion and water applied in a thin layer up to 3/8 of Rancho Bernardo, University an inch thick on a street surface, can protect and preserve the street pavement for approximately 3‐7 years.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

This project involves the application of a slurry seal on approximately 60 miles of roads throughout the city. Slurry seal is generally used on streets which are in good condition City Heights, College Area, Greater North Park, Kensington‐Talmadge, Linda Vista, Road Maintenance & to protect them from deterioration. The application of a slurry seal, which consists of San Diego San Diego Slurry Seal Group 1902 Mission Valley, Navajo, Normal Heights, Otay Mesa, Otay Mesa‐Nestor, San Ysidro, 08/2018 12/2018 3 7 77, 78, 79 38, 39, 40 Rehabilitation sand, emulsion and water applied in a thin layer up to 3/8 of Skyline‐Paradise Hills, Southeastern San Diego, Tierrasanta, Uptown an inch thick on a street surface, can protect and preserve the street pavement for approximately 3‐7 years.

This project involves repairing approximately 30 miles of roads throughout the city. The project includes removing 2"‐3" of deteriorated asphalt and replacing it Road Maintenance & Carmel Valley, Clairemont Mesa, Mira Mesa, Rancho Bernardo, Rancho San Diego San Diego AC Overlay 1901 with a fresh new asphalt surface. ADA improvements are made to curb ramps, 09/2018 07/2019 20 20 77, 78, 79 38, 39, 40 Rehabilitation Penasquitos, Torrey Pines, University sidewalks, and driveways. Damaged cross gutters, alley aprons, and curb & gutters are also replaced.

Reconstruction of the embankment supporting the eastbound lanes of West San Road Maintenance & West San Marcos Boulevard Slope Marcos Boulevard from Acacia Drive to Viewpoint Drive. The existing embankment is San Marcos San Diego In the City of San Marcos, on West San Marcos Boulevard, from Acacia Drive to Viewpoint Drive 11/2018 05/2019 25 50 75 38 Rehabilitation Reconstruction Project moving to the south endangering the eastbound lanes, sidewalk, street lights, and fire hydrants. Use of a Pavement Preservation Strategy in the placement of a Surface Seal of Road Maintenance & San Marcos San Diego Annual Surface Seal Roadways. This is a carryover of a FY 17/18 approved project that will be complete in Mission Road, Twin Oaks Valley Road 02/2018 08/2018 5 8 75 38 Rehabilitation FY18/19. To replace burnt out and/or obsolete bulbs for the internally illuminated street name Illuminated Street Signs Lightung Santee San Diego Other signs by energy efficient LED bulbs which provides much longer service life with energy All signalized intersections in the city (60) 05/2018 08/2018 15 20 71 38 Replacement savings.

Road Maintenance & Pavement Repair and Rehabilitation Repair and rehabilitate streets as recommended by the City's Pavement Management Includes streets identified in the City's Pavement Management Analysis Report within zones BF, BB, Santee San Diego 04/2018 12/2018 20 25 71 38 Rehabilitation Citywide Analysis Report. The project will focus on overlays and full reconstructions. AA, CG, EE, BD, EB, CD, CD, FC, CI, CE, ED, AND EF.

Road Maintenance & Pavement Roadway Maintenece Conduct pavement maintenance on streets as recommended by the City's Pavement Includes streets identified on in the City's Pavement Management Analysis Report within zones BF, Santee San Diego 04/2018 12/2018 10 15 71 38 Rehabilitation Citywide Management Analysis Report. The project will focus on crack-filling, and slurry sealing. BB, AA, CG, EE, BD, EB, CB, CD, FC, CI, CE, ED, ED, and EF.

Road Maintenance & Provide maintenance and repair to City owned bridges. Including bridge deck seals, Magnolia Avenue bridge, Cuyamaca Street bridge, Carlton Hills Boulevard bridge, Mast Boulevard Santee San Diego Bridge Restorations Citywide 06/2018 12/2019 25 30 71 38 Rehabilitation deck sealing, and minor patching. bridge, and Prospect Avenue bridge. Since Solana Beach is only four square miles in size, each year, work typically covers all quadrants and most neighborhoods. The quadrants are determined by two main roads that bisect the City. These roads are Interstate 5 running north/south and Lomas Santa Fe Drive running east/west. Some The City's SB1 funds will be added to the annual pavement repair project so more of the main streets that are included in this project include Cliff Street from North Cedros Avenue to Road Maintenance & 2018/19 Annual Pavement streets could be repaired. As part of this project, it is estimated that 2" overlays will be Rios Avenue; South Sierra Avenue from Border Street to Dahlia Drive; Seabright Lane – entire street; Solana Beach San Diego 05/2018 12/2018 15 25 78 39 Rehabilitation Maintenance Project placed on 425,000 square feet of roads and slurry seals will be placed on approximately South Cedros Avenue from Marsolan Avenue to Cofair Avenue; South Granados Avenue from 220,000 square feet of roads. A copy of the tentative street list is attached. Palmitas Avenue to the southern end; and Santa Rosita from Santa Helena to Santa Florencia. In summary, this project will include four streets in the Northwest quadrant of the City, seven streets in the southwest quadrant, eight streets in the northeast project and two streets in the southeast quadrant.

Resurfacing and rehabilitation of deteriorated street pavement areas, including asphalt E Bobier Dr from Anza Ave to Lynette Circle, W Vista Way from Cedar Rd to Grapevine Rd, W Vista overlay of greater than one-inch in thickness, where identified as priorities in the Way from Santa Clara to WB SR-78 ramp @ Melrose, Bonita Dr at Bluegrass Rd, Camino Corto from Road Maintenance & Street Rehabilitation, Construction, Vista San Diego Pavement Management System 5-Year Maintenance Plan. Work includes resurfacing Vista Village Dr to Camino Patricia, Caren Rd from Galaxy Dr to end, Cedar Rd from West Dr to W 03/2019 10/2019 10 20 76 36 Rehabilitation and Overlay-Biennial 0.5 miles of Arterial roadways, 5.6 miles of Local streets; replacement of 35 curb ramps; Vista Way, Valencia Dr from W Vista Way to end, Valencia Dr from Copper Dr to end, Yacon Cir from repair of 2,500 square feet of sidewalks; and re-striping 1 mile of bike lanes. Yacon St to end, Yacon St from Hackamre Rd to Yacon Cir, Yacon St from Amador Ave to Tylee St

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Cypress Dr from Alta Vista Ter to Monte Vista Dr N/S Cypress Dr from Alta Vista Dr S/S to Alta Vista Ter Eucalyptus Av from Beaumont Dr to Alta Vista Dr Eucalyptus Av from Marlin Dr to Beaumont Dr Eucalyptus Av from Vista Glen Ln to Marlin Dr Bonair Rd from Palomar Pl N/S to 300' N/Palomar Pl Camino Loma Verde from Grandview Rd to City Limits Bonair Rd from Palomar Pl S/S to Foothill Dr Grandview Rd from Camino Loma Verde to End Meadow Lake Dr from Vista Way E E/S to Glenmere Rd E/S Cypress Dr from Loni Ln to Santa Fe Av S N/S Repair or replace storm-drain culverts throughout the city that have reached the end of Cypress Dr from Monte Vista Dr S/S to Loni Ln Road Maintenance & Citywide Storm Drain Relining / Vista San Diego their useful life, have failed as identified in the storm-drain inventory, or where needed Meadow Lake Dr from Glenmere Rd E/S to End 03/2018 10/2019 40 50 76 36 Rehabilitation Replacement prior to overlay or other pavement rehabilitation work. Vista Grande Dr from Elevado Rd to City Limits Vista Grande Dr from Warmlands Av to Elevado Dr W Vista Way from Cedar Rd to Grapevine Rd W Vista Way from Santa Clara to WB SR-78 ramp @ Melrose Durian St from Hill Dr to end Highland Dr from Olive Ave to Cielita Linda Dr Mistletoe St from Tylee St to 400' N/O Tylee St Palm Bark St from Tylee St to Cinchona St Rose Dr from Highland Dr to City Limits Tylee St from Durian St to Ann's Way Valencia Dr from W Vista Way to end Yacon St from Hackamre Rd to Yacon Cir Cypress Dr from Alta Vista Ter to Monte Vista Dr N/S Cypress Dr from Alta Vista Dr S/S to Alta Vista Ter Eucalyptus Av from Beaumont Dr to Alta Vista Dr Eucalyptus Av from Marlin Dr to Beaumont Dr Eucalyptus Av from Vista Glen Ln to Marlin Dr Ocean View Dr from Civic Center Dr to Terrace Dr Traci Ln from Eucalyptus Av to End Beverly Dr from Elm Dr to Foothill Dr Tacoma Ln from Beverly Dr to End Old Foothill Dr from San Clemente Dr (W) N/S to 160' NW Lion's Gate/End Via Christina from (SPUR) 510' S/Loop end to End Valley Dr from Monte Vista Dr to City Limits Peach Grove Ln from Hillway Dr to End Service Pl from Santa Fe Av S to End Bonair Rd from Palomar Pl N/S to 300' N/Palomar Pl Mesa Verde Dr from Alta Mesa Dr to End Capri Dr from Bel Air Dr E N/S to End Glenmere Rd from Oak Dr to Meadow Lake Dr N/S Repair and maintenance sealing of street surfaces using slurry seal, cape seal, chip Shelsteve Ter from Alestar St to End seal, and asphalt concrete overlay less than one inch in thickness, where identified as Road Maintenance & Street Maintenance and Slurry Seal - Park Av from Ocean View Dr (S) to Eucalyptus Av (S) Vista San Diego priorities in the Pavement Management System 5-Year Maintenance Plan. Work 05/2018 12/2018 4 6 76 36 Rehabilitation Biennial Alta Calle from Alta Vista Dr to 200' S/Alta Vista Dr includes 1.5 miles of slurry seal on Arterial roadways; 1.25 miles of Cape seal on Local Normark Ter from Alestar St to End streets; 5.4 miles of slurry seal on Local streets; and re-striping 2 miles of bike lanes. Amber Ln from Eucalyptus Av to 220' S/Eucalyptus Av Sunrise Dr from Rudd Rd to City Limits Fireside Ln from Valley Dr W/S to End Independence Way from Monte Mar Rd to Elm Dr Bel Air Dr E from 130' N/Deerhaven Dr to 510' E/Capri Dr Orleavo Dr from Crescent Dr N/S to End Camino Loma V1erde from Grandview Rd to City Limits Palomar Pl from Vista Way E to Oak Dr Sierra Verde Dr from Civic Center Dr to Gate Bonair Rd from Palomar Pl S/S to Foothill Dr Peach Grove Ln from Beaumont Dr to Hillway Dr Rancho Pacifica Pl from Alta Vista Dr to End Crescent Ct from Crescent Ln W/S to End Donnan Pl from Glenmere Rd E/S to End Mesa Verde Dr from Beverly Dr to Alta Mesa Dr San Clemente Av from Calle Huerto to Luziero Dr Bel Air Dr W from Alta Vista Dr to End Crescent Ln from Crescent Dr S/S to End

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Pavement Renovation on; Alpha St from Arleta Ave to Leland Ave, Bowdoin St from Mansell St to End, Brussels St from Mansell St to Ordway St, Calgary St from Sawyer St/Velasco Ave to End, Dartmouth St from Mansell St to End, The work scope for this project includes; Delta St from Campbell Ave to Leland Ave, Hahn St from Sunnydale Ave to Blythdale Ave, Harkness (17/18 Carryover) PW Various - Construction of 38 ADA compliant curb ramps Ave from San Bruno Ave to Girard St, Jamestown Ave from Ignacio Ave to Griffith St, Ordway St from Road Maintenance & San Francisco San Francisco Locations Pavement Renovation - Grind and Pave of 28 Street Segments Goettingen St to Alder St/Ankeny St, Parque Dr from Esquina Dr to Geneva Ave, Pueblo St from 09/2017 01/2019 14 21 17 11 Rehabilitation No. 29 - Grind and Pave of 13 Intersections Velasco Ave to End, Racine Lane from Beeman Lane/Wabash Terrace to San Bruno Ave, Raymond - 2 new curb inlets with horizontal protection bar Ave from Bayshore Blvd to Alpha St, Redondo St from Ingerson Ave to Jamestown Ave, Sawyer St from Sunnydale Ave to Sunrise Way, Sunrise Way from End to End, Tubbs St from Tennessee St to Indiana St, Wilde Ave from San Bruno to Girard St

The work scope for this project includes: 15th St : Potrero Ave to Hampshire St, 18th St : Missouri St to De Haro St, 20th St : 3rd St to Vermont Road Maintenance & PW Various Locations Pavement - Construction of 90 ADA compliant curb ramps St, Alameda St : Henry Adams St to Vermont St, Berry St : 7th St to De Haro St, Connecticut St : 16th San Francisco San Francisco 04/2018 04/2020 14 21 17 11 Rehabilitation Renovation No. 37 - Grind and pave 35 Blocks St to 20th St, De Haro St : 16th St to 17th St, Guy Pl : 1st St to Lansing St, Henry Adams St : Alameda - Grind and pave 22 Intersections St to 15th St and Kansas St, Kansas St : 17th St to End, Vermont St : Division St to 20th St

The work scope for this project includes: 18th St : Vermont St to San Bruno Ave, Anza St : Park Presidio Blvd to 30th Ave, Central Ave : Waller - Construction of 77 ADA compliant curb ramps Various Locations Pavement St to Turk Blvd, Charter Oak Ave : Industrial St to End, Crestmont Dr : Christopher Dr and Glenhaven Road Maintenance & - Reconstruct 2 blocks of concrete pavement San Francisco San Francisco Renovation No. 35 and Sewer Ln to End, Gladeview Way : Olympia Way to Panorama Dr, Glenbrook Ave : Mountain Spring Ave to 06/2018 06/2020 14 21 17, 19 11 Rehabilitation - Grind and pave 40 blocks Replacement Palo Alto Ave, Knollview Way : Olympia Way to Panorama Dr, Roosevelt Way : 14th St and Alpine Ter - Grind and pave 25 instersections to Loma Vista Ter, Skyview Way : Cityview Way to Marview Way, Sunnydale Ave : Hahn St to End - Localized base repair The work scope for this project includes: Various Locations Pavement 10th Ave : Judah St to Moraga St, 11th Ave : Judah St to Noriega St, 12th Ave : Judah St to 09th Ave Road Maintenance & - Construction of 38 ADA compliant curb ramps San Francisco San Francisco Renovation No 36 and Sewer and Rivera St, 15th Ave : Judah St to Kirkham St, Mendosa Ave : 09th Ave to End, Moraga St : 09th 08/2018 05/2020 14 21 17, 19 11 Rehabilitation - Grind and pave 26 Blocks Replacement Ave to 11th Ave, Noriega St : 12th Ave to 16th Ave, Quesada Ave : Keith St to Newhall St - Grind and pave 9 Intersections The work scope for this project includes: Dicha Aly : Lupine Ave to Wood St, Divisadero St : Broadway to Marina Blvd, Jackson St : Presidio Various Locations Pavement Road Maintenance & - Grind and pave 46 blocks Ave to Cherry St, Laurel St : Pacific Ave to Lupine Ave, Maple St : Sacramento St to California St, San Francisco San Francisco Renovation No 38 and Sewer 09/2018 07/2020 14 21 17, 19 11 Rehabilitation - Construction of 104 ADA complaint curb ramps Sacramento St : Walnut St to Arguello Blvd, Spruce St : Pacific Ave to Mayfair Dr , Steiner St : Pine St Replacement - Construction of 1 transit bulb-out to California St Congo St : Circular Ave to Monterey Blvd, Cresta Vista Dr : Baxter Aly and Casitas Ave to Coventry The work scope for this project includes: Ct, Detroit St : Staples Ave to Stillings Ave and Vista Verde Ct, Hazelwood Ave : Brentwood Ave to Road Maintenance & Various Locations Pavement - Construction of 62 ADA compliant ramps Casitas Ave and Yerba Buena Ave, Judson Ave : Edna St to Phelan Ave, Lansdale Ave : Juanita Way San Francisco San Francisco 01/2019 10/2020 14 21 17, 19 11 Rehabilitation Renovation No 40 - Grind and pave 34 blocks to Dalewood Way, Myra Way, and Sherwood Ct, Los Palmos Dr : Teresita Blvd to Globe Aly and - Grind and pave 20 intersections Hazelwood Ave, Malta Dr : Valletta Ct to Oshaughnessy Blvd, San Pablo Ave : Granville Way and Portola Dr to Yerba Buena Ave

Bell Ct : End to Whitney Young Cir, Carpenter Ct : End to Hawkins Ln and Whitney Young Cir, Cashmere St : End to La Salle Ave, Commer Ct : End to Garlington Ct, Dukes Ct : Cashmere St to End, Galvez Ave : Newhall St to Phelps St, Garlington Ct : La Salle Ave to End, George Ct : Ingalls St The work scope for this project includes: to End, Hawkins Ln : End to Carpenter Ct and Whitney Young Cir, Hillview Ct : End to Lindsay Cir and Road Maintenance & Various Locations Pavement - Grind and pave approximately 46 blocks Whitney Young Cir, Innes Ave : End to Newhall St, Jamestown Ave : Ingalls St to Jennings St, La San Francisco San Francisco 02/2019 01/2021 14 21 17 11 Rehabilitation Renovation No 41 - Construct 49 ADA compliant curb ramps Salle Ave : Ingalls St to Newhall St, Mabrey Ct : End to Richards Cir and Whitney Young Cir, Middle - Grind and pave 18 Intersections Point Rd : Evans Ave and Jennings St to Ingalls St and Innes Ave, Osceola Ln : La Salle Ave to La Salle Ave, Progress St : Whitney Young Cir to End, Reuel Ct : Hudson Ave to End, Whitfield Ct : La Salle Ave to End, Whitney Young Cir : Carpenter Ct and Hawkins Ln to Newcomb Ave, Youngs Ct : End to Whitney Young Cir The work scope for this project includes; - Grind and Pave 13 Street Segments Pavement Renovation on; Road Maintenance & (17/18 Carryover) PW Palou Ave San Francisco San Francisco - Construct 38 curb ramps On Newhall St from Oakdale ave to Palou Ave 10/2017 06/2020 14 21 17 11 Rehabilitation Infrastructure Improvements - Construct 1,700 square feet of bus pad On Palou Ave from Crisp Road to Barneveld Ave - Reconstruct approximately 20,000 square feet of base repair Pavement Renovation on; The work scope for this project includes; On Avila St from Chesnut St to Casa Way/Marina Blvd -Construction of 148 ADA compliant curb ramps On Buchanan St from Clay St to North Point St (17/18 Carryover) PW Various Road Maintenance & -Grind and pave 51 Street Segments On Capra Way from Mallorca Way to Scott St San Francisco San Francisco Locations Pavement Renovation No 09/2016 04/2020 14 21 17 11 Rehabilitation -Grind and pave 32 Intersections On Fern St from Van Ness Ave to Gough St 39 -9 Curb Inlets On Laguna St from California ST to Bay St -Construction of 6 Bus Pads On Pine St from Van Ness Ave to Masonic Ave/Presidio Ave On Sacramento St from Van Ness Ave to Buchanan St Road Maintenance & Rehabilitated with new pavement overlay and thermoplastic striping, and reconstruction Escalon San Joaquin Escalon Avenue Escalon Avenue from State Route 120 to the northerly City Limits. 05/2018 06/2018 10 12 12 5 Rehabilitation of broken sidewalks. Road Maintenance & City-wide Road Maintenance - FY Lathrop San Joaquin Rehabilitate existing pavement using Cold in-place recycling (CIR). Harlan Road between Louise Avenue and 1,000 feet south 06/2018 10/2018 10 15 9 12 Rehabilitation 18/19 RHMA Allocation Road Maintenance & City-wide Road Maintenance - Remove approx. 40,000 square feet of existing asphalt, install pavement fabric and Lathrop San Joaquin Intersection of Harlan Road / Warren Avenue 06/2018 10/2018 5 10 9 12 Rehabilitation (17/18 Carryover) install new top lift of asphalt. Various Streets inside Park West and Sunwest Subdivision in City of Lodi: Applewood Dr, Bayberry Dr, Road Maintenance & 2018/2019 Pavement Resurfacing Black Oak Way, Candlewood Dr, Elderica Wy, Glen Oak Dr, Live Oak, Way, Park Oak Dr, Park West Lodi San Joaquin Rehabilitate streets with rubberized cape seal and slurry seal product. 11/2018 04/2019 5 10 9 5 Rehabilitation Project Dr, Ponderosa Dr, Sweetwood Dr, White Oak Wy, Kramer Dr, Tilden Dr, Westwind Dr and Wightman Dr

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Road Maintenance & 2017/2018 Oavement Resurfacing Rehabilitate existing streets with rubberized cape seal/slurry seal with local digout Church Street (Lodi to Kettleman); Hutchins Street (Kettleman to Harney); Vine Street (Beckman to Lodi San Joaquin 07/2018 09/2018 5 10 9 5 Rehabilitation Project (pavement repair); Project carryover from 2017 Cluff); Cluff Avenue (Vine to Industrial); Industrial Way (Beckman to Cluff) Yosemite Avenue: Main Street to This project will rehabilitate, replace, or restore approximately 35,000 square yards of Road Maintenance & Manteca San Joaquin Cottage Avenue Improvement pavement that is aging, or beginning to fail. This project also includes the installing The Project is located on Yosemite Avenue, between Main Street and Cottage Drive. 07/2018 03/2019 15 25 12 5 Rehabilitation Project (17/18 Carryover) 10,000 linear feet of bicycle lanes. Main Street: Yosemite Avenue to This project will rehabilitate, replace, or restore approximately 42,000 square yards of Road Maintenance & Manteca San Joaquin Atherton Drive Improvement Project pavement that is aging, or beginning to fail. This project also includes the installing The Project is located on Main Street, between Yosemite Avenue to Atherton Drive. 07/2018 03/2019 15 25 12 5 Rehabilitation (17/18 Carryover) 12,000 linear feet of bicycle lanes.

The project will rehabilitate, replace, and/or restore pavement that is aging or beginning to fall. The project will include a combination of pavement maintenance methods including asphalt overlays, slurry seals, dig outs, base repair, crack seal, cape seal Road Maintenance & 2019 Annual Pavement Manteca Woodbridge Senior Community Manteca San Joaquin and/or microsurfacing at various locations throughout the region in accordance with the 12/2018 05/2019 10 20 12 5 Rehabilitation Maintenance Project 1451 Americana St, Manteca, CA 95336 recommendations of the City Pavement Management Program (PMP). Project construction is scheduled for FY 2018-20. The useful life of the pavement rehabilitation is approximately 10-20 years.

This project will entail pavement repair including asphalt overlays, base repairs, crack seal, cape seal, microsurfacing, and other pavement repairs at the Mayor’s Park Road Maintenance & Mayor's Park Subdivision Pavement Subdivision. The project is consistent with the recommendation of the City Pavement Manteca San Joaquin Mayor's Park Subdivision located at 1440 Kelley Drive, Manteca, CA 95336 12/2018 05/2019 10 20 12 5 Rehabilitation Project Maintenance Program (PMP). Project construction is scheduled for FY 2018-20. The useful life of the pavement rehabilitation is approximately 10-12 years.

Pavement maintenance of 65,000 square yards of road surface. This could include Road Maintenance & Springtime Estates Improvemen This project area is East of Main Street, North of Louise Avenue, and South and West of State Manteca San Joaquin asphalt overlays, slurry seals, dig outs, base repair, and other pavement repairs in 09/2018 12/2018 15 25 12 5 Rehabilitation Project (17/18 Carryover) Highway 99. accordance with the recommendations of the City Pavement Management Program.

Road Maintenance & Mulholand/California Resurface Includes a micro-slurry and an asphalt rubber cape seal with isolated dig out and repair Ripon San Joaquin Mulholand Drive, California Avenue and surrounding roads 02/2019 05/2019 10 15 12 5 Rehabilitation Project sections and striping Road Maintenance & Includes an asphalt rubber cape seal with isolated dig out and repair sections and Ripon San Joaquin Orange/Palm Resurface Project Orange Avenue, Palm Avenue and surrounding roads 07/2020 10/2020 10 15 12 5 Rehabilitation striping Road Maintenance & Includes an asphalt rubber cape seal with isolated dig out and repair sections and Ripon San Joaquin Denise/Baily Resurface Project Denise Drive, Baily Drive and surrounding areas 02/2021 05/2021 10 15 12 5 Rehabilitation striping Road Maintenance & River Road Overlay Project (17/18 Includes a grind and overlay on major arterial River Road for approximately 5,200 feet, Ripon San Joaquin River Road between Jack Tone Road and North Ripon Road 07/2018 10/2018 15 25 12 5 Rehabilitation Carryover) isolated dig out and repair sections and striping. Various Locations through 45- centerline miles, below is a sample of the 231 locations tht may be selected from: 1.) Alan Goldfien Ct - Kate Linde Ci To Cul-De-Sac 2.) Alee Ln - Gelley Wy To Squall Wy 100 Ft North 3.) Anastasia Ln - Mccook Wy To Cul-De-Sac 4.) Arthur Ct - Hydrangea Dr To Cul-De-Sac Road Maintenance & Includes multiple projects to provide approximately 45-centerline miles of slurry seal Stockton San Joaquin Local Street Resurfacing 5.) Asbury Wy - Wishon Dr To Cortina Ln 06/2019 07/2019 5 7 13 5 Rehabilitation resurfacing treatment. 6.) Bartlett Ct - Cottrell Ln To Cul-De-Sac 7.) Belvedere Av - Oak St To Flora St 228.) Wishon Dr - Britton Av To Asbury Wy 229.) Wood Ridge Ct - Green Ridge Dr To Cul-De-Sac 230.) Yutan Ln - Togninali Ln To Estrella Av 231.) Zitlau Ct - Klemeyer Ci To Cul-De-Sac

Various Locations: Assess Approximately 398 below is a sample for reference. 1.) 1500 SYCAMORE ST 2.) 1600 SYCAMORE ST 3.) 6022 FILLMORE AVE 4.) 2770 EL DORADO ST 5.) 1551 MAIN ST 6.) 1415 SPRING ST 7.) 1231 N PERSHING AVE Curb, Gutter, and Sidewalk Includes the removal and replacement of City tree-damaged curb, gutter, and sidewalk Stockton San Joaquin Safety 33.) 36 W POPLAR ST 08/2019 09/2019 40 50 13 5 Replacement at approximately 398 locations. 34.) 1350 W ROBINHOOD DR2290 E MARKET ST 194.) 117 E E ST 393.) 229 N AIRPORT WY 394.) W ROBINHOOD DR & N PERSHING AV 395.) 2816 CHAUNCY CI 396.) 6523 N EL DORADO ST 397.) 2011 S SACRAMENTO ST 398.) 2493 E PARK ST

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Various Locations Citywide: 1.) Aft Court – Urchin Street to End of Cul-de-sac; 2.) Anchor Place – Jonathen Street to End of Cul-de-sac; 3.) Bard Drive – Fresno Avenue to Washo Way; 4.) Bard Drive – Fresno Avenue to Longdon Drive; 5.) Barge Court – Kay Bridges Place to End of Cul-de-sac; 6.) Barnacle Court – Urchin Street to End of Cul-de-sac; 7.) Beech Avenue – Jasmine Avenue to Sumac Avenue; 8.) Birch Avenue – Rosewood Drive to Westland Avenue; 9.) Blossom Circle – Horsetail Drive to End of Cul-de-sac; 10.) Broadway Avenue – Eleanor Avenue to Main Street; 11.) Brookstone Avenue – Woodbury Lane to Cypress Hill Lane; 12.) Burney Falls Drive – Oxwell Drive to Longdon Drive; 13.) Buttonwillow Avenue – Westland Avenue to Rosewood Drive; 14.) Cedarwood Court – Timberwood Lane to End of Cul-de-sac; 15.) Crown Peak Lane – EWS Woods Boulevard to Brookstone Avenue; 16.) Cypress Hill Lane – Woodhollow Avenue to Brookstone Avenue; 17.) David Avenue – Main Street to End of Cul-de-sac; 18.) Dune Place – Jonathen Street to End of Cul-de-sac; This project includes resurfacing approximately 11 centerline miles of various local Road Maintenance & 2018 Slurry Seal Project (17/18 19.) Edgebrook Avenue – Wateford Avenue to Windsail Lane; Stockton San Joaquin (residential) streets in Stockton. The project includes slurry sealing, fog sealing, and 06/2018 08/2018 5 7 13 5 Rehabilitation Carryover) 20.) Fomosana Lane – Trident Street to End of Cul-de-sac; removal and replacement of pavement striping and markings. 21.) Formosan Lane – Horsetail Drive to Trident Street; 22.) Half Dome Court – Trident Street to End of Cul-de-sac; 23.) Horsetail Drive – Holman Road to Blossom Circle; 24.) Horsetail Drive – Formosana Lane to Holman Road; 25.) Jonathen Street – Stern Place to Anchor Place; 26.) Juniper Avenue – Peppertree Drive to Hammer Lane S. Frontage Road; 27.) Kay Bridges Place – Carolyn Weston Boulevard to Stern Place; 28.) Kyburz Court – Pajaro Way to End of Cul-de-sac; 29.) Longdon Drive – Burney Falls Drive to Platte Road; 30.) Manzanita Avenue – Westland Drive to Beech Avenue; 31.) Marciano Place – Dayton Herzog Lane to End; 32.) Netherton Avenue – Eleanor Avenue to Main Street; 33.) Ninth Street – Scribner Street to Airport Way; 34.) Old Spanish Drive – Oxwell Drive to Rouen Court; 35.) Ophir Street – Eighth Street to End of Cul-de-sac; 36.) Oxwell Drive – Platte Road to Rouen Court; 37.) Peat Way – Blossom Circle to Etcheverry Drive; 38.) Peppertree Drive – Meadow Avenue to Hammer Lane; 39.) Platte Road – Oxwell Drive to Longdon Drive;

Various Locations: Industrial Drive – Pock Lane to SR 99 Frontage Road; SR 99 Frontage Road – Approx. 800 LF North of Transworld Drive; SR 99 Frontage Road – Approx. 1,100 LF South of Transworld Drive; SR 99 Frontage Road – Approx. 1,000 LF North of Togninali Lane; SR 99 Frontage Road – Approx. 800 LF South of Togninali Lane; Zephyr Street – Approx. 700 LF West of Perlman Drive; Zephyr Street – Street Lights Re-Wiring Project This project will replace stolen wire for approximately 100 non-functional street lights at Approx. 1,100 LF East of Perlman Drive; Perlman Drive – Approx. 2,300 LF North of Zephyr Street; Stockton San Joaquin Safety 03/2018 07/2018 40 50 13 5 (17/18 Ongoing) various locations and includes securing pull boxes to prevent future vandalism. Producers Drive – Industrial Drive to Zephyr Street; Industrial Drive – 1,500 LF West of Gibraltar Court; Industrial Drive – 600 LF East of Gibraltar Court; Gibraltar Court – Entire Court; Zephyr Street – Airport Way to B Street; Arch Road – SR 99 Frontage Road to Logistics Drive; Giannecchini Lane – Arch-Airport Road to Boeing Way; Quantas Lane – Transworld Drive to Boeing Way; Transworld Drive – Quantas Lane to SR 99 Frontage Road.

This project will install Rectangular Rapid Flashing Beacons, upgrade existing Two Mid-block Locations on Center Street: Lighted Crosswalk Upgrades (17/18 Stockton San Joaquin Safety crosswalks/signs, and install frontage improvements at two uncontrolled crossing to 1.) Between Main Street and Weber Avenue (Parker's Alley); and 03/2019 09/2019 15 20 13 5 Carryover) increase pedestrian and bicycle safety at two locations. 2.) Between Weber Avenue and Miner Avenue (Channel Street).

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Various: #1520 Acacia St - Stockton Street to Baker Street #1521 Lincoln - Vine St to Rose St #1522 Rose St - Stockton Street to Baker Street #1523 Rose St - Edison St to Harrison St #1524 Vine St - Baker St to Edison St #1525 Stockton St - Willow St to Vine St #1526 Stockton St - Rose St to Magnolia St #1527 Magnolia St - Baker St to Edison St #1528 Baker St - Rose St to Magnolia St #1529 Swain Rd - Percival Way to Ector Way #1530 Swain Rd - Ector Way to Village Green Dr #1531 Village Green Dr - Swain Rd to Winslow Way #1532 Village Green Dr - Swain Rd to Homewood Ct/Dr #1533 Village Green Dr - Tristan Cir to Homewood Ct/Dr #1534 Village Green Dr - Tristan Cir to Tristan Cir #1535 Winslow Wy - Lorraine Way to Village Green Dr #1536 Winslow Wy - Lorraine Way to Village Green Dr This project will install traffic calming measures such as speed humps, speed cushions, #1537 Ector Wy - Swain Rd to Homewood Ct/Dr Neighborhood Traffic Management traffic circles, etc. in 8 neighborhoods. The project will develop and construct traffic #1538 Ector Wy - Swain Rd to Homewood Ct/Dr Stockton San Joaquin Traffic Control Devices 07/2018 11/2019 15 20 13 5 Program (17/18 Carryover) calming plans that offer viable solutions to each neighborhood's specific traffic safety #1539 Percival Wy - Percival Ct to Homewood Ct/Dr concerns. #1540 Homewood Dr - Percival Way to Village Green Dr #1541 Tristan Ci - Village Green Dr to Village Green Dr #1542 Tristan Ci - Village Green Dr to Village Green Dr #1543 River Oaks Drive - River Park Cir to River View Cir #1544 River Oaks Drive - Whistler Way to AG Spanos Blvd #1545 River Bluff Lane - Whistler Way to Creek Trail Cir #1546 Eagle Rock Circle - Whistler Way to Whistler Way #1547 Eagle Rock Circle - Whistler Way to Whistler Way #1548 Creek Trail Court - River Bluff Lane to River Bluff Lane #1549 River Park Cir - River Oaks Dr to River Oaks Dr #1550 Laurel St - Sonora St to Marsh St #1551 Laurel St - Marsh St to Church St #1552 Marsh St - Laurel St to Ash St #1553 Sonora St - Laurel St to B St #1554 Sonora St - Laurel St to Ash St #1555 Ash St - Sonora St to Marsh St #1556 Ash St - Marsh St to Church St #1557 Ash St - Church St to Hazelton Av #1558 Church St - Laurel St to Ash St 11th Street From Tracy Blvd to Central (Overlay); 12th Street From Holly Dr. to Adams St. (Overlay); Arbor Rd From MacArthur to Holly Dr. (Overlay); Bessie Ave. From Carlton Ave. to Grant Line Rd. (Overlay); Beverly From Lincoln Blvd to Schleiger Dr. (Overlay); Eaton From Holly Dr. to East St. (Micro-surface); Eaton From Richard Dr. to Tracy Blvd (Micro-surface); Eaton From Tracy Blvd to Holly Dr. (Micro-surface); El Portal From 11th St. to 100' N of Highland (Overlay); Grant Line Rd From Lincoln to N. Tracy Blvd (Overlay); Highland Ave. From Bessie Ave. to El Portal (Overlay); Due to modest damage to the existing pavement structure, micro-surfaces and overlays Road Maintenance & Street Patch & Overlay Project FY Highland Ave. From Holly Dr. to El Portal (Overlay); Tracy San Joaquin will be applied. A total of 248,464 square feet of micro-surface and 1,165,391 square 11/2018 01/2020 7 15 13 5 Rehabilitation 2018-19 Hollywood From Holly Dr. to East St. (Overlay); feet of overlay will be applied. Lincoln Blvd From Lowell Ave. to 195' S of Beverly (Overlay); Lincoln Blvd From 195' S of Beverly to 11th St. (Overlay); Lowell Ave. From Corral Hollow to Regency (Overlay); Paradise Bridge From City Limits to Pescadero (Overlay); Rehn Rd. From McDermott Dr. to Pavement Change (Overlay); Schulte Rd From Tracy Blvd to 530' W/O Central Ave. (Overlay); Schulte Rd From 530' W/O Central Ave. to Central (Overlay); W. Beverly From Bessie Ave. to Parker Ave. (Overlay); W. Beverly From W. Lowell Ave. to Wall St. (Overlay); Walnut From 11th St. to Highland Ave. (Overlay); Whittier Ave. From Holly Dr. to East St. (Micro-surface)

To create a link between Kimball High School and the Redbridge neighborhood and Complete Streets Tracy San Joaquin Lammers Road Sidewalk provide a safe walking route to school for students, 4,100 linear feet of sidewalk will be On the East side of Lammers Road From Schulte Road to Kimball High School 11/2018 01/2020 10 15 13 5 Components installed. Road Maintenance & MacArthur Drive Overlay (17/18 Due to modest damage to the existing pavement structure, a 284,000 square foot Tracy San Joaquin MacArthur Drive From Grant Line Road to I-205 06/2018 11/2018 10 15 13 5 Rehabilitation Carryover Project) overlay will be applied. Road Maintenance & Arroyo Grande San Luis Obispo James Way Repairs Pavement repairs consisting of digouts on James Way prior to overlay James Way from Oak Park Boulevard to Tally Ho Road 08/2018 06/2019 10 10 35 17 Rehabilitation

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Major pavement rehabilitation for approximately 0.78 miles of arterial roadway to improve deteriorated pavement conditions and better define roadway configuration for all roadway users, including motorists, bicyclists, and pedestrians. This roadway Road Maintenance & El Camino Real Rehabilitation - Atascadero San Luis Obispo section is heavily used and the City receives numerous complaints regarding its El Camino Real from San Anselmo Road (East) to San Benito Road 06/2018 12/2018 15 25 35 17 Rehabilitation North 17/18 Carryover Project condition and inquiries of when it will be replaced. Project will include constructing approximately 250 feet of a “missing link” section of sidewalk on the west side to provide better pedestrian connectivity along the corridor.

INSTALL AND ENHANCED PEDESTRIAN CROSSINGS AT 2 LOCATIONS BY 13TH STREET PEDESTRIAN PROVIDING PED BUTTON ACTIVATED FLASHING SIGNS, ENHANCED PAINTED El Paso de Robles San Luis Obispo Safety 13TH STREET PINE TO PARK 06/2018 08/2018 10 20 33 15 IMPROVEMENTS CROSSWALKS AND ADDITIONAL STREET LIGHTS. ALSO INCLUDES ROAD MAINTENANCE AND REHABILITATION Road Maintenance & DIG-OUT REPAIRS AT PASO El Paso de Robles San Luis Obispo DIG-OUT REPAIRS AT LOCALIZED LOCATIONS WHERE PAVEMENT HAS FAILED PASO ROBLES STREET NORTHBOUND OFF RAMP AT HWY 101 TO 13TH STREET. 06/2018 08/2018 10 12 33 15 Rehabilitation ROBLES STREET Road Maintenance & DIG-OUT REPAIRS AT NIBLICK El Paso de Robles San Luis Obispo DIG-OUT REPAIRS WHERE PAVING HAS FAILED AT NIBLICK ROAD BY NICKLAUS NIBLICK ROAD AT NICKLAUS 07/2018 09/2018 10 15 33 15 Rehabilitation ROAD AT NICKLAUS REPAIR DETERIORATED ROAD SURFACE, REMOVE AND REPLACE CURB Road Maintenance & SHERWOOD ROAD REPAIRS-- RAMPS TO MEET CURRENT ADA STANDARDS, INSTALL STREETLIGHTS, El Paso de Robles San Luis Obispo SHERWOOD ROAD--FONTANA TO CRESTON ROAD 04/2018 05/2018 10 15 33 15 Rehabilitation FONTANA TO CRESTON INSTALL NEW TRAFFIC SIGNAL, INSTALL LANDSCAPING AND IRRIGATION, UPGRADE AND UPSIZE OLD SEWER MAINS. The City Council of the City of Grover Beach has, through a public process, identified street rehabilitation as a top priority. The Council adopted a Capital Improvement Program in accordance with these identified priorities that includes the selected project. Road Maintenance & CIP 2283 Major Street Maintenance Grover Beach San Luis Obispo The selected project will include elements to improve bicycle and pedestrian safety, and S. Oak Park Blvd, El Camino Real, 4th Street, Farroll, Grand Ave and The Pike 08/2018 05/2019 15 20 35 17 Rehabilitation Program 17/18 Carryover improved pavement conditions will reduce travel times which leads to reduced vehicle emissions helping the State achieve its air quality and greenhouse gas emissions reductions goals. Road Maintenance & CIP 2283 Major Street Maintenance Rehabilitate local major streets to improve driver and pedestrian safety and meet the Grover Beach San Luis Obispo Oak Park Blvd, West Grand Avenue, N 4th Street, El Camino Real, Farroll Rd, The Pike 08/2018 09/2023 15 20 35 17 Rehabilitation Program City's Circulation Plan. Pavement maintenance of portions of streets and avenues listed in the "Project Location" section using funding from SB1 and Local sources. Maintenance techniques Segments of the following streets and avenues: Barlow, Beachcomber, Coral, Juniper, Little Morro Ck Road Maintenance & Streets Pavement Preservation- include Triple Layer Cape Seal, Cape Seal, Chip Seal and Type II Microsurfacing. Morro Bay San Luis Obispo Rd, Main, Morro, Morro Bay Alley, Panay, Preston, Tahiti, 09/2018 04/2019 6 10 35 17 Rehabilitation FY18_19 Striping , Signage and required perimeter improvements are also included. Estimated Tide, Vashon, Verdon and West $191,000 provided through SB1 with $357,619.40 from local option sales tax and CalRecycle grant. Streetscape project resurfacing an existing road, providing separate bike/pedestrian Complete Streets Pismo Beach San Luis Obispo Shell Beach Streetscape lane, bulbouts, landscaping, street furniture, LID features, LED lights, bulbouts, Shell Beach Road, Pismo Beach, CA 93449 12/2017 09/2019 20 50 35 17 Components improved pedestrian safety, increased crosswalks The existing sidewalk is wood and has protruding screws and warped, rotted, and splintered boards. The project will replace the wood sidewalk with a concrete paver Complete Streets San Luis Obispo San Luis Obispo Concrete Paver Sidewalk sidewalk that will eliminate the trip and fall hazards, provide a context appropriate Santa Barbara Street from Broad Street to Leff Street. 05/2018 12/2018 50 75 35 17 Components sidewalk, reduce long-term maintenance costs and provide access to community members of all abilities.

The Broad Street Bike Boulevard connects Pacheco Elementary School to the neighborhood south of Foothill Boulevard by constructing a Class I bike path between Foothill and Ramona and installing a bicycle and pedestrian crossing at Foothill and Complete Streets Broad Street Bike Boulevard (17/18 Ferrini. This project is the first phase of a larger effort to provide a safe, low-stress route San Luis Obispo San Luis Obispo Broad Street between Foothill Boulevard and Ramona Street. 05/2018 10/2019 20 50 35 17 Components Carryover) for bicyclists and pedestrians connecting the downtown core to the school, neighborhoods and shopping north of Foothill Boulevard. The estimated cost of this Phase I work is $900,000. The project is anticipated to start construction in early 2019.

The El Capitan Bridge connects El Capitan Way neighborhood to the Fuller Road / Poinsettia Street / French Park neighborhood via a trail. Several years ago, a large tree Complete Streets San Luis Obispo San Luis Obispo El Capitan Bridge fell on the El Capitan Bridge catastrophically damaging the bridge. This project will El Capitan Way 05/2018 06/2019 100 100 35 17 Components replace the existing bridge with a new bridge. The estimated cost of this work is $100,000. The project is anticipated to start construction in fall 2018.

The work to be completed includes removal and replacement of approximately 2 inches Patricia Drive – Between Serrano Drive and Austin Avenue of asphalt concrete pavement on various streets. Once milling has been completed, the Road Maintenance & Serrano Drive – (1) Between Selby Lane and Robleda Drive Atherton San Mateo 2019 Street Overlay Project contractor and the Town's project engineer shall identify any pavement failures for 06/2019 12/2019 7 10 24 13 Rehabilitation (2) Between Robleda Drive and Stockbridge Avenue repairs. Repave the entire street with a self-propelled paver & finish per Town Heather Drive - Between Linden Avenue and James Avenue Standard Specifications. Patricia Drive - Between Serrano Drive and Austin Avenue Road Maintenance & Atherton San Mateo Street Overlay (17/18 Carryover) Grind 2" and overlay Serrano Drive Section 1 - Between Selby Lane and Robleda Drive 06/2019 12/2019 15 20 24 13 Rehabilitation Serrano Drive Section 2 - Between Robleda Drive and Stockbridge Avenue

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Alta Visa Drive - Between Ridgeview Drive and Fletcher Drive Arthur Lane - Between Selby Lane to end of cul-de-sac Austin Avenue - Between Selby Lane and Stockbridge Avenue Barry Lane - Between E/O 34 Barry Lane to South End Bergessen Court - Between Stockbridge Avenue to end of cul-de-sac Betty Lane - Between Polhemus Avenue to end of cul -de-sac Camino Por Los Arboles - Between Camino al Lago and Camino de Los Robles Catalpa Drive - Between Irving Avenue and James Avenue Clay Drive - Between Atherton Avenue to end of cul-de-sac Elizabeth Way - Between Shearer Drive to end of cul-de-sac Greenoaks Drive - Between Oak Grove Avenue to Rosewood Drive Heritage Court - Between Middlefield Road to end of cul-de-sac Irving Avenue - Between Heather Drive to end of cul-de-sac Jennings Lane Section 1 - Between Middlefield Road to end of cul -de-sac Road Maintenance & Atherton San Mateo Street Slurry Seal (17/18 Ongoing) Slurry Seal and Restripe Existing Roadways Jennings Lane Section 2 - Between Jennings Lane to end of cul-de-sac 05/2018 10/2018 3 5 24 13 Rehabilitation Mandarin Way - Between Alameda de Las Pulgas to end of cul -de-sac McCormick Lane - Between cut-de-sac and Watkins Avenue Middle Gate - Between Almendral Avenue and Park Drive Mosswood Avenue - Between Greenoaks Drive to end of cul-de-sac North Gate - Between Almendral Avenue and Park Drive Parker Avenue- Between Stockbridge Avenue to end of cul-de-sac Prado Secoya - Between Elena Avenue and end of cul-de-sac Polhemus Avenue Between Polhemus Avenue and end of cul-de-sac Ridgeview Drive - Between Alta Vista Drive and end of cul-de-sac Selby Lane - Between E/O 241 Selby Lane to North End of cul-sac Snowden Avenue - Between Wilburn Avenue and Belleau Avenue South Gate - Between Almendral Avenue and Park Drive Stockbridge Avenue -Between Stockbridge Avenue to end of cul-de-sac Surrey Lane - Between Middlefield Road to end of cul dle-sac

Road Maintenance & Belbrook Way - Between Walsh Road to end of cul-de-sac Atherton San Mateo Street Slurry Seal (17/18 Carryover Slurry Seal and Restripe Existing Roadways 06/2019 12/2019 3 5 24 13 Rehabilitation Mesa Court - Between Ridgeview Drive to end of cul-de-sac

The project will provide for the preparation of contract documents and the construction Various streets in Belmont, CA including the following: Belle Monte Ave. from Notre Dame Ave. to costs for the mill and overlay of the following streets for FY 18/19: Belle Monte Ave. Road Maintenance & Alameda de las Pulgas, Ponce Ave. from Prindle Road to Cipriani Blvd., San Ardo Way from Monte Belmont San Mateo 2019 Mill & Overlay from Notre Dame Ave. to Alameda de las Pulgas, Ponce Ave. from Prindle Road to 05/2019 09/2019 10 15 22 13 Rehabilitation Cresta Dr. to Barclay Way, Coronet Blvd., from Prindle Rd. to Ralston Ave., and Lincoln Ave. from Cipriani Blvd., San Ardo Way from Monte Cresta Dr. to Barclay Way, Coronet Blvd., Newlands Ave. to Cipriani Blvd. from Prindle Rd. to Ralston Ave., and Lincoln Ave. from Newlands Ave. to Cipriani Blvd.

The project will provide for the preparation of contract documents and the construction costs for the slurry seal of the following streets: North Road from Hillman Avenue to Notre Dame Avenue North Road from Hillman Avenue to Notre Dame Avenue, Ralston Ranch Road from Ralston Ranch Road from Christian Drive to Ralston Avenue Road Maintenance & RMRA Street Project (17/18 Christian Drive to Ralston Avenue, Mountain View Avenue from Hiller Street to Old Mountain View Avenue from Hiller Street to Old County Road Belmont San Mateo 05/2018 09/2018 3 7 22 13 Rehabilitation Ongoing) County Road, Coronet Boulevard from Casa Bona Avenue to Lyon Avenue, Hasting Coronet Boulevard from Casa Bona Avenue to Lyon Avenue Drive from Carlmont Avenue to San Carlos City Limits, Kedith Avenue from Ralston Hasting Drive from Carlmont Avenue to San Carlos City Limits Avenue to O'Neill Avenue Kedith Avenue from Ralston Avenue to O'Neill Avenue

Bayshore Boulevard from 650’ south of Old County Road to Geneva Avenue, Cypress Lane from Valley Drive to end, Main Street from Bayshore Boulevard to city limit, San Benito Road from Sierra Point to Glen Parkway, Silverspot from Golden Aster to Lily Court, Glen Parkway from Humboldt to Road Maintenance & Brisbane San Mateo Crack Seal of Various City Streets A citywide crack seal of various city streets. Lake Street, Humboldt Road from Placer Way to Kings Road., Monterey Street from Solano to 05/2019 09/2019 2 2 22 13 Rehabilitation Visitacion Avenue, Solano Street from Monterey to Mendocino, Visitacion Avenue from Alvarado to Klamath, Guadalupe Canyon Parkway (north side) from city limits to Bayshore Boulevard and Valley Drive from Bayshore Boulevard to West Hill Drive.

The work consists of street base failure repair and resurfacing on various streets within The project streets include Albemarle Way, Alvarado Avenue, Benito Avenue, Castillo Avenue, Road Maintenance & 2018 and 2019 Street Resurfacing the city limit. Construction activities will include asphalt concrete “dig-out” repairs, Channing Road, Clarendon Road, Columbus Avenue, Corbitt Drive, Davis Drive, De Soto Avenue, Burlingame San Mateo 07/2019 12/2019 24 30 22 13 Rehabilitation Project surface milling, asphalt concrete overlay, traffic markings, new concrete and other Hillside Circle, Maple Avenue, Montero Avenue, Murchinson Drive, Park Avenue, Sequoia Avenue related work. and Winchester Place.

The project consists of street base failure repair and resurfacing on various streets Road Maintenance & 2018 Street Resurfacing Project within the City limits. Several different types of activities will be used including asphalt Burlingame San Mateo City of Burlingame on California Drive, Trousdale, Cadalliac Way and Broadway 12/2018 12/2019 10 24 22 13 Rehabilitation 17/18 Ongoing concrete "dig-out" repairs, asphalt concrete overlay, street reconstruction, surface milling, traffic markings, traffic control, concrete base repair and related works.

Implementation of bicycle and pedestrian safety related improvements. The project scope includes: relocation and reconstruction of the existing curb, gutter, sidewalk, driveway approaches and non-ADA compliant ramps; addition of new continuous Complete Streets Mission Road Bike/Pedestrian Colma San Mateo sidewalk; extension of Class II bicycle lanes with green pavement markings; Mission Road, between El Camino Real and Lawndale Boulevard, Colma. 10/2018 10/2020 10 20 19 11 Components Improvements construction of stormwater curb extension with bioretention/infiltration basins for stormwater treatment and high visibility crosswalks with rectangular rapid flashing beacons; installation of speed feedback signs and energy efficient street lights.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Abbot Ave., Acton St., Alexander Ave., Alp Ave., Atlanta St., Bellevue Ave., Beta Ave., Bismarck St., Blossom Ct., Bonnie St., Brunswick Ct., Brunswick St., Castle St., Chelsea Ct., Clayton Ct., Cobblestone Ct., Como Ave., Cottonwood Dr., County St., Craig Ct., Crocker Ave., Deanne Ln., E. Cavour St., East Market St., East Moltke St., East Vista Ave., Eastlake Ave., Edgemar St., Edgewood Ct., Evergreen Ave., First Ave., Fisher St., Florence St., Ford St., Frankfort St., Gambetta St., Road Maintenance & 2018-19 Crocker/Hillside Street Application of latex-modified asphalt slurry seal on selected streets citywide per the 7- Daly City San Mateo Garibaldi St., Garwood Dr., Guadalupe Pkwy, Guttenberg St., Hanover St., Hillside Blvd., Irvington St., 01/2019 07/2019 5 8 19 11 Rehabilitation Slurry Seal year Street Slurry Seal Master Plan. Lausanne Ave., Lisbon St., Linden St., Lowell St., Mar Vista Dr., Marshall Way, Muirwood Dr., Oliver St., Orange Ct., Parma St., Partridge Ln., Paul St., Peoria St., Peter St., Price St., Risel Ave., Roosevelt Ave., Royce Way, Second Ave., Sylvan St., Tallwood Dr., Templeton Ave., Templeton Ave., Teresa St., Thiers St., Third Ave., Valley St., Villa St., Wellington Ave., Whittier St., Winchester St., Wyandotte Ave.

Alta Loma Ave., Belhaven Ave., Belhaven Ct., Buena Vista Ave., Campana Ave., Carleton Ave., Castillejo Dr., Cerro Ct., Cerro Dr., Clarinada Ave., Del Prado Dr., Eastmoor Ave., Edgemont Dr., El Dorado Dr., Escuela Dr.,Glenbrook Ave., Grandview Ave., Higate Dr., Huntington Dr. , Lakeshire Dr., Road Maintenance & St. Francis Heights Street Slurry Application of latex-modified asphalt slurry seal on selected streets citywide per the 7- Larkspur Ave., Lincoln Ave., Mariposa Ave., Mayfield Ave., Midvale Dr., Monterey Dr., Northaven Dr., Daly City San Mateo 01/2018 07/2018 5 8 19 11 Rehabilitation Seal year Street Slurry Seal Master Plan. Olcese Ct., Pamela Ct., Portola Ave., Ridgefield Ave.,Rockridge Ave., San Fernando Way, San Miguel Ave., Santa Elena Ave., Santa Paula Dr., Santa Rita Ave., Savage Way, Shelbourne Ave., Southdale Ave., St. Catherine Dr., St. Francis Blvd, St. James Ct., St. Marks Ct., St. Michaels Ct.,Verano Dr., Woodland Ave., Woodside Ave., Zita Manor

The Bay Road project will include street repaving; bicycle and pedestrian Complete Streets East Palo Alto San Mateo ST-05A Bay Road Improvements improvements; landscaping improvements; and replacement of storm drain and water 0.7 miles of Bay Road from Clarke Avenue to Cooley Landing 12/2018 01/2020 20 40 24 13 Components trunk lines. Road Maintenance & ST-08 University Ave Resurfacing & This project provides for pavement resurfacing, restriping, upgrading of traffic signals East Palo Alto San Mateo University Avenue from Woodland Avenue to Notre Dame Avenue 06/2020 12/2022 5 40 24 13 Rehabilitation Signal Upgrade and various other improvements on University Avenue. ST-09 Bicycle & Pedestrian This project is for the installation of street improvements to enhance vehicular, University Avenue , Pulgas Avenue, Clarke Avenue, Cooley Avenue, Bay Road, Newbridge Ave, East East Palo Alto San Mateo Safety 12/2018 12/2019 5 40 24 13 Improvements pedestrian and bicycle safety throughout the City. Bayshore Rd, West Bayshore Rd ,Woodland Avenue, Donohoe St., Weeks Street This project provides for the planning and construction of speed bumps, bulb-outs and Pulgas Avenue, Clarke Avenue, Cooley Avenue, Bay Road, East Bayshore Rd, West Bayshore Rd, East Palo Alto San Mateo Traffic Control Devices ST-12 Traffic Calming Program other traffic calming devices to reduce speed through residential zones and to increase 08/2019 12/2022 20 40 24 13 Woodland Avenue, Weeks Street, Runnymede St safety.

This project will provide for the widening of the University Avenue/US 101 overpass to Complete Streets ST-14 University Avenue provide safer pedestrian and bicycle travel and more efficient vehicle travel. The East Palo Alto San Mateo University Avenue from Woodland Avenue to Donohoe Street 06/2020 12/2021 20 40 24 13 Components Interchange project will include the widening of the overpass bridge and construction of a new diagonal off-ramp from southbound (SB) 101 onto SB University Avenue

This project is to develop a new loop road around the north and east of the University Complete Streets Loop Road (new) - north and east of the University Village neighborhood that will connect University East Palo Alto San Mateo ST-17 New Loop Road Village neighborhood that will connect University Avenue to the Ravenswood Business 09/2018 12/2027 20 40 24 13 Components Avenue to the Ravenswood Business District (RBD) District (RBD) and include a Class I bicycle and pedestrian trail.

ST-19 Runnymede/ University East Palo Alto San Mateo Traffic Control Devices Upgrading of traffic signals and various other improvements Runnymede/University Avenue 12/2020 12/2021 10 20 24 13 Avenue Signal

Gaillardia Way, (Azalia Drive - Pulgas Ave), Gardenia Way, (Azalia Drive - Verbena Drive), Lotus Way , (Cul-De-Sac - Wisteria Drive), Aster Way, (Wisteria Drive - Daphne Way), Verbena Drive (Camellia Drive - Cul-De-Sac), Notre Dame Ave (University Ave - Fordham Street), Georgetown St (Tulane Ave - Road Maintenance & ST-07 Street Resurfacing Program - This project provides for the resurfacing of City streets during the ten-year life of the East Palo Alto San Mateo Purdue Ave), Hunter Street (Purdue Ave - Georgetown Street), Purdue Ave (University Ave - Fordham 09/2018 06/2019 20 40 24 13 Rehabilitation Annual Project 2018-19 CIP. Roughly $1,000,000 needs to be expended annually on street resurfacing. Street), Ralmar Ave (Green Street - Donohoe Street), Ralmar Ave (Green Street - Cul-De-Sac), Donohoe Street (Menalto Ave - West Bayshore Road), Michigan Ave (University Ave - Illinois Street), Bell Street (University Ave Cooley Ave)

Road Maintenance & ST-13 Major Street Reconstruction - This project provides for the reconstruction of damaged City streets during the ten-year East Palo Alto San Mateo Runnymede Street, Bay Road, Woodland Avenue 12/2018 06/2019 20 40 24 13 Rehabilitation Annual Project 2018-19 life of the CIP

Street rehabilitation including localized asphalt concrete repairs, surface overlays, and Road Maintenance & Street Rehabilitation - OBAG2 (2018- installation of bicycle route sharrow symbols, legends, and signage. The project also East Hillsdale Boulevard from the Rainbow Bridge to Gull Avenue, and Edgewater Boulevard from Foster City San Mateo 06/2019 09/2019 10 20 22 13 Rehabilitation 2019) includes ADA ramp upgrades, and curb and gutter and sidewalk repairs as necessary, Beach Park Boulevard to East Hillsdale Avenue. and pedestrian crosswalk improvements. Road Maintenance & Annual Pavement Rehabilitation Project consists of pavement grinding, base repair, asphalt overlay, thermoplastic traffic Foster City San Mateo East Hillsdale Boulevard and Beach Park Boulevard 04/2018 07/2018 15 20 22 13 Rehabilitation Project striping and pavement markings, and new access.

The project will look to reconstruct and preserve pavement throughout the City. Road Maintenance & Pavement Management & Traffic Belleville Boulevard neighborhood, Poplar Street, Downtown Half Moon Bay, with potential others Half Moon Bay San Mateo Specifically for FY 18-19, the project will look at reconstruction of approximately 1 miles 03/2019 02/2020 15 30 24 13 Rehabilitation Safety Program based on available funding. of pavement, reconstruct 6 ADA ramps, and other related improvements.

Church Street - Mill Street to northerly cul-de-sac; Magnolia Street - Main Street to westerly terminus at The project will look to reconstruct and preserve pavement throughout the City. Road Maintenance & Pavement Management & Traffic Highway 1; Naples Avenue - Roosevelt Boulevard to southerly terminus; Railroad Avenue - Grove Half Moon Bay San Mateo Specifically for FY 17-18, the project will look at reconstruction of approximately 1 mile 05/2018 10/2018 15 30 24 13 Rehabilitation Safety Program (17/18 Carryover) Street to Metzgar Street; Miramontes Point Road - Canada Cove entrance to Highway 1; Kelly Avenue - of pavement, reconstruct a dozen ADA ramps, and other related improvements. San Benito Street to easterly terminus; San Benito Street - Miramontes Street to end

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

The 2019 Street Resurfacing Project consists of street resurfacing and rehabilitation work for approximately 53 miles of rubberized asphalt overlay, asphalt overlay, cape seal, microsurfacing, and crack sealing. The primary factor for choosing the roadway segments included for rehabilitation is the Pavement Condition Index (PCI) of each roadway. PCI is a measure of a street's condition derived through field inspections that utilize scoring criteria developed by the Metropolitan Transportation Commission's (MTC) pavement management program. Field inspections were conducted in fall of 2018, and the roads with the lowest PCI rating were included in this project and will increase the Town's overall PCI. The improvement of the PCI will help to eliminate the need for vehicles to slow, swerve, or stop suddenly to avoid hazardous road conditions. Properly maintained streets also help to improve traffic flow and assist in preventing Road Maintenance & congestion, slow traffic, and generally unsafe driving conditions. The Town plans to Selected streets are located in various areas within the Town’s limit. Detailed locations of each street Hillsborough San Mateo 2019 Street Resurfacing Project 05/2019 09/2019 4 30 22 13 Rehabilitation continue to utilize ,where appropriate, recycled Rubberized Asphalt Concrete (RAC) to are summarized in the project list attached. help reduce the accumulation of disposed tires occupying landfills in the State of California. The RAC also provides a smoother and quieter roadway surface than conventional asphalt and offers a better platform for outdoor activities such as cyclying and running, which in turn promotes the overall health of the community. Location of the Project: Selected streets are located in various areas within the Town's limit. Detailed locations of each street are summarized in Appendix A. Schedule of Completion: The project is expected to complete by September 2019. Estimated Useful Life: Current life expectancies of proposed streets are shown in Appendix A. Resurfacing and rehabilitation work will extend life expectancy of the these streets as shown below: 2" Mill and AC Overlay - 20 to 30 years 2" RAC Overly - 8 to 15 years 2" AC Overlay - 8 to 15 years Cape Seal - 6 to 8 years Microsurfacing - 4 to 6 years

Item Street Name Begin Cross Street End Cross Street 1 Alder Pl Seminary Dr End of Place 2 Almanor Av Hamilton Av Terminal St 3 Atkinson Ln Santa Cruz Av Atkinson Ln (end) 4 Barton Pl Barton Wy End of Place 5 Barton Wy Concord Dr Gilbert Av 6 Bay Laurel Dr Olive St Amber Wy 7 Brady Pl Seminary Dr End of Place 8 Concord Dr Woodland Av Marmona Dr 9 Cornell Rd Creek Rd Cambridge Av 10 Eastcreek Dr Alma St Willow Rd 11 Elmwood Pl Hanna Wy End of Place 12 Garwood Wy Encinal Av 420' S of Encinal Av 13 Ginger St Hamilton Av Sandlewood St 14 Gloria Cir Seminary Dr End of Circle 15 Hanna Wy Seminary Dr End of Way 16 Haven Av Pave change (bend) Haven Ct 17 Haven Ct Haven Av End of Court 18 Hazel St Hamilton Av Sandlewood St Biennial project to rehabilitate streets throughout the City. City’s Pavement Road Maintenance & 2018 Street Preventive Maintenance 19 Henderson Av Bay Rd Van Buren Rd Menlo Park San Mateo Management Program assesses the condition of existing streets and assists in the 06/2018 11/2018 5 7 24 13 Rehabilitation Project 20 Hollyburne Av Pierce Rd Newbridge St selection process. 21 Linfield Dr Waverly St Middlefield Rd 22 Market Pl Alpine Av Del Norte Av 23 Marmona Ct Marmona Dr End of Court 24 Modoc Av Hamilton Av Terminal St 25 Oakdell Dr Olive St Lemon Av 26 Oakland Av Bay Rd Van Buren Rd 27 Pepperwood Ct Seminary Dr End of Court 28 Poppy Av Evergreen St Magnolia St 29 Princeton Rd Creek Dr College Av 30 Riordan Pl Hanna Wy End of Place 31 Riordan Pl Coleman Wy Riordan Pl 32 Robin Wy Marmona Dr Lexington Dr 33 Sandlewood St 57' E of Chilco Av 145' E of Ginger St 34 Santa Monica Av Coleman Wy San Luis Dr 35 Saxon Wy Windsor Dr End of Way 36 Seminary Dr Middlefield Rd Alder Pl 37 Seminary Dr Alder Pl Monica Av 38 Sonoma Pl Sonoma Av Van Buren Rd 39 Stone Pine Ln El Camino Real 200' NE of El Camino Real Project involves upgrading and/or replacing approximately 60 year old electrical Chrysler Stormwater Pump Station Menlo Park San Mateo Safety equipment and pumps at the Chrysler Pump Station to reduce potential flooding of 1221 Chrysler Drive, Menlo Park CA 94025 08/2019 11/2024 20 50 24 13 Improvements (17/18 Carryover) adjacent travel ways.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Live Oak Av and El Camino Real At the Northwest Intersection Nealon Park alley: 831 Roble Av Jack Lyle Park: 570 Fremont Av 15 Biltmore Ln Near Hallmark Circle At or near 1155 Trinity Dr Intersection of Pope & Elm Streets Start of Willow Rd and Bay Rd Front of 4000 Bohannon Dr Laurel St (Between Cherry Av and Ravenswood Av). In front of 1064 Laurel St South side of Laurel St (Between Encinal Av and Laurel Pl) In front of 1555 Laurel St Middlefield Rd (Crosswalk at Linfield Av ) Encinal Av at the intersection with Laurel St Ravenswood Av (Between El Camino Real and RR tracks) Market Pl Park from Plumas Av On-Call Asphalt and Concrete Annual project to improve the timeliness of street repairs that ensure the safety of Menlo Park San Mateo Safety "Community Garden" Next to 1320 Hill Av 05/2018 11/2019 12 15 24 13 Repair Services pedestrians and roadway users. Santa Cruz Av (Downtown) between University Dr and El Camino Real Santa Cruz Av Near the Intersections of Orange Av and Avy Av Ravenswood Av (Several East of Tracks to Marcussen Dr)-West bound lane only Willow Rd (Clover Ln. Fire service crossing pavement settled ) Laurel Av (end of road Near HWY 101 Caltrans sound wall) Intersection of Fanita Wy and Oakdale Dr Menalto Av East from Walnut St-[Pothole repairs at various locations] Glenwood Ave. both East and West side of tracks-[From tracks to El Camino Real]" Intersection of El Camino Real and Creek Dr At Intersection of Hillview Pl and Hillview Dr Close to Belle Haven School across from 1331 Alamanor Av The listed work locations provided above is subject to change due to available funding and may only be partially accomplished on a per year basis

1. Belle Haven: Bounded by Willow on the East; Southern Pacific Railroad on the North; and by Pierce Road on the West. Total of 10 locations. 2. Suburban Park/Lorelei Manor Flood Triangle: Bounded by Van Buren Road on the North East, Bay Road on the South and Marsh Road on the West. Total of 20 locations. 3. The Willows: Bounded by Willow Road on the North West, by Middlefield on the South, Highway 101 on the North and the City Limit line on the North east and South East. Total of 15 locations. 4. Linfield Oaks: Bounded by Middlefield Road on the North, by Alma Street on the South, by Ravenswood Ave on the West, and by San Francisquito Creek/the City Limits on the East. Total of 18 locations. 5. West Menlo: Bounded by Valparaiso on the West, University Drive on the North, and San Francisquito Creek/City Limits on the South. Total of 30 locations. 6. Central Menlo: Bounded by the City Limit on the North, by Alma Street and Caltrain Right of Way Multi-year Sidewalk Repair Program on the South, and Ravenswood on the East. Total 10 locations. Project to eliminate sidewalk tripping hazards caused by City tree root damage at listed Menlo Park San Mateo Safety Replacement of speed humps 7. Park Forrest; Bounded by El Camino Real, and Noel Drive on the South, on the North by the City 05/2018 11/2019 25 30 24 13 City Neighborhood (17/18 Carryover) Limits and Caltrain Right of Way, and by Ravenswood on the East. Total of 5 locations. 8. Downtown: Bounded by El Camino Real on the North, by Valparaiso Avenue on the West, by University Drive on the South, and by Middle Avenue on the East. Total of 15 locations. 9. Stanford Heights: Bounded by the City Limits/Alameda de Las Pulgas on the North, by Sand Hill Road, Alamida de Las Pulgas, and City Limits on the South, by the City Limits on the West. Total of 20 locations. 10. Stanford Hills: Bounded by Branner Drive and The City Limits on the West, Junipero Serra and mindering the City Limits on the East, by Sand Hill Road and the City Limits on the North. Total of 8 locations.

The above listed locations may be subject to change due to unforeseen circumstances during planning and construction

Replacement of 4 speed humps along North Lemon Avenue between Santa Cruz Avenue and Multi-year Transportation Projects Valparaiso Ave; Replacement of 2 speed tables on Monte Rosa Drive, between Siskiyou Drive and Menlo Park San Mateo Safety Replacement of Speed Humps Annual project to replace speed humps. 05/2018 11/2019 10 30 24 13 Sand Hill Drive; Replace 2 speed humps on Carlton Avenue between Abby Drive and Hamilton (17/18 Carryover) Avenue. Miti-Year Transportation Project Crane Street 50 feet South of Valparaiso Avenue; Interception of Santa Cruz Avenue and Johnson Menlo Park San Mateo Safety Flashing Beacons System (17/18 Installation of Rapid Rectangular Flashing Beacon Systems (RRFB) Street; Interception of Ravenswood Avenue and Alma Street; Oak Grove Avenue, between Maloney 05/2018 11/2019 10 30 24 13 Carryover) Lane and Hoover Street; Interception of Middle Road and Linfield Drive. Multi-year Transportation Projects On Willow Road between Middlefield Road and Bayfront Expressway; Marsh Road, between Bay Road Menlo Park San Mateo Safety Adaptive Traffic Signal System Deployment of Adaptive Traffic Signal system 05/2018 11/2019 10 30 24 13 and Bayfront Expressway; Bayfront Expressway between Marsh Road and University Drive. (17/18 Carryover)

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Suburban Park/Lorelei Manor Flood Triangle: Bounded by Van Buren Road on the North East, Bay Multi-year Transportation Projects Road on the South and Marsh Road on the West; Linfield Oaks, bounded on the North by Middlefield Menlo Park San Mateo Safety High Volume Series Ligth Circuit High Voltage Series Street Light Circuit Conversion 05/2018 11/2019 10 30 24 13 Road, on the South by Alma Street/Caltrain Right of Way, on the East by San Francisquito Creek/City Conversion (17/18 Carryover) Limits, and on the West by Revenswood Avenue. Crestview Drive Springfield Drive Overlay of Crestview Drive, Springfield Drive, Valencia Drive, and Toyon Drive. Work Road Maintenance & Millbrae San Mateo Valencia Drive and Toyon Drive includes signage striping, pavement legend, sidewalk replacement, and wheel chair Crestview Drive, Springfield Drive, Valencia Drive, and Toyon Drive. 10/2018 02/2019 20 29 22 13 Rehabilitation repaving project 2019 curb ramps upgrade.

Road Maintenance & Overlay of Larkspur Drive from Skyline Blvd to Helen Drive. Work includes signage Millbrae San Mateo Larkspur Drive Repaving 2019 Larkspur Drive between 01/2019 05/2019 20 29 22 13 Rehabilitation striping, pavement legend, sidewalk replacement, and wheel chair curb ramps upgrade.

Slurry seal of the following streets: Anita Drive from Geraldine Drive to Magnolia Avenue; Bayview Avenue from Lomita Anita Drive from Geraldine Drive to Magnolia Avenue; Bayview Avenue from Lomita Avenue to Lomita Avenue to Lomita Avenue; Cypress Avenue from Park Boulevard to Juanita Avenue; Avenue; Cypress Avenue from Park Boulevard to Juanita Avenue; Henry Place; Dexter Place; Robert Henry Place; Dexter Place; Robert Place; Helen Drive from Brookside Lane to Banbury Place; Helen Drive from Brookside Lane to Banbury Lane; Helen Drive from Geraldine Drive to Lane; Helen Drive from Geraldine Drive to Magnolia Avenue; Juanita Avenue from Magnolia Avenue; Juanita Avenue from Santa Susana Ave to Cypress Avenue; Lomita Avenue from Road Maintenance & Slurry Seal Maintenance of various Millbrae San Mateo Santa Susana Ave to Cypress Avenue; Lomita Avenue from Ridgewood Drive to Ridgewood Drive to Cypress Avenue; Rosalita Lane; Santa Florita Avenue from Park Boulevard to 07/2018 09/2018 5 9 22 13 Rehabilitation streets Cypress Avenue; Rosalita Lane; Santa Florita Avenue from Park Boulevard to Lomita Lomita Avenue; Santa Susana Avenue from Park Boulevard to Juanita Avenue; Santa Teresa Avenue Avenue; Santa Susana Avenue from Park Boulevard to Juanita Avenue; Santa Teresa from Park Boulevard to Lomita Avenue Avenue from Park Boulevard to Lomita Avenue Sequoia Avenue Sequoia Avenue

Overlay of Old Bayshore Highway from Burlingame City Limit to Millbrae Avenue. Work Road Maintenance & Old Bayshore Highway Repaving Millbrae San Mateo includes signage, striping, pavement legend, sidewalk and median replacement, and Old Bayshore Highway between Burlingame City Limit & Millbrae Avenue 06/2018 09/2018 20 29 22 13 Rehabilitation 2018 (17/18 Carryover) wheel chair curb ramps upgrade.

The FY 2017-18 Pavement Rehabilitation Project will rehabilitate the pavement along Linda Mar Boulevard from Adobe Drive to Alicante Drive and Oceana Boulevard from Milagra Drive to Monterey Road by placing 2 inches of asphalt overlay. This project will Road Maintenance & FY 2017-18 Pavement Linda Mar Boulevard from Adobe Drive to Alicante Drive and Oceana Boulevard from Milagra Drive to Pacifica San Mateo also include pavement grinding for base repair as well as installation of thermoplastic 08/2018 09/2018 15 20 22 13 Rehabilitation Rehabilitation Project Monterey Road traffic striping, markings, and pavement markers. This project was intended to start in 17/18 but were not able to and moved into 18/19. We request that you include this project on our 18/19 list (17/18 Carryover).

Citywide HICKEY BOULEVARD @ FAIRMONT SHOPPING CENTER GATEWAY DRIVE @ FAIRMONT SHOPPING CENTER GATEWAY DRIVE @ FAIRMONT SHOPPING CENTER GATEWAY DRIVE @ SPRINGDALE DRIVE PALMETTO AVENUE @ BILL DRAKE WAY PALMETTO AVENUE @ WEST AVALON DRIVE PALMETTO AVENUE @ MILAGRA PEDESTRIAN OVERCROSSING OCEANA BOULEVARD @ MILAGRA DRIVE OCEANA BOULEVARD @ PALOMA AVENUE CRESPI DRIVE @ ROBERTS ROAD CRESPI DRIVE @ LADERA WAY CRESPI DRIVE @ PERALTA ROAD CRESPI DRIVE @ ESCALERO ROAD CRESPI DRIVE @ SEVILLE DRIVE DE SOLO DRIVE @ ANZA DRIVE DE SOLO DRIVE @ ARGUELLO BOULEVARD PERALTA ROAD @ MONTEZUMA DRIVE The Citywide Curb Ramp Project will replace 100 curb ramps throughout the City of FRANCISCO BOULEVARD @ CARMEL AVENUE Complete Streets Pacifica San Mateo Citywide Curb Ramp Project Pacifica. This project was intended to start in 17/18 but were not able to and moved into ODDSTAD BOULEVARD @ LINDA MAR BOULEVARD 08/2018 09/2018 20 30 22 13 Components 18/19. We request that you include this project on our 18/19 list (17/18 Carryover). ODDSTAD BOULEVARD @ TOLEDO COURT ODDSTAD BOULEVARD @ SHOPPING CENTER DRIVEWAY ODDSTAD BOULEVARD @ PARK PACIFICA AVENUE TERRA NOVA BOULEVARD @ SHOPPING CENTER DRIVEWAY TERRA NOVA BOULEVARD @ ODDSTAD BOULEVARD ROSITA ROAD @ MONTE VERDE DRIVE ROSITA ROAD @ RIO VISTA DRIVE ROSITA ROAD @ PALOU DRIVE ROSITA ROAD @ GALVEZ DRIVE WEST ROSITA ROAD @ GALVEZ DRIVE EAST ROSITA ROAD @ CAPISTRANO DRIVE LINDA MAR BOULEVARD @ CAPISTRANO DRIVE LINDA MAR BOULEVARD @ MADEIRA DRIVE ROCKAWAY BEACH AVENUE @ DONDEE WAY REINA DEL MAR AVENUE @ RIECHLING AVENUE REINA DEL MAR AVENUE @ LAUREN AVENUE FRANCISCO BOULEVARD @ CLARENDON ROAD FRANCISCO BOULEVARD @ SANTA MARIA AVENUE FRANCISCO BOULEVARD @ SALADA AVENUE

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts The project consists of the construction of 1,400 feet of sidewalk, curb and gutter along Complete Streets the west side of Palmetto Avenue. This project was intended to start in 17/18 but were Pacifica San Mateo Palmetto Sidewalk Project Palmetto Avenue from Westline Drive to 100 Palmetto Avenue 10/2018 11/2019 20 30 22 13 Components not able to and moved into 18/19. We request that you include this project on our 18/19 list (17/18 Carryover).

The Project will install vegetated curb extension at the midblock crossing directly in front Cabrillo School Pedestrian Crossing of the school. The vegetated curb extensions will help increase safety and reduce or Pacifica San Mateo Safety Crespi Drive at Cabrillo School 05/2019 06/2019 10 15 22 13 Improvement Project eliminate polluted stormwater runoff, reduce stormwater management costs, and increase the aesthetic value of streets and neighborhoods.

1. Project Description: This proposed project consists of street resurfacing and rehabilitation work consisting of base repairs, crack sealing, and asphalt overlay or Location of the Project: slurry/surface seals. The primary factor for choosing the roadway segments included is Acorn Court: Entire length; Alamos Drive: Entire length; Goya Road: Entire length; Grove Court: Entire Road Maintenance & Street resurfacing project in the Portola Valley San Mateo the Pavement Condition Index (PCI) of each roadway. PCI is a measurement of a length; Groveland Street: Entire length; Los Trancos Road: Alpine Road to Palo Alto Town limits; 05/2020 07/2020 4 6 24 13 Rehabilitation Town of Portola Valley street’s condition derived through field inspections that utilize scoring criteria developed Naranja Way: Entire length; Portola Green Circle: Entire length by the Metropolitan Transportation Commission’s (MTC) pavement management program.

Road Maintenance & 2017-2018 Overlay Project - Twin Preventative rehabilitation and pavement maintenance, including raising utilities covers Redwood City San Mateo Twin Dolphin Drive, Marine to Redwood Shores Parkway, in the City of Redwood City 04/2018 04/2019 8 15 22 13 Rehabilitation Dolphin Drive (FY17-18 Carryover) to grade, ADA improvements and installation of associated markers and striping.

Road Maintenance & Hopkins Avenue Overlay Project Preventative rehabilitation and pavement maintenance, including raising utilities covers Redwood City San Mateo Hopkins Avenue, El Camino Real to Upland Road 12/2018 12/2019 8 15 22 13 Rehabilitation (FY17-18 Carryover) to grade, ADA improvements and installation of associated markers and striping.

This program addresses ongoing roadway pavement repair and replacement needs. The Roadway Management Program inventories, assesses, and tracks maintenance of Road Maintenance & FY2018-19 Pavement Management the City’s roadways. Each year, streets are prepared for resurfacing with crack sealing Chestnut Street, El Camino Real to Railroad; Middlefield Road, Jefferson Avenue to Main Street; Redwood City San Mateo 11/2018 06/2019 8 15 22 13 Rehabilitation Program and spot repairs before being resurfaced with an “overlay,” “cape seal,” or “slurry seal”. Spring Street, Woodside Road to Douglas Street; Warwick Street, Edgewood Road to City Limits In Fiscal Year 2018-19, the City intends to use RMRA funding to overlay the below listed street locations. Projects are located as follows: Santa Helena Avenue between San Antonio Avenue and El Camino Road Maintenance & Rehabilitate pavement on three (3) streets by removing existing pavement section and San Bruno San Mateo 2018-19 Street Rehabilitation Real, Mills Avenue between Kains Avenue and San Bruno Avenue, Eastburn Court between Whitman 08/2019 10/2019 20 20 22 13 Rehabilitation replacing with new asphalt and aggregate base. Way and Cul-de-sac.

Rehabilitate pavement on one (1) street by removing existing pavement section and Road Maintenance & San Bruno San Mateo 2017-18 Street Rehabilitation replacing with new asphalt and aggregate base. This is a carryover project from 2017- On Masson Avenue between San Bruno Avenue and Angus Avenue West. 08/2018 10/2018 20 20 22 13 Rehabilitation 18 that due to contract approval delays will not be completed until fiscal year 2018-19.

Road Maintenance & Arundel Rd, Palm Ave, Hillcrest Rd, Upland Ave, Vista Ave, Carmelita Dr, Prospect St, Knoll Dr, San Carlos San Mateo 2018 Pavement Rehabilitation Pavement rehabilitation, maintenance, striping, and ADA ramps 07/2018 10/2018 7 20 22 13 Rehabilitation Coronado Ave, and Hilltop Dr. Road Maintenance & Brittan Avenue and Cedar Street San Carlos San Mateo Pavement rehabilitation, maintenance, striping, and ADA ramps Brittan Ave, from Elm St. to El Camino Real, and Cedar St. from San Carlos Ave. to end. 03/2019 07/2019 12 13 22 13 Rehabilitation Resurfacing

Alameda de las Pulgas, from State Route 92 to 24th Avenue; Grand Boulevard, from Prospect Row to Project work includes milling of pavement surface, asphalt concrete overlay, upgrade of Road Maintenance & 2018-19 Street Rehabilitation at east end/railroad tracks; Pasadena Drive, from 39th Avenue to south end; Poplar Avenue, from San Mateo San Mateo curb access ramps, installation of pavement markings and striping and other incidental 04/2019 09/2019 10 15 22 13 Rehabilitation Various Locations Delaware Street to Amphlett Boulevard; Ottawa Street, from Trollman Avenue to Lorraine Avenue; and work. Rochester Street, from Monte Diable Avenue to York Avenue.

The project will rehabilitate the pavement on E. Hillsdale Boulevard from Saratoga Drive to Norfolk Street (approximately 0.44 mile). The proposed treatment includes milling Road Maintenance & E. Hillsdale Boulevard Rehabilitation the existing pavement surface then applying an asphalt concrete overlay. Related work The project is located on E. Hillsdale Boulevard from Saratoga Drive to Norfolk Street in the City of San Mateo San Mateo 07/2018 11/2018 15 15 22 13 Rehabilitation (17/18 Carryover) will include the upgrade of curb access ramps to current standards, installation of San Mateo. pavement striping and other markings, installation of traffic loops and adjust manhole to finished grade.

The work consists of the installation of enhanced pedestrian crossings, corner bulbout Complete Streets Grand Boulevard Initiative Phase 2 South San Francisco San Mateo and median refuges at two intersections, expand two bus stop/waiting areas, install El Camino Real between Kaiser Way and McLellan Drive. 03/2018 03/2019 10 30 22 13 Components (Kaiser Way to McLellan Dr.) approximately 2000 feet of new landscaped medians, and green infrastructure.

(17/18 Carryover) Grand Boulevard Improve El Camino Real between Arroyo Drive and Kaiser Way by installing enhanced Complete Streets South San Francisco San Mateo Project Phase 3 (Arroyo Drive to pedestrian crossings, bike lanes, corner bulb out and median refuges, expanded bus El Camino Real between Arroyo Drive and Kaiser Way 12/2018 12/2019 10 30 19, 22 13 Components Kaiser Way) stop/waiting areas, a new landscaped median, and green infrastructure.

(17/18 Carryover) North Access Complete Streets South San Francisco San Mateo Road Bike and Pedestrian Widen approximately 1,000 feet of bike and pedestrian pathways North Access Road beginning at South Airport Boulevard. 06/2018 06/2019 15 20 22 13 Components Improvements

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

2019 Road Rehab (18/19 List): Oakhaven Way from Woodside Dr. to End; Greer Rd. from Kings Mountain Rd. to End; Roan from Patrol to End; Portola Rd. from Family Farm to 1231 Portola Rd. 2018 Road Rehab (17/18 Carryover): Crest Rd from Cinnabar to Cragmont; Harcross Rd from School to End; Normandy Lane from Woodside Dr to End; Hardwick Rd from Woodside dr to End; Canada Rd Project includes pavement rehabilitation and replacement, digouts, roadside swale Road Maintenance & from Woodside Rd to Palm circle; Patrol Rd from Summit Springs to End; Ward Way from Alameda Woodside San Mateo 2019 Road Rehabilitation Project paving, new pavement striping and marking, and may include associated storm 05/2019 07/2019 5 15 24 13 Rehabilitation De las Pulgas to End; Eleanor Dr from 270 Eleanor to Eugenia; Glenwood Rd from Hillsdale Dr to End; drainage and safety-related improvements on streets throughout the Town. Hillside Dr from Glenwood to Alta Mesa; Stadler Dr from End S to End N; Alta Mesa Rd from Highland Terrace to Hillside; West California from Jefferson to 1992 ft N of Jefferson; West Glen Way from W.California to Glencrag; Maple Way from East View to Glencrag; Portola Rd from Highland to Family Farm; Portola Rd from Sandhill to La Honda.

Calor Drive; La Lata Drive; La Lata Place; Terrace Court; Menlo Drive; Kim Sue Lane; Teri Sue Lane; Road Maintenance & FY 2018-19 Road Maintenance Buellton Santa Barbara Type II Slurry Seal and localized R&R. Paula Ray Lane; La Pita Place; Irelan Drive; Dawn Drive; Sharon Place; Nina Place; Karen Place; 06/2019 08/2019 15 25 37 19 Rehabilitation Project Park Street; Second Street (Calor Drive to west of Central Avenue); Oak Tree Way; Twin Oaks Drive

6th St. (Yucca Ln. to Elm Ave.); 8th St. (Holly Ave. to End); 9th St. (Linden Ave. to Franklin Creek); Elm Ave. (8th St. to 7th St.); Holly Ave. (Carpinteria Ave. to 7th St.); Juniper Pl. (Yucca Ln. to Elm Ave.); Linden Ave. (Carpinteria Ave. to Railroad); Wullbrandt Wy. (Linden Ave. to Cactus Ln.); Yucca Ln. (Carpinteria Ave. to 6th St.); 6th St. (Palm Ave. to Walnut Ave. and East End to Olive Ave.); Road Maintenance & Carpinteria Santa Barbara Street Maintenance Program Road Maintenance & Rehabilitation (Carryover from FY 17/18 Project List) Cactus Ln. (8th St. to 7th St.); Citrus Pl. (Maple Ave. to Cactus Ln.); Maple Ave. (8th St. to Carpinteria 12/2018 06/2019 5 20 37 19 Rehabilitation Ave.); Olive Ave. (6th St. to South End); Walnut Ave. (6th St. to South End); Carpinteria Ave. (Linden Ave. to Holly St.); Reynolds Ave. (US 101 to Carpinteria Ave.); Casitas Pass Rd. (Foothill Rd. to Cameo Rd.); Via Real (Lemonwood Dr. to Calle Lagunitas); Cramer Circle (East Via Real to West Via Real); Santa Ynez Ave. (North End to Via Real)

Road Maintenance & Parking Lot No. 2 & Cactus Lane Reconstruction of Roadway Structural Section, Pedestrian Facilities, Drainage Carpinteria Santa Barbara Cactus Lane from Carpinteria Avenue to Wullbrandt Way 12/2018 06/2019 5 20 37 19 Rehabilitation Improvements Structures, and Curb and Gutter (Carryover from FY 17/18 Project List) CATHEDRAL OAKS ROAD - EAST SIDE OF BRIDGE W/O CARLORLO DRIVE TO E/O SANTA FY 2017/18 PAVEMENT Full section pavement rehabilitation with lime & cement treated pulverized base under MARGUERITA DRIVE Road Maintenance & Goleta Santa Barbara REHABILITATION PROJECT– AC at vehicle travelways and mill & overlay at selected bikelanes. Median CATHEDRAL OAKS ROAD - E/O SANTA MARGUERITA DRIVE TO FAIRVIEW AVENUE 06/2018 12/2018 20 30 37 19 Rehabilitation CATHEDRAL OAKS RD. improvements and paint striping. ALTERNATE 1- CATHEDRAL OAKS ROAD EAST SIDE OF BRIDGE TO N. LOS CARNEROS ROAD Staff is proposing that all the SB 1 funding programmed for FY 18/19 be used to fund the FY 18/19 Pavement Rehabilitation Project. The proposed list of project sites Staff is proposing that all the SB 1 funding programmed for FY 18/19 be used to fund the FY 18/19 includes deep lift road reconstruction with an approximate new 5.5-inch asphalt surface Pavement Rehabilitation Project. The proposed list of project sites includes deep lift road for: reconstruction with an approximate new 5.5-inch asphalt surface for: Road Maintenance & FY 18/19 Pavement Rehabilitation Evergreen Drive between Cathedral Oaks Drive and Brandon Drive (Collector) Average Goleta Santa Barbara 12/2018 06/2019 20 30 37 19 Rehabilitation Project. PCI = 50; Hillview Drive (Residential/Local) PCI = 35; Forest Drive (Residential/Local) PCI = 39 The estimated cost of the above work is approximately $1,011,000. The useful life of The estimated cost of the above work is approximately $1,011,000. The useful life of the the improvements is expected to be at least 20 years. improvements is expected to be at least 20 years.

Crack Fill & Slurry Seal (Type B) and localized 4" removal and replacement of HMA on Streets included but not limited to: Calle Cesar E. Chavez St., La Purisma St., San Miguel Ct., Road Maintenance & 2019 Pavement Maintenance City roads as outlined in City's Pavement Management System document (2013) and Guadalupe Santa Barbara Tognazzini Ave., Sixth St., Fourth, Holly, Fir, Elm, 3rd, Cedar, Birch, Second, Amber Streets and 05/2019 11/2019 3 5 35 19 Rehabilitation Project any roads deferred from previous years. Projected to address 16 streets in the 18/19 Flower Avenue. slated project. Plans available upon request. Section 1: Ibis Circle, Pacific Dunes Way from W. Main to Surfbird Ln, Sandpiper Lane from Pacific Dune Way to cul-de-sac, Point Sal Dunes Ln from W. Main to Surfbird Road Maintenance & 2018 Pavement Maintenance Crack Fill & Slurry Seal (Type B) and localized 4" removal and replacement of HMA on Ln, Surfbird Ln from Pacific Dunes to Surfbird Ct., Egret Lane. Section 2: Garrett Street, Mary Knoll Guadalupe Santa Barbara 05/2018 11/2018 3 5 35 19 Rehabilitation Project City roads as outlined in City's Pavement Management System document (2013). Drive. Section 3: 2nd St from Tognazzini Ave to Hwy 1, Campodonico Ave from 2nd St to 7th St, Alley between Campodonico Ave and Hwy 1 from 2nd to 7th St, 3rd Street, 7th St, Rubio St, Peralta St. from 10th St to 11th St, Escalante St. City wide within the boundaries of the Four (4) City Council Districts as follows: Maps of the City Council Districts are available on the City of Lompoc Website, Maintenance of Traffic Control Maintenance of City owned traffic control signs, painting of lane line striping and Lompoc Santa Barbara Traffic Control Devices http://www.cityoflompoc.com/Clerk/Graphics/DistrictMap.jpeg. 06/2018 07/2018 2 5 35 19 Signs, Striping, and Markings. roadway markings (arrows, stop bars, speed limit, etc.) by City Maintenance workers. All locations are subject to change and will be selected based on priority need and available resources throughout the year.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts City wide within the boundaries of the Four (4) City Council Districts as follows:

City Council District 1 - all that portion of the City beginning at the intersection of North Avenue and the City’s western border near Z Street; thence proceeding easterly along North Avenue to 3rd Street; thence proceeding southerly along 3rd Street to the alley between North Avenue and Lemon Avenue; thence proceeding easterly along the alley to 7th Street; thence proceeding northerly along 7th Street to North Avenue; thence proceeding easterly along North Avenue to Riverside Drive; thence proceeding southeasterly along Riverside Drive to the intersection of Riverside Drive, Pine Avenue and the eastern border of the City; thence proceeding counter-clockwise along the City border, including the non-contiguous parcel along McLaughlin Road, until the point of origin. Ci ty Council District 2 - all that portion of the City beginning at the intersection of North Avenue and the City’s western border near Z Street; thence proceeding easterly along North Avenue to F Street; thence proceeding southerly along F Street to Pine Avenue; thence proceeding easterly along Pine Avenue to the alley between F Street and E Street; thence proceeding southerly along the alley to Airport Avenue; thence proceeding westerly along Airport Ave to F Street; thence proceeding southerly along F Street to College Avenue; thence proceeding westerly along College Avenue to H Street; thence proceeding southerly along H Street to Chestnut Avenue; thence proceeding westerly along Chestnut Avenue to U Street; thence proceeding northerly along U Street to Laurel Avenue; thence proceeding westerly along Laurel Avenue to the western City border; thence proceeding clockwise Road Maintenance & along the City border until the point of origin. Lompoc Santa Barbara Pavement Repair Various pavement repairs of the City roadway network by City Maintenance workers. 06/2018 07/2018 1 20 35 19 Rehabilitation Ci ty Council District 3 - all that portion of the City beginning at the intersection of the City’s southern border and the easterly extension of Oxford Drive along the southern border of Census Block 060830027083006, thence proceeding westerly along the easterly extension of Oxford Drive along the southern border of Census Block 060830027083006 until C Street; thence proceeding northerly along C Street until Willow Avenue; thence proceeding easterly along Willow Avenue until B Street; thence proceeding northerly along B Street until Hickory Avenue; thence proceeding westerly along Hickory Avenue until C Street; thence proceeding northerly along C Street until the Civic Center Plaza parking lot driveway; thence proceeding westerly and northerly through the Civic Center parking lot driveway to D Street; thence proceeding northerly along D Street until the east-west powerline right-of-way between Ocean Avenue and Walnut Avenue; thence proceeding easterly along the powerline right-of- way until the alley and north-south powerline right-of-way between D Street and C Street; thence proceeding northerly along that alley to Walnut Avenue; thence proceeding westerly along Walnut Avenue to D Street; thence proceeding northerly along D Street to College Avenue; thence proceeding westerly along College Avenue to F Street; thence proceeding northerly along F Street to Airport Avenue; thence proceeding easterly along Airport Avenue to the alley between F Street and E Street; thence proceeding northerly along the alley to Pine Avenue; thence proceeding westerly along Pine Avenue to F Street; thence proceeding northerly along F Street to North Avenue; thence proceeding easterly along North Avenue to 3rd Street; thence proceeding southerly along 3rd Street to the alley between North Avenue and Lemon Avenue; thence proceeding easterly along the alley to 7th Street; thence proceeding northerly along 7th Street to North Avenue; thence proceeding easterly along North The project will rehabilitate five blocks of Mission Street from US 101 to State Street by replacing failing traffic signal conduit at five signalized intersections; replacing Road Maintenance & Santa Barbara Santa Barbara Mission Street Overlay damaged concrete curbs, gutters, and cross gutters; upgrading access ramps to meet Mission Street from US 101 to State Street in the City of Santa Barbara 04/2019 08/2019 15 20 37 19 Rehabilitation Americans with Disabilities Act requirements; and grinding and overlaying the roadway surface. Grind and overlay five blocks of Bath Street from Carrillo Street to Micheltorena Street. Road Maintenance & FY 17/18 Ongoing Bath Street Santa Barbara Santa Barbara Access ramps along this corridor will also be upgraded to meet Americans with Bath Street from Carrillo Street to Micheltorena Street in Downtown Santa Barbara 05/2018 09/2018 15 20 37 19 Rehabilitation Overlay Disabilities Act requirements. This project consists of placing a chip seal surface treatment and install pavement markings on various City streets in the City of Santa Maria. Chip seal is a preventive Various Street throughout the City, some of which include: maintenance treatment for giving added life to pavement. It represents an important E. Alvin Avenue east of Suey Road, E. Donovan Road from Broadway to College Drive, N. Railroad Road Maintenance & Santa Maria Santa Barbara 2018 Chip Seal Project part of the City's annual street maintenance program because it "rejuvenates" the Avenue from Canal to Atlantic, S. Miller Street from Main to Camino Colegio, S. Miller Street from 09/2018 12/2018 5 10 35 19 Rehabilitation asphalt concrete pavement structure by replacing oil that has evaporated, worn away, or McCoy to Orcutt Expressway, Santa Maria Way from Broadway to the City Limits, West Battles Road been lost to the elements. The project will provide a surface treatment for from Blosser to A Street. approximately 4,000,000 SF of roads.

This project will place a standard 2-inch asphalt overlay over two (2) distressed street sections. Work will include digging out and repairing failed pavement areas with new East Alvin Avenue and South hot mix asphalt concrete. It will include grinding down the surface of the roadways to Road Maintenance & East Alvin Avenue from College Drive to Bradley Drive; South College Drive from Stowell Road to Santa Maria Santa Barbara College Drive Pavement allow for an even transition from the overlaid roadway to the roadway edge. Then a 09/2018 12/2018 15 25 35 19 Rehabilitation Enos Drive Rehabilitation glass grid will be placed followed by the hot mix asphalt. The project also includes installation of new striping and pavement markings. Approximately 165,000 SF of roadway, equivalent to 2 lane miles, will be renewed.

This project will place a rubberized asphalt overlay approximately 1.25" thick over five (5) existing roadways. The work involves grinding down the edges of the roadways to E. Cypress Street from S. Nicholson Avenue to S. Stratford Avenue, E. Cypress Street from S. Road Maintenance & allow for an even transition from the overlaid roadway and the roadway edge. Once the Palisade Drive to S. Suey Road, N. Valerie Street from E. Main Street to E. Alvin Avenue, N. Palisade Santa Maria Santa Barbara Thin Maintenance Overlay (2017/18) 05/2018 06/2018 7 15 35 19 Rehabilitation overlay is complete, the roadway striping will be replaced. This project will resurface Drive from N. Valerie Street to E. Alvin Avenue, N. Lincoln Street from W. El Camino Street to W. five (5) severely distressed roadways accounting for 364,000 square feet or the Bunny Avenue, and W. Pershing Street from S. Blosser Road to S. Western Avenue. equivalent of 4-5 lane miles.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

This project will place a standard 2-inch asphalt overlay over a severely distressed section of Miller Street. Work will include digging out and repairing failed pavement areas with new hot mix asphalt concrete. It will include grinding down the surface of the Road Maintenance & North Miller Street Pavement Santa Maria Santa Barbara roadways to allow for an even transition from the overlaid roadway to the roadway edge. North Miller Street from Chapel Street to Alvin Avenue 03/2019 06/2019 15 25 35 19 Rehabilitation Rehabilitation (2017/18) Then a glass grid will be placed followed by the hot mix asphalt. The project also includes installation of new striping and pavement markings. Approximately 70,000 SF of roadway, equivalent to 0.8 lane miles, will be renewed.

Preliminary: Portions of Alisal Rd, Atterdag Rd, Birch Dr, Elverhoy Wy, Fifth St, First Crt, First St, Willow Dr, Mountain View Dr, Third St, Fjord Dr, Ironwood Wy, Juniper Dr, Pepperwood Wy, Road Maintenance & FY 2018-19 Pavement Slurry Seal Apply Type 2 slurry seal to asphalt surface to extend useful life of roadway pavement, Solvang Santa Barbara Sandalwood Wy, Aarhus Dr, Midten Hof, Oster Sted, Vester Sted, Aebeltoft Wy, Eucalyptus Dr, 09/2018 05/2019 6 9 35 19 Rehabilitation Project and apply new striping and pavement markings. Fredensborg Canyon Rd, Laurel Av, Roskild Dr, Creekside Dr, Holly Ln, Rebild Dr, Nysted Dr, Ringsted Dr, Skagen Dr, Viborg Dr, Alamo Pintado Rd, Maple Av, and Windmill Crt.

Reconstruct segments of Alamo Pintado Road and South Alisal Road by recycling the Alamo Pintado Rd & South Alisal Rd Road Maintenance & existing asphalt pavement and road base using a process know as full depth Alamo Pintado Road from Coyote Creek Road to the northerly City Limits, and south Alisal Road from Solvang Santa Barbara Full Depth Reclamation - Road 03/2020 05/2021 25 40 35 19 Rehabilitation reclamation. South Alisal Road will also be widened to include bike lanes on both sides the Santa Ynez River to the southerly City Limits. Reconstruction Project FY 2020-21 of the road. Install asphalt concrete overlay, perform pavement digout repair and overlay Road Maintenance & ANNUAL STREET MAINTENANCE - preparation, reconstruct median islands, remove and replace pavement striping and Winchester Blvd from northern city limit near Rosemary Ln to southern city limit at Knowles Drive and Campbell Santa Clara 04/2019 04/2020 10 15 28 15 Rehabilitation WINCHESTER BLVD markings, install ADA compliant curb ramps and relocation of traffic poles as needed, a portion of Campbell Ave from Winchester Blvd to Jeffers Way. and other incidental work. Install asphalt concrete over the width of the two traveled lanes (approximately 24 feet) ANNUAL STREET MAINTENANCE - Audrey Avenue - from Burrows Road to the eastern terminus east of Vale Avenue at the rear entrance Road Maintenance & and apply slurry seal from road edge to road edge. The project will also install ADA Campbell Santa Clara AUDREY AVENUE & HACK to Capri elementary School, and Hack Avenue - from W. Parr Avenue to the northern terminus at 06/2018 12/2018 10 15 28 15 Rehabilitation compliant accessibility ramps at the intersections of Audrey/Burrows and at AVENUE_17/18 ONGOING Audrey Avenue Audrey/Oburn, and new striping. Hanford Dr., Moltzen Dr., Rodrigues Ave from Western Ave to De Anza Blvd, Paradise Dr., Leola Ct, Road Maintenance & 2019 Pavement Maintenance Phase Cupertino Santa Clara Residential Asphalt Overlay N Portal Ave, Drake Ct, Stonydale Dr., Degas Ct, Voss Ave, El Prado Way, Salem Ave, Poppy Dr., 08/2018 10/2019 25 25 24 10 Rehabilitation 1 Ruppell Pl, 2018 Pavement Maintenance Phase 1 Project is a residential overlay project. The Road Maintenance & 2018 Pavement Maintenance Phase Approximately 40 residential street segments including Phar Lap Dr, Clifford Dr, Scofield Dr, Johnson Cupertino Santa Clara project includes approximately 40 street segments. Construction will begin in June 05/2018 09/2018 25 30 28 15 Rehabilitation 1 Ave, Phil Ln, and Plum Tree Lane. 2018 and continue through September 2018 In the City of Gilroy, on the following street segments: Road Maintenance & FY 19 Pavement Maintenance Pavement maintenance project, including digouts, crack seal, and rubberized cape seal Farrell Ave (from Wren to Monterey); Eighth St (from Princevalle to Church); Martin St (from Monterey Gilroy Santa Clara 08/2018 10/2018 6 8 30 17 Rehabilitation Project surface treatment. to Chestnut); Murray Ave (from I.O.O.F to Leavesley), and; San Ysidro Ave (from 2250 ft. N of Leavesley to Las Animas); Base failure repair and thin overlay of Los Altos Avenue between Yerba Santa Avenue and El Camino Real. Class III bicycle pathway and pedestrian striping improvements. Road Maintenance & Los Altos Avenue and West Edith Los Altos Avenue (Yerba Santa Avenue to El Camino Real); West Edith Avenue (Los Altos Avenue to Los Altos Santa Clara Base failure repair and thin overlay of West Edith Avenue between Los Altos Avenue 08/2018 10/2018 15 15 24 13 Rehabilitation Avenue - Overlay San Antonio Road). and San Antonio Road. Class III bicycle pathway and pedestrian striping improvements.

Removal of a portion of the outfall apron below Page Mill Road box culvert, removal of 13 willow and walnut trees, grading of new channel, creation of a rock rip-rap and Matadero Creek Restoration Project Los Altos Hills Santa Clara Safety reinforced drop-pool habitat features, downstream enforcement of the creek banks, and Page Mill Road at Berry Hill Court 03/2019 04/2019 30 50 24 13 (On-Going) replanting. Project will provide pavement stability of a portion of Page Mill Road improving pedestrian and vehicular access and safety.

This project is to construct a pathway on DeBell Road connecting Miranda and Manuella Complete Streets Los Altos Hills Santa Clara Estacada Way Pathway Project Road. The pathway connection will provide a safer route to school and improve DeBell Road, Los Altos Hills 07/2018 05/2019 20 30 24 13 Components pedestrian safety.

This project is to construct an off-road native pathway connecting Fremont Road and Complete Streets Fremont Road to Redwood Grove Los Altos Hills Santa Clara Redwood Grove in City of Los Altos. The pathway connection will improve pedestrian Fremont Road 07/2018 05/2019 20 30 24 13 Components Pathway Project safety and connection to neighboring towns and existing routes.

Alejandro Drive (St. Francis Road-End (north); Altamont Road (Black Mountain Road-Taaffe Road); This is an annual street resurfacing project that includes 1.5” and 2” overlay with Ascension Drive (St. Francis Road-End); Bryne Park Lane (Alternate 1) (Altamont Road-w. of 27269 digouts, microsurfacing, microsurfacing and digouts, 4” AC deep lift patching, 4” full Byrne Park Ln); De Bell Road (Manuella Road-Estacada Drive); Deer Springs Way (Alternate 1) grind and paving, pavement markings replacement, and micro-surfacing throughout (Bryne Park Lane-1st Bulb); Edgerton Road (Black Mountain Road-end); El Monte Road (Moody Road- various streets within Town limits. (See attached exhibit for street names.) The selected Fork at 950' West of Stonebrook Drive); Emerald Hill Lane (Prospect Avenue-End); Fremont Road (St. 2018 Pavement Rehabilitation and streets were determined by the recommendation from the Metropolitan Transportation Road Maintenance & Francis Road-Concepcion Road); Julietta Lane (s. of 27340 Julietta Ln-End); La Cresta Court (La Los Altos Hills Santa Clara Storm Drainage Improvement Commission’s Pavement Management Program. Alternate streets were selected due to 07/2018 11/2018 5 20 24 13 Rehabilitation Cresta Drive-End); La Loma Court (Alternate 1) (La Loma Drive-End); La Loma Drive (Alternate 1) Project recent change of ownership from private to public, which allowed connectivity between (Prospect Avenue-Summit Wood Road); Natoma Road (Elena Road-Black Mt. Road); O'Keefe Lane public streets. The condition of the privately own streets required street reconstruction (350' West of Vista Serena-End); Page Mill Road (Baleri Ranch Road-Country Way); Purissima Road in order to allow safe public use. This project will extend the life span of streets (Concepcion Road-Robleda Road); Ravensbury Avenue (Magdalena Road-Crestridge Drive); throughout the Town between 5, 15 and 20 years depending of type of rehabilitation Ravensbury Avenue (Hillpark Lane-End); Roble Veneno Lane (Concepcion Road-End); Seven Acres method. Lane (Fremont Road-End); Viscaino Place (Viscaino Road-End)

Page Mill Road / Moon Lane Design and construction for a pedestrian bridge to alleviate the congestion and safety Northbound of Page Mill Road, crossing the Matadero Creek between Paseo Del Roble and Moon Los Altos Hills Santa Clara Safety Pedestrian Bridge Project (On- 06/2018 06/2018 20 50 24 13 between motorists and pedestrians. Lane. Going)

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts This project is to construct a pathway connecting Summerhill Avenue between El Monte Road and Nicole Lane to City of Los Altos. The pathway connection will improve Complete Streets Summerhill Pathway Project Los Altos Hills Santa Clara pedestrian safety from high traffic speeds due to Summerhill Avenue being used as an Summerhill Ave at Los Altos Hills side 07/2018 06/2019 20 30 24 13 Components (Design) alternate arterial road. This project is DESIGN only. Actual construction will be budgeted and scheduled beyond FY 2019-20 This streets operation and maintenance will cover town-wide public streets (total 216 streets) in general, the approximate boundary streets are listed below: Road Maintenance & Streets Operations and This budget will support the necessary work on Various street repairs and maintenance Los Altos Hills Santa Clara Page Mill Road - Arastradero Road - Foothill Expressway - Edith Ave - Fremont Road - O'Keefe Ln - El 07/2018 06/2019 5 10 24 13 Rehabilitation Maintenance Budget throughout town on as needed basis Monte Road - Summerhill Avenue - Magdalena Avenue - Eastbrook Avenue - W Loyola Drive - Stone Brook Drive - Moody Road Then back on Page Mill Road.

The storm drain operation, repair, annd maintenance will cover town-wide storm drainage on public This budget will support the necessary work on various storm drain (public streets road streets (total 216 streets) and facilities, the approximate boundary streets are listed below: Road Maintenance & Storm Drain Operating and Los Altos Hills Santa Clara side and a few facilities) cleaning and maintenance repairs throughout town on as Page Mill Road - Arastradero Road - Foothill Expressway - Edith Ave - Fremont Road - O'Keefe Ln - El 07/2018 06/2019 10 15 24 13 Rehabilitation Maintenance Budget needed basis Monte Road - Summerhill Avenue - Magdalena Avenue - Eastbrook Avenue - W Loyola Drive - Stone Brook Drive - Moody Road Then back on Page Mill Road.

The pathways operation, repair, and maintenance will cover town-wide pathways along public streets (total 216 streets) in general, the approximate boundary streets are listed below: Complete Streets Pathways Operating and This budget will support the necessary work on various street side pathway Los Altos Hills Santa Clara Page Mill Road - Arastradero Road - Foothill Expressway - Edith Ave - Fremont Road - O'Keefe Ln - El 07/2018 06/2019 5 10 24 13 Components Maintenance Budget maintenance throughout town on as needed basis for drainage and safety purposes Monte Road - Summerhill Avenue - Magdalena Avenue - Eastbrook Avenue - W Loyola Drive - Stone Brook Drive - Moody Road Then back on Page Mill Road.

Road Maintenance & Los Gatos Santa Clara Street Repair & Resurfacing (2019) Placement of rubber cape seal or overlay to maintain pavement surface. National Avenue from Samaritan Drive to Los Gatos-Almaden Road 04/2019 10/2019 10 25 28 15 Rehabilitation Road Maintenance & Los Gatos Santa Clara Street Repair & Resurfacing (2020) Placement of rubber cape seal or overlay to maintain pavement surface. Knowles Drive from Dardanelli Lane to Dell Avenue. 04/2020 10/2020 10 25 28 15 Rehabilitation Road Maintenance & Los Gatos Santa Clara Street Repair & Resurfacing (2021) Placement of rubber cape seal or overlay to maintain pavement surface. Union Avenue from Blossom Hill Road to Los Gatos-Almaden Road 04/2021 10/2021 10 25 28 15 Rehabilitation Road Maintenance & Los Gatos Santa Clara Street Repair & Resurfacing (2022) Placement of rubber cape seal or overlay to maintain pavement surface. Quito Road from Bicknell Road to Woodbank Way. 04/2022 10/2022 10 25 28 15 Rehabilitation

Roadway pavement repair including pavement maintenance treatments, AC overlay and Road Maintenance & reconstruction. Additionally, the project includes replacement and upgrade of curb, Roadway rehabilitation of McCarthy Boulevard from northern city limit to Tasman Drive, Murphy Ranch Milpitas Santa Clara Street Resurfacing Project 2019 03/2019 09/2019 10 15 25 10 Rehabilitation gutter, driveway, sidewalk, signage, striping, installation of ADA ramps, and Road, Sandisk Drive, and Technology Drive in City of Milipitas implementation of bike facilities per the 2009 Bikeway Master Plan.

Project streets will be bounded by Milpitas Boulevard, I680, Jacklin Road, and Yosemite Drive. Road Maintenance & 2018 Street Resurfacing Project Maintenance seal treatment, overlay, and/or reconstruction of city streets, construction Milpitas Santa Clara Specific streets and maintenance treatment to be incorporated into the project will be determined by 12/2018 12/2018 5 15 25 10 Rehabilitation 17/18 Ongoing of ADA curb ramps, and implementation of bike facility per city's bikeway masterplan pavement survey report to be completed by Dec. 2017. Road Maintenance & Oak Noll is located off of Daves Aves between Kirkorian and and Kavin Ln. The Road ends on Daves Monte Sereno Santa Clara Oak Noll Resurfacing Project Rehabilitating Oak Noll Drive 06/2018 08/2018 3 7 28 15 Rehabilitation Ave. Road Maintenance & Rehabilitation of Bruce Ave . The treatment will be contingent on the coring/further Monte Sereno Santa Clara Bruce Avenue Bruce Ave beginning at San Benito Way and ending Poppy Lane 05/2019 06/2019 12 15 28 15 Rehabilitation research results. Road Maintenance & Remove and replace of failed pavement sections, a 2" asphalt concrete overlay and the Monterey Road between Cochrane Road and Tilton Avenue; East Dune Avenue between Hill Road Morgan Hill Santa Clara Pavement Resurfacing Project 04/2019 07/2019 5 10 29, 30 17 Rehabilitation restriping of existing bike lanes, legends, crosswalks and lane lines. and Thomas Grade

Road Maintenance & Rehabilitation of Sutter Boulevard The removal and replacement of failed pavement sections, a 2” asphalt concrete Morgan Hill Santa Clara Sutter Boulevard between the intersections of Cochrane Road to Serene Drive 05/2018 07/2018 5 10 29, 30 17 Rehabilitation 17/18 Carryover overlay and the restriping of existing bike lanes, legends, crosswalks and lane lines.

Resurfacing Project Locations: California Street from Castro Street to South Shoreline Boulevard; Velarde Street from Bush Street to Anza Street; North Shoreline Boulevard from Gatehouse to Kite Flying Area Slurry Seal or Microsurfacing Project Locations: Install asphalt concrete and fog seal overlays, raise utilities and monuments, raise low Hollingsworth Drive from El Monte Avenue to East End; Kathy Way from Hollingsworth Drive to Lloyd Road Maintenance & Streets Resurfacing and Slurry Seal Mountain View Santa Clara median island where needed to standard, or apply slurry seal to selected street Way; Melba Court from Kathy Way to East End; Dell Avenue from Alvin Street to West End; Doverton 07/2019 10/2020 8 10 24 13 Rehabilitation Program surfaces. Square from Levin Avenue to Levin Avenue; Katrina Way from Levin Avenue to Fairbrook Drive; Pamela Drive from Phyllis Avenue to Bay Street; Bay Street from Pamela Drive to El Camino Real; Tulane Drive from Fordham Way to Columbia Drive; Columbia Drive from Tulane Drive to Sladky Avenue

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Project Location: Aitken Avenue from Solana to West End - OK Gretel Lane from Cuesta Drive to Hans Avenue - OK Nilda Avenue from Cuesta Drive to Hans Avenue - OK Garden Terrace/Woodleaf Way from (entire circle) Sleeper to Sleeper - OK Pioneer Way from Evelyn Avenue to South End - OK Bernardo Avenue from North End to Central Expressway – Deleted from list due to conflict with other project Ehrhorn Avenue from Church to El Camino Real – Deleted from list due to conflict with other project 17/18 Carryover Project: Street High School Way from Shoreline to Castro – Changed limit Road Maintenance & Install asphalt concrete and fog seal overlays, raise utilities and monuments, or apply Mountain View Santa Clara Resurfacing and Slurry Seal Jessie Lane from Paul to Calderon - OK 06/2018 09/2018 8 10 24 13 Rehabilitation slurry seal to selected street surfaces Program Miller Avenue from San Antonio to Del Medio – Deleted from list due to conflict with other project San Pierre Way from Middlefield to Montecito - OK Sun-Mor Avenue from ‘Beginning of Improvement’ to Levin - OK Limetree Lane from Rose Avenue to Spencer Ct - OK Orangetree Lane from Rose to Sunnyvale City Limit - OK Peachtree Court from Walnut to end – Deleted from list due to conflict with other project Bernardo Avenue from Middlefield to Central Expressway Gladys Avenue from Easy Street to Whisman - OK Plymouth Street from Rengstorff to Amherst Way – Deleted from list due to conflict with other project Fordham Way from Orangetree to Limetree – Added to the list

This project will install enhanced bicycle and pedestrian improvements, 42,000 square Complete Streets Charleston-Arastradero Corridor Arastradero Road from Coulombe Drive to El Camino Real and Charleston Road from El Camino Real Palo Alto Santa Clara feet of landscaped median and bio-retention areas, bulb-outs, traffic signal 07/2018 05/2020 25 35 24 13 Components Project (Phase 3) to Alma Street and Middlefield Road to San Antonio Road (map included in the uploaded staff report). modifications and installation of a new traffic signal and new rubberized pavement.

Alma Street (Palo Alto Ave to Melville Ave); Barron Avenue (Laguna Ave. to Josina Ave); Guinda The FY 2018 Asphalt Paving Project includes the replacment of broken sidewalks, Street (Melville Ave to Addison Ave); Hale Street (Palo Alto Ave to University Ave); La Calle Court Road Maintenance & 17/18 Carryover Projects (FY 2018 driveways, damaged PCC slabs, and uplifted curb and gutter; installation of valley Palo Alto Santa Clara (Barron Ave to End, North/South); Lane 33 (Ruthven Ave to Cowper St); Bryant Street (Lincoln Ave to 05/2018 11/2018 25 30 24 13 Rehabilitation Asphalt Paving Project) gutters and curb ramps; resurfacing of asphalt pavement and installation of new Kingsley Ave); Whitman Court (Bryant St to Waverley St); Kellogg Avenue (Alma St to Middlefield Rd); signage and striping. Quarry Road (El Camino Real to Arboretum Rd)

10th Street (Between Highway 101 and Keyes Street); 11th Street (Between East Hedding Street and Keyes Street); Adrian Way (Between Ocala Avenue and Story Road); Almaden Boulevard (Between Santa Clara Street and Balbach Street); Coleman Road (Between Almaden Expressway and Santa Road Maintenance & 2019 MAJOR STREET SEALING This project will install microsurfacing sealant over streets that may have received spot Teresa Boulevard); De Anza Boulevard (Between Bollinger Road and Highway 85); East Empire Street San Jose Santa Clara 05/2019 10/2019 5 7 25, 27, 28, 29 10, 15 Rehabilitation PROJECT "remove and replace" repairs. (Between North 1st Street and North 22nd Street); Flint Avenue (Between Marten Avenue and Guluzzo Drive); Leigh Avenue (Between Moorpark Avenue and Hamilton Avenue); Lucretia Avenue (Between Story Road and Phelan Avenue); Murphy Avenue (Between Oakland Road and Lundy Avenue); San Antonio Street (Between 28th Street and Jackson Avenue)

Allen Avenue (Between Santa Teresa Boulevard and Steinbeck Drive) Beswick Drive (Between Blossom Hill Road and Cottle Road) Cypress Avenue (Between Moorpark Avenue and Williams Road) Echo Valley Drive (Between Hillcrest Drive and Glenview Drive) Flint Avenue (Between Guluzzo Drive and Norwood Avenue ) Koch Lane (Between Plummer Avenue and Almaden Road) This project aims to resurface and rehabilitate the following section of road within the Leigh Avenue (Between City limit and San Carlos Street) City of San Jose. The project will include work such as Cold In-Place Recycling (CIR), Road Maintenance & 2019 MAJOR STREET Leigh Avenue (Between Parkmoor Avenue and Scott Street) San Jose Santa Clara placing pavement fabric, applying a rubberized hot mix asphalt overlay, replacing traffic 05/2019 10/2019 15 20 27, 28, 29 15, 17 Rehabilitation RESURFACING PROJECT McKee Road (Between Highway 101 and King road) striping and markings, adding new/enhanced bike lanes, and installing bicycle detector Phelps Avenue (Between Williams Road and City limit) loops. Plummer Avenue (Between Foxworthy Avenue and Curtner Avenue) Prospect Road (Between Johnson Avenue and South De Anza Boulevard) East San Antonio Street (Between South 17th Street and 28th Street) San Jose Avenue (Between Monterey Road and Almaden Expressway) Story Road (Clayton Road and Fleming Avenue) East William Street (Between North 1st Street and 16th Street)

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

16th St (Between San Carlos St and Margaret St) 17th St (Between Santa Clara St and San Carlos St) Bird Ave (Between San Carlos St and Willow St) Payne Ave (Between Saratoga Ave and City Limit) Samaritan Dr (Between Bascom Ave and Union Ave) Willow St (Between Lincoln Av and 1360's Meridian Ave) Blaney Ave (Between Prospect Rd and Bollinger Rd) This project aims to resurface and rehabilitate the following section of road within the Canoas Garden Av (Between Almaden Rd and Almaden Ex) 2018 MAJOR STREET City of San Jose. The project will include work such as Cold In-Place Recycling (CIR), Road Maintenance & Mckean Rd (Between Almaden Rd and Mckean Ct) San Jose Santa Clara RESURFACING PROJECT (17/18 placing pavement fabric, applying a rubberized hot mix asphalt overlay, replacing traffic 05/2018 11/2018 15 20 28 15 Rehabilitation Mckean Rd (Between Harry Rd and City Limit) Ongoing) striping and markings, adding new/enhanced bike lanes, and installing bicycle detector Mckean Rd (Between Bailey Ave and S City Limit) loops. Mckee Rd (Between White Rd and Valley View Ave) Norwood Av (Between White Rd and Gurdwara Ave) Plumeria Dr (Between 1st St and Montague Ex) Ringwood Av (Between Trade Zone Bl and Birchmeadow Ln) San Salvador St (Between Market St and 10th St) Viola St (Between S Market St and Almaden Ave) Yerba Buena Rd (Between Silver Creek Rd and Deans Place Way)

• De La Cruz Blvd. (Greenwood Dr. to Aldo Ave.) [DELCRZ 000002]; • De La Cruz Blvd. (Aldo Ave. to Laurelwood Rd.) [DELCRZ 000003]; • De La Cruz Blvd. (Laurelwood Rd. to Trimble Rd.) [DELCRZ 000004]; • De La Cruz Blvd. (Central Expwy. to 816 FT N of Martin Ave) [DELCRZ 000005]; • De La Cruz Blvd. (Martin Ave. to Reed St.) [DELCRZ 000006]; • De La Cruz Blvd. ((A) Coleman Ave. to Merge (De La Cruz NB Off-Ramp)) [DELCRZ 000007]; Pavement maintenance and rehabilitation for the existing street. The work includes • De La Cruz Blvd. ((A) Merge (De La Cruz NB Off- Ramp) to Reed St.) [DELCRZ 000009]; treating the pavement with asphalt concrete, slurry seal, or cape seal. Ancillary work Road Maintenance & Annual Street Maintenance and • De La Cruz Blvd. ((B) Reed St. to Fork (De La Cruz SB On-Ramp)) [DELCRZ 000010]; Santa Clara Santa Clara may include removal and replacement of failed pavement areas, and reconstruction of 04/2019 12/2019 3 20 25 10 Rehabilitation Rehabilitation Program Project • De La Cruz Blvd. ((D) Coleman Ave. to Merge (De La Cruz SB On-Ramp)) [DELCRZ 000012]; curbs, gutters, sidewalks, ADA curb ramps, traffic striping, markings, roadway legends • De La Cruz Blvd. (816 FT N of Martin Ave to Martin Ave) [DELCRZ 000014]; and traffic detection loops as needed. • De La Cruz Blvd. ((C) Fork (El Camino Off-Ramp) to El Camino Real) [DELCRZ 000016]; • De La Cruz Blvd. ((F) Fork (El Camino Off-Ramp) to Lewis St.) [DELCRZ 000017]; • De La Cruz Blvd. ((B) Fork (De La Cruz Sb On-Ramp) to Coleman Ave.) [DELCRZ 000018]; • De La Cruz Blvd. ((E) El Camino Real to Merge (El Camino On- Ramp)) [DELCRZ 000019]; • De La Cruz Blvd. ((E) Fork (Coleman Off-Ramp) to Coleman Ave.) [DELCRZ 000020]; • De La Cruz Blvd. ((F) Merge (El Camino On- Ramp) to Fork (Coleman Off-Ramp)) [DELCRZ 000021];

City wide various streets. All locations are projected and subject to change based on the City's annual need and resources. Street From To BOYCE LN VERDE VISTA LN END CALLE MONTALVO MONTALVO RD END CHESTER AVE VIA TESORO CT 14331 CHESTER AVE FARWELL AVE SARA-LG RD WILD OAK WAY MONTALVO RD SARATOGA-LG RD HILL AVE MONTALVO RD HILL AVE 76' N of HILL AVE MONTAUK CT MONTAUK DR END MONTAUK DR FRUITVALE AVE TAOS DR MT EDEN RD GARROD CITY LIMITS Pavement maintenance project to rehabilitate city roadways to improve PCI and safety. Road Maintenance & Annual Roadway Improvements OKANOGAN CT OKANOGAN DR END Saratoga Santa Clara AC overlay, Repair Failed Street Sections, micro-surfacing , traffic loops, curb and 09/2018 06/2019 10 15 27 15 Rehabilitation 2018-2019 OKANOGAN DR MONTAUK DR TAOS DR gutter, ADA ramps and re-striping traffic lanes. PARK DR SARATOGA-LG RD HUME DR PARK DR HUME DR PEPPER LN PIERCE RD VINTAGE LN MASSON CT PRUNE BLOSSOM VERDE VISTA LN END PURDUE DR BAYLOR AVE VILLA NOVA RD TAMWORTH AVE VERDE VISTA LN SEATON AVE TAOS DR MONTAUK DR OKANOGAN DR TONI ANN PL ERDE VISTA LN END VERDE CT VERDE VISTA LN END VERDE VISTA LN SARA-SUNNY RD SARAHILLS DR WOODWARD CT TAMWORTH AVE END WOOD DELL CT SARATOGA AVE END

Tasman Dr - Fair Oaks e/s to Vienna; Tasman Dr - Vienna to Lawrence Expwy; Tasman Dr - Lawrence expwy e/s to Birchwood; Tasman Dr - Birchwood to Adobe Wells; Tasman Dr - Adobe Wells to Road Maintenance & ST 18-10 Slurry Seal of Arterial Reamwood; Tasman Dr - Reamwood to w/side channel; Wolfe Rd - Evelyn to reed/OSFR; Wolfe Rd - Sunnyvale Santa Clara Type 3 Slurry Seal 01/2019 08/2019 7 10 24 13 Rehabilitation Streets 2019B Reed/OSFR to Iris; Wolfe Rd - Iris to Gary; Wolfe Rd - Gary to Maria; Wolfe Rd - Maria to El Camino Real; Java Ave. - Mathilda to Bordeaux; Java Ave. - Bordeaux to Borregas; Java Ave. - Borregas to Geneva; Java Ave. - Geneva to Crossman; Java Ave. - Crossman to 237 overpass

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Noranda Dr - Homestead to west end; Mango Dr - Heathersone s/s to Knickerbocker n/s; Britton Ave. - Road Maintenance & ST 18-10 Pavement Overlay of City Wolfe to Taylor; Taylor Ave. - Fair Oaks e/s to Britton; Old San Francisco Road (OSFR) Fair Oaks e/s Sunnyvale Santa Clara Pavement Overlay 01/2019 12/2019 10 15 24 13 Rehabilitation Streets to Gail; OSFR - Gail to Wolfe w/s; Murphy - Olive s/s to El Camino Real n/s of island; Murphy - Iowa s/s to Olive n/s Road Maintenance & 42nd Avenue Pavement Pavement rehabilitation of 42nd Avenue from Jade Street to Capitola Avenue, Diamond 42nd Avenue from Jade Street to Capitola Road, Diamond Avenue from 42nd Avenue to 45th Avenue Capitola Santa Cruz 04/2018 12/2019 15 25 29 17 Rehabilitation Rehabilitation Avenue from 42nd Avenue to 45th Avenue and Ruby Court. and Ruby Court. Upgrade old catch basins within the city street system to reduce flooding and improve There are 1,452 catch basins within the city limits, of which 755 are older Type A catch basins that Santa Cruz Santa Cruz Other Catch Basin Replacement Citywide 09/2018 11/2018 30 50 29 17 road user safety. require replacement. Replace deteriorated CMP storm drains within the city street system to reduce flooding, Corrugated Metal Pipe (CMP) Santa Cruz Santa Cruz Other street caveins and improve road user safety. There are 54 miles of storm drains and There are 54 miles of storm drains within the City and approximately 10% are CMP. 09/2018 11/2018 30 50 29 17 Replacement Citywide approximately 10% are CMP.

Road Maintenance & Arterial and Collector Street Replace sidewalks and access ramps to meet current standards concurrent with Santa Cruz Santa Cruz Cedar Street from Laurel to Lincoln 05/2018 11/2018 15 20 29 17 Rehabilitation Reconstruction (17/18 Carryover) reconstructing Arterial and Collector streets.

Reconstruct Riverside Avenue between Beach Street and Third Street in the City's Complete Streets popular main beach area in conjunction with a Rule 20A utility undergrounding project. Santa Cruz Santa Cruz Riverside Avenue Streetscape Riverside Ave, between Beach and Third. 09/2018 06/2019 15 50 29 17 Components Projects includes new sidewalks, streetlights, paving, bike lanes, crosswalks and the removal of a stop controlled intersection. Reconstruct portions of River Street and Water Streets, both arterial streets near Road Maintenance & Arterial and Collector Street Santa Cruz Santa Cruz Downtown Santa Cruz. Projects includes new access ramps,CIR paving, green bike River Street, between Water and Highway and Water Street, between Branciforte and Pacific. 07/2018 06/2019 15 20 29 17 Rehabilitation Reconstruction lanes, and crosswalks. Road Maintenance & Local match funding for FEMA and OES eligible federal storm damage restoration Upper Park Road north of DelaVeaga Rd, West Cliff Drive at San Jose, East Cliff Drive at 3rd Ave, Santa Cruz Santa Cruz Storm Damage (17/18 Carryover) 05/2018 06/2019 30 50 29 17 Rehabilitation projects on the City street and multi-use path system. Ocean at Plymouth, Parkway north of Allerton.

This project will rehabilitate Green Hills Road from Glen Canyon Road to its terminus. The project will include bike lanes, road widening, new curb and gutter, Road Maintenance & Pavement Rehabilitation on Green Green Hills Road from Glen Canyon Road to its terminus, Glen Canyon Road from Vern Hart Fish Scotts Valley Santa Cruz restriping on Glen Canyon Road from Vern Hart Fish Park to Green Hills Road. The 04/2018 08/2018 15 20 29 17 Rehabilitation Hills Road Park to Green Hills Road, South Navarra Drive from Green Hills Road to Grant Creek Road project will also include signage and sharrows on South Navarra Drive from Green Hills Road to Grant Creek Road.

This project is an annual street overlay program that includes the resurfacing of various Road Maintenance & Annual Street Blue Hills Court, Green Tree Way, Kentwood Court, Pinecone Lane, Purple Hills Court, Sageland Scotts Valley Santa Cruz city-maintained streets on a rotating basis. Maintenance in FY 18/19 will consist of 08/2018 06/2019 10 15 29 17 Rehabilitation Maintenance/Resurfacing Program Court, Taryn Court, Granite Creek Road, Nadia Court, Scotts Valley Drive, Lock hart Gulch Road HMA overlays. Reconstruct roadway and bike lanes, install new sidewalk, upgrade curb ramps and Road Maintenance & Watsonville Santa Cruz Airport Blvd Reconstruction PH2 driveway crossings, install median island, modify traffic signals to include additional Airport Blvd from Westgate Dr/Larkin Valley Rd to Hangar Way 06/2018 09/2019 20 20 30 17 Rehabilitation pedestrian crossing and install flashing beacon at Holm Rd. Road Maintenance & Airport Blvd Pavement Watsonville Santa Cruz Reconstruct roadway due to failed pavement Airport Blvd from Freedom Blvd to 600 feet west 06/2019 09/2020 20 20 30 17 Rehabilitation Reconstruction

Intersections of Rodriguez St & West Beach St, Rodriguez St & West Lake Ave, Freedom Blvd & Brennan St, Freedom Blvd & Alta Vista Ave, Freedom Blvd & Clifford Ave, Freedom Blvd & Davis Ave, Freedom Blvd & Green Valley Rd, Airport Blvd & Loma Prieta Ave, Airport Blvd & Hanger Way, Watsonville Santa Cruz Traffic Control Devices Citywide Signal Upgrade - HSIP Upgrade traffic signals and pedestrian crossing facilities Airport Blvd & Nielson St, Airport Blvd & Westgate Dr, Airport Blvd & Freedom Blvd, Green Valley Rd 07/2018 07/2019 10 10 30 17 & Harkins Slough Rd, Green Valley Rd & Quiet Meadow Dr, Green Valley Rd & Kralj Dr, Green Valley Rd & Lawrence Ave, Green Valley Rd & Loma Prieta Ave/Pennsylvania Dr, Green Valley Rd & Carnation Dr, Green Valley Rd & Home Depot Driveway, Ohlone Parkway & Harkins Slough Rd

Provide complete streets improvements including but not limited to pedestrian facilities, Complete Streets Watsonville Santa Cruz Downtown Revitalization bus stops, parking, bicycle facilities and traffic management. Includes design, Main St from Freedom Blvd to Riverside Dr and Rodriguez St from Main St to Riverside Dr 06/2019 07/2020 20 20 30 17 Components environmental documentation and construction.

Complete Streets Pedestrian crossing enhancements that incorporate bulbouts, landscaping, lighting, Watsonville Santa Cruz Lincoln St Safety Improvements Lincoln St from East Beach St to Riverside Dr 06/2019 03/2020 20 20 30 17 Components decorative pedestrian scale fencing, crosswalks, sidewalks and pedestrian amenities.

Blackburn St from East Lake Ave to East Beach St, Green Valley Rd from Harkins Slough Rd to Home Road Maintenance & Watsonville Santa Cruz Maintain Road Pavement sealing Depot Entrance, Ohlone Parkway from railroad tracks to Main St, Longview Dr from Progress Ave to 07/2018 07/2019 8 8 30 17 Rehabilitation Pennsylvania Dr and Elm St Marchant St to Lincoln St. Rehabilitate roadway and bikelanes, widen to accommodate extension of bicycle lanes Road Maintenance & Watsonville Santa Cruz Airport Blvd Improvements and portion of travel lane, install bus pull out, new sidewalks and curb ramps, refuge Airport Blvd from Freedom Blvd to City Limits 02/2018 06/2019 20 20 30 17 Rehabilitation island, flashing beacon and striping. Bridge St from Beck St to East Lake Ave, Green Valley Road from Harkins Slough Rd to city limits, Provide signage and traffic markings along bicycle corridors and provide educational Harkins Slough Rd/Walker St from Green Valley Rd to Riverside Dr, Pennsylvania Dr from Green Watsonville Santa Cruz Other Citywide Bicycle Facilities 07/2018 06/2019 10 10 30 17 programs Valley Rd to Main St, Rodriguez St from Riverside Dr to Main St, West Beach from Lee Rd to Rodriguez St 490 Auto Center Dr, 500 Auto Center Dr, 580 Auto Center Dr, Union St & Maple Ave, Peck St & Union Complete Streets Replacement and/or installation of curb ramps and street crossings to comply with Watsonville Santa Cruz Citywide Curb Ramp Program St, Elm St & Union St, 65 Nielson St, Central Ave & Main St, Herman Ave, field approach opposite 07/2018 06/2019 20 20 30 17 Components current ADA standards 173 Herman Ave, Roosevelt St & Herrick Ct, Roosevelt St & Cullumber Ct

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Arthur Rd from Mariposa Ave to Freedom Blvd, Blackburn St from East Lake Ave to East Beach St, Elm St from Marchant St to Lincoln St, Green Valley Rd from Harkins Slough Rd to the Home Depot driveway, Longview Dr from Progress Ave to Pennsylvania Dr, Ohlone Parkway from the railroad Watsonville Santa Cruz Traffic Control Devices Citywide Signs, Markings & Striping Remove, replace and/or upgrade existing roadway signs, markings and striping tracks to Main St, West Beach St from Ohlone Parkway to west City limits, West Beach St from Walker 07/2018 06/2019 10 10 30 17 St to Industrial Rd and the alley between Stanford St & East High St and parallel to Lincoln St & Jefferson St. The intersections of Central Ave & Main St, Elm St & Union St, Peck St & Union St, Roosevelt St & Herrick Ct, Roosevelt St & Cullumber Ct and Union St & Maple Ave.

All or portions of Bay Breeze, Fed Ex, Stone Creek, Struve Slough, Upper Struve Slough and Watsonville Santa Cruz Other Maintain Trails Maintain and enhance existing pedestrian and bicycle trails 07/2018 06/2019 10 10 30 17 Watsonville Slough trails Educational/safety programs and installation of striping, markers, signage, flashing Watsonville Santa Cruz Safety Pedestrian & Traffic Safety Roache Rd, Beach St near Harvest Dr, Harkins Slough Rd 07/2018 06/2019 15 15 30 17 beacons, curb extensions, speed humps, etc. Arthur Rd from Mariposa Ave to Freedom Blvd, West Beach St from Ohlone Parkway to west City Road Maintenance & Watsonville Santa Cruz Road Repair Repair roadway limits, West Beach St from Walker St to Industrial Rd, alley between Stanford St & East High St and 07/2018 06/2019 10 10 30 17 Rehabilitation parallel to Lincoln St & Jefferson St

Intersections of Main St and Second St/Maple Ave, Rodriguez St and West Beach St, Rodriguez St and West Lake Ave, Freedom Blvd and Brennan St, Freedom Blvd & Martinelli St, Freedom Blvd and Crestview Dr, Freedom Blvd and Alta Vista Ave, Freedom Blvd and Clifford Ave, Freedom Blvd and Davis Ave, Freedom Blvd and Green Valley Rd, Airport Blvd and Loma Prieta Ave, Airport Blvd and Signals and Lighting Replacement Watsonville Santa Cruz Traffic Control Devices Replace, upgrade or maintain traffic signals and lighting Ross Ave, Airport Blvd and Hanger Way, Airport Blvd and Nielson St, Airport Blvd and Westgate Dr, 07/2018 06/2019 10 10 30 17 and Maintenance Airport Blvd & Freedom Blvd, Green Valley Rd and Harkins Slough Rd, Green Valley Rd and Quiet Meadow Dr, Green Valley Rd and Kralj Dr, Green Valley Rd and Lawrence Ave, Green Valley Rd and Loma Prieta Ave/Pennsylvania Dr, Green Valley Rd and Carnation Dr, West Beach St and Lee Rd, Green Valley Rd and Home Depot driveway, Ohlone Parkway and Harkins Slough Rd

Road Maintenance & Reconstruct roadway and bikelanes, replace asphalt pedestrian path with curb, gutter Watsonville Santa Cruz Green Valley Rd Improvements Green Valley Rd from Struve Slough to Freedom Blvd 06/2018 06/2019 20 20 30 17 Rehabilitation and sidewalk and ADA compliant curb ramps, upgrade signage and loop detectors

Road Maintenance & Anderson Shasta Cape Seal of North Street Cape seal North Street North Street from SR273 to Sacramento River Bridge 04/2019 05/2019 6 10 1 1 Rehabilitation Road Maintenance & Anderson Heights Cape Seal Anderson Shasta Cape seal streets in Anderson Heights neighborhood Pinion, Larch, Lodgepole, Aspen, Spruce, Hemlock, and Jefferies Streets 04/2019 05/2019 10 20 1 1 Rehabilitation Project Road Maintenance & Anderson Shasta City Wide Grinder Dig-out Remove and replace sections of failing pavement. North Street between McMurray and Stringy and South Street between SR273 and Emily Drive 06/2018 07/2018 20 30 1 1 Rehabilitation Road Maintenance & Residential cape and slurry seal project Redding Shasta 2017-18 Cape/Slurry Seal Quail Ridge, Edgewood Drive, Lancer, Arroyo Manor, Hacienda Heights, and Stetson. 03/2018 08/2018 5 12 1 1 Rehabilitation Addressing 6 Streets in slated project

Project includes installation of bike lanes and sidewalks along Quartz Hill Road. Also Redding Shasta Safety Quartz Hill Road ATP Widening Quartz Hill Road from Market Street to just south of Terra Nova. 01/2018 08/2018 10 20 1 1 the addition of enhanced pedestrian crossings with rapid flashing beacons.

Project includes a road diet, sidewalk gap closure, ADA curb ramps, buffered bike lanes Redding Shasta Safety Bechelli Lane ATP Improvements Bechelli Lane from Cypress Avenue on the North to Riverview Country Club. 02/2019 05/2022 10 15 1 1 and enhanced pedestrian crossings. Road Maintenance & Residential cape and slurry seal. Canby Rd., Browning St.,Old Alturas Rd., Victor Ave., Woodside Meadows, Alfreda Way, Reservoir Redding Shasta 2018-19 Cape/Slurry Seal 04/2019 07/2019 5 12 1 1 Rehabilitation Servicing at minimum 7 streets Ln., and various other streets.

Widen Bidwell Lane and North Bonnyview Road to add bicycle and pedestrian facilities Redding Shasta Safety Bonnyview Safe Routes to School Bidwell Lane and North Bonnyview road to East Bonnyview Road. 01/2019 08/2019 15 30 1 1 including sidewalk and enhanced crosswalks to/from Bonnyview Elementary School.

Project generally consists of grinding, paving fabric installation, HMA placement, and Road Maintenance & Cascade Boulevard Improvements Shasta Lake Shasta thermoplastic striping and marking on Cascade Boulevard between Shasta Dam Cascade Boulevard between Shasta Dam Boulevard and Grand Coulee Boulevard. 07/2018 10/2018 20 30 1 1 Rehabilitation 2018 (17/18 Carryover Project) Boulevard and Grand Coulee Boulevard. Project generally consists of preparation for and application of high-molecular-weight Churn Creek Bridge Methacrylate Shasta Lake Shasta Other methacrylate resin and thermoplastic striping on the Churn Creek bridge deck on Pine Pine Grove Ave @ Churn Creek 07/2018 10/2018 20 30 1 1 Deck Seal (17/18 Carryover Project) Grove Avenue. Project generally consists of completing the civil and structural engineering, Moody Creek Bridge Replacement environmental, right-of-way, and PSE work related to the rehabilitation and/or Shasta Lake Shasta Other Cascade Boulevard @ Moody Creek 06/2022 12/2025 50 75 1 1 Project (17/18 Carryover Project) replacement of the Moody Creek Bridge on Cascade Boulevard. Construction of project will follow completion of design.

Street Boundaries Include: Poole Ln, Beckwith Rd, White St, Jones St, Zollinger St, Meeker St, 1st St, Chip Seal and Slurry on all city streets 2nd St, 3rd St, 4th St, E 2nd St, W 3rd St, N 5th St, Church St, Court Ln, Pine St, Railroad Ave, School Road Maintenance & Loyalton Sierra City of Loyatlon New Stop Signs St, Front St, E Lewis St, Mill St, Taylor Ave, Granite Ave, Patterson Ave, Cemetery Rd, Hill St 07/2018 07/2019 5 10 1 1 Rehabilitation Fix pothole on city streets All locations have yet to be finalized and are subject to change. Each location will be selected based on priority need and resources throughout the year.

Street Boundaries Include: Poole Ln, Beckwith Rd, White St, Jones St, Zollinger St, Meeker St, 1st St, 2nd St, 3rd St, 4th St, E 2nd St, W 3rd St, N 5th St, Church St, Court Ln, Pine St, Railroad Ave, School Road Maintenance & Railroad and Lewis (17/18 Loyalton Sierra Fixing curbs and road repair for wash out. St, Front St, E Lewis St, Mill St, Taylor Ave, Granite Ave, Patterson Ave, Cemetery Rd, Hill St 05/2018 06/2018 3 5 1 1 Rehabilitation Carryover) All locations have yet to be finalized and are subject to change. Each location will be selected based on priority need and resources throughout the year.

Road Maintenance & 2018-19 Street Rehabilitation E. Fourth Street from Pine to Center Dorris Siskiyou Rehabilitation & maintenance of local roadway 08/2018 04/2018 20 30 1 1 Rehabilitation Project (17/18 Carryover) Juniper St. from Hwy 97 to Hazen St.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Complete Streets Remove and replace sidewalks and construct ADA-compliant curb ramps on Dunsmuir Dunsmuir Siskiyou 2018 Sidewalk Project Dunsmuir avenue near Cedar and Oak Streets. 05/2018 12/2018 25 25 1 1 Components Avenue. Various streets in Dunsmuir as funds allow. From east to west, the streets would include from “Castle” to “Sacramento.” And from south to north, the streets would include from “Vernie” to “Linda Place.” Road Maintenance & Dunsmuir Siskiyou Asphalt crack sealing Crack seal existing streets This area includes approximately 40 streets. The Public Works Director has a list of streets with the 06/2019 06/2019 3 3 1 1 Rehabilitation highest priority need for crack fill projects - with streets Gray, Branstetter, and Fourth having the most need. Road Maintenance & Etna Siskiyou Main Street 2018 (Carryover 17/18) Main Street Road Repair Main Street 05/2018 08/2018 5 20 1 1 Rehabilitation Road Maintenance & City of Etna Street Repair Multiple Repaving street repair along 4 street locations in the city of Etna as identified in the Etna Siskiyou Main Street, Charles Street, Bryan Street, Cleveland Street 06/2018 08/2019 5 20 1 1 Rehabilitation Locations location field. Road Maintenance & Projects will consist of crack sealing the streets with specialized high quality materials Montague Siskiyou Crack Sealing (17/18 Carryover) City of Montague West Webb, S 13th, Buell, Prather, 5th St, N 6th and 9th St. 07/2018 06/2019 1 1 1 1 Rehabilitation to prevent the intrusion of water and incompressible materials. Road Maintenance & Pine St, Sheldon Ave, Merritt Ave, Perry Ave, Eugene Ave, Ida St, Gaudenzio Ave, Shasta Ct, Smith Mount Shasta Siskiyou Citywide Street Maintenance Street resurfacing, repair, paving overlay, crack seal, and chip seal 07/2018 08/2018 5 10 1 1 Rehabilitation St, South A St, and South B St. Remove existing traffic signals and install new traffic signals at the intersection of Alma Alma Street Traffic Signal Project Mount Shasta Siskiyou Traffic Control Devices Street and North Mt. Shasta Blvd. Construct new ADA compliant curb ramps at the four The intersection of Alma Street and North Mt. Shasta Blvd. 03/2018 10/2018 25 50 1 1 (17/18 ongoing) corners of the intersection. Crack sealing of streets citywide at the following locations: Road Maintenance & Annual Citywide Crack Sealing crack sealing of Main Street between F and G Streets, crack sealing of Second Street Tulelake Siskiyou City of Tulelake- surface of Main and Second Streets 04/2018 06/2018 15 20 1 1 Rehabilitation (Ongoing 2017/2018) between E and F Streets, and crack sealing Second Street between Modoc and B Streets. Crack sealing of streets citywide of the following locations: crack sealing C Street between Fourth Street and the Water Yard, crack sealing B Road Maintenance & Annual Citywide Crack Seal 2018- Tulelake Siskiyou Street between Main Street and the end of B Street, and crack sealing Second Street City of Tulelake- surface area of C, B and Second Streets 07/2018 06/2019 5 10 1 1 Rehabilitation 2019 between B Street and E Street.

Road Maintenance & Weed Siskiyou Parks Street Rehab of failing asphault Park Street from Main St to Tebbe St. 06/2018 11/2018 10 20 1 1 Rehabilitation Road Maintenance & Vista Drive Rehab 17/18 Carryover Weed Siskiyou 17/18 Carryover Project Rehabilitation and maintenance of a local roadway Vista Drive 06/2018 09/2018 10 20 1 1 Rehabilitation Project

City of Yreka Strategic Paving, Various streets in City of Yreka locations TBD; Road Maintenance & Strategic chipsealing and other appropriate maintenance of approximately 15,000 LF of Yreka Siskiyou Preventive and Planning Project Greenhorn Road – Main Street to Greenhorn Park entrance 06/2018 12/2018 5 15 1 1 Rehabilitation city streets. (17/18 Ongoing) S. Phillipe from Hwy. 3 to City Limits and Limestone, Quarry, Helwig, Juniper, and Deer Creek Way

Noyes Ct.; Bayshore Rd (East Channel Rd. to Industrial Way); East Channel Rd (Channel Rd to Road Maintenance & Bayshore Rd); Denfield Ave (Military West to 650ft north of Military West); West 2nd St (W-N St to Benicia Solano Street Resurfacing 2019 Project Grind & overlay 04/2019 06/2019 20 25 14 3 Rehabilitation Raymond Dr.); Harbor Vista Ct; West 5th (Military to W-J St); West 6th (Cove Way to W-K St); East 3rd (I780 to Hillcrest); Shirley Dr (Raymond Dr to Bridgeview Ct); West I St (W-6th to W-5th)

Street segments include: East C Street from North First Street to Doyle Lane; North Second Street Road Maintenance & 2018 Pavement Rehabilitation from East C Street to Creekside Circle; South Almond Street from West A Street to Porter Road; Dixon Solano Slurry seal and replace striping on various streets within the City of Dixon. 06/2018 08/2017 7 10 4 3 Rehabilitation Project (17/18 Ongoing) South Lincoln Street from West A Street to south city limits; and West F Street from Pitt School Road to North First Street. Street segments include: West A Street at I-80; Porter Road from West A Street to south city limits; Road Maintenance & 2019 Pavement Rehabilitation Slurry seal, crack seal and asphalt dig-out repairs and replacement of traffic striping on West H Street from Pitt School Road to Evans Road; Evans Road from West H Street to West A Dixon Solano 04/2019 06/2019 7 10 4 3 Rehabilitation Project various streets within the City of Dixon. Street; Pitt School Road from West A Street to Stratford Avenue; Ary Lane from Pitt School Road to Market Lane; Market Lane from UPRR tracks to First Street (SR113). Location is bounded by I-80, Hwy 12, southern City Limits, E. Tabor Ave, Walters Rd, Air Base Pkwy, Road Maintenance & Fairfield Solano PW Maintenance Crews Pot hole and spot repairs Laurel Creek Cement Hill Road, Dover Ave and Manuel Campos Pkwy which contains approximately 07/2020 11/2022 5 7 11 3 Rehabilitation 481 roadways. Road Maintenance & Fairfield Solano Safe Routes to School E. Tabor Ave Safe Routes to School Gap Closure West of RR tracks to East of Olive Ave 07/2020 11/2022 10 15 11 3 Rehabilitation

Business Center Dr (City Limit to Green Valley Rd), Business Center Dr (Green Valley Rd to Suisun Valley Rd), Business Center Dr (Dan Wilson Creek to Suisun Valley Rd), Business Center Dr (Suisun Pavement Maintenance Project Parkway to Dan Wilson Creek), Central Way (Pittman Rd to City Limits), Central Place (Pittman Rd to Road Maintenance & Fairfield Solano 2018 - Phase 2 Cordelia & Green Repaving approximately 1,807,444 square feet End), Pittman Rd (Cordelia Rd to 1000' North of Redwood Meadows Ln), Pittman Rd (1000' North of 08/2018 11/2018 5 16 11 3 Rehabilitation Valley Redwood Meadows Ln to Link Rd), Pittman Rd (Link Rd to Central Way), Pittman Rd (Central Way to I- 80), Cordelia Rd (Monument to Link Rd), Cordelia Rd (Link Rd to City Limits), Suisun Valley Rd (Neitzel Rd to Mangels Blvd), Suisun Valley Rd (Mangels Blvd to City Limits)

Chadbourne Rd (Highway 12 to Cordelia Rd), Beck Ave (Highway 12 to Cordelia Rd), Courage Dr Road Maintenance & Pavement Maintenance Project (Chadbourne Rd to Beck Ave), Cordelia Rd (Ledgewood Creek to Beck Ave), Cordelia Rd (Beck Ave Fairfield Solano Repaving approximately 1,299,986 square feet 07/2019 11/2019 7 16 11 3 Rehabilitation 2019 to Chadbourne Rd), Fulton Dr (Lopes Rd to Watt Dr), Fermi Dr (Watt Dr to Lopes Rd), Watt Dr (Fulton Dr to Redtop Rd) Cadenasso Dr (Beck Ave to Auto Mall Pkwy), North Texas Stt (Travis to Air Base Parkway), Road Maintenance & Pavement Maintenance Project Huntington Dr (Peabody Rd to End), Capitola Way (Woodcreek Dr to Waterman Blvd), Air Base Fairfield Solano Repaving approximately 1,124,134 square feet 07/2020 11/2022 5 16 11 3 Rehabilitation 2020-222 Parkway (250' West of Heath Dr to Heath Dr), Air Base Parkway (Peabody Rd to Parker Rd), E. Tabor Ave (Claybank Rd to Manor Pl)

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Complete Streets Front Street Bicycle and Pedestrian Install new bicycle and pedestrian crossing, ADA curb ramps, lighted crosswalk, Rio Vista Solano Front Street and near Hwy. 12 off and on ramp to Front Street. 06/2018 06/2018 20 40 11 3 Components Improvement Project pavement and slurry seal, sidewalks, and new striping. Altus Lane, Amber Drive, Andrews Circle, Beechwood Circle (959 Beechwood to Ashwood Drive), Beale Cir, Breakwater Circle, Bridgewater Circle, Catalina Circle, Cinnamon Way, Civic Center (Lotz to Driftwood), Cordelia St (Kellogg to Park), Deercreek Way, Dickey Court, Dover Circle, Fennie Court, Filbert Court, Fort Ord Court, Gunter Drive, Hickam Circle, Honker Lane, Kessler Circle, Little Rock Road Maintenance & Suisun City Solano Asphalt Concrete Overlay Project Asphalt Concrete Overlay project for various streets citywide. Circle, Maxwell Circle, McClellan Drive, McGuire Circle, Newark Lane, Pensacola Lane, Perkins Court, 05/2018 07/2019 40 50 11 3 Rehabilitation Peytonia Lane, Redbud Way, Rocky Point Cove, Savannah Lane, Silk Oak Court, Tamarisk Circle, Tea Rose Way, Tuscon Circle, Vandenberg Circle, Victory Way, Vinewood Court, Walnut Street (School to Kellogg), Walnut Street (Kellogg to Slough) and Wesley Ave (140' SO Chyrl to 120' N Chyrl).

Canary Court, Crested Drive (Pintail to 110' N of Whistler), Hacienda Lane (Fortuna to Montebello), Heron Drive (Blue Jay to 430' S of Blue Jay), Jeanne Court (Chyrl to end), Lemonwood Drive (Mosswood to Redondo), Michael Court (Marcia to end), Ricky Court (Marcia to end), Swallow Court (Swallow Lane to end), Stellar Way (Longspur to end of cul de sac), Westwind Way (Emperor to end), Westwind Lane (Westwind Lane to cul de sac), Whippor Will Way (Swallow to Skylark) and Yuba Road Maintenance & Court (Pelican to end). Suisun City Solano 17/18 18/19 Cape Seal Project Cape Seal/Slurry Seal on various streets citywide 04/2018 09/2018 25 50 11 3 Rehabilitation Locations from 17/18 carry over: Marston Court, Driftwood Drive 015, Hillborn Court, Spence Court, Brookside Court, Flagstone Cir, Hibiscus Lane, Keyes Court, McNabe Court, Birchwood Court, Bottlebrush Court, Camellia Court, Dawn Rose Court, Dawn Rose Way, Driftwood Drive, Kinsmill Court, Limewood Drive, McCoy Creek Court and Peytonia Court.

RHMA Overlay: Dobbins Street from East Monte Vista Ave to Merchant Street; Mason Street from Cernon Street to Davis Street; Hickory Street from I-80 to Davis Street; Arcadia Street Road Maintenance & Vacaville Solano Vacaville RHMA Overlay from Ulatis Dr to Woodstock Cir; Lawrence Drive from Orange Drive to end; Tulare Dobbins St, Mason St, Hickory St, Arcadia St, Lawrence Dr, Tulare Dr, California Dr 10/2018 10/2019 10 25 11 3 Rehabilitation Drive from Marshall Road to Brookdale; California Drive from Los Robles Ct to Alamo Lane; replace non-compliant curb ramps, striping improvements

Grind, adjust utilities, cold in-place recycle, replace traffic detection, stripe and place Road Maintenance & East Monte Vista/Gibson Canyon Vacaville Solano 1.5" RHMA overlay on East Monte Vista Ave. from County Airport Road to Aviation East Monte Vista Avenue 05/2018 09/2018 10 25 11 3 Rehabilitation Road Cold In-Place Recycle Drive and Gibson Canyon Road from Ulatis Creek Bridge to Fruitvale Drive

The following intersections are targeted for as far as the allocated funding allows: Jennings Ave at Steffan St; Steffan St at Steffan St; Steffan St at Buss Ave; Brookwood Ave at Cottonwood Dr; Thelma Ave at Concord St; Rinaldo Dr at Roleen Dr; David Ct at Roleen Dr; Alice Dr Installation of curb ramps throughout the City where they are absent. Removal of ADA Complete Streets Citywide Curb Ramp and ADA at Roleen Dr ; York St at Alameda St; York St at El Dorado St; York St at Sutter St; York St at Napa St; Vallejo Solano non-compliant sidewalk tripping hazards throughout the City in partnership with the 01/2018 08/2018 25 40 14 3 Components Improvement Project Aden St at Parrott St; Werden St at Parrott St; Benicia Rd at Central Ave; Lassen St at Clark Dr; residents. Michigan St at El Dorado St; Mississippi St at Couch St; Carolina St at Sutter St; Carolina St at Alameda St

The following streets are target for slurry sealing for as far as the funding allows: BETTY COURT (JACK LONDON DRIVE to END); DONNER PASS ROAD ( W/O EBBETTS PASS RD to 50' E/O TOBIN DR); OLYMPIC DRIVE (QUARTZ LN to WHITNEY AVE); BASALT DRIVE (80' WEST OF ZIRCON to OLYMPIC DRIVE); COPPER WAY (BASALT DRIVE to QUARTZ LANE); Road Maintenance & Vallejo Solano Citywide Slurry Seal Project Slurry seal a number of streets throughout the City. PERSIMMON DRIVE (PHOENIX CIRCLE to PHOENIX CIRCLE); PLATT COURT (TUOLUMNE 04/2018 09/2018 6 15 14 3 Rehabilitation STREET to END); RIVERVIEW DRIVE (TUOLUMNE STREET to MITCHELL COURT); AMBER AVENUE (HOLLY STREET to POWER DRIVE); EDGEHILL COURT (WOODSIDE ROAD to END); HOSPITAL DRIVE (TUOLUMNE STREET to 236' E/O TUOLUMNE ST); VALLE VISTA AVENUE (NORTH OF WHITECLIFF DR to FAIRGROUNDS DRIVE)

Wilshire Ave. (Alhambra Ave. to Pacheco Dr.); Saunders Dr. (Keats Dr. to Delwood St.); Delwood St. (Saunders Dr. to Georgia St.); Barcelona St. (Cordova St. to Devlin Dr.); Dillon Dr. (Elliott Dr. to Diana Dr.); Rome Dr. (Elliott Dr. to Diana Dr.); Lorenzo Dr. (Stephen Ct. to Elliott Dr.); Diana Dr. (Stephen Ct. Road Maintenance & Various City Streets will be repaved to improve the conditions and increase the life span Vallejo Solano Street Overlay/Preservation to Mini Dr.); Benson Ave. (Rodgers St. to C St.); Scenic Way (Daniels Ave. to Benson Ave.); Mayo 01/2019 06/2019 15 20 14 3 Rehabilitation of the streets. Ave. (Rice St. to Campbell Ave.); Thirteenth St. (South End to Madigan Ave.); Calaveras St. (Solano Ave. to Springs Rd.); Calaveras St. (Springs Rd. to Tennessee St.); Castlewood Dr. (Springs Rd. to Westwood St.); Florence Ct. (N Camio Alto to End); Valle Vista Ave. (Redwood St. to Whitecliff Dr.)

The project consists of ADA curb ramp upgrade, portions of Road Maintenance & Pavement Rehabilitation sidewalk replacement, and installation of sub drain including Vallejo Solano Rollingwood Drive between Baywood Drive and Pope Drive 04/2018 06/2019 15 20 14 3 Rehabilitation Rollingwood Drive rehabilitation of asphalt pavement. The project extends for approximately 1800 linear feet from Pope Drive to Baywood Drive. Road Maintenance & 4th Street Reconstruction - 17/18 Reconstruct 4th Street from North Jefferson Street (eastern boundary) to street end City of Cloverdale, 4th Street from North Jefferson Street (eastern boundary) to street end (western Cloverdale Sonoma 06/2019 07/2019 15 20 2 2 Rehabilitation Carryover (western boundary) with new AC paving - 17/18 Carryover. boundary). Complete Streets Rockydale Lane Reconstruction - City of Cloverdale, Rockydale Lane from Lake Street (northern boundary) to 5 feet south of northern Cloverdale Sonoma Reconstruct Rockydale Lane to include accessibility features - 17/18 Carryover. 08/2020 09/2020 15 20 2 2 Components 17/18 Carryover boundary of Parcel 001-111-033 Road Maintenance & Lincoln Avenue Rehabilitation Repairs 725 feet of Lincoln Avenue, full width, from the intersection with La Salle Cotati Sonoma Project rehabilitates Lincoln Avenue within the City of Cotati, Sonoma County. 07/2018 10/2018 8 10 10 3 Rehabilitation Project Avenue easterly to the City limits.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Almond Way: s/o S Fitch Mtn. Rd to end; Center Street: s/o Matheson St to n/o Mill St; East Street: Healdsburg 2018 Pavement Road Maintenance & Pavement preservation/rehabilitation by Cape Seal (asphalt rubber chip seal under s/o Matheson St to end; First Street: s/o Matheson St to s/o Mason St; Fitch Street: s/o Matheson St Healdsburg Sonoma Preservation and Rehabilitation 08/2018 11/2018 5 7 2 2 Rehabilitation Microsurfacing) to w/o Harmon St; Front Street: s/o Mason St to n/o Healdsburg Ave; Haydon Street: e/o East St to Projects w/o University St

Albert Court: Lupine Rd to end (cul de sac) Alexandria Drive: Monte Vista (west) to Monte Vista (east) Ferrero Drive: Healdsburg Ave to Linda View Foss Creek Circle: Grove St (north) to Grove St (south) Foss street: North St to end Jachetta Court: Ridgeview to end (cul de sac) Jasmine Court: Ferrero to end (cul de sac) Langhart Drive/Court: Alexandria to end (cul de sac) Healdsburg 2018 Pavement Road Maintenance & Linda View Drive: Ferrero to end (cul de sac) Healdsburg Sonoma Preservation and Rehabilitation Pavement Preservation & maintenance with cape seal (17/18 carryover) 08/2018 11/2018 5 7 2 2 Rehabilitation Lupine Road/Court: March Ave to end (cul de sac) Projects (17/18 Carryover) Moore Lane: West North to end (cul de sac) North Street: Grove to Healdsburg Ave Ridgeview Drive: Powell to end (cul de sac) Robinson Court: Langhart to end (cul de sac) Smith Court: Langhart to end (cul de sac) Theresa Court: Lupine to end (cul de sac) Vista Via Drive: Powell to end (cul de sac) West North Street: Grove St to end (cul de sac)

Allegheny Court (Yarberry Drive to End of Cul-de-sac) Almanor Street (Rainier Circle to Downing Street) Belle View Avenue (Hayes Avenue to End of Street) Bond Avenue (McDowell Blvd South to Sartori Drive) Brainerd Avenue (North Fair Street to North Fair Street) Cardinal Way (Noriel Lane to Hawk Drive) Caulfield Lane (Saint Francis Drive to Payran Street) Covey Way (McDowell Blvd South to Daniel Drive) The project includes approximately 13,208 square yards of High Volume Slurry Seal Doris Way (Payran Street to End of Street) and approximately 3,125 SY yards of 2" grind and overlay. The project will include Dover Lane (Reisling Road to Lansdowne Way) Road Maintenance & Petaluma Sonoma Pavement Restoration 18/19 asphalt dig outs, new curb ramps, sidewalk repair, striping and signage. Dublin Court (Winds 05/2019 10/2019 5 23 10 3 Rehabilitation On average high volume slurry seal will extend the useful life by 5 to 8 years and a 2" Technology Lane (Casa Grande Road to End of Cul-de-sac) Grind and Overlay will extend the useful life 18 to 22 years Turtle Creek Way (Sonoma Mountain Parkway to Noriel Lane) Vanessa Way (Schuman Lane to Cindy Lane) Walnut Street (West Street to Oak Street) West Payran Street (Petaluma Blvd North to NWPRR Railroad Xing) West Payran Street (Graylawn Avenue to Petaluma River Bridge) Westminister Lane (Winchester Lane to Lansdowne Way) Winchester Lane (Lansdowne Way to Westminister Lane) Windmill Lane (Sleepy Hollow Lane to Castle Drive) Wood Lane (Ponderosa Drive to Gumwood Lane)

B Street (Petaluma Blvd South to El Rose Drive); I Street (Petaluma Blvd South to City Limits); Grant The project includes approximately 89200 square yards of High Volume Slurry Seal. Street (I Street to Mountain View Ave); Madison Street (Arlington Drive Lakeville Street); McKenzie Road Maintenance & Petaluma Sonoma Pavement Restoration 17/18 The project will include asphalt dig outs and striping Avenue (McDowell Blvd S. to Stuart Drive); Kresky Way (Stuart Drive to Lindberg Lane); Lindberg 07/2018 11/2018 5 8 10 3 Rehabilitation On average high volume slurry seal will extend the useful life by 5 to 8 years Way (Saint Francis Drive to McDowell Blvd S.); St. Francis Drive (Lindberg lane to Lombardi Avenue); S. McDowell Blvd Ext (Lakeville Hwy to Bridge)

Pavement preservation treatments including crack seals and slurry seals. Crack sealing prevents the intrusion of water and incompressible material into the cracks and Southwest Boulevard between Adrian Drive and Snyder Lane; Snyder Lane between Holly Avenue Road Maintenance & 2019-2022 Pavement Management Rohnert Park Sonoma reinforces the adjacent pavement. Slurry seals further seal the cracks, restore lost and Golf Course Drive; Golf Course Drive between SMART Railroad Tracks and Fairway Drive; 02/2019 08/2019 4 6 4 3 Rehabilitation (Crack Seals and Slurry Seals) flexibility to the pavement surface, provide a deep, rich black pavement surface color, Commerce Boulevard between Enterprise Drive and Golf Course Drive. protect the underlying pavement and provide a new driving surface.

Road Maintenance & Southwest Boulevard Reconstruction of Southwest Boulevard between No Name Street and College View Rohnert Park Sonoma Southwest Boulevard between No Name Street and College View Drive 03/2020 11/2020 24 30 4 3 Rehabilitation Reconstruction Drive. Pavement preservation treatments including small areas of pavement repair (i.e. "digouts") and cape seal application (i.e. a combination of chip seal and thin slurry seal) . Cape seals are used when the pavement deterioration is greater than what a slurry Road Maintenance & Rohnert Park Sonoma Southwest Boulevard Cape Seal seal or microsurfacing is designed to correct, yet the pavement has not deteriorated to Southwest Boulevard between Commerce Boulevard and No Name Street 03/2020 11/2020 6 10 4 3 Rehabilitation the point of requiring an expensive asphalt overlay. A cape seal prevents water penetration, reducing subsequent damage to the road bed, along with providing a new wearing surface. Road Maintenance & Martin Avenue Rehabilitation (17/18 Rohnert Park Sonoma Pavement rehabilitation (full depth reclamation) Martin Avenue between Redwood Drive and Dowdell Avenue 05/2017 06/2018 20 30 4 3 Rehabilitation Ongoing) Southwest and Commerce Improvement of traffic flow through this intersection which may include lane Rohnert Park Sonoma Safety Boulevard Intersection reconfiguration and installation of various traffic devices (e.g. roundabout, signage, and Intersection of Southwest Boulevard and Commerce Boulevard 01/2018 11/2020 25 30 4 3 Improvements (17/18 Carryover) pavement markings)

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Pavement preservation treatments including small areas of pavement repair (i.e. "digouts") and cape seal application (i.e. a combination of chip seal and thin slurry seal) . Cape seals are used when the pavement deterioration is greater than what a slurry Country Club Drive between Rohnert Park Expressway and Eleanor Avenue; Golf Course Drive Road Maintenance & 2019-2022 Pavement Management Rohnert Park Sonoma seal or microsurfacing is designed to correct, yet the pavement has not deteriorated to between Country Club Drive and Hillview Way; Snyder Lane between Golf Course Drive and Moura 08/2018 06/2019 6 10 4 3 Rehabilitation (Cape Seal Project) the point of requiring an expensive asphalt overlay. A cape seal prevents water Lane penetration, reducing subsequent damage to the road bed, along with providing a new wearing surface. Road Maintenance & 2019-2022 Pavement Management Asphalt overlay, which is a new pavement section (generally 1.5″ – 2″ thick) placed over Country Club Drive between Eleanor Avenue and Ellen Street; Southwest Boulevard between College Rohnert Park Sonoma 08/2018 06/2019 12 17 4 3 Rehabilitation (Asphalt Overlay) the top of an existing pavement surface. View Drive and Adrian Drive Traffic Signals System Needs Implementation of a central traffic management system, including interconnect media, Golf Course Drive, Redwood Drive, Rohnert Park Expressway, Commerce Boulevard, Snyder Lane, Rohnert Park Sonoma Traffic Control Devices Implementation Project (17/18 06/2018 06/2019 10 15 4 3 local intersection hardware, and central system software and hardware East Cotati Avenue Carryover) Fulton Road Reconstruction - This project will reconstruct Fulton Road between Occidental Road and W. 3rd Street Road Maintenance & Santa Rosa Sonoma Occidental Road to W 3rd Street using roller compacted concrete technology, updating pedestrian ramps to current ADA Fulton Road between Occidental Road and W. 3rd Street 04/2018 04/2019 20 20 2, 10 2 Rehabilitation (17/18 Carryover) standards and maintaining existing Class II Bicycle lanes.

The project will reconstruct Pacific Avenue between Montecito Avenue and Humboldt Street which involves removing the entire pavement section and replacing it with new Pacific Avenue - Montecito Avenue asphalt concrete and underlying aggregate base to restore its life and serviceability. Road Maintenance & to Humboldt Street Santa Rosa Sonoma The project will also include upgrading pedestrian curb ramps to meet current state and Pacific Avenue - Montecito Avenue to Humboldt Street (reconstruction/pavement rehabilitation) 07/2018 12/2020 10 20 2 2 Rehabilitation (reconstruction/pavement federal accessibility standards. The reconstructed roadway will enhance the surface by rehabilitation) replacing failing pavement and reduce ongoing maintenance costs. The estimated useful life of the planned pavement rehabilitation is expected to be 20 years.

The SMART Hearn Multi-Use Crossing is located at Hearn Avenue and the SMART railroad tracks. The project will connect two existing segments of the SMART Multi-Use path (MUP) in southwest Santa Rosa. The proposed signalized street connection will create an enhanced crossing at Hearn Avenue for bicyclists and pedestrians using the Sonoma Marin Area Rail Transit multi-use path along the SMART rail corridor. The project will design and install a Santa Rosa Sonoma Other (SMART) Hearn Multi-Use Path Hearn Avenue and the SMART railroad tracks. 05/2017 06/2019 10 20 10 2 signalized crosswalk at the SMART MUP intersecting with Hearn Avenue. In addition, (MUP) Crossing the project will include construction of ADA curb ramps on each side of the street, minor modifications to the sidewalk, curb and gutter, and modification of the concrete median in Hearn Avenue to accommodate the pathway, signage and pavement markings. The estimated useful life of the planned pavement rehabilitation is expected to be 20 years.

Reconstruct and stabilize the south shoulder of Bodega Avenue along its shared Roadway shoulder reconstruction, Sebastopol Sonoma Safety boundary with a cemetery; this gains sufficient roadway width to accommodate bicycle South shoulder Bodega Ave between Pleasant Hill Rd & Virginia Ave. 07/2018 05/2019 20 30 10 2 Bodega Avenue lanes Road Maintenance & Pavement preservation,several City Recurring pavement preservation project, overlay and slurry seal as appropriate to Sebastopol Sonoma Abbott Ave. to Zimpher Rd. with 536 Total Streets 07/2022 06/2023 20 30 10 2 Rehabilitation streets, later fiscal year location

Complete Streets Class 1 bike path Bodega Ave Class 1 bicycle path along Bodega Ave between Ragle Rd and the City boundary at the Sebastopol Sonoma Sebastopol, CA Bodega Avenue west end 03/2021 07/2023 8 10 10 2 Components Ragle Rd to City Line Atascadero Creek. That is also a connection point to a County bicycle path.

Complete Streets Class 1 Bicycle Path across Libby Bicycle gap closure across Libby Park to connect end of Washington St. with Pleasant Sebastopol Sonoma Libby Park 03/2021 08/2022 8 10 10 2 Components Park Hill road Upgrade intersection to a traffic Upgrade intersection control from crosswalk flashing light warning system to full traffic Sebastopol Sonoma Safety Ragle Road - Bodega Avenue intersection 11/2020 09/2021 30 40 10 2 signal signal Redo intersection, Covert Lane and Sebastopol Sonoma Safety Redo intersection with difficult left turns and poor sight distances and angles. Covert Lane and SR 116/Healdsburg Avenue 07/2021 09/2023 30 40 10 2 SR 116 Complete Streets Bodega Corridor preliminary plan Engineering Design: pavements, sidewalks, bicycle lanes, crosswalks, signals all along Sebastopol Sonoma Bodega Avenue, entire length 06/2018 08/2018 30 40 10 2 Components and design Bodega Avenue Road Maintenance & Laguna Preserve parking entry Sebastopol Sonoma Parking entrance at Laguna Park needs rehab and improvement Laguna Wildlife Preserve Park 07/2021 06/2023 20 30 10 2 Rehabilitation paving Road Maintenance & Sebastopol Sonoma Ives Park pathways Park paved pathways need rehabilitation and improvement Ives Park 07/2021 06/2023 30 40 10 2 Rehabilitation Bodega/Florence crosswalk & safety Sebastopol Sonoma Safety Relocate crosswalk and create a raised pedestrian refuge island at the median Bodega Avenue - Florence Avenue Intersection 03/2018 08/2018 30 40 10 2 improvements Bodega/Washington crosswalk and Sebastopol Sonoma Safety Install a raised pedestrian refuge island within the existing center lane area. Bodega Avenue - Washington Avenue intersection 03/2018 06/8201 30 40 10 2 safety improvements

Bring curb ramps at crosswalks and intersections to current ADA standards; Complete Streets Gravenstein Hwy, north and south; Healdsburg ave, North and South Main Streets; and Sebastopol Sonoma ADA Curb Ramps 30 crosswalk locations along SR 116 through Sebastopol 01/2018 06/2018 8 20 10 2 Components Petaluma Ave. This is a necessary first step prior to repaving then adding bicycle lanes on the same streets, which are separate but integral parts of a larger project.

Bodega/Robinson crosswalk & Sebastopol Sonoma Safety Restripe crosswalks and add a flashing light crosswalk warning system, "PAWB" Bodega Avenue - Robinson Road intersection 03/2018 08/2018 30 40 10 2 safety improvements Road Maintenance & Widen Bodega Ave north side between Golden Ridge and Virginia Avenues by Sebastopol Sonoma Bodega Avenue widening north side Between Golden ridge and Virginia Avenues along Bodega Avenue 07/2019 05/2020 20 30 10 2 Rehabilitation replacing a non-standard sidewalk Sidewalk gap closure Bodega Ave Sebastopol Sonoma Safety Add sidewalk along Bodega Ave at the Huntley Square development; city contribution Bodega Ave at Huntley Square 08/2020 06/2021 20 30 10 2 at Huntley Square

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Sidewalk gap closure mBodega Ave Add a sidwalk along Bodega ave between Golden ridge and Pleasant Hill where nothing Sebastopol Sonoma Safety between Golden Ridge Ave and Bodega Ave between golden Ridge and Pleasant Hill 09/2020 06/2021 20 30 10 2 currently exists Pleasant Hill Rd Road Maintenance & Repave Bodega Avenue Jewell to Pavement preservation project, portion of Bodega ave between Jewell Ave and Sebastopol Sonoma Bodega ave between Jewell and Pleasant Hill 07/2020 06/2021 20 30 10 2 Rehabilitation Pleasant Hill Pleasant Hill road

Road Maintenance & Pavement preservation, several City Recurring pavement preservation projects, overlay or slurry seal dependent on location. Sebastopol Sonoma Locally owned streets within the City of Sebastopol 07/2022 06/2023 8 20 10 2 Rehabilitation streets Specific streets determined by pavement evaluations closer to the time of bid lettings

Sidewalk gap closure, Bodega Ave a portion of the sidewalk between Nelson and Robinson is non-standard, steep, and Sebastopol Sonoma Safety Bodega Ave, between Nelson & Robinson 07/2020 06/2021 8 10 10 2 Nelson to Robinson buckled. This sidewalk gap needs to be reconstructed to meet standards.

Complete Streets Bicycle Lanes and striping along After repaving, shoulder and sidewalk work, add bicycle lanes striping and signs. This Sebastopol Sonoma Bodega Avenue from SR 116 to the west City Line. 07/2021 11/2021 8 10 10 2 Components Bodega avenue should complete the planned bicycle system within the city of Sebastopol!

Road Maintenance & Repave Bodega Avenue, High Sebastopol Sonoma Pavement preservation project, portion of Bodega Avenue Bodega Avenue between High Street and Jewell avenue 07/2018 06/2019 20 30 10 2 Rehabilitation Street to Jewell Avenue

Various street segments throughout the City of Sonoma. Streets segments could include the following: Fifth Street East (City limits to Denmark Street), East Spain Street (First Street East to Second Street This project is a part of the City’s commitment to keeping the City’s streets in a safe and East), Andrieux Street (Fourth Street West to Third Street West), Engler Street (Brockman Drive to functional condition for multi-modal circulation. The project will provide slurry seal street Fifth Street East), West MacArthur Street (Manor Drive to Second Street West), Third Street West Road Maintenance & surface treatment for various street segments throughout the City of Sonoma. Auxiliary Sonoma Sonoma 2018 Citywide Slurry Seal Project (Robinson Street to West Napa Street), First Street West (Malet Street to House #19995), Montini Way 07/2018 11/2018 3 5 10 3 Rehabilitation work in support of the slurry seal treatment includes surface preparation; crack seal; (Fourth Street West to Fifth Street West), Denmark Street (Dead end west of Brockman Drive to Garry removal and replacement of pavement striping markings; protection of existing utility Lane), West Spain Street (Junipero Serra Drive to Fifth Street West), Avenue Del Oro (House #693 to structures, curb and gutter, and cross gutter; and other related work. Appleton Way), Berryessa Court (Berryessa Drive to Cul de Sac), and Fifth Street West (West MacArthur Street to Andrieux Street).

Slurry seal to invest in on-going maintenance of Town streets to reduce deterioration of All streets east of Hembree Lane bounded on the north side by Arata Lane down south to the US 101 Road Maintenance & Town-Wide Street Resurfacing Windsor Sonoma pavement and extend the useful life of the streets. This is part of the annual pavement including streets in the Crosscreek, Wilson Estates, Jane's Meadow and Poole Creek neighborhood 06/2018 07/2018 5 10 2 2 Rehabilitation (17/18 Ongoing) maintenance plan and is considered a best management practice. (e.g. Billington Lane, Wilson Lane, etc.)

Roundabout Projects (17/18 Construct two roundabout projects to increase safety, rehabilitate streets and reduce Ceres Stanislaus Safety Central Ave. and Pine St., Morgan Ave. and Aristocrat Drive 06/2018 02/2019 18 25 21 12 Ongoing) emissions within the community Road Maintenance & Hughson Stanislaus Santa Fe Avenue Overlay Project 2" pavement overlay on Santa Fe Avenue Santa Fe Avenue from Hatch Road to 7th Street 04/2018 08/2018 7 10 12 8 Rehabilitation Road Maintenance & Hughson Stanislaus Whitmore Avenue Slurry Seal Slurry Seal on Whitmore Avenue Whitmore Avenue from east of Tully Road to Charles Street 12/2018 06/2019 5 7 12 8 Rehabilitation Cracks seal several street segments in preparation of slurry seal program, some areas Monticello / Crater Area; Girbaldi Ct. Cielito Dr. End of Court; Manor Oak Area; Capistrano Area; Road Maintenance & Crack Seal and Asphalt Digout Modesto Stanislaus need dig out asphalt repairs also. Approximately 100 lane miles of residential streets Hashem Area; Robin Hood Area 10/2018 05/2019 5 7 21 5 Rehabilitation Repairs will be prepared. Sheldon Area; Glenwood Area; Poust Area; Kavanagh Area

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Lakewood Area Street From To Mulholland Dr Lakewood Ave Staci Ln Lake Park Ct Mulholland Dr End Staci Ln Para Dr Shane Ln Olinda Ln Shane Ln E.Orangeburg Ave. Bella Terra Dr Shane Ln Para Dr Virlee Dr Para Dr Shane Ln Ocotillo Wy Virlee Dr Pepper Tree Ln Wild Palms Dr Dessert Willow Ln End Shane Ln Virlee Dr Staci Ln Desert Willow Ln Orangeburg Wild Palms Dr Joshua Wy Desert Willlow Ln Pepper Tree Ln Mesquite Wy Desert Willlow Ln Pepper Tree Ln Pepper Tree Ln Orangeburg Ave Wild Palms Dr Fransen Ln Orangeburg Ave Wild Palms Dr Traverler Ct Fransen Ln End Justin Ct Palmdale Dr End Zachary Ct Palmdale Dr End Road Maintenance & Prarie Dog Dr Saguaro Wy Wild Palms Dr Modesto Stanislaus Modesto SB1 Projects Type II Slurry to approximately 92 lane miles of residential streets 05/2018 09/2018 5 7 21 5 Rehabilitation Havasu Dr Orangeburg Ave Wild Palms Dr Saguaro Wy Prarie Dog Dr End Indian Butte Ct Havasu Dr End Tumbleweed Ct Havasu Dr End Sandy Ct Orangeburg Ave End

Rumble Area Street From To Capbell Ln Robbie Ave Rumble Rd Brentwood Ct Campbell Ln End Dwight Ln Campbell Ln Rumble Rd Richmond Ct Dwight Ln End Bewhall Ct Dwight Ln End Thorton Ct Rumble Rd End Sharondell Dr Mount Vernon Dr Dwight Ln Robbie Ave Carver Rd Rockwood Pl Teri Ln Mount Vernon Dr Derek Wy Derek Wy Teri Ln Earlmar Ln Earlmar Ln Mount Vernon Dr Derek Wy Evona Ct Teri Ln End Various locations throughout Modesto within the following boundaries: The northern boundary is Kiernan Avenue (State Highway 219) and Claribel Road. The eastern Traffic Signal and Street Lighting Maintain traffic signals and street lighting systems throughout Modesto Modesto Stanislaus Safety boundary is Claus Road to Santa Fe Avenue. The southern boundary is Whitmore Avenue. The 07/2018 06/2019 5 7 21 5 Maintenance 220 traffic signals, 11,575 street lights western boundary is State Highway 99 on the north and Morse Road extended north and south.

Various locations throughout Modesto within the following boundaries: Maintain traffic signs and street striping throughout Modesto The northern boundary is Kiernan Avenue (State Highway 219) and Claribel Road. Traffic Sign and Striping 30,677 traffic signs, typically 2400 signs are replaced or repaired annually Modesto Stanislaus Safety The eastern boundary is Claus Road to Santa Fe Avenue. 07/2018 06/2019 5 7 21 5 Maintenance 4000 intersections, 2000 stop signs, 2100 marked cross walks, and 886 center lane The southern boundary is Whitmore Avenue. miles of striping are maintained. The western boundary is State Highway 99 on the north and Morse Road extended north and south.

T Street from Yolo Avenue to Inyo Avenue; Kern Street from Main Street to T Street; Fresno Street Road Maintenance & Newman Stanislaus 2018-19 SB-1 Crack seal, slurry and stripe. Small pavement replacement (potholes). from Main Street to T Street; Tulare Street from Main Street to T Street; Mariposa Street from Main 07/2018 06/2019 5 10 21 12 Rehabilitation Street to T Street Road Maintenance & H Street (Between Oak Ave & Ash Grind, remove and replace pavement section of street with limited curb gutter and Oakdale Stanislaus H Street from Oak Avenue to Ash Street 07/2018 10/2018 15 25 12 8 Rehabilitation Street)(17/18 Carryover) sidewalk replacements. Road Maintenance & Ash Street ( Between J Street & H Grind, remove and replace pavement section of street with limited curb gutter and Oakdale Stanislaus Ash Avenue between H street and J Street 07/2018 10/2018 15 25 12 8 Rehabilitation Street) sidewalk replacements.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

W LAS PALMAS AVE - PLAZA CIR to N 9TH ST S DEL PUERTO AVE - PLAZA CIR to E ST S DEL PUERTO AVE - E ST to SPERRY AVE HOLLY HOCK CIR - LORELEI LN to MORNING GLORY DR LORELEI LN - MORNING GLORY DR to N HARTLEY ST EMILY CT - LORELEI LN to NW END LILY CT - LORELEI LN to NW END M ST - N 2ND ST to WARD AVE L ST - N 2ND ST to N 7TH ST K ST - N 2ND ST to N SALADO AVE Road Maintenance & Slurry and Crack Seal - Streets J ST - N 2ND ST to N 3RD ST Patterson Stanislaus Slurry Seal and Crack Seal 03/2019 07/2019 5 7 21 12 Rehabilitation Submitted for FY 18/19 I ST - N 2ND ST to N 7TH ST H ST - N 4TH ST to N 7TH ST N SALADO AVE - PLAZA CIR to WARD AVE N 4TH ST - L ST to M ST N 5TH ST - L ST to M ST N 5TH ST - K ST to L ST N 5TH ST - W LAS PALMAS AVE to K ST N 7TH ST - W LAS PALMAS AVE to N SALADO AVE MAC DUFF WAY - CLOVER AVE TO MORAY WY *All locations subject to change, and will be selected based on priority, need and resources throughout the year.

N DEL PUERTO AVE - PLAZA CIR to N 2ND ST MORNING GLORY DR - LORELEI LN to PERIWINKLE DR PERIWINKLE DR - HANNAH DR to MORNING GLORY DR J ST - N 3RD ST to N 7TH ST N 3RD ST - K ST to M ST N 4TH ST - N SALADO AVE to I ST POPPY AVE - CLOVER AVE to S DEL PUERTO AVE CANYON CT - POPPY AVE to END HANSEN CT - POPPY AVE to END KINSHIRE WAY - CLOVER AVE to S DEL PUERTO AVE Road Maintenance & FDR 2" HMA/9" AB - Streets Patterson Stanislaus FDR 2" HMA/9" AB KLOPPING CT - KINSHIRE WAY to END 03/2019 07/2019 15 20 21 12 Rehabilitation Submitted FY 18/19 S 9TH STREET - KINSHIRE WAY to SPERRY AVE DE LASH CT - KINSHIRE WAY to END AGADONI CT - KINSHIRE WAY to END CLOVER AVE - POPPY AVE to SPERRY AVE S DEL PUERTO AVE - POPPY AVE to SPERRY AVE AMBERINA CT - AMBERNIA DR to END AMBERINA DR - AMBERINA CT to S DEL PUERTO AVE BONNEAU CT - S 9TH STREET to END *All locations subject to change, and will be selected based on priority, need and resources throughout the year.

WARD AVE - W LAS PALMAS AVE to JAMES BURKE AVE WARD AVE - JAMES BURKE AVE to N SALADO AVE WARD AVE - N SALADO AVE to AMERICAN EAGLE AVE E LAS PALMAS AVE - 699 E/O N HARTLEY ST to N HARTLEY ST E LAS PALMAS AVE - LA LYNN DR to N HARTLEY ST E LAS PALMAS AVE - N. 1ST ST to LA LYNN DR HANNAH DR - PERIWINKLE DR to LORELEI LN ROSEMARY DR - HANNAH DR to MORNING GLORY DR Road Maintenance & 2.5" AC Overlay - Streets Submitted SAFFRON WY - WALNUT AVE to PERIWINKLE DR Patterson Stanislaus 2.5" AC Overlay 03/2019 07/2019 10 15 21 12 Rehabilitation FY 18/19 N 3RD ST - PLAZA CIR to K ST N 4TH ST - I ST to L ST N 6TH ST - H ST to L ST N 6TH ST - W LAS PALMAS AVE to H ST N 7TH ST - N SALADO AVE to L ST SPERRY AVE - S AMERICA EAGLE AVE to WALKER RANCH PKWY SPERRY AVE - WALKER RANCH PKWY to BALDWIN RD *All locations subject to change, and will be selected based on priority, need and resources throughout the year.

ORKNEY DR - TARLAND LN to WARD AVE; TIREE PL - NORTH END to ORKNEY DR; TARLAND Slurry Seal and Crack Seal - Streets LN - KIRKWALL WY to ORKNEY DR; KIRKWALL WY - MORAY WY to TARLAND LN; MORAY WY - Road Maintenance & Patterson Stanislaus Submitted FY 17/18 (17/18 Slurry Seal and Crack Seal KIRKWALL WY to MACKILHAFFY DR; MORAY CT - MORAY WY to WEST END; MACKILHAFFY DR - 06/2018 12/2018 5 7 21 12 Rehabilitation Carryover) MORAY WY to D AVE; MC MURPHY CT - NORTH END to MACKILHAFFY DR; PITSCOTTIE LN - ORKNEY DR to MACKILHAFFY DR

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Almondwood Drive - Rio Verde Drive to Rivergate Drive, Silver Rock Road - Oakdale Road to Patterson Road, Goldstone Way - Silverrock Road to High Mesa Way, South Gate Drive - Lonestar lane to Oakdale Road, High Mesa Way - Silverock Road to Goldstone Way, Rock Creek Road - Red Rock Lane to Patterson Road, Kentucky Avenue - Claus Road to Terminal Avenue, Sandy Ridge Drive - Rocky Point Way to Hot Springs Lane, Hot Springs Lane - Patterson Road to Sandy Ridge Drive, Rocky Point Way - Sandy Ridge Drive to Clearwater Way, Clearwater Way - Red Rock Lane to South End, Red Rock Lane - Sandy Ridge Drive to Clearwater Way, Crossroads Drive - Mc Cafrey Lane to Colony Manor Drive, Virginia Avenue - Tennessee Avenue to Castleberg Drive, McAllister Drive - Kasper Drive to Crossroads Drive, Deleon Way - McCaffrey Lane to McAllister Lane, Kasper Drive - McCaffrey Lane to McAllister Lane, McCaffrey Lane - Kasper Drive to Crossroads Drive, McDevitt Drive - Woodard Way to McAllister Lane, Woodard Way - McDevitt Drive to Falcon Ridge Lane, Howard Avenue - Morrill Road to Patterson Road, Newbrook Drive - Lindbrook Drive to Morrill Road, Linbrook Drive - Newbrook Drive to Carnwood Drive, Soares Place - Roselle Avenue to West End, Fern Court - Roselle Avenue to SW End, Ward Avenue - Howard Avenue to Don Avenue, Sierra Street - Eighth Street to First Street & Jackson to Callendar Avenue, St. Lakes Court - RiverCove Road Maintenance & Riverbank Stanislaus Crack Seal Repairs Crack Seal 57 road segments throughout Riverbank Drive to South End, Olive Grove Court - Estelle Avenue to East End, River Mesa Drive - Stanislaus 03/2018 06/2018 5 7 12 5 Rehabilitation Street to Santa Fe Street, North Rose Brook Drive - Rose Brook Drive to Roselle Avenue, Rose Brook Drive - South Rose Brook Drive to North Rose Brook Drive, Story Brook Lane - Rose Brook Drive to Roselle Avenue, Second Street - Atchison Street to Sierra Street, Stanislaus Street - Third Street to Eighth Street, Texas Avenue - Terminal Avenue to Chief Tucker Avenue, Nevada Avenue - Terminal Avenue to Chief Tucker Avenue, Deer Ridge Place - Country Manor Drive to North End, Jaguar Court - Country Manor Drive to North End, Colony Manor Drive - Oakdale Road to Estelle Avenue, Heritage Manor Drive - Colony Park Drive to Estelle Avenue, 3rd Street - High Street to Atchison Street, 3rd Street - Riverside Drive to High Street, 4th Street - Atchison Street to Topeka Street, 4th Street - Topeka Street to Santa Fe Street, 5th Street - High Street to Atchison Street, 5th Street - Atchison Street to Santa Fe Street, 6th Street - Sierra Street to Stanislaus Street, 6th Street - Stanislaus Street to Santa Fe Street, Candlewood Circle - Candlewood Place to South End, Claus Road - Patterson Road to Santa Fe Street, Karen Alane Way - Stanley Allen Court to Oakdale Road, Kenneth Charles Court - North End to Karen Alane Way, Patterson Road - Hwy 108 to Railroad Avenue, Riverside Drive - 3rd Street to 4th Street, Stanley Allen Court - North End to Karen Alane Way, Topeka Street - 3rd Street to 5th Street

Christoffersen Median Fencing Install median fence to prohibit pedestrians crossing at unmarked and uncontrolled Turlock Stanislaus Safety On Christoffersen Parkway from Walnut Road to the West approximately 1000'. 06/2018 08/2018 30 50 12 8 (17/18 Ongoing) locations. Road rehabilitation (inlay and overlay) of Lander Avenue and Hawkeye. Install missing Road Maintenance & Turlock Stanislaus Lander and Hawkeye Rehab segments of sidewalk and reconstruct curb ramps. Install new stripping and On Lander Avenue from South Ave. to Glenwood and on Hawkeye Ave. from Olive to Daubenberger. 05/2019 12/2019 15 25 12 8 Rehabilitation crosswalks.

Road Maintenance & Road rehabilitation (inlay and overlay) of Wayside Avenue. Install missing segments of Turlock Stanislaus Wayside Ave. Rehab On Wayside from Geer to Olive 05/2019 08/2019 15 25 12 8 Rehabilitation sidewalk and reconstruct curb ramps. Install new stripping and crosswalks.

On 5th street 100' south of Ryker to Linwood; Ryker Ct; Federation Ct; Picard Ct; Crusher Ave; Warp Dr; Shadow Park Dr; Viscount Ct; Noble Ln; Victoria Ct; Royal Wood Ln; Ahern Ct; Button Ct; Pernet Road Maintenance & 2018 SB 1 Slurry Seal (17-18 Turlock Stanislaus Place slurry seal and new striping Ct; Kalland Ct; Callisto Ln; Bardini Way; Heartland Way; Rosenthal Dr; Avatar Ct; Andino Ct; Putnam 07/2018 10/2018 7 10 12 8 Rehabilitation Carryover) Ct; Ceder Ridge; Milano Way; Milano Ct; Whispering Pines Dr; Whispering Pines Ct; Pine Valley Ct; Apple Blossom; Venture Ln; Alanta Ct; and Ellard Ct. Address potholes throughout the City of Turlock encompassed by Taylor Rd, Waring Rd, Glenwood Road Maintenance & Ave, and Washington Rd. for a total of 984 streets. Exact locations have yet to be determined by the Turlock Stanislaus Road Maintenance Worker 1 Labor costs for road maintenance worker (pot hole crew). 08/2018 06/2019 1 10 12 8 Rehabilitation City; all locations selected for service or improvements will be chosen based on priority need throughout the year. Potholes throughout the City of Turlock encompassed by Taylor Rd, Waring Rd, Glenwood Ave, and Road Maintenance & Washington Rd. for a total of 984 streets. Exact locations have yet to be determined by the City; all Turlock Stanislaus Road Maintenance Worker 2 Labor costs for road maintenance worker (pot hole crew). 08/2018 06/2019 1 10 12 8 Rehabilitation locations selected for service or improvements will be chosen based on priority need throughout the year. Potholes throughout City of Turlock encompassed by Taylor Rd, Waring Rd, Glenwood Ave, and Road Maintenance & Washington Rd. for a total of 984 streets. Exact locations have yet to be determined by the City; all Turlock Stanislaus Hot Mix Asphalt Material costs for road maintenance (pot hole). 08/2018 06/2019 1 10 12 8 Rehabilitation locations selected for service or improvements will be chosen based on priority need throughout the year. For potholes throughout the City of Turlock encompassed by Taylor Rd, Waring Rd, Glenwood Ave, Road Maintenance & Equipment costs for road maintenance (pot hole)(Truck and trailer for hauling and and Washington Rd. for a total of 984 streets. Exact locations have yet to be determined by the City; Turlock Stanislaus Hot Mix Truck and Trailer 07/2018 06/2019 10 20 12 8 Rehabilitation placing HMA) all locations selected for service or improvements will be chosen based on priority need throughout the year. throughout the City of Turlock encompassed by Taylor Rd, Waring Rd, Glenwood Ave, and Road Maintenance & Washington Rd. for a total of 984 streets. Exact locations have yet to be determined by the City; all Turlock Stanislaus Thermoplastic Trailer Equipment costs for thermoplastic (striping)(increase visibility of striping) 07/2018 06/2019 10 20 12 8 Rehabilitation locations selected for service or improvements will be chosen based on priority need throughout the year.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Throughout the City of Turlock encompassed by Taylor Rd, Waring Rd, Glenwood Ave, and Road Maintenance & Washington Rd. for a total of 984 streets. Exact locations have yet to be determined by the City; all Turlock Stanislaus Thermoplastic Material Material costs for thermoplastic (striping)(increase visibility of striping) 07/2018 06/2019 5 10 12 8 Rehabilitation locations selected for service or improvements will be chosen based on priority need throughout the year. A full depth pavement placement with replacement of sidewalk, curb and gutter where Complete Streets Summer Street Improvement Waterford Stanislaus necessary. Summer Street is the worst conditioned with a PCI of 3. Therefore, a total Summer Street (between F St and La Gallina St) in Waterford, CA 95386 05/2018 08/2018 3 100 12 8 Components Project reconstruction is appropriate for this project. This is a full rehab of Summer Street which has been deemed the "worst street" in the Road Maintenance & Summer Street Improvement City since the 2013 street survey with a PCI of 3. The full reconstruction and rehab will Waterford Stanislaus Summer Street in Waterford, CA. (Between F St and D Street) 06/2018 08/2018 45 100 12 8 Rehabilitation Project include replacing some curb, gutter and side walks which has also deteriorated over the years along with the street itself.

Road Maintenance & Pennington Road West Reconstruct Pennington Road between Connecticut Ave and Broadway after the Live Oak Sutter Pennington Road between Connecticut Ave and Broadway 10/2018 10/2019 20 20 3 4 Rehabilitation Reconstruction (17/18 Carryover) installation of a new water main.

Road Maintenance & Reconstruct and improve Kola St from Larkin Rd to N St in coordination with the Live Oak Sutter Kola Street Reconstruction Kola Street from Larkin Rd to N St 07/2020 12/2023 20 20 3 4 Rehabilitation Highway 99 Streetscape Project beginning in 2020 Road Maintenance & .3' Mill and AC Overlay, ADA ramp improvements, striping improvements, safety Yuba City Sutter Franklin Avenue Rehabilitation Palora Avenue to Wilbur Avenue 04/2018 09/2018 20 30 3 4 Rehabilitation signage. Road Maintenance & .3' Mill and AC Overlay, ADA ramp improvements, striping improvements, safety Yuba City Sutter Sanborn Road Rehabilitation Bogue Road to Nand Drive 05/2018 10/2018 20 30 3 4 Rehabilitation signage. Road Maintenance & Widening and complete reconstruction, ADA ramp improvements, striping Yuba City Sutter Bridge Street Rehabilitation Gray Avenue to Cooper Avenue 04/2020 10/2020 30 50 3 4 Rehabilitation improvements, safety signage. Road Maintenance & Yuba City Sutter Garden Highway Rehabilitation .3' mill and AC overlay, ADA ramp improvements, striping improvements. Lincoln Road to Shanghai Bend Road 04/2022 10/2022 20 30 3 4 Rehabilitation Road Maintenance & Yuba City Sutter S Walton Avenue Rehabilitation .3' mill and AC overlay, ADA ramp improvements, striping improvements. Lincoln Road to Camino De Flores 04/2023 10/2023 20 30 3 4 Rehabilitation Road Maintenance & Yuba City Sutter Tharp Road Rehabilitation .3' mill and AC overlay, ADA ramp improvements, striping improvements. SR 20 WB to Poole Boulevard 04/2024 10/2024 20 30 3 4 Rehabilitation Road Maintenance & Civic Center Boulevard Yuba City Sutter .3' mill and AC overlay, ADA ramp improvements, striping improvements. SR 20 WB to Butte House Road 04/2024 10/2024 20 30 3 4 Rehabilitation Rehabilitation Road Maintenance & Yuba City Sutter Queens Avenue Rehabilitation .3' mill and AC overlay, ADA ramp improvements, striping improvements. Blevin Road to Stabler Lane 04/2025 10/2025 20 30 3 4 Rehabilitation Road Maintenance & Yuba City Sutter Blevin Road Rehabilitation .3' mill and AC overlay, ADA ramp improvements, striping improvements. Butte House Road to Queens Avenue 04/2025 10/2025 20 30 3 4 Rehabilitation Road Maintenance & Yuba City Sutter El Margarita Road Rehabilitation .3' mill and AC overlay, ADA ramp improvements, striping improvements. Imperial Way to 1100' S/O Spirit Drive 04/2026 10/2026 20 30 3 4 Rehabilitation Road Maintenance & Yuba City Sutter Littlejohn Road Rehabilitation .3' mill and AC overlay, ADA ramp improvements, striping improvements. Hunn Road to Franklin Road 04/2026 10/2026 20 30 3 4 Rehabilitation Road Maintenance & Yuba City Sutter Washington Avenue Rehabilitation .3' mill and AC overlay, ADA ramp improvements, striping improvements. Gray Avenue to Live Oak Boulevard 04/2027 10/2027 20 30 3 4 Rehabilitation Road Maintenance & Yuba City Sutter Railroad Avenue Rehabilitation .3' mill and AC overlay, ADA ramp improvements, striping improvements. Lask Drive to Teesdale Road 04/2028 10/2028 20 30 3 4 Rehabilitation Road Maintenance & Yuba City Sutter Stabler Lane Rehabilitation .3' mill and AC overlay, ADA ramp improvements, striping improvements. Jamie Drive to Butte Vista Lane 04/2028 10/2028 20 30 3 4 Rehabilitation Road Maintenance & Hoag Street Overlay (17/18 Corning Tehama 2-inch asphalt overlay, ADA compliant curb returns and curb and gutter improvements Hoag Street between Solano and Tehama Streets 07/2018 08/2018 15 18 3 4 Rehabilitation Carryover) Road Maintenance & Reconstruction/overlay of Kimball Road from Montgomery Street to the City of Red Bluff Red Bluff Tehama Kimball Road Reconstruction Kimball Road from Montgomery Street to the Red Bluff Community Center, west of S. Jackson Street 08/2018 03/2019 7 10 3 4 Rehabilitation Community Center, approximately 0.80 miles. Overlay/resurfacing of a portion of Franklin Street, 1st Street, Union Street, Hickory Road Maintenance & Franklin Street & 1st Street Paving Franklin Street, 1st Street, Union Street, Hickory Street, Johnson Street and Lincoln Street on the east Red Bluff Tehama Street, Johnson Street and Lincoln Street on the east side of Red Bluff High School, 08/2018 03/2019 7 10 3 4 Rehabilitation Complex side of Red Bluff High School. See exhibit attached. approximately 1 mile Road Maintenance & Microsurfacing of half width of Walnut Street between Paskenta and David. Complete Red Bluff Tehama Walnut Ave. Overlay Walnut Street between Paskenta and David 05/2018 08/2018 5 7 3 4 Rehabilitation the resurfacing that has occurred as part of Courthouse project. Road Maintenance & Tehama Tehama Crack seal city streets Seal cracks in all city streets. City of Tehama C,D,E,F,G,H,I,2nd,3rd,4th,5th Sts.,Gyle Rd. 04/2019 08/2019 3 5 3 4 Rehabilitation Road Maintenance & Street Improvement Project (17/18 Pamela Ave from Lillie to Quail Run Drive for street reconstruction and M Street from Tulare to Fresno Dinuba Tulare Street Reconstruction and installation of curbs, gutters and sidewalk 03/2019 05/2019 20 30 26 14 Rehabilitation Carryover) Street curb, gutter and sidewalk improvements Intersection of Tulare Street and H Street, Intersection Nebraska and Crawford, Olive Way between Road Maintenance & Dinuba Tulare Street Reconstruction Project Street Reconstruction Crawford and Randle, Sierra Way Between Monte Vista and Alta Ave., Euclid Ave Between 12/2018 01/2018 20 30 26 14 Rehabilitation Bloomingdale and Saginaw Ave. Road Maintenance & Street Improvement Project (17/18 Dinuba Tulare Replace defective asphalt concrete adjacent to traffic circles Tulare & N , Tulare & L, Tulare & K, Fresno & L , and Kern & L 08/2018 10/2018 20 30 26 14 Rehabilitation Ongoing) Road Maintenance & Pine Street (F Street to Kaweah Ave), Rocky Hill Drive (between Kaweah and C Street), B-F Street Exeter Tulare Downtown Streets Project Rehabilitation of streets with Type 2 Slurry Seal and striping 07/2019 09/2019 8 10 26 16 Rehabilitation (between Palm and Maple)

Includes pavement and drainage repairs, There are three project sections: A bus pad will be constructed on E. Costner St. Approximately 200’ east of N. Rose Ave, Roadway Road Maintenance & Costner Street Road Repair Project This project is in the City of Farmersville and is located in the boundaries of W. Costner St. and W. Farmersville Tulare realignment and re-grading along Costner St. from N. Linnel Ave to N. Shasta Ave to 01/2018 04/2018 8 10 26 14 Rehabilitation 17/18 Ongoing Ash St. to the north and south and N. Ventura and N. Kern St. to the West and East. improve drainage, and slurry seal and chip seal within the boundaries of W. Ash St. and W. Costner St., N. Ventura and N. Kern St.. All of which are in residential areas.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts East Walnut Repair and Complete Streets Includes road repair, and reconstruction, curb, gutter and sidewalk improvements and This project is located in the City of Farmersville on E. Walnut Ave between Farmersville Blvd. and N. Farmersville Tulare Improvement Project South sSide of 12/2018 06/2020 20 25 26 14 Components bicycle and pedestrian safety installations and enhancements Freedom Drive. This project is located next to the Farmersville High School. Roadway 17/18 Ongoing

The project is located in the City of Farmersville, CA. the project is on the east side of S. Farmersville Blvd. The project is located within the boundaries of E. Oakland St. which runs east to west and S. Camelia Ave which runs north to south. The interior streets are as follows; S. Rose Ave and South Road Maintenance & road maintenance to be performed using a chip seal and slurry seal known as a Cape Farmersville Tulare CAPE Seal Project Avery Ave, both North to South running streets and are to the east of S. Camelia Ave E. Fresno St, E. 01/2020 01/2021 8 10 26 14 Rehabilitation Seal. All ramps within the area will be upgraded to ADA standards (approximately 23) Kirkland St., Grove St. and E. Tulare St. are all east to west running and are located south of E. Oakland St. The location is the most southeastern part of the City and is at the City Limits. The project is located in a residential area.

The project is located in the City of Farmersville, CA along W. Walnut Ave between N. June Ave to the Complete Streets West Walnut Ave Full Depth Will include 132,000 SF of full depth reconstruction which includes hot mix asphalt over Farmersville Tulare west and Farmersville Blvd to the east. Cross streets from west to east are N. Matthew Ave, Carolyn 01/2020 01/2021 25 30 26 14 Components Reconstruction Project aggregate base. 6 ADA curb returns will also be reconstructed. St., N. Ventura Ave, Franquette Ave, and Hartley Ave. This project is located in a residential zone.

Will include construction of 2,300 LF of sidewalk, curb and gutter, construct 8 ADA curb East Walnut Ave Repair and The project is located in the City of Farmersville, CA along E. Walnut Ave. between Farmersville Blvd Complete Streets returns, construct 15 drive approaches, a 7 foot bike lane, purchase additional right of Farmersville Tulare Improvement Project North Side of to the west and Rd. 168 to the east. This project is located across the street From Farmersville High 01/2022 12/2023 25 30 26 14 Components way for a 12’ travel lane, a 5 foot wide sidewalk, 1 cross gutter, 10 street lights, curb and Roadway School near residential and some commercial areas. gutter, 3 storm drain inlets, and 1950 of 36” storm drain piping.

Complete Streets West Walnut Repair and Includes road repair, and reconstruction, curb, gutter and sidewalk improvements and This project is located in the City of Farmersville on W. Walnut Ave between N. June St. and Farmersville Tulare 07/2018 06/2019 20 25 26 14 Components Improvement Project 17/18 Ongoing bicycle and pedestrian safety installations and enhancements. Farmersville Blvd. This project is located in a residential zone.

Road Maintenance & Surface seal of 2 miles of Tulare Road (arterial street). Restripe effected areas (bike Lindsay Tulare Tulare Road (17/18 carryover) Oak Avenue to Foothill Avenue 01/2019 04/2019 5 10 26 14 Rehabilitation lanes and travel lanes). Road Maintenance & Lindsay Tulare Westmore Court (17/18 carryover) Surface seal of .13 miles of Westmore Court (residential street). Mariposa Street south to alley 01/2019 04/2019 5 8 26 14 Rehabilitation Road Maintenance & Lindsay Tulare Samoa Street (17/18 carryover) Surface seal of .12 miles of Samoa Street (commercial/residential street). Mirage Avenue to Homasell Avenue 01/2019 04/2019 5 8 26 14 Rehabilitation Road Maintenance & Lindsay Tulare Elmwood/Mirage/Honolulu/Samoa surface seal, restripe, .7 miles Downtown Lindsay area 04/2020 06/2021 5 10 26 14 Rehabilitation Road Maintenance & Lindsay Tulare Ashland/Frazier/Eastwood surface seal .28 miles Ashland/Frazier/Eastwood Streets 04/2020 06/2021 5 8 26 14 Rehabilitation Lindsay Tulare Safety Hermosa/Westwood Roundabout New roundabout at Hermosa Street and Westwood Avenue Hermosa Street and Westwood Avenue 06/2018 12/2018 15 25 26 14 Road Maintenance & Lindsay Tulare Burem Lane Renovation Recycle and rehabilitate .1 mile Burem Lane, west of Westwood Avenue 04/2020 10/2021 15 18 26 14 Rehabilitation Road Maintenance & Surface seal of 2 miles of Hermosa Street (arterial street). Restripe effected areas (bike Lindsay Tulare Hermosa Street (17/18 carryover) Hwy. 65 to Mirage Avenue 04/2020 06/2021 15 18 26 14 Rehabilitation lanes and travel lanes). Road Maintenance & Asphalt recycling of .1 miles of Mirage Avenue (arterial street). Restripe effected areas, Lindsay Tulare Mirage Avenue (17/18 carryover) Samoa Street to Hermosa Street 04/2020 06/2021 15 18 26 14 Rehabilitation renovate concrete curbs, gutters and sidewalks. Road Maintenance & Asphalt recycling of .25 miles of Linda Vista Avenue (residential street). Renovate Lindsay Tulare Linda Vista Loop (17/18 carryover) Valencia Street to Valencia Street 04/2020 06/2021 15 18 26 14 Rehabilitation concrete curbs, gutters and sidewalks, minor storm drain upgrades. Road Maintenance & Henderson Avenue Cold Foam In- Reconstruction of asphalt section of four-lane arterial roadway, 0.5 miles in length and Porterville Tulare Located between Indiana Street and Jaye Street. 08/2018 12/2018 15 20 26 14 Rehabilitation Place Recycling 64 feet of width. Road Maintenance & Rehabilitation of asphalt surface of four-lane arterial roadway, two miles in length and Porterville Tulare Plano Street Microsurfacing Located between State Route 190 and Henderson Avenue. 07/2018 09/2018 7 10 26 14 Rehabilitation 64 feet of width. Road Maintenance & Rehabilitation of asphalt surface of four-lane arterial roadway, 0.5 miles in length and 64 Porterville Tulare Henderson Avenue Rehabilitation Located between Balmayne Drive and Patsy Street. 08/2018 12/2018 15 20 26 14 Rehabilitation feet of width. Rehabilitation of four-lane arterial road, half-mile in length, and 64 feet wide. The Road Maintenance & Orange Avenue Rehabilitation rehabilitation includes the removal and replacement of the asphalt pavement section Porterville Tulare Between Main Street and Plano Street, this is also a school route to Santa Fe Elementary School. 05/2018 10/2018 10 15 26 14 Rehabilitation (17/18 Ongoing) and curb ramps, updating traffic signal components, and other related items to improve the deficiencies of the roadway. Road Maintenance & Reconstruction of roadway section of four-lane arterial roadway, 0.35 miles in length Porterville Tulare Henderson Avenue Reconstruction Located between Second Street and Plano Street. 02/2019 06/2019 15 20 26 14 Rehabilitation and 64 feet of width. Road Maintenance & Reconstruction of roadway section of four-lane arterial roadway, 0.5 miles in length and Porterville Tulare Newcomb Street Reconstruction Located between Olive Avenue and Morton Avenue. 02/2019 06/2019 15 20 26 14 Rehabilitation 64 feet of width. Pavement Management System selected project to reconstruct Cross Ave. between W. Complete Streets Tulare Ave. and West St. In addition to replacing pavement, project includes ADA Tulare Tulare Cross Ave. Improvements Cross Ave. between W. Tulare Ave. and West St. in the City of Tulare 07/2018 12/2018 20 25 26 16 Components concrete work, ADA traffic signal improvements, and surface water infrastructure improvements. Pavement Management System project to reconstruct Maple Avenue between Complete Streets Tulare Tulare Maple Ave. Improvements Sacramento Street and E Street. Includes ADA Concrete work, and improvements to Maple Ave. between Sacramento and "E" Streets in the city of Tulare 02/2019 08/2019 20 25 26 16 Components the Water, Sewer and Surface Water infrastructure. Pavement Management System / Traffic Safety project on Cartmill Avenue between the Complete Streets Cartmill/Highway 99 Interchange and De La Vina Street. Includes ADA Concrete work, Tulare Tulare Cartmill/Hillman Improvements On Cartmill Ave. between State Route 99 and De La Vina Street in the City of Tulare. 12/2018 06/2020 20 25 26 16 Components signal upgrades, street reconstruction and improvements to the Water, Sewer and Surface Water infrastructure. Pavement Management System project to reconstruct Sonora Avenue between West Complete Streets Tulare Tulare Sonora Ave. Improvements Street and E Street. Includes ADA Concrete work, and improvements to the Water, Sonora Avenue between West Street and E Street in the City of Tulare. 02/2019 12/2019 20 25 26 16 Components Sewer and Surface Water infrastructure.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Pavement Management System project to reconstruct Cherry Street between Tulare Complete Streets Cherry St., Bash Alley, Lyndale Dr. Avenue and Merritt Avenue; Bash Alley between Auburn Street and Cherry Street; Cherry Street between Tulare Avenue and Merritt Avenue; Bash Alley between Auburn Street and Tulare Tulare 03/2018 06/2019 20 25 26 16 Components Improvements Lyndale Drive between Cherry Street and Blackstone Street. Includes ADA Concrete Cherry Street; Lyndale Drive between Cherry Street and Blackstone Street in the City of Tulare. work, and improvements to the Water, Sewer and Surface Water infrastructure.

Segments of Arlen Ave, Border Links Dr, Cambridge Ave, Chestnut Ct, Church St, Cindy St, Crescent Road Maintenance & Cape Seal Road Maintenance. This project list was previously submitted for FY 17/18 Visalia Tulare Cape Seal Ct, Damsen Ave, Fairview Ave, Garden St, Gilmer Ct, Green View Ct, Highland St, Hillsdale Ave, 06/2018 08/2018 6 10 26 16 Rehabilitation but will begin work in June 2018. Hillsdale Ct, Howard Ave, Hyde Ave, Judy Ave, Julieann St, and Keogh Ave.

Rehabilitation of approximately 3.29 miles of roads in the City of Visalia. The project Road Maintenance & FY 18-19 Pavement Rehabiliation Walnut Avenue from Central to Court, Murray Avenue from Giddings to Encina, Center Avenue from Visalia Tulare also includes the upgrade of existing curb ramps to be ADA compliant, and the repair of 05/2019 06/2019 15 20 26 16 Rehabilitation SB1 Encina to Burke, Demaree Street from Houston to Ferguson, and Main Street from Conyer to Hall miscellaneous damaged concrete structures such as curbs, gutters, and drain inlets.

The project is located in Woodlake, CA along its main road S. Valencia Blvd (SR 245). The cross street boundries that are containing the project site are Bravo Ave which is the northern cross street Construct about 3,300 linear feet of curb, gutter, and 6 foot wide sidewalk on both sides Complete Streets South Valencia Boulevard and Wutchumna ditch with is at the southern end on the project site. Within the project site you will Woodlake Tulare of S. Valencia Blvd (SR 245). The improvements also include the installation of ADA 06/2018 12/2018 15 20 26 14 Components Improvements Project also find the cross street Deltha Ave, Laguna Ave, and Ropes Ave going from south to north. The ramps, drive approaches, storm drainage, paving, and landscape repair project is located in a high residential area and is towards the most southern part of town. The city yard is on the south of this project and just to the east is Bravo Lake.

The project is located in Woodlake, CA in a commercial zone of the city. The location is Magnolia St Construct about 550 linear feet of curb, gutter, and decorative sidewalk along the east between Antelope Ave and Lakeview Ave. The project is on the east side of Magnolia St in front of a Complete Streets Magnolia Street Improvements side of Magnolia St between Antelope Ave and Lakeside Ave. The sidewalk will be 10 Woodlake Tulare commercial center. To the north of the project location across Lakeview Ave is residential area. To 06/2018 12/2018 10 15 26 14 Components Project feet wide and includes brick tree wells, two drive approaches, ADA ramps, decroative the west of the project is a transit center along with a commercial zone and the City's main road, N. street lights, storm drainage, paveout, and stirping. Valencia Blvd (SR 245). To the south of the project, just past Antelope Ave, is a City park.

Construct about 620 linear feet of curb, gutter, and 6 foot wide sidewalk along N. The project is located in Woodlake, CA in a high residential area along N Valencia Blvd (SR 245) Valencia Blvd (SR 245). The imrpovements also include drive approaches, 5 foot wide towards the northern part of town. The cross streets are Sequoia Ave which is the northern cross street Complete Streets North Valenia Boulevard Extension Woodlake Tulare bike lanes, 30 foot radius curb return with ADA ramps, street lights, paveout, and and Sierra Ave which is the southern cross street. One block to the west along Palm St is Woodlake 03/2019 12/2019 15 20 26 14 Components Project striping. The project will also constrcut about 150 feet of 4 foot wide sidewalk along W Valley Middle School and all around the project site is residential. To the east is a proposed Sequoia Ave to connect to existing sidewalk. development site for more residential homes. Road Maintenance & Sonora Tuolumne FY 2019 Street Overlay Street overlay of approximately 0.5 to 0.75 miles depending on street width Snell Street between Bonanza Road and Spring Hill Drive 07/2019 10/2019 15 25 5 14 Rehabilitation Various City Streets: Snell-Washington Streetot City Limiits; Stewart Street-Lytton Street to Church Road Maintenance & Centerline Striping and Street Centerline Striping and Street Markings of various city streets including centerline and Street; Lyons Street-Stewart Street to Greenley Raod; Mono Way-Greenley road to Sanguinetti Road; Sonora Tuolumne 08/2018 09/2018 3 5 5 14 Rehabilitation Markings 17/18 Carryover pavement markings using thermoplastic materials Sanguinetti Road-Grennley Road to Sanguinetti Loop Road; Saratoga Road-Shaws Falt to City limit; Guzzi Lane-Greenley Road to Paujline Court

ADOBE WY from SANTA ROSA RD to CALLE ARENA; ALDER VIEW LN from HOLLYRIDGE DR to MISSION OAKS BL; ALIENTO WY from S END to N END; ALTA COLINA from COLONY DR to E END; ANDANTE CT from CALLE ARENA to N END; AQUA VERDE CT from ALIENTO WY to E END; ASHVIEW LN from HICKORY VIEW CR to WILLOW VIEW DR; BEECHVIEW CR from HOLLY VIEW to E END; BIRCH VIEW LN from ELDER VIEW LN to HOLLYRIDGE DR; BUENA MESA CT from W Road Maintenance & END to E END; BUENOS TIEMPOS DR from LADERA VISTA DR to COLONY DR; CALLE ARENA Camarillo Ventura Annual Resurfacing Asphalt Rubber Aggregate Membrane (ARAM), Slurry Seal, and appurtenant work 07/2018 10/2018 7 10 44 19 Rehabilitation from CALLE CANON to CALLE BODEGA; CALLE BODEGA from CALLE CANON to N END; CALLE CANON from CALLE BODEGA to N END; CALLE MENDOTA from MISSION OAKS BL to VIA CUPERTINO; CARISSA CT from CALLE ARENA to N END; CD RD to CERVATO DR (E); VIA CARRANZA from CORTE VISTORA to MISSION OAKS BL; VIA CUPERTINO from S END to PASEO MONTELENA; VIA PACHECO from VIA CUPERTINO to N END; VILLA ADOBE from LOS PUEBLOS DR to COLONY DR; WILLOW VIEW DR from HOLLYRIDGE DR (W) to HOLLYRIDGE DR (E)

Road Maintenance & Neighborhood Street Rehabilitation Pavement rehabilitation of various local streets to include patch repair, grinding, paving BURSON LN, THIRD ST, ORANGE GROVE, OLD TELEGRAPH RD, WILEMAN, BARD, CLAY, Fillmore Ventura 09/2018 12/2018 15 20 37 19 Rehabilitation FY18-19 and appurtenant work. MOUNTAIN VIEW, MAIN, LOS SERENOS, RIVE AND GOODENOUGH RD Repair of lifted/broken sidewalks, curb and gutter and ribbon gutter. Includes 4,000 Bard St (Saratoga to Clay); Clay St (Bard to Second); Mountain View St (Sespe to Main); Main St Road Maintenance & Sidewalk, Curb and Gutter Repairs Fillmore Ventura square feet of sidewalks, 250 linear feet of curb and gutter and 220 square feet of (Mountain View to Central); Los Serenos St (Ventura to Sierra Vista); River St (Sandalwood to 09/2018 12/2018 20 30 37 19 Rehabilitation (FY17-18 Carryover) ribbon gutter repairs. Central); Goodenough Rd (Hinckley to Arrasmith) Recycled Asphalt Pavement (RAP) Slurry Seal and crack sealing on 75,000 SF of Road Maintenance & Street Resurfacing (FY17-18 Fillmore Ventura pavement. Work is preventative maintenance to cost effectively extend the life on B St (s/o River); River St (B to A); Surrey Way; Carriage Place 09/2018 12/2018 10 20 37 19 Rehabilitation Carryover) streets in good condition. Road Maintenance & General maintenance including but not limited to pavement maintenance and repairs Downtown area between Spring Road and Moorpark Avenue, north of Los Angeles Avenue and south Moorpark Ventura Pavement Preservation 07/2018 01/2019 5 10 44 27 Rehabilitation and repairs to adjacent facilities due to the work. of Wicks Road

San Antonio St., Crestview Dr., Palomar Rd. Tico Rd., Rincon St., Santa Ana St., Lion St., Oak St., Road Maintenance & The work comprises of street overlays, including cold planning, milling, placing Ojai Ventura 2019 Road Rehabilitation Project Ayers Ave., Fairway Lane, San Gabriel St., San Rafael St., Eucalyptus St., Summer St., Fairview Rd., 05/2019 11/2019 15 25 37 19 Rehabilitation Rubberized Asphalt Concrete (RAC), concrete work, striping, and ADA curb ramps. McKee St., N. Montgomery St., Aliso St., Matilija St., Grandview Ave., Pleasant St., Douglas St.

Road Maintenance & Rice Avenue Roadway The resurfacing project consists of a two-inch cold mill and 3/8-inch ARAM and finished Oxnard Ventura Rice Avenue from US Highway 101 to Fifth Street in the City of Oxnard. 03/2018 08/2018 10 15 44 19 Rehabilitation Rehabilitation with 2-inch ARHM. Road Maintenance & Cooper Road Roadway The resurfacing project will rehabilitate the neighborhood streets and improve Oxnard Ventura Cooper Road from Oxnard Boulevard to Juanita Avenue 05/2018 12/2018 10 15 44 19 Rehabilitation Rehabilitation pedestrian access. Road Maintenance & Auto Center Neighborhood Carryover Project from FY 17/18. The resurfacing project consists of a two-inch cold mill The Auto Center Commercial Neighborhood area is east of US Highway 101, between N. Rose Oxnard Ventura 01/2018 08/2018 15 20 44 19 Rehabilitation Roadway Rehabilitation and 3/8 inch ARAM and finished with 2-inch ARHM. Avenue and Rice Avenue/Santa Clara Avenue in the City of Oxnard

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Pleasant Valley Crosswalk Accessibility Improvements and Crosswalk installation including signage, curb and Port Hueneme Ventura Safety Intersection Pleasant Valley & San Pedro St. 10/2018 02/2019 25 50 44 19 Intersection Upgrade gutter, sidewalk and bulb outs.

Surfside Drive; Market Street; Hueneme Rd; N. Ventura Rd; Cindy; Bolder Drive; Patterson; West Channel Islands Blvd; Pleasant Valley Citywide Pedestrian Safety (17/18 Replacement of Cracked Sidewalks. Repair or replacement of uplifted sidewalks. Add Port Hueneme Ventura Safety All project locations are not final, each location will be selected based on priority need and resources 08/2018 04/2019 8 10 44 19 Ongoing) additional Curb ramps in compliance with CALDAG and ADA. throughout the year. Locations may be subject to change based on priority need and resources.

Intersection of Park Ave & Ventura Rd. to Intersection of Park Ave & Bard Rd; Intersection of Joyce Road Maintenance & Grind & Overlay for Select Streets Dr. & N. 5th St. to Intersection of Joyce Dr. & Myrna Dr.; Intersection of Myrna Dr. & Florence Ave to Port Hueneme Ventura Grind and 2-inch Overlay 07/2018 05/2019 2 10 44 19 Rehabilitation (17/18 Carryover) Intersection of Myrna Dr. & S. J St.; Intersection of Scott St. & N. Ventura Rd. to Intersection of Scott St. & Willowbrook St. Road Maintenance & Intersection of E. Surfside Dr & N. Ventura Rd to Intersection of E. Channel Island Blvd & N. Ventura Port Hueneme Ventura Crackfill and Slurry (17/18 Ongoing) Fill Cracks and Slurry seal areas along Ventura Road. 07/2018 09/2018 5 7 44 19 Rehabilitation Road Road Maintenance & Intersection W. Channel Island & Bolker Dr. to Intersection W.Hemlock Rd & Bolker Dr. Port Hueneme Ventura Microsurfacing (17/18 Carryover) Add a protective seal coat to extend the pavement life of Bolker Drive 07/2018 09/2018 5 10 44 19 Rehabilitation Intersection W. Channel Island & Bolker Way to Intersection W.Hemlock Rd & Way Citywide Crosswalk Upgrades Restripe Crosswalk with new highly reflective paint. Upgrade signs to highly reflective Bard Rd and N. 6th Pl.; Sunkist St and N. 6th St.; Bryce Canyon Ave & N. 6th St.; Bryce Canyon Ave Port Hueneme Ventura Safety 07/2018 10/2018 5 10 44 19 (17/18 Ongoing) signs. and S. M St; Market St. and Port Hueneme Rd. Market St. Crosswalk Intersection Port Hueneme Ventura Safety New lighted crosswalk to be installed at intersection Intersection Market St & Hueneme Rd 09/2018 12/2018 10 15 44 19 Upgrade

The project consists of pavement slurry seal, rehabilitation and resurfacing; curb ramp Road Maintenance & Community Street Improvement Various City roads within the eastern and western City boundary along Telegraph Road and northern Santa Paula Ventura upgrades; traffic signal modifications (as needed) and curb and gutter repairs. 07/2018 05/2019 15 25 37 17 Rehabilitation Project and southern City boundary along 10th Street and Hwy 150. Estimated design costs are $80,000.00 and estimated construction cost is $580,000.00.

The project consists of installing a storm water quality treatment control BMP infiltration Complete Streets Foothill/Hardison/Cameron Storm Santa Paula Ventura basin with 0.25-mile sediment capture chambers incorporating infiltration wells. Foothill Rd. from Ridge Crest Dr. to Steckel Dr. 07/2018 05/2018 10 20 37 17 Components Drain Project Estimated design costs are $67,000.00 and estimated construction cost are $334,650.

Ventura St. (Seventh St. to Harvard Blvd.), High St. (Ojai Rd. to Guilberson St.), Orchard St. (Ojai Rd. to end), Virginia Terr. (Sixth St. to Ojai Rd.), Santa Barbara St. (Palm Ave. to Sixth St.), Peck Rd. (Harvard Blvd. to Santa Paula St.), Monte Vista Dr. (Sixth St. to Tenth St.), Oak St. (Ventura St. to Road Maintenance & The project consists of repairing 54,563-square feet sidewalk trip hazards. Estimated Santa Paula Ventura Community Sidewalk Repair Project Santa Barbara St.), Santa Paula St. (Palm Ave. to Sixth St.), Eleventh St. (Santa Paula St. to Saticoy 07/2018 02/2018 20 30 37 17 Rehabilitation design cost is $80,000.00 and estimated construction cost is $398,000. St.), Twelfth St. (Saticoy St. to Santa Paula St.), Saticoy St. (Eleventh St. to Twelfth St.), Sixth St. (Santa Paula St. to Virginia Terr.), Santa Paula St. (Twelfth St. to Eleventh St.), Peralta Dr. (Santa Cruz St. to Santa Ana St.)

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts Blackstock Avenue (Los Angeles Ave to Barnes St) Claudia Avenue (Heywood St to Lee St) Copley Street (Hilldale Ave to End) Elmdale Avenue (Brower St to Cochran St) Erica Street (Bridget Ave to Lee St) Fred Avenue (Sycamore Dr to Lee St) Garvin Avenue (Heywood St to Lee St) Golden Bear Court (Lake Park Dr to End) Golden Fern Court (Lake Park Dr to End) Golden Grove Court (Golden Park Pl to End) Goldenwood Circle (Lake Park Dr to Golden Moss Ct) Golden Moss Court (Lake Park Dr S to End) Golden Park Place (Lake Park Dr S to End) Golden Vine Court (Lark Park Dr S to End) Graceland Street (Elmdale Ave to Justin Ave) Hampton Avenue (Birchcroft St to Oak Haven Ave Hanley Avenue (Heywood St to Lee St) Harrington Road (Appleton Rd to E End) Heywood Street (Bridget Ave to Sycamore Dr) Road Maintenance & FR 2018-19 Annual Minro Streets Hudspeth Avenue (Dakin Ave to Arcane St) Simi Valley Ventura Repave/Resurface streets pavements, and all appurtenant wor 09/2018 12/2018 15 20 38 27 Rehabilitation Rehabilitation Hudspeth Avenue (Kearney Ave to Dakin Ave) Hudspeth Avenue (Sutter Ave to Kearny Ave) Hudspeth Avenue (Wallace St to Fitzgerald Rd) Justin Avenue (Brower St to Cochran St) Knollhaven Street (Elmdale Ave to Justin Ave) Larch Street (Bigelow Ave to Wisteria St) Lawson Avenue (Sycamore Dr to Lee St) Lee Street (Marcella St to Lee St N) Lee Street North (Heywood St to Lee St) Marcella Street (Sycamore Dr to Sycamore Dr) Martha Morrison Drive North (Sycamore Ridge St to Cantrice St) Martha Morrison Drive North (Wood Ranch Parkway to Sycamore Ridge St) Martha Morrison Drive South (Cantrice St to Wood Ranch Parkway) Misty Falls Court (Lake Park Dr S to End) Misty Lake Court (Misty Trails Pl to End) Misty Trails Place (Lake Park Dr S to End) Racine Street (Sycamore Dr to Galena Ave) Ravenna Street (Racine St to Waldo St) School Street (Church St to Blackstock Ave) Silver Fern Court (Misty Trails Place to End) Ashley Dr. (Fourth St. to East End); Borden Ave. (Fitzgerald Rd. to Arcane); Brandon Ave. (Fitzgerald Rd. to South End); Hagen Court (Parkhurst St. to End); Heywood St. ( Sycamore Dr. to Bridget Ave.); Road Maintenance & Simi Valley Ventura Carryover FY 2017/18 SB 1 Projects Repave/Resurface street paving and all appurtenant work Hudspeth Ave. (Fitzgerald Rd. to Sutter Ave.); Knollhaven St. (Elmdale Ave. to Justin Ave.); Smith Rd. 09/2018 12/2018 15 20 38 27 Rehabilitation (Kuehner Dr. to East End); Burnside St. (Elmdale Ave. to Justin Ave.); Hampton Ave. (Oak Haven Ave. to Birchcroft St.)

Road Maintenance & 2018 Pavement Overlay and Overlay and Resurface 34.1 miles of arterial and residential streets, reconstruction of Streets City-Wide: Lynn Rd, Olsen Rd, Thousand Oaks Blvd, Townsgate Dr, Erbes Rd., Avenida de Thousand Oaks Ventura 12/2017 12/2018 15 20 7 4 Rehabilitation Resurfacing Program 295 curb ramps to meet ADA compliance. las Arboles, Valley Spring, Area 192, Area 197, Area 261, Area 41, Area 310, Area 308 and Area 32.

This project consists of resurfacing Johnson Drive from Bristol Road to HWY 101. The Road Maintenance & project includes cold milling, pavement repairs, manhole and valve adjustments to Ventura Ventura Johnson Drive (Bristol to HWY 101) Along Johnson Drive from Bristol Road to HWY 101 southbound ramps 07/2018 06/2019 15 20 37 19 Rehabilitation grade, upgrading street signs, re-striping, replacement of traffic inductive loops, and asphalt overlay. This project consists of resurfacing Victoria Avenue from Telephone Road to HWY 126. Road Maintenance & Victoria Avenue (Telephone to HWY The project includes cold milling, pavement repairs, manhole and valve adjustments to Ventura Ventura Along Victoria Avenue from Telephone Road to HWY 126 ramps 07/2018 06/2019 15 20 37 19 Rehabilitation 126) grade, upgrading street signs, re-striping, replacement of traffic inductive loops, concrete work, and asphalt overlay. This project consists of resurfacing Ralston Street from Portola Road to Victoria Road Maintenance & Avenue. The project includes cold milling, pavement repairs, manhole and valve Ventura Ventura Ralston Street (Portola to Victoria) Along Ralston Street from Portola Road to Victoria Avenue 07/2018 06/2019 15 20 37 19 Rehabilitation adjustments to grade, upgrading street signs, re-striping, replacement of traffic inductive loops, concrete work, and asphalt overlay.

Tim Spencer Alley, located between F and G and connecting Second and Third, has been in disrepair for several years. The sanitary sewer and the water mains are aging beyond repair and need replacing. Additionally the alley surface is damaged and does Complete Streets Tim Spencer Alley Reconstruction not flow properly. This project will replace the sewer and water mains and reconstruct Davis Yolo Tim Spencer Alley - the Alley between F Street and G Street from Second Street to Third Street 03/2018 03/2019 18 20 4 3 Components 17/18 Carryover the alley surface. The new development at 239 G Street desires a surface treatment similar to their property for a length near Third Street, along their property and will fund that portion of the project. Construction will have to be carefully implemented to minimize the businesses that use the alley for sewer, water, vehicle deliveries, etc.

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

Combining the scope of improvements near the Davis Little League fields and the H Street Tunnel entrance improvements, this project includes ADA compatible access along the Little League fields; resurface H Street from Eighth and north to the end; H Street between Eight Street parking lot south of Covell Blvd Bike/Ped Pathway between H Street Davis Yolo Other H Street Project - DLL and Tunnel 03/2018 05/2018 10 20 4 3 improved street lighting, especially near the fields; improving the west end of the tunnel and J Street entrance; improving the tunnel lighting; resurfacing the bike path from the east end of the tunnel to Drexel; and resolving the right of way issue at Drexel.

High Priority infrastructure safety improvements for Birch Lane elementary school per Birch Lane Elementary School Walk Davis Yolo Safety the Walk Bike Audit Report. Includes safety improvements such as High visibility cross Ponteverde and Tulip 06/2019 10/2019 8 10 4 3 Bike Audit Report Improvements walks, curb ramps, curb extensions, mid-block crossings, refresh markings

Fifth Street Improvements (L to Pole Design and construction of multi-modal and safety improvements including striping, Davis Yolo Safety Fifth Street Improvements (L to Pole Line) 05/2019 09/2019 8 10 4 3 Line) 17/18 Carryover Class IV bike lanes, transit stop improvements, mid-block, enhanced crossing.

Install a bicycle path on the north side of East Covell Boulevard, from just west of J East Covell Bicycle Path - North Davis Yolo Safety Street to Pole Line, roughly a half mile. This project was a result of the East Covell North side of E. Covell Blvd from Pole Line to J Street 05/2019 10/2019 10 20 4 3 Side Corrider Plan (ECCP).

This CIP provides for a pavement management design and construction throughout the Road Maintenance & Transportation Infrastructure Rehab City. This is a multimillion dollar a year project to focus on maintaining and repairing Davis Yolo Various locations/streets throughout Davis 11/2017 12/2018 10 20 4 3 Rehabilitation 17/18 Carryover streets throughout the City. In 17/18, two years worth of concrete was completed. The pavement and bike path package was not completed and is being carried over to 18/19.

1) Resurface Mace Boulevard, and 2) increase non‐motorized transportation along the corridor and between the neighborhoods east and west of Mace Blvd, particularly increasing levels of bicycling to Pioneer Elementary School. The Project Scope includes resurfacing and restriping the entire corridor, reconstructing where needed, Road Maintenance & Mace Boulevard Corridor 17/18 Davis Yolo improving Mace/Cowell intersection for bicycles and pedestrians (e.g. remove free Mace Blvdbetween Redbud Drive and Cowell Boulevard 03/2018 12/2018 8 10 4 3 Rehabilitation Carryover right turns/extend pedestrian refuge islands, installing bike boxes), installing two‐way protected, buffered cycle track on the east side, reconfiguring lanes from four to two plus turn lanes, installing a buffered bike lane on west side, and installing signal control (RRFB or HAWK) at San Marino.

This CIP provides for pavement management design and construction throughout the Road Maintenance & City. This is a multi million dollar a year project to focus on maintaining and repairing Davis Yolo Transportation Infrastructure Rehab various locations in the city of Davis, CA consisting of 9.9 Square Miles 08/2018 06/2019 10 20 4 3 Rehabilitation streets throughout the City. This year's project includes a pavement rehabilitation and bike path package. These improvements have been designated “High Priority” safety improvements for Complete Streets Fourteenth Street / Villanova Drive North Davis ES from the Walk Bike Audit Report and street resurfacing. Includes Fourteenth Street from F Street to Oak Avenue; and Villanova Drive from Anderson Road to Sycamore Davis Yolo 02/2019 06/2019 10 20 4 3 Components Improvements 17/18 Carryover buffered bike lanes, intersection curb extensions, pedestrian refuge islands, restriping Lane crosswalks, green bike lane striping alongside loading zones. The work shall include reconstruction of L Street between 5th Street and Claremont Road Maintenance & L Street Improvements 17/18 Drive; a 1.3' full depth reclamation pavement section reconstruction, utility adjustments, Davis Yolo L Street between Fifth Street and Claremont Drive. 05/2018 06/2019 8 10 4 3 Rehabilitation Carryover curb and gutter, concrete flatwork, signage, striping and pavement markers on L Street from 5th Street to Claremont Drive. Preparation of a multiyear Pavement Rehabilitation Program that includes updating Pavement Management System The 2018 PMS update will survey and inventory the City streets and roadway system (approximately West Sacramento Yolo Other PMS. The 2018 PMS update will include a comprehensive survey and inventory of City 01/2018 01/2019 5 7 7 6 Update 200 centerline miles and 406 lane miles). streets and roadway system. The project limits is bound by 15th Street (North), Jefferson Blvd (East), Stone Blvd (South) and Park Road Maintenance & States Streets Neighborhood Rehabilitate the local street network including storm drainage repairs, ADA accessibility Blvd (West). The streets within that boundary include Maryland Ave, Delaware Ave, Pennsylvania West Sacramento Yolo 01/2018 12/2019 5 10 7 6 Rehabilitation Pavement Rehabilitation upgrades and pavement rehabilitation in an Old West Sacramento Neighborhood. Ave, Alabama Ave, Virginia Ave Vermont Ave, Carolina Ave, Circle St, Alameda St, 16th St, 17th St, Regent St, Euclid St and 19th St. Road Maintenance & West End of West Capitol Avenue West Sacramento Yolo Design Phase of West Capitol Ave from I-80 to Enterprise Blvd (approximately 1 mile). West Capitol Avenue: I-80 to Enterprise Blvd 04/2018 12/2020 5 30 7 6 Rehabilitation Rehabilitation

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). City- Fiscal Year 2018-19 Local Streets and Roads Proposed Project List *The Proposed Project List will be finalized upon the Commission's adoption of the cities and counties eligible for funding. August 3, 2018

Est. Project Est. Project Est Useful Life Est Useful Life Assembly Agency Name County Project Type Title Description Location Senate Districts Start Completion Min Max Districts

2.1 : (Anderson Avenue (From Railroad Avenue, West to Dead End) 111,456 square feet, Spot Repairs, Crack seals, Slurry Seals, Grind and Pave (Cracks) 2.2 : (Carrion Court, Priscilla Court) 39,420 SQUARE FEET, SPOT REPAIRS, CRACK SEALS, SLURRY SEALS 2.3 : (THIRD STREET (ALL)) 80,532 SQUARE FEET, SPOT REPAIRS, CRACK 2.1 : (Anderson Avenue (From Railroad Avenue, West to Dead End) SEALS, SLURRY SEALS 2.2 : (Carrion Court, Priscilla Court) 2.4 : (MAIN STREET (GRANT AVENUE TO SECOND STREET)) 153,328 SQUARE 2.3 : (THIRD STREET (ALL)) FEET, SPOT REPAIRS, CRACK SEALS, SLURRY SEALS, GRIND AND PAVE 2.4 : (MAIN STREET (GRANT AVENUE TO SECOND STREET)) CRACKS 2.5 : (BETTY COURT (ALL)) Road Maintenance & Annual Road Maintenance 2.5 : (BETTY COURT (ALL)) 9,540 SQUARE FEET, SPOT REPAIRS, SLURRY SEALS, Winters Yolo 2.6 : (EAST BAKER STREET (RAILROAD AVENUE TO EAST MAIN STREET)) 11/2018 03/2019 5 15 4 3 Rehabilitation Rehabilitation (FY 2018/19) CRACK SEALS 2.7 : (BAKER STREET (RAILROAD AVENUE, WEST TO DEAD END)) 2.6 : (EAST BAKER STREET (RAILROAD AVENUE TO EAST MAIN STREET)), 2.8 : (EAST STREET (BETWEEN EAST ABKER STREET AND EAST MAIN STREET)) 113,596 SQUARE FEET, SLURRY SEAL, CRACK SEAL, SPOT REPAIR 2.9 : (EAST STREET (EAST BAKER STREET TO DEAD END)) 2.7 : (BAKER STREET (RAILROAD AVENUE, WEST TO DEAD END)) 65,052 *All locations are selected based on priority need and resources throughout the year, location may be SQUARE FEET, SLURRY SEALS, CRACK SEALS, SPOT REPAIRS subject to change. 2.8 : (EAST STREET (BETWEEN EAST ABKER STREET AND EAST MAIN STREET)) 29,472 SQUARE FEET, SLURRY SEAL, CRACK SEAL, SPOT REPAIR 2.9 : (EAST STREET (EAST BAKER STREET TO DEAD END)) 11,808 SQUARE FEET, OVERLAY (GRIND AND PAVE)

Roadway rehabilitation including asphalt roadway rehabilitation, repair damaged curb, Road Maintenance & gutter and sidewalk sections, improve ADA access at intersections, improve delineation Woodland Yolo 2020 Road Rehabilitation Project Matmor Road from E. Main Street to Gibson Road and Gum Avenue from East Street to Matmor Road. 12/2019 12/2022 15 20 4 3 Rehabilitation of, and widen bike lanes. Project will improve access to shopping, school and neighborhoods within and through the project area. Phase 1 includes sealing and maintenance repairs on roadway segments that are the Road Maintenance & highest traffic. Slurry Seal repair. Marysville Yuba Preventative Maintenance Program First Street ‐ F Street to B Street 02/2019 03/2019 5 10 3 4 Rehabilitation First Street ‐ F Street to B Street Phase 1 includes sealing and maintenance repairs on roadway segments that are the Road Maintenance & highest traffic. Slurry seal project. Marysville Yuba Preventative Maintenance Program Yuba Street ‐ 6th Street to 10th Street 02/2019 03/2019 5 10 3 4 Rehabilitation Yuba Street ‐ 6th Street to 10th Street Phase 1 includes sealing and maintenance repairs on roadway segments that are the Road Maintenance & highest traffic. Slurry seal project. Marysville Yuba Preventative Maintenance Program D Street ‐ 1st Street to 3rd Street 02/2019 03/2019 5 10 3 4 Rehabilitation D Street ‐ 1st Street to 3rd Street Phase 1 includes sealing and maintenance repairs on roadway segments. Slurry seal Road Maintenance & project. Marysville Yuba Preventative Maintenance Program F Street ‐ 3rd Street to 10th Street 02/2019 03/2019 5 10 3 4 Rehabilitation F Street ‐ 3rd Street to 10th Street Phase 1 includes sealing and maintenance repairs on roadway segments that are the Road Maintenance & highest traffic. Slurry seal project. Marysville Yuba Preventative Maintenance Program H Street ‐ 3rd Street to 14th Street 08/2018 10/2018 5 10 3 4 Rehabilitation H Street ‐ 3rd Street to 14th Street This project would replace a failed culvert on Malone Ave at S Grasshopper Slough and Malone Avenue Culvert at S. Wheatland Yuba Other repave sections of Malone Avenue. New pavement would accommodate future Class I On Malone Avenue at S Grasshopper Slough crossing. 07/2018 10/2018 50 50 3 4 Grasshopper Slough bikeway. Road Maintenance & Hooper Street Pavement This project would resurface approximately 800 feet of Hooper Street, around Wheatland Yuba On Hooper Street between Hwy 65 and Olive Street. 04/2019 08/2019 20 20 3 4 Rehabilitation Resurfacing Wheatland Elementary School and Virginia School. Road Maintenance & Wheatland Yuba G Street This project would level and seal a portion of G Street On G Street from Wheatland Road to 3rd Street 06/2018 08/2018 10 15 3 4 Rehabilitation Road Maintenance & Wheatland Yuba F Street This project would level and seal a portion of F Street On F Street between Wheatland Road and 3rd Street 06/2018 08/2018 10 15 3 4 Rehabilitation Road Maintenance & Wheatland Yuba 3rd Street This project would level and seal a portion of 3rd Street On 3rd Street between F Street and G Street 06/2018 08/2018 10 15 3 4 Rehabilitation

*All project detail is based on the Proposed Project Lists submitted to the Commission for Fiscal Year 2018-19 Program Funding and are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).