Addu City Hithadhoo

Total Page:16

File Type:pdf, Size:1020Kb

Addu City Hithadhoo MALDIVES LAND AND SURVEY AUTHORITY MINISTRY OF NATIONAL PLANNING, HOUSING & INFRASTRUCTURE Office (PABX): +(960) 3004300, Fax: +(960) 3004254 Ameenee Magu, Maafannu, Male', 20392, Maldives. Email: [email protected] Web: www. surveyofmaldives.gov.mv CONTROL POINT DETAILS Station Number PSM 5774 Coordinate Information Geodetic Grid WGS 84 UTM Zone 43 Lat: 73°05’59.12705” E: 288525.0321 Long: 0°37’35.21222” N: 9930719.1601 Ellp Height: -96.4480 4101 Orth Height: 1.194 Island Name: S.Hithadhoo Date: 05/01/2021 Monument description & method of survey: - Concrete casted in 300mm wooden box, length measuring 1000mm buried below ground, 1m s/s rod driven into the concrete as the center mark. Monument labeled with s/s plate stating point ID. - 100mm above ground. - GNSS static survey post processing. - Vertical control, PSM elevation relative to established elevation of GAN BM4. - Inter-visible to PSM5775 General site condition & access: - Located towards south east of the island, east of Link Road near Masjid. Reclaimed land next to South International port, - Easy access. Owner: Addu City Council Height 1.5m Height 1.5m Distance 5m Distance 5m DOWN TOWARD PSM NORTH VIEW EAST VIEW Height 1.5m Height 1.5m Height 1.5m Distance 5m Distance 5m FROM PSM UPTOWARD SKY SOUTH VIEW WEST VIEW SITE INFORMATION Station Number P S M 5 7 7 4 Station Horizon Mask 0 Locality 270 90 TN MN 180 0 Magnetic Declination 3 Declination applied to this figure? Height above Marker that horizon Yes No was mapped from 1.5 m Mosque North 335° 12.5m 89° 244° 12.5m Fithiroanu 10.5m PSM 5774 Funa Sketched by: Abdul Awwal Scale: Not to scale Date: 01/01/2021 Maldives Land and Survey Authority , MINISTRY OF NATIONAL PLANNING, HOUSING & INFRASTRUCTURE, Ameenee Magu, Maafannu, Male', 20392, Maldives, Office (PABX): +(960) 3004300, Fax: +(960) 3004254, Email: [email protected], Web: www.surveyofmaldives.gov.mv MALDIVES LAND AND SURVEY AUTHORITY MINISTRY OF NATIONAL PLANNING, HOUSING & INFRASTRUCTURE Office (PABX): +(960) 3004300, Fax: +(960) 3004254 Ameenee Magu, Maafannu, Male', 20392, Maldives. Email: [email protected] Web: www. surveyofmaldives.gov.mv CONTROL POINT DETAILS Station Number PSM 5775 Coordinate Information Geodetic Grid WGS 84 UTM Zone 43 Lat: 73°06’01.50068” E: 288598.5877 Long: 0°37’48.74107” N: 9930303.5830 Ellp Height: -96.1444 4101 Orth Height: 1.497 Island Name: S.Hithadhoo Date: 05/01/2021 Monument description & method of survey: - Concrete casted in 300mm wooden box, length measuring 1000mm buried below ground, 1m s/s rod driven into the concrete as the center mark. Monument labeled with s/s plate stating point ID. - 100mm above ground. - GNSS static survey post processing. - Vertical control, PSM elevation relative to established elevation of GAN BM4. - Inter-visible to PSM5774 General site condition & access: - Located towards south east of the island, east of Link Road near Bandhari Magu. On reclaimed Land next to south international Port. Nearest to Public Service Media VHF Antenna Mast. - Easy access. Owner: Addu City Council Height 1.5m Height 1.5m Distance 5m Distance 5m DOWN TOWARD PSM NORTH VIEW EAST VIEW Height 1.5m Height 1.5m Height 1.5m Distance 5m Distance 5m FROM PSM UPTOWARD SKY SOUTH VIEW WEST VIEW SITE INFORMATION Station Number P S M 5 7 7 5 Station Horizon Mask 0 Locality 270 90 TN MN 180 0 Magnetic Declination 3 Declination applied to this figure? Height above Marker that horizon Yes No was mapped from 1.5 m VHF Antenna 0° 141m PSM 5775 120° 114m 153° 64m Light post Light post North Sketched by: Abdul Awwal Scale: Not to scale Date: 01/01/2021 Maldives Land and Survey Authority , MINISTRY OF NATIONAL PLANNING, HOUSING & INFRASTRUCTURE, Ameenee Magu, Maafannu, Male', 20392, Maldives, Office (PABX): +(960) 3004300, Fax: +(960) 3004254, Email: [email protected], Web: www.surveyofmaldives.gov.mv MALDIVES LAND AND SURVEY AUTHORITY MINISTRY OF NATIONAL PLANNING, HOUSING & INFRASTRUCTURE Office (PABX): +(960) 3004300, Fax: +(960) 3004254 Ameenee Magu, Maafannu, Male', 20392, Maldives. Email: [email protected] Web: www. surveyofmaldives.gov.mv CONTROL POINT DETAILS Station Number PSM 5776 Coordinate Information Geodetic Grid WGS 84 UTM Zone 43 Lat: 73°05’33.62196” E: 287736.0886 Long: 0°37’17.53258” N: 9931261.9915 Ellp Height: -96.2899 4101 Orth Height: 1.352 Island Name: S.Hithadhoo Date: 05/01/2021 Monument description & method of survey: - Concrete casted in 300mm wooden box, length measuring 1000mm buried below ground, 1m s/s rod driven into the concrete as the center mark. Monument labeled with s/s plate stating point ID. - 100mm above ground. - GNSS static survey post processing. - Vertical control, PSM elevation relative to established elevation of GAN BM4. General site condition & access: - Located towards south west of the island in kanbihaa Magu extention. West of Addu Equitorial Hospital - Easy access. Owner: Addu City Council Height 1.5m Height 1.5m Distance 5m Distance 5m DOWN TOWARD PSM NORTH VIEW EAST VIEW Height 1.5m Height 1.5m Height 1.5m Distance 5m Distance 5m FROM PSM UPTOWARD SKY SOUTH VIEW WEST VIEW SITE INFORMATION Station Number P S M 5 7 7 6 Station Horizon Mask 0 Locality 270 90 TN MN 180 0 Magnetic Declination 3 Declination applied to this figure? Height above Marker that horizon Yes No was mapped from 1.5 m North 18.5m 10m 76° 330° 1m 153° PSM 577 6 Scrubs Towards the Beach Sketched by: Abdul Awwal Scale: Not to scale Date: 01/01/2021 Maldives Land and Survey Authority , MINISTRY OF NATIONAL PLANNING, HOUSING & INFRASTRUCTURE, Ameenee Magu, Maafannu, Male', 20392, Maldives, Office (PABX): +(960) 3004300, Fax: +(960) 3004254, Email: [email protected], Web: www.surveyofmaldives.gov.mv .
Recommended publications
  • Population and Housing Census 2014
    MALDIVES POPULATION AND HOUSING CENSUS 2014 National Bureau of Statistics Ministry of Finance and Treasury Male’, Maldives 4 Population & Households: CENSUS 2014 © National Bureau of Statistics, 2015 Maldives - Population and Housing Census 2014 All rights of this work are reserved. No part may be printed or published without prior written permission from the publisher. Short excerpts from the publication may be reproduced for the purpose of research or review provided due acknowledgment is made. Published by: National Bureau of Statistics Ministry of Finance and Treasury Male’ 20379 Republic of Maldives Tel: 334 9 200 / 33 9 473 / 334 9 474 Fax: 332 7 351 e-mail: [email protected] www.statisticsmaldives.gov.mv Cover and Layout design by: Aminath Mushfiqa Ibrahim Cover Photo Credits: UNFPA MALDIVES Printed by: National Bureau of Statistics Male’, Republic of Maldives National Bureau of Statistics 5 FOREWORD The Population and Housing Census of Maldives is the largest national statistical exercise and provide the most comprehensive source of information on population and households. Maldives has been conducting censuses since 1911 with the first modern census conducted in 1977. Censuses were conducted every five years since between 1985 and 2000. The 2005 census was delayed to 2006 due to tsunami of 2004, leaving a gap of 8 years between the last two censuses. The 2014 marks the 29th census conducted in the Maldives. Census provides a benchmark data for all demographic, economic and social statistics in the country to the smallest geographic level. Such information is vital for planning and evidence based decision-making. Census also provides a rich source of data for monitoring national and international development goals and initiatives.
    [Show full text]
  • The Republic of Maldives Renewable Energy Roadmap Final Workshop
    The Republic of Maldives Renewable Energy Roadmap Final Workshop 17 September 2015, Kurumba Resort, the Maldives Organized by: The Ministry of Environment and Energy, Republic of Maldives & The International Renewable Energy Agency (IRENA) Roadmap Overview • Review of key renewable energy plans & studies including: . Maldives SREP Investment Plan . Greater Malé Region Renewable Energy Integration Plan . Towards a Carbon-neutral Energy Sector: Maldives Energy Roadmap 2014-2020 . Solar PV Integration in the Maldives • Modelling of least cost options solar PV deployment . Gdh. Thinadhoo & Villingili • Goal: supporting RE deployment by identifying: . Key barriers & areas for further analysis . Recommendations to build on existing efforts 2 Key RE Deployment Plans & Studies SREP Investment Plan 2012, World Bank, ADB, IFC 138.5 million USD, 26 MW RE Outer Islands Technical assistance & 62 million USD, 7 MW RE Greater Malé capacity building + infrastructure upgrades 69.5 million USD, 19 MW RE 7 million USD supporting additional RE Greater Malé RE Integration Plan Towards a Carbon-neutral Energy Sector 2015, World Bank 2014 ADB 43.5 MW RE RE in Outer Islands Solar PV Integration in the Maldives 2013, ADB PV in Greater Malé & Outer Islands 3 Maldives Scaling up Renewable Energy Program in Low Income Countries (SREP) Investment Plan World Bank, ADB, IFC, 2012 4 SREP Investment Plan Overview • Objective: RE deployment to transform electricity sector • A key funding mechanisms for RE projects in the Maldives • Designed to leverage private investment • 138.5 million USD divided into three components Funding (million USD) SREP Investment Components Public Pirvate 1) Renewable energy for Greater Malé 34.5 35 2) Renewable energy for outer islands 46 16 3) Technical assistance & capacity building 7 0 Total investemnt 87.5 51 5 SREP: Four Funding Programs 1) ASPIRE: Accelerating sustainable private investments in RE .
    [Show full text]
  • Coastal Adpatation Survey 2011
    Survey of Climate Change Adaptation Measures in Maldives Integration of Climate Change Risks into Resilient Island Planning in the Maldives Project January 2011 Prepared by Dr. Ahmed Shaig Ministry of Housing and Environment and United Nations Development Programme Survey of Climate Change Adaptation Measures in Maldives Integration of Climate Change Risks into Resilient Island Planning in the Maldives Project Draft Final Report Prepared by Dr Ahmed Shaig Prepared for Ministry of Housing and Environment January 2011 Table of Contents 1 INTRODUCTION 1 2 COASTAL ADAPTATION CONCEPTS 2 3 METHODOLOGY 3 3.1 Assessment Framework 3 3.1.1 Identifying potential survey islands 3 3.1.2 Designing Survey Instruments 8 3.1.3 Pre-testing the survey instruments 8 3.1.4 Implementing the survey 9 3.1.5 Analyzing survey results 9 3.1.6 Preparing a draft report and compendium with illustrations of examples of ‘soft’ measures 9 4 ADAPTATION MEASURES – HARD ENGINEERING SOLUTIONS 10 4.1 Introduction 10 4.2 Historical Perspective 10 4.3 Types of Hard Engineering Adaptation Measures 11 4.3.1 Erosion Mitigation Measures 14 4.3.2 Island Access Infrastructure 35 4.3.3 Rainfall Flooding Mitigation Measures 37 4.3.4 Measures to reduce land shortage and coastal flooding 39 4.4 Perception towards hard engineering Solutions 39 4.4.1 Resort Islands 39 4.4.2 Inhabited Islands 40 5 ADAPTATION MEASURES – SOFT ENGINEERING SOLUTIONS 41 5.1 Introduction 41 5.2 Historical Perspective 41 5.3 Types of Soft Engineering Adaptation Measures 42 5.3.1 Beach Replenishment 42 5.3.2 Temporary
    [Show full text]
  • List of MOE Approved Non-Profit Public Schools in the Maldives
    List of MOE approved non-profit public schools in the Maldives GS no Zone Atoll Island School Official Email GS78 North HA Kelaa Madhrasathul Sheikh Ibrahim - GS78 [email protected] GS39 North HA Utheem MadhrasathulGaazee Bandaarain Shaheed School Ali - GS39 [email protected] GS87 North HA Thakandhoo Thakurufuanu School - GS87 [email protected] GS85 North HA Filladhoo Madharusathul Sabaah - GS85 [email protected] GS08 North HA Dhidhdhoo Ha. Atoll Education Centre - GS08 [email protected] GS19 North HA Hoarafushi Ha. Atoll school - GS19 [email protected] GS79 North HA Ihavandhoo Ihavandhoo School - GS79 [email protected] GS76 North HA Baarah Baarashu School - GS76 [email protected] GS82 North HA Maarandhoo Maarandhoo School - GS82 [email protected] GS81 North HA Vashafaru Vasahfaru School - GS81 [email protected] GS84 North HA Molhadhoo Molhadhoo School - GS84 [email protected] GS83 North HA Muraidhoo Muraidhoo School - GS83 [email protected] GS86 North HA Thurakunu Thuraakunu School - GS86 [email protected] GS80 North HA Uligam Uligamu School - GS80 [email protected] GS72 North HDH Kulhudhuffushi Afeefudin School - GS72 [email protected] GS53 North HDH Kulhudhuffushi Jalaaludin school - GS53 [email protected] GS02 North HDH Kulhudhuffushi Hdh.Atoll Education Centre - GS02 [email protected] GS20 North HDH Vaikaradhoo Hdh.Atoll School - GS20 [email protected] GS60 North HDH Hanimaadhoo Hanimaadhoo School - GS60
    [Show full text]
  • Maldives Four Years After the Tsunami
    Maldives - 4 Years after the tsunami Progress and remaining gaps Department of National Planning Ministry of Finance and Treasury Republic of Maldives July 2009 2 Executive Summary | Ministry of Finance and Treasury - Department of National Planning Executive Summary In the four years since the tsunami, much has been accomplished to provide its survivors first with basic needs and then with the resources to restart their lives. Most of the physical infrastructure will be finished in 2009 and tsunami resources have enabled notable improvements in health and education. The challenging housing sector was brought under control and most of the remaining work will be completed in the year as well. Large-scale disruptions to livelihoods and the economy were mitigated. Lasting improvements made in disaster risk reduction policies, institutions and systems will increase resilience to future crises. Although the speed and scope of recovery in the Maldives has been impressive, a number of problems caused or worsened by the tsunami have not yet been resolved and remain priorities for government and its partners: The vital needs of water and sanitation and reconstruction of remaining infrastructure for harbours and jetties remain unfinished priorities highlighted in the analysis. Additionally, the relocation of entire island populations is clearly a complex undertaking. Completing the last of the housing and resettling remaining displaced persons (IDPs) will require attention to such details as livelihoods and social arrangements on the islands. It is inevitable that some of these processes will lag into 2010 while currently unfunded sanitation and harbour infrastructure projects will need to extend even further into the future.
    [Show full text]
  • Republic of Maldives: Preparing Outer Islands for Sustainable Energy Development
    Initial Environmental Examination August 2014 Republic of Maldives: Preparing Outer Islands for Sustainable Energy Development Prepared by the Ministry of Environment and Energy, Government of Maldives for the Asian Development Bank This Initial Environmental Examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CURRENCY EQUIVALENTS (as of 31 March 2013) Currency Unit = Maldivian Ruffiyaa (MVR) MVR1.00 = US$ 0.065 US$1.00 = MVR 15.410 LIST OF ABBREVIATIONS ADB - Asian Development Bank CFC - Chlorofluorocarbons DG - Diesel Generator EA - Executing Agency EIA - Environmental Impact Assessment EPA - Environmental Protection Agency EMP - Environmental Management Plan EPC - Engineering, Procurement and Construction FENAKA - Fenaka Corporation Limited GoM - Government of Maldives GDP - Gross Domestic Product GFP - Grievance Focal Points GHG - Green House Gases GRC - Grievance Redress Committee GFP - Grievance Focal Point IA - Implementing Agency IEE - Initial Environmental Examination IUCN - International Union for Conservation of Nature MEE - Ministry of Environment and Energy MOF - Ministry of Finance PCBs - polychlorinated biphenyl PMC - Project Management Consultant PPTA - Project Preparatory Technical Assistance PV - photovoltaic REA - Rapid Environmental Assessment SPS - Safeguard Policy Statement TA - Technical Assistance WHO - World Health Organization NOTES (i) The fiscal year (FY) of the Government of Madives ends on 31 December.
    [Show full text]
  • Result Website.Pdf
    ` 2 ުރަބްނަނ ުޓޭޑިޑްނެކ 1 ުރަބްނަނ ުޓޭޑިޑްނެކ ުރަބްނަނ ުޓޭޑިޑްނެކ ޢަބްދުﷲ ޔާމީން ޢަބްދުލްޤައްޔޫމް އިބްރާޙީމް މުޙައްމަދު ޞާލިޙް، ްސެރްޑެއ ިއާމަނ ެގުޓޭޑިޑްނެކ މއ. ކާމިނީހުޅަގުގެ، މާލެ ނޫރާނީއާގެ، ޅ. ހިންނަވަ ު ރ ުތަޔްއިޘިއަޙ ީޕ.ީޑ.ްމެއ ްމެއ.ީޕ.ީޕ 134705 96052 ުޓޯވ ުނުބިލ 58.4 41.6 ަތްއަސްނިއ 230757 :ުޓޯވ ަޙްއަޞ 3132 : ުޓޯވ ްލިޠާބ 233889 :ުޓޯވ ަލްމުޖ 262135 : ުދަދަޢ ެގްނުހީމ ާވްނެގިބިލ ުޤްއަޙ ެގުމުނިދ ުޓޯވ F M Box Solih Valid Total Voted Invalid Eligible Box Box No Gayoom Mohamed 1 - Abdulla 1 - Abdulla 2 - Ibrahim Yameen Abdul A01.0.1 Ha. Atoll, Male' - 1 458 497 955 22 977 471 506 977 1028 A01.01.1 Ha. Thuraakunu - 1 159 103 262 0 262 127 135 262 322 A01.02.1 Ha. Uligamu - 1 115 114 229 4 233 114 119 233 283 A01.04.1 Ha. Hoarafush - 1 194 203 397 7 404 181 223 404 456 A01.04.2 Ha. Hoarafushi - 2 178 208 386 6 392 185 207 392 451 A01.04.3 Ha. Hoarafushi - 3 168 159 327 2 329 167 162 329 383 A02.0.1 Ha. Atoll, Male' - 2 205 345 550 6 556 302 254 556 577 A02.03.1 Ha. Molhadhoo - 1 56 107 163 1 164 72 92 164 188 A02.05.1 Ha. Ihavandhoo - 1 376 433 809 9 818 373 445 818 855 A02.05.2 Ha. Ihavandhoo - 2 240 538 778 6 784 381 403 784 854 A02.10.1 Ha. Maarandhoo - 1 152 207 359 11 370 158 212 370 412 A03.0.1 Ha. Atoll, Male' - 3 359 524 883 11 894 460 434 894 927 A03.11.1 Ha.
    [Show full text]
  • Study on Post-Tsunami Restoration and Conservation Projects in the Maldives
    Study on Post-Tsunami Restoration and Conservation Projects in the Maldives Ecosystems and Livelihoods Group, Asia Study on Post-Tsunami Restoration and Conservation Projects in the Maldives Marie Saleem and Shahaama A. Sattar February 2009. Cover photo: Thaa Vilufushi after reclamation © Hissan Hassan Table of Contents 1 Introduction ................................................................................................... 3 2 Summary of post-tsunami restoration and conservation initiatives ............... 7 3 ARC/CRC Waste Management Programme .............................................. 11 3.1 Background ......................................................................................... 11 3.2 Summaries of outcomes in the Atolls .................................................. 12 3.2.1 Ari Atoll ......................................................................................... 13 3.2.2 Baa Atoll ....................................................................................... 13 3.2.3 Dhaalu Atoll .................................................................................. 13 3.2.4 Gaaf Alifu and Gaaf Dhaalu Atolls ................................................ 14 3.2.5 Haa Alifu Atoll............................................................................... 14 3.2.6 Haa Dhaalu Atoll .......................................................................... 15 3.2.7 Kaafu and Vaavu Atolls ................................................................ 15 3.2.8 Laamu Atoll .................................................................................
    [Show full text]
  • Maldives Human Development Report 2014
    Empowered lives. Resilient nations. Maldives Human Development Report 2014 Bridging The Divide : Addressing Vulnerability, Reducing Inequality Maldives Human Development Report 2014 Bridging The Divide : Addressing Vulnerability, Reducing Inequality Copyright © 2014 By the Ministry of Finance and Treasury and the United Nations Development Programme in the Maldives All rights reserved. The document or extracts from this publication may, however, be freely reviewed, quoted, reproduced or translated, in part or in full, provided the source is given due acknowledgement. The views expressed in this publication are those of the author(s) and do not necessarily represent those of the United Nations, including UNDP, or their Member States. Published by: The Ministry of Finance and Treasury and the United Nations Development Programme in the Maldives Cover and Layout design by: Hussain Furushaan and Hassan Eeman / Bihura Studio First published in June 2014 4 | ACKNOWLEDGEMENTS NATIONAL RESEARCH & PEER REVIEWER WRITING TEAM Professor A.K. Shiva Kumar Aishath Raniya Sobir, Lead Author, Blanco Private Limited Fathmath Shiuna, EDITOR Blanco Private Limited Lamya Ibrahim, Nandini Oberoi Blanco Private Limited Shirana Shafeeq, Blanco Private Limited PROJECT TEAM Athifa Ibrahim, NATIONAL STEERING Head of Policy and Inclusive Growth, UNDP Mohamed Naahee Naseem, COMMIttee Communications and Advocacy Associate, UNDP Ali Shareef, Abdul Haleem Abdul Ghafoor, Project Assistant, UNDP Deputy Minister, Ministry of Finance and Treasury Ahmed Naeem, (Chairperson)
    [Show full text]
  • Maldives' Population Dynamics
    Maldives’ Population Dynamics: Policy Prospects for Human Growth and Opportunity John F. May, Ph.D. Copyright, UNFPA 2016 ISBN Maldives’ Population Dynamics: Policy Prospects for Human Growth and Opportunity John F. May, Ph.D. The views and opinions expressed in this report are those of the author and do not reflect the official policy or position of the National Bureau of Statistics, or the United Nations Population Fund. Assumptions made within the analysis are not reflective of the position of the Government of Maldives or any agency of the United Nations. Foreword As an island nation the Maldives faces unique challenges in the years ahead, from social and economic ones to mitigating the effects of climate change. But it also stands at the cusp of greater economic growth and development. The 2014 Population and Housing Census provided a helpful snapshot of Maldivian society and in particular the dynamic make-up of the Maldives population which will help drive the agenda needed for developing future policies to further long-term development planning. The census highlighted the important challenge the Maldives faces in terms of building opportunities for young people, improving reproductive health outcomes, improving gender equality and addressing migration issues. It also examined the potential for the Maldives to capture the country’s first demographic dividend, seizing the possibilities of economic growth which could result, if the country’s younger generation are provided with further higher education opportunities needed to get secure good jobs and better income. The Maldives has proven to be a resilient nation, and has come a long way in its economic and social development, but more can be done to seize the economic opportunities the country could benefit from in the years ahead.
    [Show full text]
  • Low Emission Climate Resilient Development Programme
    Low Emission Climate Resilient Development Final Programme Report FINAL PROGRAMME NARRATIVE AND FINANCIAL REPORT REPORTING PERIOD: 8 NOVEMBER 2013 – 31 NOVEMBER 2018 Country, Locality(s), Priority Area(s) / Strategic Programme Title & Project Number Results Programme Title: Low Emission Climate Resilient Laamu Atoll, Maldives Development (LECReD) Priority area / strategic results: UNDAF Programme Number: 00088009 & MV102 Outcome 9: “Enhanced capacities at national and MPTF Office Project Reference Number: 00088009 local levels to support low carbon lifestyles, climate change adaptation and risk reduction” Participating Organization(s) Implementing Partners UNDP National counterparts (government, private, NGOs & UNFPA others) UNICEF UNOPS UN Women WHO FAO Programme/Project Cost (US$) Programme Duration Total approved budget as per project document: $9.2 million Overall Duration 59 months MPTF /JP Contribution: 6,273,835 UNDP Start Date: 08 Nov 2013 UNOPS 1,254,163 Original End Date: 11 Nov 2016 UNICEF 340,750 WHO 621,468 UNFPA 330,009 Current End date: 31 Nov 2018 211,861 (agreed extended date) UN Women FAO 184,575 TOTAL: US$ 9.2 million Programme Assessment/Review/Midterm Eval. Report Submitted By Assessment/Review - attached Name: Yuko Oaku Yes No Date: 29.02.2016 Title: Coordination Specialist Mid-Term Evaluation Report – attached Participating Organization (Lead): United Nations Yes No Date: 29.02.2016 Email address: [email protected] Page 2 of 58 ABBREVIATIONS AND ACRONYMS AA Administrative Agent CCA Climate Change Adaptation
    [Show full text]
  • Application Document
    Application Document for Prequalification of Engineering, Procurement and Construction (EPC) Contractors for Reclamation by Dredging and Shore Protection works for about 228Ha of Land in Addu City financed under Line of Credit extended by Export-Import Bank of India on behalf of Government of India under IDEAS Export-Import Bank of India Issued on: September 04, 2020 INVITATION FOR PREQUALIFICATION OF EPC CONTRACTORS FOR GOVERNMENT OF INDIA LINE OF CREDIT (LOC) PROJECT The Export-Import Bank of India [hereafter Exim Bank, or the Bank], on behalf of the Government of India (GOI), extends from time-to-time, concessional credit facilities under the Indian Development and Economic Assistance Scheme (IDEAS) to overseas governments / their nominated agencies in developing countries for financing projects involving procurement of goods, civil works, consultancy and non-consultancy services to be contracted to Indian entities. These Lines of Credit (LOCs) are governed by the Guidelines issued by the GOI from time-to- time. As per the extant guidelines issued vide letter No. 21/3/2015-IDEAS dated December 7, 2015, the Bank is required to carry out a prequalification exercise and provide a list of prequalified bidders to the Borrower for invitation of bids for specific contract packages under the project(s) financed by the LOCs. In pursuance to the above, the Bank invites Applications from eligible Indian entities for prequalification of Engineering, Procurement and Construction (EPC) Contractors for Reclamation of about 228Ha of Land in Addu City, Maldives under a Line of Credit extended to the Government of the Republic of Maldives. An upfront and non-refundable Processing Fee of INR 25,000 plus applicable GST (presently 18%) is payable through NEFT transfer as per details given below: [i] Applicant’s Name <Applicant’s Name> [ii] Name of Beneficiary Export-Import Bank of India [iii] Beneficiary’s Bank Name Export-Import Bank of India [iv] Account No.
    [Show full text]